Loading...
HomeMy WebLinkAboutPRE 2021-0027; IONIS PHARMACEUTICALS; Admin Decision Letterr August 16, 2021 Jon Ohlson DGA Architects 2550 Fifth Avenue, Suite 115 San Diego, CA 92103 FILE fY\Ct..1 l-4of o._.d-8./ l7.( ~ SUBJECT: PRE 2021-0027 {DEV 2021-0141} -IONIS PHARMACEUTICALS APN 209-120-23, -24 ("city of Carlsbad Thank you for submitting a preliminary review for the construction of a 164,833-square-foot (SF), 48-foot- tall research and development (R&D) building and a 21-foot-tall, partially subterranean, three-level parking structure on Lots 21 and 22 of the Carlsbad Oaks North Business Park Specific Plan, SP 211(C). Lots 21 and 22 are located on the north side of Whiptail Loop, northwest of the existing IONIS R&D campus off Gazelle Court and Whiptail Loop. The existing campus comprises two lots and includes a conference center and the main headquarters/R&D building. A total of 460 parking stalls are proposed on Lots 21 and 22. Access to the site will be provided by two private driveways off Whiptail Loop. A parking study (Urban Systems Associates, June 2021) was submitted with the Preliminary Review to support a request for the reduction in the number of parking stalls. The proposal also includes a request to construct a private pedestrian bridge across Whiptail Loop. In response to your application, the Planning Division has prepared this comment letter. Please note that the purpose of a preliminary review is to provide you with direction and comments on the overall concept of your project. This preliminary review does not represent an in-depth analysis of your project. It is intended to give you feedback on critical issues based upon the information provided in your submittal. This review is based upon the plans, policies, and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal, new plans, policies, and standards may be in effect and additional issues of concern may be raised through a more specific and detailed review. Planning: General 1. General Plan and zoning designations for the property are as follows: a. General Plan: P-1, Planned Industrial; b. Zoning: P-M, Planned Industrial; and c. Specific Plan: The property is located within the boundaries of the Carlsbad Oaks North Business Park Specific Plan, SP 211(C). Community Development Department Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-73141760-602-4600 I 760-602-8560 f I www.carlsbadca.gov PRE 2021-0027 (DEV 2021-0141) -IONIS PHARMACEUTICALS August 16, 2021 Page 2 t-•:;~j t8:' t ~:-: H 2. The project requires the following permits: a. Site Development Plan (SDP). Because the building height exceeds 45 feet in height, a SDP subject to approval by the Planning Commission is required. If the building height is reduced to 45 feet, a Minor Site Development Plan subject to approval from the City Planner is required. Please see Planning Bullet Nos. 3 and 4 below for additional information regarding building height and setbacks. b. Minor Subdivision (MS) or Lot Line Adjustment. A Minor Subdivision or Lot Line Adjustment will be required to merge Lots 21 and 22 into one lot. Please see Land Development Engineering Bullet No. 3 for additional information. c. Landscape Plan Revision. A revision to the landscape plan for the IONIS conference center located at 2850 Gazelle Court will be required to address the changes associated with the addition of the bridge and pedestrian path proposed on the manufactured slope. All necessary application forms, submittal requirements, and fee information are available at the Planning counter located in the Faraday Building at 1635 Faraday Avenue or on line at www.carlsbadca.gov. You may also access the General Plan Land Use Element and the Zoning Ordinance online at the website address shown; select Department Listing; select Planning Home Page. Please review all information carefully before submitting. Planning: 1. Climate Action Plan (CAP). Requirements related to the city's goals to reduce greenhouse gas (GHG) emissions will likely impact development requirements of this project. A form.al application submittal will need to include a completed Climate Action Plan Checklist (Form P-30) to determine what requirements will apply to the project. New GHG reduction requirements are related to energy efficiency, photovoltaic, electric vehicle charging, water heating and traffic demand management requirements, as set forth in the California Green Building Standards Code and in . Carlsbad Municipal Code Chapters 18.21, 18.30 and 18.51 which is available on the city's website at the following address: