HomeMy WebLinkAboutSDP 2018-0023; CARLSBAD OAKS NORTH BUSINESS PARK LOT 4; FINAL SOILS REPORT; 2020-04-09Project No. 06442-42-26A April 9, 2020 Badiee Development Inc. Post Office Box 3111 La Jolla, California 92038 Attention: Mr. Scott Merry Subject: FINAL REPORT OF TESTING AND OBSERVATION SERVICES PERFORMED DURING CONSTRUCTION OF SITE IMPROVEMENTS CARLSBAD OAKS NORTH BUSINESS PARK – LOT 4 CARLSBAD, CALIFORNIA References: 1. Final Report of Testing and Observation Services Performed During Site Grading, Carlsbad Oaks North Business Park – Lot 4, Carlsbad, California, prepared by Geocon Incorporated, dated April 1, 2020 (Project No. 06442-42-26A). 2. Precise Grading Plan For: Carlsbad Oaks Lot 4 (Victory Carlsbad Oaks Lot 4), Project No. SDP2018-0023, Drawing No. 498-7A, prepared by Excel Engineering, revised date August 14, 2019. Dear Mr. Merry: In accordance with the request of your site superintendent, we provided compaction testing and observation services during construction of the site improvements within the subject project. We provided our services between June 2019 and March 2020. The scope of our services consisted of performing in-place density tests on a “call out” basis during backfill of plumbing, electric, sewer, storm drain, water (potable and fire service lines), joint trench, and wall backfill. We also performed in-place density tests on sidewalk and pavement subgrade, aggregate base and asphalt concrete. We performed in-place density testing using a nuclear gauge in substantial conformance with ASTM D 6938 for soil and aggregate base, and D 2950 for asphalt concrete. Results of the field tests are summarized in Table I. Results of the in-place density tests indicate soil placed for trench backfill possesses a dry density of at least 90 percent of the laboratory maximum dry density near or slightly above optimum moisture content at the locations tested. Similarly, a relative compaction of at least 95 percent was achieved on GEOCON INCORPORATED GEOTECHNICAL ■ ENVIRONMENTAL ■ 6960 Flanders Drive ■ San Diego, California 92121-297 4 ■ Telephone 858.558.6900 ■ Fax 858.558.6159 Project No. 06442-42-26A - 2 - April 9, 2020 TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. AC 1 03/06/20 N Side of Bldg Pathway 0.0 AC1 145.9 143.7 98 95 AC 2 03/06/20 N Side of Bldg Pathway 0.0 AC1 145.9 141.3 97 95 AC 3 03/06/20 N Side of Bldg Pathway 0.0 AC1 145.9 141.4 97 95 AC 4 03/06/20 N Side of Bldg Pathway 0.0 AC1 145.9 143.1 98 95 AC 5 03/06/20 N Side of Bldg Street 0.0 AC1 145.9 140.1 96 95 AC 6 03/06/20 N Side of Bldg Street 0.0 AC1 145.9 141.9 97 95 AC 7 03/06/20 N Side of Bldg Street 0.0 AC1 145.9 141.5 97 95 AC 8 03/06/20 N Side of Bldg Street 0.0 AC1 145.9 143.1 98 95 AC 9 03/06/20 N Side of Bldg Street 0.0 