HomeMy WebLinkAbout111 SEQUOIA AVE; ; 87-540; PermitII) z 0 ~ a: ◄ _,
(.J w 0
a: w 0 ...
5 I w z 3 0
I hereby attlrm that I am licensed under
ovlalona ol Chapter 9 (commencing with
tlon 7000) ol Division 3 or the Business
an Pfoleaalons Code, and my license Is in
lull force and effect.
I hereby affirm Iha! I am exempl tram the con1rac-
t0<'s License Law !or the following reason (Sec. 7031.5 Business and Professions Code: Any cily or county whtth re-quires a permII 10 construct, alter, improve. demolish. or
repair any structure. prior to its issuance also requires !heap-
plicant for such permII to me a signed statement thal he is
hcensed pursuant to the pnMsions of the Comractor's
License Law (Chapler 9 c0<nrnencing with Sect10n 7000 ol Division 3 ot the Business and Prolessions COde) or thal is ex-
empt therefrom and the basis for the allegeo exemption Any vk>lation of Section 7031.5 by an applicant lor a permit sub-
jects the applicant to a civil penalty of not more than five hun-dred dollars ($500).
I I I, as owner cl the property, or my employees with wages
as !heir sole compensat,on, w,11 do the work, and the struc-
ture is not intended or oflered for sale (Sec. 7044, Business
and Prolessions Code: The Contractor's License Law does nor apply lo an owner of property who builds or improves
!hereon and who does such work himself or lhrough his own employees, provided that such improvements are not intend-
ed or otlered ror saJe. II, however. lhe building or improve-
ment 1s sold within one year ol completion, lhe owner-builder will have the burden of provin9 that he did not build °' im-
prove 10< the purpose ol sale).
rJ I. as owner of the property, am exclusively contracting with licensed contractors to cons1ruct the prOJOCt (Sec. 7044.
Business and Professions Code: The Contractor's LJcense
Law does not apply to an owner of property who builds or im-
proves thereon. and who contracts fOf each projects with a contractor(s) license pursuant to the Contractor's License Law),
D As a homeowner I am improving my home, and the follow· ing conditions exisl:
1. The w0<k is being per1ormed prior to sale. 2. I have lived in my home for twelve months prior to completion of this work
3. I have not claimed this exemption during the last th!ee years.
D lamexemptunderSec. ______ ,B&P.C.
for !his reason ------------
I nereby altirm that I have a certificate of consent to
s nsure. or a certificate of Workers' Compensation ln--
s ra e. or a certified copy thereof (Sec. 3800. labor COde)
D Copy is filed with the city
0 Cert1f1ed copy is hereby furnished
CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE
(This section need not be completed if the permit
is for one hundred dollars ($100) o, less)
0 I certify that in the performance of the work fOf which
this permit is issued. I shall not employ any person in any
manner so as to become subject to the Workers' Compen-
sation Laws of California.
NOTICE TO APPLICANT: If. after making this Certificate
of EHmption. you should become subject to the Workers·
Compensation provisions of the Labor Code, you must
forthwith comply with such provisions or this permit shall
be deemed revoked.
D I hereby affirm that there is a construction lending
agency for the performance of the woi1<. for which this per-
mit is Issued (Sec. 3097. Civil Code)
Lender·s Name ___________ _
Lender's Address ___________ _
USE BALL POINT PEN ONLY & PRESS HARD APPLICANT TO FILL IN INFORMATION WITHIN SHADED AREA AND DECLARATIONS.
CARLSBAD BUILDING DEPARTMENT APPLICATION & PERMIT . 2075 Las Palmas Dr., Carlsbad, CA 92009-4859 (619) 438-1161
JOB ADDRESS AV.ST.RO. 'NEAREST CRO•trt.
ID,El;;JC,;N1
BUSINESS LICE.NSE # VALUATION PERMIT NUMBER
11 l S £61,e,< 0 l ,\ ~ BWt> \ <::l'."1{ .... 4 ~1 /~o LOT BLOCK I SU8:°IVISIO~ • I AS~t,prgt~ -..zo CO~TRACTOR ,,L ' .
Cr-TRAC_~RS ~ t ZONE -,~. _,._ .,.~ .
