HomeMy WebLinkAbout2021-05-19; Planning Commission; Resolution 7415PLANNING COMMISSION RESOLUTION NO. 7415
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
CARLSBAD, CALIFORNIA, APPROVING OF A COASTAL DEVELOPMENT
PERMIT TO ALLOW FOR THE DEMOLITION OF AN EXISTING RESIDENCE
AND THE CONSTRUCTION OF A NEW 4,085 SQUARE FOOT SINGLE FAMILY
RESIDENCE WITHIN THE MELLO II SEGMENT OF THE CITY'S LOCAL
COASTAL PROGRAM LOCATED AT 4464 ADAMS STREET WITHIN LOCAL
FACILITIES MANAGEMENT ZONE 1.
CASE NAME: FORESTER RESIDENCE
CASE NO: CDP 2020-0018
WHEREAS, Sam Wright, "Developer," has filed a verified application with the City of Carlsbad
regarding property owned by John Forester, "Owner," described as
Lot 13 of Bellavista, in the City of Carlsbad, County of San Diego
California, state of California, according to map thereof no. 2152, filed
in the office of the County Recorder of San Diego County March 3, 1929
("the Property"); and
WHEREAS, said verified application constitutes a request for a Coastal Development Permit as
shown on Exhibit(s) "A" -"L" dated May 19, 2021, attached hereto and on file in the Carlsbad Planning
Division, "CDP 2020-0018 -FORESTER RESIDENCE," as provided in Chapter 21.201.030 of the Carlsbad
Municipal Code; and
WHEREAS, the Planning Commission did, on May 19, 2021, hold a duly noticed public hearing as
prescribed by law to consider said request;
WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if
any, of all persons desiring to be heard, said Commission considered all factors relating to the Coastal
Development Permit.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad,
as follows:
A) That the above recitations are true and correct.
B) That based on the evidence presented at the public hearing, the Commission APPROVES
"CDP 2020-0018 -FORESTER RESIDENCE," based on the following findings and subject to
the following conditions:
Findings:
1. That the proposed development is in conformance with the Certified Local Coastal Program and
all applicable policies in that the site is designated for single-family residential development, and
the project proposes demolition of an existing single-family residence and construction of a new
4,085-square foot single-story single-family residence. The development is consistent with the
LCP Mello II R-4 land use designation. No agricultural activities, sensitive resources, geological
instability, flood hazard or coastal access opportunities exist onsite. Given that the project is
located in a residential neighborhood where the majority of dwellings are one-and two-stories,
the construction of a new one-story single-family residence will not obstruct views of the
coastline as seen from public lands or public right-of-way, nor otherwise damage the visual
beauty of the Coastal Zone.
2. The proposal is in conformity with the public access and recreation policies of Chapter 3 of the
Coastal Act in that the property is not located adjacent to the coastal shore; therefore, it will
not interfere with the public's right to physical access or water-oriented recreational activities.
3. The project is consistent with the provisions of the Coastal Resource Protection Overlay Zone
(Chapter 21.203 of the Zoning Ordinance) in that the project will adhere to the city's Master
Drainage Plan, Grading Ordinance, Storm Water Ordinance, BMP Design Manual and
Jurisdictional Runoff Management Program (JRMP) to avoid increased urban runoff, pollutants,
and soil erosion. No steep slopes or native vegetation is located on the subject property and
the site is not located in an area prone to landslides, or susceptible to accelerated erosion,
floods, or liquefaction.
4. The Planning Commission finds that the project, as conditioned herein, is in conformance with the
Elements of the city's General Plan, in that the General Plan Land Use designation for the
property is R-4 Residential which allows for the development of single-family and multiple-
family residences at a density of 0-4 dwelling units per acre (du/ac). The project's density (1.73
du/ac) does not exceed the range of the R-4 General Plan Land Use designation. Therefore, the
proposed new single-family residence is consistent with the city's General Plan.
5. That the project is consistent with the city's Landscape Manual and Water Efficient Landscape
Ordinance (Carlsbad Municipal Code Chapter 18.50).
6. That the City Planner has determined that the project belongs to a class of projects that the State
Secretary for Resources has found do not have a significant impact on the environment, and it is
therefore categorically exempt from the requirement for the preparation of environmental
documents pursuant to Section 15303(a), construction of a single-family residence, of the state
CEQA Guidelines. In making this determination, the City Planner has found that the exceptions
listed in Section 15300.2 of the state CEQA Guidelines do not apply to this project.
