HomeMy WebLinkAbout2541 STATE ST; ; CB150449; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
04-23-2015 Residential Permit Permit No: CB150449
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
2541 STATE ST CBAD
RESDNTL
2030543406
$295,759.00
1
0
Sub Type: CONDO
Lot#: 6
Constuction Type: 5B
Reference #: CT130005
Structure Type: MF5+
Bathrooms: 0
Status: ISSUED
Applied: 02/11/2015
Entered By: JMA
Plan Approved: 04/23/2015
Issued: 04/23/2015
Inspect Area:
Project Title:
Orig PC#: PC140037
STATE ST. TOWNHOMES: PHS 2 C1
Plan Check#: PC150021
405 SF 1 ST FLR COMMERCIAL/1,694 SF LIV/ 476 SF GAR/ 67 SF
BALCONY/ 585 SF ROOF DECK
Applicant:
TAYLOR MORRISON OF CA, LLC
STE 1450
100 SPECTRUM DR
IRVINE CA 92618-4935
949-341-1289
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
Green Bldg Stands Plan Chk Fee
$1,317.94
$0.00
$922.56
($500.00)
$0.00
$38.45
$6,190.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,931.00
FS1
($3,931.00)
$0.00
$12.00
$0.00
Total Fees: $24,285.41 Total Payments to Date:
Inspector:
Owner:
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
Fire Sprinkler Fees
TOTAL PERMIT FEES
$24,285.41 Balance Due:
{,, Clearance:
FS1
$0.00
$317.00
$4,800.00
$0.00
$5,382.81
$4,968.75
$0.00
$0.00
$0.00
$0.00
$0.00
$210.00
$89.00
$65.38
$0.00
$0.00
$0.00
$0.00
$471.52
$0.00
$0.00
$24,285.41
$0.00
approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. lf you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annu\ their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees fn connection with this project. NOR DOES IT APPLY to any
I
Inspection List
Permit#: CB150449 Type: RESDNTL CONDO STATE ST. TOWNHOMES: PHS 2 C1
405 SF 1 ST FLR COMMERCIAU1 ,694 SF L
Date Inspection_ Item Inspector Act --------Comments
03/15/2016 89 Final Combo PY AP
03115/2016 89 Final Combo RI AM PLEASE/COF
12/03/2015 39 Final Electrical PY PA
10/14/2015 17 Interior Lath/Drywall PY AP
10/14/2015 23 Gas/TesURepairs PY AP
10/13/2015 17 Interior Lath/Drywall PY CA
10/07/2015 17 Interior Lath/Drywall PY AP
10/02/2015 84 Rough Combo PY AP
10/01/2015 84 Rough Combo PY AP
09/21/2015 13 Shear Panels/HD's PY AP
09/21/2015 13 Shear Panels/HD's PY AP
09/21/2015 13 Shear Panels/HD's PY AP
09/21/2015 13 Shear Panels/HD's PY AP
09/11/2015 15 Roof/Reroof PY AP
09/01/2015 17 Interior Lath/Drywall PY PA
08/2712015 17 Interior Lath/Drywall PY PA
08/24/2015 15 Roof/Reroof PY AP
08/21/2015 15 Roof/Reroof PB AP
06/25/2015 11 Fig/Foundation/Piers PB AP
06/22/2015 81 Underground Combo PB CA
Tuesday, March 22, 2016 Page 1 of 1
---------------
~ ,<::?.t,) ~ (ll 'f Of
CARLSBAD
P · •llding Division INSPECTION RECORD
--..-,NSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE l<EPT ON THE JOB
CB150449 2541 STATEST
STATE ST. TOWNHOMES: PHS 2 C1
40S SF 1ST FLR C:OMMERCIAL/1 ,fi!¼ SF LIV/ 476 SF
GAR/ 67 SF BALCONY/ 585 SF ROOF DECK
RESDNTL CONDO
Lot#: 6 TAYLOR MORRISON OF CA, LL C
0 CALI. BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION
RE:t.,0RD COP't 0 FOR BUILDING INSPECTION CALL: 760.;602-2725
OR GO TO: www.Carlsbadca.gov/Buildlng AND CLICK ON
"Request fnspec ion"
DATE: I _,, .. -..-
IF "YES" IS CHECKED BELOW THAT DIVISION'S APPROVAL IS REQUIRED RIOR TO RE UESTING A FINAL BUILDING INSPECTION.
