HomeMy WebLinkAboutSDP 2018-0017; PROJECT 2020; FINAL SOILS REPORT; 2020-02-21GEOTECHNICAL ■MATERIALS ■ SPECIAL INSPECTIONS Merlin Entertainments, Inc. One LEGOLAND Way Winter Haven, FL 33884 Attention: Mr. Tom Storer Subject: Report SBE ■ SLBE As-Graded Geologic and Geotechnical Conditions LEGOLAND Project 2020 1 Legoland Drive, Carlsbad, California Grading Permit No. GR 2018-0046 References: Provided at the end of this report. Dear Mr. Storer: February 21, 2020 NOVA Project No. 1019055 This report presents the geotechnical observations and the results of testing performed by NOVA Services, Inc. (NOVA) during grading for the above-referenced project. This report addresses only the geologic and geotechnical considerations associated with the project's construction. The services described herein were performed by NOV A for Merlin Entertainments, Inc. during the period of March 18, 2019 to February 8, 2020. NOVA is retained by Merlin Entertainments, Inc. as Geotechnical Engineer-of-Record (GEOR) for this work. BACKGROUND Location The subject development known as LEGOLAND 2020, is located within the LEGOLAND California Theme Park in the City of Carlsbad, California. The site is located in the southwest portion of the amusement park and is bounded by Legoland Drive to the west and by themed attractions associated with the park on all other sides. Project Description General The new development consists of a three-level theater attraction structure with two below-grade levels to the northwest of the limits of the project and two drop tower rides at the northern limits. Billboard theming walls are set about the periphery of the site. Associated improvements include driveways, walkways, retaining walls, and underground utilities. Purpose of the Earthwork The purpose of the earthwork was to provide (i) a building pad founded in formational soils to support the below-grade structure, (ii) a building pad comprised of engineered soils suitable for support of the tower rides; and (iii) support for retaining walls, billboard walls, utilities, flatwork, and pavements. Report of As-Graded Geotechnical and Geologic Conditions LEGO LAND Project 2020 Carlsbad, California Permitted Design Documentation Geotechnical February 21, 2020 NOVAProjectNo. 1019055 The design basis geotechnical report is Geotechnical Update Report, Proposed Theater Ride and Drop Towers, LEGOLAND Theme Park, Carlsbad, California, Leighton and Associates, Inc., Project No. 10075.024, July 10, 2018. (hereinafter, 'Leighton 2018a'). Updated design recommendations are provided in Geotechnical Update Report, Proposed Project 2020, LEGOLAND Theme Park, Carlsbad, California, Leighton and Associates, Inc., Project No. 10075.026, September 24, 2018. (hereinafter, 'Leighton 2018b'). Constn1ction Permitted construction drawings addressing earthwork, shoring, and deep foundations are provided in Construction Set -ASJ# 12, Volumes O through 6, 1 Lego land Drive, Carlsbad, CA, WMB-ROI Architecture, Project No. 17-187 .1, civil plans provided by Commercial Development Resources, shoring plans provided by PB&A Inc., Structural Engineering, Geo-Structures, Earth Retention, structural plans provided by Structural Systems Engineering, January 15, 2020 (hereinafter, 'WMB-ROI 2020'). OBJECTIVES AND SCOPE OF NOV A'S SERVICES Objectives The objectives of the work reported herein were twofold, namely: (i) to observe geologic conditions encountered during grading; and (ii) to document that the earthwork/grading was completed in conformance with the requirements of Leighton 2018a, Leighton 2018b, and WMB-ROI 2020. Scope In order to accomplish the above objectives, NOV A undertook the scope of services abstracted below during the period ofrelevant construction, March 18, 2019 to February 08, 2020. 1. Observation of Shoring and Drilling Operations. NOV A observed the installation of the externally braced excavation as requested by the Contractor including v-nail construction, soil nail installation, and soil nail load testing and lock-off. NOV A also observed the installation of micropiles and cast-in-place drill hole (CIDH) piles for deep foundation systems. 2. Periodic Observation and Testing. NOV A performed observations at times requested by the Contractor during earthwork operations (removals, grading, and compaction, etc.) and for paving. NOVA performed in-place density and moisture content testing of fills. Laboratory testing was performed on materials utilized during the earthwork operations. 3. Technical Support. NOVA provided periodic technical support in response to geotechnical related issues during construction. 