HomeMy WebLinkAbout2635 CANNON RD; BLDG 3; CBR2017-2290; PermitBuilding Permit Finaled
Print Date: 04/16/2021
Job Address:
Permit Type:
Parcel#:
Valuation:
Occupancy Group:
2635 CANNON RD,
BLDG-Residential
1683601600
$5,808,296.67
#of Dwelling Units: 30
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Residential Permit
CARLSBAD, CA 92010
Work Class: Apartments
Track#:
Lot#:
Project#:
Plan#:
Construction Type:
Orig. Plan Check#: PC2016-0042
Plan Check#:
(city of
Carlsbad
Permit No: CBR2017-2290
Status:
Applied:
Issued:
Finaled Close Out:
Inspector:
Final Inspection:
Closed -Finaled
09/21/2017
03/27/2019
PBurn
04/16/2021
Project Title:
Description: CASA ALDEA: BLDG 3 // 30 UNIT SENIOR APARTMENT// 34,366 SF UNITS & HALL// 385 SF OFFICE// 2,491 GARAGE// 2,50
SF COMMON AREA// 2,701 SF BALCONIES// TOTAL BLDG AREA 42,449 SF
FEE
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
Property Owner:
ALDEA PARTNERS
CARL GUSTAFSON
6102 GULLSTRAND ST
SAN DIEGO, CA 92122
(619) 247-9159
COMMUNITY FACILITIES DISTRICT (CFD) FEE -RES
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -inside CFD
SB1473 GREEN BUILDING STATE STANDARDS FEE
SEWER BENEFIT AREA FEES -D
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
SWPPP PLAN REVIEW FEE TIER 1-MEDIUM
TRAFFIC IMPACT Residential Apartments w/in CFD
TRAFFIC IMPACT Residential Apartments w/in CFD
Total Fees: $289,239.53 Total Payments To Date: $289,239.53
Contractor:
WISE RIVER BUILDERS INC
6102 GULLSTRAND ST
SAN DIEGO, CA 92122-3824
(858) 455-1771
Balance Due:
AMOUNT
$13,103.91
$1,172.74
$8,281.80
$830.00
$170.00
$2,091.00
$1,669.00
$105,711.00
$233.00
$74,280.00
$28,800.00
$755.08
$246.00
$56.00
$50,400.00
$1,440.00
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure ta timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
Building Permit Inspection History Finaled
(City of
Carlsbad
PERMIT INSPECTION HISTORY for (CBR2017-2290)
Permit Type: BLDG-Residential Application Date: 09/21/2017 Owner: ALDEA PARTNERS
Work Class: Apartments Issue Date: 03/27/2019 Subdivision:
Status: Closed -Finaled Expiration Date: 03/29/2021 Address: 2635 CANNON RD
IVR Number: 6624 CARLSBAD, CA 92010
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
07/07/2020 BLDG-16 lnsulatlon 132177-2020 Cancelled Tony Alvarado Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency April 17, 2020-preliminary insulation Yes
inspection completed for second and third
floor areas.