OWNER'S NAME -. ft;.p ·~~NER'S PHONE .• -·-/fl~ .I.,,, "1411;'7. • ,~z.lJ
, __ SH~L ~SSOC1~i£S CONTRACTOR'S ADDRESS / STATE UCEN&E NO. IIUILDING SO. FOOTAGE LTt> · ~ ~z.-rno ;;t?Yt, -st:: ~ ;A:-r-4&-~"+?-OWNER'S MAILING ADDRESS S "f •TE -, 50 ,,
l'30l DO\/~ DESIGNER DESIGNER'S PHONE ST ... .. I .... Ir, •• ;;. B ,.~,. ...a ,..4
DESCRIPTION OF WORK ' -#
DESIGNER'S ADDRESS STATE LICENSE NO. 0016 06/22 0101 02BldPmt
~5 t>V ~.J ~t>'-t?OIII W1'//;::. 30-(
F/P FLA ELEV. NO OCC GP EDU ~,,v.1~ "1ft'1-V) sJ.M STORIES
vO NO ---
I I PARK ING SPACE I RES UNITS GRADING PERMIT ISSUED I REDEVELOPMENT TYPE OCC LOAD Fl RE SPA
AREA CONST
YO N 0 vO NO vO NO Not Valid Unl~s M~chine Certified
QTY. PLUMBING PERMIT -ISSUE 7~ QTY. MECHANICAL PERMIT -ISSUE 15~ SUMMARY/ACCOUNT NUMBER
EACH FIXTURE TRAP INSTALL FU RN. DUCTS i.JP TO 100,000 BTU BUILDING PERMIT 001-810·00·00·8220 ,:'L) -
EACH BUILDING SEWER OVER 100,000 BTU SIGN PERMIT 001 ·810·00-00-8221
EACH WATER HEATER ANO/DR VENT BOILER/CO MPRESSOR UP TO 3 HP PLAN CHECK 001-810-00·00·8821
EACH GAS SYSTEM 1 TD 4 OUTLETS BOILER/COMPRESSOR 3-15 HP TOTAL PLUMBING 001 ·810-00-00·8222
EACH GAS SYSTEM 5 OR MORE METAL FIREPLACE ELECTRICAL 001 ·810·00·00-8223
EACH INSTA~--ALTER, REPAIR WATER PIPE VENT FAN SINGLE DUCT MECHANICAL 001 ·810·00·00·8224
EACH VACUUM BREAKER MECH EXHAUST -HOOOIOUCTS MOBILEHOME 001 ·8~-8W!li, I•
WATER SOFTNER RELOCATION OF EA FURNACE/HEATER SOLAR 001•8t-~u~uu· ., '.J. r\. .t< If l"l
EACH ROOF DRAIN (INSIDE) DRYER VENT STRONG MOTION 880·519·92·33 -
TOT.C.L MECHANICAL FIRE SPRINi<LERS 001 ·810·00#J/q2211 ,, .,.. .... _
TOTAL PLUMBING I -... V I.JOO PUBLIC FACILITIES FEE 320-810·00·00-8740 s~ BRIDGE FEE 36Ultltl·~4t;,. ·---QTY. ELECTRICAL PERMIT -ISSUE QTY. MOBILE HOME SETUP PARK-IN-LIEU (AREA DEVELOO~illT ... -~ "••-
NEW CONST EA AMP!SWT1BKR CAR PORT T1F 134-810·00·00:8835'" , ... r,, , .. ~ SERV(
1 PH 3 PH AWNING LA COSTA TlF 133-810-00-00-8835
EXIST BLOG EA AMPISWT/BKR GARAGE FMF
1 PH 3 PH LICENSE TAX 001-810·00-00-8162
REMOOEL'ALTER PER CIRCUIT MFF 880·519-92-57
TEMP POLE 200 AMPS
OVER 200 AMPS
TEMP OCCUPANCY (30 DAYS)
CREDIT DEPOSIT
TOTAL ELEORICAL I TOTAL TOTAL FEES PAYABLE I ✓ 30-
I HAVE CAREFULLY EXAMINED THE COMPLETED "APPLICATION AND PERMIT" ANO DO HEREBY Exptrat,on Every permit Issued by the Bulldtng Otf1c1aI under the prov,sIons ol thIs * AN OSHA PERMIT IS AE0UIRED FOA EXCAVATIONS OYER
CERTIFY UNDER PENALTY OF PERJURY THAT ALL INFORMATION HEREON INCLUDING THE Code shall e•pire by lim,t1111on and become null and v01d If the buifdIng or work !I' 0" DEEP ANO DEMOLITION OR CONSTRUCTION OF
DECLARATIONS ARE TRUE ANO CORRECT AND f FURTHER CERTIFY ANO AGREE IF A PERMIT 15 authonzed by such permit 1s not commenced wIthIn 180 days from the date"' sucti STRUCTURES OYER 3 STOfllES IN HEIGHT
ISSUED: TO COMPLY WITH ALL CITY COUNTY ANO STATE LAWS GOVERNING BUILDING CON-~~::a~·~, '~v '::'.:::Je?~h=':~r:~tc"~~~.:le~~~~ r.,;,i;::~.i'~tr:r.i~~ or
STRUCTfON. WHETHER SPECIFIED HEREIN OR NOT I ALSO AGREE TO SAVE INDEMNIFY AND ~.7~ .J'Nt O CONTRACTOR('.l APPROVED BY DATE KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES. JUDGMENTS, COSTS ANO NER
EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE /, ~· I t/u/P7 GRANTING OF THIS PERMIT. 'A/, BY PHONE 0 RJrJ 'if'[)Jw .. JI? I I /l!1L. --{ ' ...
C <ll u
a. a. <i
I
0 (/) (/)
QJ (/)
(/)
<i
I
;;
0
ai >-
QJ u C <ll
C
LL
0 u QJ a. (/)
C
TYPE I DATE INSPECTOR I
BUILDING I
I
97,~
FOUNDATlON I FIELD INSPECTION RECORD
REINFORCED STEEL I·
MASONRY I
GUNITE OR GROUT l
REQUIRED SPECIAL INSPECTIONS INSPECTOR'S NOTES
INSPECTION REQ IF INSPECTORS DATE CHECKED APPROVAL
SUB FRAME □ FLOOR □ CEIJ_ING SOILS COMPLIANCE
SHEATHING D ROOF D SitlEAR PRIOR TO
FRAME I
FOUNDATION INSP
EXTERIOR LATH ; STRUCTURAL CONCRETE
OVER 2000 PSI
INSULATION I • PRESTRESSED
CONCRETE
INTERIOR LATH & DRYWALL I POST TENSIONED :
PLUMBING t
CONCRETE . -
FIELD WE(,DING \1 ' bil h n,.~ ('.l;.•••U
M,-J:f0b'n£ ,~ __ ,._ , ...
□ SEWER AND BUCO D fil/CO
UNDERGROUND □ WASTE (=! WATER
TOP OUT □ WASTE □ WATER
HIGH STRENGTH -! .. ). .. rvia, ,.a-" .
