HomeMy WebLinkAbout2021-06-08; City Council; Resolution 2021-135RESOLUTION NO. 2021-135
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, ADOPTING CHANGES TO THE MASTER FEE SCHEDULE
WHEREAS, the City Council of the City of Carlsbad, California has the authority to establish
fees for city services; and
WHEREAS, from time-to-time said fees are reviewed and evaluated to maintain an
adequate fee structure recovering costs for city services; and
WHEREAS, the City Council has determined the cost of providing general and
development-related services; and
WHEREAS, the City Council believes it is necessary for the City Manager to have the
authority to adjust the parks and recreation and library and arts program and classes fees from
time to time to remain competitive and within the market pricing for like programs and classes;
and
WHEREAS, the City Council finds it necessary, to recover the costs for city services; and
WHEREAS, the City Council has held the necessary public hearing and allowed for public
comment on the establishment said fees.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California,
as follows:
1.That the above recitations are true and correct.
2.That the changes to the Master Fee Schedule as shown in Attachment A are
adopted.
3.The City Council authorizes the City Manager or a designee to set parks and
recreation and library and cultural arts program, rental, and class fees that are
included in the Community Services Guide. The fees shall not exceed the fully
burdened, including direct and indirect, costs of providing the program, rental,
and class but shall be no less (except in the case of introductory, discount or
promotional pricing) than the lowest fee charged for like kind programs or classes
in similarly benchmarked Southern California cities.
June 8, 2021 Item #11 Page 197 of 336
4.The City Council authorizes the City Manager or a designee to change vehicle and
traffic violation fees at the time, and by the same amount, as the state changes its
portion of the fine. Any changes to these fees will be made to the current Master
Fee Schedule.
5.This resolution shall become effective on Sept. 1, 2021; not sooner than 60 days
after adoption in accordance with California Government Code Section 66017 for
development-related service fees and development impact fees.
6.Per the contract with Waste Management, changes to the recycling and trash fees
as shown in Attachment A shall become effective on July 1, 2021.
PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the City Council of the
City of Carlsbad, the Board of Directors of the Carlsbad Municipal Water District, the Board of
Directors of the Carlsbad Public Financing Authority, the City of Carlsbad Community
Development Commission, and the City Council of the City of Carlsbad as Successor Agency to the
Carlsbad Redevelopment Agency held on the 8th day of June, 2021, by the following vote, to wit:
AYES: Hall, Blackburn, Acosta, Bhat-Patel, Schumacher.
NAYS: None.
ABSENT: None.
MATT HALL, Mayor
\.„.._,2\AC-3111/W illair 3-415
BARBARA ENGLESON, City Clerk
(SEAL)
June 8, 2021 Item #11 Page 198 of 336
Proposed Master Fee
Schedule
FY 2021‐22
All Fees Within, except Trash Collection Rates,
Effective September 1, 2021
Trash Collection Rates Effective July 1, 2021
Attachment A
June 8, 2021 Item #11 Page 199 of 336
Master Fee Schedule FY 2021‐22
Contents
Section 1 – General City Service Fees, Deposits, Rates, Penalties and Fines
Miscellaneous Fees and Returned Checks ....................................................................................... 4
Deposits and Securities .................................................................................................................... 5
Special Events and Safety Training Center ....................................................................................... 6
Ambulance and Street Light Energizing ........................................................................................... 7
City Clerk Fees .................................................................................................................................. 8
Library Fees ...................................................................................................................................... 9
Fire (Fire Extinguishing and Alarm Systems) .................................................................................. 10
Fire (Development Applications, Plan Review, and Inspection) .................................................... 12
Fire (Annual Inspection and Fire Code Permits) ............................................................................ 14
Police Department Fees ................................................................................................................. 16
Administrative and Vehicle, Traffic, and Parking Penalties ........................................................... 17
Trash Collection Rates .................................................................................................................... 18
Utility Account and Service Fees .................................................................................................... 22
Utility Meter Installation and Connection ..................................................................................... 24
Utility (San Diego County Water Authority) .................................................................................. 26
Section 2 – Development Related Fees
Planning Department Fees ............................................................................................................ 28
Engineering Department Fees ....................................................................................................... 32
Building (New Construction, Additions and Major Remodels) ...................................................... 37
Building (Minor/Miscellaneous Residential & Commercial Improvements) ................................. 42
Building (Plumbing, Mechanical, and Electrical) ............................................................................ 45
Building (Simple Single or Combination Permits List) .................................................................... 47
Section 3 – Development Impact Fees
Bridge and Thoroughfare District 2 Map ....................................................................................... 49
Local Facilities Management Zones Map ....................................................................................... 50
Park in Lieu Fees, Park Districts Map ............................................................................................. 51
Planned Local Drainage Fee Areas and Map .................................................................................. 52
Sewer Benefit Area and Connection Fees Map ............................................................................. 54
Affordable Housing, Habitat Mitigation, and Traffic ..................................................................... 56
June 8, 2021 Item #11 Page 200 of 336
Section 1
General City Service Fees,
Deposits, Rates, Penalties and
Fines
June 8, 2021 Item #11 Page 201 of 336
Fee Name Fee Type
Notes Fee/Deposit
Miscellaneous Fees
Administrative Fee for 1915 Act Bond Call ‐ 1% of principal being
repaid (All Assessment Districts using 1915 Act Bonds)each [1] $50 min/$500 max
Business License ‐ additional CA fee each [3],[5]4.00$
Business License ‐ master list of active business licenses each [2]31.00$
Business License ‐ monthly list of new licenses each [2]6.00$
Cable Channel Administration Fee per hour [2]94.00$
Electric Vehicle Charging Fee per kWh [1]$0.35
GIS ‐ digital data delivery, production of new documents,
reproduction of existing documents, and technical services per hour [1]Actual Cost
Hearing Disposition Services for Parking Citations ‐ Personal Hearings each [1]Actual Cost
Hearing Disposition Services for Parking Citations ‐ Written Review each [1]Actual Cost
City Publications each [1] Copy Charge
Community Facilities District Annexation ‐ City Labor (Plus actual
consultants costs)each [2]1,504.00$
Returned Check Fee
First Returned Check each [4]25.00$
Each Additional Check each [4]35.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3] Set per CA Government Code 4467
[4] Set per CA Civil Code 1719
[5] Business license tax, set per Carlsbad Municipal Code 5.08.010, is separate from these fees.
June 8, 2021 Item #11 Page 202 of 336
Fee Name Fee Type
Notes Fee/Deposit
Deposits and Securities
Grading and Erosion Control
Grading Security (with approved plans) deposit [1],[3] Based on Grading
Cost Estimate
Grading Cash Deposit deposit [1],[3] Up to 10% of total
grading security
Development/Subdivision Improvements
Faithful Performance Security deposit [1],[3]
Based on
Improvement Cost
Estimate
Labor and Materials Security deposit [1],[3]
50% of Faithful
Performance
Security
Monumentation Security deposit [1],[3] Based on Total Cost
of Monumentation
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3]Per CA Government Code 53079, 1% shall be deducted from any interest due.
The city may require a security be provided to ensure work related to a project is completed in accordance with
the Carlsbad Municipal Code and development agreements executed with the city. This information is to help
understand the standard structure of how these deposits and securities are calculated. The security amounts are
calculated using final city‐approved cost estimates, not initial or draft estimates during plan check.
June 8, 2021 Item #11 Page 203 of 336
Fee Name Fee Type
Notes Fee/Deposit
Special Events Fees
Special Event Application ‐ Minor ‐ 2 or less intersections
(fee + services rendered)each [1],[3] 134.00$
Special Event Application ‐ Major ‐ 3 or more intersections
(fee + services rendered) each [1],[3] 401.00$
Special Event Application ‐ Third party Vendor Fee per day [1],[3] 90.00$
Special Event City Services ‐ Staff Time per hour [1] Actual Cost
Safety Training Center Facility Fees
One Shooting Range full day [1]1,167.00$
One Shooting Range 1/2 day [1]584.00$
Two Shooting Ranges full day [1]1,311.00$
Two Shooting Ranges 1/2 day [1]686.00$
Classroom full day [1]553.00$
Classroom 1/2 day [1]317.00$
Confined Space Prop full day [1]614.00$
Confined Space Prop 1/2 day [1]307.00$
Grinder full day [1]440.00$
Grinder 1/2 day [1]256.00$
Grinder/Commercial Prop (No Fire Ops)full day [1]635.00$
Grinder/Commercial Prop (No Fire Ops)1/2 day [1]317.00$
Grinder/Residential Prop (No Fire Ops)full day [1]635.00$
Grinder/Residential Prop (No Fire Ops)1/2 day [1]317.00$
PriSim (Training Simulator)full day [1]500.00$
PriSim (Training Simulator)1/2 day [1]250.00$
Pump Draft Pit full day [1]400.00$
Pump Draft Pit 1/2 day [1]200.00$
Streetscape full day [1]154.00$
Streetscape 1/2 day [1]113.00$
Special Events Recovery ‐ Hourly hourly [1]51.00$
Shooting Range ‐ Hourly hourly [1]118.00$
Shooting Range Hazardous Waste Disposal Fees each [1],[4]200.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3] Carlsbad Municipal Code 8.17 defines and outlines Special Events which may require a permitting.
[4] Fee charged as determined by staff
Full details on how to apply for a Special Event Application can be referenced in the Special Event Reference
Handbook available on the City of Carlsbad website. The below fees are listed for reference only and may not be
representative of the entirety of a Special Event Application cost. A valid, unexpired City of Carlsbad Business
License is required for all special event applicants. Carlsbad Municipal Code Section 8.17.070 CMC requires an
applicant to pay a non‐refundable fee to allow third party vendors to participate under the applicant’s business
License.
June 8, 2021 Item #11 Page 204 of 336
Fee Name Fee Type
Notes Fee/Deposit
Ambulance Fees
Assessment/Non‐Transport with medication given. No charge for
assessment if no medication given and non‐transport.per [1] 213.00$
Advanced Life Support 1 ‐ Resident and Non‐Resident ‐ plus Level I or
Level II supplies and medications per [1] 1,224.00$
Advanced Life Support 2 ‐ Non‐Resident ‐ plus Level II supplies and
medications per [1]1,437.00$
Advanced Life Support 2 ‐ Resident ‐ plus Level II supplies and
medications per [1]1,331.00$
Basic Life Support ‐ Resident and Non‐Resident per [1]999.00$
Mileage Charge mile [1]24.00$
Oxygen Charge per [1]80.00$
Street Light Energizing Fees
40 watts each [3]74.00$
45 watts each [3]80.00$
70 watts each [3]107.00$
85 watts each [3]125.00$
100 watts each [3]141.00$
150 watts each [3]198.00$
200 watts each [3]254.00$
250 watts each [3]311.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3]Street Light Energizing Fees are the cost for energizing each street light for eighteen months, and include a $30.00
charge per light for connecting the light to an SDG&E service point.
