HomeMy WebLinkAboutCT 2017-0006; Roosevelt Townhomes; Hydrology Report For 2569 Roosevelt Street; 2020-02-20---.... ..
• .. -
•
...
• ..
• ..
... ..
..
... .. ..
•
. .,
... .. .. .. -.. -
,..
-
.. .. -
RECORD COPY
HYDROLOGY REPORT
FOR
2569 ROOSEVELT STREET
APN: 203-101-35
DATE: FEBRUARY 20, 2020
PREPARED BY:
J&o.jM~,
Imtial
SAN DIEGO LAND SURVEYING AND ENGINEERING INC.
9665 CHESAPEAKE DRIVE, SUITE 445
r::~("""'•-·· r.\;J ,n,.'
I I-r , r· ,....,. ~' /E _ -\.: ., u ,. , ::: \ L
f I. ·-~:NFC:
SAN DIEGO, CA. 92123
CITY OF CARLSBAD
GRADING PLAN NUMBER GP 2019-0032
PROJECT NUMBER CT 2017-0006
DWG. NO. 520-9A
~=NT
c,/,h,Q ~,
Date
--.. --.. -... ..
.,
-..
.. ..
-.. ..
-...
•
.. ..
..
• -• .. .. ..
•
•
• -..
TABLE OF CONTENTS
PROJECT DESCRIPTION
STANDARDS AND METHODS
ANALYSIS
CONCLUSIONS
CERTIFICATION STATEMENT
APPENDICES
VICINITY MAP
COUNTY OF SAN DIEGO STORM DRAIN MANUAL
TABLE 3-1, RUNOFF COEFFICIENTS FOR URBAN AREA
COUNTY OF SAN DIEGO STORM DRAIN MANUAL
TABLE 3-2, TIME OF CONCENTRATION CHART
COUNTY OF SAN DIEGO STORM DRAIN MANUAL
FIGURE 3-2, INTENSITY DURATION DESIGN CHART
EXHIBITS
HYDROLOGY MAP -EXISTING CONDITION
HYDROLOGY MAP -PROPOSED CONDITION
1
1
2
3
4
APPENDIX A
APPENDIX B
APPENDIX C
APPENDIX D
EXHIBIT A
EXHIBIT B
•
•
•
-•
•
•
...
•
•
•
• -..
• ..
-...
• ..
•
• ..
•
•
• -.. ..
•
•
• -...
PAGE 1
PROJECT DESCRl:PTION:
EXISTING PROJECT SITE DESCRIPTION:
The site is 0.2207 acres in size and is occupied by a family home .
The general direction of drainage is to the southwest and the
adjacent property. The project is immediately adjacent to
Roosevelt Street. This public road drains to the north. There
are wood fences on the north, west and south property lines. The
east property line is Roosevelt Street. Therefor none or minimal
offsite water drains onto the site.
See the 30 scale drainage areas map in Exhibit A for more detail
of the project .
The existing impervious area is 2,504 SF. or 0.0575 AC . 26.1%
PROPOSED PROJECT DESCRIPTION:
The proposed project will consist of removal of the existing home
and the construction of five new single family home. The rear of
the site will be raised with a 3' high retaining wall so that the
entire site will drain to the public right of way. The entire site
will be disturbed by grading and construction. The public
improvements will consist of additional water services, sewer
lateral, a new driveway and sidewalk.
See the 30 scale drainage areas map in Exhibit B for more detail
of the proposed project .
The proposed impervious area is 3,509 SF. or 0.0805 AC . 36.5%
STANDARDS AND METHODS:
PURPOSE OF CALCULATIONGS:
Calculate the storm runoff generated by the residential site and
the impact to the downstream lands .
•
•
•
•
•
•
•
•
•
•
•
• .. .. .. .. -.. .. -..
• ..
• -------•
-
PAGE 2
HYDROLOGIC MODEL AND METHODS USED:
This report uses the "Rational Method" as demonstrated in the
County of San Diego Storm Drain Manual.
Q = CIA
WATER QUALITY DESIGN STORM:
The design storm for this report shall be the 100 year storm .
ANALYSIS
PRE-DEVELOPMENT RUNOFF VOLUMES AND PEAK FLOWS:
Runoff factor "C" for medium residential ( 4. 3 DU/A) with a soil
type of "D" from table 3-1 "Runoff Coefficients for Urban Areas"
from the above manual and attached in Appendix "B" is 0. 52. See
Exhibit "A" for plan view of the drainage area .