http://www.qcode.us/codes/carlsbad/view.php?topic=18&frames=on To the extent that new GHG reduction requirements are in effect at the time of application for grading or building permits, the project will be required to comply with the effective requirements even if different than what is proposed in the project's planning approvals. GHG reduction requirements may impact, but are not limited to, site design and local building code requirements. If incorporating new GHG reduction requirements results in substantial modifications to the project after planning approvals are obtained, then prior to issuance of grading or building permits, the applicant may be required to submit and receive approval of a Consistency Determination or an Amendment application for the project through the Planning Division. 2. Parking Study. Based on the proposed breakdown in uses and the prior studies that have been prepared for the existing IONIS buildings, staff is preliminarily supportive of the request to modify the parking standards and reduce the required number of parking stalls for the proposed 164,833- square-foot R&D building from 497 parking stalls to 460. Pursuant to the parking study prepared PRE 2021-0027 (DEV 2021-0141) -IONIS PHARMACEUTICALS August 16, 2021 Page 3 by Urban Systems Associates, Inc. (June 2021), a minimum of 315 parking spaces are recommended. This recommendation is based on an analysis on the parking demand for similar R&D buildings as well as an assessment of the parking utilization at the existing IONIS campus. Further, staff is supportive of the request to reduce the parking requirements as pedestrian connectivity is encouraged throughout the IONIS campus via the proposal for a pedestrian bridge and a cross walk. Notwithstanding the above, prior to formal application submittal, please revise the parking study to address any additional parking reductions required to address the comments in this letter. In addition, please revise the study to include information with respect to the number of employees, customers and any telework schedules IONIS is/will be implementing which may impact the parking utilization. 3. Building Height. Exclusive of the roof equipment screen, the proposed building roofline extends up to a maximum height of 48 feet. Pursuant to Carlsbad Municipal Code (CMC) Section 21.34.070A.2(b), a building height above 45 feet may be permitted with the approval of an SDP in accordance with the provisions of CMC Chapter 21.06. The SDP requires approval by the Planning Commission. In addition to the SDP findings, pursuant to CMC Section 21.34.070A.2(b)(iii), the following findings shall be made: (A) The height of the building(s) will not adversely affect the surrounding properties; and (B) The building(s) will not be unduly disproportional to other buildings in the area. If you would like the proposal to be considered as an administrative-level decision, please revise the building height to a maximum of 45 feet. If you would like to proceed with the building height as proposed (i.e., 48 feet), with the SDP application submittal, please include information, such as surrounding building sizes and cross sections through the subject property and adjacent properties supporting the above-noted additional findings which are required to be made as part of the approval of the SDP. 4. Setbacks. Pursuant to CMC Section 21.34.070A.2(c), the required setbacks shall be increased at a ratio of one horizontal foot for every one foot of vertical construction beyond 35 feet. The additional setback area shall be maintained as landscaped open space. As the 48-foot-tall building exceeds the 35-foot height limitation by 13 feet, all setbacks shall be increased by 13 additional feet. As the area needs to be landscaped, the parking spaces cannot be located in this area. Listed below are the required setbacks pursuant to CMC Section 21.34.070 and the additional required setback area for a building over 35 feet in height (excluding parapets and equipment screens). PRE 2021-0027 (DEV 2021-0141) -IONIS PHARMACEUTICALS August 16, 2021 Page 4 5. 6. 