AC1 145.9 139.5 96 95 AC 10 03/06/20 N Side of Bldg Street 0.0 AC1 145.9 139.6 96 95 AC 11 03/06/20 W Side of Bldg 0.0 AC1 145.9 142.6 98 95 AC 12 03/09/20 SW Corner Fire Lane 0.0 AC2 145.4 142.6 98 95 AC 13 03/09/20 S Side Fire Lane 0.0 AC2 145.4 141.2 97 95 AC 14 03/09/20 S Side Parking Bay 0.0 AC2 145.4 141.1 97 95 AC 15 03/09/20 S Side Parking Bay 0.0 AC2 145.4 141.2 97 95 AC 16 03/09/20 S Side Parking Bay 0.0 AC2 145.4 142.5 98 95 AC 17 03/09/20 S Side Parking Bay 0.0 AC2 145.4 139.4 96 95 AC 18 03/09/20 S Side Parking Bay 0.0 AC2 145.4 139.7 96 95 AC 19 03/09/20 S Side Parking Bay 0.0 AC2 145.4 138.3 95 95 AC 20 03/09/20 S Side Fire Lane 0.0 AC2 145.4 138.4 95 95 AC 21 03/09/20 S Side Parking Bay 0.0 AC2 145.4 141.0 97 95 AC 22 03/09/20 S Side Parking Bay 0.0 AC2 145.4 141.1 97 95 AC 23 03/09/20 SE Side Fire Lane 0.0 AC2 145.4 140.9 97 95 AC 24 03/09/20 SE Side Parking Bay 0.0 AC2 145.4 138.4 95 95 AC 25 03/09/20 SE Side Parking Bay 0.0 AC2 145.4 141.2 97 95 AC 26 03/09/20 SE Corner Fire Lane 0.0 AC2 145.4 141.2 97 95 AC 27 03/09/20 NE Corner Fire Lane 0.0 AC2 145.4 140.9 97 95 AC 28 03/09/20 NE Corner Parking Bay 0.0 AC2 145.4 139.7 96 95 Field Density (pcf) Relative Compaction (%) Required Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD/ YY) Elev. or Depth (feet)Curve No. Max. Density (pcf) Location ~GEOCON TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. Field Density (pcf) Relative Compaction (%) Required Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD/ YY) Elev. or Depth (feet)Curve No. Max. Density (pcf) Location AC 29 03/09/20 NE Corner Parking Bay 0.0 AC2 145.4 139.5 96 95 AC 30 01/07/20 Caribou Court Cul-de-Sac 0.0 AC1 145.9 144.0 99 95 ~GEOCON TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. B 1 01/07/20 Caribou Court 0 4 0 143.9 7.6 141.3 9.8 98 95 B 2 03/05/20 Fire Lane N Side 0 5 0 125.2 8.6 120.1 12.2 96 95 B 3 03/05/20 Fire Lane N Side 0 5 0 125.2 8.6 119.5 12.7 95 95 B 4 03/05/20 Fire Lane W Side 0 5 0 125.2 8.6 120.6 12.0 96 95 B 5 03/05/20 Fire Lane S Side 0 5 0 125.2 8.6 118.9 13.3 95 95 B 6 03/05/20 Fire Lane S Side 0 5 0 125.2 8.6 119.1 13.0 95 95 B 7 03/05/20 Parking Bay W Side 0 5 0 125.2 8.6 115.0 12.9 92 95 B 7 A 03/06/20 Parking Bay W Side 0 5 0 125.2 8.6 119.1 12.6 95 95 B 8 03/06/20 Parking Bay W Side 0 5 0 125.2 8.6 118.9 10.0 95 95 B 9 03/06/20 Parking Bay S Side 0 5 0 125.2 8.6 122.6 10.7 98 95 B 10 03/06/20 Parking Bay S Side 0 5 0 125.2 8.6 121.8 11.3 97 95 B 11 03/06/20 Parking Bay S Side 0 5 0 125.2 8.6 119.4 13.2 95 95 B 12 03/06/20 Parking Bay S Side 0 5 0 125.2 8.6 118.9 13.5 95 95 B 13 03/06/20 Parking Bay S Side 0 5 0 125.2 8.6 120.3 12.5 96 95 B 14 03/06/20 Parking Bay S Side 0 5 0 125.2 8.6 121.1 11.5 97 95 B 15 03/06/20 Fire Lane S Side 0 5 0 125.2 