BOLTS
.., . .,. " 11.,..; ... J, SPECIAL MASONRY I\. l J .,
·TUB AND SHOWER PAN I ~T-.1 -r;"T"'\
GAS TEST : PILES CAISSONS ~ l . ..; ,;
I ,.,J
LI -1--' .,-.--1
□ WATER HEATER D SOLAR WATER
I
ELECTRICAL l
l
□ ELECTRIC UNDERGROUND [II UFFER
ROUGH ELECTRIC t
D ELECTRIC SERVICE D TEMPpRARY
D BONDING D POOL ! ' •. . -. ' ' I
MECHANICAL I l
D DUCT & PLEM., □ REF. PIAING
HEAT -AIR COND. SYSTEMS i I
VENTILATING SYSTEMS I l
!
-. .
· ~' -:" OTOT
.,.,,. , r.r,-r:> ,J .
·•.
CALL FOR FINAL INSPE~poN WHEN-Alli~ A~OP.RIATE -ITEMS ABOVE HA, E BEEM-APP OVE ·--
FINAL l
,, L. .. ,4-1 _r ...... 1-11 --,:1 --~-t ' -..l "'< .,_ -· ---.;. -. . -j I <,t• f ·--· ,' -I -'·--PLUMBING ~ -. l ,., "" -, .._ r r'; ' . . <"' -. '-., -,., f i -•'
ELECTRICAL 1 u.. I
<-4 .~ . -.. I . ,, ' . , ..
MECHANICAL I ~
GAS ! ' : r r .. . ' .. r-l\"'-. -, . . -.. t ; . i ......
BUILDING t 0-
\ '" I
SPECIAL CONDITIONS I 1\:-'' . . .... -.
'
BRONZE EAGLE ENTERPRISE, INC
consulting engineers
23682 bincher dr.
el toro, ca 92630
(714) 770-9967
Mr. Pete Dreibelbis
City of Carlsbad
JUNE 24, 1987
Re: Sequoia Street Condominiums
Corner of Sequoia Street & Carlsbad Blvd.
Dear Pete,
This letter is to confirm our phone conversation regarding the footing
along the South wall which is on line A' of sheet SS. It is my understanding
that this footing will not be cast at this time due to an existing
telephone pole being in the way. From a structural point of view,
this will be acceptable. However, whereever there is an intersecting
footing, (4) # 4 dowels shall be placed per the attached detail. Also,
this footing must be cast prior to the floor slab is cast.
Please call if you have any questions.
_ __, f¢f'I~ TO ee,
cµ-:;,r M?H-
--i==i=r---•--rwrft4b ~Hf
_--1..-_------J.,~ _ __.___ ~ f\.t<Ho
FOOTING DOWELS _i
At?..\
July 20, 1987
Art Beard
B & B Engineers
2111 Industrial Court
Suite A
Vista, CA 92083
Citp of Carlsbab
BUILDING DEPARTMENT
111 SEQUOIA AVENUE, CARLSAD
Please be informed that we, the City of Carlsbad Building Department,
will not accept any reports from the Inspector of Record, Doug Dentino,
who represents your firm at the above address.
We would appreciate you assigning another inspector on this project
if so contracted in the future.
Your cooperation will be greatly appreciated on this matter. For further
information, please contact me.
Principal Inspector
TM:hmj
--------------------------------------
FOUNDATION INVESTIGATION
FOR
SEA VIEW CONDOMINIUMS
CARLSBAD, CALIFORNIA
January 1975
--------------------------------------
Lawney-Haldveer A1sa1iat1s
Foundation I Soil I Geological Engineers
11585 SORRENTO VALLEY ROAD, SAN DIEGO, CALIFORNIA 92121
Mr. Stephen Q. Abbey
1111 Via Las Cumbres
San Diego, California 92111
January 6, 1975
S 134-1, S826
JOHN V LOWNEY, C. E.
PETER KALDVEER, C. E.
ROBERT R. PRATER, C. E.
DONALD H. HILLEBRANDT, C. E.
714 / 453-5605
RE: FOUNDATION INVESTIGATION
SEA VIEW CONDOMINIUMS
CARLSBAD, CALIFORNIA
Dear Mr. Abbey:
In accordance with your request, we have performed a foundation investigation for the
subject project. The accompanying report presents the results of our field investigation,
laboratory tests, and engineering analysis. The soil and foundation conditions are discussed
and recommendations for the foundation engineering aspects of the project are presented.
We refer you to the text of the report for detailed recommendations.
If you have any questions concerning our findings, please call.
Very truly yours,
~~OCIATES
Robert Prater
RP :res
Copies: Addressee (2)
Rick Engineering Company, San Diego
Attn: Mr. Dick Elliot (2)
Rick Engineering Company, Carlsbad
Attn: Mr. Bob Ladwig (1)
Coneer Engineering
Attn: Mr. Ibrahim K. Salameh (1)
PALO ALTO/ OAKLAND/ MONTEREY/ SAN DIEGO
.. ------.. -----.. ---... ----------..
---
--....
....
FOUNDATION INVESTIGATION
For
SEA VIEW CONDOMINIUMS
CARLSBAD, CALIFORNIA
To
MR. STEPHEN Q. ABBEY
1111 Via Las Cumbres
San Diego, California 92111
January 197 5
---·--~---··---
---------------.. .. .. -...
--------------
---
TABLE OF CONTENTS
LETTER OF TRANSMITTAL
TITLE PAGE
TABLE OF CONTENTS
INTRODUCTION
SCOPE
SITE INVESTIGATION
A. Surface
B. Subsurface c. Groundwater
D. Seismicity
CONCLUSIONS AND RECOMMENTATIONS
A. EARTHWORK
1. Excavation
2. Permanent Slopes
3. Recompaction of Loose Surface Soils
4. Material for Fill
5. Compaction
6. Trench Backfi 11
7. Construction Observation
B. FOUNDATIONS
1. Footings
2. Floor Slabs
3. Retaining Walls
4. Lateral Loads
FIGURE 1 -SITE PlAN
APPENDIX A -FIELD INVESTIGATION
Figure A-1 -Key to Exploratory Boring Logs
Exploratory Boring Logs
APPENDIX B -LABORATORY INVESTIGATION
Figure B-1 -Gradation Test Data
Table B-1 -Summary of Direct Shear Tests of Undisturbed Samples
Page No.