7. Property Setback for 35' -foot-tall Setback for 45'-tall Setback for 48-foot- line building building tall building Front Average setback of 35 feet; Average setback of 45 Average setback of 48 setback shall not be less feet; setback shall not be feet; setback shall not than 25 feet; setback shall less than 35 feet; setback be less than 38 feet; be entirely landscaped shall be entirely setback shall be landscaped entirely landscaped Side 10 feet, entirely landscaped 20 feet, entirely 23 feet, entirely landscaped landscaped Rear Minimum of 20 feet, of Minimum of 30 feet, of Minimum of 33 feet, which at least 10 feet shall which at least 20 feet shall of which at least 23 be entirely landscaped be entirely landscape·d feet shall be entirely landscaped Based on a review of the site plan and parking layout, it does not appear the additional setback area for the increased building height can be accommodated along the rear property line without reducing the parking and revising the site layout. Staff therefore recommends the height of the building be reduced to 40-45 feet. Alternatively, please consider shifting the parking garage closer to the building to allow the parking to be shifted out of the setback area long the rear property line. Hillside Development Ordinance/Retaining Walls. The perimeter slopes around the northeast and east property lines qualify as manufactured uphill perimeter slopes pursuant to CMC Section 21.95.140C.1. As such, the maximum allowable retaining wall height is six (6) feet. Based on the inforn:iation p~ovided, it appears the project complies with the maximum allowable height up to the front setback line. However, pursuant to SP 211(C), the maximum allowable wall height in the front yard setback is three (3) feet. As currently designed, the project does not comply with this standard. Please revise the plans as appropriate. Private Pedestrian Bridge. Staff is preliminarily supportive of the proposal for a pedestrian bridge over Whiptail Loop. However, staff recommended enhancements to the design such as the incorporation of architectural features found at the IONIS campus (i.e., use of multi-colored · precision block and/or stone/tile). Please see the existing pedestrian bridge over Calle Barcelona (just east of the intersection with El Camino Real) for ideas as to what staff might expect to see in an enhanced design. Screening/Design of Parking Structure. a. Provide cross sections and renderings of the parking structure as viewed from the open space area to the northwest .. b. Because of the topography at the northwest corner of the site (i.e., downhill slope), the parking structure will be very visible across the permanent open space area. Please incorporate a decorative screen around the northwest corner of the parking structure to allow planting at the base and opportunities for vines to grow up the screen in this area (i.e., green screen). Please also provide additional trees in this area to soften the views. c. Incorporate material enhancements to the structure, such as the use of the multi-colored precision block for the elevator tower. PRE 2021-0027 (DEV 2021-0141) -IONIS PHARMACEUTICALS August 16, 2021 Page 5 8. Employee Eating Area. Pursuant to CMC Section 21.34.07((), a minimum of 300 square feet of outdoor eating facilities shall be provided for each 5,000 square feet of building area. Credit towards the required amount of square footage will be given for indoor eating facilities on a 1:1 basis as determined by the city planner. Based on a useable building area of 149,104 square feet (as presented on Sheet G-0001), a minimum of 8,946 square feet of employee eating area is required. Please provide an outdoor eating area exhibit showing how the project complies with this requirement with the project submittal. Please note staff is supportive of the proposed outdoor eating area within the landscaped setback area which overlooks the open space to the northwest. 9. Grading Plan. For each section of retaining wall proposed, please provide a detailed cross section (at tallest point) which shows the exposed bottom-of-wall and top-of-wall elevations, along with any planters proposed in front of the retaining wall. Please utilize an enhanced material for the retaining walls. 10. Proposed basement. Please revise the grading plan, floor plans and elevation to show where the basement is located. 11. Building Design. Pursuant to the architectural guidelines of SP 211((), no more than 35 linear feet of unarticulated exterior walls shall be allowed in areas visible from parking lots or public streets. In addition, all building elevations are required to have fa~ade variation and a minimum of three (-3) separate materials, colors, or textures. Please submit an exhibit with the submittal supporting these requirements. The addition of an accent stone or tile around the entrance feature is recommended for the south elevation. 12. Lighting Plan. Pursuant to SP 211((), a separate lighting plan shall be submitted for each perimeter lot abutting the permanent open space area to the north. All outdoor lighting shall be designed to reflect downward and shall utilize low pressure sodium or equivalent to minimize the impacts to wildlife. Cut-off shields shall also be utilized adjacent to the open space areas. 