4. Reporting. NOV A provided periodic reporting during the conduct of the work. Preparation of this report completes NOV A's scope of services. 2 Report of As-Graded Geotechnical and Geologic Conditions LEGOLAND Project 2020 Carlsbad, California CONSTRUCTION SUMMARY General February 21, 2020 NOVA Project No. 1019055 Construction of relevance to this report was completed during the period of March 18, 2019 to February 08, 2020. The Contractor was Swinerton Builders. The specialty shoring subcontractor was Condon Johnson. The specialty earthwork subcontractor was Naton Engineering Inc. Other specialty subcontractors included Rand Engineering, Inc. NOV A did not provide full-time surveillance of earthwork operations. NOV A provided periodic observation of earthwork operations, at times requested by the Contractor. The description of earthwork operations provided in the following subsections reflects observations by NOV A during its presence on- site and may not reflect all work by the Contractor. Soil Nail Walls Site Preparation Grading operations to prepare for v-nail installation consisted of removals of up to 7 feet of existing soil and replacing it with select fill. The fills placed around the theater perimeter were moisture conditioned to near optimum moisture content in relatively thin, uniform lifts. Backfill was densified to at least 90% relative compaction after ASTM D 1557 (the 'Modified Proctor'). Figure 1 depicts the grading operations. V-Nails NOVA observed the excavation and drilled installation of 110 vertical soil nails ('v-nails') around the perimeter of the theater structure. The work was completed in conformance with the approved shoring plans (WMB-ROI 2020) and referenced geotechnical reports (Leighton 2018a and 2018b). Figure 2 (following page) depicts the drilling operations for the v-nails. Soil Nails for External Bracing NOV A observed the installation and load testing of inclined soil nails in areas of below-grade construction. The work was completed in conformance with the approved shoring plans (WMB-ROI 2020) and referenced geotechnical reports (Leighton 2018a and 2018b). Figure 3 (following page) depicts the soil nail drilling. Figure 1. Grading Operations, to Prepare for V-Nail Installation (March 27, 2019) 3 Report of As-Graded Geotechnical and Geologic Conditions LEGOLAND Project 2020 Carlsbad, California Figure 2. Drilling of V-Nails (April 8, 2018) Figure 3. Soil Nail Drilling (April 30, 2019) 4 February 21, 2020 NOVA Project No. 1019055 Report of As-Graded Geotechnical and Geologic Conditions LEGOLAND Project 2020 Carlsbad, California Earthwork Site Preparation February 21, 2020 NOVAProjectNo. 1019055 Prior to earthwork operations, debris, topsoil, and vegetation in the areas being improved were removed and disposed of offsite. Operations The grading subcontractor utilized a variety of medium to heavy-duty equipment to perform the earthwork. Equipment included: wheel loaders, backhoes, tracked excavators, rollers, and sheepsfoot compaction wheels. Manually operated reciprocating hammers were used where access to larger equipment was limited. Retaining Walls Earthwork operations consisted of backfilling portions of the building perimeter walls. A concrete masonry unit (CMU) retaining wall was constructed to retain the slope at the northern portion of the site. Retaining wall backfill operations consisted of placing soils that were moisture conditioned to near optimum moisture content in relatively thin, uniform lifts. Backfill was densified to at least 90% relative compaction after ASTM D1557 (the 'Modified Proctor'). Figure 4 depicts the backfill operations for the northern CMU retaining wall. Figure 4. Spreading Retaining Wall Backfill at Northern CMU Wall (August 27, 2019) 5 Report of As-Graded Geotechnical and Geologic Conditions LEGOLAND Project 2020 Carlsbad, California Retaining Wall Drainage February 21, 2020 NOV A Project No. IO 19055 NOVA was not asked to observe the installation of the subdrain system, the subdrain connections or outlet locations. Utilities NOV A observed backfilling operations for several utility line trenches. Characteristically sandy utility backfill was moisture conditioned to near optimum moisture content and compacted to at least 90% relative compaction after ASTM D1557 using manually operated reciprocating hammers and a sheepsfoot wheel attached to tracked excavators. Earthwork for Shallow Foundational Elements Earthwork for the new rides, shoring walls, and retaining walls may be generalized to have included the step-wise sequence of operations described below. l. Step 1. Removal. At least the upper approximate 3 to 5 feet of soils were removed to contact with a competent bottom in the areas receiving the new shallow foundational elements. Laterally, the removals extended outward of the planned improvements at least 5 feet. Excavated soils were staged for later replacement. 