HomeMy WebLinkAbout2414 MAJANO PL; 2; CBR2020-1377; PermitBuilding Permit Finaled
Residential Permit
Print Date: 08/02/2021
Job Address: 2414 MAJANO PL, # 2, CARLSBAD, CA 92009-9137
(City of
Carlsbad
Permit No: CBR2020-1377
Status: Closed -Finaled
Permit Type: BLDG-Residential Work Class: Second Dwelling Unit
Parcel#: 2550810800 Track #:
Valuation: $122,480.64 Lot#:
Occupancy Group:
#of Dwelling Units: 1
Project#:
Plan#:
Bedrooms: Construction Type:
Bathrooms: Orig. Plan Check#:
Occupant Load: Plan Check#:
Code Edition:
Sprinkled:
Project Title:
Applied:
Issued:
Fina led Close Out:
Inspector:
Final Inspection:
06/25/2020
12/18/2020
PDrei
08/02/2021
Description: GARDINIER: 864 SF DETATCHED ADU// 200A PANEL UPGRADE (EVSE READY REQUIRED)
Applicant:
JAMES CHINN
2120 JIMMY DURANTE BLVD, # 114
DEL MAR, CA 92014-2215
(858) 755-5863
FEE
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
Property Owner:
GARDINIER RONI
2414 MAJANO PL
CARLSBAD, CA 92009
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
SB1473 GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
SWPPP PLAN REVIEW FEE TIER 1-MEDIUM
Total Fees: $2,039.93 Total Payments To Date: $2,039.93
CoApplicant:
RIMMER CONSTRUCTION INC
2240 ENCINITAS BLVD, # D527
ENCINITAS, CA 92024-4345-SAN DIEGO
Balance Due:
AMOUNT
$707.65
$495.36
$66.00
$175.00
$92.00
$182.00
$5.00
$15.92
$246.00
$55.00
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
. {_ City of
Carlsbad
RESIDENTIAL
BUILDING PERMIT
APPLICATION
B-1
Plan Check (t;R_:;l0)..6 -}3=t-1
Est . Value 11 IJd4 ':136 .&t4
PC Deposit -------
Date ( a /iJ. j" /.2e,M
_____ ;...... _________ .SUite: ____ APN: 255-081-08-00
CT/Project t:MAP 8154, TCT NO. 73-18 UNIT N0 .2 lot ~ ..... 13_0 __
Fire Sprinklers: Q YES 0 NO Air Condidonina: 0 YES Q NO Electrical Panel Upgrade: 0 YES 0 NO
BRIEF Of.SCRIPTION OF WORK: 864 S.F. DETACHED ACCESSORY DWELLING UNIT
0_ Addition/New: 864 Living SF, ___ Deck SF, ___ Pat io Sf, ___ Garage SF
Is thiS to create an A«.essory Dwelling Unit? 0 Y O N New fireplace? 0 Y ® N, if yes how many? _
□Remodel: ____ Sf of affected area ls the area a conversion or change of use ? 0 Y ON
0 Pool/Spa: SF Addttfonal Gas or Electrical Features? _________ _
O Sotar. ___ KW, _. __ Modules, Mounted:Q Roof QGround , Tilt:O vO W, RMA: 0 YON,
Battery;OY QN, Panel UpiJ"lfde: Ov ON
D Reroof: __________________________ _
□Phm1binllt/Merct.licaU'Sec1trkalOnly: _______________ _
□Other: __________________________ _
APPUCANT (PRIMARY CONTACT)
Name: JAMES CHINN, ARCHITECT
Address: 2120 JIM.MY DURANTE BLVD. #114
ctty: DEL MAR State:CA Zip: 92014
Phone:858-755-6863
Email: ~.com
DESIGN PROFESSJONAL
Name: JAMES CHINN.. AROHfTECT
Address: 2120 JIMMY DURANTE BLVD. #114
City:: DEL MAR State:~: 92014
Phc,ne:858-75&-6863
Email: jameschinn4000gmail.com
PROPERTY OWNER
Name: RONI GARDINIER
Addtes$: 2008 CAMBRIDGE AVE.
ctty: CARDIFF State:~Zlp: _92_009 __ _
Phone: 760-533-5746
£mall: ronigardinier@gmail.com
Architec.tStete Ucense:.;;;C-...;1...;;.573_;...7 ______ _
('Sec. 7031.S 9us1Mss am PlofeWonf Q)de: An¥ City« c.ounty..eikh requires a permit to c:onstl\la, titer, lmprawe. demolish orreptlr flff'f structurt, poor to Its
~ _, r«qu1re I.hi .,iant farmch permit to flllf a,._~ that he/stta ls lanHd punulllt to lhl pn,vlstons of the Olntr9dar's Ucllns4 L1w
{Chllptw 9, Qllllll'lel-1111111 Secdoll 1000 ol DMlkwl 3 of die 8iainlsJ and ProflSS!onS Code) or that .hvshe Is ext/1\pt thett!ftorn. and the basis for the allrepd
~ AnvWJlltloft of s.dion 7CaU by any appllcant for• permit .Nbttcts !Mappilc:ant tl>I cMI penalty of not ITIOf'II than liw hundnld dollan ($500}).