June 8, 2021 Item #11 Page 205 of 336
Fee Name Fee Type
Notes Fee/Deposit
City Clerk Fees
Blueprinting of Standard Size each [1]5.00$
Appeals to City Council each [2]107.00$
Candidate Filing Fee each [3]25.00$
Notice of Intention to Circulate Initiative Petition each [4]200.00$
Certification Fee each [1]24.00$
Subpoena Fees
Deposition Subpoena per day [5]275.00$
Records Subpoena ‐ research per hour [6]17.00$
Copy Fees
Copies & Printing ‐ Black & White each [1]0.10$
Copies & Printing ‐ Color each [1]0.10$
CD Copy each [1]Actual Cost
DVD Copy each [1]Actual Cost
USB Drive Copy each [1]Actual Cost
FPPC Fees
Campaign Statements per page [7]0.10$
Conflict of Interest Statement per page [7]0.10$
Fees for services not listed will be determined on a case‐by‐case
basis. It will be based on the fully burdened hourly rate and the time
of service provided.
per hour [2]107.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3] Set per City of Carlsbad Municipal Code 1.12.010
[4]Maximum limit set per CA Elections Code 9202
[5]Set per CA Government Code 68096.1(b)
[6]Maximum limit set per CA Evidence Code 1563(b)(1)
[7]Set per CA Government Code 81008
June 8, 2021 Item #11 Page 206 of 336
Fee Name Fee Type
Notes Fee/Deposit
Library Fees
Copies & Printing ‐ Black & White each [1]0.20$
Copies & Printing ‐ Color each [1]1.00$
Account Collection Fee per item [1]10.00$
Hold Request Non‐Pickup Fee per item [2]1.00$
Borrowing ‐ Audio/Visual Equipment per day, per
item [1]5.00$
Overdue Fines ‐ Audio/Visual Equipment per day, per
item [1]5.00$
Card Replacement per card [2]2.00$
Overdue Fines ‐ DVD/Video Game per day, per
item [1]1.00$
Overdue Fines ‐ Juvenile Material per day, per
item [1]0.10$
Overdue Fines per day, per
item [1]0.25$
Carlsbad History Collection Photo Fee per request [1] Actual Cost
Inter Loan per request [2]6.00$
Lost/Damaged Item Processing fee per item [2]6.00$
Lost/Damaged Item per item [1]List Price
Fees for services not listed will be determined on a case‐by‐case
basis. It will be based on the fully burdened hourly rate and the time
of service provided.
per hour [2]12.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
June 8, 2021 Item #11 Page 207 of 336
Fee Name Fee Type
Notes Fee/Deposit
FIRE EXTINGUISHING AND ALARM SYSTEMS
New Sprinkler System
ESFR Fire Sprinkler System (Initial system)each [2]944.00$
Each additional System each [2]261.00$
Per Additional Inspection each [2]112.00$
ESFR Fire Sprinkler System with In‐Rack Sprinklers each [2]1,093.00$
Each additional System each [2]261.00$
Per Additional Inspection each [2]112.00$
Fire Pump (first pump) each [2]869.00$
Each Additional pump each [2]298.00$
NFPA 13 System < 100 heads each [2]682.00$
Per Additional Inspection each [2]112.00$
Per Additional Plan Type each [2]149.00$
NFPA 13 System > 100 heads (includes one riser) each [2]944.00$
Each Additional Riser each [2]261.00$
Per Additional Inspection each [2]112.00$ Per Additional Plan Type each [2]149.00$
NFPA 13R System 3‐16 units (per building) each [2]944.00$
Per Additional Inspection (per building) each [2]149.00$ Per Additional Plan Type each [2]149.00$
NFPA 13D Single Family System (Plan Review Per Initial or Single
Plan Type) each
[2]271.00$
Per Additional Plan Type each [2]149.00$
NFPA 13D Single Family System (Inspection Per Building) each [2]137.00$
Underground Piping with up to 4 Hydrants/Risers each [2]831.00$ Underground Piping with 5 or more Hydrants/Risers each [2],[3]1,096.00$
Tenant Improvement Sprinkler System
NFPA 13 or 13R System 6 heads or less each [2]137.00$ NFPA 13 or 13R System 7 ‐ 100 heads each [2]607.00$
Per Additional Inspection each [2]149.00$
Per Additional Plan Type each [2]149.00$
NFPA 13 or 13R System > 100 heads each [2]719.00$
Per Additional Inspection each [2]149.00$
Per Additional Plan Type each [2]149.00$
June 8, 2021 Item #11 Page 208 of 336
Fee Name Fee Type
Notes Fee/Deposit
Other Extinguishing Systems
Gas Systems (Med Gas, Industrial Gas, LPG)each [2]458.00$
Hood & Duct Extinguishing System each [2]458.00$
Each additional System each [2]224.00$
Pre‐Action System with Alarm each [2]607.00$
Refrigeration Systems < 500 lbs. each [2]794.00$
Refrigeration Systems > 500 lbs. each [2]1,354.00$
Special Equipment (Ovens, Dust, Battery) each [2]458.00$
Special Extinguishing System each [2]644.00$
Spray Booths each [2]458.00$
Alarm Systems
New Alarm System each [2]1,392.00$
Per Additional Inspection each [2]149.00$
Per Additional Plan Type each [2]149.00$
Sprinkler Monitoring each [2]421.00$
Per Additional Inspection each [2]149.00$
Per Additional Plan Type each [2]149.00$
Tenant Improvement Fire Alarm System each [2]682.00$
Per Additional Inspection each [2]149.00$
Per Additional Plan Type each [2]149.00$
June 8, 2021 Item #11 Page 209 of 336
Fee Name Fee Type
Notes Fee/Deposit
DEVELOPMENT APPLICATIONS, PLAN REVIEW AND INSPECTION
Building Construction Plan (Architectural Review)
A‐1 Occupancies ‐ New each [2]1,306.00$
A‐1 Occupancies ‐ Tenant Improvements each [2]999.00$
A‐2 & A‐3 Occupancies ‐ New each [2]896.00$
A‐2 & A‐3 Occupancies ‐ Tenant Improvements each [2]691.00$
A‐4 & A‐5 Occupancies ‐ New each [2]1,306.00$
A‐4 & A‐5 Occupancies ‐ Tenant Improvements each [2]999.00$
E Occupancies ‐ New each [2]1,306.00$
E Occupancies ‐ Tenant Improvements each [2]999.00$
E Occupancies (Daycare only) each [2]523.00$
F Occupancies ‐ New each [2]896.00$ F Occupancies ‐ Tenant Improvements each [2]691.00$
H Occupancies (not including Chem Class) ‐ New each [2]896.00$
H Occupancies (not including Chem Class) ‐ Tenant Improvements each
[2]691.00$
I Occupancies ‐ New each [2]896.00$
I Occupancies ‐ Tenant Improvements each [2]691.00$
L Occupancies ‐ New each [2]523.00$
L Occupancies ‐ Tenant Improvements each [2]411.00$
R‐1 & R‐2 Occupancies <50 units New flat [2]1,306.00$
R‐1 & R‐2 Occupancies ≥50 units New flat [2]1,615.00$
R‐3 Townhomes New each [2]896.00$
R Occupancies All ‐ Tenant Improvements each [2]691.00$ S Occupancies < 50,000sq. ft. New flat [2]523.00$
S Occupancies < 50,000sq. ft. ‐ Tenant Improvements flat [2]411.00$
S Occupancies ≥ 50,000sq. ft. New flat [2]971.00$
S Occupancies ≥ 50,000sq. ft. ‐ Tenant Improvements flat [2]746.00$
Plan Review and Inspection
Hazardous Materials Storage
Chem Class <10 Chemicals flat [2]533.00$
Chem Class 10‐ 25 Chemicals flat [2]831.00$
Chem Class 26 ‐ 100 Chemicals flat [2]1,204.00$ Chem Class >100 Chemicals flat [2]1,578.00$
Fire Department Access & Fire Lanes flat [2]271.00$
High Piled Storage flat [2]831.00$
High Rise Structure greater than 55 feet 373.00$
Per Additional Floor flat [2]298.00$
Storage Tanks
Aboveground Storage Tanks (First tank)each [2]794.00$
Underground Storage Tanks (First tank)each [2]719.00$
Each Additional Tank each [2]112.00$
June 8, 2021 Item #11 Page 210 of 336
Fee Name Fee Type
Notes Fee/Deposit
Vegetation Fuel Modification
Custom Home flat [2]533.00$
Tract <75 Homes flat [2]981.00$
Tract ≥75 Homes flat [2]1,429.00$
Smoke Control ‐ Rationale Analysis & Plan Review 1,504.00$
Other Fire Fees
Aerial Fireworks Display
Major each [2]1,419.00$
Minor each [2]821.00$
Plan Review
Processing Fee each [2]25.00$
Per Hour ‐ Overtime hourly [2]162.00$
Per Hour ‐ Regular Office Hours hourly [2]149.00$
Hourly Services for: Alternate Methods and Materials Review, Time
First Hour each [2]175.00$
Each Additional Hour hourly [2]149.00$
Plan Resubmittal (3rd and Subsequent Submittal, per hour) hourly [2]149.00$
Reinspection (Per inspection) each [2]212.00$
Tent Permit (Not associated with special events)
Single tent each [2]224.00$
2‐5 tents flat [2]448.00$
6 or more tents flat [2]598.00$
Weed Abatement Administrative Fee 298.00$
Fire Nuisance Alarm ‐ 1st response in 12 month period each [1]‐$
Fire Nuisance Alarm ‐ 2nd response in 12 month period each [1]89.00$
Fire Nuisance Alarm ‐ 3rd response in 12 month period each [1]177.00$
Fire Nuisance Alarm ‐ each additional response thereafter each [1]348.00$
Fire Nuisance Alarm ‐ each billing each [1]12.00$
Special Events Application ProcessingMinor: Events that may impact emergency operations equipment or
access and have attendance or participation of under 1,500 persons
(Building and Safety)
Single tent each [2],[6]25.00$ 2‐5 tents flat [2],[6]149.00$
6 or more tents each [2],[6]25.00$ Major: Events that may impact emergency operations equipment or
access and have attendance or participation of 1,500 or more
persons (Building and Safety) each
[2],[6]149.00$
Miscellaneous: Events that may impact emergency operations
equipment or access and may only require an over the counter
submittal each
[2],[6]25.00$
Special Events ‐ Fire Prevention/Operations Support Prior To/During
Event each
[2],[6] Actual Cost
June 8, 2021 Item #11 Page 211 of 336
Fee Name Fee Type
Notes Fee/Deposit
ANNUAL INSPECTIONS AND FIRE CODE PERMITS
Annual Inspections for the following Occupancies:Care Facility for more than 6 ambulatory & non‐ambulatory
clients each
[2],[4]162.00$
Hospitals, Nursing homes, Mental hospitals, Detoxification and
Surgery Centers each [2],[4]311.00$
Commercial Care Facility (i.e. Child, Drug & Alcohol, Juvenile, &
etc.)each [2],[4]162.00$
Pre‐Inspection Residential Care Facility (i.e. Single Family
Residences) each
[2],[4]162.00$
High Rise Facility > 75 ft. (per floor of building)each [2],[4]162.00$
Public or Private School [2],[4]‐$
Pre‐School each [2],[4]373.00$
Elementary/Middle School each [2],[4]598.00$ High School each [2],[4]896.00$
State Mandated Hotel and Motel Inspection
1‐5 Buildings per property flat [2],[4]523.00$
6‐10 Buildings per property flat [2],[4]896.00$
11 or more buildings per property flat [2],[4]1,120.00$
State Mandated Apartment Inspection
3‐10 units per building flat [2],[4]187.00$
11‐40 units per building flat [2],[4]224.00$
Greater than 40 units per building flat [2],[4]299.00$
Fire Code Permits ‐ Initial Permit
Tier 1each[2],[5]162.00$
Tier 2each[2],[5]311.00$
Tier 3each[2],[5]461.00$
Fire Code Permits ‐ Annual Renewal Permit
Tier 1each[2],[5]87.00$
Tier 2each[2],[5]162.00$
Tier 3each[2],[5]237.00$
Assembly
< 300 people flat [2]162.00$
> 300 people flat [2]311.00$
All Other Occupancies Annual Inspections
Tier 1 ‐ 5,000 s.f. or less flat [2]124.00$
Tier 2 ‐ 5,001 to 20,000 s.f.flat [2]199.00$
Tier 3 ‐ 20,001 and greater flat [2]311.00$
Fees for services not listed will be determined on a case‐by‐case
basis. It will be based on the fully burdened hourly rate and the time
of service provided.