13. Fire Suppression Area. Pursuant to SP 211((), a 30-foot-wide fire suppression zone (FSZ) is required along the north property line. Based on discussions with the Fire Department, parking stalls can be located in the FSZ. As currently designed, the project complieswith this requirement. Please ensure the plans identify the location of the FSZ. In addition, please see Fire comments below with respect to the types of plants which are not acceptable in this area. 14. Prior to submittal of the formal application, please revise the plans as follows: a. On Sheet A-101, the minimum back-up area between each row of parking stalls is 24 feet. At the rear of the building, the back-up area is reduced to 23.5 feet. Please revise the plans to comply with the Zoning Code. b. For the retaining walls which abut a row of parking stalls, please ensure the planting area in front of the walls is large enough to accommodate planting to adequately screen the walls. Vines and shrubs are recommended in these areas. PRE 2021-0027 (DEV 2.021-0141) -IONIS PHARMACEUTICALS August 16, 2021 Page 6 Land Development Engineering: 1. A preliminary title report dated within 6 months of the application date is required with the submittal of a discretionary application and final engineering application. Show and label on the plans, all easements listed in said report. If the easement cannot be shown, list the easement on the plan and state "non-plottable". 2. This project is required to provide a preliminary grading plan with the submittal of a discretionary application and is subject to a final engineering grading plan and grading permit. 3. If this project proposes a minor subdivision to merge the two lots, a parcel map is required and the relinquishment of access rights per Map No. 16145 is to be abandoned on the parcel map. If a minor subdivision is not proposed, a lot line adjustment will be required to merge the two lots and a summary vacation is required to summarily vacate the relinquishment of access rights. 4. A geotechnical report, drainage study, and storm water quality management plan (SWQMP) will be required with the submittal of a discretionary application and final engineering application. 5. A Transportation Impaction Analysis (TIA) per the city's TIA guidelines will be required with the submittal of a discretionary application. An approved scoping agreement by the Transportation Planning and Mobility division will be required prior to the submittal of a discretionary application. The city's TIA guidelines are available on the city's website and coordinate with the Transportation Planning and Mobility manager on the scoping agreement. 6. A Vehicle Miles Travelled (VMT) analysis may be required based on the city's CEQA determination for this project. Refer to the city's VMT guidelines which is available on the city's website. If a VMT analysis is required, two copies shall be submitted at the time of the discretionary application. 7. This project will be subject to a Transportation Demand Management (TDM) plan: Refer to the city's TOM guidelines which is available on the city's website. Submit two copies of a preliminary TDM plan at the time of the discretionary application. 8. Based on the preliminary Storm Water Quality Management Plan (SWQMP) submitted for the preliminary review, this project is subject to Priority Development Project and hydro modification requirements. Two copies of the preliminary SWQMP shall be submitted at the time of the discretionary application. 9. The proposed modular wetlands as a proprietary biofiltration BMP will not be accepted as the project site is currently vacant and a normal biofiltration basin (BF-1) can be designed to fit within the footprint of the property. Also, to be considered propriety biofiltration, the devices must be vegetated, is required to demonstrate infeasibility as to why a normal biofiltration basin cannot be accommodated on-site and needs to demonstrate 40% retention is being met. The modular wetlands cannot be located within the private dr.ive aisle. Additionally, a modular wetland cannot be considered as a flow-thru device as the city does not have Alternative Compliance Program to accept a flow-thru device for the purposes of pollutant treatment control. 