Time of concentration is composed of "Maximum Overland Flow
Length" plus "Travel Time" to point of discharge. The maximum
overland flow length is taken form Table 3-2, included in Appendix
C, for medium density residential (4.3 DU/A) with a grade of 2% is
8 .1 mins. for the first 80 feet. The "Travel Time" for the
remaining 75 feet is 6.7 mins. The total Tc= 14.8 mins.
Using the 100 year storm and the rainfall intensity-duration-
frequency curves from the chart in Appendix "D". Determine
rainfall intensity "I". For 14.8 min., 100 year storm, the
rainfall intensity= 3.28.
Zone Existing Area El= 0.0307 acres
This area consists of the portion of the site that drains to
Roosevelt Street .
Ql00 =CIA= .52 x 3.28 x 0.0307 = 0.05 CFS
Zone Existing Area E2 = 0.1900 acres
This area consists of the portion of the site that drains to the
rear adjacent property.
Ql00 =CIA= .52 x 3.28 x 0.1900 0.32 CFS
Tota1 project runoff:
Ql00 = 0.5 + 0.32 = 0.37 CFS
•
•
•
•
• ..
• ..
•
..
..
..
•
• ..
...
◄
◄
• ..
.. .. ..
•
.. .. ..
•
•
•
•
• ..
PAGE 3
POST-PROJECT RUNOFF VOLUMES AND PEAK FLOWS:
Runoff factor "C" for high density residential (24.0 DU/A) with a
soil type of "D" from table 3-1 "Runoff Coefficients for Urban
Areas" from the above manual and attached in Appendix "B" is 0.71.
See Exhibit "B" for plan view of the drainage area .
Time of concentration is composed of "Maximum Overland Flow
Length" plus "Travel Time" to point of discharge. The maximum
overland flow length is taken form Table 3-2, included in Appendix
C, for medium density residential (4.3 DU/A) with a grade of 2% is
8 .1 mins. for the first 80 feet. The "Travel Time" for the
remaining 75 feet is 6.7 mins. The total Tc= 14.8 mins .
Using the 100 year storm and the rainfall intensity-duration-
frequency curves from the chart in Appendix "D". Determine
rainfall intensity "I". For 14.8 min., 100 year storm, the
rainfall intensity= 3.28 .
Zone Proposed Area Pl= 0.2207 acres
This area consists of the portion of the site that drains to
Chelsea Road .
Ql00 CIA .71 X 3.28 X 0.2207 0.51 CFS
Tota1 project runoff:
Ql00 = 0.51 CFS
CONCLUSIONS:
The most important design change from the existing condition is
that the amount of area that drains to the public street is now
100% of the site. No impact to the adjacent properties is
anticipated. The runoff of the proposed site is an increase over
the existing site. This is mitigated by the fact that the runoff
is directed to the improved public street. The brick pavers
(impervious paving will reduce, to negligible, the runoff of small
storms and reduce the runoff of large storms so as to not exceed
the capacity of the completely improved public street to carry the
storm runoff down stream .
The overall increase in runoff ( 0. 14 CFS) is directed to the
street .
•
•
1111 ..
• ..
..
• ..
f/1
•
•
•
• .. -• -.. -.. -•
•
•
• .. -• ..
• .. ..
PAGE 4
CERTIFICATION STATEMENT:
This Hydrology Report has been prepared under the direction of the
following registered civil engineer. The registered civil
engineer (Engineer) attests to the technical information contained
herein and the engineering data upon which the following design,
recommendations, conclusions and decisions are based. The
selection, sizing, and design of storm water treatment and other
control measures in this report meet the requirements of the
Regional Water Quality Control Board Order R9-2013-0001 and
subsequent amendments.
ENGINEER OF WORK:
MICHAEL LEE SMITH, RCE 35471
MY REGISTRATION EXPIRES ON
9/30/2021
DATE: 02-20-2020
-•
•
•
• ..
• ,.
-•
•
• .. ..
.. .. .. ..
41 ..
-.. ..
..
..
ti
• ..
• ..
• ..
..
" ..
APPENDIX A
VICINITY MAP
•
•
•
• --
•
•
•
• ..
111
• ..
•
•
•
• ..
• -..
• ..
•
•
•
•
...
,.
•
◄
• ..
•
•
•
•
SITE
VICINITY MAP
CITY OF OCEANSIDE
PACIFIC
OCEAN
78
VICINITY MAP
NO SCALE
NOT TO
SCALE
11111
•
4
• ..
•
• ..
• ..
..
..
..
..
..
•
•
•
Ill
..
4
..