per hour [2]149.00$
June 8, 2021 Item #11 Page 212 of 336
Fee Name Fee Type
Notes Fee/Deposit
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3] Additional Reinspection fees shall apply for phased inspection projects at the discretion of the Fire Marshall
[4]
[5]
[6] Additional fees for Standby of fire personnel and equipment during event will apply.
Tier 1 – Candles – Open Flame; Cryogens; Dry Cleaning; Liquefied Petroleum Gas (LPG); Motor Vehicle Fuel Dispensing; Industrial Ovens; Hot
Works; Welding
Tier 2 – Aerosol; Aviation Facility; Waste Handling; Carnival/Fair; Combustible Materials Storage; Compressed Gas; Dust Producing Operations;
Flammable Liquids – Storage; Combustible Liquids – Storage; Flammable/Combustible Liquids – Tanks; Flammable/Combustible Liquids –
AST/UST Removal; Fruit Ripening; Hazardous Materials; Magnesium Work; Repair Garage; Tire Storage; Explosives‐Model Rockets
Tier 3 – Aircraft Refueling; Explosives – Blasting & Fireworks; High Piled Combustible Storage (HPS); Lumber Yards & Woodworking Plants;
Refrigeration Equipment; Spraying or Dipping Operations;
Package Permits – All permits associated in the following activities are included in the Tier priced above: Dry Cleaning; Motor Vehicle Fuel
Dispensing; Repair Garage; Welding
All annual inspection fees shall include time for the initial inspection and 1 reinspection. All subsequent reinspection shall be charged an
additional rate per inspection.
June 8, 2021 Item #11 Page 213 of 336
Fee Name Fee Type
Notes Fee/Deposit
Police Fees
Audio / Photos on Disk each [2]37.00$
Burglary Alarm Registration Fee each [2]24.00$
False Alarm Response ‐ Second Occurrence each [2]33.00$
False Alarm Response ‐ Additional Occurrence each [2]62.00$
Excess False Alarm Panic Response ‐ Robbery each [3]100.00$
Excess False Alarm Panic Response ‐ Burglary each [3]100.00$
Copy Investigation Record each [2]51.00$
Dispatch Records Searches per query [2]19.00$
Entertainment License each [2]260.00$
Fingerprinting processing Fee each [2],[5]22.00$
Fix‐It Ticket ‐ moving violation each [2],[6]18.00$
Fix‐It Ticket ‐ parking/registration violation each [2],[6]11.00$
Handicap Placard Violation Waiver Processing Fee each [2],[7]24.00$
Photograph Copy ‐ Subpoena or Records requests that require
retrieval in QueTel evidence program.each [2]18.00$
Police/Fire ‐ Emergency Response DUI Traffic Collision (max $12,000
per incident)each [1]Actual Cost
Production of body worn camera videos. Staff time per hour of
production and redaction of videos.each [1]Actual Cost
Report Copy Fee (Free to Victim) each [2]11.00$
Rental of Conference rooms to Safety Personnel each [2]195.00$
Storage/Impounded Vehicle Administrative Charge each [2]135.00$
Administrative Fee ‐ DUI each [1]20.00$
Massage license permit (plus fingerprint processing fee) each [4]136.00$
Fees for services not listed will be determined on a case‐by‐case
basis. It will be based on the fully burdened hourly rate and the time
of service provided.
per hour [2]74.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3] Set per City of Carlsbad Municipal Code 8.50.080 [E]
[4] Set per City of Carlsbad Municipal Code 5.16.070
[5] Plus actual cost from processing agency
[6] Requires proof of correction
[7] Waived with proof of correction
June 8, 2021 Item #11 Page 214 of 336
Fee Name Fee Type
Notes Fee/Deposit
Administrative Citation Penalties
1st Violation of a City Ordinance each [3]100.00$
2nd Violation of a City Ordinance each [3]200.00$
3rd Violation of a City Ordinance each [3]500.00$
Subsequent violation of same ordinance within one year each [3]500.00$
Vehicle, Traffic, and Parking Civil Penalties
CA Vehicle Code Violation, if not specified by separate fee amount
(rounded)each [4]48.00$
CA VC 2500(i) BUS ZONE each [4]263.00$
CA VC 2500(l) CURB CUT/DISABLED ACCESS each [4]343.00$
CA VC 22507.8 (a)‐(c) DISABLED PARKING SPACE / ACCESS
AREA / LOADING AREA each [4]343.00$
CA VC 22522 SIDEWALK ACCESS RAMP 3FT AWAY each [4]343.00$
CA VC 22526 (a)(b) BLOCK INTERSECTION/GRIDLOCK each [4]63.00$
CA Vehicle Code Violation for Equipment, if not specified by
separate fee amount (rounded)each [4]38.00$
CA VC 4000(a) EXPIRED REGISTRATION each [4]63.00$
CA VC 26100C TINTED COVERS ON HEADLIGHTS each [4]48.00$
CA VC 28071 PASSENGER CAR BUMPERS REQUIRED each [4]88.00$
San Diego County Code Parking Violation, if not specified by
separate fee amount (rounded)each [4]63.00$
SDCC 41.125 VEHICLE IN PARK AFTER POSTED HRS each [4]38.00$
SDCC 72.121 REMOVE IGNITION KEY each [4]48.00$
SDCC 73.110 SLEEPING/CAMPING IN VEHICLE each [4]38.00$
Carlsbad Municipal Code Vehicle and Traffic Violation, if violation
not established by the CA Vehicle Code Violation or San Diego
County Code Parking Violation.
each [1]50.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3] Set per City of Carlsbad Resolution 2001‐167 and limit set per CA Government Code Section 36900 [B]
[4] Set per City Policy to the San Diego County Sheriff's Department Parking Fee Violation Table.
June 8, 2021 Item #11 Page 215 of 336
Fee Name Fee Type
Notes Fee/Deposit
Trash Collection Rates (Stormwater fee included)
Residential Services
Residential ‐ per month (64 or 96 gallon cart)[3]24.20$
Residential ‐ per month (35 gallon trash)[3]22.03$
Trash Collection ‐ Residential ‐ per month (backyard service)[3]30.48$
Extra trash cart beyond first cart [3]2.64$
Two additional Green Waste and/or Recycling carts will be free of
charge, after each additional cart will be charged [3]2.64$
Commercial Services
Commercial Cart (1‐96 gal trash, 1‐96 gal recycling)
One pick‐up per week (1‐96 gal cart ‐ trash, 1‐96 gal cart ‐ recycling) [3]50.56$
Two pick‐ups per week (1‐96 gal cart ‐ trash, 1‐96 gal cart ‐ recycling)[3]89.43$
Three pick‐ups per week (1‐96 gal cart ‐ trash, 1‐96 gal cart ‐
recycling)[3]128.21$
One pick‐up per week (1‐96 gal cart ‐ trash) [3]24.13$
Two pick‐ups per week (1‐96 gal cart ‐ trash)[3]48.27$
Three pick‐ups per week (1‐96 gal cart ‐ trash)[3]72.38$
Extra pick‐up per week (1‐96 gal cart ‐ trash)[3]11.38$
Commercial Yard Bins
2‐yard bin ‐ one pick‐up per week [3]86.33$
2‐yard bin ‐ two pick‐ups per week [3]151.89$
2‐yard bin ‐ three pick‐ups per week [3]217.54$
2‐yard bin ‐ four pick‐ups per week [3]283.03$
2‐yard bin ‐ five pick‐ups per week [3]348.68$
2‐yard bin ‐ six pick‐ups per week [3]414.26$
2‐yard bin ‐ extra pick‐up [3]41.54$
3‐yard bin ‐ one pick‐up per week [3]117.27$
3‐yard bin ‐ two pick‐ups per week [3]213.81$
3‐yard bin ‐ three pick‐ups per week [3]310.32$
3‐yard bin ‐ four pick‐ups per week [3]406.81$
3‐yard bin ‐ five pick‐ups per week [3]503.36$
3‐yard bin ‐ six pick‐ups per week [3]599.91$
3‐yard bin ‐ extra pick‐up [3]55.73$
4‐yard bin ‐ one pick‐up per week [3]156.37$
4‐yard bin ‐ two pick‐ups per week [3]292.01$
4‐yard bin ‐ three pick‐ups per week [3]427.69$
4‐yard bin ‐ four pick‐ups per week [3]563.34$
4‐yard bin ‐ five pick‐ups per week [3]698.99$
4‐yard bin ‐ six pick‐ups per week [3]834.62$
4‐yard bin ‐ extra pick‐up [3]66.68$
5‐yard bin ‐ one pick‐up per week [3]195.52$
June 8, 2021 Item #11 Page 216 of 336
Fee Name Fee Type
Notes Fee/Deposit
5‐yard bin ‐ two pick‐ups per week [3] 370.32$
5‐yard bin ‐ three pick‐ups per week [3] 545.10$
5‐yard bin ‐ four pick‐ups per week [3]719.85$
5‐yard bin ‐ five pick‐ups per week [3]894.65$
5‐yard bin ‐ six pick‐ups per week [3]1,069.43$
5‐yard bin ‐ extra pick‐up [3]77.61$
Commercial Split Bins (includes 2 locks )
One pick‐up per week [3]94.72$
Two pick‐ups per week [3]172.87$
Three pick‐ups per week [3]251.00$
Four pick‐ups per week [3]329.16$
Five pick‐ups per week [3]407.28$
Six pick‐ups per week [3]485.44$
Commercial Recycling
96 gal cart ‐ one pick‐up per week [3]22.22$
96 gal cart ‐ two pick‐ups per week [3]44.46$
96 gal cart ‐ three pick‐ups per week [3]66.66$
96 gal cart ‐ extra pick‐up [3]10.53$
3‐yard bin ‐ one pick‐up per week [3]85.08$
3‐yard bin ‐ two pick‐ups per week [3]143.92$
3‐yard bin ‐ three pick‐ups per week [3]202.77$
3‐yard bin ‐ four pick‐ups per week [3]261.59$
3‐yard bin ‐ five pick‐ups per week [3]312.28$
3‐yard bin ‐ six pick‐ups per week [3]374.51$
3‐yard bin ‐ seven pick‐ups per week [3]436.93$
3‐yard bin ‐ extra pick‐up [3]39.05$
4‐yard bin ‐ one pick‐up per week [3]86.47$
4‐yard bin ‐ two pick‐ups per week [3]146.27$
4‐yard bin ‐ three pick‐ups per week [3]206.08$