1
1
1
1
2
2
2
2
3
3
3
3
4
4
4
4
4
4
5
5
6
A-1
B-1
-------.. --------..
----------------... ---
INTRODUCTION
FOUNDATION INVESTIGATION
FOR
SEA VIEW CONDOMINIUMS
CARLSBAD, CALIFORNIA
In this report we present the results of our foundation investigation For a proposed 24-unit
condominium pro;ect to be constructed on the northeast side of Carlsbad Boulevard, south
of Tamarack Avenue in Carlsbad, California. The purpose of this investigation was to
evaluate the foundation materials.and to provide recommendations concerning the soil and
foundation engineering aspects of the project.
The proposed development will be constructed on two lots separated by the presently existing
Sequoia Avenue as shown on the attached Site Plan, Figure l. Each of the structures along
the northeast portions of the two lots will consist of a parking garage covered with a rein-
forced concrete deck with three stories of wood-frame construction above. The walls of the
parking garage will be of masonry block construction. The buildings along Carlsbad Boule-
vard will be two-story, wood-frame structures. In the parking garages, maximum column
and wall loads wil I be approximately 120 kips and 20 kips per I ineal foot, respectively.
In the two-story structures, maximum wall loads will be approximately 2 kips per lineal foot.
Site grading will consist primarily of excavation to lower the site grades down to an average
elevation of about Elev. +44 within the area of the proposed buildings. This wil I require
excavation depths of up to about 10 feet. The wal Is of the parking garages a long the north-
east boundary of the site will therefore act as retaining walls.
SCOPE
The scope of work performed for this investigation included a site reconnaissance, subsurface
exploration, laboratory testing, engineering analyses of the field and laboratory data and
the preparation of this report. The data obtained and the analyses performed were for the
purpose of providing design and construction criteria For site earthwork, building foundations,
and retaining walls.
SITE INVESTIGATION
A subsurface investigation was performed at the site on December 18, 1974, using a truck-
mounted bucket auger to investigate and sample the subsurface soi Is. Two exploratory borings
were drilled to a maximum depth of 20 feet at the approximate locations shown on the Site
Plan, Figure 1. Logs of the borings and details regarding the field investigation ore included
in Appendix A. Laboratory test results ore presented in Appendix B.
A. Surface
Most of the area of the proposed buildings is presently occupied by residential structures
and appurtenances including trees, shrubs, fences, asphalt drives, concrete slobs, etc. The
4 W, ■-•Fiala ;Ill\;'! .Iii. IMlb
-.. ----------------------,. ... -.. ----------
S 134-1, Page 2
natural ground surface elevation varies from a low of about Elev. +41 at the southern
extremity of the site to a high of about Elev. +52 in the northern portion of the site.
B. Subsurface
The soi Is encountered in the exploratory borings consisted predominantly of silty sands
from the ground surface to the maximum depths of the borings. The sandy soils are generally
in a loose condition near the surface becoming medium dense to dense below an average
depth of 3 feet. No expansive soi Is were encountered at the site.
The attached boring logs and related information depict subsurface conditions only at these
specific locations and at the particular dates indicated. Soil conditions at other locations
may differ from conditions occurring at these locations. Also, the passage of time may result
in a change in the soil conditions at these locations due to environmental changes.
C. Groundwater
Free groundwater was not encountered in any of the exploratory borings drilled at the site.
It must be noted however that fluctuations in groundwater levels are possible due to variations
in rainfall, temperature, and other factors not evident at the time our measurements were made
and reported herein.
D. Seismicity
Based on available published information there are no faults known to exist at the site and
the nearest known major active faults are the Elsinore and San Jacinto Fault Zones located
approximately 24 and 48 miles northeast of the site, respectively.
Although research on earthquake prediction hos greatly increased in recent years, seismologists
have not yet reached the point where they can predict when and where an earthquake will
occur. Nevertheless, on the basis of current technology, it is reasonable to assume that the
proposed buildings will be subjected to at least one moderate earthquake during their design
Ii fe. During such an earthquake, the danger from foul t offset through the site is remote but
strong shaking of the site is likely to occur.
CONCLUSIONS AND RECOMMENDATIONS
From a soil and foundation engineering standpoint1 the site is suitable for the proposed
development provided the conclusions and recommendations presented in this report are incor-
porated into the design and construction of the project. The opinions1 conclusions and
recommendations presented in this report are contingent upon Lowney/Kaldveer Associates
being retained to review the final plans and specifications and to observe the site earthwork
and installation of foundations.
The primary feature of concern at the site is the loose condition of the upper three feet of
sandy surface soils. Buildings founded directly on these compressible soils could be subject
.,w•••••••~•-• -.-~•.._ -;-~• ••••"'""~~----------0.,-~,, ........ _____ _
-... -..
------------------... -.. ---... ---... ---.... -
S 134-1, Page 3
to excessive total and differential settlements. This would be especially true for those
buildings founded partially on the loose surface soils and partially on the less compressible
underlying denser sands. Based on the presently proposed building pad elevations (Elev.
+43.7 and Elev. +44.0) the loose surface soils will be removed over much of the site by
the required excavations. In some areas however, portions of the structures would be
founded partially on the compressible loose surface soils and partially on the more competent
underlying medium dense to dense sandy soils. In our opinion, the most economical means
by which to provide uniform foundation support is to remove and recompact the loose surface
soils below the foundation bearing level on those building sites where the loose soils are
not removed by the required excavations. Detailed recommendations are presented in the
following paragraphs.
A.
L
EARTHWORK
Excavation
Excavation of the on-site soils can be accomplished using standard earthmoving equipment.