BLDG-24 Rough/Topout 129106-2020 Cancelled Paul Burnette Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
04/16/2019 04/16/2019 BLDG-31 089059-2019 Passed Paul Burnette Complete
Underground/Conduit -
Wiring
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
04/17/2019 04/17/2019 BLDG-11 089136-2019 Partial Pass Paul Burnette Reinspectlon Incomplete
Foundation/Fig/Piers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
05/30/2019 05/30/2019 BLDG-21 093230-2019 Partial Pass Paul Burnette Relnspectlon Incomplete
Underground/Underflo
or Plumbing
Checklist Item COMMENTS Passed
BLOG-Building Deficiency No
05/31/2019 05/31/2019 BLDG-21 093375-2019 Partial Pass Paul Burnette Relnspection Incomplete
Underground/Underflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
06/03/2019 06/03/2019 BLDG-21 093653-2019 Partial Pass Michael Collins Reinspection Incomplete
Underground/Underflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Sanitary waste to POC at Line 3.7-3.13 & Yes
3F-3L
06/19/2019 06/19/2019
Friday, April 16, 2021 Page 1 of7
PERMIT INSPECTION HISTORY for {CBR2017-2290)
Permit Type: BLDG-Residential Application Date: 09/21/2017 Owner: ALDEA PARTNERS
Work Class: Apartments Issue Date: 03127/2019 Subdivision:
Status: Closed -Finaled Expiration Date: 03129/2021 Address: 2635 CANNON RD
IVR Number: 6624 CARLSBAD, CA 92010
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
BLDG-11 095071-2019 Passed Paul Burnette Complete
Foundation/Fig/Piers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/09/2019 07/09/2019 BLDG-24 Rough/Topout 096873-2019 Partial Pass Paul Burnette Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
09/04/2019 09/04/2019 BLDG-14 102901-2019 Partial Pass Paul Burnette Reinspection Incomplete
Frame/Steel/Bolting/We
!ding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
10/07/2019 10/07/2019 BLDG-14 106699-2019 Passed Paul Burnette Complete
Frame/Steel/Bolting/We
!ding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
12/10/2019 12/10/2019 BLDG-15 Roof/ReRoof 113095-2019 Partial Pass Paul Burnette Relnspection Incomplete
(Patio)
Checklist Item COMMENTS Passed
BLOG-Building Deficiency No
12/31/2019 12/31/2019 BLDG-15 Roof/ReRoof 11507 4-2019 Partial Pass Paul Burnette Reinspection Incomplete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
01/15/2020 01/15/2020 BLDG-15 Roof/ReRoof 116428-2020 Passed Paul Burnette Complete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
03/06/2020 03/06/2020 BLDG-13 Shear 121617-2020 Failed Tony Alvarado Reinspection Incomplete
Panels/HD (ok to wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency March 20, 2020 -building three sheer No
walls missing 835 clips and LPT fours
connectors throughout.
03/09/2020 03/09/2020 BLDG-13 Shear 121789-2020 Passed Tony Alvarado Complete
Panels/HD (ok to wrap)
Friday, April 16, 2021 Page 2of7
PERMIT INSPECTION HISTORY for {CBR2017-2290)
Permit Type: BLDG-Residential
Work Class: Apartments
Status: Closed -Finaled
Application Date:
Issue Date:
Expiration Date:
IVR Number:
09/21/2017 Owner: ALDEA PARTNERS
03/27/2019 Subdivision:
03/29/2021 Address: 2635 CANNON RD
6624 CARLSBAD, CA 92010
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency March 9, 2020 -building #3/shearwalls Yes
inspection completed and all previous
correction addressed and approved.
March 6, 2020 -building #3 shearwall
missing metal connectors A-35 clips and
LPT4 metal connectors (typical).
03/12/2020 03/12/2020 BLDG-Fire Final 105233-2019 Failed Felix Salcedo Reinspectlon Incomplete
Checklist Item COMMENTS Passed
FIRE-Building Final No
03/25/2020 03/25/2020 BLDG-24 Rough/Topout 123217-2020 Passed Tony Alvarado Complete
Checklist Item COMMENTS Passed
BLOG-Building Deficiency March 25, 2020 -preliminary dwelling unit Yes
ceiling overhead areas~approved. OK to
insulate. All three levels OK to insulate.
Roof drains tested and approved.
BLDG-85 T-Bar, Celling 123216-2020 Passed Tony Alvarado Complete
Grids, Overhead
Checklist Item COMMENTS Passed
BLDG-Building Deficiency March 25, 2020 -preliminary dwelling unit Yes
ceiling overhead areas-approved. OK to
insulate. All three levels OK to insulate.
Roof drains tested and approved.
BLDG-14 March 25, 2020 -preliminary dwelling unit Yes
Frame-Steel-Bolting-Welding ceiling overhead areas-approved. OK to
(Decks) insulate. All three levels OK to insulate.
Roof drains tested and approved.
BLDG-24 Rough-Topout March 25, 2020 -preliminary dwelling unit Yes
ceiling overhead areas-approved. OK to
insulate. All three levels OK to insulate.
Roof drains tested and approved.
04/17/2020 04/17/2020 BLDG-16 Insulation 125026-2020 Partial Pass Tony Alvarado Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency April 17, 2020-preliminary insulation Yes
inspection completed for second and third
floor areas.
