Loading...
HomeMy WebLinkAbout2635 CANNON RD; BLDG 3; CBR2017-2290; PermitBuilding Permit Finaled Print Date: 04/16/2021 Job Address: Permit Type: Parcel#: Valuation: Occupancy Group: 2635 CANNON RD, BLDG-Residential 1683601600 $5,808,296.67 #of Dwelling Units: 30 Bedrooms: Bathrooms: Occupant Load: Code Edition: Sprinkled: Residential Permit CARLSBAD, CA 92010 Work Class: Apartments Track#: Lot#: Project#: Plan#: Construction Type: Orig. Plan Check#: PC2016-0042 Plan Check#: (city of Carlsbad Permit No: CBR2017-2290 Status: Applied: Issued: Finaled Close Out: Inspector: Final Inspection: Closed -Finaled 09/21/2017 03/27/2019 PBurn 04/16/2021 Project Title: Description: CASA ALDEA: BLDG 3 // 30 UNIT SENIOR APARTMENT// 34,366 SF UNITS & HALL// 385 SF OFFICE// 2,491 GARAGE// 2,50 SF COMMON AREA// 2,701 SF BALCONIES// TOTAL BLDG AREA 42,449 SF FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) Property Owner: ALDEA PARTNERS CARL GUSTAFSON 6102 GULLSTRAND ST SAN DIEGO, CA 92122 (619) 247-9159 COMMUNITY FACILITIES DISTRICT (CFD) FEE -RES ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES -inside CFD SB1473 GREEN BUILDING STATE STANDARDS FEE SEWER BENEFIT AREA FEES -D SEWER CONNECTION FEE (General Capacity all areas) STRONG MOTION-RESIDENTIAL SWPPP INSPECTION FEE TIER 1-Medium BLDG SWPPP PLAN REVIEW FEE TIER 1-MEDIUM TRAFFIC IMPACT Residential Apartments w/in CFD TRAFFIC IMPACT Residential Apartments w/in CFD Total Fees: $289,239.53 Total Payments To Date: $289,239.53 Contractor: WISE RIVER BUILDERS INC 6102 GULLSTRAND ST SAN DIEGO, CA 92122-3824 (858) 455-1771 Balance Due: AMOUNT $13,103.91 $1,172.74 $8,281.80 $830.00 $170.00 $2,091.00 $1,669.00 $105,711.00 $233.00 $74,280.00 $28,800.00 $755.08 $246.00 $56.00 $50,400.00 $1,440.00 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure ta timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov Building Permit Inspection History Finaled (City of Carlsbad PERMIT INSPECTION HISTORY for (CBR2017-2290) Permit Type: BLDG-Residential Application Date: 09/21/2017 Owner: ALDEA PARTNERS Work Class: Apartments Issue Date: 03/27/2019 Subdivision: Status: Closed -Finaled Expiration Date: 03/29/2021 Address: 2635 CANNON RD IVR Number: 6624 CARLSBAD, CA 92010 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status 07/07/2020 BLDG-16 lnsulatlon 132177-2020 Cancelled Tony Alvarado Reinspection Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency April 17, 2020-preliminary insulation Yes inspection completed for second and third floor areas. BLDG-24 Rough/Topout 129106-2020 Cancelled Paul Burnette Reinspection Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 04/16/2019 04/16/2019 BLDG-31 089059-2019 Passed Paul Burnette Complete Underground/Conduit - Wiring Checklist Item COMMENTS Passed BLDG-Building Deficiency No 04/17/2019 04/17/2019 BLDG-11 089136-2019 Partial Pass Paul Burnette Reinspectlon Incomplete Foundation/Fig/Piers (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency No 05/30/2019 05/30/2019 BLDG-21 093230-2019 Partial Pass Paul Burnette Relnspectlon Incomplete Underground/Underflo or Plumbing Checklist Item COMMENTS Passed BLOG-Building Deficiency No 05/31/2019 05/31/2019 BLDG-21 093375-2019 Partial Pass Paul Burnette Relnspection Incomplete Underground/Underflo or Plumbing Checklist Item COMMENTS Passed BLDG-Building Deficiency No 06/03/2019 06/03/2019 BLDG-21 093653-2019 Partial Pass Michael Collins Reinspection Incomplete Underground/Underflo or Plumbing Checklist Item COMMENTS Passed BLDG-Building Deficiency Sanitary waste to POC at Line 3.7-3.13 & Yes 3F-3L 06/19/2019 06/19/2019 Friday, April 16, 2021 Page 1 of7 PERMIT INSPECTION HISTORY for {CBR2017-2290) Permit Type: BLDG-Residential Application Date: 09/21/2017 Owner: ALDEA PARTNERS Work Class: Apartments Issue Date: 03127/2019 Subdivision: Status: Closed -Finaled Expiration Date: 03129/2021 Address: 2635 CANNON RD IVR Number: 6624 CARLSBAD, CA 92010 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status BLDG-11 095071-2019 Passed Paul Burnette Complete Foundation/Fig/Piers (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 07/09/2019 07/09/2019 BLDG-24 Rough/Topout 096873-2019 Partial Pass Paul Burnette Reinspection Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency No 09/04/2019 09/04/2019 BLDG-14 102901-2019 Partial Pass Paul Burnette Reinspection Incomplete Frame/Steel/Bolting/We !ding (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency No 10/07/2019 10/07/2019 BLDG-14 106699-2019 Passed Paul Burnette Complete Frame/Steel/Bolting/We !ding (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 12/10/2019 12/10/2019 BLDG-15 Roof/ReRoof 113095-2019 Partial Pass Paul Burnette Relnspection Incomplete (Patio) Checklist Item COMMENTS Passed BLOG-Building Deficiency No 12/31/2019 12/31/2019 BLDG-15 Roof/ReRoof 11507 4-2019 Partial Pass Paul Burnette Reinspection Incomplete (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency No 01/15/2020 01/15/2020 BLDG-15 Roof/ReRoof 116428-2020 Passed Paul Burnette Complete (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 03/06/2020 03/06/2020 BLDG-13 Shear 121617-2020 Failed Tony Alvarado Reinspection Incomplete Panels/HD (ok to wrap) Checklist Item COMMENTS Passed BLDG-Building Deficiency March 20, 2020 -building three sheer No walls missing 835 clips and LPT fours connectors throughout. 03/09/2020 03/09/2020 BLDG-13 Shear 121789-2020 Passed Tony Alvarado Complete Panels/HD (ok to wrap) Friday, April 16, 2021 Page 2of7 PERMIT INSPECTION HISTORY for {CBR2017-2290) Permit Type: BLDG-Residential Work Class: Apartments Status: Closed -Finaled Application Date: Issue Date: Expiration Date: IVR Number: 09/21/2017 Owner: ALDEA PARTNERS 03/27/2019 Subdivision: 03/29/2021 Address: 2635 CANNON RD 6624 CARLSBAD, CA 92010 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency March 9, 2020 -building #3/shearwalls Yes inspection completed and all previous correction addressed and approved. March 6, 2020 -building #3 shearwall missing metal connectors A-35 clips and LPT4 metal connectors (typical). 03/12/2020 03/12/2020 BLDG-Fire Final 105233-2019 Failed Felix Salcedo Reinspectlon Incomplete Checklist Item COMMENTS Passed FIRE-Building Final No 03/25/2020 03/25/2020 BLDG-24 Rough/Topout 123217-2020 Passed Tony Alvarado Complete Checklist Item COMMENTS Passed BLOG-Building Deficiency March 25, 2020 -preliminary dwelling unit Yes ceiling overhead areas~approved. OK to insulate. All three levels OK to insulate. Roof drains tested and approved. BLDG-85 T-Bar, Celling 123216-2020 Passed Tony Alvarado Complete Grids, Overhead Checklist Item COMMENTS Passed BLDG-Building Deficiency March 25, 2020 -preliminary dwelling unit Yes ceiling overhead areas-approved. OK to insulate. All three levels OK to insulate. Roof drains tested and approved. BLDG-14 March 25, 2020 -preliminary dwelling unit Yes Frame-Steel-Bolting-Welding ceiling overhead areas-approved. OK to (Decks) insulate. All three levels OK to insulate. Roof drains tested and approved. BLDG-24 Rough-Topout March 25, 2020 -preliminary dwelling unit Yes ceiling overhead areas-approved. OK to insulate. All three levels OK to insulate. Roof drains tested and approved. 04/17/2020 04/17/2020 BLDG-16 Insulation 125026-2020 Partial Pass Tony Alvarado Reinspection Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency April 17, 2020-preliminary insulation Yes inspection completed for second and third floor areas. 04/27/2020 04/27/2020 BLDG-18 Exterior 125778-2020 Passed Paul Burnette Complete Lath/Drywall Checklist Item COMMENTS Passed BLOG-Building Deficiency Yes 05/11/2020 05/11/2020 BLDG-Electric Mater 127288-2020 Passed Paul Burnette Complete Release Friday, April 16, 2021 Page 3 of7 PERMIT INSPECTION HISTORY for (CBR2017-2290) Permit Type: BLDG-Residential Application Date: 09/21/2017 Owner: ALDEA PARTNERS Work Class: Apartments Issue Date: 03/27/2019 Subdivision: Status: Closed -Finaled Expiration.Date: 03/29/2021 Address: 2635 CANNON RD IVR Number: 6624 CARLSBAD, CA 92010 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status Checklist Item COMMENTS · Passed BLDG-Building Deficiency Yes 