IF YOU HAVE ANY QUESTIONS PLEASE CALL THE APPLICABLE DIVISIONS AT THE PHONE NUMBERS PROVIDED BELOW. AFTER
ALL REQUIRED APPROVALS ARE SIGNED OFF-FAX TO 760-602-8560. EMAIL TO BL0GINSPECTIONS0'CARLSB DCA GOV OR
BRING IN A COPY OF THIS CARO TO: 1635 FARADAY AVE., CARLSBAD, CA 92008. BUILDING INSPECTORS CAN BE REACHED
AT 760-602•2700 BETWEEN 7:30 AM -8:00 AM THE DAY OF YOUR INSPECTION.
Required Prior to Requesting Building Final If Checked YES Inspector Notes
Planning/Landscape 760-944-8463 Allow 48 hours
CM&I (Engineering Inspections) 760-438-3891 Call before 2 pm
Fire Prevention 760-002-4660 Allow 48 hours
Type of Inspection Type of Inspection
CODE # ELECTRICAL Date Inspector
#11 #31 0 ELECTRIC UNDERGROUND O UFER
#12 REINFORCED STEEL #34 ROUGH ELECTRIC
''·66 MASONRY PRE GROUT #33 0 ELECTRIC SERVICE O TEMPORARY
0 GROUT 0 WALL DRAINS #35 PHOTO VOLTAIC
#10 TILT PANELS _________ _.., ____ +------#39 ANAL
#11 POUR STRIPS CODE # MECHANICAL
#11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS & PIPING
#14 SUBFRAME O FLOOR 0 CEILING #44 0 DUCT & PLENUM O REF. PIPING
#15 ROOF SHEATHING #43 HEAT-AIR COND. SYSTEMS
#13 EXT. SHEAR PANELS #49 FINAL
1116 INSULATION
#18 EXTERIOR LATH 1181 UNDERGROUND (11,12,21,31)
#17 INTERIOR LATH & DRYWALL #82 DRYWALL.EXT LATH, GAS TES ( 17,18,23)
1151 POOL EXCA/STEEL/80ND/FENCE #83 ROOF SH EATING, EXT SHEAR (13,15)
1155 PREPLASTER/FlNAL #84 FRAME ROUGH COMBO (14,24,34,44)
#85 T-Bar (14,24,34,44)
FINAL OCCUPANCY (19,29,39,49)
#22 Date Ins ector
#21
#24 TOP OUT O WASTE O WTR A/S UNDERGROUND VISUAL
#27 TUB & SJlOWER PAN A/S UNDERGROUND HYDRO
A/S UNDERGROUND FLUSH
A/S OVERHEAD VISUAL
#28 SOLAR WATER A/S OVERHEAD HYDROSTATIC
#29 FINAL A/S FINAL
F/A ROUGH-IN
#600 PRE-CONSTRUCTION MEETING F/A FINAL
#603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN
11605 NOTICE TO CLEAN FIXED EXTING SYSTEM HYDROSTATIC ruT
11607 WRITTEN WARNING AXED EXTINGUISHING SYSTEM ANAL
#609 NOTICE OFVIOIATION MEDICAL GAS PRESSURE TEST
#610 VERBAL WARNING MEDICAL GAS FINAL
REV Hl/2012 SEE BACK FOR SPECIAL NOTES
L TG-.,
'J-
/I ,,
('city of
Carlsbad
CIRCUIT CARD
8-36
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
THIS CARD MUST BE FILLED OUT AND AV All.ABLE AT THE SER VICE EC UTPMENT FOR THE ROUGH INSPECTION
Address: l '{ '1 I J' J-1 nt" Sr',t v ,:~ CA It: t,J 6 ,1 t> u 'h ""'" Permit Number: C[J 15"0 '/'/Cf
Owner. 4'IJ Yt.lA. M,,1(4.1,ro,J I Phone: ('N(jJ .J '/ J -/ 7AtJ Area In Sq. Ft. ~o,·e, Contractor:~c.4,t..i. i"16-P .ll-~AtvS"£:T Phone: lD /9 5 79 "9 s-~o
PANEL: G-4~1£ LO I ooo A.LC. "'2 <./ a VOLTS I 0 --:2.,. WIRE
LOCATION CKT BKR WIRE MISC REC REC LTG MISC WIRE BKR
SIZE SIZE TYPE SIZE TYPE SIZE CKT LOCATION
/< I T<:.116 1 2.-Q L:J, GV 4 f)t::.J ~, JD C.tJ :J-5 2 Ale
/)1, IC ,e.o 3 2.0 i2-cu r 2-1..( OIJ JO C\.) .,;1.5 4 A Jc...