2. Step 2. Re-Densification. A representative from NOV A approved the bottom of excavations exposed by Step 1. The bottoms of the removals were scarified at least 8 inches and compacted to at least 90% relative compaction after ASTMD1557 (the 'Modified Proctor'), at approximately the optimum moisture content. 3. Step 3. Replacement. Soils staged in Step 1 were replaced as compacted fill. The replaced soils were moisture conditioned to near optimum moisture content then spread in loose lifts of typically 8 to 10 inches. Thereafter, the soils were densified to at least 90% relative compaction after ASTMD 1557 (the 'Modified Proctor') in accordance with the project specifications. Theater Attraction NOV A observed the excavation operations for the subterranean level following the installation of the soil nail-retained wall. The bottom of the excavation extended to the depths shown on the approved grading plans for the project. The excavation removed the existing fill and exposed competent Old Paralic deposits (Qap) at the bottom of the excavation. A NOV A representative approved the bottom of excavations. Flexible Pavements The pavement section construction consisted of the sequence of operations described below. 1. Step 1. Subgrade Preparation. Subgrade preparation consisted of scarifying the surficial soils, moisture conditioning, and then densification of the subgrade to a depth of 12 inches to at least 95 percent relative compaction after ASTM D1557. 2. Step 2. Base Course. An approximately 4 to 6.5-inch-thick layer ofrecycled Class II aggregate base was placed and densified to at least 95 percent of the material's maximum density. 6 Report of As-Graded Geotechnical and Geologic Conditions LEGOLAND Project 2020 Carlsbad, California February 21, 2020 NOV A Project No. 1019055 3. Step 3, Wearing Surface. An approximately 4-inch-thick layer of asphaltic wearing surface was spread in loose lifts and densified by static rolling. Figure 5 depicts the paving operations for the fire lane access road. Portland Cement Concrete Pavements The subgrade preparation for the vehicular Portland cement concrete (PCC) pavements consisted of scarifying the surficial soils, moisture conditioning, and then densification of the subgrade to a depth of 12 inches to at least 95 percent relative compaction after ASTM D1557. Flatwork Flatwork subgrade preparation consisted of scarifying the surficial soils, moisture conditioning, and then densification of the subgrade to a depth of24 inches to at least 90 percent relative compaction after ASTM D1557. Deep Foundations Micro piles Figure 5. Paving Operations (February 08, 2020) Micropiles were installed for foundation support for the below-grade theater structure. As requested, NOVA observed the excavation of the micropiles and noted to be minimally dimensioned in accordance with the referenced plans (WMB-ROI 2020). The piles were observed to be founded in the proper bearing strata. Figure 6 (following page) depicts the drilling and construction of the micropiles. 7 Report of As-Graded Geotechnical and Geologic Conditions LEGOLAND Project 2020 Carlsbad, California Figure 6. Micropile Construction (May 06, 2019) CIDH Piles February 21, 2020 NOVA Project No. 1019055 Cast in-place drilled hole (CIDH) piles were installed for foundation support for the billboard theming walls. As requested, NOV A observed the excavation of the CIDH piles and noted to be minimally dimensioned in accordance with the referenced plans (WMB-ROI 2020). The piles were observed to be founded in the proper bearing strata. Figure 7 (following page) depicts the drilling operations for the CIDH piles. 8 Report of As-Graded Geotechnical and Geologic Conditions LEGOLAND Project 2020 Carlsbad, California February 21, 2020 NOVA Project No. 1019055 Figure 7. Drilling Operations for CIDH Piles (May 10, 2019) 9 Report of As-Graded Geotechnical and Geologic Conditions LEGOLAND Project 2020 Carlsbad, California February 21, 2020 NOV A Project No. 1019055 OBSERVATION AND TESTING BY NOVA Observation The adequacy of earthwork was determined in part by observation of earthwork operations by NOV A staff familiar with the requirements for earthwork in the Carlsbad area and familiar with the specific intent and specific requirements of this project. This observation was the basis for selection by NOVA of locations for in situ testing of density and for recovery of samples for laboratory testing. Density Testing NOV