The contractor should be made responsible for the stability and maintenance of any temporary
construction slopes that he may utilize during construction of the parking garage retaining
walls. Due to the cohesionless nature of the sandy soirs that will be encountered in the base-
ment excavation, it is our opinion that temporary construction slopes will not stand safely
at an inclination steeper than about 1.0 horizontal to 1.0 vertical.
2. Permanent Slopes
Based on the results of our stability analyses, we recommend that the proposed cut-slopes (and
any fill slopes) be constructed to an inclination not steeper than 1.5 horizontal to 1 vertical.
This recommendation applies to all permanent slopes up to 15 feet high •
The on-site sandy soils are quite susceptible to erosion. Therefore, the project plans and
specifications should contain all necessary design features and construction requirements to
prevent erosion of the on-site soils both during and after construction. This is particularly
important on those slopes where the foundations of buildings will be installed near the tops
of slopes. Slopes should be appropriately planted with a protective ground cover.
3. Recompaction of Loose Surface Soils
Footings supporting the proposed buildings should not be founded over or within the 3-foot
thickness of loose sandy soil that .overlies the site. On those building pads where the loose
surface soils are not removed by the required site excavations, we recommend that the loose
soi Is be excavated to a depth of 3 feet below the original ground surface elevation and
replaced as compacted structural fill up to the design finish grade. Where the layer of loose
surface soil is only partially removed by the required site excavations and where the building
foundations will extend below the zone of loose soil, excavation and recompaction of the loose
soils will not be necessary.
·•---,,_-,...__---
---.. ----------------------------...
....
,.. -... -
S 134-1 , Page 4
4. Materio I for F ii I
Al I existing on-site soils obtained from the required site excavations having an organic
content of less than 3 percent by volume are suitable for reuse as fill and/or backfill as
required, Existing on-site materials for use as fill should not, however, contain rocks,
cobbles, or lumps over 6 inches in greatest dimension with no more than 15 percent larger
than 2 .5 inches.
5. Compaction
All structural fill should be compacted to a minimum degree of compaction of 90 percent
based upon ASTM Test Designation D 1557-70. Fil I should be compacted by mechanical
means only in lifts not exceeding 8 inches in uncompacted thickness.
6. Trench Backfi 11
Pipeline trenches should be backfilled with compacted structural fill. Backfill material
should be placed by mechanical means only in I ift thicknesses appropriate to the type of
compaction equipment utilized, Trench backfill should be compacted to a minimum degree
of compaction of 85 percent. In building and pavement areas, the upper 3 feet of trench
backfill should be compacted to a minimum degree of compaction of 90 percent. The on-
site sandy soils are suitable for use as backfill.
7. Construction Observation
Variations in subsurface conditions are possible and may be encountered during construction,
In order to permit correlation between the preliminary subsurface data and the actual sub-
surface conditions encountered during construction and to assure conformance with the plans
and specifications, it is essential that we be retained to observe the site excavation work,
foundation excavations, selection of satisfactory fill materials, and placement and compaction
of fills and backfills.
B. FOUNDATIONS
1. Footings
We recommend that the buildings be supported on conventional continuous and/or isolated
spread footings. Footings may be founded in undisturbed natural soil (and/or recompacted
surface soils where applicable). Footings for the parking garage should be founded at least
18 inches below rough pad grade or 22 inches below the lowest adjacent finish grade,
whichever is deeper. Footings for the lighter two-story buildings should be founded at least
12 inches below rough pad grade or 16 inc;::hes below lowest adjacent finish grade, which-
ever is deeper. Footings located adjacent to the tops of slopes should be founded sufficiently
deep so as to provide at least 5 feet of horizontal cover between the footing and the slope
face at the footing bearing level. Footings located adjacent to utility trenches should have
their bearing surfaces situated below an imaginary 1.5 to 1 plane projected upward from
the bottom edge of the adjacent utility trench.
lDWfltlf•lt•ldvt■r l11a1lalfl
------
--------.... --..
----------
------....
S 134-1, Page 5
Footings founded at the above recommended depths may be designed for allowable bearing
pressures of 3,000 pounds per square foot (psf) due to dead loads, 4,000 psf due to combined
dead and live loads, and 5,500 psf due to all loads, including wind or seismic. All con-
tinuous footings should, however, have a minimum width of 12 inches and contain top and
bottom reinforcement to provide structural continuity and to permit spanning of local
irregularities. To assure that footings are founded in material of sufficient bearing capacity,
it is essential that we inspect the footing excavations prior to placing reinforcing steel or
concrete.
Settlements under building loads are expected to be within tolerable limits for the proposed
structures. We estimate that total settlements should not exceed approximately 1 inch and
post-construction differential settlemerts across any one building should not exceed 1/2 inch.
2. Floor Slabs
Building floor slabs may be supported directly on undisturbed natural soil (and/or reompacted
surface soil where applicable). However, in areas where moisture-sensitive floor coverings
are to be used and in other areas where floor wetness would be undesirable, 4 inches of free
draining, rounded gravel such as 3/8-inch pea gravel should be placed beneath floor slobs
to serve as a capillary barrier between the subgrade soil and the slob. In order to minimize
vapor transmission, an impermeable membrane should be placed over the gravel. The mem-
brane should be covered with 2 inches of sand to protect it during construction. The sand
should be lightly moistened just prior to placing the concrete.
3. Retaining Walls
Retaining walls in the parking garages must be designed to resist both lateral earth pressures
and any additional pressures caused by surcharge loads on the adjoining ground surface. We
recommend that unrestrained (free to rotate) wal Is with a level backfil I be designed to resist
an equivalent fluid pressure of 30 pounds per cubic foot. We recommend that restrained wal Is
be designed to resist on equivalent fluid pressure of 30 pounds per cubic foot plus an additional
uniform lateral pressure of SH pounds per square foot where H = height of backfil I above the
top of the wal I footing in feet.