10. Based on the Storm Water Standards Questionnaire, E-34 Form in the preliminary SWQMP, it appears to be filled out incorrectly. Revise the E-34 form accordingly. PRE 2021-0027 (DEV 2021-0141) -IONIS PHARMACEUTICALS August 16, 2021 Pa e 7 11. It appears on the DMA exhibit in the preliminary SWQMP, has portions of Drainage Management Areas (DMAs) that by-pass water quality facilities based on the proposed grades and drainage methods. These portions of the DMA will need to be routed to a water quality facility for pollutant control and hydromodification. Alternatively, these portions of DMAs should be evaluated to determine if they qualify as self-mitigating areas. 12. On September 1, 2021, the city will no longer be utilizing infiltration feasibility worksheets and adopting the County of San Diego methodology which infiltration infeasibility needs to be documented and determined by the geotechnical engineer. Carlsbad will also be adopting the County of San Diego sizing worksheets for pollutant control. Revise the sizing sheets accordingly to the city's BMP Design Manual. 13. Provide in the preliminary SWQMP, the city's single sheet BMP plan attachment 4. The city's template is available on the city's website. 14. Submitthe preliminary grading plan for discretionary review in engineering scale 1" = 20'. 15. All on-site fire service lines, hydrants, and related appurtenances is required to be privately maintained and owned. A note shall be added to the fire utility plans. 16. Provide on the preliminary grading plan, the proposed PAD elevations of the building and distinguish the different PAD and finish floor (FF) elevations of the building on the plan. 17. Show and label on the plans, the existing sewer service (lateral) and call-out whether it is to remain or to be removed. If to be removed, show, and label the proposed sewer service on the plans. 18. Provide on the title sheet, the demands of traffic in average daily trips (ADT), water in gallons per day (GPD) and sewer in equivalent dwelling units (EDU). 19. Label on the plans, the proposed top and bottom retaining wall elevations. 20. Show and label on the plans, the adjacent structures/buildings, and contours within 25-ft of the project boundary. 21. Provide 3-point vehicle turning movements for the parking structure. 22. Add on the preliminary grading plan, the stopping sight distance for both driveway approaches. 23. Revise the proposed drainage method for the project to eliminate any concentrated discharge onto slopes. 24. Provide on the preliminary grading plan, the flowline elevations of the proposed brow ditches. 25. Add and call-out on the preliminary grading plan, pedestrian ramps that are ADA compliant for the proposed driveway approaches. 26. Add on the preliminary grading plan, the proposed width for both of the driveway approaches. PRE 2021-0027 (DEV 2021-0141) -IONIS PHARMACEUTICALS August 16, 2021 Page 8 27. Add on the preliminary grading plan, the pedestrian path and connection from the lonis Conference Center property (Parcel 1 of Map No. 21705). Show and call-out any required on-site improvements for the conference center parking lot. 28. Provide in the preliminary SWQMP and grading plan, the cross-section detail of the proposed biofiltration basin. Verify that the finish grade elevation with the top of grading elevation matches the calculated ponding depth. 29. Label on the preliminary grading plan, the invert elevations of all the existing and proposed storm drain facilities. 30. Label on the preliminary grading plan for the proposed slopes, a maximum of 2:1 slope. 31. The proposed pedestrian bridge is to be privately owned and maintained. Verify that the pedestrian bridge on the preliminary grading plan matches the elevation detail. Verify that the vertical clearance for the pedestrian bridge is adequate for semi-trailer truck. Lastly, verify that the pedestrian bridge is ADA compliant. 32. Call-out on the preliminary utility plan, that all existing 12-inch PVC water main stub outs and sewer laterals not to be utilized by the project in Whiptail Loop are to be removed and capped at the main. 33. Address the redline comments on the plans and SWQMP. Fire Department: 1. Fire access and building footprint are acceptable. 2. The pedestrian bridge elevations appear to comply with Fire Code requirements. 3. The following comments were provided regarding the Fire Suppression Area on the landscape plan: a. All species of grass proposed to be located in the Fuel Modification Zone shall be removed from the plant palette. b. Remove coyote brush from the revegetation area as there may be an issue as it grows in the future. Building Department: 1. Provide calculation to justify proposed square footage in excess of allowable limits of CBC Table 506.2 (frontage increase or unlimited building area calculations). 