BATl-l·:5 5 20 l2 cu ~ v,:: o , I ;J~ C.(.l ..:Le 6 ,.,, /A/ (
Jc /TC/I~ 7 :zo ,,_ CV Li ;;;J-C:., '0\/ I;>. ClJ ;:L(j 8 SPLIT
IFLc:i! 9 . /5 ii./ cu L I I ;;._ w ?...0 10 wA-~H-E"~
6-A.€..,tG£ 11 IS tl./ <::-v 3 j /,:1_ c..J 2.() 12 FA-LI
'i/) tSl'l>.s4<.. 13 /~ /9 <::,t.J l .? I ~ l'-i CV 7-s 14 ~E O /9'fr~
'/)t:,J.1-toA:>J.J 15 l'> L'I-Cv I {r, LI-I It./-Gu I .::_; 16 -;A~'£/('(
,;;..Jr~v~ ~~ IS l 'f <:0 2 'f I f;l, I 'I CV I 5-18 'j>1f'(IE./ f,~f
lt-tAS BATH-19 /5' [<J, C..(.) ·7 ~ <-f I Pf c..u 15" 20 .n1 ,4.-:,;;., Rl:""1 J S:-rA I ti!'<
/)/NIN«-21 .-LC /2-. cu '1 5' '-2...., /1.i CA) IS: 22 ~'f-J{fks.
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 I 40
41 42
MAIN: 0 __j ..1.:5 AMP BRK/FUSE 121° MLO Computed Load 7 I.( ' "'.3. AMPS
BUS: 1_;,..s-AMP See Ca/cu/el/on Worksheet on beck
Branch circuits required:
Service entrance or feeder co7,.uctors: A) Lighting Circuits 220 -3(b), 4(d)
A) Size: No. ~ 0 B) Type: Pi%iCU O AL B) Two Small Appliance Circuits 210-11(8)
C) Insulation: c:;i::=-~ D) Condu t Size: __ C) Laundry Circuit 220-16(b)
Service ground/bond:. /
B) Type: -~ CU O AL
D) Central Heating Equipment 422-12
A) Size: No. 3 D E) Bathroom 210 -52(d)
-~tamp location(s): UFER 250 -50(c) Remarks:
Water Pipe 250 -104
D Ground Rod 250-52
D I certify that ell terminations have been torqued In acco,rdance with manufacturer's GFCI locations 210-8. 680 -70:
°gJ Bathroom(s) ~Kitchen Instructions and that tha work shown on this circuit card represents the full extent of ! Garage(s) □Hydromassage Tub the work performed under this permit.
Outdoors D -D owner
AF;Protected Circ. ~-12 ·~contrac~~<-'--t Al~ e.-,~,44 ?f
Bedroom(s) (;,.\Ji f!..y v,> I-ti= f?. E., □ Signed G ,._, _ <..:.. Date :....! IS:-
PaQe 1 of 2 Rev. 03/09
/
)
2
w.
3
1.