Wherever walls will be subjected to surcharge loads, they should be designed for an additional
uniform lateral pressure equal to one-third or one-half the anticipated surcharge load depending
on whether the wa II is unrestrained or restrained.
The recommended pressures assume that adequate drainage will be provided at the ground surface
to prevent the build-up of hydrostatic pressures from surface water infiltration. In order to
prevent wetness of the walls due to any minor infiltration of water into the backfil I behind the
walls, we recommend that consideration be given to waterproofing the walls prior to placing
backfil I.
Backfill placed behind the walls should be compacted to a minimum degree of compaction of
90 percent using light compaction equipment. If heavy compaction equipment is used, the walls
----------•·
-..
----... --... .. -.. .. -.. .. -.. -... --... ---... ..
.. ...
... ..
... ... -...
S 134-1 , Page 6
should be appropriately temporarily braced. If the void space remaining between the finished
wall and the excavation is insufficient to allow compaction of the backfill by mechanical
means, then we recommend that the space be backfilled with lean concrete or 3/4-inch
crushed rock •
Retaining wal Is should be supported on spread footing foundations ~esigned in accordance
with the recommendations presented previously under Item B. 1., 11Footings 11 • Lateral load
resistance for the walls can be developed in accordance with the recommendations presented
immediately below under Item B.4., "Lateral Loads 11 •
4. Latera I Loads
Lateral load resistance for the proposed buildings may be developed in friction between the
base of the foundations and the supporting subgrade. An allowable friction coefficient of
0.30 is recommended for use in design.
Additional lateral load resistance ,m~y be developed in passive pressures acting against the
footings. A passive resistance equal to an equivalent fluid weighing 300 pounds per cubic
foot may be used in design provided the footings are poured neat against undisturbed soil •
lBWMy-Nllklwlf A11ed11t11
,.
->>' a
c(
m
UI
.I
0:
(
u
Approximate Scale (Feet) ----0 25
LEGEND
EB-14
50 75 100
Indicates approximate
location of explora-
tory boring
Yellow indicates
location of proposed
structures
Base: A topographic survey prepared bt, Rick Engineering
Company, latest revision 12/18/ 14.
lowney-Haldueer Associates
Foundallon I Soll I Geo/og/ca/ Engineers
SITE: PLAN
SEA VIEW CONDOMINIUMS
Carlsbad, California
PROJECT NO. DATE -----------------1 S134-1 January lY/!> Figure
--------------------.. ... -..
-.. .. -.. .. .. -.. .. ----
A-1
APPENDIX A -FIELD INVESTIGATION
The field investigation consisted of a surface reconnaissance and a subsurface exploration
program using a truck-mounted, 24-inch diameter bucket auger. Three exploratory borings
were drilled at the site on December 18, 1974 to a maximum depth of 20 Feet at the approxi-
mate locations shown on the Site Plan, Figure 1. The soils in the borings were continuously
logged in the field by our representative and described in accordance with the Unified Soil
Classification System (ASTM D2487). The logs of the borings as well as a key for soil classi-
fication are included as part of this appendix. The approximate ground surface elevations
noted on the boring logs were taken from a preliminary print of a topographic survey prepared
by Rick Engineering Company, latest revision December 18, 1974.
Representative jar ond:relatively undisturbed samples were obtained from the exploratory
borings at selected depths appropriate to the investigation. All samples were returned to our
laboratory for evaluation and appropriate testing. Standard penetration resistance blow
counts were obtained in the borings by dropping a 140-pound hammer through a 30-inch free
fall. A 2-inch O. D. split spoon sampler was driven to a maximum depth of 18 inches and
the number of blows recorded for each 6-inch penetration interval. The blows per foot
recorded on the boring log represent the accumulated number of flows that were required
to drive the last 12 inches. Relatively undisturbed samples were obtained by driving a 2.5-
inch I. D. sampler 18 inches into the soil using the 140-pound hammer. Boring log notations
for the standard split spoon and 2.5-inch I.D. samplers are as indicated below:
Standard Split Spoon Sampler ~ 2,5-lnch l,D, Sampler
The boring logs show our interpretation of the subsurface conditions at the dates and locations
indicated, and it is not warranted that they are representative of subsurface conditions at other
locations and times •
, -•-~ ... _, __ .._ ____ ... ____ _
---------.. --.. .. ----.. -----... ----.. -.. .. -.. -... -
PRIMARY DIVISIONS GROUP SECONDARY DIVISIONS SYMBOL
GRAVELS CLEAN GW Well graded gravels, gravel-sand mixtures, liulc or no
...J GRAVELS fines. · ~ (.fj a:: 0 MORE THAN HALF CLESS "THAN GP Poorly 9radcd gravels or gravel-sand mixtures. little or
...J Wo 5% FINES) no fines . 5 <N OF COARSE
(/) :l-' FRACTION IS GRAVEL GM Silty gravels, gravel-sand-silt mixtures. non-plastic fines. 0
0 u..Z w LARGER THAN WITH w Oz N FINES GC Clayey gravels, gravel-sand-clay mixtures. plastic fines. z LL <( vi NO. 4 SIEVE ~ .J J: w <C I-> SANDS CLEAN SW Well graded sands, gravelly sands. little or no fines. (!) J: w SANDS a:: w zw vi MORE THAN HALF CLESS THAN (/) <C l? SP Poorly graded sands or gravelly sands, little or no fines. :c a:: 5% FINES) c::: I-<C OF COARSE 8 .J w FRACTION IS SANDS SM Silly sands, sand-silt mixtures. non-plastic fines. 0:: !!1 0 SMALLER THAN WITH ~ NO. 4 SIEVE FINES SC Clayey sands, sand-clay mixtures. plastic fines.
w SILTS AND CLAYS ML lnor~anic silts and very fine sands. rock flour, silty or
(/) N c ayey fine sands or clayey silts with slight plasticity. ...J LL 0: in 0 w 0 .J lnor~anic clays of low to medium plasticity. gravelly .J w LIQUID LIMIT IS CL (/) LL < > cays, sandy cl.iys, silty clays, lean clays. ...J ~ w < in LESS THAN 50% 0 :c (I) OL Organic silts and organic silty clayi; of low plasticity. w z z !!! 0
~ ~ 0 Inorganic sills micaceous or diatomaceous fine sandy or ...J N SILTS AND CLAYS MH t-~ ci s11ty1s01ls. 'elastic silts.
