HomeMy WebLinkAboutPlan Review - Structural Proposed Carlsbad Car Wash,, .
Construction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying
December 6, 2019
Toyota Carlsbad
RECORD coPY-
CTE Job No. 10-13214T
frA/m5'
Initial
Attention: Ms. Peggy Keleher
5424 Paseo Del Norte
Carlsbad, California 92008
Telephone: (858) 679-1185
.._ _______ _ Date
Subject: Plan Review -Structural
Proposed Carlsbad Car Wash
6010 Avenida Encinas
Carlsbad, California
References: At end of document
Ms. Keleher:
Via Email: pkelcher@toyotacarlsbad.com
As requested, Construction Testing & Engineering, Inc. (CTE) CTE has reviewed the referenced
structural plans for the subject project for conformance with CTE's previously issued
geotechnical documents. Based on CTE's review, the reviewed structural plans appear to be in
substantial conformance with our recommendations. The following was noted:
1) Sheet Sl, Foundation Notes, Item 3 references CTE's 2016 geotechnical report. CTE's
referenced June 17 and May 9, 2019 letters, which served as update geotechnical letters
for the subject project, should also be referenced.
2) Sheet Sl, Retaining Wall general Notes, Item 5 indicates a soil allowable bearing
pressure of 2,500 psi. The value provided by CTE is 2,500 psf.
This letter is subject to the same limitations as other CTE geotechnical documents for the subject
site.
REcrrvEo
UEC 11 2019
LANO DEVELOPMENT
ENGINEERING
1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net
Plan Review -Structural
Proposed Carlsbad Car Wash
Page2
6010 A venida Encinas, Carlsbad, California
December 6. 2019 CTE Job No. 10-13214T
CTE appreciates this opportunity to be of service on this project. If you have any questions
regarding this report, please do not hesitate to contact the undersigned.
Respectfully submitted,
CONSTRUCTION TESTING & ENGINEERING, INC.
Dan T. Math, GE #2665
Principal Engineer
Colm J. Kenny, RCE #84406
Senior Engineer
CJK/JFL/DTM:ack
REFERENCES
Jay F. Lynch, CEG #1890
Principal Engineering Geologist
Structural Plans, Sheets Sl, S2, S3, SDI, SD2, & SD3
Eco-Friendly Auto Spa
6010 Avenida Encina
Carlsbad, California 92011
Prepared by Langston & Associates, dated November 4, 2019
Response to Third-Party Geotechnical Review (Second)
Proposed Eco-Friendly Auto Spa
6010 A venida Encinas
Carlsbad, California
Project No: 8838.1, Log No. 20536
Dated June 17, 2019
\\Esc_server\projects\10-13000 to 10-13999 Projects\10-132141\Ltr_Plan Review -Structural.doc
Plan Review -Structural
Proposed Carlsbad Car Wash
6010 A venida Encinas, Carlsbad, California
December 6 2019
Response to Review Comments
Proposed Carlsbad Car Wash
6010 Avenida Encinas, Carlsbad, California
CTE Job No. 10-13214T
Dated May 9, 2019
Percolation Test Results for Proposed Biofiltration Basins
Proposed Carlsbad Car Wash
6010 Avenida Encinas, Carlsbad, California
CTE Job No. 10-13214T
Dated May 26, 2017
Geotechnical Investigation
Proposed Carlsbad Toyota Car Wash
6010 A venida Encinas, Carlsbad, California
CTE Job No. 10-13214T
Dated September 16, 2016.
Page3
CTE Job No. 10-13214T
\\Esc_server\projects\10-13000 to 10-13999 Projects\10-132141\Ltr_Plan Review -Structural.doc