Loading...
HomeMy WebLinkAbout2541 STATE ST; ; CB150449; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 04-23-2015 Residential Permit Permit No: CB150449 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: 2541 STATE ST CBAD RESDNTL 2030543406 $295,759.00 1 0 Sub Type: CONDO Lot#: 6 Constuction Type: 5B Reference #: CT130005 Structure Type: MF5+ Bathrooms: 0 Status: ISSUED Applied: 02/11/2015 Entered By: JMA Plan Approved: 04/23/2015 Issued: 04/23/2015 Inspect Area: Project Title: Orig PC#: PC140037 STATE ST. TOWNHOMES: PHS 2 C1 Plan Check#: PC150021 405 SF 1 ST FLR COMMERCIAL/1,694 SF LIV/ 476 SF GAR/ 67 SF BALCONY/ 585 SF ROOF DECK Applicant: TAYLOR MORRISON OF CA, LLC STE 1450 100 SPECTRUM DR IRVINE CA 92618-4935 949-341-1289 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee HMP Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Green Bldg Stands Plan Chk Fee $1,317.94 $0.00 $922.56 ($500.00) $0.00 $38.45 $6,190.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,931.00 FS1 ($3,931.00) $0.00 $12.00 $0.00 Total Fees: $24,285.41 Total Payments to Date: Inspector: Owner: Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWAFee CFO Payoff Fee PFF (3105540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee (4305541) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnLieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees Fire Sprinkler Fees TOTAL PERMIT FEES $24,285.41 Balance Due: {,, Clearance: FS1 $0.00 $317.00 $4,800.00 $0.00 $5,382.81 $4,968.75 $0.00 $0.00 $0.00 $0.00 $0.00 $210.00 $89.00 $65.38 $0.00 $0.00 $0.00 $0.00 $471.52 $0.00 $0.00 $24,285.41 $0.00 approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. lf you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annu\ their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees fn connection with this project. NOR DOES IT APPLY to any I Inspection List Permit#: CB150449 Type: RESDNTL CONDO STATE ST. TOWNHOMES: PHS 2 C1 405 SF 1 ST FLR COMMERCIAU1 ,694 SF L Date Inspection_ Item Inspector Act --------Comments 03/15/2016 89 Final Combo PY AP 03115/2016 89 Final Combo RI AM PLEASE/COF 12/03/2015 39 Final Electrical PY PA 10/14/2015 17 Interior Lath/Drywall PY AP 10/14/2015 23 Gas/TesURepairs PY AP 10/13/2015 17 Interior Lath/Drywall PY CA 10/07/2015 17 Interior Lath/Drywall PY AP 10/02/2015 84 Rough Combo PY AP 10/01/2015 84 Rough Combo PY AP 09/21/2015 13 Shear Panels/HD's PY AP 09/21/2015 13 Shear Panels/HD's PY AP 09/21/2015 13 Shear Panels/HD's PY AP 09/21/2015 13 Shear Panels/HD's PY AP 09/11/2015 15 Roof/Reroof PY AP 09/01/2015 17 Interior Lath/Drywall PY PA 08/2712015 17 Interior Lath/Drywall PY PA 08/24/2015 15 Roof/Reroof PY AP 08/21/2015 15 Roof/Reroof PB AP 06/25/2015 11 Fig/Foundation/Piers PB AP 06/22/2015 81 Underground Combo PB CA Tuesday, March 22, 2016 Page 1 of 1 --------------- ~ ,<::?.t,) ~ (ll 'f Of CARLSBAD P · •llding Division INSPECTION RECORD --..-,NSPECTION RECORD CARD WITH APPROVED PLANS MUST BE l<EPT ON THE JOB CB150449 2541 STATEST STATE ST. TOWNHOMES: PHS 2 C1 40S SF 1ST FLR C:OMMERCIAL/1 ,fi!