2. Show an accessible path of travel to the outdoor seating at the west end of the parking lot. PRE 2021-0027 (DEV 2021-0141) -IONIS PHARMACEUTICALS August 16, 2021 Page 9 3. CAP EV charging requirements-Section 4B to be revisited: a. 10% of total parking to be EVSE (EV charging stalls do not count as parking per 11B-208.1). b. 50% of the 10% total to be "installed" (23 EV charging stations installed). c. The remainder shall be "ready" or "capable." d. 23 EVSE stalls require 1 van accessible EVSE stall, 2 standard EVSE stalls and 2 ambulatory stalls. 4. Other CAP measures 1B, 2B, 3B and 5 to be detailed on the plans. The size of the system must be confirmed to be in compliance with CAP 2B at initial project submittal but may be deferred. Landscaping: Numbers below are referenced on the red line plans where appropriate for ease in locating the area of the comment concern. 1. The following comments are considered to preliminary to a Concept Plan submittal but are based on Section 3 of the Landscape Manual which outlines requirements for Concept Plan submittals. The general intent of these comments is to identify any significant issues of concern for future planning. At the time of the first full Conceptual Plan review, all of Section 3 of the landscape manual will be reviewed. 2. Please show and label any site items that might require special screening such as trash enclosures and transformers. 3. On the Planting Plans, please provide callouts to identify BMP basins. 4. It would be helpful to have a small Key Map on each sheet showing what area of the site is shown on each sheet. This is not required for Concept Plans but will be required for Construction Drawings. 5. On the Planting Plans, please identify the planned location for the irrigation water meter. Coordinate with the civil engineer to ensure the plans to show the same location. 6. The Landscape Manual indicates that landscape plans are to feature ground cover, shrubs, and trees to screen elements of unsightliness and screen/soften new improvements. The Landscape Manual also indicates that landscaping shall be use.d to accentuate and enhance architecture. Sufficient trees should be provided on the project to provide screening and softening of the buildings. As plans develop, this issue will be examined in greater detail. Landscape softening of the development is probably one of the most significant landscape issues 'on the project. 7. Please show existing trees or tree groupings on existing perimeter slopes. Indicate if any are to be removed. All slopes will need to be planted to meet the minimum slope revegetation standards. Tree planting on slopes (a combination of existing and proposed) will contribute to the screening and softening referenced above. PRE 2021-0027 {DEV 2021-0141) -IONIS PHARMACEUTICALS August 16, 2021 Page 10 8. With so many slope areas on the plans, please provide slope indicator lines to help identify where slopes are located and what direction they are sloping. 9. Please prepare a Maintenance Responsibility Exhibit at a scale and size (preferably one sheet) that provides an overall view of the project and shall clearly identify the various areas of landscape maintenance responsibilities (private, and Association, etc.). 10. Please verify if fire suppression zones are required for this project. Review plans with the Fire Marshal to confirm fire suppression zone locations and requirements and provide documentation of findings. Address fire suppression as appropriate. 11. Plans are very conceptual at this stage. The proposed plant species shown in the plant legend appear to be an appropriate mix for the project. With future Concept Plan level submittals, please develop more detail on the planting plans to provide a better indication of planting groupings and density of planting. 12. The plan shall demonstrate that plants, when installed and at maturity, will be positioned to avoid obstructing motorists' views of pedestrian crossings, driveways, roadways, and other vehicular travel ways. On collector streets and larger, landscape elements over 30 inches in height (including planting measured at maturity) as measured from adjacent street grade are not permitted at street corners within a triangular zone drawn from two points, 25.feet outward from the beginning of curves. At medium to high use driveways, the 30-inch height limitation applies at driveways 25 feet from the edge of the apron outward along the curb, then 45 degrees in toward the property. Landscape features (shrubs, trees, fencing, etc.) shall be selected to ensure that no visual impairments or obstructions are located within the CalTrans sight distance lines. Please coordinate with the civil engineer and show and label all vehicular sight lines and sight triangles on the plans per above and insure no conflicts. 