COUNTY
TABLE 3-1,
APPENDIX B
OF SAN DIEGO STORM DRAIN MANUAL
RUNOFF COEFFICIENTS FOR URBAN AREA
I I I I & • ll I • •
San Diego County Hydrology Manual
Date: June 2003
l I • • I t .. . ' j .. . a I • I t I
Section:
Page:
Table3-l
RUNOFF COEFFICIENTS FOR URBAN AREAS
Land Use I Runoff Coefficient ''C"
Soil Type
NRCS Elements Coun Elements %IMPER. A B
Undisturbed Natural Terrain (Natural) Pennanent Open Space o• 0.20 0.25
Low Density Residential (LDR) Residential, 1.0 DU/A or less 10 0.27 0.32
Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38
Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41
Medium Density Residential (MOR) Residential, 4.3 DU/A or less 30 0.41 0.45
Medium Density Residential (MOR) Residential, 7.3 DU/A or less 40 0.48 0.51
Medium Density Residential (MOR) Residential, 10.9 DU/A or less 45 0.52 0.54
Medium Density Residential (MOR) Residential, 14.5 DU/A or less 50 0.55 0.58
High Density Residential (HOR) Residential, 24.0 DU/A or less 65 0.66 0.67
High Density Residential (HOR) Residential, 43.0 DU/ A or less 80 0.76 0.77
Commercial/Industrial (N. Com) Neighborhood Commercial 80 0.76 0.77
Commercial/Industrial (G. Com) General Commercial 85 0.80 0.80
Commercial/Industrial (O.P. Com) Office Professional/Commercial 90 0.83 0.84
Commercial/Industrial (Limited I.) Limited Industrial 90 0.83 0.84
Commercial/Industrial (General I.) General Industrial 9S 0.87 0.87
• I
C
0.30
0.36
0.42
0.45
0.48
0.54
0.57
0.60
0.69
0.78
0.78
0.81
0.84
0.84
0.87
ll I
3
6 of26
D
0.35
0.41
0.46
0.49
a I
l:t'.1 >< -V, 1-3 -z
Cl
@-'
0.57
0.60
0.63
~
0.79 "'d :;,:,
0.79 0 "'d
0.82 0 Cl)
tt'l
0.85 t:,
0.85
0.87
*The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff
coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area
is located in Cleveland National Forest).
DU/A= dwelling units per acre
NRCS = National Resources Conservation Service
3-6
l I • •
> 1-t,
1-t,
tr:l z 0 -><
c::i
-..
...
•
•
•
•
•
•
• -•
..
..
-
• ..
41 ..
-,.
•
• ..
•
•
411
•
•
•
• ..
APPENDIX C
COUNTY OF SAN DIEGO STORM DRAIN MANUAL
FIGURE 3-1, TIME OF CONCENTRATION CHARTS
..
•
•
•
•
•
•
... ..
... ..
... ..
... ..
-.. ..
•
• -..
•
•
•
• ..
•
•
•
• --
San Diego County Hydrology Manual
Date: June 2003
Section:
Page:
3
12 of26
Note that the Initial Time of Concentration should be reflective of the general land-use at the
upstream end of a drainage basin. A single lot with an area of two or less acres does not have
a significant effect where the drainage basin area is 20 to 600 acres.
Table 3-2 provides limits of the length (Maximum Length (LM)) of sheet flow to be used in
hydrology studies. Initial Ti values based on average C values for the Land Use Element are
also included. These values can be used in planning and design applications as described
below. Exceptions may be approved by the "Regulating Agency" when submitted with a
detailed study .
Table 3-2
MAXIMUM OVERLAND FLOW LENGTH (LM)
& INITIAL TIME OF CONCENTRATION {Ti)
Element* DU/ .5% 1% 2% 3% 5% 10%
Acre LM Ti LM Ti LM Ti LM Ti LM Ti LM Ti
Natural 50 13.2 70 12.5 85 10.9 100 10.3 100 8.7 100 6.9
LOR I 50 12.2 70 11.5 85 10.0 100 9.5 100 8.0 100 6.4
LOR 2 50 11.3 70 10.5 85 9.2 100 8.8 100 7.4 100 5.8
LOR 2.9 50 l0.7 70 10.0 85 8.8 95 8.1 100 7.0 100 5.6
MOR 4.3 50 10.2 70 9.6 80 8.1 95 7.8 100 6.7 100 5.3
MOR 7.3 50 9.2 65 8.4 80 7.4 95 7.0 100 6.0 100 4.8
MOR 10.9 50 8.7 65 7.9 80 6.9 90 6.4 100 5.7 100 4.5
MOR 14.5 50 8.2 65 7.4 80 6.5 90 6.0 100 5.4 100 4.3
HOR 24 50 6.7 65 6.1 75 5. I 90 4.9 95 4.3 100 3.5
HOR 43 50 5.3 65 4.7 75 4.0 85 3.8 95 3.4 100 2.7
N.Com 50 5.3 60 4.5 75 4.0 85 3.8 95 3.4 100 2.7
G.Com 50 4.7 60 4.1 75 3.6 85 3.4 90 2.9 100 2.4
O.P./Com 50 4.2 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2
Limited I. 50 4.2 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2
General I. 50 3.7 60 3.2 70 2.7 80 2.6 90 2.3 100 1.9
*See Table 3-1 for more detailed description
3-12
• --.. -
.. .. -
..