8.6 119.5 10.0 95 95 B 16 03/06/20 Parking Bay S Side 0 5 0 125.2 8.6 119.6 10.7 96 95 B 17 03/09/20 Fire Lane SE Side 0 5 0 125.2 8.6 122.5 10.0 98 95 B 18 03/09/20 Parking Bay SE Side 0 5 0 125.2 8.6 122.7 9.8 98 95 B 19 03/09/20 Parking Bay SE Side 0 5 0 125.2 8.6 120.3 9.8 96 95 B 20 03/09/20 Fire Lane Corner 0 5 0 125.2 8.6 121.6 10.2 97 95 B 21 03/09/20 Fire Lane Corner 0 5 0 125.2 8.6 119.1 9.5 95 95 B 22 03/09/20 Parking Bay Corner 0 5 0 125.2 8.6 119.0 9.9 95 95 B 23 03/09/20 Parking Bay Corner 0 5 0 125.2 8.6 121.5 9.6 97 95 B 24 03/09/20 West Side 0 5 0 125.2 8.6 120.4 9.6 96 95 Required Relative Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD /YY) Location Elev. or Depth (feet) Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) ~GEOCON TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. ET 1 07/18/19 NE Perimeter Bldg -3 2 0 133.0 8.1 122.4 7.9 92 90 ET 2 07/19/19 NE Perimeter Bldg -2 2 0 133.0 8.1 122.3 8.5 92 90 ET 3 07/19/19 NE Perimeter Bldg -1 2 0 133.0 8.1 123.8 8.8 93 90 ET 4 07/19/19 NE Perimeter Bldg -1 2 0 133.0 8.1 123.7 8.8 93 90 ET 5 02/20/20 W of Site Entrance 259 3 0 133.8 8.0 124.3 8.2 93 90 ET 6 02/20/20 W of Site Entrance 260 3 0 133.8 8.0 124.4 8.6 93 90 ET 7 02/20/20 W of Site Entrance 260 3 0 133.8 8.0 128.0 8.7 96 90 ET 8 02/20/20 W of Site Entrance 0 3 0 133.8 8.0 126.0 8.9 94 90 ET 9 02/21/20 W of Site Entrance -1 3 0 133.8 8.0 121.0 9.4 90 90 ET 10 02/21/20 W of Site Entrance -1 3 0 133.8 8.0 122.3 8.9 91 90 Required Relative Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD /YY) Location Elev. or Depth (feet) Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) ~GEOCON TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. FS 1 08/23/19 E of Bldg 0+32 -1 2 0 133.0 8.1 125.8 7.9 95 90 FS 2 08/23/19 E of Bldg 0+85 -1 2 0 133.0 8.1 127.3 8.6 96 90 FS 3 08/23/19 E of Bldg 1+25 -1 2 0 133.0 8.1 122.4 8.8 92 90 FS 4 08/26/19 E of Bldg 0+30 -1 2 0 133.0 8.1 123.2 9.5 93 90 FS 5 08/26/19 E of Bldg 1+00 -1 2 0 133.0 8.1 122.8 8.7 92 90 FS 6 08/26/19 E of Bldg 1+90 0 2 0 133.0 8.1 122.0 10.6 92 90 FS 7 11/01/19 W of Bldg -1 1 0 130.1 8.6 121.8 9.6 94 90 FS 8 11/01/19 W of Bldg 0 1 0 130.1 8.6 120.3 10.0 92 90 FS 9 11/01/19 S of Bldg 0 1 0 130.1 8.6 121.2 10.1 93 90 FS 10 11/01/19 S of Bldg -1 1 0 130.1 8.6 121.5 9.8 93 90 FS 11 11/01/19 S of Bldg 0 1 0 130.1 8.6 120.8 10.3 93 90 FS 12 11/04/19 SW of Bldg 0 2 0 133.0 8.1 122.4 8.9 92 90 FS 13 11/19/19 NE of Bldg -1 2 0 133.0 8.1 122.5 7.1 92 90 FS 14 11/19/19 NE of Bldg -1 2 0 133.0 8.1 125.3 8.6 94 90 FS 15 11/20/19 N Side of Bldg -1 2 0 133.0 8.1 123.4 8.7 93 90 FS 16 11/20/19 N Side of Bldg -1 2 0 133.0 8.1 122.8 8.3 92 90 Required Relative Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD /YY) Location Elev. or