Loading...
HomeMy WebLinkAbout1293 SHOREBIRD LN; ; CB981322; PermitCity of Carlsbad 02/02/1999 Building Permit Permit No:CB981322 Building Inspection Request Line (760) 438-3101 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 1293 SHOREBIRD LN CBAD SFD Sub Type: 2157800900 Lot#: $272,642.00 Construction Type: Reference #: 3150 SF+604 GAR+62 SF PORCH 61 VN CT90-31 PLAN 1,PHASE 3,BELLA LAGO-BROOKFIELD Applicant: BROOKFIELD HOMES 12865 POINR DEL MAR DEL MAR CA 92014 619 481-8500 Total Fees: Description Status: Applied: Entered By: Appr/lssued: Inspect Area: ISSUED 04/21/1998 RMA 05/08/1998 PS . '~-e-ce Due: ::. ·p $28.70 • C •" " " . Fee ----------------------------------------------------.. --~-- * ELECTRICAL TOTAL * MECHANICAL TOTAL * PLUMBING TOTAL BLDG PLAN CHECK BUILDING PMTS Enter Additional Reclai~• MISC BLDG PMTS PUBLIC FACILITIE R 1 TIME SP TX STRNG MOTION TRAFFIC IMPACT Inspector: : A j ' \ , \"" 11 l ,1,, FINAL APPROVAL Date: (,. ·· j_3 -'19 Clearance: 60.00 91. 50 203.00 735.28 1,226.58 2,400.00 30.00 4,962.08 4,698.83 27.26 550.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your rkJht to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or seNice fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which vou have oreviousl" been niven a NOTICE similar to this or as to which the statute of limitations has nreviouslv otherwise exnired. CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 ~8,,70 City of Carlsbad Inspection Request For: 6/18/99 Permit# CB981322 Inspector Assignment: PS --- Title: 3150 SF+604 GAR+62 SF PORCH Description: PLAN 1,PHASE 3,BELLA LAGO-BROOKFIELD Type:SFD Sub Type: Job Address: Suite: Location: 1293 SHOREBIRD LN Lot APPLICANT BROOKFIELD HOMES Phone: 7604381915 61 Inspector: 5 ~ Owner: BROOKFIELD CARLSBAD INC Remarks: Total Time: CD Description 19 29 39 49 Final Structural Final Plumbing Final Electrical Final Mechanical Act Comments Requested By: BOB Entered By: CHRISTINE .A£ ______ _ _M_ _______ _ _M_ _______ _ .Jr£_ ______ _ Inspection History Date Description Act lnsp Comments 5/19/99 39 Final Electrical co PS OK TO RELEASE ELEC 3/10/99 82 Drywall/Ext Lath/Gas Test NS PS 3/9/99 82 Drywall/Ext Lath/Gas Test AP DH 3/3/99 16 Insulation AP DH 3/1/99 84 Rough Combo AP DH AP ON 2/26 3/1/99 84 Rough Combo AP DH 2/26/99 84 Rough Combo AP PS 2/24/99 84 Rough Combo NS PS 2/5/99 13 Shear Panels/HD's AP PS 2/4/99 13 Shear Panels/HD's CA PS BY ED-RAIN 2/2/99 13 Shear Panels/HD's co PS RE-INSP FEE DUE SEE NOTICE ATTACHED 1/5/99 · 15 Roof/Reroof AP RB 1/4/99 15 Roof/Reroof CA RB 11/6/98 11 Ftg/Foundation/Piers WC PD 11/6/98 11 Ftg/Foundatlon/Piers AP PD GARAGE 11/3/98 81 Underground Combo AP PS 11/2/98 81 Underground Combo NR PS 10/27/98 21 Underground/Under Floor AP PS City of Carlsbad Inspection Request For: 5/19/99 Permit# CB981322 Tille: 3150 SF+604 GAR+62 SF PORCH Description: PLAN 1,PHASE 3,BELLA LAGO-BROOKFIELD Type:SFD Sub Type: Job Address: 1293 SHOREBIRD LN Suite: Lot 61 Location: 6-PPLICANT : BROOKFIELD HOMES Owner: BROOKFIELD CARLSBAD INC Remarks: EMR Total Time: CD Description Act Comments 39 Final Electrical .