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-:-8558 Email: Building@lcarlsbadca.gov
Page 1 of2 Rev. 06/18
(~PTION A): WORKERS'COMPENSATION DECLARATION:
I hearby affirm under penalty of perjury one of the following dee/orations: 01 hive aod will nulnt.in a certificate of consent to selt-insu~ for worker( aimpensatlon provided by Sertion 3700 at the labor Code, for the performaoce of the this permlt is is.sued.
nd wlU malntal/1 wortel"s compensation, as required t,y Section 3700 of !he l.ibor COde, for the perfo~!te lch this penntt Is Issued.
. com•: ~UJ,il~ :::i: and po/Icy number are: lnsunince Co pa y N.ame:,__ ___ ".::;>=.T.:.=..;(7,w...---.:_;_;.:...;:;.l.,_ _______ _
Polky No. __ ._...,.J:JJe.......,'---.:S"----'-/'\S;;.;•~=.__ __ Explratlon Date: / .;lO~
0 Certificate of EXA!lnptlon: I certify that lo the periorma1101.' of the.won: for which this permit • ed, 1 sllall not employ ~ny person In any manner so aJ U> be come
subject to the workm Cl:Jfflpe!Uatlon Laws of Cllifomlll. WARHING: Failure to seaini c:ompenutlon-race Is un~ul, and SNJI subje<t an employer to
almlnal penalties and civil fines up .to $100,000.00, In n t~ to the CO$t of co nsatlon, damaaes as p,ovlded tot In s.ctlon 3706 of tN Labor Code,
lntl!rut and attorney's fees. :------/
CONTRACTOR SIGNATURE: _'"'",.__t-_:::::::""7'-________ □AGENT DATE: 11 /'> /to
( OPTION 8 ): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Low for the following reason:
01, u owner of the property or my employees with wages <1$ their sole compensation, will do the work and the structure is oot intended or offored lot sale (Sec.
7044. Business and Professions Codt: The Contractor's Ucvise Law does not apply to an owner of property who builds or improves thereon, and who doe$ suc:h work
himself or through his own eml)lovees. provided that such lmpr0Vffl1ents are not fntended or offerf!d far sale. If, however, the building or improvement ts sold within
one ye;ir of compleUon, the owner-builder will have the burden of provilli th.it. he did not build or improve for the purpose of sale).
0 I, as owner of the proptrty, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's Uunse law does not apply to an owner of property who builds or Improves thereon, and contracts for suth projects with contraetor(s) licen.sed
pumiant to the Contractor's Ucense Law).
0 I am exempt under Sedioo ______ Business and Profeuions Code for this reason:
1. I personally plan to prO\llde the major l.ibor and materials for construction of the proposed preperty improvement. QvES Q NO
2. I (have/ ha~ not) signed an application for a building permit for the proposed work.
3. I hove contract.ed with the followlns person (firm I to provide the proposed COl\$!ructlon (indude name address/ phone/ contractors' license number):
4. I plan to provide portloos of the work, but I have hired the following person to coordinate, svpe,we and provide the ma;or work (include name/ address/ phone /
contractors' lic.ense number):
5. I wlU provide $01!\e of the WO<k, but I have contracted (hfred) the following persons to provide the work lndlcat.ed (indude name/ address/ phone/ type of wori<):
OWNER SIGNATURE: _________________ □ AGENT DATE: _____ _
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there Is a coostruction lending agency for the performance of the work this permit ls Issued (Sec. 3097 (I) OVil Code).
Lender's Name: __________________ lendel'sAcldress: _________________ _
ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
ts the applicant or future buJldlnc ocaipant required to submit a business plan, acutely haurdous materials registration form or risk management and prevention
program under Sections 25505, 25513 or 25534 of the Presley-Tanner Hazardous Substance Account Act? I Yes/ No
ts the applicant or future bl/riding occupant required to obtain a permit from the air pollution control district or air quality management di$trict7 Yes / No
ts the facility to be constructed withln 1.000 feet of the outer boundary of a sdlool site? Yes I No
IF ANY OF THE' ANSWERS AR£ YES, A FINAL CERTIFICATE OF OCOJPANCY MAY NOT BE issum UNLESS THE APPUCANT HAS MET OR ts MEETING THE
REQUIREMENTS OF THE OfflCE OF EMERGENCY SERVJaS AND THE AIR POUUTION c.oNTROL DISTRICT.
APPLICANT CERTIFiCATION:
I certify that 1 113~ read the application and state that the above Information Is correct and that the Information on the plans Is accurate. I agree to comply with all
City ordinance.s and State laws relating to building constructJon.
I hereby authoril.e representative of the Oty of calitbad to enter upon 1he above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AHO mP
HARMl£SSTHEO'IYOfCAALS8ADAGAINSTAI.LIJA811JTIES,JUDGMENTS,COSTSANOEXPENSESWHICHMAYINNrtWAYAOOIUEAGAINSTSAIOOlYINCOHSEQUENCEOF
THE GRANl1NG OFTitlS PERMIT.OSHA: fAll OSHA pemit is r@qUited foreiavatlonsowr S'(I deep and clemo6tioll or a>ns1rUCtion of structures CMr 3 mies In heisht.