Depth (feet) Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) ~GEOCON TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. JT 1 02/06/20 N of Bldg -1 1 0 130.1 8.6 122.6 8.6 94 90 JT 2 02/06/20 N of Bldg -1 1 0 130.1 8.6 124.4 8.1 96 90 JT 3 02/06/20 S of Bldg 0 1 0 130.1 8.6 118.9 8.8 91 90 JT 4 02/06/20 S of Bldg -1 1 0 130.1 8.6 121.3 9.3 93 90 JT 5 02/06/20 S of Bldg 0 1 0 130.1 8.6 121.5 8.6 93 90 Required Relative Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD /YY) Location Elev. or Depth (feet) Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) ~GEOCON TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. PT 1 07/01/19 E Side -1 2 0 133.0 8.1 122.5 8.3 92 90 PT 2 07/01/19 E Side -1 2 0 133.0 8.1 121.1 8.7 91 90 PT 3 07/02/19 E Side -1 2 0 133.0 8.1 123.8 8.1 93 90 PT 4 07/02/19 E Side -1 2 0 133.0 8.1 122.4 9.0 92 90 PT 5 07/02/19 W Side -2 2 0 133.0 8.1 121.2 8.6 91 90 PT 6 07/02/19 W Side -2 2 0 133.0 8.1 119.8 8.6 90 90 PT 7 07/03/19 W Side -2 2 0 133.0 8.1 121.1 8.3 91 90 PT 8 07/03/19 W Side -1 2 0 133.0 8.1 121.0 8.4 91 90 PT 9 07/03/19 W Side -2 2 0 133.0 8.1 122.4 9.0 92 90 PT 10 07/03/19 W Side -1 2 0 133.0 8.1 119.9 8.8 90 90 Required Relative Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD /YY) Location Elev. or Depth (feet) Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) ~GEOCON TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. SD 1 06/14/19 Existing Box N Side 360 2 10 135.7 7.3 125.5 9.7 93 90 SD 2 06/18/19 E of Box SD 8 360 2 10 135.7 7.3 123.1 9.0 91 91 SD 3 06/18/19 E of Box SD 8 359 2 10 135.7 7.3 124.2 9.3 92 90 SD 4 06/18/19 W of Box SD 7 360 2 10 135.7 7.3 124.5 9.2 92 90 SD 5 10/28/19 Line 2 365 2 0 133.0 8.1 122.5 9.3 92 90 SD 6 10/28/19 Line 2 365 2 0 133.0 8.1 123.6 9.5 93 90 SD 7 11/01/19 W of CO at SD 7 365 2 0 133.0 8.1 123.2 9.6 93 90 SD 8 11/04/19 SW of Bldg 364 1 0 130.1 8.6 116.8 10.8 90 90 SD 9 11/04/19 SW of Bldg 364 1 0 130.1 8.6 117.4 10.1 90 90 SD 10 11/04/19 SW of Bldg 365 1 0 130.1 8.6 117.2 10.3 90 90 SD 11 11/04/19 SW of Bldg 365 1 0 130.1 8.6 118.3 10.6 91 90 SD 12 02/05/20 Line from Biofilter Basin 362 2 0 133.0 8.1 123.1 8.1 93 90 SD 13 02/05/20 Line from Biofilter Basin 364 2 0 133.0 8.1 123.8 8.3 93 90 SD 14 02/05/20 Line from Biofilter Basin 366 2 0 133.0 8.1 123.0 8.0 92 90 SD 15 02/05/20 Dissipator 365 2 0 133.0 8.1 122.7 8.8 92 90 Required Relative Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD /YY) Location Elev. or Depth (feet) Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) ~GEOCON TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. SG 1 01/15/20 S of Bldg 0 2 0 133.0 8.1 126.6 9.2 95 95 SG 2 01/15/20 S of Bldg 0 2 0 133.0 8.1 125.8 8.1 95 95 SG 3 01/15/20 S of Bldg 0 2 0 133.0 8.1 128.0 7.3 96 95 SG 4 01/15/20 