A provided observation of earthwork operations as requested by the Contractor. Quality Assurance (QA) in-place density testing of soils placed as compacted fills and backfills was performed after ASTM D6938 ('In-Place Density and Moisture by Nuclear Methods'). The density of the asphaltic wearing surface of pavements was determined after ASTM D2950 ('Standard Test Method for Density of Bituminous Concrete by Nuclear Methods'). The approximate locations of the density tests conducted for this work are shown on the attached Plates. The laboratory test results are presented in Table I. The field in-place density test results are summarized in Table II. Laboratory Testing The field density testing was supported by laboratory testing of representative samples of soils utilized for fills, backfills, and pavement materials in accordance with ASTM D1557. The test results are presented in Table I. The indications of this testing are the basis for NOV A's judgments regarding the relative compaction of the fills placed. CONCLUSIONS Observed Geologic and Soil Conditions Geologic and Soil The geologic conditions observed during the excavation were generally consistent with those described in Leighton 2018a and 2018b. Materials exposed at the base of excavations consisted of Old Parlic Deposits (Qop) and previously compacted fill (Qaf). Conclusion Based on the observations and testing reported herein, it is NOV A's opinion that the soil engineering and engineering geologic aspects of the grading are in compliance with the approved geotechnical repo1t and the grading plans in WMB-ROI 2020. Limitations Periodic Testing and Observation This report presents opinions, information, and data relative to the earthwork at the subject site. Representatives of NOV A conducted periodic testing and made observations during the progress of the 10 Report of As-Graded Geotechnical and Geologic Conditions LEGOLAND Project 2020 Carlsbad, California February 21, 2020 NOVA Project No. 1019055 construction to evaluate conformance with the project requirements. The testing by NOV A indicates that the earthwork observed conformance with the project requirements for placement and densification. Results presented herein are only representative of the samples and areas tested. As with any manufactured product, there are statistical variations in the uniformity of an earth fill and in the accuracy of the test used to measure its qualities. As compared with other manufactured products, earthwork has usually wider fluctuations in both the product and the test results. Variations in material properties are inherent in any earthwork operation and should be expected at this site. Survey References to elevations and locations herein were based on surveyors or grade checker stakes in the field and from the project grading plans prepared by Commercial Development Resources in WMB-ROI 2019. NOV A did not provide construction surveying services. NOV A has no opinion regarding the accuracy of the elevations or surface geometry with respect to the approved plans. Supervision The presence of NOVA personnel during the work progress did not involve any direct supervision of the Contractor or his work forces. Professional and technical advice and recommendations were provided to the Owner during the conduct of the work, based upon NOV A's observations and evaluations. REFERENCES Leighton 2018a. Geotechnical Update Report, Proposed Theater Ride and Drop Towers, LEGOLAND Theme Park, Carlsbad, California, Leighton and Associates, Inc., Project No. 10075.024, July 10, 2018. Leighton 2018b. Geotechnical Update Report, Proposed Project 2020, LEGOLAND Theme Park, Carlsbad, California, Leighton and Associates, Inc., Project No. 10075.026, September 24, 2018. NOVA 2019a. Assumption ofGeotechnical Engineer-of-Record, LEGOLAND 2020, I Lego/and Dr., Carlsbad, CA 92008, NOVA Services, Inc., Project 1019055, March 13, 2019. NOV A 2019b. Pad Certification, Th eater Attraction, LEGO LAND 2020, City of Carlsbad, CA, NOV A Services, Inc., Project 1019055, June 5, 2019. WMB-ROI 2020. Construction Set-AS1#12, Volumes O through 6, I Legoland Drive, Carlsbad, CA, WMB-ROI Architecture, Project No. 17-187.1, civil plans provided by Commercial Development Resources, shoring plans provided by PB&A Inc., Structural Engineering, Geo-Structures, Earth Retention, structural plans provided by Structural Systems Engineering, January 15, 2020. 