13. For parking lots, trees shall be provided at the minimum rate of one per·every four parking stalls. Trees pertaining to this requirement shall be located within the parking area, exclusive of parking lot setbacks. The trees shall be located in close proximity to the spaces they are to shade. There are a few parking bays on the site that will need an additional tree to meet this requirement. Please see the planting plans. 14. If a landscaped strip is provided perpendicular to rows of parking spaces, the planting area shall be designed to provide a minimum of four (4) feet of landscaping clear of vehicle overhangs. Sheets L2.1 and 2.3 include a center planter that is 4' (total) width. Please refer to the landscape manual page 16, Figure 3D. Please increase the width of the planter to meet the requirement. 15. Parking areas shall be screened from adjacent property or streets through the use of planting or any combination of planting, mounding, and decorative walls. Screening elements shall have a total height of at least three (3) feet. The Concept Plan should demonstrate how this requirement will be satisfied. 16. Per the Carlsbad Oaks North Specific Plan, a minimum of 10% of the parking area shall be landscaped. The "parking area" includes all parking spaces and drive aisles. The plantings shall be contained in planting areas with a minimum dimension of 4' and bounded by a concrete or masonry curb of a minimum of 6" in height. The plantings shall be located throughout the off- PRE 2021-0027 (DEV 2021-0141) -IONIS PHARMACEUTICALS August 16, 2021 Page 11 street parking areas in order to obtain the maximum amount of dispersion. Please provide a calculation showing the percentage of landscape area provided in the parking area. Sheet L2.1 shows an example of the method of determining what areas can be counted towards the 10% requirement. All landscape area between the red lines can be counted. 17. Please add the following notes to the plans and ensure all requirements are met: Slopes 6:1 or steeper requiring erosion control measures as specified herein shall be treated with one or more of the following planting standards: a. Standard 1-Cover Crop/ And Erosion Control Matting: Cover crop shall be a seed mix typically made up of quick germinating and fast covering grasses, clovers, and/or wildflowers. Submit the specific seed mix for City approval prior to application. The cover crop shall be applied at a rate sufficient to provide 90% coverage within thirty (30) days. The type of erosion control matting shall be as approved by the city and affixed to the slope as recommended by the manufacturer. On slopes 3 feet or less in vertical height where adjacent to public walks or streets: When planting occurs between August 15 and April 15, erosion control matting shall be required. During the remainder of the year, the cover crop and/or erosion control matting may be used. On slopes greater than 3 feet in height, erosion control matting shall be required, and a cover crop shall not be used, unless otherwise approved by the City. b. Standard #2 -Ground Cover One hundred {100%) percent of the area shall be planted with a ground cover known to have excellent soil binding characteristics (planted from a minimum size of flatted material and spaced to provide full coverage within one year). c. Standard #3 -Low Shrubs Low spreading woody shrubs (planted from a minimum of 1-gallon containers) shall cover a minimum of seventy (70%) percent of the slope face (at mature size). d. Standard #4 -Trees and/or Large Shrubs Trees and/or large shrubs shall be (planted from a minimum of 1-gallon containers) shall be installed at a minimum rate of one (1) plant per two hundred {200) square feet. Slopes -6:1 or steeper and: a. 3' or less in vertical height and adjacent to public walks or streets require at a minimum Standard #1 (cover crop or erosion control matting). PRE 2021-0027 (DEV 2021-0141) -IONIS PHARMACEUTICALS August 16, 2021 Page 12 b. 3' to 8' in vertical height require Standards #1 (erosion control matting shall be installed in lieu of a cover crop), #2 and #3. c. In excess of 8' in vertical height require Standards #1 (erosion control matting shall be installed in lieu of a cover crop), #2, #3, and #4. - Areas graded flatter than 6:1 require a cover crop per Standard #1 with temporary irrigation when they have one or more of the following conditions: a. Sheet graded pads not scheduled for improvements within 6 months of completion of rough grading. b. A potential erosion problem as determined by the City. c. Identified by the City as highly visible areas to the public or have special conditions that warrant immediate treatment. 