S of Bldg 0 2 0 133.0 8.1 125.8 9.0 95 95 SG 5 01/15/20 S of Bldg 0 2 0 133.0 8.1 127.5 9.0 96 95 SG 6 01/15/20 S of Bldg 0 2 0 133.0 8.1 126.9 8.0 95 95 SG 7 02/28/20 S of Bldg 0 2 0 133.0 8.1 127.4 8.4 96 95 SG 8 02/28/20 S of Bldg 0 2 0 133.0 8.1 131.1 7.3 99 95 SG 9 02/28/20 N of Bldg 0 2 0 133.0 8.1 126.8 8.6 95 95 SG 10 02/28/20 W of Bldg 0 2 0 133.0 8.1 129.2 7.9 97 95 SG 11 03/24/20 Entrance Drive 0 2 0 133.0 8.1 125.8 8.8 95 95 SG 12 03/24/20 Entrance Drive 0 2 0 133.0 8.1 128.6 6.8 97 95 SG 13 03/24/20 Entrance Drive 0 2 0 133.0 8.1 125.9 8.5 95 95 SG 14 03/26/20 Entrance Drive 0 2 0 133.0 8.1 126.2 6.4 95 95 Required Relative Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD /YY) Location Elev. or Depth (feet) Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) ~GEOCON TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. SM 1 07/19/19 SW Corner 367 2 0 133.0 8.1 122.5 8.6 92 90 SM 2 07/19/19 SW Corner 366 2 0 133.0 8.1 123.8 8.5 93 90 SM 3 07/19/19 SW Slope 359 2 0 133.0 8.1 123.5 8.2 93 90 SM 4 07/22/19 SW Slope 344 2 0 133.0 8.1 122.3 8.5 92 90 SM 5 07/22/19 SW Slope 333 2 0 133.0 8.1 122.3 8.2 92 90 SM 6 07/23/19 SW Slope 352 2 0 133.0 8.1 119.9 8.4 90 90 SM 7 07/23/19 SW Slope 337 2 0 133.0 8.1 119.8 8.1 90 90 Required Relative Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD /YY) Location Elev. or Depth (feet) Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) ~GEOCON TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. SW 1 01/28/20 S Side of Bldg 0 2 0 133.0 8.1 125.4 5.7 94 90 SW 2 01/28/20 S Side of Bldg 0 2 0 133.0 8.1 131.5 4.4 99 90 SW 3 01/28/20 S Side of Bldg 0 2 0 133.0 8.1 133.0 4.7 100 90 SW 4 01/28/20 S Side of Bldg 0 2 0 133.0 8.1 126.7 5.7 95 90 SW 5 01/28/20 S Side of Bldg 0 2 0 133.0 8.1 124.4 3.6 94 90 SW 6 01/28/20 S Side of Bldg 0 2 0 133.0 8.1 126.7 6.2 95 90 SW 7 01/28/20 S Side of Bldg 0 2 0 133.0 8.1 129.2 4.3 97 90 SW 8 03/31/20 NE Side Caribou Court 0 2 0 133.0 8.1 122.3 11.7 92 90 SW 9 03/31/20 NE Side Caribou Court 0 2 0 133.0 8.1 120.9 12.0 91 90 Required Relative Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD /YY) Location Elev. or Depth (feet) Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) ~GEOCON TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. WB 1 10/04/19 Anchor Retaining Wall 1A 1+92 350 3 0 133.8 8.0 121.5 8.8 91 90 WB 2 10/04/19 Anchor Retaining Wall 1A 1+65 352 3 0 133.8 8.0 122.0 9.0 91 90 WB 3 10/04/19 Anchor Retaining Wall 1A 2+15 352 3 0 133.8 8.0 120.9 8.3 90 90 WB 4 10/07/19 Anchor Retaining Wall 1A 1+75 354 3 0 133.8 8.0 122.7 8.6 92 90 WB 5 10/07/19 Anchor Retaining Wall 1A 2+20 355 3 0 133.8 8.0 121.5 8.1 91 90 WB 6 10/07/19 Anchor Retaining Wall 1A 1+92 356 3 0 133.8 8.0 120.8 9.4 90 90 WB 7 10/07/19 Anchor Retaining