• ..
,.
◄
411 .. ..
,.
..
◄
•
•
• ..
•
•
•
•
•
11
•
•
APPENDIX D
COUNTY OF SAN DIEGO STORM DRAIN MANUAL
FIGURE 3-1, INTENSITY DURATION DESIGN CHART
l I I _t
10.0
9.0
8.0
7.0
6.0
5.0
lo
3.0
2.0
0
9
8
7
6
5 0.
0. 4
0 .3
0 .2
"' " ' ..... -..
"'
'"
"
0 .1'
• r,,.,, .... !lo..
' • r,,.,, ' " .
" 'r-,,, • r,,..
""' ' . " ...
"""" ·r,,.
• l • • .. '
' . '
"!lo.. ...
'I' , ... i,,. .,ro~ . r--.. ' .. , ... ""~~~~ , ... '~ ~ ~~ I" "" • "'~~
l"r,,. ~ .. ~~ I"'
""'
~ ~
.. , ~ .. "' .... ,, "' ~ ~ , .. ~~ ... -~ ~~ . "" ~ ~ .. ,, ~~ ~
... ,
"'"" ~~ ~~
5 6 7 8 9 10 15 20 30
Minutes
• I l I • j j • • •
EQUATION
I = 7.44 P5 D-0.645
I I = Intensity (In/hr)
Ps = 6-Hour Precipitation (in)
D = Duration (min)
~,
" .
" , ... I" " ' I"' I".., ... ' ,,..
~ . ' I""' I" ...
I"' ""'
• ""~ ~~ "i"o .....
'r--""~
~ I"' ~
... " "' " ,. ~
" .. ...
• I"""" ... ~
""' ""' "" """
40 50 1 2 3 4 5 6
Duration Hours
• I
0)
i ..
l
6.0 °&
5.5 i
5.0 :::i
4.5 5' n 4.0 i
3.5 .!!?.
3.0
2.5
2.0
1.5
1.0
Intensity-Duration Design Chart • Template
• • . , • • • • • J • •
Dlractlons for Appllcallon:
(1) From precipitation maps determine 6 hr and 24 hr amounts
for the selected frequency. These maps are induded in the
County Hydrology Manual (10, 50, and 100 yr maps induded
in the Design and Procedure Manual).
(2) Adjust 6 hr precipitation (If necessary) so that it is within
the range of 45% to 65% of the 24 hr precipitation (not
appHcaple to Desert).
(3) Plot 6 hr precipitation on the right side of the chart.
(4) Draw a line through the point parallel to the plotted lines.
(5) This line is the intensity-duration curve for the location
being analyzed.
Appllcatlon Form:
(a) Selected frequency IO O year
(b) P6 = 2, < in., P24 = ~, '=>,~ = S<.o %c2i
2 _ 24
(c) Adjusted P6<2> = _.!2._ in.
(d)tx= ~min. ~l".>T, 14. 8' PtteP.
(e) I= 3-°l.'j( in.lhr.
Note: This chart replaces the Intensity-Duration-Frequency
curves used since 1965.
10
14.~
1.._;-
~ ~
& ..
I !
I . '
I I
I
I •
I . ,
C
I
I
I
l-I 1 ·
i I l
l -
' , '
I I
j -·
I ,·:t~
' .
I ' ;
·I I
s2°45'
u
' 7 l
-'"I' ., ,
!
' j 1 i · , I
~1 ~-i-t
r-,-.--,--,--, ----:-----------.---. ----.J --I I;' . I ~-i 1 •.• •• ,•.
If it .
'
-; .. ,
. .