18. For the Concept Plan submittal, please provide a Water Conservation Plan in conjunction with the Landscape Concept Plan. This plan shall demonstrate to the City how the proposed development will use all practical means available to conserve water in the landscape. Please provide/address the following: a. Please indicate the proposed type of water to be used for irrigation (i.e. potable, recycled, graywater, etc.). b. Please provide a colored or hatched plan clearly showing where recycled water, graywater and potable water are proposed to be used for irrigation. This plan will be forwarded to Carlsbad Municipal Water District (CMWD) for review. Any comments will be returned to the applicant. c. Irrigation systems for all projects, except for service to a single-family residence or front yard irrigation on individually metered condos, shall be designed to use non-potable, treated recycled water, unless an exemption is approved by the City Utilities Department. d. Please provide written descriptions of water conservation features including addressing xeriscape principles (see Appendix A of the Landscape Manual) within the project. e. Hydrozone Diagram: Please include one "Hydrozone Diagram" which identifies grouping of plants within the individual hydrozones (high, moderate, low, very low or special landscape areas) and which indicates the square footage and irrigation method of each area. f. Separate water service for landscaping (including, but not limited to connections, water meters, and back flow preventers) shall be provided for all commercial/industrial projects, golf courses, parks, and residential common areas in projects over four (4) dwelling units. g. Concept plans shall include calculations which document the maximum allowed annual water use for the landscaped area or maximum applied water allowance (MAWA) and estimated total water use (ETWU). A landscape project shall not exceed the MAWA. The PRE 2021-0027 (DEV 2021-0141) -IONIS PHARMACEUTICALS August 16, 2021 Page 13 19. MAWA for a landscape project shall be determined by the following calculation as defined in the City ordinance: MAWA = (ETo)(0.62)[(0.45 x LA)+ (0.55 x SLA)]. The ETWU shall be determined by the following calculation as defined in the Landscape Manual: Please provide calculations and worksheets on city forms as found in the Landscape Manual. In addition to the calculations, include a statement on the plans signed under penalty of perjury by the person who prepared the plan that provides: "I am familiar with the requirements for landscape and irrigation plans contained in the City of Carlsbad's Landscape Manual _and Water Efficient Landscape Regulations. I have prepared this plan in compliance with those regulations and the landscape manual. I certify that the plan implements those regulations to provide efficient use of water." Please provide a line beneath this statement for signature and date. PLEASE RETURN REDLINES and provide 2 copies of all plans (concept, water conservation, fire protection, and colored water use plan) for the next submittal. The submittal must be made to a Planning Division staff member at the Planning counter along with a transmittal clearly indicating what the submittal is for (i.e. Conceptual Plan re-submittal). Please call the Planning Division Counter at (760) 602-4610 to make a submittal appointment. Please provide a written response to all comments clearly indicating where and how each comment was addressed. If you would like to schedule a meeting to discuss this letter with the commenting departments, please contact Shannon Harker at the number below. You may also contact each department individually as follows: • Planning Division: Shannon Harker, Associate Planner, at (760} 602-4621 • Land Development Engineering: Kyrenne Chua, Project Engineer, at (760) 602-2744 • Fire Department: Randy Metz, Fire Marshal, at (626) 536-6677 DON NEU, AICP City Planner DN:SH:cf Enc: Engineering redlines (previously provided to applicant) Landscape redlines (previously provided to applicant) c: Wayne Sanders, !SIS Pharmaceuticals, 2855 Gazelle Court, Carlsbad, CA 92010 Kyrenne Chua, Project Engineer Randy Metz, Fire Department File Copy/ Data Entry