¼ SF LIV/ 476 SF GAR/ 67 SF BALCONY/ 585 SF ROOF DECK RESDNTL CONDO Lot#: 6 TAYLOR MORRISON OF CA, LL C 0 CALI. BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION RE:t.,0RD COP't 0 FOR BUILDING INSPECTION CALL: 760.;602-2725 OR GO TO: www.Carlsbadca.gov/Buildlng AND CLICK ON "Request fnspec ion" DATE: I _,, .. -..- IF "YES" IS CHECKED BELOW THAT DIVISION'S APPROVAL IS REQUIRED RIOR TO RE UESTING A FINAL BUILDING INSPECTION. IF YOU HAVE ANY QUESTIONS PLEASE CALL THE APPLICABLE DIVISIONS AT THE PHONE NUMBERS PROVIDED BELOW. AFTER ALL REQUIRED APPROVALS ARE SIGNED OFF-FAX TO 760-602-8560. EMAIL TO BL0GINSPECTIONS0'CARLSB DCA GOV OR BRING IN A COPY OF THIS CARO TO: 1635 FARADAY AVE., CARLSBAD, CA 92008. BUILDING INSPECTORS CAN BE REACHED AT 760-602•2700 BETWEEN 7:30 AM -8:00 AM THE DAY OF YOUR INSPECTION. Required Prior to Requesting Building Final If Checked YES Inspector Notes Planning/Landscape 760-944-8463 Allow 48 hours CM&I (Engineering Inspections) 760-438-3891 Call before 2 pm Fire Prevention 760-002-4660 Allow 48 hours Type of Inspection Type of Inspection CODE # ELECTRICAL Date Inspector #11 #31 0 ELECTRIC UNDERGROUND O UFER #12 REINFORCED STEEL #34 ROUGH ELECTRIC ''·66 MASONRY PRE GROUT #33 0 ELECTRIC SERVICE O TEMPORARY 0 GROUT 0 WALL DRAINS #35 PHOTO VOLTAIC #10 TILT PANELS _________ _.., ____ +------#39 ANAL #11 POUR STRIPS CODE # MECHANICAL #11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS & PIPING #14 SUBFRAME O FLOOR 0 CEILING #44 0 DUCT & PLENUM O REF. PIPING #15 ROOF SHEATHING #43 HEAT-AIR COND. SYSTEMS #13 EXT. SHEAR PANELS #49 FINAL 1116 INSULATION #18 EXTERIOR LATH 1181 UNDERGROUND (11,12,21,31) #17 INTERIOR LATH & DRYWALL #82 DRYWALL.EXT LATH, GAS TES ( 17,18,23) 1151 POOL EXCA/STEEL/80ND/FENCE #83 ROOF SH EATING, EXT SHEAR (13,15) 1155 PREPLASTER/FlNAL #84 FRAME ROUGH COMBO (14,24,34,44) #85 T-Bar (14,24,34,44) FINAL OCCUPANCY (19,29,39,49) #22 Date Ins ector #21 #24 TOP OUT O WASTE O WTR A/S UNDERGROUND VISUAL #27 TUB & SJlOWER PAN A/S UNDERGROUND HYDRO A/S UNDERGROUND FLUSH A/S OVERHEAD VISUAL #28 SOLAR WATER A/S OVERHEAD HYDROSTATIC #29 FINAL A/S FINAL F/A ROUGH-IN #600 PRE-CONSTRUCTION MEETING F/A FINAL #603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN 11605 NOTICE TO CLEAN FIXED EXTING SYSTEM HYDROSTATIC ruT 11607 WRITTEN WARNING AXED EXTINGUISHING SYSTEM ANAL #609 NOTICE OFVIOIATION MEDICAL GAS PRESSURE TEST #610 VERBAL WARNING MEDICAL GAS FINAL REV Hl/2012 SEE BACK FOR SPECIAL NOTES L TG-., 'J- /I ,, ('city of Carlsbad CIRCUIT CARD 8-36 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov THIS CARD MUST BE FILLED OUT AND AV All.ABLE AT THE SER VICE EC UTPMENT FOR THE ROUGH INSPECTION Address: l '{ '1 I J' J-1 nt" Sr',t v ,:~ CA It: t,J 6 ,1 t> u 'h ""'" Permit Number: C[J 15"0 '/'/Cf Owner. 4'IJ Yt.lA. M,,1(4.1,ro,J I Phone: ('N(jJ .J '/ J -/ 7AtJ Area In Sq. Ft. ~o,·e, Contractor:~c.4,t..i. i"16-P .ll-~AtvS"£:T Phone: lD /9 5 79 "9 s-~o PANEL: G-4~1£ LO I ooo A.LC. "'2 <./ a VOLTS I 0 --:2.,. WIRE LOCATION CKT BKR WIRE MISC REC REC LTG MISC WIRE BKR SIZE SIZE TYPE SIZE TYPE SIZE CKT LOCATION /< I T<:.116 1 2.-Q L:J, GV 4 f)t::.J ~, JD C.tJ :J-5 2 Ale /)1, IC ,e.o 3 2.0 i2-cu r 2-1..( OIJ JO C\.) .,;1.5 4 A Jc... BATl-l·:5 5 20 l2 cu ~ v,:: o , I ;J~ C.