SINGLE FAMILY DWELLING
ELECTRICAL SERVICE LOAD CALCULATION
As an alternative method, the STANDARD METHOD
found In ARTICLE 220 of the National Electric Code., may be used
GENERAL LIGHTING LOADS
Dwelling ..:2-, I 7 7 sq. ft. x 3 VA= 220-3(a) '2 1 5 3 / VA
Smallapplianceloads-220-16(a)1500VAx 1 circuits= 3 ,ooo VA
Laundry load -220-16(b) 150_0 VA x _______ circuits = / ~ S OQ VA ·
General Lighting Total / 11 O 3 / VA
2. COOKING EQUIPMENT LOADS -Nameplate Value
Range --VA=
Cooktop ------,,=----VA =
Oven (s) ______ VA=
__ --__ VA
____ VA
____ VA
Cooking Equipment Total. ____ VA
3. ELECTRIC DRYER 220-18 (Nameplate, 5000 VA minimum) ,
Dryer ,-VA= DryerTotal. ____ VA
4. FIXED APPLIANCE LOADS 230-30 (b) (3)
Dishwasher =
Disposal=
Compactor=
Water Heater =
Hydromassage Bathtub =
Microwave Oven =
Built-in Vacuum =
=
5. OPTIONAL SUBTOTAL (Add all of the above totals)
6. APPL YING DEMAND FACTORS -TABLE 220-30
First 10,000 VA x 100% ~
Optional Subtotal (from line 5) { Remaining .I...J 1·7~/ VA x 40%= •
7. HEATING OR AC LOAD -TABLE 220-30
Larger of the Heating or AC Load =
/, sec VA
7 .SO VA ____ VA
____ VA
____ VA
r s-ca VA
____ VA
____ VA
Fixed Appliance Total 5 1750 VA ('i , ,g/ VA '
10,000 VA
lo/I 1.. VA
~/ Ot>C, VA
8. OPTIONAL LOADS TOTAL (Add totals from lines 6 and 7) == l 7/t I~ VA
9. MINIMUM SERVICE SIZE = Optional Loads Total = 74, l.c 3 Ampere
240 Volt
(Please put total on front of card under Computed Load)
I
'
INSTALLATION CERTIFICATE CF-6R-ENV-01
Envelope -Insuladon; Roofine:: Fenestration (Page 1 of 3)
Site Addre11: I Enforcement A1ency: I Permit Number:
( LOT -6 ) 2541 STAT!: STREET CB150449
/f mor, 1han one person has responsibility for installation of the items on this certificate, each person shall prepare and sign a certificate
applicable to the portion of construction/or which /hey are responsible; al/ernatively, 1he person with chief responsibility for construction shall
prepare and sign this certificate/or the entire construction. All applicable Mandatory Measures with check boxes require to be checked tn m.rure
the mandarorv measures have been mer.
De1crlpdon of Insulation
1. RAISED FLOOR
Material: _______ ...,.,,.-------Brand Name: _____________ _
Thickness (inches): N/A Thermal Resistance (R-Value): ______ _
D §JSO(d): Minimum R-13 insulation in raised wood-frame floor or equivalent U-factor.
2. SLAB FLOOR/PERIMETER
Material: ______ _,..,-,-,--------
Thickness (inchcs): ___ N_IA ______ _
Brand Name: _____________ _
Thermal Resistance (R-Value): ______ _
Perimeter Insulation Depth (inches): ____ _
D fi I 50(1): Water absorption rate for the insulation material alone without facings is no greater than 0.3%; water vapor pcrmcancc
rate is no greater than 2.0 penn/inch and shall be protected from physical damage and UV light deterioration.
3. EXTERIOR WALL
a. Insulation Type (e.x.. Batt, Loose Fill, Spray Foam)
2X4 BATTS
b .. Insulation Type (e.x.. Batt, Loose Fill, Spray Foam)
2X6 BATTS
Brand: _____ M_A_N_V_IL_L_E ______ _
Spray/Loose fill) Installed Actual Thickness
(inches): ____ _
a. Thermal Resistance (R-Value): __ R_-1_3 ____ _
b. Thermal Resistance (R-Value): __ R_-1_9 ___ _
Spray/Loose fill)
Contractor's min installed weight/ft, __ lb
Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value)
□ § I SO(c): Minimum R-13 insulation in wood-frame wall or equivalent U-factor.
Exterior Foam Sheathing (rigid Insulation)
Material: _____________ _ Brand Name: _____________ _
Thickness (inches) : ___ N_/A ______ _ Thermal Resistance (R-Value) : ______ _
4. FOUNDATION WALL
Material: ______ --:-:--:-:--------
Thickness (inches): ___ N_I_A _____ _
Brand Name: ____________ _
lbermal Resistance (R-Value): ______ _
5. CEILING
Batt or Blanket Type: BATTS Brand Name: ___ M_A_N_V_I_L_LE __ =""=----
Loose Fill Type:___________ Thermal Resistance (R-Value): __ R_-3_0 ___ _
Spray Foam Type:___________ Brand Name: ___________ _
Installed Actual Thickness (inches):_____ Contractor's min installed weight/f't2 ___ lb
Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value):
D § ISO(a): Minimum R-19 insulation in wood-frame ceiling or equivalent U-factor.