4‐yard bin ‐ four pick‐ups per week [3]265.87$
4‐yard bin ‐ five pick‐ups per week [3]317.37$
4‐yard bin ‐ six pick‐ups per week [3]380.60$
4‐yard bin ‐ seven pick‐ups per week [3]444.05$
4‐yard bin ‐ extra pick‐up [3]39.72$
Commercial Yard Waste
96 gal cart ‐ one pick‐up per week [3]25.01$
96 gal cart ‐ extra pick up [3]11.04$
3‐yard bin ‐ one pick‐up per week [3]135.28$
3‐yard bin ‐ two pick‐ups per week [3]242.81$
Commercial Compactor
3‐yard bin ‐ one pick‐up per week [3]164.53$
3‐yard bin ‐ two pick‐ups per week [3]308.13$
3‐yard bin ‐ three pick‐ups per week [3]451.70$
June 8, 2021 Item #11 Page 217 of 336
Fee Name Fee Type
Notes Fee/Deposit
3‐yard bin ‐ four pick‐ups per week [3]595.26$
3‐yard bin ‐ five pick‐ups per week [3]738.87$
3‐yard bin ‐ six picks‐up per week [3]882.48$
3‐yard bin ‐ extra pick‐up [3]66.91$
Special Haul Bin Rate ‐ includes delivery fee
3‐yard bin ‐ one pick‐up per week [3]144.15$
3‐yard bin ‐ two pick‐ups per week [3]225.28$
3‐yard bin ‐ three pick‐ups per week [3]306.39$
3‐yard bin ‐ four pick‐ups per week [3]387.48$
3‐yard bin ‐ five pick‐ups per week [3]468.61$
3‐yard bin ‐ six pick‐ups per week [3]549.73$
3‐yard bin ‐ extra pick‐up [3]47.07$
Construction and Demolition Recycling
Special Haul Bin (no Storm Water Fees) 1 week or less [3]101.84$
3‐yard temporary C&D Recycling Bin [3]120.63$
4‐yard temporary C&D Recycling Bin [3]131.09$
Other Fees and Charges
Bin Exchange [3]65.56$
Bin Lock Set Up Fee [3]40.97$
Locking Fee [3]15.57$
Overloaded Bins [3]56.76$
Bin paint charge fee ‐ allowed 1 per year. After first paint within one
year, there will be a charge per paint request.[3]113.45$
Bin that needs to be moved:
5 to 30 feet [3]5.74$
31 to 50 feet [3]7.79$
Additional 25 feet increments [3]7.79$
Special haul bin delivery [3]45.44$
Certified burial at Miramar plus special handling fee charged by
Miramar [3]355.62$
Commercial Return to Service Fee ‐ The return to service fee for two
or more calls in a one‐month period by a bin [3]73.08$
Copy Fee ‐ The charge for copies requested by customers [3]1.56$
Delivery of extra cart [3]13.04$
Late Fee ‐ There will be a minimum fee on any delinquent account ‐
$3 minimum charge [3]3.91$
Bulky Item ‐ Exceeding 5 per pick up ‐ First item [3]46.29$
Bulky Item ‐ Exceeding 5 per pick up ‐ each addl item [3]11.87$
Per Bulky Item ‐ first item [3]46.29$
Per Bulky Item ‐ each additional item [3]11.87$
Bulky Item requiring 2 people to handle [3]66.40$
Single and Multi‐Family Residents ‐ 3 bulky item pick ups per calendar year with 5 items
maximum per pick up
Commercial Bin Customers shall be charged for bulky item pick‐ups
June 8, 2021 Item #11 Page 218 of 336
Fee Name Fee Type
Notes Fee/Deposit
Contamination Fee ‐ to recover costs for separating solid waste
placed in a recycling or green waste container or for arranging a
special, unscheduled collection due to contamination.
[3]58.99$
Scout service per bin per service [3]53.08$
Residential Return to Service Fee ‐ The return to service fee for two
or more calls in a one‐month period by a residential customer [3]37.17$
Restart Fee ‐ The fee for restarting commercial service when a
permanent account has been terminated for non‐payment.[3]22.30$
Roll off Service
Service Fee ‐ Roll off service [3]242.11$
Disposal Fee per Ton (pass through)[3]49.05$
Roll off ‐ Demurrage Per Day Charge [3]5.16$
Delivery [3]62.30$
Delivery Demo (includes signage) [3]63.43$
Relocation Charge onsite [3]48.67$
Relocation Charge offsite [3]69.46$
Wash Out Receiver Boxes [3]55.68$
Dead Run charge [3]83.47$
Standby charge after 5 minutes [3]2.21$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3] Set per contract by Waste Management
June 8, 2021 Item #11 Page 219 of 336
Fee Name Fee Type
Notes Fee/Deposit
Utility Account and Service Fees
Water Account Fees
Discontinuation of Service ‐ Non‐Payment (Shut‐off)each [2]44.00$
Service Reconnection (Non‐Payment) ‐ Same Day / Non‐Business
hours (After Hours Turn‐On)each [2],[3]196.00$
Continuity of Service each [2]8.00$
Electronic Notice (in lieu of door hanger)each [2]1.00$
Door Hanger Notice each [2]18.00$
New Account Set Up (Admin)each [2]37.00$
Service Reconnection for Non‐Payment (Next Day) Business Hours
(Next Scheduled Day Turn‐On)each [2],[3]72.00$
New Account Service Connection ‐ (Same Day) Business Hours (Same
Day Turn‐On)each [2]126.00$
Water Services Fees
Utility Standards and Specifications each [1]Actual Cost
Potable Water Meter ‐ Construction Meter Deposit deposit [1]900.00$
Potable Water Meter ‐ Construction Meter Installation each [2]211.00$
Potable Water Meter ‐ Construction Meter Relocation each [2]94.00$
Blueprinting of Standard Size (24" x 36") Improvement Plan Sheet
(cost for each)each [2]6.00$
Potable Backflow Preventer Annual Testing ‐ 1st Notice each, per
month [1]3.00$
Potable Backflow Preventer Annual Testing ‐ 2nd Notice per month [1]12.00$
Potable Backflow Preventer Annual Testing ‐ 3rd Notice per month [1]36.00$
Potable Water Shutdown Fee each [1]805.00$
Recycled Water Fees
Recycled Backflow Preventer Annual Testing ‐ 2nd Notice per month [2]12.00$
Recycled Backflow Preventer Annual Testing ‐ 3rd Notice per month [2]36.00$
Cross‐Connection Inspection ‐ County Department of Environmental
Health (CDEH)each [2]Actual Cost
Recycled Backflow Preventer Annual Testing ‐ 1st Notice each, per
month [2]3.00$
Cross‐Connection Reinspection each [2]151.00$
Recycled Water Meter ‐ Construction Meter Deposit deposit [1]900.00$
Recycled Water Meter ‐ Construction Meter Installation each [2]211.00$
Recycled Water Meter ‐ Construction Meter Relocation each [2]94.00$
E28 Recycled Water Shutdown ‐ Deposit deposit [2]900.00$
E28 Recycled Water Shutdown ‐ Actual Cost each [2]805.00$
June 8, 2021 Item #11 Page 220 of 336
Fee Name Fee Type
Notes Fee/Deposit
Wastewater Fees
Fats, Oils, and Grease (FOG) Fee each [1]140.00$
Fees for services not listed will be determined on a case‐by‐case
basis. It will be based on the fully burdened hourly rate and the time
of service provided.
per hour [2]151.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3] Maximum limited set per CA Health and Safety Code 1169149(a)(1)
June 8, 2021 Item #11 Page 221 of 336
Fee Name Fee Type
Notes Fee/Deposit
Utility Meter Installation Fees
Potable Water (meter size, inches)
5/8" Displacement per [1] 364.00$
Fire Protection – 5/8" Displacement per [1] 364.00$
3/4” Displacement per [1]371.00$
1” Displacement per [1]404.00$
1‐1/2” Displacement per [1]579.00$
1‐1/2” Turbo per [1]710.00$
2” Displacement per [1]781.00$
2” Turbo per [1]996.00$
3" Ultrasonic per [1] Actual Cost
4" Ultrasonic per [1] Actual Cost
6” Ultrasonic per [1] Actual Cost
8” Ultrasonic per [1] Actual Cost
10” Ultrasonic per [1]Actual Cost
12” Ultrasonic per [1] Actual Cost
Recycled Water (meter size, inches)
5/8" Displacement per [1]364.00$
Fire Protection – 5/8" Displacement per [1]364.00$
3/4” Displacement per [1]371.00$
1” Displacement per [1]404.00$
1‐1/2” Turbo per [1]710.00$
2” Turbo per [1]996.00$
3" Ultrasonic per [1] Actual Cost
4" Ultrasonic per [1] Actual Cost
6” Ultrasonic per [1] Actual Cost
8” Ultrasonic per [1] Actual Cost
10” Ultrasonic per [1] Actual Cost
12” Ultrasonic per [1] Actual Cost
The following language is based on Carlsbad Municipal Water District Ordinance 45: Where a single family
residential water meter is required to be 1” due to a fire sprinkler requirement, the Connection Fee, SDCWA
System Capacity Charge and the Water Treatment Capacity Charge will be based on the size of the meter
necessary to meet the water use requirements, not the actual meter size of 1”. These fees are in addition to the
Potable & Recycled Water Connection Fees and SDCWA Fee.
June 8, 2021 Item #11 Page 222 of 336
Fee Name Fee Type
Notes Fee/Deposit
Utility Potable and Recycled Water Connection Fees (meter size, inches)
Displacement
5/8” each [1] 4,526.00$
3/4”each [1]6,453.00$
1”each [1]10,184.00$
1‐1/2”each [1]19,237.00$
2”each [1]28,970.00$
3”each [1]49,013.00$
4”each [1]76,242.00$
6”each [1] 141,591.00$
8”each [1] 167,351.00$
Turbo and Ultrasonic (All Irrigation Meters)
1‐1/2”each [1]22,583.00$
2”each [1]36,211.00$
3”each [1]76,242.00$
4”each [1] 217,834.00$
6”each [1] 435,659.00$
8”each [1] 610,132.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
These fees are in addition to the Meter Installation Fees and SDCWA Fees.