7. The Planning Commission has reviewed each of the exactions imposed on the Developer
contained in this resolution, and hereby finds, in this case, that the exactions are imposed to
mitigate impacts caused by or reasonably related to the project, and the extent and the degree
of the exaction is in rot,Jgh proportionality to the impact caused by the project.
Conditions:
General
PC RESO NO. 7415 -2-
NOTE: Unless otherwise specified herein, all conditions shall be satisfied prior to the issuance of grading
or building permits, whichever occurs first.
1. Approval is granted for CDP 2020-0018 as shown on Exhibits "A" -"L", dated May 19, 2021, on
file in the Planning Division and incorporated herein by reference. Development shall occur
substantially as shown unless otherwise noted in these conditions.
2. If any of the following conditions fail to occur, or if they are, by their terms, to be implemented
and maintained over time, if any of such conditions fail to be so implemented and maintained
according to their terms, the city shall have the right to revoke or modify all approvals herein
granted; deny or further condition issuance of all future building permits; deny, revoke, or further
condition all certificates of occupancy issued under the authority of approvals herein granted;
record a notice of violation on the property title; institute and prosecute litigation to compel their
compliance with said conditions or seek damages for their violation. No vested rights are gained
by Developer or a successor in interest by the city-'s approval of this Coastal Development Permit.
3. Staff is authorized and directed to make, or require the Developer to make, all corrections and
modifications to the Coastal Development Permit documents, as necessary to make them
internally consistent and in conformity with the final action on the project. Development shall
occur substantially as shown on the approved Exhibits. Any proposed development, different
from this approval, shall require an amendment to this approval.
4. Developer shall comply with all applicable provisions of federal, state, and local laws and
regulations in effect at the time of building permit issuance.
5. If any condition for construction of any public improvements or facilities, or the payment of any
fees in-lieu thereof, imposed by this approval or imposed by law on this Project are challenged,
this approval shall be suspended as provided in Government Code Section 66020. If any such
condition is determined to be invalid, this approval shall be invalid unless the City Council
determines that the project without the condition complies with all requirements of law.
6. Developer/Operator shall and does hereby agree to indemnify, protect, defend, and hold
harmless the City of Carlsbad, its Council members, officers, employees, agents, and
representatives, from and against any and all liabilities, losses, damages, demands, claims and
costs, including court costs and attorney's fees incurred by the city arising, directly or indirectly,
from (a) city's approval and issuance of this Coastal Development Permit, (b) city's approval or
issuance of any permit or action, whether discretionary or nondiscretionary, in connection with
the use contemplated herein, and (c) Developer/Operator's installation and operation of the
facility permitted hereby, including without limitation, any and all liabilities arising from the
emission by the facility of electromagnetic fields or other energy waves or emissions. This
obligation survives until all legal proceedings have been concluded and continues even if the city's
approval is not validated.
7. Prior to the issuance of a building permit, the Developer shall provide proof to the Building
Division from the Carlsbad Unified School District that this project has satisfied its obligation to
provide school facilities.
8. This approval shall become null and void if building permits are not issued for this project within
24 months from the date of project approval.
PC RESO NO. 7415 -3-
9. Prior to the issuance of the grading or building permit, whichever occurs first, Developer shall
submit to the city a Notice of Restriction executed by the owner of the real property to be
developed. Said notice is to be filed in the office of the County Recorder, subject to the satisfaction
of the City Planner, notifying all interested parties and successors in interest that the City of
Carlsbad has issued a(n) Coastal Development Permit by Resolution(s) No. 7415 on the property.
Said Notice of Restriction shall note the property description, location of the file containing
complete project details and all conditions of approval as well as any conditions or restrictions
specified for inclusion in the Notice of Restriction. The City Planner has the authority to execute
and record an amendment to the notice which modifies or terminates said notice upon a showing
of good cause by the Developer or successor in interest.
10. Developer shall submit and obtain City Planner approval of a Final Landscape and Irrigation Plan
showing conformance with the approved Preliminary Landscape Plan and the city's Landscape
Manual. Developer shall construct and install all landscaping and irrigation as shown on the
approved Final Plans. All landscaping shall be maintained in a healthy and thriving condition, free
from weeds, trash, and debris. All irrigation systems shall be maintained to provide the optimum
amount of water to the landscape for plant growth without causing soil erosion and runoff.