(.!'.) w c:: z w LIQUID LIMIT IS CH Inorganic clays of high plasticity. fat clays. w a: ~ z 0 z ~ ~ <( GREATER THAN 50% u: :c OH Organic clays of medium to high plasticity, organic silts. I-I
HIGHLY ORGANIC SOILS Pt Peat and other highly organic soils.
' DEFINITION OF TERMS
U.S. STANDARD SERIES SIEVE CLEAR SQUARE SIEVE OPENINGS
200 40 10 4 3/411 311 12 11
SAND GRAVEL
SILTS AND CLAYS I I I COARSE
COBBLES BOULDERS
F1NE MEDIUM COARSE FINE
GRAIN SIZES
SANDS.GRAVELS ANO BLOWS/FOOT t CLAYS AND STRENGTH* BLOWS/FOOT t NON-PLASTIC SILTS PLASTIC SILTS
VERY LOOSE 0 -4 VERY SOFT 0 -1/4 0 -2
LOOSE 4 -10 SOFT 1/4 -1/'1: 2 -4
FIRM t/2 -1 4 -8 MfDIUM DENSE 10 -30 STIFF 1 -2 8 -16
DENSE JO -5() VERY STIFF 2 -4 16 -32
VERY DENSE OJER 50 HARD OVER 4 CYI/ER 32
RELATIVE DENSITY CONSISTENCY
t Number of blows of 140 pound hammer falling 30 inches to drive a 2 inch 0.0. (1-3/8 inch t.D->
split spoon CASTM 0-1586),
t Unconfined compressive strength in tons/sq. h. as determined by laboratory testing or approximated
by the standard penetration test CASTM D-1586), pocket penetrometer, torvane, or visual observation .
KEV TO EXPLORATORY BORING LOGS
Unified Soil Classification System CASTM D-2487)
lownev•Boldueer Associates SEA VIEW CONDOMINIUMS
Carlsbad, California
Foundalion I Soll I Geological Eng/1100,s PrlOJECT NO. DATE
S134-1 Jmwmy 1975 Figure A-1
----,,,.__...,.. ____ ,.,._ .... ..,__,..,...,_,,
-
DRILL RIG Bucket Auger SURFACE ELEVATION +51 '(Approx) LOGGED BY DPS
DEPTH TO GROUNDWATER None A TD BORING DIAMETER 24 Inches DATE DRILLED 12/18/74
DESCRIPTION AND CLASSIFICATION
DESCRIPTION AND REMARKS
SIL TY SA N D
:~r, I t,, 1 , , 1, I 1 ,r ,r I , ,, l / ( 1 I < • 1; ·1
SYM-COLOR BOL
brown
light
brown
light
brown
to gray
I ight
brown
SOIL CONSIST. TYPE
loose SM
me dium
de nse
a:
DEPTH w ..J 0..
(FEET) ::, < (I)
---1 -
--
,_ 2 ----,_ -
,_ 3 -
,_ _.__._
,_ 4 -
,_ --5
.... -
,_ 6 -
.... -~~ -7 -
,_ -
,_ 8 ---
..... 9 -
..... -
-10-
I--
.... 11 -
,_ -
I-12 -~ -,_ 13 -
,_ -
..... 14 -
,_ -
~ 15 -
..... -
,_ 16 -
,_ --17 -
.... -
.... 18 -
--.___
-19 -
--
20 -
z w-: . w 0 (.)t-. :r z ~ z u.. a: -a:t;~-<<' w,_
:: Iii~ ,_z < z a: ... <w w w o (I) w -o ~~ ~a: ... ~ Zv,..J w w Cl) 0 Iii ~ Q. a: -(.)
8 3.7
18 5 .6
23
25 3 .7
EX PLO RA TORY BORING LOG
Lowney-Haldueer Associates SI I\ If \\' N l )0/'vl I f'-1 I l lM '.:->
a rl sho d , Co lir 1111
Foundation I Soll I Geologlco/ Engineers
.__P_R_O_JE_c_r_N_o_. -~---D_A_T_E __ _J BORING
.Jan My 1975 NO S 134 -1 fB-1
ow w > :c z in ... -u,t,-II. w z u.. z a: w (I) O a,a:~ u ::, .. z O (I) :i (.;J
------... --.. -------------.. .. .. ----.. -.. ..
---
DRILL RIG Bucket Auger SURFACE ELEVATION+48 .S'(Approx) LOGGED BY DPS
DEPTH TO GROUNDWATER None ATD BORING DIAMETER 24 Inches DATE DRILLED 12/18/74
Zw-: ,. w C ~ :r: DESCRIPTION AND CLASSIFICATION 001-... :r:z ~ iii I-IC ;::: :;!:"-ir;: a:~:!-
SYM-DESCRIPTION ANO REMARKS BOL
SILTY SAND
.
Bottom of Boring = 11.5 Feet
lawn1y•Haldu1er AssaEiates
Fourid•Uon I Soll / Geological Engineer•
COLOR
brown
light
brown
.