June 8, 2021 Item #11 Page 223 of 336
Fee Name Fee Type
Notes Fee/Deposit
San Diego County Water Authority (SDCWA) Fees
SDCWA System Capacity Charge (meter size, inches)
Fire Protection per [3]
Based on size of
meter
5/8" Displacement per [3]5,312.00$
3/4” Displacement per [3]5,312.00$
1” Displacement per [3]8,499.00$
1‐1/2” Displacement per [3]15,936.00$
1‐1/2” Turbo per [3]15,936.00$
2” Displacement per [3]27,622.00$
2” Turbo per [3]27,622.00$
3” per [3]50,995.00$
4” per [3]87,117.00$
6”per [3] 159,360.00$
8”per [3] 276,224.00$
10”per [3] 414,336.00$
12”per [3] 701,184.00$
Water Treatment Capacity Charge (meter size, inches)
Fire Protection per [3]
Based on size of
meter
5/8" Displacement per [3]148.00$
3/4” Displacement per [3]148.00$
1” Displacement per [3]237.00$
1‐1/2” Displacement per [3]444.00$
1‐1/2” Turbo per [3]444.00$
2” Displacement per [3]770.00$
2” Turbo per [3]770.00$
3” per [3]1,421.00$
4” per [3]2,427.00$
6”per [3]4,440.00$
8”per [3]7,696.00$
10”per [3]11,544.00$
12”per [3]19,536.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3]
The following language is based on Carlsbad Municipal Water District Ordinance 45: Where a single family
residential water meter is required to be 1” due to a fire sprinkler requirement, the Connection Fee, SDCWA
System Capacity Charge and the Water Treatment Capacity Charge will be based on the size of the meter
necessary to meet the water use requirements, not the actual meter size of 1”.
These fees are set by San Diego County Water Authority, effective January 1, 2021, and are in addition to the Meter Installation Fees and
Potable and Reclaimed Connection Fees.
June 8, 2021 Item #11 Page 224 of 336
Section 2
Development Related
Service Fees
June 8, 2021 Item #11 Page 225 of 336
Fee Name Fee Type
Notes Fee/Deposit
Planning Department Fees
Agricultural Mitigation Fee
per net
converted
acre
[1] $ 10,000.00
Amendments and Revisions to Approved Projects flat [1] 50% of current
application fee
Appeals to Planning Commision / City Council [2]786.00$
Building Plan Review
Minor Projects, per permit each [3]98.00$
Major Projects, per permit each [4]295.00$
Coastal Development Permit (CDP)
2 ‐ 4 unit or lot subdivision and SFD w/ bluff
per unit/lot ‐
whichever is
greater
[2]2,629.00$
5 or more units or lot subdivision per permit [2]4,280.00$
Emergency flat [2]532.00$
Exemption flat [2]293.00$
Minor Permit flat [2]1,032.00$
Non‐Residential + 10 cents per square foot flat [2]1,165.00$
Single Family Lot flat [2]1,298.00$
Conditional Use Permit (CUP)
Within Biological Habitat Preserve flat [2]1,018.00$
Minor flat [2]905.00$
Regular flat [2]5,405.00$
Daycare Permit (7 ‐ 14 Children)flat [2]253.00$
Environmental Impact Assessment (EIA)
Initial Study ‐ NEGATIVE DECLARATION flat [2]2,083.00$
Initial Study ‐ MITIGATED NEG DEC flat [2]1,146.00$
Environmental Impact Report (EIR)
Addendum
First 20 hours of project planner base fee (flat)[2]3,028.00$
>20 hours of project planner per hour [2]98.00$
Focused/Supplemental (requiring a public hearing)
First 120 hours of project planner and 20 hours of project
engineer base fee (flat)[2]15,293.00$
>120 project planner hours and >20 project engineer hours per hour [2]227.00$
FULL EIR
First 180 hours of project planner and 40 hours of project
engineer base fee (flat)[2]23,453.00$
>180 project planner hours and >40 project engineer hours per hour [2]227.00$
Fish & Game Fee
Environmental Impact Report (EIR) flat [5] $ 3,218.00
June 8, 2021 Item #11 Page 226 of 336
Fee Name Fee Type
Notes Fee/Deposit
Environmental Document pursuant to a Certified Regulatory
Program (CRP)flat [5] $ 1,127.00
Negative Declaration (ND) /Mitigated Negative Declaration
(MND)flat [5] $ 2,330.00
Extensions to projects in process flat [1] 25% of current fee
General Plan Amendment deposit [2]5,145.00$
Habitat Management Plan (HMP)
Amendment to Plan Document ‐ Major ‐ first 60 hours of project
planner base fee (flat)[2]6,443.00$
>60 hours of project planner per hour [2]98.00$
Amendment to Plan Document ‐ Minor flat [2]3,887.00$
Permit ‐ Major ‐first 40 hours of project planner base fee (flat)[2]4,711.00$
>40 hours or project planner per hour [2]98.00$
Permit ‐ Minor ‐ first 20 hours of project planner base fee (flat)[2]653.00$
>20 hours of project planner per hour [2]98.00$
Permit ‐ MINOR W/MINISTERIAL PERMIT flat [2]1,160.00$
Hillside Development Permit ‐ Major ‐ first 40 hours of project
planner base fee (flat)[2]3,028.00$
Hillside Development Permit ‐ Minor ‐ first 20 hours of project
planner base fee (flat)[2]1,498.00$
Inspection ‐ Additional Planning per hour [2]98.00$
Inspection ‐ Overtime per hour per hour [2]112.00$
Landscape Plan Check / Inspection Fees
City Processing Fee per project [2]295.00$
Contractor Cost per project [1] Actual Cost
Local Coastal Plan ‐ Amendment flat [2]7,521.00$
Local Facilities Management Fees ‐ as established by Council deposit [1]Actual Cost
Local Facilities Management Plan/Amendment ‐ Fee + deposit in
minimum increments of $5,000 deposit [1]10,000.00$
Master Plan
Master Plan ‐ Pre‐Filing Submittal flat [1]8,013.00$
First 200 hours of project planner and 100 hours of project
engineer base fee (flat)[2]33,569.00$
>200 project planner hours and >100 project engineer hours per hour [2]289.00$
Major Amendment
First 100 hours of project planner and 40 hours of project
engineer base fee (flat)[2]15,978.00$
>100 project planner hours and >40 project engineer hours per hour [2]269.00$
Minor Amendment
First 30 hours of project planner and 7 hours of project
engineer base fee (flat)[2]2,010.00$
>30 project planner hours and >7 project engineer hours per hour [2]269.00$
June 8, 2021 Item #11 Page 227 of 336
Fee Name Fee Type
Notes Fee/Deposit
Non‐Conforming Construction Permit flat [2]840.00$
Notice Fee (+ postage) flat [1]Actual Cost
Plan Consistency Determination [2]852.00$
Planned Development (residential/non‐residential) ‐ 5 or more
lots/units ‐ Major Subdivision per project [2]10,077.00$
Planned Development (residential/non‐residential) ‐ 4 or fewer
lots/units per project [2]3,634.00$
Planning Commission Agenda and Minutes (+ postage)per page [1] Copy Charge
Planning Commission Determination‐other flat [2]1,970.00$
Postage (All)flat [1]
Current Postage
Rate x Number of
labels
Precise Development Plan flat [2]9,172.00$
Preliminary Plan Review ‐ Major (Other)flat [2]852.00$
Preliminary Plan Review ‐ Minor (SFD) flat [2]240.00$
Reversion to Acreage (Consistent with city payroll records charged
against a $3,100 deposit)
First 25 hours of project planner and 20 hours of project
engineer base fee (flat)[2]5,039.00$
Satellite Antenna Permit flat [2]506.00$
Sign Program
Sign Permit (including non‐commercial) flat [2]73.00$
Sign Program flat [2]1,271.00$
Modified Minor Sign Program flat [2]842.00$
Modified Regular Sign Program flat [2]3,170.00$
Site Development Plan
Minor ‐ Village Area Request for a Parking Option flat [2]1,080.00$
Minor ‐ Residential, less than or equal to 4 units/lots or as
required per CMC/PLAN flat [2]5,385.00$
Major ‐ 5 or more units/lots or as required per CMC/PLAN flat [2]13,658.00$
Special Use Permit ‐ Other flat [2]4,133.00$
Special Use Permit ‐ Floodplain flat [2]4,133.00$
Specific Plan
Base Fee
First 200 hours of project planner and 60 hours of project
engineer base fee (flat)[2]31,180.00$
>200 project planner hours and >60 project engineer hours per hour [2]269.00$
Amendment ‐ Major ‐$
First 180 hours of project planner and 30 hours of project
engineer base fee (flat)[2]24,049.00$
>180 project planner hours and >30 project engineer hours per hour [2]269.00$
Amendment ‐ Minor
First 20 hours of project planner and 7 hours of project
engineer base fee (flat)[2]1,750.00$
June 8, 2021 Item #11 Page 228 of 336
Fee Name Fee Type
Notes Fee/Deposit
>20 project planner hours and >7 project engineer hours per hour [2]269.00$
Street Name Change flat [2]1,783.00$
Tentative Maps
Tentative Parcel Map ‐ Minor Subdivision ‐ 0‐ 4 Lots/Units flat [2]4,586.00$
Tentative Tract Map ‐ 5 ‐ 49 units/lots flat [2]9,930.00$
Tentative Tract Map ‐ 50 + units/lots flat [2]15,164.00$
Tentative Tract Map Litigation Stay flat [1] 25% of current fee
Third Party Review
Processing Fee per project [2]605.00$
Consultant Cost per project [1] Actual Cost
Variance flat [2]3,408.00$
Variance ‐ Minor flat [2]905.00$
Village Area
Village Area Review ‐ Administrative flat [2]495.00$
Village Area Review ‐ Major ‐ Plus Noticing Costs flat [2]3,505.00$
Village Area Review ‐ Minor ‐ Plus Noticing Costs flat [2]1,912.00$
Wireless Communication Third Party Review flat [1]Actual Cost
Zone Change flat [2]5,910.00$
Zone Code Compliance Letter flat [2]139.00$
Research Fee per hour [2]139.00$
Fees for services not listed will be determined on a case‐by‐case
basis. It will be based on the fully burdened hourly rate and the time
of service provided.
per hour [2]98.00$
TOTAL
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3] Minor: residential new/remodel, commercial/industrial tenant improvement
[4] Major: Commercial/Industrial new
[5]Set by Department of Fish and Wildlife. Fish & Game fees are additional to the EIA /EIR fees. Includes $50.00 County Clerk processing fee.
