HomeMy WebLinkAbout2825 STATE ST; ; 63-5462; PermitAPPLICATION FOR Bu' u fl I I G PERMIT
5462
CITY OF CARLSBAD -BUILDING INSPECTION DIVISION
PHONE PArkway 9-1181 -Ext. 36 ,-
?,;::;,::,;:) ':21.§?-~~,r!ft¾;,a;;j-_ .. ,,,,,; AddrnH ,2f~f ~/l?~;-;.
c'.m, .. \o• ~~ff;' ~~"'"' Addrn" ~ c,;;---pS;;;
: :,~o~.+~::,~(Q Ki,::, A::,:,., To R,p,i, : No :: ::,;::• : T: o B~o~:.::: ················ .......................................... .
(Frome, Mosonry, Etc.) ~ (Ono Fa · y Dwelling, Store, Etc.)
Floor Space of Proposed Construction (sq. feet) ..... ~t:.~ .. ~ .. Const. Valuation $ ...... ~0..0 ..... ~ ........................................................... .
attached 0
Floor Space of Garage (sq. feet) ................................................. detached OConst. Valuation $ .................................................................................................... ..
LEGAL DESCRIPTION .................................................................................................................................................................................................................................. .
Lot Block Subdivision
:::.::::;~~=:SliZ? :::::~:::: ~:: .. ,,. : :
Assigned House Number
LAND AREA ...................................... NUMBER OF EXISTING DWELLINGS ON PROPOSED BUILDING SITE .................................................... (INDICATE
SIZE, USE AND LOCATION ON PLOT PL✓ THIS CONSTRUCTION INCLUDE ANY PLUMBING INSTALLATION, ALTERATION, OR
ADDITION? YES................ NO ................ .
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION AND STATE THAT THE ABOVE IS CORRECT AND AGREE TO COMPLY
WITH ALL CITY ORDINANCES AND STATE LAWS REGULATING BUILDING CONSTRUCTION.
If a check is tendered for p·ayme nt of the above fee and the check is
not honored when presented for payment, your Building Permit will be
immediately revoked.
Driveway Permit Required Yos ( No(~ Fee ..................................... .
Grading Permit Required Yes ( ) No(~ ................................................... ..
Sewer Disposal Plant Capital Cont. Fee .................................................................. ..
Sewer Pumping Station Capital Cont. Fee ................................................................. .
Variance Water House Service Charge ....................................................................................... .
Eng. Check By ............................................................................ .. Water Meter Charge ..................................................................................................... .
Sub Total .................................................................................... ..
Plans Approv~ .... "T' ........ '/7"') ... ~ .. Plan Check Fee ....................... 0 ... 0 ..................................................................... .
Approved by ........ /.( ... L ...... ~ .. ~ ....... ~ ................................................... Building Pormit Fee ...... 1/.. .................................................................................. .
Date ............. / .. 9.?.. .. :::::. ... &..~.=·· .. 6..5......................................... Total Charges .... .?:/ ...... ~ .... ~ ................................................................ ,_