EXPIRATION: Every perr,wtlswed bo/the 8uildq Official I.rider the pn:MSlons ofthls Code ei,pire by llmltalion and become null and'l'Old If the buildq orwo,k autheJ,tzeel
by such pennlt Is not COITlffll!IICl!d wltNn 180 the date of such penn1tpM1· ;IJll;Oll!lqorw011t authorized by such permit Is~ or abandoned at ;,tr, time after
the WOfk ts commenced ror a period of 180 10.S..S.
1635 Faraday Ave carlsbad,
B-1
Ph: 760-602-2719 Fax: 760-602-8558
Page 2 of2
Email: Building@carlsbadca.gov
Rev. 06/18
Permit Type: BLDG-Residential Application Date: 06/25/2020 Owner: TRUST GARDINIER RONI
Work Class: Second Dwelling Unit Issue Date: 12/18/2020 Subdivision: CARLSBAD TCT#73-18 UNIT#02
Status: Closed -Finaled Expiration Date: 11/10/2021 Address: 2414 MAJANO PL, # 2
IVR Number: 27068 CARLSBAD, CA 92009-9137
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-18 Exterior 157383-2021 Passed Tim Kersch Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06/09/2021 06/09/2021 BLDG-Electric Meter 159326-2021 Cancelled Chris Renfro Reinspection Incomplete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
06/10/2021 06/10/2021 BLOG.Electric Meter 159348-2021 Passed Chris Renfro Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/30/2021 07/30/2021 BLDG•Flnal Inspection 163225-2021 Failed Peter Dreibelbis Reinspectlon Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final No
BLOG-Electrical Final No
08/02/2021 08102/2021 BLDG-Final Inspection 163306-2021 Passed Peter Dreibelbis Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final No
BLDG-Electrical Final No
Monday, August 2, 2021 Page 3 of 3
Application Date: 0612512020 Owner: TRUST GARDINIER RONI Permit Type: BLDG-Residential
Work Class: Second Dwelling Unit Issue Date: 1211812020 Subdivision: CARLSBAD TCT#73-18 UNIT#02
Status:
Scheduled
Date
03/26/2021
03/29/2021
04127/2021
05107/2021
0511412021
Closed -Finaled Expiration Date: 11/10/2021
IVR Number: 27068
Address: 2414 MAJANO PL, # 2
CARLSBAD, CA 92009-9137
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
Checklist Item
BLDG-Building Deficiency
COMMENTS
March 15, 2021:
No building deficiencies.
1. No building water heater repair
deficiencies.
2. New 4" inch plumbing sewer lateral line,
under 10'foot high, water head pressure
leak pipe test, from point of correction at
front of dwelling/sidewalk Location, with
(3) sewer clean-outs, to point of
connection at new ADU building location.
-approved.
03/25/2021 BLDG-23 153521-2021 Passed Tony Alvarado
Gas/Test/Repairs
Checklist Item
BLDG-Building Deficiency
COMMENTS
March 25, 2021:
No Gas Pipe Repair Deficiencies.
1. 1" diameter new poly propylene
plumbing gas line with tracer wire, under
air pressure gas leak test with gauge
holding air-pressure, gas repair 1eak work
to new plumbing gas line-for new
detached ADU Building-approved.
03/29/2021 BLDG-15 Roof/ReRoof
(Patio)
153712-2021 Passed Chris Renfro
Checklist Item COMMENTS
BLDG-Building Deficiency
04/27/2021 BLDG-13 Shear
Panels/HD (ok to wrap)
Checklist Item
156033-2021
COMMENTS
Passed Tim Kersch
BLDG-Building Deficiency Photos taken and sent to planning. Ok to
wrap
05107/2021 BLDG-84 Rough
Combo(14,24,34,44)
Checklist Item
156773-2021 Passed
COMMENTS
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
Waived insulation inspection
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
0511412021 BLDG-17 Interior
Lath/Drywall
157384-2021 Passed
Peter Dreibelbis
Tim Kersch
Passed
Yes
Complete
Passed
Yes
Complete
Passed
Yes
Complete
Passed
Yes
Complete
Passed
No
No
No
No
No
Complete
Monday, August 2, 2021 Page 2 of 3
Building Permit Inspection History Finaled
(city of
Carlsbad
Permit Type:
Work Class:
Status:
Scheduled
Date
01/14/2021
02/05/2021
02/12/2021
02/17/2021
03/23/2021
BLDG-Residential Application Date: 06/25/2020 Owner: TRUST GARDINIER RONI
Second Dwelling Unit Issue Date: 12/18/2020 Subdivision: CARLSBAD TCT#73-18 UNIT#02
Closed -Finaled Expiration Date: 11/10/2021 Address: 2414 MAJANO PL, # 2
IVR Number: 27068 CARLSBAD, CA 92009-9137
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
01/1412021 BLDG-SW-Pre-Con
Checklist Item
148253-2021
COMMENTS
Passed Peter Dreibelbis
BLDG-Building Deficiency
02/05/2021 BLDG-21 149905-2021 Passed Peter Dreibelbis
Underground/Underflo
or Plumbing
Checklist Item
BLDG-Building Deficiency
COMMENTS
02/12/2021 BLDG-84 Rough
Combo(14,24,34,44)
150451-2021 Failed Paul Burnette
Checklist !tern
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
02/17/2021 BLDG-84 Rough
Combo(14,24,34,44)
150671-2021 Passed Tony Alvarado
Checklist Item
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
COMMENTS
February 17, 2021: (foundation/footings
stab reinforcement steel inspection).