June 8, 2021 Item #11 Page 229 of 336
Fee Name Fee Type
Notes Fee/Deposit
Engineering Department Fees
Adjustment Plat per project [2]1,551.00$
Building Plan Review
Minor Projects, per permit each [3]194.00$
Major Projects, per permit each [4]581.00$
Certificate
Certificate of Compliance each [2]1,258.00$
Certificate of Compliance In Lieu of Parcel Map each [2]3,309.00$
Certificate of Correction each [2]978.00$
Construction Change Review ‐ Major
Base Fee per project [2]825.00$
Plus fee per sheet per sheet [2]270.00$
Construction Change Review ‐ Minor
Base Fee per project [2]586.00$
Plus fee per sheet per sheet [2]171.00$
Developer Agreements ‐ Deposit $10,000 increments
(Consistent with city payroll records + overhead)deposit [1]Actual cost
Easement Document Processing and Recording ‐ Major (all others) per project [2]785.00$
Easement Document Processing and Recording ‐ Minor (Single Family
Lot)per project [2]139.00$
Encroachment Agreement Processing per project [2]406.00$
Grading Permit Investigation Fee (Consistent with city payroll records
+ overhead)deposit [1]Actual Cost
Grading Plan Check Fees (cubic yard)
0 ‐ 100 flat [2]510.00$
101 ‐ 1,000 flat [2]1,021.00$
each additional 100 each [2]226.00$
1,001 ‐ 10,000 flat [2]3,055.00$
each additional 1,000 each [2]194.78$
10,001 ‐ 100,000 flat [2]4,808.00$
each additional 10,000 each [2]280.56$
100,001 ‐ 200,000 flat [2]7,333.00$
each additional 10,000 each [2]443.00$
200,001 ‐ 400,000 flat [2]11,763.00$
each additional 10,000 each [2]143.00$
400,001 ‐ 1,000,000 flat [2]12,049.00$
each additional 100,000 each [2]143.00$
1,000,000+flat [2]12,907.00$
each additional 100,00 each [2]1,290.70$
June 8, 2021 Item #11 Page 230 of 336
Fee Name Fee Type
Notes Fee/Deposit
Grading Permit Fees (cubic yard)
0 ‐ 100 flat [2],[4],
[5]510.00$
101 ‐ 1,000 flat [2],[4],
[5]517.00$
each additional 100 each [2],[4],
[5]103.78$
1,001 ‐ 10,000 flat [2],[4],
[5]1,451.00$
each additional 1,000 each [2],[4],
[5]105.11$
10,001 ‐ 100,000 flat [2],[4],
[5]2,397.00$
each additional 10,000 each [2],[4],
[5]200.67$
100,001 ‐ 200,000 flat [2],[4],
[5]4,203.00$
each additional 10,000 each [2],[4],
[5]200.10$
200,001 ‐ 400,000 flat [2],[4],
[5]6,204.00$
each additional 10,000 each [2],[4],
[5]305.55$
400,001 ‐ 1,000,000 flat [2],[4],
[5]12,315.00$
each additional 100,000 each [2],[4],
[5]1,528.33$
1,000,000+flat [2],[4],
[5]21,485.00$
each additional 100,000 each [2],[4],
[5]2,148.50$
Improvement Plan Review Fee
$0 ‐ $20,000 flat [2]1,631.00$
$20,001 ‐ $50,000 flat [2]3,135.00$
additional $10,000 each [2]454.67$
$50,001 ‐ $100,000 flat [2]4,499.00$
additional $10,000 each [2]385.00$
$100,001 ‐ $250,000 flat [2]6,424.00$
additional $10,000 each [2]576.13$
$250,001 ‐ $500,000 flat [2]15,066.00$
additional $10,000 each [2]194.44$
$500,001 ‐ $1,000,000 flat [2]19,927.00$
additional $10,000 each [2]104.94$
$1,000,000+flat [2]25,174.00$
additional $10,000 each [2]251.74$
June 8, 2021 Item #11 Page 231 of 336
Fee Name Fee Type
Notes Fee/Deposit
Improvement Inspection
$0 ‐ $20,000 flat [2]413.00$
$20,001 ‐ $50,000 flat [2]2,027.00$
additional $10,000 each [2]678.33$
$50,001 ‐ $100,000 flat [2]4,062.00$
additional $10,000 each [2]203.00$
$100,001 ‐ $250,000 flat [2]5,077.00$
additional $10,000 each [2]162.87$
$250,001 ‐ $500,000 flat [2]7,520.00$
additional $10,000 each [2]187.48$
$500,001 ‐ $1,000,000 flat [2]12,207.00$
additional $10,000 each [2]130.20$
$1,000,000+flat [2]18,717.00$
additional $10,000 each [2]187.17$
Mapping Fees
Final Tract Map ‐ Major Subdivision
Base Fee per project [2]9,012.00$
additional acre per acre [2]6.00$
Parcel Map ‐ Minor Subdivision per project [2]4,045.00$
Neighborhood Improvement Agreements each [2]189.00$
Oversize Load Permit ‐ 1 trip each [6]16.00$
Oversize Load Permit ‐ Annual/Per Year each [6]90.00$
Quitclaim of Easement each [2]825.00$
Reapportionment Fees for 1911 Act Assessment Districts each [1]Actual Cost
Retaining Wall Plan Check Fees
Retaining Wall Plan Check Valuation
$0 ‐ $50,000 flat [2]418.00$
$50,001 ‐ $250,000 flat [2]2,035.00$
$250,000+flat [2]3,585.00$
Reversion to Acreage deposit [2]3,410.00$
June 8, 2021 Item #11 Page 232 of 336
Fee Name Fee Type
Notes Fee/Deposit
Right‐of‐Way Permit
Minor ‐ Non‐Construction each [2]206.00$
Minor ‐ Construction each [2]419.00$
Utility
City Processing Fee each [2]339.00$
Inspector's Time hourly [2]144.00$
Utility (by contract)each [2]892.00$
Use ‐ Initial Permit
Curb Cafe each [2]419.00$
Outdoor Display each [2]206.00$
Sidewalk Café each [2]419.00$
Use ‐ Annual Renewal
Curb Cafe each [2]206.00$
Outdoor Display each [2]206.00$
Sidewalk Café each [2]206.00$
Village Area ‐ Curb Café (max of two parking spaces)per space/
per year [2]1,200.00$
Secured Agreement Processing ‐ Extension each [2]385.00$
Secured Agreement Processing ‐ Replacement, plus improvement
plan revision fees if required each [2]678.00$
Segregation of Assessments ‐ 1‐ 4 lots (Consistent with city payroll
records + overhead, consultant cost and recording fee. Also see
Streets and Highways Code Section 8760‐8769 )
deposit [1]Actual Cost
Segregation of Assessments ‐ 5 lots or more ‐ fee + $20 per lot
(Consistent with city payroll records + overhead, consultant cost and
recording fee. Also see Streets and Highways Code Section 8760‐
8769)
deposit [1]Actual Cost
Storm Water Pollution Prevention Plan (SWPPP) Fees
Plan Review Fee
Tier 1per site [2]64.00$
Tier 2per site [2]339.00$
Tier 3 one acre or
less [2]775.00$
Tier 3 ‐ Supplemental Fee per acre [2]98.00$
Inspection Fee
Tier 1per site [2]271.00$
Tier 2per site [2]1,494.00$
Tier 3 one acre or
less [2]2,528.00$
Tier 3 ‐ Supplemental Fee per acre [2]411.00$
June 8, 2021 Item #11 Page 233 of 336
Fee Name Fee Type
Notes Fee/Deposit
Storm Water Quality Management Plan (SWQMP) Fees
Plan Review ‐ Base Fee each [2]400.00$
Plan Review ‐ For each subsequent acre or portion thereof over
one half acre per acre [2]97.00$
Inspection Fee ‐ Base Fee each [2]337.00$
Inspection Fee ‐ For each subsequent acre or portion thereof over
one half acre per acre [2]134.00$
Street Vacation ‐ Street/Public Service Easement Vacation ‐ Regular each [2]4,026.00$
Street Vacation ‐ Street/Public Service Easement Vacation ‐ Summary each [2]1,597.00$
Third Party Review
Processing Fee per project [2]339.00$
Consultant Cost per project [1]Actual Cost
Village Area ‐ Parking In Lieu Fee each [1]11,240.00$
Fees for services not listed will be determined on a case‐by‐case
basis. It will be based on the fully burdened hourly rate and the time
of service provided.
per hour [2]194.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
[3] Minor: residential new/remodel, commercial/industrial tenant improvement
[4] Major: Commercial/Industrial new
[5]
[6]
[7] Maximum limit set by CA Vehicle Code 35795(b)(1)
Quantities are calculated by using the greater of cut/fill, plus remedial work. Plan checks extending more than 24 months may be assessed an
additional fee of 25% of the current plan check fee.
Minor grading plan check fees are 50% of standard plan check fees. Qualifying for minor grading plan check is subject to City Engineer approval
per CMC 15.16.062.