6. AITIC ROOF INSULATION AND/OR ATTIC RADIANT BARRIER
Material:_______________ Brand Name: ____________ _
Material: N/A Brand Name: ____________ _
Thickness (inches): ___________ Thermal Resistance (R-Value): ______ _
D §II 8(a): Insulation installed meets Standards for Insulating Material.
D §ISO(g): Mandatory Vapor barrier installed in Climate Zones 14 or 16.
2008 Residential Compliance Forms August 2009
INSTALLATION CERTIFICATE CF-6R-ENV-0l
Envelone Insulation: Roofin°· Fenestration (Pa11e l of3)
Site Addrn■: I Enforcement A1enq-: I Permit Number:
( LOT-6) 2541 STATE STREET CB150449
De1crlatlon of Roofin• Productl
CRRC Product ID Manufact\u'cr Product Roor Roor Product Initial Sollr Aged Solar Thmnal
Number lnfonnarion Brand/Model T•-,... Slo-Wei•ht 1 Rcflcctaoce Reflectance• Emittance
□'
NIA □'
□•
I. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory al
ww.coolroofs.orglproduclslsearch.php
1. Th, weight in lbs per square feet of th• roofing product being installed.
J. Check box if the Aged Reflectance is a ca/culatedmfue using the equation below,/ootnote 4.
4. lf tht aged rejl1ctance Is nol available In the Cool Roof Rating Council ·s Rated Product Directory then use the inillal reflectance value from the
dincto~ and UH the enuation tn.2+0. 7r,. -0.21 to obtain a calculated 01tedvalue.
,,r DCHECK Al'l'LICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REOU/REMENT:
C The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are eumpl from the above Cool
Roof criteria.
C Roof constructions that have thermal mass ovor the roof membnnc whh a wcia:ht of at least 25 lb/ft' is exempted from the above Cool Roof
criteria.
To apply Liquid Field Applied Coa1lng1, the coating must be applied wilh a minimum dry mil thickness of 20 mils across lhe enlire roof surface and
meet minimum ~rformance reoufrementJ li1ted in 6 / J 8/iJJ and Table I J 8-C. Select the nnn/icable coatinP
□ Aluminum-Pi-ontcd Amhah Roof Coatine: I □ Ccmcn1-Based RoofCoatin° I □ Other ✓ □ CRRC-1 Label A•achod to CF-6R
(Note ilno CRRC·l label iJ available, this comolfance method cannot be used and another me1hod is renuired to meet comnlfancel.
FENESTRATION/GLAZING
Product # Total Quantity Add, fatcrior Commwts/ Manufacturer/Brand Name U-Product of NFRC of Like Produ,;:t Arca Shadina Dev. Loc■rion/ Special 1~m 1GROUP LIKE RODUCTS) factor1 SHGC1 Panes Cmificd1•1 fQntiona"r. ft' or Overhan° ,_
I
2
J
• N/A
' •
7.
,.
/. Uu Nlwifrom ofenutralion prodvct'i NFRC Certified label. For /ene:stro1ion products without an NFRC laNI, tat the d~fault values from Ste lion I 16. Tobit
I 16--A "1Ni //6-B of th, 20(18 Energy E/flclfflC)' Standard.!.
2. NFRC Loht/ Certii;ca1t1 :shall not H n,nov~ until the build/-ins-c1or has nri!ltd the emcJt --·. Enter Yu or No,
C fl 16(a)l; Doors and windows between conditioned and unconditioned spaces designed to limit air leakage.