No building deficiencies.
1. Received footing setbacks form
certification from surveyor.
2. Received pad certification form from
geotechnical/civil engineer.
3. Required height certification form
(pending).
4. Slab reinforcement steel rebar verified,
wrapped underground plumbing pipes
through concrete approved, Footings top
and bottom rebar reinforcement steel
verified, steel rebar Uber-ground exposed
and verified, scope of foundation/slab steel
reinforcement rebar per structural engineer
plans and detail specifications-approved.
03/2312021 BLDG-22 Sewer/Water
Service
153391-2021 Passed Tony Alvarado
Complete
Passed
Yes
Complete
Passed
Yes
Reinspection Incomplete
Passed
No
No
No
No
No
Complete
Passed
Yes
Complete
Monday, August 2, 2021 Page 1 of 3
DATE: 9/08/2020
JURISDICTION: CARLSBAD
PLAN CHECK#.: CBR2020-1377
✓• EsG1I
A SAFf:bu1lt Company
SET: II
PROJECT ADDRESS: 2414 MAJANO PLACE
PROJECT NAME: NEW SFD ADU FOR GARDINIER
□tPLICANT
'JURIS.
l:8J The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
0 The check list transmitted herewith is for your information. The plans are being held at EsGil until
corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
0 The applicant's copy of the check list has been sent to:
JAMES CHIN
l:8J EsGil staff did not advise the applicant that the plan check has been completed.
0 EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: J_tMES Telephone#: 858 755 5863
Date contacted:qfif~ (~ ) Email: JAMESCHINN400@GMAIL.COM
Mail Telephone
0 REMARKS:
By: Bert Domingo
EsGil
Fax In Person
Enclosures:
8/28/2020
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
•
DATE: 7/08/2020
JURISDICTION: CARLSBAD
PLAN CHECK#.: CBR2020-1377
✓• EsG1I
A SAFtbuilt Cornpa1~y
SETI
PROJECT ADDRESS: 2414 MAJANO PLACE
PROJECT NAME: NEW SFD ADU FOR GARDINIER
□ APPLICANT
□ JURIS.
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
1:8'.1 The check list transmitted herewith is for your information. The plans are being held at EsGil until
corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant ; contact person.
1:8'.1 The applicant's copy of the check list has been sent to:
JAMES CHIN
D EsGil staff did not advise the applicant that the plan check has been completed.
1:8'.1 EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: JAMES Telephone#: 858 755 5863
Date contacted: (by: ) Email: JAMESCHINN400@GMAIL.COM
Mail Telephone
0 REMARKS:
By: Bert Domingo
EsGil
Fax In Person
Enclosures:
6/29/2020
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
PLAN REVIEW CORRECTION LIST
SINGLE FAMILY DWELLINGS AND DUPLEXES
PLAN CHECK#.: CBR2020-1377 JURISDICTION: CARLSBAD
PROJECT ADDRESS: 2414 MAJANO PLACE
FLOOR AREA:
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE INITIAL PLAN REVIEW
COMPLETED: 7/08/2020
FOREWORD (PLEASE READ):
STORIES:
HEIGHT:
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 6/29/2020
PLAN REVIEWER: Bert Domingo
This plan review is limited to the technical requirements contained in the California version of
the International Residential Code, International Building Code, Uniform Plumbing Code,
Uniform Mechanical Code, National Electrical Code and state laws regulating energy
conservation, noise attenuation and access for the disabled. This plan review is based on
regulations enforced by the Building Department. You may have other corrections based on
laws and ordinance by the Planning Department, Engineering Department, Fire Department or
other departments. Clearance from those departments may be required prior to the issuance of
a building permit.
Present California law mandates that construction comply with the 2019 edition of the California
Code of Regulations (Title 24), which adopts the following model codes: 2018 IRC, 2018 IBC,
2018 UPC, 2018 UMC and 2017 NEC.
The above regulations apply, regardless of the code editions adopted by ordinance.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2018 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: CARLSBAD
PREPARED BY: Bert Domingo
PLAN CHECK#.: CBR2020-1377
DATE: 7/08/2020
BUILDING ADDRESS: 2414 MAJANO PLACE
BUILDING OCCUPANCY: R 3
BUILDING AREA Valuation
PORTION ( Sq. Ft.) Multiplier
ADU
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code CB By Ordinance
------
1997 UBC Buildin Permit Fee g ...
1997 UBC Plan Check Fee -~
Type of Review: 0 Complete Review
D Repetitive Fee
Reg. VALUE ($)
Mod.
122,481
122,481
D Structural Only
-_ -~ Repeats
D Other
D Hourly
EsGil Fee
1--------11 Hr. @ * ~ -----c1 $460.011 ---=::::,
Comments: In addition to the above fee, an additional fee of$ is due ( hour@
$ /hr.) for the CalGreen review.