June 8, 2021 Item #11 Page 234 of 336
Fee Name Fee Type
NotesFee/Deposit
Building Department Fees
NEW CONSTRUCTION, ADDITIONS, AND MAJOR REMODELS
Commercial/Industrial Uses ‐ Structural (All newly constructed or
added space for non‐residential occupancies classified as CBC Group
A, B, E, F, H, I, M, or other commercial occupancies not specifically
addressed elsewhere in this Fee Schedule)
0 ‐ 500 sqft flat [2]964.00$
additional sqft each [2]0.30$
501 ‐ 5,000 sqft flat [2]2,323.00$
additional sqft each [2]0.41$
5,001 ‐ 10,000 sqft flat [2]4,350.00$
additional sqft each [2]0.04$
10,001 ‐ 50,000 sqft flat [2]5,956.00$
additional sqft each [2]0.09$
50,001 ‐ 100,000 sqft flat [2]10,578.00$
additional sqft each [2]0.11$
Commercial Residential and Multifamily Residential Uses ‐ (All
newly constructed or added space for residential occupancies
classified as CBC Group R (except R‐3), or other residential
occupancies not specifically addressed elsewhere in this Fee
Schedule)0 ‐ 500 sqft flat [2]914.00$
additional sqft each [2]0.51$
501 ‐ 5,000 sqft flat [2]3,188.00$
additional sqft each [2]0.50$
5,001 ‐ 10,000 sqft flat [2]5,685.00$
additional sqft each [2]0.05$
10,001 ‐ 50,000 sqft flat [2]7,538.00$
additional sqft each [2]0.13$
50,001 ‐ 100,000 sqft flat [2]13,939.00$
additional sqft each [2]0.14$
Low and Moderate Hazard Storage ‐ (All newly constructed or added
space for storage occupancies classified as CBC Group S, or other
storage occupancies not specifically addressed elsewhere in this Fee
Schedule)
0 ‐ 500 sqft flat [2]939.00$
additional sqft each [2]0.33$
501 ‐ 5,000 sqft flat [2]2,422.00$
additional sqft each [2]0.22$
5,001 ‐ 10,000 sqft flat [2]3,510.00$
additional sqft each [2]0.03$
10,001 ‐ 50,000 sqft flat [2]4,523.00$
additional sqft each [2]0.01$
June 8, 2021 Item #11 Page 235 of 336
Fee Name Fee Type
NotesFee/Deposit
50,001 ‐ 100,000 sqft flat [2]4,943.00$
additional sqft each [2]0.05$
Attached Accessory and Utility Uses ‐ (All newly constructed, added
or structurally remodeled space for utility and accessory occupancies
classified as CBC Group U, or other utility and accessory occupancies
not specifically addressed elsewhere in this Fee Schedule
0 ‐ 200 sqft flat [2]494.00$
additional sqft each [2]1.36$
201 ‐ 400 sqft flat [2]766.00$
additional sqft each [2]0.62$
401 ‐ 600 sqft flat [2]890.00$
additional sqft each [2]0.31$
601 ‐ 1,000 sqft flat [2]1,013.00$
additional sqft each [2]0.15$
1,001 ‐ 3,000 sqft flat [2]1,310.00$
additional sqft each [2]0.44$
Detached Accessory and Utility Uses ‐ (All newly constructed, added,
or structurally remodeled space for utility and accessory
occupancies/uses not specifically addressed elsewhere in this Fee
Schedule)
0 ‐ 200 sqft flat [2]494.00$
additional sqft each [2]1.36$
201 ‐ 400 sqft flat [2]766.00$
additional sqft each [2]0.62$
401 ‐ 600 sqft flat [2]890.00$
additional sqft each [2]0.31$
601 ‐ 1,000 sqft flat [2]1,013.00$
additional sqft each [2]0.15$
1,001 ‐ 3,000 sqft flat [2]1,310.00$
additional sqft each [2]0.44$
Shell Buildings for all Commercial/Industrial Uses ‐ (The enclosure
for all newly constructed or added space for non‐residential
occupancies classified as CBC Group A, B, E, F, H, I, M, or other
commercial occupancies not specifically addressed elsewhere in this
Fee Schedule where the interior is not completed or occupiable)
0 ‐ 500 sqft flat [2]816.00$
additional sqft each [2]0.21$
501 ‐ 5,000 sqft flat [2]1,780.00$
additional sqft each [2]0.26$
5,001 ‐ 10,000 sqft flat [2]3,065.00$
June 8, 2021 Item #11 Page 236 of 336
Fee Name Fee Type
NotesFee/Deposit
additional sqft each [2]0.02$
10,001 ‐ 50,000 sqft flat [2]4,053.00$
additional sqft each [2]0.01$
50,001 ‐ 100,000 sqft flat [2]4,548.00$
additional sqft each [2]0.05$
Commercial/Industrial Tenant Improvement ‐ Structural ‐
(Structurally remodeled space for non‐residential occupancies
classified as CBC Group A, B, E, F, H, I, M, or other commercial
occupancies not specifically addressed elsewhere in this Fee Schedule
where the structure is not altered)
0 ‐ 500 sqft flat [2]717.00$
additional sqft each [2]0.20$
501 ‐ 5,000 sqft flat [2]1,631.00$
additional sqft each [2]0.09$
5,001 ‐ 10,000 sqft flat [2]2,076.00$
additional sqft each [2]0.05$
10,001 ‐ 50,000 sqft flat [2]4,202.00$
additional sqft each [2]0.04$
50,001 ‐ 100,000 sqft flat [2]6,401.00$
additional sqft each [2]0.06$
Commercial/Industrial Tenant Improvement ‐ Non‐structural ‐ (Non‐
structurally remodeled space for non‐residential occupancies
classified as CBC Group A, B, E, F, H, I, M, or other commercial
occupancies not specifically addressed elsewhere in this Fee Schedule
where the structure is not altered)
0 ‐ 500 sqft flat [2]648.00$
additional sqft each [2]0.20$
501 ‐ 5,000 sqft flat [2]1,532.00$
additional sqft each [2]0.07$
5,001 ‐ 10,000 sqft flat [2]1,878.00$
additional sqft each [2]0.05$
10,001 ‐ 50,000 sqft flat [2]3,732.00$
additional sqft each [2]0.04$
50,001 ‐ 100,000 sqft flat [2]5,610.00$
additional sqft each [2]0.06$
Commercial Residential and Multifamily Residential Remodels ‐
Structural ‐ (Structurally remodeled space for residential occupancies
classified as CBC Group R (except R‐3), or other residential
occupancies not specifically addressed elsewhere in this Fee
Schedule)
0 ‐ 500 sqft flat [2]766.00$
additional sqft each [2]0.42$
June 8, 2021 Item #11 Page 237 of 336
Fee Name Fee Type
NotesFee/Deposit
501 ‐ 5,000 sqft flat [2]2,669.00$
additional sqft each [2]0.31$
5,001 ‐ 10,000 sqft flat [2]4,226.00$
additional sqft each [2]0.06$
10,001 ‐ 50,000 sqft flat [2]6,673.00$
additional sqft each [2]0.08$
50,001 ‐ 100,000 sqft flat [2]10,726.00$
additional sqft each [2]0.11$
Commercial Residential and Multifamily Residential Remodels ‐
Non Structural ‐ (Non‐Structurally remodeled space for residential
occupancies classified as CBC Group R (except R‐3), or other
residential occupancies not specifically addressed elsewhere in this
Fee Schedule)
0 ‐ 500 sqft flat [2]766.00$
additional sqft each [2]0.25$
501 ‐ 5,000 sqft flat [2]1,878.00$
additional sqft each [2]0.38$
5,001 ‐ 10,000 sqft flat [2]3,757.00$
additional sqft each [2]0.06$
10,001 ‐ 50,000 sqft flat [2]5,981.00$
additional sqft each [2]0.08$
50,001 ‐ 100,000 sqft flat [2]9,936.00$
additional sqft each [2]0.10$
Single Family Dwellings and Duplexes ‐ (All newly constructed or
added space for residential occupancies classified as CBC Group R‐3,
including custom builds and model homes for tract master plans, or
other similar residential occupancies not specifically addressed
elsewhere in this Fee Schedule)
0 ‐ 1,000 sqft flat [2]1,162.00$
additional sqft each [2]0.41$
1,001 ‐ 2,500 sqft flat [2]1,780.00$
additional sqft each [2]0.26$
2,501 ‐ 4,000 sqft flat [2]2,175.00$
additional sqft each [2]0.25$
4,001 ‐ 6,000 sqft flat [2]2,669.00$
additional sqft each [2]0.27$
6,001 ‐ 8,000 sqft flat [2]3,213.00$
additional sqft each [2]0.40$
Duplicate Floor Plan Review ‐ Single Family Dwellings and Duplexes
0 ‐ 1,000 sqft flat [2]969.00$
additional sqft each [2]0.24$
June 8, 2021 Item #11 Page 238 of 336
Fee Name Fee Type
NotesFee/Deposit
1,001 ‐ 2,500 sqft flat [2]1,335.00$
additional sqft each [2]0.13$
2,501 ‐ 4,000 sqft flat [2]1,532.00$
additional sqft each [2]0.20$
4,001 ‐ 6,000 sqft flat [2]1,928.00$
additional sqft each [2]0.17$
6,001 ‐ 8,000 sqft flat [2]2,274.00$
additional sqft each [2]0.28$
Duplicate Floor Plan Review ‐ Attached or Detached Accessory and
Utility Uses
0 ‐ 200 sqft flat [2]470.00$
additional sqft each [2]0.74$
201 ‐ 400 sqft flat [2]618.00$
additional sqft each [2]0.25$
401 ‐ 600 sqft flat [2]667.00$
additional sqft each [2]0.43$
601 ‐ 1,000 sqft flat [2]840.00$
additional sqft each [2]0.14$
1,001 ‐ 3,000 sqft flat [2]1,112.00$
additional sqft each [2]0.37$
Site Improvements ‐ This includes substantial development of private
parking lots which are processed separate of the structure and
include any combination of the following: Underground utilities,
parking lot lighting, accessible path of travel analysis, grading,
drainage and compliance with the City's parking and driveway
standards.
0 ‐ 500 sqft flat [2]395.00$
additional sqft each [2]0.13$
501 ‐ 5,000 sqft flat [2]964.00$
additional sqft each [2]0.06$
5,001 ‐ 10,000 sqft flat [2]1,285.00$
additional sqft each [2]0.01$
10,001 ‐ 50,000 sqft flat [2]1,483.00$
additional sqft each [2]0.01$
50,001 ‐ 100,000 sqft flat [2]1,878.00$
additional sqft each [2]0.02$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
June 8, 2021 Item #11 Page 239 of 336
Fee Name Fee Type
NotesFee/Deposit
Building Department Fees
MINOR/MISCELLANEOUS RESIDENTIAL & COMMERCIAL IMPROVEMENTS
Above Ground Storage Tank per permit [2]232.00$
Cell Site
Radio over 30 ft. high each [2]647.00$
Dish, 10 ft. dia. w/decoder each [2]481.00$
Equipment Enclosure each [2]1,099.00$
Awning or Canopy per permit [2]275.00$
Bollards up to 4pcs per permit [2]344.00$
Certificate of Occupancy per permit [2]15.00$
Decks / Balcony
Repair each [2]100.00$
New/Replace each [2]825.00$
Demolition of Building
Commercial each [2]191.00$
Residential each [2]550.00$
Fence or Freestanding Wall up to 100'each [2]618.00$
Fire Damage Repair ‐ Residential ‐ Minor per permit [2]230.00$
Fireplace Repair/Replace per permit [2]412.00$
Foundation Repair
Commercial each [2]515.00$
Residential each [2]515.00$
Greenhouse per permit [2]515.00$
Manufactured House / Building
Commercial per permit [2]292.00$
Residential per permit [2]515.00$
Mobile Home (Within a park, per current edition of Title 25,
published by California Division of Housing and Community
Development.)