\VI e X -(,
-------.--·-~~ .. , .~ --I
1 in , I -;
' '
I j
• I '
I <r-I
I • CD I
~
I I l s-30' ! I
I
I -
"7
-1
I j
I
I
~-
County of San Diego
Hydrology Manual
Rainfall Isopluvia/s
100 Year Rainfall Event-24 Boun
lsopluvial (inches)
l-Ls-
DPW ~GIS _,, ..... _ ----
N -+-E
ntSMAP•l'IICMOEOWfflOll'W_,.,Ol,.,,,ICIND, PTHEJIE)O'RESS
011-.ICLUll9IG,.,,-N<JfLM!U>TO. THE..uEDW-,,U
01'-Aa!T't NllJ-FDII• PAllllCI.INt !'1-. Coll,lltlN_.,,_,._ ,_.....,. ____ .. MNCWI_ ______ .. ___ ..
_...-, .. ..-. ----------__,.,__, __ _
s
3 0
IL-
3 MIies
I
I
I I
I
I
I
I
I
I
I
' I
-r
I '
I I
I •
• I •
i I ..j. r .i--s iTh-..... _ ~I
! ' .
I !
~i
~t 'ci .... ,,,,,.
' !
~~_'..----r~---?~~:+:~~~mfrJ
I
32"45'
32"30'
"1
' l
l
0 .o ~. IC))
'?
,
...
• I ~
l
! i
8 . ,.._ ... ...
J_. I I
I I .
·!: c6 ' l : I :i --I
--.
1
t ·-l I 1 I r -
+ j
-,
I
i I
I
i •. !
. , I
• ---..j '•• t I •., I I • •
l 1'-•t .••~•j t \. -
I I • -· J .,.,
. ..
. ... .. . .. .
.~-..... ! • • • . .·· so: c:s···· ' -~·
e
-..,.----,------, . i
1 I
: . -r-.
C
• I -r-·-·r I I j -.----,
,
!
33'30'
----t-• l ..1
• •;•••..,t : I : . .. ...
.·
~--· ·-· .. -
J ;~ -~
J ;-r:
---r-'
I
saw-
, ~--• .. -·'t· .,
32"30'
1
-i County of San Diego
Hydrology Manual
Rainfall Isop/uvials
100 Year Rainfall Event -6 Boan
lsopluvial (inches)
DPW 41tGIS _,,Moi<_ ----
N
+
~-==-~~~---=~ 0# MEM:IWl!'Aam' IHD l'ffllESI FOR A ~Nl'TICIANI l'URPOIE ao,,.wo-.,. ..... -==-=-===.=:=-=--_,.._ .. -. ________ _,..__
...-.-.. ---s
3 0
2-
3 MIies
?"5
--..
•
• .. ..
•
• ..
• ..
• -•
-
• ..
• ..
• .. ..
• ..
•
1111 ..
• ..
•
•
•
EXHIBIT A
EXISTING CONDITIONS DRAINAGE AREAS MAP
"" "" ···•··--··----------
I
I
I
I
I
I
I
"
I
I
I
I
I
I
I
I
I
I
----,-----
I
,, : ZONE E2
If' f'
I
EXHIBIT A
HYDROLOGY MAP
EXISTING CONDITIONS
SCALE 1" = 30'
PROJECT AREA
AREA = 9,613 SF. OR 0.2207 AC.
ZONE E1
AREA = 1,336 SF. OR 0.0307 AC.
ZONE E2
AREA = 8,277 SF. OR 0. 1900 AC.
IMPERVIOUS AREA
AREA = 2,504 SF. OR 0.0575 AC.
26.1% OF SITE
• ..
...
11
...
41
... ..
... .. .. .. .. .. .. .. ..
•
•
•
-• ..
•
•
• .. --• .. ..
• --•
EXHIBIT B
PROPOSED CONDITIONS DRAINAGE AREAS MAP
I
I
I
I
I
I
I
I
" t ..
I
fiJ ...
I
I
I
I
I
l
' ~
'.::=::::::=::: ----t-=---
V y y
y
y
V
~
D
--~------~ ....... ------
i L __
11
:1
~ :1
I I
I I
:(~\
nw,sro,w
S1UCCO 8UILDIHO
11
I
11 /_
11
:1 ,---------1,
I ~ """"""""""·" ....... I
DtlSffHO 8UILDIHO
----~·············-S·.r I ------,-
DtlSffHO 8UILDIHO 1
I
I
EXHIBIT B
HYDROLOGY MAP
PROPOSED CONDITIONS
SCALE 1" = 30'
PROJECT AREA
AREA = 9,613 SF. OR 0.2207 AC.
ZONE P1
AREA = 9,613 SF. OR 0.2207 AC.
IMPERVIOUS AREA
AREA = 3,509 SF. OR 0.0805 AC.
36. 5% OF SITE
LEGEND
----ZONE P1
--+ DIRECTION OF DRAINAGE
----BUILDING PAD
~ BRICK PAVERS
VZZZZZ7A PLANTER
----LOT LINE