0 0 0 11 Report of As-Graded Geotechnical and Geologic Conditions LEGOLAND Project 2020 Carlsbad, California February 21, 2020 NOVA Project No. 1019055 CLOSURE NOV A appreciates the opportunity to be of service to Merlin Entertainments, Inc. on this most interesting project. Should you have any questions or comments, please do not hesitate to contact the undersigned at (858) 292-7575. Sincerely, ::p,Inc. Wail Mdkhtar Senior Project Manager Ian A. Bobolia Project Engineer Attachments: Attachment I: Tables Attachment 2: Plates 12 ~ /;;i~-#;t( n Miller-Hicks, P.G., C.E.G. Senior Engineering Geologist l~ '1". ~ n F. O'Brien, P.E., G.E. cipal Geotechnical Engineer ATTACHMENT 1 TABLES As-Graded Geologic and Geotechnical Conditions LEGOLAND Project 2020 City of Carlsbad, California Grading Permit No. GR 2018-0046 NOVA Project No. 1019055 February 21 , 2020 Legoland 2020 Carlsbad, CA Material ID A B C D E F G Material ID AC-1 AC-2 Abbreviation MG CG UT RW E SG SD s FG B AC FS TABLEI February 2020 NOV A Project No. IO 19055 LABORATORY DENSITIES AND TESTING TERMINOLOGY Laboratory Maximum Density (ASTM Dl557) Material Description Silty Sand Silty Sand with Gravel Silty Sand (Import) Silty Sand (Import and Onsite Blend) Silty Sand Class II Recycled Base 30-300 (Escondido Materials) Recycled Base (Moodys El Corazon Recycling) Laboratory Maximum Density (ASTM D1560) Material Description 31243163 (California Commercial Asphalt) 3/8" Type III D (California Commercial Asphalt) Description of Terms Mass Grading Curb & Gutter Utility Line Trench Retaining Wall Backfill Electrical Line Trench Subgrade Storm Drain Trench Sewer Line Trench Finished Pad Grade Aggregate Base Asphalt Concrete Finished Surface NOV A Services, Inc. Optimum Moisture (%) 8.7 11.2 7.5 9.5 8.8 11.8 12.0 Max Wet Density 147.6 146.0 Maximum Dry Density (pg) 131.3 126.6 135.8 130.2 133.5 120.5 120.0 Legoland 2020 February 2020 Carlsbad, California NOVA Project No. 1019055 TABLE II SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTS Test Test Soil Laboratory Field Rel. Pass/ Date Number Type Test Location Elevation ID (pct) (%) (pct) (%) Comp. Fail 3/27/19 I MG Theater Perimeter 155.5 C 135.8 7.5 123.9 8.1 91% Pass 2 MG Theater Perimeter 157.0 C 135.8 7.5 125.1 8.8 92% Pass 3 MG Theater Perimeter 157.5 C 135.8 7.5 124.4 8.0 92% Pass 4 MG Theater Perimeter 156.5 C 135.8 7.5 121.9 12.3 90% Pass 5 MG Theater Perimeter 158.5 C 135.8 7.5 122.0 12.1 90% Pass 6 MG Theater Perimeter 150.0 C 135.8 7.5 125.4 10.8 92% Pass 7 MG Theater Perimeter 154.0 C 135.8 7.5 126.4 10.8 93% Pass 8 MG Theater Perimeter 154.0 C 135.8 7.5 124.8 9.5 92% Pass 9 MG Theater Perimeter 154.0 C 135.8 7.5 123.9 10.1 91% Pass 10 MG Theater Perimeter 155.5 C 135.8 7.5 128.1 8.2 94% Pass II MG Theater Perimeter 155.5 C 135.8 7.5 127.4 8.7 94% Pass 12 MG Theater Perimeter 156.0 C 135.8 7.5 126.4 8.4 93% Pass 13 MG Theater Perimeter 156.0 C 135.8 7.5 127.9 7.5 94% Pass 14 MG Theater Perimeter 148.0 C 135.8 7.5 125.8 9.1 93% Pass 15 MG Theater Perimeter 148.0 C 135.8 7.5 125.8 10.0 93% Pass 16 MG Theater Perimeter 148.0 C 135.8 7.5 125.8 9.4 93% Pass 3/28/19 17 MG Theater Perimeter 148.5 C 135.8 7.5 124.8 8.2 92% Pass 18 MG Theater Perimeter 149.0 C 135.8 7.5 126.4 8.4 93% Pass 19 MG Theater Perimeter 149.0 C 135.8 7.5 125.4 9.1 92% Pass 20 MG Theater Perimeter 146.0 C 135.8 7.5 125.2 9.1 92% Pass 21 MG Theater Perimeter 146.0 C 135.8 7.5 126.7 9.3 93% Pass 22 MG Theater Perimeter 147.5 C 135.8 7.5 127.4 8.8 94% Pass 23 MG Theater Perimeter 147.0 C 135.8 7.5 127.2 10.I 94% Pass 24 MG Theater Perimeter 149.0 C 135.8 7.5 125.8 10.5 93% Pass 25 MG Theater Perimeter 150.0 C 135.8 7.5 125.1 9.7 92% Pass 3/29/19 26 MG Theater Perimeter 146.5 D 130.2 9.5 121.4 10.8 93% Pass 27 MG Theater Perimeter 148.0 D 130.2 9.5 120.8 11.2 93% Pass 28 MG Theater Perimeter 148.0 D 130.2 9.5 120.4 II.I 92% Pass 29 MG Theater Perimeter 149.0 D 130.2 9.5 121.1 11.3 93% Pass 30 MG Theater Perimeter 149.0 D 130.2 9.5 119.4 12.1 92% Pass 31 MG Theater Perimeter 149.0 D 130.2 9.5 119.9 11.8 92% Pass 32 MG Theater Perimeter 147.5 D 130.2 9.5 120.9 11.8 93% Pass 33 MG Theater Perimeter 148.5 D 130.2 9.5 121.2 11.4 93% Pass 34 MG Theater Perimeter 148.0 D 130.2 9.5 122.4 I I.I 94% Pass 35 MG Theater Perimeter 148.0 D 130.2 9.5 122.7 10.8 94% Pass 36 MG Theater Perimeter 148.0 D 130.2 9.5 121.8 11.0 94% Pass 37 MG Theater Perimeter 150.0 D 130.2 9.5 122.2 10.8 94% Pass 38 MG Theater Perimeter 150.0 D 130.2 9.5 122.9 10.4 94% Pass 39 MG Theater Perimeter 150.0 D 130.2 9.5 123.3 10.4 95% Pass 40 MG Theater Perimeter 150.5 D 130.2 9.5 120.9 11.0 93% Pass 41 MG Theater Perimeter 150.5 D 130.2 9.5 121.2 11.2 93% Pass 4/1/19 42 MG Theater Perimeter 150.0 D 130.2 9.5 118.8 12.4 91% Pass 43 MG Theater Perimeter 149.5 D 130.2 9.5 119.1 12.1 91% Pass 44 MG Theater Perimeter 150.5 D 130.2 9.5 120.0 11.8 92% Pass 45 MG Theater Perimeter 149.5 D 130.2 9.5 119.4 