Sheet 1 of 1
PLANS
1. Please make all corrections, as requested in the correction list. Submit FOUR new
complete sets of plans for commercial/industrial projects (THREE sets of plans for
residential projects). For expeditious processing, corrected sets can be submjtted
in one of two ways: ·
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil and the Carlsbad Planning,
Engineering and Fire Departments.
2. Bring TWO corrected set of plans and calculations/reports to EsGil, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all
remaining sets of plans and calculations/reports directly to the City of Carlsbad
Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the
City Planning, Engineering and Fire Departments until review by EsGil is complete.
2. All sheets of plans must be signed by the person responsible for their
preparation. (California Business and Professions Code).
3. Plans deviating from conventional wood frame construction shall have the
structural portions signed and sealed by the California state licensed engineer or
architect responsible for their preparation, along with structural calculations.
(California Business and Professions Code).
FIRE PROTECTION
4. Please indicate on the plans whether the existing residence has a fire sprinkler
system installed. If so, then provide a note stating that any additions/alterations
will be provided with an automatic residential fire sprinkler system. Section
R313.2.
5. Exterior walls and projections shall comply with one of the following tables.
Section R302.1. Please review and address the following specific concerns:
a)
Use this table if the building DOES NOT have an automatic fire sprinkler system.
Exterior Wall Element Min. Fire Rating Min. Fire Separation
Distance
(Fire-Resistance Rating) 1-hour, with exposure < 5 feet
Walls from both sides
(Not Fire Rated) O hours ~ 5 feet
Not Allowed N/A <2 feet
Projections (Fire-Resistance Rating) 1-hour on the ~ 2 feet to 5 feet underside a.b.c
(Not Fire Rated) O hours > 5 feet
Not Allowed N/A < 3 feet
Wall Openings 25% maximum of wall O hours 3 feet area
Unlimited 0 hours 5 feet
Penetrations All See Sec. R302.4 < 5 feet
None reauired 5 feet
• May be reduced to O hours on the underside of the projection if fireblocking is
provided from the wall's top plate to the underside of the roof sheathing.
b May be reduced to O hours at rake overhangs where gable vent openings are
not installed.
c Heavy timber or fire-retardant treated wood may be substituted for the 1-hour
on the underside.
FOUNDATION REQUIREMENTS
6. Provide a copy of the project soil report. The report shall include foundation
design recommendations based on the engineer's findings and shall comply with
Section R401.4.
7. The soils engineer recommended that he/she review the foundation excavations.
Note on the foundation plan that "Prior to the contractor requesting a Building
Department foundation inspection, the soils engineer shall advise the building
official in writing that:
a) The building pad was prepared in accordance with the soils report,
b) The utility trenches have been properly backfilled and compacted, and
c) The foundation excavations, the soils expansive characteristics and
bearing capacity conform to the soils report."
8. Provide a letter from the soils engineer confirming that the foundation plan,
grading plan and specifications have been reviewed and that it has been
determined that the recommendations in the soils report are properly
incorporated into the construction documents (when required by the soil report).
MECHANICAL
9. Show on the plans the location, type and size (Btu's) of all heating and cooling
appliances or systems.
10. Every dwelling unit shall be provided with heating facilities capable of maintaining
a room temperature of 68 degrees Fat a location 3 feet above the floor and 2
feet from exterior walls in all habitable rooms. Show basis for compliance. CRC
303.10.
·-----------' -
11. Detail the dryer exhaust duct design from the dryer to the exterior. The maximum
length is 14 feet with a maximum of two 90-degree elbows or provide the
manufacturer's duct length specification description on the plans: Include the
dryer specifications (manufacturer, model, and fuel type) as well as the duct
description (size and type). CMC Section 504.4.2.1.
12. Show how makeup air will be provided for the washer and dryer enclosure. The
code requires an opening with a minimum of 100 square inches of makeup air
(can be louvered door). CMC 504.4.1
MISCELLANEOUS
13. Please show the capacity of the drag truss on the plans.
14. Shower enclosures shall be tempered.
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
• Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes □ No □
The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive,
Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to
perform the plan review for your project. If you have any questions regarding
these plan review items, please contact Bert Domingo at EsGil. Thank you.
RAMONA LUMBER COMPANY INC.
PH: 760-789-1080
FAX: 760-789-4958
425 MAPLE STREET RAMONA CA 92065
LEONARD@RAMONALUMBER.COM; ED@RAMONALUMBER.COM ;
KATHY@RAMONALUMBER.COM
TRUSS ENGINEERING
JOB# 16830
NAME: RONI GARDINIER
COVER SHEET
-,~~~
. ,,.
I
/ ,--------,
I 7-11-00 l :,iJ J..:.'. i, IJ J'J .:.ii:!n
/.1!..'J P.!.".JUil f;!IJ.0:.i.='c; /cl/ --:::.:::;:.:_,
Plan provided ror truss placement
/ t:S // only. Refer to truss cale\Aation and
engineenng structural drawings for all
A3/
futher information. Building
designer/engineer of record are
responsible for all non truss to truss
connections. Building
m designer/engineer of record to review
and approve all designs prior to
construction.