@ [)[( Inspection History Date Description Act lnsp Comments 3/10/99 82 Drywall/Ext Lath/Gas Test NS PS 3/9/99 82 Drywall/Ext Lath/Gas Test AP DH 3/3/99 16 Insulation AP DH 3/1/99 84 Rough Combo AP DH AP ON 2/26 3/1/99 84 Rough Combo AP DH 2/26/99 84 Rough Combo AP PS 2/24/99 84 Rough Combo NS PS 2/5/99 13 Shear Panels/HD's AP PS 2/4/99 13 Shear Panels/HO'S CA PS BY ED· RAIN Inspector Assignment: PS ---- Phone: lnspector: 1 ~ -b Requested By: BOB Entered By: CHRISTINE 2/2/99 13 Shear Panels/HO'S co PS RE-INSP FEE DUE SEE NOTICE ATTACHED 1/5/99 15 Roof/Reroof AP RB 1/4/99 15 Roof/Reroof CA RB 11/6/98 11 Ftg/Foundation/Piers WC PD 11/6/98 11 Ftg/Foundation/Piers AP PD GARAGE 11/3/98 81 Underground Combo AP PS 11/2/98 81 Underground Combo NR PS 10/27/98 21 Underground/Under Floor AP PS 10/27/98 22 Sewer/Water Service AP PS 10/26/98 21 Underground/Under Floor co PS 10/26/98 22 Sewer/Water Service co PS 4 City., Carlsbad ~ ·; Final Bulldlnu 1ns11Clion ~-. . . Dept: Bulldin~ Planning Plan Check #: CMWD St Lite Fire Permit#: Project Name: Address: Contact Person: CB981322 3150 SF+604 GAR+62 SF PORCH PLAN 1,PHASE 3,BELLA LAGO-BROOKFIELD 1293 SHOREBIRD LN Phone: Water Dist: Date: Permit Type: Sub Type: Lot: 61 6/15/99 10:27:1 SFD •· ········•• 11 I I 111 I 11111111111I1111111111111111111 8111 llllltltll lltl I I I Ill I II■•••·•••■ 111111 I·······••••••••■■ 111111111111 ---'-"--,..O ........... .,c..;;...H-4,1'::,,,, .. ___ ~=~ected b I l ~ /w'\ Approved ~ Disapproved -- Inspected Date By: __________ Inspected: _____ Approved: ___ Disapproved: __ Inspected Date By: __________ Inspected: _____ Approved: ___ Disapproved: __ 111111 I I I lfl I llt I 11111 II I I Ill I I 111111111111111 t i II I I 11111111111111 1 I I I I 111 11111111 Ill I lllllllllllltlll I I It I lltl•····•• ■■I I Ill I••••·••••••■ ■I I I I l l ••••••·••1 Comments: ______________________________ _ cnv 11 Carlsbad ~ ·; Final Bulldlnu lnspeelion 4 ~ ..... . . Dept: Building Engineering ~MWD Plan Check#: C/ Permit #: CB981322 Project Name: Address: Contact Person: Sewer Dist: 3150 SF+604 GAR+62 SF PORCH PLAN 1,PHASE 3,BELLA LAGO-BROOKFIEL:.D 1293 SHOREBIRD LN Phone: Water Dist: St Lite Fire Date: Permit Type: Sub Type: Lot: 61 6/15/99 10:27:1 SFD •••••••■■I 111 ■■•••••••■II■■■ I ti I 1■■■ 1111■1111111111 I 111111111 ■,■ ■If■ I I II I Ill■ I 11 I 111111 I ■1■■■■■■111 I I II I■■ I I I ■■■■■I■ I■ I 111 I ■II 111 ■Ill■■ II II I I I I I I··•••••■■ Inspected (/Vf? Date (o' I (o $Approved: ✓ Disapproved: __ By: Inspected: Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ 1111 I I 11 I 11 I I••••••■■ II I I 111 I I ■■■Ill I 11111I111111111 111111111 I It 1111 I I·••••••■ ■11 1 11 I I ti tltl■■■■■■■■ 111 I I············•■ ■I I I I ■Ill■■■■ ti■■■■■ I■ 11 ••••••■■I■■ I Comments: _______________________________ _ ~ CIIYOI Carlsbad m Rnal Bulldina Inspection Dept: Building Engineering Planning C~Fire PlanCheck#: ···-·e7 Date: Permit#: Project Name: Address: Contact Person: Sewer Dist: CB981322 3150 SF+604 GAR+62 SF PORCH PLAN 1,PHASE 3,BELLA LAGO-BROOKFIELD 1293 SHOREBIRD LN Phone: Water Dist: Permit Type: Sub Type: Lot: 61 6/15/99 10:27:1 SFD 1111IIIII111111111111111 I I I I I I I I I I ltl l 111111111111111111111111 I Ill 1111111111111111111 I I 111111111111111111II1111111 I 111 1111111 I 11 I 1111 I Il l I 111 I I I I 11111 Ill I ~~:pectet~c Date ~ -\ ~pproved/4-Disapproved: __ Inspected: Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ .......................................................................................................................................................... , Comments: -------------------------------