per permit [2] 584.00$
Partition/ Wall ‐ Interior/Non‐Structural <100' per permit [2] 347.00$
Patio
Frame with Cover each [2]100.00$
Frame with Cover & Walls each [2]550.00$
Screen or Plastic Walls each [2]412.00$
Plastering Outside per permit [2]344.00$
Remodel ‐ Residential
Kitchen/Bath each [2]350.00$
Other ‐ up to 500 s.f.each [2]481.00$
Other ‐ above 500 s.f per 100 sqft [2]0.34$
Repairs ‐ Miscellaneous
Commercial each [2]366.00$
Residential each [2]86.00$
Retaining Wall
Non‐Engineered ‐ City Standard per permit [2]100.00$
June 8, 2021 Item #11 Page 240 of 336
Fee Name Fee Type
NotesFee/Deposit
Reroofing
Commercial per permit [2] 266.00$
Residential per permit [2]89.00$
Roof Structure Repair / Reinforcement
Commercial each [2]253.00$
Residential each [2]357.00$
Saunas (Steam)per permit [2]309.00$
Sign
Wall ‐ Illuminated per permit [2]139.00$
Wall ‐ Non‐Illuminated per permit [2]139.00$
Pole per permit [2]344.00$
Monument per permit [2]139.00$
Skylight
Commercial each [2]344.00$
Residential each [2]344.00$
Solar ‐ Residential (Up to 10 kW)per permit [2]268.00$
Per kW above 10kW per kW [2]48.00$
Add Residential Battery Back‐up per permit [2]206.00$
Add Residential Panel Upgrade per permit [2]240.00$
Add Reverse Tilt System/ Ground Mount per permit [2]309.00$
Solar ‐ Commercial (Up to 50 kW)per permit [2]618.00$
Per kW between 51kW ‐ 250kW per kW [2]62.00$
Per kW above 250kW per kW [2]62.00$
Spray Booth Install / Clean Room per permit [2]248.00$
Stairs
New/Replace First Story each [2]378.00$
Additional Story each [2]309.00$
Repair each [2]378.00$
Siding
Stucco each [2]378.00$
Stone/Brick Veneer each [2]398.00$
Storage Racks
<8 ft, first 100 lf per permit [2]447.00$
each add'l. 100 lf each [2]82.00$
>8 ft, first 100 lf per permit [2]481.00$
>8 ft, ea. Add'l 100 lf each [2]220.00$
Swimming Pool
Commercial per permit [2]228.00$
Residential per permit [2]228.00$
Temporary Seating or Bleachers Install per permit [2]515.00$
Trash Enclosure Install per permit [2]240.00$
June 8, 2021 Item #11 Page 241 of 336
Fee Name Fee Type
NotesFee/Deposit
Windows / Door
Commercial each [2]309.00$
Residential each [2]309.00$
Other Inspections (Per Hour)
Inspections outside of normal business hours (minimum charge: two
hours)per hour [2]129.00$
Re‐inspection fees per hour [2]129.00$
Inspections for which no fee is specifically indicated (minimum
charge: one half‐hour)per hour [2]129.00$
Additional plan review required by changes, additions or revisions to
approved plans (minimum charge: one half‐hour)per hour [2]129.00$
Other Building Fees
Building Permit Revision, Fee + Third Party Hourly Charge per hour [2] actual cost
Building Plan Check Fee (8% discount on repetitive plan checks) each [2] actual cost
Green Building Standards Plan Check and Inspection each [2] actual cost
Green Building State Standards Fee (SB1473)each [1]
$1.00 per every
$25,000 in building
valuation or fraction
thereof (minimum
fee $1.00)
Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard
Mapping Fee ‐ Residential each [1]
Pass through from
State: $13.00 per
$100,000 valuation
(minimum $0.50 fee)
Strong Motion Instrumentation Fee (SMIP) and Seismic Hazard
Mapping Fee ‐ Commercial each [1]
Pass through from
State: $28.00 per
$100,000 valuation
(minimum $0.50 fee)
Fees for services not listed will be determined on a case‐by‐case
basis. It will be based on the fully burdened hourly rate and the time
of service provided.
per hour [2]137.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
June 8, 2021 Item #11 Page 242 of 336
Fee Name Fee Type
NotesFee/Deposit
Building Department Fees
Simple Single or Combination Permits
(see list of simple items)per permit [2]193.00$
Water Heater Only per permit [2]108.00$
Complex Mechanical Permits
FAU less than 100,000 Btu/h per permit [2]481.00$
FAU greater than 100,000 Btu/h per permit [2]618.00$
Floor furnace (including vent)per permit [2]344.00$
Suspended, wall, or floor‐mounted heaters per permit [2]275.00$
Appliance vents not included in an appliance permit per permit [2]550.00$
Boiler up to 100,000 Btu/h per permit [2]653.00$
Boiler 100,000 Btu/h to 500,000 Btu/h per permit [2]275.00$
Compressor up to 3 HP per permit [2]309.00$
Compressor up to 3 HP to 15 HP per permit [2]323.00$
Other Complex Mechanical per permit [2]412.00$
Complex Electrical Permits
Commercial Appliance per permit [2]275.00$
Power Apparatus per permit [2]275.00$
Motor not over 1 HP each [2]275.00$
Motor over 1 HP and not over 10 HP each [2]275.00$
Motor over 10 HP and not over 50 HP each [2]275.00$
Motor over 50 HP and not over 100 HP each [2]309.00$
Motor over 100 HP each [2]344.00$
Generator not over 1 KW each [2]275.00$
Generator over 1 KW and not over 10 KW each [2]309.00$
Generator over 10 KW and not over 50 KW each [2]412.00$
Generator over 50 KW and not over 100 KW each [2]412.00$
Generator over 100 KW each [2]481.00$
Transformer not over 1 KVA each [2]344.00$
Transformer over 1 KVA and not over 10 KVA each [2]344.00$
Transformer over 10 KVA and not over 50 KVA each [2]378.00$
Transformer over 50 KVA and not over 100 KVA each [2]412.00$
Transformer over 100 KVA each [2]412.00$
Services of 600 volts or less and over 400 amperes to 1000
amperes in rating each [2]412.00$
Services over 600 volts or over 1000 amperes in rating each [2]550.00$
Other Complex Electrical each [2]412.00$
PLUMBING, MECHANICAL AND ELECTRICAL PERMITS ‐ NOT ASSOCIATED WITH A BUILDING
PERMIT
June 8, 2021 Item #11 Page 243 of 336
Fee Name Fee Type
NotesFee/Deposit
Complex Plumbing Permits
Fire Suppression System / Commercial Hood per permit [2]584.00$
Onsite Sewer 6" & Over per permit [2]378.00$
Onsite Water 6" & Over per permit [2]378.00$
Onsite Storm Drain 6" & Over per permit [2]378.00$
Other Complex Plumbing per permit [2]412.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
June 8, 2021 Item #11 Page 244 of 336
Fee Name
Simple Mechanical Items:
Addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating,
cooling, absorption, or evaporative cooling system.
HVAC change out ‐ existing dwelling
Air‐handling unit under 10,000 CFM
Evaporative cooler
Ventilation fan connected to a single duct
Hood and duct system
Duct systems
Miscellaneous mechanical (wall furnace, condensing units, gas outlet/gas test, etc.)
Other simple mechanical
Simple Electrical Items:
Receptacle, switch, and lighting outlets
Lighting fixtures
Pole or platform‐mounted lighting fixtures
Theatrical‐type lighting fixtures or assemblies
Appliances not exceeding one horsepower (HP), kilowatt (KW), or kilovolt‐ampere (KVA), in rating
Busways
Trolley and plug‐in‐type busways ‐ each 100 feet or fraction thereof
Signs, outline lighting, or marquees supplied from one branch circuit
Services of 600 volts or less and not over 200 amperes in rating
Miscellaneous apparatus, conduits, and conductors
Portable generators less than 10,000 W
Temporary power panel/service
Temporary power pole
Other simple electrical
Simple Plumbing Items:
Plumbing fixtures
Building sewer
Rainwater systems
Water heater
Industrial waste pretreatment interceptor
Water piping and/or water treating equipment
Repair or alteration of drainage or vent piping
Backflow devices
Atmospheric‐type vacuum breakers
Gas test
Gas outlets
Residential remodel/repairs
Other simple plumbing
Simple Single or Combination Permits List
June 8, 2021 Item #11 Page 245 of 336
Section 3
Development Impact Fees
June 8, 2021 Item #11 Page 246 of 336
HOLD FOR NEW MAP FROM GIS
Fees subject to section 66000 of the California Government Code
June 8, 2021 Item #11 Page 247 of 336
June 8, 2021 Item #11 Page 248 of 336
June 8, 2021 Item #11 Page 249 of 336
June 8, 2021 Item #11 Page 250 of 336
Fee Name Fee Type
Notes Fee Level / Deposit
Planned Local Drainage Area Fees (PLDA)
PLDA A, Low Runoff per acre 6,897.00$
PLDA B, Low Runoff per acre 2,578.00$
PLDA C, Low Runoff per acre 2,502.00$
PLDA D, Low Runoff per acre 2,373.00$
PLDA A, Medium Runoff per acre 13,715.00$
PLDA B, Medium Runoff per acre 4,969.00$
PLDA C, Medium Runoff per acre 3,540.00$
PLDA D, Medium Runoff per acre 3,882.00$
PLDA A, High Runoff per acre 29,887.00$
PLDA B, High Runoff per acre 11,170.00$
PLDA C, High Runoff per acre 10,845.00$
PLDA D, High Runoff per acre 10,283.00$
Low Runoff Potential Medium Runoff Potential High Runoff Potential
CF ♦
GC ♦
L ♦
O ♦
OS ♦
P ♦
PI ♦
PI/O ♦
R ♦
R1.5 ♦
R4 ♦
R8 ♦
R15 ♦
R15/L ♦
R15/O ♦
R15/VC ♦
R23 ♦
R30 ♦
OK‐TC ♦
VC ♦
VC/OS ♦
V ♦
PLDA FEE CATEGORYGeneral Plan Land
Use Designation
June 8, 2021 Item #11 Page 251 of 336
June 8, 2021 Item #11 Page 252 of 336
June 8, 2021 Item #11 Page 253 of 336
Fee Name Fee Type
Notes Fee/Deposit
Affordable Housing Credit
Northwest Quadrants per unit [1]146,118.00$
Cassia Heights (Southeast and Southwest quadrants) per unit [1]60,851.00$
Tavarua Senior Affordable Apartments (Northwest quadrant) per unit [1]85,176.00$
Villa Loma (Southeast and Southwest quadrants) per unit [1]48,000.00$
Affordable Housing Impact Fee per unit [1]2,925.00$
Affordable Housing In‐Lieu Fee per market
unit [1]4,515.00$
Habitat Mitigation Fees, Per Acre
Type D ‐ Coastal Sage Scrub per acre [1]35,577.00$
Type E ‐ Non‐Native Grassland per acre [1]17,790.00$
Type F ‐ Agricultural Land, Disturbed Land, Eucalyptus Woodland per acre [1]3,558.00$
Traffic Impact Fees
Apartment (Inside of CFD 1)per ADT [1]338.00$
Apartment (Outside of CFD 1) per ADT [1]397.00$
Commercial/Industrial Cost Per Trip (Inside CFD) per ADT [1]134.00$
Commercial/Industrial Cost Per Trip (Outside of CFD) per ADT [1]159.00$
Condominium (Inside of CFD 1) per ADT [1]338.00$
Condominium (Outside of CFD 1) per ADT [1]397.00$
Single Family (Inside of CFD 1) per ADT [1]338.00$
Single Family (Outside of CFD 1) per ADT [1]397.00$
[Notes]
[1] Set per City policy
[2] Set per 2021 ‐ Cost of Service Study and Fee Schedule Update
June 8, 2021 Item #11 Page 254 of 336