Job#: 16830
Plan: 1
;;:,
4·12 <(
Civ1 4:12 Elev: A c.ivl -
Name: RONI
GARDINIER
/4i:·-o ~ . s,~r1t 4.!i t~·~~·-·' 2414 -~R'' · ,, ~ JANO PL.
A2 ~ ..J, ,}' '.z:c RLSBAD, CA
A1 -_, ~-·~· 7"
'-' ~ ~"t-Drawn By: 28-08-03 '-~CALI~ DANNA GRAHAM
ROOF TRUSS LAYOUT f-. f:W l f6v-...,V I Date: 6/5/2020
Scale: NTS f}fl(~_
• I,,__ I -~ ...
Job Truss Truss Type Qty Ply 16830
K7837842
1-A A Common 13 1 Job Referenc<> footionan
Ramona Lumber Co., Inc., Ramona, CA -92065, Run: 8.33 S May 6 2020 Print: 8.330 S May 6 2020 MITek Industries, Inc. Fri Jun 05 10:20:51
ID:y5cS8ZPAR?PRPK6_1hUu4zzAl4p-KalG8J4RIWDbhCil2w2DrgKpiWqWPL99D9?SV2z9Maj
Page: 1
-2-0-0 7-6-15 14-4-1 21-1-4
2-0-0 7-6-15 6-9-3 6-9-3
5x6=
4
9-10-0 18-10-3
9-10-0 9-0-4
Scale= 1 :57.3
Plate Offsets (X, Y): [9:0-4-0,0-3-4)
Loading (psf) Spacing 2-0-0 est DEFL lo
TCLL (roof) 20.0 Plate Grip DOL 1.25 TC 0.41 Vert(LL) -0.16
TCDL 17.0 lumber DOL 1.25 BC 0.64 Vert(CT) -0.70
BCLL 0.0* Rep Stress Iner YES WB 0.36 Horz(CT) 0.14
BCDL 10.0 Code IBC2018/TPl2014 Matrix-AS
LUMBER
TOP CHORD
BOT CHORD
WEBS
BRACING
TOP CHORD
BOT CHORD
REACTIONS
FORCES
TOP CHORD
BOT CHORD
WEBS
NOTES
2X4 DF No.1&Btr G
2X4 OF No.1&Btr G
2X4 OF Stud/Std G
Structural wood sheathing directly applied.
Rigid ceiling directly applied.
(size) 2=0-3-8, 6=0-3-8
Max Horiz 2=-62 (LC 10)
Max Uplift 2=-143 (LC 12), 6=-143 (LC 12)
Max Grav 2=1499 (LC 1), 6=1499 (LC 1)
(lb) -Maximum Compression/Maximum
Tension
1-2=0/48, 2-3=-3218/458, 3-16=-2827/387,
4-16=-2737/398, 4-17=-2737/398,
5-17=-2827/386, 5-6=-3218/458, 6-7=0/48
2-9=-339/3009, 8-9=-17512006,
6-8=-354/3009
4-8=-56/886, 5-8=-612/205, 4-9=-56/886,
3-9=-612/205
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vult=110mph (3-second gust)
Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft;
8=45ft; L=29ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterlor(2E) -2-0-9 to
0-9-12, Interior (1) 0-9-12 to 14-4-1, Exterior(2R) 14-4-1
to 17-4-1, Interior (1) 17-4-1 to 30-8-12 zone; cantilever
left and right exposed; end vertical left and right
exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
3) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
4) • This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
5) A plate rating reduction of 20% tias been applied for the
green lumber members.
6) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 143 lb uplift at
joint 2 and 143 lb uplift at Joint 6.
7) This truss is designed in accordance with the 2018
International Building Code section 2306.1 and
referenced standard ANSI/TPI 1.
8) This truss design requires that a minimum of 7/16•
structural wood stieathing be applied directly to the top
chord and 112~ gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
A_ WARNING -Vr,rify design par11melen; •nd READ NOTES ON THIS AND INCLUDED M/TEK REFERENCE PAGE Mll-7473 rev. 10!0312015 BEFORE USE.
Design valid for use only with MiTek® connec!Ol'S. Thls design is ba.sed only upon paramelers shown, and Is for an individual building component not
a truss system. Before use. the building designer must verify the applicability of design perameters and properly incorporate this design Into the overall
building design. Bracing Indicated Is to prewnt buckling of lndlvldual truss web and/or chord members only. Additional temporary and permanent bracing
is always required for stability and to prevent collapse with possible personal injury end property damage. For general guidance regarding the
(loc)
8-15
8-15
6
fabrication. storage, dalivary, erection and bracing of trusses and truss systems. sea ANSIITPl1 Qua/lty Crherla, DSB-89 •nd SCSI Bui/ding Componenl Safely Information avellable from Truss Plate Institute, 218 N. LH Street, Suite 312, Alex.andrle, VA 22314
1/defl
>999
>493
"''
28-8-3
7-6-15 130-8-3 I
2-0-0
28-8-3
9-10-0
Ud
240
180
"''
PLATES GRIP
MT20 220/195
Weight: 112 lb FT= 10%
June 5,2020
Nii'
Milek·
250 Klug Circle
Corona, CA 92880
Job Truss Truss Type Qty Ply 16830
K7837843
1-A A1 Common Supported Gable 1 1 Job Reference rontionall
Ramona Lumber Co., Inc .. Ramona, CA-92065, Rul'I: 8.33 S May 6 2020 Print: 8.330 S May 6 2020 MiTek Industries, Inc. Fri Jun 05 10:20:54
ID:rFZWUBc1MW42VevzH961cFzAHsL-9k6XPM8CLMzkP79vPB9d5xatVx0Yp7E1c5Sniiz9Mad
Page: 1
-2-0-0 14-4-1
2-0-0 14-4-1
2 "? ~ "I ,,
0 0
2928 27 26 25 24 23 22
4x8 ,.. 3x5•
3x5 ,.
