HomeMy WebLinkAbout1224 MARIPOSA RD; ; CBRA2020-0175; PermitBuilding Permit Finaled
(city of
Carlsbad
Residential Associated Permit
Print Date: 05/25/2021 Permit No: CBRA2020-0175
Job Address: 1224 MARIPOSA RD, CARLSBAD, CA 92011-4206 Status: Closed -Fina led
PermitType: BLDG-Associated Permit Residential Work Class: Second Dwelling Unit
Parcel#: 2122210300 Track#:
Valuation: $45,536.21 Lot#:
Project#:
Plan#:
Occupancy Group:
#of Dwelling Units: 1
Bedrooms: Construction Type:
Bathrooms:
Occupant Load:
Orig. Plan Check#: PC2020-0032
Plan Check#:
Code Edition:
Sprinkled:
Project Title:
Description: GARCIA: 232 SF ATTACHED ADU// INSTALL FIREPLACE
Applicant:
ANNE PARIZEAU
5304 ONTARIO ST
OCEANSIDE, CA 92056-1810
(760) 201-3347
FEE
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
Property Owner:
STEVE AND LAURA GARCIA
1222 MARIPOSA RD
CARLSBAD, CA 92011-4206
(623) 570-7543
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
SB1473 GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION-RESIDENTIAL
Total Fees: $799.60 Total Payments To Date:
Building Division
$799.60
Applied:
Issued:
Finaled Close Out:
Inspector:
Final Inspection:
CoApplicant:
REX MIYAKE
PO BOX 3388
08/25/2020
11/04/2020
CRenf
05/25/2021
RANCHO SANTE FE, CA 92067
Balance Due:
AMOUNT
$380.40
$266.28
$41.00
$42.00
$62.00
$2.00
$5.92
$0.00
Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
Permit Type: BLDG-Associated Permit Residenti:
Work Class: Second Dwelling Unit
Status: Closed -Finaled
Scheduled Actual Inspection Type
Date Start Date
05/25/2021 05125/2021 BLDG-Final Inspection
Checklist Item
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
Tuesday, May 25, 2021
Application Date: 0812512020
Issue Date: 11104/2020
Owner: STEVE AND LAURA GARCIA
Subdivision: CARLSBAD TCT#97-14 UNIT#01
MARIANO
Expiration Date: 0912712021 Address: 1224 MARIPOSA RD
IVR Number: 28257 CARLSBAD, CA 92011-4206
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
158048-2021
COMMENTS
May 25, 2021:
Passed Tony Alvarado
1. No building floor/remodel Deficiencies.
2. Structural, electrical, plumbing,
mechanical scope of remodel work within
interior footprint of dwelling, per structural
and architectural plans in detail
specifications-approved.
May 25, 2021:
1. No building floor/remodel Deficiencies.
2. Structural, electrical, plumbing,
mechanical scope of remodel work within
interior footprint of dwelling, per structural
and architectural plans in detail
specifications-approved.
May 25, 2021:
1. No building floor/remodel Deficiencies.
2. Structural, electrical, plumbing,
mechanical scope of remodel work within
interior footprint of dwelling, per structural
and architectural plans in detail
specifications-approved.
May 25, 2021:
1. No building floor/remodel Deficiencies.
2. Structural, electrical, plumbing,
mechanical scope of remodel work within
interior footprint of dwelling, per structural
and architectural plans in detail
specifications-approved .
Complete
Passed
Yes
Yes
Yes
Yes
Page 4 of 4
Permit Type:
Work Class:
Status:
Scheduled
Date
03/24/2021
03/30/2021
BLDG-Associated Permit Residenti: Application Date: 08/25/2020 Owner: STEVE AND LAURA GARCIA
Second Dwelling Unit Issue Date: 11/04/2020 Subdivision: CARLSBAD TCT#97-14 UNIT#01
MARIANO
Closed -Finaled Expiration Date: 09/27/2021 Address: 1224 MARIPOSA RD
IVR Number: 28257 CARLSBAD, CA 92011-4206
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
BLDG-84 Rough
Combo(14,24,34,44)
152910-2021 Passed Tony Alvarado
Checklist Item
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
March 17, 2021:
1. No Building Deficiencies.
2. Exterfor stucco lath installation work is
completely finished, prior to rough
combination MEPS Inspection.
3. Rough frame MEPS inspection, scope of
work-approved.
4. Shower enclosures hot mop, under
water leak test, scope of work-approved.
March 17, 2021:
1. No Building Deficiencies.
2. Exterior stucco lath installation work is
completely finished, prior to rough
combination MEPS Inspection.
3. Rough frame MEPS inspection, scope of
work-approved.
4. Shower enclosures hot mop, under
water leak test, scope of work-approved.
March 17, 2021:
1. No Building Deficiencies.
2. Exterior stucco lath installation work is
completely finished, prior to rough
combination MEPS Inspection.
3.·Rough frame MEPS inspection, scope of
work-approved.
4. Shower enclosures hot mop, under
water lea~ test, scope of work-approved.
March 17, 2021:
1. No Building Deficiencies.
2. Exterior stucco lath installation work is
completely finished, prior to rough
combination MEPS Inspection.
3. Rough frame MEPS inspection, scope of
work-approved.
4. Shower enclosures hot mop, under
water leak test, scope of work-approved.
