HomeMy WebLinkAbout2051 PALOMAR AIRPORT RD; ; CBC2019-0490; Recycle{city of Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Develooment Services Building Division 1635 Faraday Avenue 760-602-2719 www. car/sbadca. gov Many of the materials generated from your project can be re cycled. You are required to list materials that will be reused, recycled or disposed from your project. If you have quest ions about the recycling requirement or completing this form, please contact Waste Management at {760) 929-9400, a certified C&D re cycler, or the Carlsbad Building Division at {760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be used for all construction projects within the City of Carlsbad. PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued without a completed Construction Waste Management Plan. Applicant Information Permit No. C.8L2ol4't -O'f'f D Project Title Project Address Z.O S I l>"-l0t1._. -'f,.'tyo.r"t P-oiJ APN Applicant Name wHlt"'-J ------------------ Last First Owner 0 Contractor Architect e;-o Applicant Address 10::,. S" · ~dlfU ~ ~ 224 Phone ( ~SB ) )$4-611.\ E-mail Address j~L.> ~c...a_ Sc). u-, Applicant Mailing Address (if different than project address) Project Type (check all that apply): Residential □ Brief Description l2.L,, .toa..11 ·.., Co~ Public Building □ Other 0 -- Industrial □ Project Size l ~ '3 1t-t,(c> S f (square footage) Estimated Cost of Project $ __ 4t_l=-O_O_t>__._t_O_D__;;;(.)'----------- Please check the appropriate box: &Ian on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction. DI plan on self-hauling to a certified recycling facility and will provide all receipts after construction. D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE MANAGEMENT. Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Page 1 of 4 Rev. 7/1/20 PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final building approval. DEBRIS RECYCLING REPORT (ACTUAL): .... ::1.11, .. , ... Acknowledgement I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Permit No. L Q L-2.o t~--. Otl 46 Print Name :Sort-t4 Lo; (t~.1 Address LD~ <; l,~t),,(>S ~ ~~ S-vf 4,,c.. l,cc.<.~ <..A Date <i/ 4/ ~I ' ., Llcr:, l ,::1.1111.,■:-Use this Final Log below to track loads of materials as they leave the job site. ®®SAVE RECEIPTS®® Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons. A B C Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility Reused or Recycled Disposed in (Name, Address, Phone) Salvaged Landfill Exame_le: Palomar Transfer Station, 5960 El 01/01/2020 Concrete (broken) 5 tons Camino Real -(760) 603-0153 ~ .tL. ~~~ .,. 0,,,... l.. ~ le.. nf.-( 0 C,,C....... 1- iPw-I\ Ir e-i.-J Ji'1rn-,'.i1 ,, - @TOTAL ..... :1.11,1~-~ l ::}-L ~ ~ 1 Q.5.'t .'-lL. h' ,aJ2 Diversion Rate Achieved = % !>65%0 Traf columns A Y'li; Total of columns A + B + C DIVERSION Contractor/Owner Signature V\.-..,-v-,,,V---Date tt/ t{ ! 'b / - Attach the following docum~~ ion to this Report: Return completed form and documentation to: • Original recycling weight tickets, dfill weight tickets City of Carlsbad . Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor) . Any other relevant information to support Recycling Report 1635 Faraday Avenue Carlsbad, CA 92008 Page 3 of4 Rev. 711120 DUMPSITE/LANDFILL Palomar Landfill (PAL) 5960 El Camino Real Carlsbad CA 92008 ' ' DATE OF SERVICE SVC TICKET# 6/15/2020 202702 6/20/2020 205050 6/26/2020 205785 7/15/2020 211179 7/21/2020 212811 7/27/2020 214529 8/5/2020 216958 8/17/2020 220898 8/25/2020 223143 8/31/2020 224064 9/9/2020 228082 9/12/2020 229185 9/22/2020 231566 9/30/2020 237041 10/12/2020 237041 10/20/2020 239475 10/31/2020 243244 11/3/2020 243245 11/16/2020 247408 11/16/2020 247407 11/25/2020 251075 11/25/2020 251074 12/15/2020 257406 12/15/2020 257405 1/8/2021 262478 1/8/2021 262480 1/21/2021 266286 1/22/2021 266659 1/22/2021 266479 1/22/2021 266481 2/9/2021 271229 2/17/2021 273340 2/26/2021 275588 2/27/2021 276402 2/27/2021 276403 2/27/2021 276404 3/19/2021 281365 3/26/2021 283328 3/30/2021 283727 3/30/2021 283728 4/14/2021 288098 Total Tons Total Tons Diverted Total Tons Landfilled Total Diversion GENERAL CONTRACTOR: C-2 BUILDING GROUP 2051 PALOMAR AIRPORT RD CARLSBAD, CA. 92011 Construction & Recycling Services 5701 S. Eastern Ave., STE 300, Commerce, CA 90040 714-480-2317 (Direct) 866-459-3985 (Fax) C&D SORT & TRANSFER FACILITY EDCO CDI Recycling & Buy Back Center 224 S Las Posas Rd Acct: 350-72933 Sales Rep: Victoria Brown-Delgado grea@c2sd.com Prepared Date: 08/03/2021 San Marcos CA 92078 ' Total Tons RECY BIN SIZE MATERIAL TYPE Tons RCY RATE% FACILITY 40YD C& DMIXED 4.77 4.10 86.00% EDCO SAN MARCOS (EDDl 40YD C&DMIXED 4.14 3.56 86.00% EDCO SAN MARCOS (EDD) 40YD C& DMIXED 5.70 4.90 86.00% EDCO SAN MARCOS (EDD) 40YD C&DMIXED 4.95 4.26 86.00% EDCO SAN MARCOS (EDD) 40YD C& DMIXED 3.90 3.35 86.00% EDCO SAN MARCOS (EDD) 40YD TRASH LOAD 4.56 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD C& DMIXED 3.63 3.12 86.00% EDCO SAN MARCOS (EDDl 40YD C& DMIXED 6.66 5.73 86.00% EDCO SAN MARCOS (EDD) 40YD C&DMIXED 4.53 3.90 86.00% EDCO SAN MARCOS (EDD) 40YD C& DMIXED 4.36 3.75 86.00% EDCO SAN MARCOS (EDD) 40YD C& D MIXED 6.91 5.94 86.00% EDCO SAN MARCOS (EDD) 40YD C& D MIXED 3.85 3.31 86.00% EDCO SAN MARCOS (EDD) 40YD C& D MIXED 5.03 4.33 86.00% EDCO SAN MARCOS (EDD) 40YD C& D MIXED 5.88 5.06 86.00% EDCO SAN MARCOS (EDD) 40YD C& D MIXED 4.61 3.87 84.00% EDCO SAN MARCOS (EDD) 40YD C& D MIXED 8.19 6.88 84.00% EDCO SAN MARCOS (EDD) 40YD C& D MIXED 5.06 4.25 84.00% EDCO SAN MARCOS (EDD) 40YD TRASH LOAD 3.33 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD TRASH LOAD 4.77 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD C& DMIXED 5.00 4.20 84.00% EDCO SAN MARCOS (EDD) 40YD TRASH LOAD 8.17 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD C&DMIXED 3.35 2.81 84.00% EDCO SAN MARCOS (EDD) 40YD TRASH LOAD 6.72 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD C&D MIXED 3.68 3.09 84.00% EDCO SAN MARCOS (EDD) 40YD C& D MIXED 1.80 1.51 84.00% EDCO SAN MARCOS (EDD) 40YD TRASH LOAD 4.24 0.00 0.00% PALOMAR LANDFILL (PAL) l0YD CONCRETE 10.00 10.00 100.00% MOODY'S MATERIAL'S (MOO) 40YD TRASH LOAD 6.46 0.00 0.00% PALOMAR LANDFILL (PAL) l0YD CONCRETE 10.00 10.00 100.00% MOODY'S MATERIAL'S (MOO) l0YD CONCRETE 10.00 10.00 100.00% MOODY'S MATERIAL'S (MOO) 40YD TRASH LOAD 7.98 0.00 0.00% PALOMAR LANDFILL (PAL) l0YD CONCRETE 10.00 10.00 100.00% MOODY'S MATERIAL'S (MOO) l0YD CONCRETE 10.00 10.00 100.00% MOODY'S MATERIAL'S (MOO) l0YD CONCRETE 10.00 10.00 100.00% MOODY'S MATERIAL'S (MOO) l0YD CONCRETE 10.00 10.00 100.00% MOODY'S MATERIAL'S (MOO) 40YD TRASH LOAD 6.37 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD TRASH LOAD 6.50 0.00 0.00% MOODY'S MATERIAL'S (MOO) 40YD TRASH LOAD 5.16 0.00 0.00% PALOMAR LANDFILL (PAL) l0YD CONCRETE 10.00 10.00 100.00% MOODY'S MATERIAL'S (MOO) l0YD CONCRETE 10.00 10.00 100.00% MOODY'S MATERIAL'S (MOO) 40YD TRASH LOAD 9.20 0.00 0.00% PALOMAR LANDFILL (PAL) 259.46 171.93 87.53 66.26%