HomeMy WebLinkAboutCD 2019-0010; CARLSBAD SEAWATER DESALINATION PLANT SEAWATER INTAKE MODFICATION; FINAL SOILS REPORT; 2020-12-24GEOTECHNICAL CONSULTANTS
Carson 310.684.4854 | Concord 925.243.6662 | Rancho Cucamonga 909.989.1751
Rancho Cordova 916.631.7194 | San Diego 858.609.7138 | San Jose 408.362.4920
December 24, 2020 RMA Job No. 19-2285-0
Kiewit – Shea II, A Joint Venture
10704 Shoemaker Ave.
Santa Fe Springs, CA 90670
Subject: Compaction Report
Carlsbad Desalination Plant Seawater Intake Modification
4600 Carlsbad Blvd.
Carlsbad, CA 92008
Gentlemen,
In accordance with your request, we have completed this letter to document a series of in place density (compaction) tests
that were taken within the subject site at the locations listed herein beginning on February 05, 2020 and continuing
through March 20, 2020. The compaction tests were taken in subgrade, utility trench, and water main backfill.
Field testing of the backfill was performed according to the direct transmission nuclear method, ASTM D6938. The
maximum density-optimum moisture relationship was established in the laboratory according to ASTM D1557 test
method.
Excavation of building footing was over excavated 3ft and proof rolled per project documents. Excavation was
backfilled using approved 2-sack slurry per approved RFI 016.
A summary of the results of all tests performed is attached along with a plot plan showing the compaction test locations.
The field density tests were taken at locations selected by our representative. The tests have been performed, as
previously described, in accordance to generally accepted soil testing practices as well as the Geotechnical Exploration
Report provided by Leighton Consulting on December 6, 2019. No other warranty, express or implied, is made.
Respectfully submitted,
RMA Group
Jorge F. Meneses, PhD | PE | GE | D.GE
Principal Geotechnical Engineer
GE 3041
~ ~~
RMAGroup
Every Project Matters I www.rmacompanies.com
GEOTECHNICAL CONSULTANTS
Carlsbad Desalination Plant Seawater Intake Modification December 24, 2020
Job No. 19-2285-0 Page 2 of 7
Reference(s):
1. Tetra Tech. Carlsbad Desalination Plant Intake Pump Station Phase 1, Electrical Building Foundation Plan.
C-0101 & C-3101.
2. Leighton Consulting, Inc. December 6, 2019. Geotechnical Exploration Report, Intake Pump Station Project,
Carlsbad Desalination Project, City of Carlsbad, California.
3. Tetra Tech. Carlsbad Desalination Intake Pump Station – Phase 1, RFI 016.
~~~
RMAGroup
Every Project Matters I www.rmacompanies.com
GEOTECHNICAL CONSULTANTS
APPENDIX A
COMPACTION TESTS
~~~
RMAGroup
Every Project Matters I www.rmacompanies.com
GEOTECHNICAL CONSULTANTS
Carlsbad Desalination Plant Seawater Intake Modification December 24, 2020
Job No. 19-2285-0 Page 4 of 7
MAXIMUM DENSITY – OPTIMUM MOISTURE RELATIONSHIPS:
Material
ID
Test
Method1 Description Maximum
Density, pcf
Optimum
Moisture, %
1 M Light Brown Silty Sand (Native Subgrade) 125.3 10.3
2 M Base 124.5 9.6
1Test Method
M – ASTM D1557 (Maximum Density Optimum Moisture Content Relationship)
~~~
RMAGroup
Every Project Matters I www.rmacompanies.com
GEOTECHNICAL CONSULTANTS
IN-PLACE DENSITIES:
Test
No.