04/27/2020 04/27/2020 BLDG-18 Exterior 125778-2020 Passed Paul Burnette Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Yes
05/11/2020 05/11/2020 BLDG-Electric Mater 127288-2020 Passed Paul Burnette Complete
Release
Friday, April 16, 2021 Page 3 of7
PERMIT INSPECTION HISTORY for (CBR2017-2290)
Permit Type: BLDG-Residential Application Date: 09/21/2017 Owner: ALDEA PARTNERS
Work Class: Apartments Issue Date: 03/27/2019 Subdivision:
Status: Closed -Finaled Expiration.Date: 03/29/2021 Address: 2635 CANNON RD
IVR Number: 6624 CARLSBAD, CA 92010
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS · Passed
BLDG-Building Deficiency Yes
05/27/2020 05/27/2020 BLDG-24 Rough/Topout 128595-2020 Partial Pass Paul Burnette Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06/08/2020 06/08/2020 BLDG-24 Rough/Topout 129580-2020 Passed Paul Burnette Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06/10/2020 05/10/2020 BLDG-Gas Meter 129701-2020 Failed Paul Burnette Relnspectlon Incomplete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
06/12/2020 06/12/2020 BLDG-84 Rough 130014-2020 Partial Pass Paul Burnette Reinspection Incomplete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
BLDG-Electric Meter 130131-2020 Passed Paul Burnette Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06/30/2020 06/30/2020 BLDG-84 Rough 131473-2020 Passed Tony Alvarado Complete
Combo(14,24,34,44)
Friday, April 16, 2021 Page 4 of 7
PERMIT INSPECTION HISTORY for (CBR2017-2290)
Permit Type: BLDG-Residential
Work Class: Apartments
Status: Closed -Finaled
Application Date:
Issue Date:
Expiration Date:
IVR Number:
09/21/2017 Owner: ALDEA PARTNERS
03/27/2019 Subdivision:
03/29/2021 Address: 2635 CANNON RD
6624 CARLSBAD, CA 92010
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
Checklist Item COMMENTS Passed
BLDG-14 June 30, 2020: Yes
Frame-Steel-Bolting-Welding 1. Rough combination inspection for
(Decks) framing, electrical, plumbing, and
mechanical scope of work-approved.
BLDG-24 Rough-Topout June 30, 2020: Yes
1. Rough combination inspection for
framing, electrical, plumbing, and
mechanical scope of work-approved.
BLDG-34 Rough Electrical June 30, 2020: Yes
1. Rough combination inspection for
framing, electrical, plumbing, and
mechanical scope of work-approved.
BLDG-44 June 30, 2020: Yes
Rough-Ducts-Dampers 1. Rough combination inspection for
framing, electrical, plumbing, and
mechanical scope of work-approved.
07/08/2020 07/08/2020 BLDG-16 lnsulatlon 132079-2020 Partial Pass Tony Alvarado Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency July 8, 2020 building #3, 3rd.floor Yes
i nsu lation-app roved.
BLDG-84 Rough 132178-2020 Partial Pass Tony Alvarado Reinspection Incomplete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-14 July 8, 2020 building three, second floor Yes
Frame-Steel-Bolting-Welding rough combination inspections approved.
(Decks)
BLDG-24 Rough-Topout July 8, 2020 building three, second floor Yes
rough combination inspections approved.
BLDG-34 Rough Electrical July 8, 2020 building three, second floor Yes
rough combination inspections approved.
BLDG-44 July 8, 2020 building three, second floor Yes
Rough-Ducts-Dampers rough combination inspections approved.
07/14/2020 07/14/2020 BLDG-16 Insulation 1327 42-2020 Partial Pass Tony Alvarado Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency July 14, 2020: building two second-floor Yes
insulation scope of work andapproved.
BLDG-Building Deficiency July 8, 2020 building #3, 3rd.floor Yes
insulation-approved.
07/15/2020 07/15/2020 BLDG-84 Rough 132904-2020 Passed Tony Alvarado Complete
Combo(14,24,34,44)
Friday, April 16, 2021 Page 5 of 7
PERMIT INSPECTION HISTORY for (CBR2017-2290)
Permit Type: BLDG-Residential Application Date: 09/21/2017 Owner: ALDEA PARTNERS
Work Class: Apartments Issue Date: 03/27/2019 Subdivision:
Status: Closed -Finaled Expiration Date: 03/29/2021 Address: 2635 CANNON RD
IVR Number: 6624 CARLSBAD, CA 92010
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspeclion Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
07/20/2020 07/20/2020 BLDG-16 Insulation 133284-2020 Partial Pass Paul Burnette Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency July 8, 2020 building #3, 3rd.floor Yes
insulation-approved.