05/27/2020 05/27/2020 BLDG-24 Rough/Topout 128595-2020 Partial Pass Paul Burnette Reinspection Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 06/08/2020 06/08/2020 BLDG-24 Rough/Topout 129580-2020 Passed Paul Burnette Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 06/10/2020 05/10/2020 BLDG-Gas Meter 129701-2020 Failed Paul Burnette Relnspectlon Incomplete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency No 06/12/2020 06/12/2020 BLDG-84 Rough 130014-2020 Partial Pass Paul Burnette Reinspection Incomplete Combo(14,24,34,44) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-14 Yes Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout Yes BLDG-34 Rough Electrical Yes BLDG-44 Yes Rough-Ducts-Dampers BLDG-Electric Meter 130131-2020 Passed Paul Burnette Complete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 06/30/2020 06/30/2020 BLDG-84 Rough 131473-2020 Passed Tony Alvarado Complete Combo(14,24,34,44) Friday, April 16, 2021 Page 4 of 7 PERMIT INSPECTION HISTORY for (CBR2017-2290) Permit Type: BLDG-Residential Work Class: Apartments Status: Closed -Finaled Application Date: Issue Date: Expiration Date: IVR Number: 09/21/2017 Owner: ALDEA PARTNERS 03/27/2019 Subdivision: 03/29/2021 Address: 2635 CANNON RD 6624 CARLSBAD, CA 92010 Scheduled Date Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection Checklist Item COMMENTS Passed BLDG-14 June 30, 2020: Yes Frame-Steel-Bolting-Welding 1. Rough combination inspection for (Decks) framing, electrical, plumbing, and mechanical scope of work-approved. BLDG-24 Rough-Topout June 30, 2020: Yes 1. Rough combination inspection for framing, electrical, plumbing, and mechanical scope of work-approved. BLDG-34 Rough Electrical June 30, 2020: Yes 1. Rough combination inspection for framing, electrical, plumbing, and mechanical scope of work-approved. BLDG-44 June 30, 2020: Yes Rough-Ducts-Dampers 1. Rough combination inspection for framing, electrical, plumbing, and mechanical scope of work-approved. 07/08/2020 07/08/2020 BLDG-16 lnsulatlon 132079-2020 Partial Pass Tony Alvarado Reinspection Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency July 8, 2020 building #3, 3rd.floor Yes i nsu lation-app roved. BLDG-84 Rough 132178-2020 Partial Pass Tony Alvarado Reinspection Incomplete Combo(14,24,34,44) Checklist Item COMMENTS Passed BLDG-14 July 8, 2020 building three, second floor Yes Frame-Steel-Bolting-Welding rough combination inspections approved. (Decks) BLDG-24 Rough-Topout July 8, 2020 building three, second floor Yes rough combination inspections approved. BLDG-34 Rough Electrical July 8, 2020 building three, second floor Yes rough combination inspections approved. BLDG-44 July 8, 2020 building three, second floor Yes Rough-Ducts-Dampers rough combination inspections approved. 07/14/2020 07/14/2020 BLDG-16 Insulation 1327 42-2020 Partial Pass Tony Alvarado Reinspection Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency July 14, 2020: building two second-floor Yes insulation scope of work andapproved. BLDG-Building Deficiency July 8, 2020 building #3, 3rd.floor Yes insulation-approved. 07/15/2020 07/15/2020 BLDG-84 Rough 132904-2020 Passed Tony Alvarado Complete Combo(14,24,34,44) Friday, April 16, 2021 Page 5 of 7 PERMIT INSPECTION HISTORY for (CBR2017-2290) Permit Type: BLDG-Residential Application Date: 09/21/2017 Owner: ALDEA PARTNERS Work Class: Apartments Issue Date: 03/27/2019 Subdivision: Status: Closed -Finaled Expiration Date: 03/29/2021 Address: 2635 CANNON RD IVR Number: 6624 CARLSBAD, CA 92010 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspeclion Inspection Date Start Date Status Checklist Item COMMENTS Passed BLDG-14 Yes Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout Yes BLDG-34 Rough Electrical Yes BLDG-44 Yes Rough-Ducts-Dampers 07/20/2020 07/20/2020 BLDG-16 Insulation 133284-2020 Partial Pass Paul Burnette Reinspection Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency July 8, 2020 building #3, 3rd.floor Yes insulation-approved. BLDG-Building Deficiency July 14, 2020: building two second-floor Yes insulation scope of work andapproved. 