11. The first submittal of Final Landscape and Irrigation Plans shall be pursuant to the landscape plan
check process on file in the Planning Division and accompanied by the project's building,
improvement, and grading plans.
12. Building permits will not be issued for this project unless the local agency providing water and
sewer services to the project provides written certification to the city that adequate water service
and sewer facilities, respectively, are available to the project at the time of the application for the
building permit, and that water and sewer capacity and facilities will continue to be available until
the time of occupancy.
Engineering Conditions:
General
13. Prior to hauling dirt or construction materials to or from any proposed construction site within
this project, developer shall apply for and obtain approval from, the city engineer for the
proposed haul route.
Fees/ Agreements
14. Developer shall cause property owner to execute and submit to the city engineer for recordation,
the city's standard form Geologic Failure Hold Harmless Agreement.
15. Developer shall cause property owner to execute and submit to the city engineer for recordation
the city's standard form Drainage Hold Harmless Agreement.
16. Developer shall cause property owner to submit an executed copy to the city engineer for
recordation a city standard Permanent Stormwater Quality Best Management Practice
Maintenance Agreement.
17. Property owner shall enter into a lien contract with the city for the future public improvement
along the property frontage at Adams Street. Public improvements shall be curb and gutter as
shown on the Adams Street Alignment Study Drawing Number 331-5.
PC RESO NO. 7415 -4-
18. Developer shall cause property owner to enter into a Neighborhood improvement Agreement
with the city on a city standard form for the future public improvement of Highland Avenue along
the property frontage for a half street width of 30-feet. Public improvements shall be paving,
base, sidewalks, and curbs and gutters. Improvements shall not include grading, retaining walls,
and utility relocation.
Grading
19. Based upon a review of the proposed grading and the grading quantities shown on the site plan,
a grading permit for this project is required. Developer shall prepare and submit plans and
technical studies/reports as required by city engineer, post security and pay all applicable grading
plan review and permit fees per the city's latest fee schedule.
Storm Water Quality
20. Developer shall _comply with the city's Stormwater Regulations, latest version, and shall
implement best management practices at all times. Best management practices include but are
not limited to pollution control practices or devices, erosion control to prevent silt runoff during
construction, general housekeeping practices, pollution prevention and educational practices,
maintenance procedures, and other management practices or devices to prevent or reduce the
discharge of pollutants to stormwater, receiving water or stormwater conveyance system to the
maximum extent practicable. Developer shall notify prospective owners and tenants of the above
requirements.
21. Developer shall complete and submit to the city engineer a Determination of Project's SWPPP Tier
Level and Construction Threat Level Form pursuant to City Engineering Standards. Developer shall
also submit the appropriate Tier level Storm Water Compliance form and appropriate Tier level
Storm Water Pollution Prevention Plan {SWPPP) to the satisfaction of the city engineer. Developer
shall pay all applicable SWPPP plan review and inspection fees per the city's latest fee schedule.
22. This project is subject to 'Priority Development Project' requirements. Developer shall prepare
and process a Storm Water Quality Management Plan {SWQMP), subject to city engineer
approval, to comply with the Carlsbad BMP Design Manual latest version. The final SWQMP
required by this condition shall be reviewed and approved by the city engineer with final grading
plans. Developer shall pay all applicable SWQMP plan review and inspectionfees per the city's
latest fee schedule.
23. Developer is responsible to ensure that all final design plans (grading plans, improvement plans,
landscape plans, building plans, etc) incorporate all source control, site design, pollutant control
BMP and applicable hydromodification measures.
Dedication/Improvements
24. Developer shall design the private drainage systems, as shown on the site plan to the satisfaction
of the city engineer. All private drainage systems (12" diameter storm drain and larger) shall be
inspected by the city. Developer shall pay the standard improvement plan check and inspection
fees for private drainage systems.
25. Prior to any work in city right-of-way or public easements, Developer shall apply for and obtain a
right-of-way permit to the satisfaction of the city engineer.