03/24/2021 BLDG-16 Insulation
Checklist Item
153342-2021
COMMENTS
Passed Paul Burnette
BLDG-Building Deficiency
03/30/2021 BLDG-17 Interior
Lath/Drywall
153758-2021 Passed Chris Renfro
Checklist Item
BLDG-Building Deficiency
COMMENTS
Face Time inspection completed on
3-30-2021
Complete
Passed
Yes
Yes
Yes
Yes
Complete
Passed
Yes
Complete
Passed
Yes
Tuesday, May 25, 2021 Page 3 of 4
Permit Type:
Work Class:
Status:
Scheduled
Date
03117/2021
BLDG-Associated Permit Residenlii Application Date: 08/25/2020 Owner: STEVE AND LAURA GARCIA
Second Dwelling Unit Issue Date: 11/04/2020 Subdivision: CARLSBAD TCT#97-14 UNIT#01
MARIANO
Closed -Fina led Expiration Date: 09/27/2021 Address: 1224 MARIPOSA RD
IVR Number: 28257 CARLSBAD, CA 92011-4206
Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Start Date
Checklist Item
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
Status
COMMENTS
March 12, 2021:
••• building deficiencies***
1. Rough combination, MEPS inspections,
scope of framing, plumbing, electrical, and
mechanical, scope of work not ready.
March 12, 2021:
*** building deficiencies***
1. Rough combination, MEPS inspections,
scope of framing, plumbing, electrical, and
mechanical, scope of work not ready.
March 12, 2021:
"** building deficiencies*"*
1. Rough combination, MEPS inspections,
scope of framing, plumbing, electrical, and
mechanical, scope of work not ready.
March 12. 2021:
..... building deficiencies***
1. Rough combination, MEPS inspections,
scope of framing, plumbing, electrical, and
mechanical, scope of work not ready.
March 12. 2021:
•** building deficiencies ...
1. Rough combination, MEPS inspections,
scope of framing, plumbing, electrical, and
mechanical, scope of work not ready.
03/17/2021 BLDG-18 Exterior
Lath/Drywall
152911-2021 Passed Tony Alvarado
Checklist Item
BLDG-Building Deficiency
COMMENTS
March 17, 2021:
1. No Building Deficiencies.
2. Exterior stucco lath installation work is
completely finished, prior to rough
combination MEPS Inspection.
3. Rough frame MEPS inspection, scope of
work-approved.
4. Shower enclosures hot mop, under
water leak test, scope of work-approved.
BLDG-27 Shower
Pan/Tubs
152909-2021 Passed Tony Alvarado
Checklist Item
BLDG-Building Deficiency
COMMENTS
March 17, 2021:
1. No Building Deficiencies.
2. Exterior stucco lath installation work is
completely finished, prior to rough
combination MEPS Inspection.
3. Rough frame MEPS inspection, scope of
work-approved.
4. Shower enclosures hot mop, under
water leak test, scope of work-approved.
Passed
No
No
No
No
No
Complete
Passed
Yes
Complete
Passed
Yes
Tuesday, May 25, 2021 Page 2 of4
Building Permit Inspection History Finaled
(city of
Carlsbad
Permit Type: BLDG-Associated Permit Residenti: Application Date: 08/25/2020 Owner: STEVE AND LAURA GARCIA
Work Class: Second Dwelling Unit Issue Date: 11/04/2020 Subdivision: CARLSBAD TCT#97-14 UNIT#01
Status;
Scheduled
Date
12/16/2020
12/22/2020
03105/2021
03/12/2021
MARIANO
Closed -Finaled Expiration Date: 09/27/2021
IVR Number: 28257
Address: 1224 MARIPOSA RD
CARLSBAD, CA 92011-4206
Actual Inspection Type
Start Date
02/03/2021 BLDG-15 Rool/ReRool
(Patio)
Checklist Item
Inspection No.
149855-2021
COMMENTS
Inspection Primary Inspector
Status
Passed Paul Burnette
BLDG-Building Deficiency
12/16/2020 BLDG-21 146300-2020 Passed Tony Alvarado
Underground/Underflo
or Plumbing
Checklist Item
BLDG-Building Deficiency
COMMENTS
December 16, 2020:
1. Underground waste and vent plumbing
lines with clean-out locations, underwater
test with 10' feet of plumbing pipe head
pressure, plumbing lines shaded, all
plumbing pipe lines through concrete
wrapped appropriately, underground
plumbing scope of work-approved.
12/22/2020 BLDG-11 146826-2020 Partial Pass Tony Alvarado
Foundatlon/Ftg/Plers
(Rebar)
Checklist Item
BLDG-Building Deficiency
COMMENTS
December 22, 2020:
1. Foundation footing, steel slab
reinforcement rebar for cabana structure,
per structural engineer plans and detail
specifications-approved.
2. Pending compaction putting bottoms and
slab pad certification required prior to
concrete pour.
3. informed Project superintendent Cullen,
pad/footing certification requirements, per
city of Carlsbad.
03105/2021 BLDG-13 Shear 152094-2021 Passed Chris Renfro
Panels/HD (ok to wrap)
Checklist Item COMMENTS
BLDG-Building Deficiency
03/12/2021 BLDG-84 Rough
Combo(14,24,34,44)
152630-2021 Failed Tony Alvarado
Reinspection Inspection
Complete
Passed
No
Complete
Passed
Yes
Relnspectlon Incomplete
Passed
Yes
Complete
Passed
Yes
Reinspection Incomplete
Tuesday, May 25, 2021 Page 1 of 4