Date
Item
Tested2
Location
Test
Method3
Test
Depth,
ft
Moisture,
%
Dry
Density,
pcf
Relative
Compaction,
%
Material
Type
Carlsbad Desalination Plant Seawater Intake Modification December 24, 2020
Job No. 19-2285-0 Page 5 of 7
1 2/05/20 SG Electrical Building CMU Retaining
Wall Footing
N 3.0 16.8 115.2 91.9 1
2 2/05/20 SG Electrical Building CMU Retaining
Wall Footing
N 3.0 16.0 115.8 92.4 1
3 2/05/20 SG Electrical Building CMU Retaining
Wall Footing
N 3.0 16.2 115.8 92.4 1
4 2/25/20 WM HDPE 63” Pipe Line N 8.0 7.4 114.3 91.2 1
5 3/02/20 UT 50’ S/E of the Guard Station N .0.9 8.4 120.3 96.0 1
6 3/02/20 UT 150’ S/E of the Guard Station N 0.9 8.5 119.0 95.0 1
7 3/02/20 WM 63” HDPE Water Main Trench
Line
N 6.0 8.4 114.1 91.1 1
8 3/02/20 WM 63” HDPE Water Main Trench
Line
N 4.0 8.0 113.3 90.4 1
9 3/02/20 WM 63” HDPE Water Main Trench
Line
N 2.0 8.1 112.9 90.1 1
10 3/02/20 WM 63” HDPE Water Main Trench
Line
N 0.0 7.6 115.2 91.9 1
11 3/07/20 UT 75’ S/E of the Guard Station N 0.3 8.3 119.0 95.6 2
12 3/07/20 UT 175’ S/E of the Guard Station N 0.3 8.7 119.4 95.9 2
13 3/20/20 UT 140’ of Ductbank G Electrical
Building to Intake, 35’ W/o RW
Footing at Existing Pavement
N 1.5 10.7 121.9 97.3 1
14 3/20/20 UT 140’ of Ductbank G Electrical
Building to Intake, 75’ W/o Electrical Buiilding Footing
N 3.0 14.5 119.5 95.4 1
15 3/20/20 UT 140’ of Ductbank G Electrical
Building to Intake. 20’ into N/S
Road
N 1.5 14.1 116.3 92.8 1
16 3/20/20 UT 140’ of Ductbank G Electrical
Building to Intake at the Bend
N 3.0 13.8 119.2 95.1 1
17 3/20/20 UT 140’ of Ductbank G Electrical
Building to Intake
N 2.0 15.5 124.4 99.3 1
2Item Tested:
SG – Subgrade UT – Utility Trench
WM – Water Main Backfill 3Test Method:
N - ASTM D6938 (Density of Soil In-Place by Direct Transmission Nuclear Method)
~~~
RMAGroup
Every Project Matters I www.rmacompanies.com
GEOTECHNICAL CONSULTANTS
APPENDIX B
PLOT OF COMPACTION TESTS
~~~
RMAGroup
Every Project Matters I www.rmacompanies.com
Kiewit - Shea II JV10704 Shoemaker Ave.Santa Fe Springs, CA 90670DATE:Test Location MapCarlsbad Desalination Plant4600 Carlsbad Blvd.Carlsbad, CA 92008105-04-2020BASE MAP PROVIDED BY: Tetra Tech, Carlsbad Desalination Plant Intake Pump Station Phase 1, Electrical Building Foundation Plan S-2101.THIS PLAN HAS BEEN PREPARED FOR USE AS A TESTLOCATION MAP AND IS NOT INTENDED FORCONSTRUCTION.APPROVED BY:JMCHECKED BY:RODRAWN BY:JAMFIGURE NO.:RMA JOB NO.:19-2285-0RANCHO CUCAMONGA, CA 91730909.989.1751 · FAX 909.989.428712130 SANTA MARGARITA COURTwww.rmacompanies.com*EOTECHNICAL EN*INEERIN* CONSTRUCTION INSPECTION MATERIALS TESTIN*LegendX- Approximate location of density test0848161"=8'123/