BLDG-Building Deficiency July 14, 2020: building two second-floor Yes
insulation scope of work andapproved.
07/23/2020 07/23/2020 BLDG-17 Interior 133656-2020 Passed Paul Burnette Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
08/27/2020 08/27/2020 BLDG-23 136826-2020 Passed Tony Alvarado Complete
Gas/Test/Repairs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency August 27, 2020: (virtual inspection) Yes
1. Gas test piping under pressure test with
gauge and approved.
09/29/2020 09/29/2020 BLDG-85 T-Bar, Celling 139519-2020 Passed Tony Alvarado Complete
Grids, Overhead
12/02/2020 12/02/2020 BLDG-Electric Meter 145147-2020 Passed Paul Burnette Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Paul Burnette Video inspection 12/02/2020
03/2512021 03/25/2021 BLDG-Final Inspection 153524-2021 Partlal Pass Paul Burnette Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
Friday, April 16, 2021 Page 6 of7
PERMIT INSPECTION HISTORY for (CBR2017-2290)
Permit Type: BLDG-Residential Application Date: 09/21/2017 Owner: ALDEA PARTNERS
Work Class: Apartments Issue Date: 03/27/2019 Subdivision:
Status: Closed -Finaled Expiration Date: 03/29/2021 Address: 2635 CANNON RD
IVR Number: 6624 CARLSBAD, CA 92010
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
03/29/2021 03/29/2021 BLDG-Final Inspection 153725-2021 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 2nd floor units only No
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
04/02/2021 04/02/2021 BLDG-Final Inspection 154139-2021 Partial Pass Chris Renfro Reinspectlon Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency TCO Final on 1st floor units, double check No
unit#346 for electrical. All garages, egress
and exit signs ok, final sign offs for all
departments pending
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
04/05/2021 04/05/2021 BLDG-Fire Final 153963-2021 Passed Adalmlra Maldonado Complete
Checklist Item COMMENTS Passed
FIRE-Building Final Yes
04/1612021 04/16/2021 BLDG-Final Inspection 155122-2021 Passed Chris Renfro Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
Friday, April 16, 2021 Page 7 of 7
( City of
Carlsbad
HEIGHT
CERTIFICATION
B-60
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Permit#: CfJ'¥-..-'lo ) 7 -z.i 9D Assessor's Parcel Number: ) ~ 'o -~ Lt{) -/ lo
Site Address: 926/D
Owner's Name:
This is to affirm that on /2 /; 9 / Zt>/CJ (date) the structure being const ructed on the
site was surveyed by, or under the direction of, the undersigned. The height from the lower of natural or
finished grade to the highest finished point of the roof ridge elevation, or any part of the structure
immediately above, was found to be in conformance with the approved plans.
Surveyed height measurement (top of roof sheathing) at point(s) identified in approved plans as the
highest point(s) of the structure above lower of natural or finished grade elevation.
(Attach 8 ½"x 11" sheets showing elevation(s) of structure where measurement(s) were taken and
location on site plan where they were taken)
Total thickness of roofing materials (i.e. felt and roofing) to be installed after sheathing inspection, not to ,...,,..,.1
exceed: I..A.J
I
Total Height: ____ .?....:__9_,_I _~------------------
For additional information, please contact me at (phone number) :J l_Ql) 7~ LP -Wt.JD
Seal of Registration
NOTE: Property owner or project applicant/developer may not certify building height.
Planning Division Acknowledgement·~ _____________ Date_· ____ _
PROJECT PLANNER
B-6 Page 1 of 1 Rev. 02/15
ii ii
!I II II ll " ~/.) &
I
=l.-£'.,.
~ 8568
~92.668
: ~J RF PEAK 35.67'
I
~
~-----,, ~
--,...:::==--~ .. --=~=::d:==:ll J
~
II II ii
!\
;.-
!I J•
rv1 'c:::::::i rv. i i'\,/1 'c::::::j ~ 1 1\,----: i:::::::::i rv
BLG3
FF 57.0
"~-
n J ~ + a tt tt p
•=-I
8559
94.782
RF PEAK 37.78'
8566
96.183\
AK 39.18' )(
1
□
11 +---1
11 !