C §I 16(a)2 and 3: Actual fenestration products U\stalled arc equivalent to or have a lower U-factor and/or a lower SHGC than that specified on
the Certificate of Compliance (fonn Cf-IR),
□ fl l6(1)4: Fcncstr'ltion products (except fie\d.fabricatcd windows) have a label listin11 the certified U-Factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration that meets the requirements of§ 10-1 l l(a)
C f 117: Exterior doors and window■ wcather-slrippod; all joints and pcnctntions caulked and scaled,
1008 Residential Compliance Farr:& August 2009
INSTALLATION CERTIFICATE CF-6R-ENV-0l
Envelope -Insulation: Rooflna• Fenestration (PBl!e 3 ofJ)
Site Addre11: j Enforcement Agency: I Permit Number: ( LOT-6) 2541 STATE STREET CB150449
DECLARATION STATEMENT
• I certify under penalty of perjury, under the laws of the State of California, the infonnation provided on this fonn is true and correct.
• I am cliaible under Division 3 of the Business and Professions Code to accept rcspomiibitity for constnK:tion, or an authoriicd rqirescntativc
of the penon responsible for construction (responsible pcnon).
• I certify that the installed features. materials, components, or manufactured devices idenlificd on this certificate (the installation) conforms
to all applicable codes and regulations, and the installation is coni.istent with the plans and specifications approved by the enforcement agency.
• I reviewed a copy of the Certificate of Compliance (Cf.IR) fonn approved by the cnforccmcn1 apncy that identifies the 1po::ific
requirements for the installation. I certify thal the requirements detailed on lhe CF-IR that apply to the installation have been met.
• I wlll ensure that a completed, 1laned eopf of tills lnstallatloa Certificate ,ball be po1tcd1 or made avaflable wltb the bulklln1
permit(•) l11ued for tbe bulldla1, and made available to tbe enrorcement a1eaey for all appllcable lmpectloa1, I uadentaad tbat a
slped copy of th11 Ja1tallatlon Certlffcate 11 required to be Included with the documentadoa the builder provides to the bulldla1
owner ll otcupancy.
Company Name: (Installing Subconlm::tor or General Contractor or Builder/Owner)
ROCKWELL DRYWALL, INC.
Responsible Pcnon's Name:
BUTCH INGRAM
CSLB License:
956154
2008 Re1itkntlal Compliance Forms
Dale Signed:
10-13-2015
Rc1ponsiblc Person's S ·
August 1009
' ., . .,
SOUTHWEST
111!->pection <°v. T ,-.1 ing. In .. ·. -l 11 <.. 1n1111, ,._ 1.1! \\ 1: _ I ,t I .,h,. C \ "tlh ,!-hi 1'•
i."'<•1 1 ,ll ~, ll • \ 14 -.._::()."-JJI
l \ \. , c,_: I] !( 01 '<,
October 12, 2015
Building Official
City of Carlsbad
Department of Building and Safety
1635 Faraday Ave
Carlsbad, California 92008
SPECIAL INSPECTOR'S FINAL PROJECT REPORT
Project Nam e: Seagrove Townhomes
Address:
Owner:
State Street, PH 2 Building 4
Taylor Morrison
Unit# Address
1 2521 State Street
2 2525 State Street
3 2529 State Street
4 2533 State Street
5 2537 State Street
Permit
CB150438
CB150442
CB150446
CB150447
CB150448
Unit# Address
6 2541 State Street
7 2545 State St reet
s 2549 State Street
9 2553 State St reet
Permit
CB150449
CB150450
CB150451
CB150452
This is to certify that Southwest I nspect ion and Testing, Inc. was employed to perform special inspection on
the above mentioned proj ect at t he above address, which required continuous inspection per section 1701 of
2013 California Building Code.
Brett Alblinger -Reinforced Concrete, Post Tensioned Concrete, SD #656
William Bowen -Rei nforced Concrete, Post Tensioned Concrete, SD # 541
Tom Woods-Reinforced Concrete, Post Tensioned Concrete, SD # 377
Based upon special inspection and m aterials t esting w ritten reports of this work, it is our judgment that
t he inspected work was performed to the best of our knowledge, in accordance with the approved plans,
specifications and applicable work manship provision o u,9-liJ rnia Building Code. -~ -~,~
x_;J} ' • IN ::})t~. #A g Sincere!, Reviewed By: h~<'<-__.;f, ~-:.<r. ._
m C0412•9 i'1:z rn • \'; , i;:'/(P..J. ... 31-11{!,p
Ian R. Waddell~_,':~-CIV\'.. ',
Principal Engine~'---; -.<~,)
For inspection a~estiri'g"only, no design responsibility
expre ssed or implied.