HomeMy WebLinkAbout2021-09-07; Traffic and Mobility Commission; ; El Camino Real Roadway Improvements from Sunny Creek Road to Jackspar Drive, Capital Improvement Program Project No. 6094Item 1 Meeting Date: Sept. 7, 2021 To: Traffic and Mobility Commission Staff Contact: Brandon Miles, Associate Engineer brandon.miles@carlsbadca.gov, 760-602-2745 Subject: El Camino Real Roadway Improvements from Sunny Creek Road to Jackspar Drive, Capital Improvement Program Project No. 6094 Recommended Action Review the design and support staff’s recommendation to finalize the design of the El Camino Real Roadway Improvements from Sunny Creek Road to Jackspar Drive, Capital Improvement Program (CIP) Project No. 6094 (Project) providing operational improvements consistent with the city’s General Plan Mobility Element. Background Utilized by approximately 46,000 vehicles per day, El Camino Real is an arterial street that functions as a primary north/south connection throughout the city. The posted speed limit is 55 miles per hour and bike lanes are provided in both directions. Sidewalks are currently provided on the west side of the roadway however no sidewalk is present on the east side of the roadway between Jackspar Drive to approximately 150 feet south of Sunny Creek Road. The subject portion of El Camino Real between Sunny Creek Road and Jackspar Drive is a five-lane roadway consisting of three lanes in the southbound direction and two lanes in the northbound direction. The adjoining segments of El Camino Real to the north and south of the project area are built out to the ultimate six lane arterial street standard. The Project will widen the northbound segment of El Camino Real for approximately 1,600 feet from Sunny Creek Road to Jackspar Drive consistent with the Mobility Element of the city’s General Plan. The improvement will result in a total of three 11-foot wide vehicle lanes, an 8- foot bike lane, a 3-foot buffer and a new noncontiguous 5-foot wide sidewalk with a biofiltration system for storm water treatment along the northside of the roadway. Currently, the sidewalk terminates in the northbound direction just south of Sunny Creek Road. The buffered bike lanes will include green dashed conflict zone striping. New streetlights will be added for safety on the east side of El Camino Real from Sunny Creek Road to Jackspar Drive. In addition, the intersection at Jackspar Drive will include continental style crosswalks with upgraded pedestrian ramps meeting Americans with Disabilities Act, or ADA, requirements. Next Steps Staff will receive any comments and bring back the report to the Traffic and Mobility Commission with the completed design requesting a recommendation to the City Council to approve the Project plans and specifications and authorize the City Clerk to advertise for construction bids. After the bidding process is complete, staff will bring the Project back to the City Council with a request to award a construction contract to the lowest responsive and responsible bidder. The construction is targeted to begin in mid-2022, with completion expected in late 2022. Exhibits 1. Location Map 2. Signing and Striping Plans of El Camino Real Roadway Improvements from Sunny Creek Road to Jackspar Drive EL CAMINO REALJACKSPAR DRREEF CR SUNNY CREEK RDL O N G F EL L O W R D FORECASTLE CT DON MIGUEL DR FROST AV CAMINO HILLS DRKEATS PL DON QUIXOTE DRDON TOMASO DRRANCHO CARLSBAD DRB Y R O N P L PLOT DATE: 6/16/2021 PATH: S:\EngGIS\Madison_Power\Location maps\El Camino Real Widening- Sunny Creek road to Jackspar.mxd PROJECT NAME EXHIBITPROJECTNUMBER60941EL CAMINO REAL WIDENING FROM SUNNY CREEK ROAD TO JACKSPAR DRIVE LOCATION MAP CARLSBAD VISTA OCEANSIDE ENCINITAS SAN MARCOS Vicinity Map ³ PLOTTED BY: MPower SITE SITE ³NOT TO SCALE EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 50% PS&E SUBMITTAL (05/06/2021)811Exhibit 225 LF ----------------------Exist R/W LL 17 LF \ \ --_£Exist R/W ---------• • ------• I (Sunny Creek Rd2800) D3-1 (MOD) SPEED LIMIT ® 55 BIKE OPEN TO LANE THE PUBLIC R2-1 R4-7 N-1 R7-9a SPECIAL SIGN SIGNING AND STRIPING PLAN: SCALE: 1 "=40' APN 209-060-48-00 1131 LF SIGNING AND STRIPING PLAN: SCALE: 1 "=40' DICA RT ~ • • -W3-3 CALL 2 FULL WORKING DAYS BEFORE YOU DIG APN 212-160-31-00 EL CAMINO REAL PROP R/W APN 212-102-75-00 EL CAMINO REAL \ \ \ \ ~~~~~~~ 145D FRAZEE Ro.AD SUITI> 100 SAN DIEGO, CA 92108 (858) 514-83?7 \ \ I I I APN 209-090-11-00 D3-1 (MOD) R2-1 PP R7-9a POLE MOUNTED SIGN PANEL 150 LF DD ~Of ESS /~l qi,"' ~ ,!fl " ~ § MARY E. WESTRUM ~ "' "' No. C75418 ~ Exp. 12/31 /21 * "'<'<re CIVIL J. DATE INITIAL OF c~\. ,~ ENGINEER OF WORK REVISION DESCRIPTION 40' STRIPING AND PAVEMENT MARKING LEGEND: @ WHITE DASHED LANE LINE, CA MUTCD, FIGURE 3A-102 DETAIL 12 @ BIKE LANE LINE, CA MUTCD, FIGURE 3A-112 DETAIL 39 @ BIKE LANE INTERSECTION LINE, CA MUTCD, FIGURE 3A-112 DETAIL 39A 'BL' 'BIKE LANE' PAVEMENT MARKING WORD AND BIKE LANE ARROW ~ PAVEMENT MARKING, CTSP A240 AND CTSP A24A ® 4" WHITE PAVEMENT MARKING, 25' C-C @ 12" WHITE CONTINENTAL CROSSWALK, DETAIL SHEET 22 @ CHANNELIZING LINE, CA MUTCD, FIGURE 3A-112 DETAIL 38 @ TYPE IV (L) ARROW, CTSP A24A @ 'SIGNAL AHEAD' PAVEMENT MARKING WORD, CTSP A24D @ 12" WHITE LIMIT LINE 0 GREEN PAINT BIKE LANE CONFLICT, DETAIL SHEET 22 80' SIGNING LEGEND: IRLI RELOCATE ROADSIDE SIGN IPPI PROTECT EXISTING ROADSIDE SIGN IN PLACE ~ REMOVE ROADSIDE SIGN SCALE· 1"=40' @J INSTALL ROADSIDE SIGN o' 20' 40' 80' ---~ HAS BUIL TH I P.E. EXP. DATE I REVIEl.'ED BY• INSPECTOR DATE ~ CITY OF CARLSBAD ~ 1 ENGINEERING DEPARTMENT 2 SIGNING AND STRIPING PLANS FOR: EL CAMINO REAL ROADWAY IMPROVEMENTS FROM SUNNY CREEK Rd TO JACKSPAR Dr APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXPIRES 6 /20 /22 DATE DWN BY: SI I I DRAWING NO. PROJECT NO. DATE INITIAL DATE INITIAL CHKD BY: MEW xxxx RVWD BY: MT DWG XXX OlHER APPROVAL CITY APPROVAL EL CAMINO REAL ROADWAY IMPROVEMENT PLANS - 50% PS&E SUBMITTAL (05/06/2021)811Exhibit 2STRIPING AND PAVEMENT MARKING LEGEND: @ Wl-lllE DASHED LANE LINE, CA MUTCD, FIGURE 3A-102 DETAIL 12 @ BIKE LANE LINE, CA MUTCD, FIGURE 3A-112 DETAIL 39 @ BIKE LANE INlERSECTION LINE, CA MUTCD, FIGURE 3A-112 DETAIL 39A 'si) 'BIKE LANE' PAVEMENT MARKING WORD AND BIKE LANE ARROW ~ PAVEMENT MARKING, CTSP A24D AND CTSP A24A 0 4" Wl-lllE PAVEMENT MARKING, 25' C-C @ 12" WHllE CONTINENTAL CROSSWALK, DETAIL THIS SHEET @ CHANNELIZING LINE, CA MUTCD, FIGURE 3A-112 DETAIL 38 0 T'l'PE IV (L) ARROW, CTSP A24A @ 'SIGNAL AHEAD' PAVEMENT MARKING WORD, CTSP A24D @ 12" WHllE LIMIT LINE 0 GREEN PAINT BIKE LANE CONFLICT, DETAIL THIS SHEET :::c ~ ------<C I ~ I I I I ® BIKE LANE ' R4-7 N-1 R7-9a W3-3 SIGNING LEGEND: IRLI RELOCAlE ROADSIDE SIGN IPPI PROlECT EXISTING ROADSIDE SIGN IN PLACE ~ REMOVE ROADSIDE SIGN @J INSTALL ROADSIDE SIGN APN 212-101-67-00 SIGNING A ND STRIPING PLAN: SCALE: 1''=40' Girl EL MIN 12"----a~ ..,i ~'<'c-·• .. , ..... SINGLE RAMP CORNER RAMP TYP FLARE TYP _J I:!;' <( I"= c_ 0 z 0 F f:;:l "" 0 5' CROSSWALK MARKING 7 12" WHITE CONTINENTAL CROSSWALK I I APN 212-130-44-00 I I I I I \ '► \ \ CAMINO REAL \ I I NOT TO SCALE \ I I --------;,t---' -----:::.---W4-2 BUS STOP SIGN DICA RT ~Of ESS /~l ~~~~~~~ qi,"' ~ ~ ,!fl • " ~ § MARY E. WESTRUM ~ • "' "' No. C75418 -~ Exp, 12/31 /21 * 145D FRAZEE Ro.AD "'<'<re CIVIL J SUITI> 100 SAN DIEGO, CA 92108 (858) 514-83?7 DATE INITIAL CALL 2 FULL WORKING DAYS REVISION DESCRIPTION OF c~\. ,~ BEFORE YOU DIG ENGINEER OF WORK ----, 4• n 4• 1 .. 5• .. 1 .. LENGTH PER PLAN .. 1 Var GUTTER LIP GREEN PAINT (TYP) GREEN PAINT BIKE LANE CONFLICT NOT TO SCALE -------o· 20· 40' 80' '--------=,· SCALE· 1 "=40' HAS BUIL TH P.E. EXP. DATE REVIEl.'ED BY• INSPECTOR DATE ~ CITY OF CARLSBAD ~ 2 ENGINEERING DEPARTMENT 2 SIGNING AND STRIPING PLANS FOR: EL CAMINO REAL ROADWAY IMPROVEMENTS FROM SUNNY CREEK Rd TO JACKSPAR Dr APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXPIRES 6 /20 /22 DATE DWN BY: SI I I DRAWING NO. PROJECT NO. DATE INITIAL DATE INITIAL CHKD BY: MEW xxxx RVWD BY: MT DWG XXX OlHER APPROVAL CITY APPROVAL