0
~ ~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CIB I
__.
0
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
(/:
0 1 ~ I
~ I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
r
I
I
I
y/
;
t-:::/ L ___ , __ _
'.::: ~ "' 9
15' -10"
\
"'
11' -10"
ITEMPLAN CHANGESDESCRIPTIONDATEBYKiewit - Shea II, A Joint Venture10704 Shoemaker Ave.Santa Fe Springs, CA 90670DATE: Compaction ReportCarlsbad Desalination Plant Seawater Intake Modification4600 Carlsbad Blvd.Carlsbad, CA 9200821 OF 2December 2020 LEGEND BASE MAP PROVIDED BY:Tetra TechRANCHO CUCAMONGA, CA 91730909.989.1751 · FAX 909.989.4287GEOTECHNICAL ENGINEERING CONSTRUCTION INSPECTION MATERIALS TESTING12130 SANTA MARGARITA COURTwww.rmacompanies.comDRAWN BY:JPFIGURE NO.:SHEET NO.:RMA JOB NO.:19-2285-0-Test Location141098741413161715SCALE: 1" = 25'~ I I I l I I CON~TRUCT 2~8 LF OF(jl3" H□PE lj"IPE WITl1 WATER ljl<3HT JOlr TS 25 20 . TEXISTBRl',E · · ,/ Dlsct!A~~E VAULT . (BE'fOND . . 1._ F ROPOSE b 2· PVC , VATER rEXl!J SURFACE (BEYOND) . . . ~CLOFf'll"E 1§ .!.Q ·I· I I v~SEC~~TYF:NLi : ·1-.. ±25' -1-I l ·1. ~ -----K ACCESS ROAD : ·~: :-----' < .____•: ·1 · -: : EU;CDl,ICTE!.ANK : , ---~._.:_ > ~ " • _ / {2.5'WX1.!l'D} 7 _§ ~-=~-11==---~t--I-=--t~=t._~~f-==1-~-~-t_-_-_-_t---f--1r~,-~+--f--~-~-;-f----t--}---~--J-·~_·-=1~1o~-~1--1,,!11±,1:~l11~~---j-~,h-.~r~~=· t-dr--~"'-~-1 --"'-MUC.T-'1"1'~~p--+-------l lo' --"' 0 C Q 0 g . I!:. .:.§ t------1 ~~ -10 0+90 1+00 CONNE:CTTQ PRQP 2' F'VC WATER LINE /INSTAU.2"TEE INSTAU.2"GATEVALVE 1t 11 l / s,: 1•2i,39 ; HORIZLPT I I I I RMA Group w:rr Prrti«I M tte www rmocomp(1n•r.-com 1+50 --~~=.:_~ ... , _)(\ - - --" --\ / \ BEGIN CONSTRUCTION / r STA1+00.M . -1.lii'IO. \ -\_1 ROPOSEl1) 63" HOPI~ .! DR 21 PIP.I: . 2+00 .-~:~--:-~--T-T 2+50 3+00 PROFILE BRINE LINE SCALE; HORIZ; 1"= 10" VEIU; 1"= !i" I-'. . . I T ~ ... -h-j • · · 000~ 3+50 3+80 8'I> CONSlRUCTION ~ 25 li th 20 ~u h-HI en P-c:, 1§ z H ! i~j ji t 1! E .!.Q C l.::, C Sj 0:: t)i 0111 C.) .11 S § w !p o:: ., I' f ~ -e o,. ~,i,1 _Q Jh! ., !! § II Uit ~ -10
ITEMPLAN CHANGESDESCRIPTIONDATEBYKiewit - Shea II, A Joint Venture10704 Shoemaker Ave.Santa Fe Springs, CA 90670DATE: Compaction ReportCarlsbad Desalination Plant Seawater Intake Modification4600 Carlsbad Blvd.Carlsbad, CA 9200832 OF 2December, 2020 LEGEND BASE MAP PROVIDED BY:Tetra TechRANCHO CUCAMONGA, CA 91730909.989.1751 · FAX 909.989.4287GEOTECHNICAL ENGINEERING CONSTRUCTION INSPECTION MATERIALS TESTING12130 SANTA MARGARITA COURTwww.rmacompanies.comDRAWN BY:JPFIGURE NO.:SHEET NO.:RMA JOB NO.:19-2285-0-Test Location9125116SCALE: 1" = 160'lo' -"' \ \ ~\ ~ \ V RMA Group w:rrPrrti«IM tte wwwrmocomp(J'n•r.-com ..,, •• ,..,11vr, PUMP STATION TEMPORARY SECURITY FENCE; SEENOTE4 \ ' \