(.l ..:Le 6 ,.,, /A/ ( Jc /TC/I~ 7 :zo ,,_ CV Li ;;;J-C:., '0\/ I;>. ClJ ;:L(j 8 SPLIT IFLc:i! 9 . /5 ii./ cu L I I ;;._ w ?...0 10 wA-~H-E"~ 6-A.€..,tG£ 11 IS tl./ <::-v 3 j /,:1_ c..J 2.() 12 FA-LI 'i/) tSl'l>.s4<.. 13 /~ /9 <::,t.J l .? I ~ l'-i CV 7-s 14 ~E O /9'fr~ '/)t:,J.1-toA:>J.J 15 l'> L'I-Cv I {r, LI-I It./-Gu I .::_; 16 -;A~'£/('( ,;;..Jr~v~ ~~ IS l 'f <:0 2 'f I f;l, I 'I CV I 5-18 'j>1f'(IE./ f,~f lt-tAS BATH-19 /5' [<J, C..(.) ·7 ~ <-f I Pf c..u 15" 20 .n1 ,4.-:,;;., Rl:""1 J S:-rA I ti!'< /)/NIN«-21 .-LC /2-. cu '1 5' '-2...., /1.i CA) IS: 22 ~'f-J{fks. 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 I 40 41 42 MAIN: 0 __j ..1.:5 AMP BRK/FUSE 121° MLO Computed Load 7 I.( ' "'.3. AMPS BUS: 1_;,..s-AMP See Ca/cu/el/on Worksheet on beck Branch circuits required: Service entrance or feeder co7,.uctors: A) Lighting Circuits 220 -3(b), 4(d) A) Size: No. ~ 0 B) Type: Pi%iCU O AL B) Two Small Appliance Circuits 210-11(8) C) Insulation: c:;i::=-~ D) Condu t Size: __ C) Laundry Circuit 220-16(b) Service ground/bond:. / B) Type: -~ CU O AL D) Central Heating Equipment 422-12 A) Size: No. 3 D E) Bathroom 210 -52(d) -~tamp location(s): UFER 250 -50(c) Remarks: Water Pipe 250 -104 D Ground Rod 250-52 D I certify that ell terminations have been torqued In acco,rdance with manufacturer's GFCI locations 210-8. 680 -70: °gJ Bathroom(s) ~Kitchen Instructions and that tha work shown on this circuit card represents the full extent of ! Garage(s) □Hydromassage Tub the work performed under this permit. Outdoors D -D owner AF;Protected Circ. ~-12 ·~contrac~~<-'--t Al~ e.-,~,44 ?f Bedroom(s) (;,.\Ji f!..y v,> I-ti= f?. E., □ Signed G ,._, _ <..:.. Date :....! IS:- PaQe 1 of 2 Rev. 03/09 / ) 2 w. 3 1. SINGLE FAMILY DWELLING ELECTRICAL SERVICE LOAD CALCULATION As an alternative method, the STANDARD METHOD found In ARTICLE 220 of the National Electric Code., may be used GENERAL LIGHTING LOADS Dwelling ..:2-, I 7 7 sq. ft. x 3 VA= 220-3(a) '2 1 5 3 / VA Smallapplianceloads-220-16(a)1500VAx 1 circuits= 3 ,ooo VA Laundry load -220-16(b) 150_0 VA x _______ circuits = / ~ S OQ VA · General Lighting Total / 11 O 3 / VA 2. COOKING EQUIPMENT LOADS -Nameplate Value Range --VA= Cooktop ------,,=----VA = Oven (s) ______ VA= __ --__ VA ____ VA ____ VA Cooking Equipment Total. ____ VA 3. ELECTRIC DRYER 220-18 (Nameplate, 5000 VA minimum) , Dryer ,-VA= DryerTotal. ____ VA 4. FIXED APPLIANCE LOADS 230-30 (b) (3) Dishwasher = Disposal= Compactor= Water Heater = Hydromassage Bathtub = Microwave Oven = Built-in Vacuum = = 5. OPTIONAL SUBTOTAL (Add all of the above totals) 6. APPL YING DEMAND FACTORS -TABLE 220-30 First 10,000 VA x 100% ~ Optional Subtotal (from line 5) { Remaining .I...J 1·7~/ VA x 40%= • 7. HEATING OR AC LOAD -TABLE 220-30 Larger of the Heating or AC Load = /, sec VA 7 .SO VA ____ VA ____ VA ____ VA r s-ca VA ____ VA ____ VA Fixed Appliance Total 5 1750 VA ('i , ,g/ VA ' 10,000 VA lo/I 1.. VA ~/ Ot>C, VA 8. OPTIONAL LOADS TOTAL (Add totals from lines 6 and 7) == l 7/t I~ VA 9. MINIMUM SERVICE SIZE = Optional Loads Total = 74, l.c 3 Ampere 240 Volt (Please put total on front of card under Computed Load) I ' INSTALLATION CERTIFICATE CF-6R-ENV-01 Envelope -Insuladon; Roofine:: Fenestration (Page 1 of 3) Site Addre11: I Enforcement A1ency: I Permit Number: ( LOT -6 ) 2541 STAT!: STREET CB150449 /f mor, 1han one person has responsibility for installation of the items on this certificate, each person shall prepare and sign a certificate applicable to the portion of construction/or which /hey are responsible; al/ernatively, 1he person with chief responsibility for construction shall prepare and sign this certificate/or the entire construction. All applicable Mandatory Measures with check boxes require to be checked tn m.rure the mandarorv measures have been mer. De1crlpdon of Insulation 1. RAISED FLOOR Material: _______ ...,.,,.-------Brand Name: _____________ _ Thickness (inches): N/A Thermal Resistance (R-Value): ______ _ D §JSO(d): Minimum R-13 insulation in raised wood-frame floor or equivalent U-factor. 2. SLAB FLOOR/PERIMETER Material: ______ _,..,-,-,-------- Thickness (inchcs): ___ N_IA ______ _ Brand Name: _____________ _ Thermal Resistance (R-Value): ______ _ Perimeter Insulation Depth (inches): ____ _ D fi I 50(1): Water absorption rate for the insulation material alone without facings is no greater than 0.3%; water vapor pcrmcancc rate is no greater than 2.0 penn/inch and shall be protected from physical damage and UV light deterioration. 3. EXTERIOR WALL a. Insulation Type (e.x.. Batt, Loose Fill, Spray Foam) 2X4 BATTS b .. Insulation Type (e.x.. Batt, Loose Fill, Spray Foam) 2X6 BATTS Brand: _____ M_A_N_V_IL_L_E ______ _ Spray/Loose fill) Installed Actual Thickness (inches): ____ _ a. Thermal Resistance (R-Value): __ R_-1_3 ____ _ b. Thermal Resistance (R-Value): __ R_-1_9 ___ _ Spray/Loose fill) Contractor's min installed weight/ft, __ lb Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value) □ § I SO(c): Minimum R-13 insulation in wood-frame wall or equivalent U-factor. Exterior Foam Sheathing (rigid Insulation) Material: _____________ _ Brand Name: _____________ _ Thickness (inches) : ___ N_/A ______ _ Thermal Resistance (R-Value) : ______ _ 4. FOUNDATION WALL Material: ______ --:-:--:-:-------- Thickness (inches): ___ N_I_A _____ _ Brand Name: ____________ _ lbermal Resistance (R-Value): ______ _ 5. CEILING Batt or Blanket Type: BATTS Brand Name: ___ M_A_N_V_I_L_LE __ =""=---- Loose Fill Type:___________ Thermal Resistance (R-Value): __ R_-3_0 ___ _ Spray Foam Type:___________ Brand Name: ___________ _ Installed Actual Thickness (inches):_____ Contractor's min installed weight/f't2 ___ lb Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value): D § ISO(a): Minimum R-19 insulation in wood-frame ceiling or equivalent U-factor. 6. AITIC ROOF INSULATION AND/OR ATTIC RADIANT BARRIER Material:_______________ Brand Name: ____________ _ Material: N/A Brand Name: ____________ _ Thickness (inches): ___________ Thermal Resistance (R-Value): ______ _ D §II 8(a): Insulation installed meets Standards for Insulating Material. D §ISO(g): Mandatory Vapor barrier installed in Climate Zones 14 or 16. 