20-1-0
Scale " 1 :44.4
Plate Offsets (X, Y): [2:0-1-8,0-2-0], [2:0-4-0,Edge), [11 :0-1-0,0-1-8]
Loading (psf) Spacing 2-0-0 CSI DEFL io
TCLL (roof) 20.0 Plate Grip DOL 1.25 TC 0.20 Vert(LL) -0.01
TCDL 17.0 Lumber DOL 1.25 BC 0.09 Vert(CT) -0.02
BCLL o.o· Rep Stress Iner YES WB O.Q7 Horz(CT) 0.00
BCDL 10.0 Code IBC2018/TPl2014 Matrix-AS
LUMBER
TOP CHORD
BOT CHORD
WEBS
OTHERS
BRACING
TOP CHORD
BOT CHORD
2X4 DF No.1&BtrG
2X4 DF No.1&Btr G
2X4 OF Stud/Std G
2X4 DF Stud/Std G
Structural wood sheathing directly applied,
except end verticals.
Rigid ceiling directly applied.
REACTIONS (size) 2=15-11-8, 16.:0-2-7, 19=15-11-8,
W=15-11-8, 21.:15-11-8,
22=15-11-8, 23=15-11-8,
24=15-11-8, 25=15-11-8,
26=15-11-8, 27=15-11-8,
29=15-11-8, 30=15-11-8
MaxHoriz 2=134(LC11),30=134(LC11)
Max Uplift 2=-114 (LC 12), 16=-27 (LC 12),
19=-32 (LC 12), 20=-44 (LC 24),
21=-10 (LC 12), 22=-13 (LC 12),
23=-11 (LC 12), 24=-11 (LC 12),
25=-12 (LC 12), 26=-8 (LC 12),
27=-23 (LC 12), 29=-6 (LC 9),
30=-114(LC 12)
Max Grav 2=450 (LC 1 ), 16=196 (LC 24),
19=385 (LC 24), 20=51 (LC 12),
21=153 (LC 1), 22=122 (LC 23),
23=126 {LC 1), 24=126 (LC 23),
25=120 (LC 1 ), 26=145 {LC 23),
27=34 (LC 1 ), 29=321 {LC 1 ),
30=450 (LC 1)
FORCES (lb) -Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/48, 2-3=-129/43, 3-4=-112124,
4-5=-91/31, 5-6=-91/45, 6-7=-86/66,
7-8=-81/87, 8-9=-81/108, 9-10=-87/130,
10-11=-93/149, 11-12=-102/151,
12-13=-73/114, 13-14=-76194, 14-15=-91/81,
15-16=-121/74
BOT CHORD 2-29=-43/67, 28-29=-38/60, 27-28=-38160,
26-27=-37159, 25-26=-36/57, 24-25=-35/56,
23-24=-34/55, 22-23=-33154, 21-22=-32/53,
20-21 =-31/52, 19-20=-31/52, 18-19=-32154,
17-18=-33/54, 16-17=-33/55
WEBS 11-20=-43/17, 10-21=-105/72, 9-22=-99164,
8-23=-98/53, 7-24=-98/53, 6-25=-96/52,
5-26=-109/58, 4-27=-44/34, 3-29=-222/101,
12-19=-208/103, 13-18"'-48/47, 14-ff=-40/47
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16: Vult:::110mph (3-second gust)
Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft;
B=45fl; L=24ft; eave=2ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Comer(3E) -2-0-9 to
0-11-7, Exterior(2N) 0-11-7 to 14-4-0, Corner(3R) 14-4-0
to 17-0-10, Exterior(2N) 17-0-10 to 19-11-7 zone;
cantilever left and right exposed ; end vertical left and
right exposed:C-C for members and forces & MWFRS
for reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
3) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANSlfTPI 1.
4) AH plates are 1x4 MT20 unless otherwise indicated.
5) Gable studs spaced at 1-4-0 oc.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
7) • This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
8) A plate rating reduction of 20% has been applied for the
green lumber members.
9) Provide mechanical connection (by others) of truss to
bearing plate at joint(s) 16.
20-1 0
5-8-15
4x5'"
16
21 20 19 1.5x4 11
(lac) 1/defl Ud PLATES GRIP
17-18 >999 240 MT20 220/195
17-18 >999 180
16 ola ola
Weight 134 lb FT -10%
10) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 114 lb uplift at joint
2, 27 lb uplift at joint 16, 44 lb uplift at joint 20, 10 lb
uplift at joint 21, 13 lb uplift at joint 22, 11 lb uplift at joint
23, 11 lb uplift at joint 24, 12 lb uplift at joint 25, 8 lb uplift
at joint 26, 231b uplift at joint 27, 61b uplift at joint 29, 32
lb uplift at joint 19 and 114 lb uplift at joint 2.