PC RESO NO. 7415 -5-
26. Developer shall cause owner to dedicate to the city and/or other appropriate entities an
easement for public street & public utility purposes as shown on the site plan. The offer shall be
made by a separate recorded document. All land so offered shall be free and clear of all liens and
encumbrances and without cost to the city. Streets that are already public are not required to be
rededicated. Additional easements may be required at final design to the satisfaction of the city
engineer.
27 . Developer shall design all proposed public improvements including but not limited to curb and
gutter, asphalt concrete paving and base, and curb drains as shown on the site plan. These
improvements shall be shown on grading plans processed in conjunction with this project, subject
to city engineer approval. Developer shall pay plan check and inspection fees using improvement
valuations in accordance with the city's current fee schedule. Developer shall execute a city
standard Development Improvement Agreement to install said improvements and shall post
security in accordance with C.M.C. Section 18.40.060. Developer shall apply for and obtain a right-
of-way permit prior to performing work in the city right-of-way.
Code Reminders:
28. Approval of this request shall not excuse compliance with all applicable sections of the Zoning
Ordinance and all other applicable city ordinances in effect at time of building permit issuance,
except as otherwise specifically provided herein.
29. Prior to the issuance of a building permit, Developer shall pay the Local Facilities Management
fee for Zone 1 as required by Carlsbad Municipal Code Section 21.90.050.
30. Developer shall pay planned local area drainage fees in accordance with. Section 15.08.020 of the
City of Carlsbad Municipal Code to the satisfaction of the city engineer.
31. Approval of this request shall not excuse compliance with all applicable sections of the Zoning
Ordinance and all other applicable City ordinances in effect at time of building permit issuance,
except as otherwise specifically provided herein.
32. Premise identification (addresses) shall be provided consistent with Carlsbad Municipal Code
Section 17.04.060.
33. Developer acknowledges that the project is required to comply with the city's greenhouse gas
(GHG) reduction ordinances and requirements. GHG reduction requirements are in accordance
with, but are not limited to, Carlsbad Municipal Code Chapters 18.21, 18.30, and 18.51 in addition
to the California Green Building Standards Code (CCR, Title 24, Part 11-CALGreen), as amended
from time to time. GHG reduction requirements may be different than what is proposed on the
project plans or in the Climate Action Plan Checklist originally submitted with this project.
Developer acknowledges that new GHG reduction requirements related to energy efficiency,
photovoltaic, electric vehicle charging, water heating and traffic demand management
requirements as set forth in the ordinances and codes may impact, but are not limited to, site
design and local building code requirements. If incorporating GHG reduction requirements results
in substantial modifications to the project, then prior to issuance of development (grading,
building, etc.) permits, Developer may be required to submit and receive approval of a
Consistency Determination or Amendment for this project through the Planning Division.
Compliance with the applicable GHG reduction requirements must be demonstrated on or with
the construction plans prior to issuance of the applicable development permits.
PC RESO NO. 7415 -6-
NOTICE TO APPLICANT
An appeal of this decision to the City Council must be filed with the City Clerk at 1200 Carlsbad Village
Drive, Carlsbad, California, 92008, within ten (10) calendar days of the date of the Planning Commission's
decision. Pursuant to Carlsbad Municipal Code Chapter 21.54, section 21.54.150, the appeal must be in
writing and state the reason(s) for the appeal. The City Council must make a determination on the appeal
prior to any judicial review.
PC RESO NO. 7415 -7-
NOTICE
Please take NOTICE that approval of your project includes the "imposition" of fees, dedications,
reservations, or other exactions hereafter collectively referred to for convenience as "fees/exactions."
You have 90 days from date of final approval to protest imposition of these fees/exactions. If you protest
them, you must follow the protest procedure set forth in Government Code Section 66020{a}, and file the
protest and any other required information with the City Manager for processing in accordance with
Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent
legal action to attack, review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT
APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading, or other
similar application processing or service fees in connection with this project; NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute
of limitations has previously otherwise expired.
PASSED, APPROVED, AND ADOPTED at a regular meeting of the Planning Commission of the City
of Carlsbad, California, held on May 19, 2021, by the following vote, to wit:
AYES: Commissioners Kamenjarin, Lafferty, Luna, Meenes, Merz, Sabellico, and Stine
NOES:
ABSENT:
ABSTAIN:
ROY MEENES, Chair
CARLSBAD PLANNING COMMISSION
ATTEST:
DON NEU
City Planner
PC RESO NO. 7415 -8-