HomeMy WebLinkAbout2021-07-13; City Council; Resolution 2021-165RESOLUTION NO. 2021-165
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, APPROVING THE PLANS AND SPECIFICATIONS AND
AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE VILLAS LIFT
STATION REPLACEMENT PROJECT, CIP NO. 5550
WHEREAS, the Villas Lift Station is owned and operated by the city and provides wastewater
pumping for the city's collection system; and
WHEREAS, certain components of the lift station facilities require maintenance, replacement or
improvement for their continued operation and to improve safety and reliability; and
WHEREAS, the City Council has determined it necessary, desirable and in the public interest to
construct the project; and
WHEREAS, the plans, specifications and contract documents for the project have been
prepared, are on file at the City Clerk's office and are incorporated by reference; and
WHEREAS, there are sufficient funds appropriated to the General Construction Capital Funds,
CIP Project No. 5550, to complete construction of the project; and
WHEREAS, the City Planner has determined that the project is exempt from the California
Environmental Quality Act, or CEQA, per State CEQA Guidelines Sections 15302 (replacement or
reconstruction of existing facilities), 15303 (new construction or conversion of small structures). None
of the exceptions described in CEQA Section 15300.2 are applicable to this project. A notice of
exemption will be filed in the office of the San Diego County Clerk in compliance with Section 21152
(b) of Public Resources Code.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as
follows:
1. That the above recitations are true and correct.
2. That the plans, specifications and contract documents for the project to maintain,
replace or improve components of the Villas Lift Station are hereby approved and on file
in the Office of the City Clerk.
3. That the City Clerk is hereby authorized and directed to publish, in accordance with state
law, a notice to contractors inviting bids for construction of the project in accordance
with the referenced plans and specifications.
July 13, 2021 Item #8 Page 4 of 6
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of
Carlsbad on the 13th day of July, 2021, by the following vote, to wit:
AYES:
NAYS:
ABSENT:
Hall, Blackburn, Acosta, Bhat-Patel.
None.
None.
MATT HALL, Mayor
BARBARA ENGLESON, City Clerk
(SEAL)
July 13, 2021 Item #8 Page 5 of 6