12.0 92% Pass 46 MG Theater Perimeter 150.0 D 130.2 9.5 119.7 13.0 92% Pass 47 MG Theater Perimeter 150.0 D 130.2 9.5 119.2 12.7 92% Pass 48 MG Theater Perimeter 150.0 D 130.2 9.5 120.1 11.4 92% Pass 49 MG Theater Perimeter 150.0 D 130.2 9.5 121.0 11.5 93% Pass 50 MG Theater Perimeter 149.0 D 130.2 9.5 121.0 11.6 93% Pass 51 MG Theater Perimeter 153.0 D 130.2 9.5 120.7 11.4 93% Pass 52 MG Theater Perimeter 155.0 D 130.2 9.5 120.8 12.0 93% Pass 53 MG Theater Perimeter 156.5 D 130.2 9.5 121.8 11.7 94% Pass 54 MG Theater Perimeter 158.0 D 130.2 9.5 122.4 10.8 94% Pass 55 MG Theater Perimeter 159.0 D 130.2 9.5 121.9 II.I 94% Pass 56 MG Theater Perimeter 160.5 D 130.2 9.5 121.4 11.0 93% Pass 57 MG Theater Perimeter 155.0 D 130.2 9.5 122.4 11.3 94% Pass 4/2/19 58 MG Theater Perimeter 161.0 D 130.2 9.5 118.3 11.8 91% Pass 59 MG Theater Perimeter 162.5 D 130.2 9.5 119.1 11.4 91% Pass 60 MG Theater Perimeter 163.0 D 130.2 9.5 120.3 10.8 92% Pass 61 MG Driveway 150.0 D 130.2 9.5 119.3 10.7 92% Pass 62 MG Driveway 151.0 D 130.2 9.5 120.1 10.9 92% Pass 63 MG Driveway 152.0 D 130.2 9.5 121.0 11.2 93% Pass 64 MG Driveway 152.5 D 130.2 9.5 119.4 11.3 92% Pass NOVA Services, Inc. Legoland 2020 February 2020 Carlsbad, California NOVA Project No. 1019055 TABLE II SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RESULTS Test Test Soil Laboratory Field Rel. Pass/ Date Number Type Test Location Elevation ID (pct) (%) (pct) (%) Comp. Fail 4/3/19 65 MG Driveway 151.0 D 130.2 9.5 120.9 11.0 93% Pass 66 MG Driveway 152.0 D 130.2 9.5 119.4 10.9 92% Pass 4/19/19 67 MG Retaining Wall 147.0 B 126.6 11.2 120.7 11.4 95% Pass 68 MG Retaining Wall 147.5 B 126.6 11.2 120.2 11.2 95% Pass 69 MG Retaining Wall 148.5 B 126.6 11.2 122.4 11.4 97% Pass 70 MG Retaining Wall 149.0 B 126.6 11.2 122.3 11.2 97% Pass 71 MG Retaining Wall 149.0 B 126.6 11.2 122.1 10.2 96% Pass 72 MG Retaining Wall 150.0 B 126.6 11.2 122.0 11.6 96% Pass 73 MG Retaining Wall 151.0 B 126.6 11.2 121.4 11.5 96% Pass 74 MG Retaining Wall 151.0 B 126.6 11.2 122.5 11.6 97% Pass 4/25/19 75 MG Drop Tower Ride Pad 149.0 A 131.3 8.7 128.2 8.9 98% Pass 76 MG Retaining Wall 149.0 A 131.3 8.7 127.9 9.8 97% Pass 77 CG Curb & Gutter 149.0 A 131.3 8.7 127.1 9.6 97% Pass 4/26/19 78 MG Hardscape 149.5 A 131.3 8.7 126.5 8.8 96% Pass 79 MG Hardscape 150.0 A 131.3 8.7 124.4 9.4 95% Pass 80 MG Drop Tower Ride Pad 150.0 A 131.3 8.7 126.1 8.7 96% Pass 81 MG Drop Tower Ride Pad 150.0 A 131.3 8.7 126.0 9.0 96% Pass 82 CG Curb&Gutter 151.0 A 131.3 8.7 124.8 8.8 95% Pass 83 MG Hardscape 151.0 A 131.3 8.7 125.2 8.7 95% Pass 84 MG Hardscape 151.0 A 131.3 8.7 125.4 10.0 96% Pass 5/1/19 85 MG Retaining Wall 153.0 E 133.5 8.8 123.9 9.0 93% Pass 86 MG Retaining Wall 154.0 E 133.5 8.8 125.7 9.8 94% Pass 87 MG Retaining Wall 154.0 E 133.5 8.8 127.1 11.5 95% Pass 88 MG Hardscape 154.5 E 133.5 8.8 124.3 9.3 93% Pass 89 MG Hardscape 154.5 E 133.5 8.8 122.3 8.8 92% Pass 5/2/19 90 MG Drop Tower Ride Pad 151.5 E 133.5 8.8 127.1 11.2 95% Pass 91 MG Drop Tower Ride Pad 152.0 E 133.5 8.8 126.9 10.8 95% Pass 92 MG Drop Tower Ride Pad 152.0 E 133.5 8.8 127.9 11.3 96% Pass 93 MG Drop Tower Ride Pad 152.5 E 133.5 8.8 127.1 11.4 95% Pass 94 MG Retaining Wall 153.0 E 133.5 8.8 124.4 9.2 93% Pass 95 CG Curb & Gutter 152.5 E 133.5 8.8 126.3 9.0 95% Pass 96 CG Curb&Gutter 153.5 E 133.5 8.8 126.5 IO.I 95% Pass 97 CG Curb & Gutter 154.5 E 133.5 8.8 127.1 9.4 95% Pass 98 MG Hardscape 154.5 E 133.5 8.8 125.0 9.8 94% Pass 5/6/19 99 MG Hards cape 148.0 E 133.5 8.8 125.1 8.8 94% Pass 100 MG Hardscape 149.0 E 133.5 8.8 126.0 9.2 94% Pass 101 MG Hard scape 149.0 E 133.5 8.8 126.4 8.9 95% Pass 102 MG Hardscape 150.5 E 133.5 8.8 127.4 9.4 95% Pass 103 MG Hardscape 151.0 E 133.5 8.8 126.1 8.8 94% Pass 104 MG Hardscape 151.0 E 133.5 8.8 124.9 9.0 94% Pass 105 MG Hardscape 152.5 E 133.5 8.8 125.4 9.3 94% Pass 106 MG Hard scape 152.5 E 133.5 8.8 126.2 10.0 95% Pass 5/7/19 107 MG Hard scape 149.5 E 133.5 8.8 127.8 10.8 96% Pass 108 MG Hardscape 150.5 E 133.5 8.8 127.8 10.5 96% Pass 109 MG Hard scape 150.5 E 133.5 8.8 127.4 10.2 95% Pass 110 MG Hardscape 152.0 E 133.5 8.8 126.8 10.7 95% Pass Ill MG Hardscape 152.5 E 133.5 8.8 127.2 9.8 95% Pass 8/19/19 112 RW Retaining Wall 151.0 E 133.5 8.8 120.4 9.3 90% Pass 8/20/19 113 RW Retaining Wall 151.5 E 133.5 8.8 125.4 10.6 94% Pass 8/21/19 114 RW Retaining Wall 151.5 E 133.5 8.8 120.7 10.3 90% Pass 115 RW Retaining Wall 155.5 E 133.5 8.8 127.1 9.5 95% Pass 116 RW Retaining Wall 145.5 E 133.5 8.8 122.2 I I.I 92% Pass 117 RW Retaining Wall 155.5 E 133.5 8.8 120.2 11.6 90% Pass 8/22/19 118 RW Retaining Wall 156.0 E 133.5 8.8 121.8 9.6 91% Pass 119 RW Retaining Wall 156.2 E 133.5 