Wall 1A 2+35 356 3 0 133.8 8.0 123.3 8.2 92 90 WB 8 10/08/19 Anchor Retaining Wall 1A 1+45 358 3 0 133.8 8.0 121.9 8.5 91 90 WB 9 10/08/19 Anchor Retaining Wall 1A 2+30 358 3 0 133.8 8.0 121.2 8.7 91 90 WB 10 10/09/19 Anchor Retaining Wall 1A 1+30 360 3 0 133.8 8.0 121.8 8.9 91 90 WB 11 10/09/19 Anchor Retaining Wall 1A 2+35 360 3 0 133.8 8.0 121.1 9.2 91 90 WB 12 10/09/19 Anchor Retaining Wall 1A 1+15 362 3 0 133.8 8.0 122.9 8.3 92 90 WB 13 10/09/19 Anchor Retaining Wall 1A 2+40 362 3 0 133.8 8.0 121.8 8.7 91 90 WB 14 10/09/19 Anchor Retaining Wall 1A 1+10 364 3 0 133.8 8.0 121.5 9.5 91 90 WB 15 10/09/19 Anchor Retaining Wall 1A 2+50 364 3 0 133.8 8.0 123.1 8.0 92 90 WB 16 10/11/19 Anchor Retaining Wall 1B 1+90 361 3 0 133.8 8.0 122.5 8.4 92 90 WB 17 10/14/19 Anchor Retaining Wall 1B 1+55 363 3 0 133.8 8.0 120.6 8.9 90 90 WB 18 10/14/19 Anchor Retaining Wall 1B 2+25 363 3 0 133.8 8.0 121.0 9.3 90 90 WB 19 10/14/19 Anchor Retaining Wall 1B 1+40 365 3 0 133.8 8.0 122.8 8.3 92 90 WB 20 10/14/19 Anchor Retaining Wall 1B 2+30 365 3 0 133.8 8.0 122.1 8.1 91 90 WB 21 10/17/19 Anchor Retaining Wall 2 1+25 264 3 0 133.8 8.0 123.8 8.3 93 90 WB 22 10/17/19 Anchor Retaining Wall 2 1+60 266 3 0 133.8 8.0 122.5 8.6 92 90 Required Relative Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD /YY) Location Elev. or Depth (feet) Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) ~GEOCON TABLE I SUMMARY OF FIELD DENSITY TEST RESULTS Project Name:Project No.: Pre. No. Re. WM 1 08/22/19 S of Bldg -1 2 0 133.0 8.1 113.3 7.3 85 90 WM 1 A 08/22/19 S of Bldg -1 2 0 133.0 8.1 119.4 8.3 90 90 WM 2 11/26/19 Caribou Court -2 2 0 133.0 8.1 124.2 7.7 93 90 WM 3 11/26/19 Caribou Court -1 2 0 133.0 8.1 122.6 8.3 92 90 WM 4 11/27/19 Caribou Court 0 2 0 133.0 8.1 122.4 8.4 92 90 Required Relative Compaction (%) Carlsbad Oaks North Lot 4 06442-42-26A Test No. Date (MM/DD /YY) Location Elev. or Depth (feet) Curve No. >¾" Rock (%) Max. Dry Density (pcf) Opt. Moist Content (%) Field Dry Density (pcf) Field Moisture Content (%) Relative Compaction (%) ~GEOCON TABLE I EXPLANATION OF CODED TERMS AC Asphalt Concrete IT Irrigation Trench SG Subgrade AD Area Drain JT Joint Trench SL Sewer Lateral B Base M Moisture Test SM Sewer Main CG Curb/Gutter MG Minor Grading SR Slope Repair DW Driveway MSE Mechanically Stabilized Earth Wall ST Slope Test ET Electrical Trench PT Plumbing Trench SW Sidewalk ETB Exploratory Trench RG Regrade SZ Slope Zone FB Footing Backfill RWL Reclaimed Water Lateral UT Utility Trench FG Finish Grade RWM Reclaimed Water Main WB Wall Backfill FS Fire Service SBT Subdrain Trench WL Water Lateral GT Gas Trench SD Storm Drain WM Water Main A, B, C, … R >¾" ROCK - ROCK CORRECTION The laboratory maximum dry density and optimum moisture