2008 Residential Compliance Forms August 2009 INSTALLATION CERTIFICATE CF-6R-ENV-0l Envelone Insulation: Roofin°· Fenestration (Pa11e l of3) Site Addrn■: I Enforcement A1enq-: I Permit Number: ( LOT-6) 2541 STATE STREET CB150449 De1crlatlon of Roofin• Productl CRRC Product ID Manufact\u'cr Product Roor Roor Product Initial Sollr Aged Solar Thmnal Number lnfonnarion Brand/Model T•-,... Slo-Wei•ht 1 Rcflcctaoce Reflectance• Emittance □' NIA □' □• I. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory al ww.coolroofs.orglproduclslsearch.php 1. Th, weight in lbs per square feet of th• roofing product being installed. J. Check box if the Aged Reflectance is a ca/culatedmfue using the equation below,/ootnote 4. 4. lf tht aged rejl1ctance Is nol available In the Cool Roof Rating Council ·s Rated Product Directory then use the inillal reflectance value from the dincto~ and UH the enuation tn.2+0. 7r,. -0.21 to obtain a calculated 01tedvalue. ,,r DCHECK Al'l'LICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REOU/REMENT: C The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are eumpl from the above Cool Roof criteria. C Roof constructions that have thermal mass ovor the roof membnnc whh a wcia:ht of at least 25 lb/ft' is exempted from the above Cool Roof criteria. To apply Liquid Field Applied Coa1lng1, the coating must be applied wilh a minimum dry mil thickness of 20 mils across lhe enlire roof surface and meet minimum ~rformance reoufrementJ li1ted in 6 / J 8/iJJ and Table I J 8-C. Select the nnn/icable coatinP □ Aluminum-Pi-ontcd Amhah Roof Coatine: I □ Ccmcn1-Based RoofCoatin° I □ Other ✓ □ CRRC-1 Label A•achod to CF-6R (Note ilno CRRC·l label iJ available, this comolfance method cannot be used and another me1hod is renuired to meet comnlfancel. FENESTRATION/GLAZING Product # Total Quantity Add, fatcrior Commwts/ Manufacturer/Brand Name U-Product of NFRC of Like Produ,;:t Arca Shadina Dev. Loc■rion/ Special 1~m 1GROUP LIKE RODUCTS) factor1 SHGC1 Panes Cmificd1•1 fQntiona"r. ft' or Overhan° ,_ I 2 J • N/A ' • 7. ,. /. Uu Nlwifrom ofenutralion prodvct'i NFRC Certified label. For /ene:stro1ion products without an NFRC laNI, tat the d~fault values from Ste lion I 16. Tobit I 16--A "1Ni //6-B of th, 20(18 Energy E/flclfflC)' Standard.!. 2. NFRC Loht/ Certii;ca1t1 :shall not H n,nov~ until the build/-ins-c1or has nri!ltd the emcJt --·. Enter Yu or No, C fl 16(a)l; Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. C §I 16(a)2 and 3: Actual fenestration products U\stalled arc equivalent to or have a lower U-factor and/or a lower SHGC than that specified on the Certificate of Compliance (fonn Cf-IR), □ fl l6(1)4: Fcncstr'ltion products (except fie\d.fabricatcd windows) have a label listin11 the certified U-Factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration that meets the requirements of§ 10-1 l l(a) C f 117: Exterior doors and window■ wcather-slrippod; all joints and pcnctntions caulked and scaled, 1008 Residential Compliance Farr:& August 2009 INSTALLATION CERTIFICATE CF-6R-ENV-0l Envelope -Insulation: Rooflna• Fenestration (PBl!e 3 ofJ) Site Addre11: j Enforcement Agency: I Permit Number: ( LOT-6) 2541 STATE STREET CB150449 DECLARATION STATEMENT • I certify under penalty of perjury, under the laws of the State of California, the infonnation provided on this fonn is true and