8.8 124.7 10.2 93% Pass 120 RW Retaining Wall 156.9 E 133.5 8.8 121.0 8.6 91% Pass 121 RW Retaining Wall 157.4 E 133.5 8.8 125.6 11.0 94% Pass NOVA Services, Inc. Legoland 2020 February 2020 Carlsbad, California NOVA Project No. 1019055 TABLE II SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RES UL TS Test Test Soil Laboratory Field Rel. Pass/ Date Number Type Test Location Elevation ID (pct) (%) (pct) (%) Comp. Fail 122 RW Retaining Wall 157.8 E 133.5 8.8 123.6 IO.I 93% Pass 123 RW Retaining Wall 158.6 E 133.5 8.8 123.4 9.8 92% Pass 8/27/19 124 MG Slope 160.0 E 133.5 8.8 120.7 9.0 90% Pass 125 MG Slope 160.0 E 133.5 8.8 121.1 9.3 91% Pass 8/28/19 126 CG Curb &Gutter 152.0 A 131.3 8.7 126.3 10.6 96% Pass 127 CG Curb & Gutter 152.0 A 131.3 8.7 126.9 10.1 97% Pass 9/27/19 128 UT Utility Line Trench 150.0 B 126.6 11.2 117.9 11.6 93% Pass 129 SG Hardscape 150.5 B 126.6 11.2 124.0 11.2 98% Pass 130 SG Hardscape 150.5 B 126.6 11.2 124.6 11.6 98% Pass 131 SG Hardscape 151.0 B 126.6 11.2 120.5 11.3 95% Pass 132 SG Hardscape 151.0 B 126.6 11.2 120.4 11.5 95% Pass 10/2/19 133 SG Hardscape 152.0 B 126.6 11.2 118.8 10.5 94% Fail 134 SG Hardscape 151.0 B 126.6 11.2 124.5 11.2 98% Pass 135 SG Hard scape 151.5 B 126.6 11.2 121.2 11.6 96% Pass 136 SG Hardscape 151.5 B 126.6 11.2 118.2 9.5 93% Fail 137 SG Hardscape 150.5 B 126.6 11.2 121.4 11.4 96% Pass 138 SG Hard scape 150.0 B 126.6 11.2 117.1 11.3 92% Fail 10/3/19 139 SG Retest #133 151.0 B 126.6 11.2 123.6 11.2 98% Pass 140 SG Retest #138 151.0 B 126.6 11.2 124.5 11.5 98% Pass 141 SG Hardscape 151.0 B 126.6 11.2 123.2 11.9 97% Pass 142 SG Retest #136 151.0 B 126.6 11.2 122.6 12.1 97% Pass 10/7/19 143 MG Hardscape 150.0 D 130.2 9.5 126.5 9.6 97% Pass 10/8/19 144 MG Hardscape 150.0 D 130.2 9.5 127.9 9.5 98% Pass 10/10/19 145 UT Utility Line Trench 147.0 E 133.5 8.8 121.1 11.4 91% Pass 10/21/19 146 SG Hardscape 151.0 E 133.5 8.8 124.4 9.0 93% Pass 147 SG Hardscape 151.0 E 133.5 8.8 127.0 8.8 95% Pass 148 SG Hardscape 151.0 E 133.5 8.8 128.2 10.0 96% Pass 10/22/19 149 E Electrical Line Trench 150.0 E 133.5 8.8 124.0 8.4 93% Pass 10/23/19 150 E Electrical Line Trench 149.0 E 133.5 8.8 124.3 8.4 93% Pass 151 E Electrical Line Trench 151.0 E 133.5 8.8 123.7 8.8 93% Pass 152 SG Fire Lane 150.5 E 133.5 8.8 127.8 IO.I 96% Pass 153 SG Fire Lane 150.5 E 133.5 8.8 125.8 9.8 94% Pass 10/24/19 154 SG Hardscape 151.5 E 133.5 8.8 127.7 9.4 96% Pass 155 SG Hardscape 151.0 E 133.5 8.8 126.9 8.8 95% Pass 156 SG Hardscape 151.5 E 133.5 8.8 127.4 9.2 95% Pass 157 SG Hards cape 151.0 E 133.5 8.8 127.3 10.5 95% Pass 158 SG Hardscape 151.5 A 131.3 8.7 124.9 10.1 95% Pass 159 SG Hards cape 151.5 A 131.3 8.7 127.7 9.8 97% Pass 160 SG Hardscape 151.5 A 131.3 8.7 125.6 10.4 96% Pass 161 s Sewer Line Trench 152.0 A 131.3 8.7 119.9 12.1 91% Pass 162 s Sewer Line Trench 151.0 A 131.3 8.7 121.2 10.8 92% Pass 163 E Electrical Line Trench 152.0 E 133.5 8.8 127.7 10.5 96% Pass 164 E Electrical Line Trench 152.0 E 133.5 8.8 126.9 9.4 95% Pass 165 s Sewer Line Trench 154.0 A 131.3 8.7 118.8 11.7 90% Pass 10/25/19 166 E Electrical Line Trench 150.5 E 133.5 8.8 124.3 9.8 93% Pass 167 E Electrical Line Trench 152.0 E 133.5 8.8 125.1 9.4 94% Pass 168 s Sewer Line Trench 154.5 A 131.3 8.7 123.9 10.0 94% Pass 169 s Sewer Line Trench 155.5 A 131.3 8.7 123.4 9.7 94% Pass 10/28/19 170 SG Hardscape 151.0 D 130.2 9.5 123.3 10.7 95% Pass 171 SG Hardscape 152.0 D 130.2 9.5 125.3 9.1 96% Pass 172 SD Storm Drain Trench 152.0 D 130.2 9.5 106.5 5.6 82% Fail 173 E Electrical Line Trench 152.0 D 130.2 9.5 118.8 7.6 91% Fail 174 SG Hardscape 152.0 D 130.2 9.5 126.4 10.1 97% Pass NOVA Services, Inc. Legoland 2020 February 2020 Carlsbad, California NOVA Project No. 1019055 TABLE II SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RES UL TS Test Test Soil Laboratory Field Rel. Pass/ Date Number Type Test Location Elevation ID (pct) (%) (pct) (%) Comp. Fail 10/30/19 175 s Sewer Line Trench 153.0 D 130.2 9.5 120.0 9.0 92% Pass 176 SD Retest #172 152.0 D 130.2 9.5 120.4 7.0 92% Pass 177 SD Storm Drain Trench 152.0 D 130.2 9.5 122.6 9.5 94% Pass 178 s Sewer Line Trench 152.0 D 130.2 9.5 116.7 5.5 90% Pass 179 E Retest #173 152.0 D 130.2 9.5 120.9 7.5 93% Pass 180 s Sewer Line Trench 152.0 D 130.2 9.5 122.1 9.5 94% Pass 181 s Sewer Line Trench 152.0 D 130.2 9.5 119.4 9.4 92% Pass 182 s Sewer Line Trench 152.0 D 130.2 9.5 119.1 9.8 91% Pass 183 s Sewer Line Trench 152.0 D 130.2 9.5 125.7 8.0 97% Pass 11/5/19 184 SD Storm Drain Trench 149.0 D 130.2 9.5 120.0 9.5 92% Pass 185 E Electrical Line Trench 149.0 D 130.2 9.5 128.1 9.9 98% Pass 11/6/19 186 SD Storm Drain Trench 148.0 D 130.2 9.5 120.1 10.2 92% Pass 187 SD