content can be adjusted for in-place soil that possesses rock larger than ¾ inch. The curve no. is adjusted for the percentage of ¾ inch rock in accordance with ASTM D 4718 or Woodward Clyde guidelines. TEST NO. PREFIX TEST NO. RE. Retest of previous density test failure following additional moisture conditioning or recompaction Fill in area of density test was removed during construction operations CURVE NO. Corresponds to the curve numbers presented in the summary of the laboratory maximum dry density and optimum moisture content test results. The field representative selected the curve no. based on the laboratory test results and field observations. ELEVATION OR DEPTH Corresponds to the elevation or the depth, in feet, of the in-place density/moisture content test. The value has been rounded to the nearest whole foot. 0 ~~0C_ON _______ _ Project No. 06442-42-26A April 9, 2020 TABLE II SUMMARY OF LABORATORY MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT TEST RESULTS ASTM D 1557 Sample No. Description Maximum Dry Density (pcf) Optimum Moisture Content(% dry weight) 1 Olive brown, Silty, fine to coarse SAND; trace gravel 130.1 8.6 2 Yellowish brown, Silty, fine to coarse SAND; trace gravel 133.0 8.1 3 Light brown, Silty, fine to coarse SAND; trace gravel 133.8 8.0 4 Brownish gray, Sandy GRAVEL; little silt (Class 2 Aggregate Base) 143.9 7.6 5 Grayish brown, Sandy GRAVEL; little silt (Recycled Class 2 Aggregate Base) 125.2 8.6 TABLE III SUMMARY OF LABORATORY TEST RESULTS FOR ASPHALT CONCRETE ASTM D 2041, D 2726, AND D 1560 Sample No. Test Green Book Specifications Aggregate Size (inch) Theoretical Maximum Density (pcf) Hveem Maximum Density (pcf) Percent Air Voids Stability Percent Air Voids Stability AC-1 ¾153.7 145.9 5.1 45 3-6 35 AC-2 ½152.2 145.4 4.5 50 3-6 35 TABLE IV SUMMARY OF LABORATORY ASPHALT CONCRETE GRADATION AND ASPHALT CONTENT TEST RESULTS ASTM C 136 AND D 6307 (3/4 IN. AGGREGATE) Sieve Analysis ASTM C 136 (sieve size / test type) Sample Number (% passing) Greenbook (2015) Section 203-6.5.4 Class B3 (% passing) AC-1 1 inch 100 100 ¾ inch 99 90 – 100 ⅜ inch 81 60 – 84 No. 4 58 40 – 60 No. 8 44 24 – 50 No. 30 24 11 – 29 No. 200 7 1 – 9 *Oil Content (%) ASTM D 6307 5.0 4.6 – 6.0 *Greenbook refers to as “Asphalt %” Project No. 06442-42-26A April 9, 2020 TABLE V SUMMARY OF LABORATORY ASPHALT CONCRETE GRADATION AND ASPHALT CONTENT TEST RESULTS ASTM C 136 AND D 6307 (1/2 IN. AGGREGATE) Sieve Analysis ASTM C 136 (sieve size / test type) Sample Number (% passing) Greenbook (2015) Section 203-6.5.4 Class C2 (% passing) AC-2 ¾ inch 100 100 ½ inch 98 89-100 ⅜ inch 86 70-94 No. 4 59 44-72 No. 8 44 30-54 No. 30 23 10-34 No. 200 6 2-10 Oil Content (%)* ASTM D 6307 5.2 4.8 – 6.5 *Greenbook refers to as “Asphalt %”.