correct. • I am cliaible under Division 3 of the Business and Professions Code to accept rcspomiibitity for constnK:tion, or an authoriicd rqirescntativc of the penon responsible for construction (responsible pcnon). • I certify that the installed features. materials, components, or manufactured devices idenlificd on this certificate (the installation) conforms to all applicable codes and regulations, and the installation is coni.istent with the plans and specifications approved by the enforcement agency. • I reviewed a copy of the Certificate of Compliance (Cf.IR) fonn approved by the cnforccmcn1 apncy that identifies the 1po::ific requirements for the installation. I certify thal the requirements detailed on lhe CF-IR that apply to the installation have been met. • I wlll ensure that a completed, 1laned eopf of tills lnstallatloa Certificate ,ball be po1tcd1 or made avaflable wltb the bulklln1 permit(•) l11ued for tbe bulldla1, and made available to tbe enrorcement a1eaey for all appllcable lmpectloa1, I uadentaad tbat a slped copy of th11 Ja1tallatlon Certlffcate 11 required to be Included with the documentadoa the builder provides to the bulldla1 owner ll otcupancy. Company Name: (Installing Subconlm::tor or General Contractor or Builder/Owner) ROCKWELL DRYWALL, INC. Responsible Pcnon's Name: BUTCH INGRAM CSLB License: 956154 2008 Re1itkntlal Compliance Forms Dale Signed: 10-13-2015 Rc1ponsiblc Person's S · August 1009 ' ., . ., SOUTHWEST 111!->pection <°v. T ,-.1 ing. In .. ·. -l 11 <.. 1n1111, ,._ 1.1! \\ 1: _ I ,t I .,h,. C \ "tlh ,!-hi 1'• i."'<•1 1 ,ll ~, ll • \ 14 -.._::()."-JJI l \ \. , c,_: I] !( 01 '<, October 12, 2015 Building Official City of Carlsbad Department of Building and Safety 1635 Faraday Ave Carlsbad, California 92008 SPECIAL INSPECTOR'S FINAL PROJECT REPORT Project Nam e: Seagrove Townhomes Address: Owner: State Street, PH 2 Building 4 Taylor Morrison Unit# Address 1 2521 State Street 2 2525 State Street 3 2529 State Street 4 2533 State Street 5 2537 State Street Permit CB150438 CB150442 CB150446 CB150447 CB150448 Unit# Address 6 2541 State Street 7 2545 State St reet s 2549 State Street 9 2553 State St reet Permit CB150449 CB150450 CB150451 CB150452 This is to certify that Southwest I nspect ion and Testing, Inc. was employed to perform special inspection on the above mentioned proj ect at t he above address, which required continuous inspection per section 1701 of 2013 California Building Code. Brett Alblinger -Reinforced Concrete, Post Tensioned Concrete, SD #656 William Bowen -Rei nforced Concrete, Post Tensioned Concrete, SD # 541 Tom Woods-Reinforced Concrete, Post Tensioned Concrete, SD # 377 Based upon special inspection and m aterials t esting w ritten reports of this work, it is our judgment that t he inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and applicable work manship provision o u,9-liJ rnia Building Code. -~ -~,~ x_;J} ' • IN ::})t~. #A g Sincere!, Reviewed By: h~<'<-__.;f, ~-:.<r. ._ m C0412•9 i'1:z rn • \'; , i;:'/(P..J. ... 31-11{!,p Ian R. Waddell~_,':~-CIV\'.. ', Principal Engine~'---; -.<~,) For inspection a~estiri'g"only, no design responsibility expre ssed or implied.