Storm Drain Trench 148.0 D 130.2 9.5 125.2 9.5 96% Pass 11/12/19 188 SD Storm Drain Trench 150.0 D 130.2 9.5 129.1 9.5 99% Pass 189 SD Storm Drain Trench 150.0 D 130.2 9.5 122.1 10.5 94% Pass 190 SD Storm Drain Trench 150.0 D 130.2 9.5 125.9 5.4 97% Pass 191 E Electrical Line Trench 153.0 D 130.2 9.5 127.8 9.7 98% Pass 12/13/19 192 SG Fire Lane 150.0 B 126.6 11.2 120.3 12.3 95% Pass 193 SG Fire Lane 150.0 B 126.6 11.2 121.6 11.5 96% Pass 194 SG Fire Lane 152.0 B 126.6 11.2 121.6 11.2 96% Pass 195 SD Storm Drain Trench 152.0 B 126.6 11.2 120.3 11.4 95% Pass 12/14/19 196 SG Fire Lane 152.0 B 126.6 11.2 123.6 11.9 98% Pass 197 SG Fire Lane 152.0 B 126.6 11.2 119.7 11.5 95% Pass 198 SG Fire Lane 152.0 B 126.6 11.2 124.5 11.2 98% Pass 199 SD Storm Drain Trench 150.0 B 126.6 11.2 118.1 13.7 93% Pass 200 SD Storm Drain Trench 152.0 B 126.6 11.2 112.0 13.0 88% Fail 201 SD Retest #200 152.0 B 126.6 11.2 116.5 13.0 92% Pass 202 SD Storm Drain Trench 152.0 B 126.6 11.2 120.5 10.3 95% Pass 12/16/19 203 MG Walkway 152.0 B 126.6 11.2 120.3 11.7 95% Pass 204 MG Fire Lane 152.0 B 126.6 11.2 124.1 11.2 98% Pass 205 SD Storm Drain Trench 152.0 B 126.6 11.2 120.3 11.9 95% Pass 12/17/19 206 MG Walkway 151.0 B 126.6 11.2 124.5 11.2 98% Pass 207 E Electrical Line Trench 151.5 B 126.6 11.2 122.0 11.5 96% Pass 208 MG Walkway 151.5 B 126.6 11.2 124.5 11.5 98% Pass 209 SD Storm Drain Trench 150.5 B 126.6 11.2 115.8 10.0 91% Pass 210 MG Walkway 151.5 B 126.6 11.2 122.4 10.1 97% Pass 211 SD Storm Drain Trench 151.5 B 126.6 11.2 124.2 7.4 98% Pass 12/18/19 212 E Electrical Line Trench 151.5 B 126.6 11.2 123.7 II.I 98% Pass 213 E Electrical Line Trench 151.5 B 126.6 11.2 120.4 11.6 95% Pass 214 E Electrical Line Trench 151.5 B 126.6 11.2 123.5 12.3 98% Pass 215 SG Fire Lane 151.5 B 126.6 11.2 124.6 10.2 98% Pass 216 MG Walkway 151.5 B 126.6 11.2 124.4 10.5 98% Pass 217 MG Walkway 151.5 B 126.6 11.2 122.4 9.5 97% Pass 12/19/19 218 B Fire Lane Base F 120.5 11.8 116.0 II.I 96% Pass 219 B Fire Lane Base F 120.5 11.8 117.5 12.2 98% Pass 220 B Fire Lane Base F 120.5 11.8 116.1 I 0.3 96% Pass 221 B Fire Lane Base F 120.5 11.8 115.4 12.9 96% Pass 222 AC Driveway FS AC-I 147.6 NIA 145.2 NIA 98% Pass 223 AC Driveway FS AC-I 147.6 NIA 143.6 NIA 97% Pass 224 AC Driveway FS AC-I 147.6 NIA 144.2 NIA 98% Pass 225 AC Driveway FS AC-I 147.6 NIA 143.5 NIA 97% Pass 12/20119 226 E Electrical Line Trench 152.0 B 126.6 11.2 123.6 9.7 98% Pass 227 E Electrical Line Trench 152.0 B 126.6 11.2 122.1 10.3 96% Pass 218120 228 B Driveway Base G 120.0 12.0 113.4 11.1 95% Pass 229 B Driveway Base G 120.0 12.0 113.5 8.4 95% Pass 230 B Driveway Base G 120.0 12.0 115.2 12.0 96% Pass 231 B Driveway Base G 120.0 12.0 113.7 11.1 95% Pass NOV A Services, Inc. Legoland 2020 February 2020 Carlsbad, California NOVA Project No. 1019055 TABLE II SUMMARY OF FIELD IN-PLACE DENSITY AND MOISTURE TEST RES UL TS Test Test Soil Laboratory Field Rel. Pass/ Date Number Type Test Location Elevation ID (pcl) (%) (pct) (%) Comp. Fail 232 B Driveway Base G 120.0 12.0 113.5 13.3 95% Pass 233 B Driveway Base G 120.0 12.0 115.8 11.9 97% Pass 234 B Driveway Base G 120.0 12.0 115.5 II.I 96% Pass 235 B Driveway Base G 120.0 12.0 118.1 11.4 98% Pass 236 B Driveway Base G 120.0 12.0 113.9 10.6 95% Pass 237 B Driveway Base G 120.0 12.0 114.9 10.3 96% Pass 238 AC Driveway FS AC-2 146.0 NIA 140.2 NIA 96% Pass 239 AC Driveway FS AC-2 146.0 NIA 140.2 NIA 96% Pass 240 AC Driveway FS AC-2 146.0 NIA 141.6 NIA 97% Pass 241 AC Driveway FS AC-2 146.0 NIA 141.6 NIA 97% Pass 242 AC Driveway FS AC-2 146.0 NIA 141.6 NIA 97% Pass 243 AC Driveway FS AC-2 146.0 NIA 143.1 NIA 98% Pass 244 AC Driveway FS AC-2 146.0 NIA 138.8 NIA 95% Pass 245 AC Driveway FS AC-2 146.0 NIA 140.2 NIA 96% Pass NOVA Services, Inc. ATTACHMENT 2 PLATES As-Graded Geologic and Geotechnical Conditions LEGOLAND Project 2020 City of Carlsbad, California Grading Permit No. GR 2018-0046 NOVA Project No. 1019055 February 21, 2020 'J'.j,, .... ~,:;-':,!·~;:•.:<-.,0., ?,_;~ ~ & " ~r ;:: -~ ;..,J •: ., .... 1 .... • ,, I~,•" --... ,11•,··---..... , .. CRAO!NC PLArl \A'.,ttJl.l~C C-o• KEY TO SYMBOLS Qaf Qop FILL OLD PARAUC DEPOSITS dt 245 • APPROXIMATE LOCATION OF IN-PLACE DENSITY TESTS /V /"v' 1159.0'! LIMITS OF GRADING LIMITS OF EXCAVATION APPROXIMATE ELEVATION AT EXCAVATION BOTTOM l!.tt. 4&\ 1■1 NOVA 4373 VIEWRIDGE AVENUE, SUITE B SAN DIEGO, CALIFORNIA 858-292-7575 858-292-7570 (FAX) WWW.USA-NOVA.COM w 0 > N er: 0 N 0 C 0 z z <C <( ...J ....J 0 0 C, (!} w w ...J ....J T"" PROJECT NO: DATE: DRAWN BY: REVIEWED BY: <( z er: 0 LL ....J <( () 0 <( CD Cf) ....J er: <( () 1019055 FEB 2020 DTJ WM AS-GRADED GEOTECHNICAL MAP 0 30' ~ I PLATE 1 60'