DEPTH w < <-..... ... f: Iii; Wz ~za:LL Q. !:c~ ~wo~ (FEET) :. SOIL < ~;;;g 3:z rna::1--CONSIST. TYPE <I) ~~!!?. 0 Iii iii u
loose SM ---loose to 1 -f-.-
--10 1.9 medium 2 --dense .. ---
.... 3 --.---medium -4 -21 2.8 dense --i--
-5---.... 6 --,---dense 7 37 4.0 --------8 ----9 ---
-10 ---11 -34 4.2
-12 ----13 ----14 -
.... -
.-15----16 -.... -
.... 17 ---•
I ... 18 -
.... -
.... 19 ---
-20-
EXPLORATORY BORING LOG
SEA VIEW CONDOMINIUMS
Carlsbad, California
PROJECT NO. DATE BORING
S134-l January 1975 NO. EB-2
-<I) (!I -lL UJ 2 IL. Zq;w<ll 011. a:~ u :. I-z O <I) =>u
.
-------.. ----.. ----..
-... -... ----... --.. -.. -... ---
DRILL RIG Bucket Auger SURFACE ELEVATION +46.51 (Approx LOGGED BY
DEPTH TO GROUNDWATER None A TD BORING DIAMETER 24 Inches 'DATE DRILLED
Zw~ ..
DESCRIPTION ANO CLASSIFICATION Out-,. ·-IC i= z u.. IC;:
DESCRIPTION AND REMARKS
SILTY SAND
with some clay below 5 feet
SYM-COLOR SOL
brown
DEPTH IIJ ,( ,( ..... Wz .., ~t;; .. I-...
(FEET) ::; ; !ii SOIL ,( ~~9 CONSIST. TYPE C/1 ~'1:!!l. 0 I.)
loose SM ... -.... 1 -.... -
I,-2 ---
I--
3 6 6.4 .... -... ':.. i,....1....-
... 4 -.... -
medium SM--5 /
dense SC -_-20
-6
5.3
dense
medium
dense
... 7 -
I--
-8 -
--
-9 ---
-10-. -~ --SM -11 -
----
-12 -
--
-13 ---
1-14 -
I--
... -
1-16 -
..... -i............,
i-17 -... -
I I-18 •
i.... _ ..... _
'-19 -
... -
37 7.5
42 5.7
•
19 1.6
DPS
12/18/74
t================l======='===========~-28---t==:::::t====t:===t====t===t Bottom of Boring == 20 Feet
lawnev•Haldueer Assadates
Foundation I Soil I Geological Engineers
EXPLORATORY BORING LOG
SEA VIEW CONDOMINIUMS
Carlsbad, California
.__PA_O_J_E_c_T_N_o_. --6----DA_T_E __ ---I BORING
S 134-1 January 1975 NO.
-------.. -.... ~-.,_ .. ,.._ .. , . ., .....
EB-3
.. -.. -.. -------------.. ---... ... ---·---------
-
B-1
APPENDIX B -LABORATORY INVESTIGATION
The natural water content was determined on selected samples and is recorded on the baring
logs at the appropriate sample depths.
Two laboratory gradation tests were performed on selected samples of the materials encountered
in the borings as an aid to classification. The results of these tests are presented on Figure B-1.
A direct shear test was performed on a relatively undisturbed sample of the on-site sandy soils.
The sample was sheared at a constant rate under various surcharge pressures. Failure was
taken at the peak shear stress. The results of the direct shear test are summarized in Table
B-1. ~
llwnl!y-llaldu11r ll111:1at11
----······ -·····----·
-----------------------... --------------
90
IO
I
: 60
C .. ..
: 50 u It
: '°
30
20
ID
Q
UNIFIED SOIL CLASSIFICATION SYSTEM
(ASTM C 422•72)
U. S, STANOARC> SIEVE SIZES
3 2 I 3/~ 11'1 10 1, 20 JO ~ 50 '° 80. 100 200 3'25
'
, ....
100 50 10.0 5.0 1,0 0,5 0.1 .05 .01 .oas
PARTIC:LE SIZE IN MILLIMETERS
-CRAVl:L SAND
co■■La:s .,_---------+---....... -----------c SILT ANO C:LAY
COARSt:
KEY BORING
SYMBOL NO.
• • 1
____ ..
3
SAMPLE
DEPTH
(ffftl
12
5
COARSE
ELEV.
:teal)
la111ney•Naldveer Assaciates
Foundation I Soll / Geological Englnfft1
MEDIUM
UNIFIED
SOIL
CLASSIFICATION
SYMBOL
SM
SM-SC
l'INlt
SAMPLE _DESCRIPTION
Brown, Sil TY SAND
Brown, SILTY SAND with some
clay binder •
I
-GRADATION TEST DATA
SEA VIEW CONDOMINIUMS
Carlsbad, California
PROJECT NO. DATE
S134-1 January 1975 Figure
-------------~···--·
0
10
20
30
0
..0 !
C .. .. 50 o: .. :a: .. 60 u
70
ID
z .. ..
100
.001
B-1
-------..
.. .. -.. ----.. -.. .. -.. .. .. ..
... .. .. .. -... .. .. ..
TABLE 8-1
SUMMARY OF DIRECT SHEAR TEST OF UNDISTURBED SAMPLE
Sample Dry Water Apparent Angle of
Exploratory Depth Density Content Cohesion Internal Friction
Boring No • (Feet) (pcf) (%) (psf) (degrees)
EB-3 5-6 104.7 5.4 250 35
.........llaldVl!■r IIHDdutll
RICK ENG. CO.
JOB NO.
OAT£ RECEIVED
.. 1~ .. :0 8 '75
WBR ....•. ·-··-· LAK.-
MLW .• ·-······-SFR ... -
WAR •• ·-··-····· CDS .• --
RMS .•• --•--· GLH ••. -
LFG .• ·-··-··-·-SG .. -
RCL.·-··-·-·· ERK.-
HLW •. --RIN.-
HA-----NL.IL-
....