07/23/2020 07/23/2020 BLDG-17 Interior 133656-2020 Passed Paul Burnette Complete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 08/27/2020 08/27/2020 BLDG-23 136826-2020 Passed Tony Alvarado Complete Gas/Test/Repairs Checklist Item COMMENTS Passed BLDG-Building Deficiency August 27, 2020: (virtual inspection) Yes 1. Gas test piping under pressure test with gauge and approved. 09/29/2020 09/29/2020 BLDG-85 T-Bar, Celling 139519-2020 Passed Tony Alvarado Complete Grids, Overhead 12/02/2020 12/02/2020 BLDG-Electric Meter 145147-2020 Passed Paul Burnette Complete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes NOTES Created By TEXT Created Date Paul Burnette Video inspection 12/02/2020 03/2512021 03/25/2021 BLDG-Final Inspection 153524-2021 Partlal Pass Paul Burnette Reinspection Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Structural Final Yes BLDG-Electrical Final Yes Friday, April 16, 2021 Page 6 of7 PERMIT INSPECTION HISTORY for (CBR2017-2290) Permit Type: BLDG-Residential Application Date: 09/21/2017 Owner: ALDEA PARTNERS Work Class: Apartments Issue Date: 03/27/2019 Subdivision: Status: Closed -Finaled Expiration Date: 03/29/2021 Address: 2635 CANNON RD IVR Number: 6624 CARLSBAD, CA 92010 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status 03/29/2021 03/29/2021 BLDG-Final Inspection 153725-2021 Partial Pass Chris Renfro Reinspection Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency 2nd floor units only No BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Structural Final Yes BLDG-Electrical Final Yes 04/02/2021 04/02/2021 BLDG-Final Inspection 154139-2021 Partial Pass Chris Renfro Reinspectlon Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency TCO Final on 1st floor units, double check No unit#346 for electrical. All garages, egress and exit signs ok, final sign offs for all departments pending BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Structural Final Yes BLDG-Electrical Final Yes 04/05/2021 04/05/2021 BLDG-Fire Final 153963-2021 Passed Adalmlra Maldonado Complete Checklist Item COMMENTS Passed FIRE-Building Final Yes 04/1612021 04/16/2021 BLDG-Final Inspection 155122-2021 Passed Chris Renfro Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Structural Final Yes BLDG-Electrical Final Yes Friday, April 16, 2021 Page 7 of 7 ( City of Carlsbad HEIGHT CERTIFICATION B-60 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Permit#: CfJ'¥-..-'lo ) 7 -z.i 9D Assessor's Parcel Number: ) ~ 'o -~ Lt{) -/ lo Site Address: 926/D Owner's Name: This is to affirm that on /2 /; 9 / Zt>/CJ (date) the structure being const ructed on the site was surveyed by, or under the direction of, the undersigned. The height from the lower of natural or finished grade to the highest finished point of the roof ridge elevation, or any part of the structure immediately above, was found to be in conformance with the approved plans. Surveyed height measurement (top of roof sheathing) at point(s) identified in approved plans as the highest point(s) of the structure above lower of natural or finished grade elevation. (Attach 8 ½"x 11" sheets showing elevation(s) of structure where measurement(s) were taken and location on site plan where they were taken) Total thickness of roofing materials (i.e. felt and roofing) to be installed after sheathing inspection, not to ,...,,..,.1 exceed: I..A.J I Total Height: ____ .?....:__9_,_I _~------------------ For additional information, please contact me at (phone number) :J l_Ql) 7~ LP -Wt.JD Seal of Registration NOTE: Property owner or project applicant/developer may not certify building height. Planning Division Acknowledgement·~ _____________ Date_· ____ _ PROJECT PLANNER B-6 Page 1 of 1 Rev. 02/15 ii ii !I II II ll " ~/.) & I =l.-£'.,. ~ 8568 ~92.668 : ~J RF PEAK 35.67' I ~ ~-----,, ~ --,...:::==--~ .. --=~=::d:==:ll J ~ II II ii !\ ;.- !I J• rv1 'c:::::::i rv. i i'\,/1 'c::::::j ~ 1 1\,----: i:::::::::i rv BLG3 FF 57.0 "~- n J ~ + a tt tt p •=-I 8559 94.782 RF PEAK 37.78' 8566 96.183\ AK 39.18' )( 1 □ 11 +---1 11 !