11) This truss is designed in accordance with the 2018
International Building Code section 2306.1 and
referenced standard ANSlfTPI 1.
12) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
13) No notches allowed in ovemang and 20000 from left
end and O from right end or 12" along rake from scarf,
whichever is larger. Minimum 1.5x4 tie plates required
at 2-0-0 o.c. maximum between the stacking chords.
For edge-wise notching, provide at least one tie plate
between each notch.
LOAD CASE(S) Standard
June 5,2020
£. wARN/NG. Verify design paramelani and READ NOTES ON THIS AND INCLUOEO MITEK REFERENCE PAGE M/1-7473 rev. 10/03/2015 BEFORE USE.
Design valid for use only with Milek® conne&tors. This design is based only upon parameters shown. and Is for en individual building component, not
a truss system. Before use, the building designer must v11rify the appHcability of design parameters and property incorporate \Ms design Into the overall
building design. Bracing indicated Is to prevent buckling of indivldual truss web and/or chord members only. Additional temporary and permanent bracing
Nii'
is always required for steb1\ity and to prevent collapse with possible personal Injury and property damage. For general guidance regarding tha
fabrication. storage, delivery. erection and bracing of trusses and truss systems, see ANSVTP/1 Quallty Cr/far/a, DSB-89 and SCSI Bui/ding Compor,ant
Sa,.ty Information available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314
MiTek·
250 Klug Circle
Corona. CA 92880
Job Truss Truss Type Qty Ply 16830
K7837844
1-A A2 Common 1 1 Job Reference 1octionall
Ramona Lumber Co., Inc., Ramona, CA -92065, Run: 8.33 S May 6 2020 Print: 8.330 S May 6 2020 MiTek Industries. Inc. Fri Jun 05 10:20:54
1D:w8uAZpHvMilDODpw6B9JQ2zAHwf-9k6XPMBCLMzkP79vPB9d5xaqRxxOpxe1c5Sniiz9Mad
Page: 1
-2-0-0 7-6-15 14-4-1 21-1-4
2-0-0 7-6-15 6-9-3 6-9-3
5x6=
4
41f 22
'\'
q, J,
~
~
~I 0 12 11 10
3x5= SxB• 3x5•
9-4-2 15-9-12 I 11-10-8 I 1•-11-4 I
9-4-2 6-5-10 2-0-12 2-0-12
Scale = 1 :57.3
Plate Offsets {X, Y): [2:0-0-2,Edge], [13:0-4-0,0-3-0]
Loading (psf) Spacing 2-0-0 est DEFL ia
TCLL (roof) 20.0 Plate Grip DOL 1.25 TC 0.40 Vert(LL) -0.12
TCDL 17.0 Lumber DOL 1.25 BC 0.44 Vert(CT) -0.47
BCLL o.o· Rep Stress Iner YES WB 0.87 Horz(CT) 0.02
BCDL 10.0 Code IBC2018/TPl2014 Matrix-AS
LUMBER
TOP CHORD
BOT CHORD
WEBS
BRACING
TOP CHORD
BOT CHORD
REACTIONS
FORCES
TOP CHORD
BOT CHORD
WEBS
NOTES
2X4 DF No.1 &Bir G
2X4 DF No.1&Btr G
2X4 DF Stud/Std G
Structural wood sheathing directly applied.
Rigid ceiling directly applied.
(size) 2=0-3-8, 6=1-7-6, 8=0-3-8,
10=0-3-8, 11=4-5-0, 12=0-3-8
Max Horiz 2=-62 (LC 10)
Max Uplift 2=-116 (LC 12), 6=-152 (LC 12),
11=-163(LC 12)
Max Grav 2=866 (LC 23), 6=484 {LC 24),
8=133 {LC 3), 10=114 (LC 3),
11=1487 (LC 1 ), 12=189 (LC 3)
(lb) -Maximum Compression/Maximum
Tension
1-2=0/48, 2-3=-1264/218, 3-22=-940/170,
4-22=-848/182, 4-23=-45/788, 5-23=-60/715,
5-6=-1301279, 6-7=0/48
2-13"'-111/1158, 12-13e:-4/127, 11-12e:-4/127,
10-11=-287/79, 9-10=-287/79, 8-9=-228/107,
6-8=-228/107
3-13=-5941200, 4-13=-93/954,
4-11 =-1332/245, 5-11 =-659/193, 5-9=0/170
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vult=110mph (3-second gust)
Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft;
B=45ft; L=29ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) -2-0-9 to
0-9-12, Interior (1) 0-9-12 to 14-4-1, Exterior(2R) 14-4-1
to 17-4-1, Interior (1) 17-4-1 to 30-8-12 zone; cantilever
left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
3) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
4) • This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
5) A plate rating reduction of 20% has been applied for the
green lumber members.
6) Provide mechanical connection {by others) of truss to
bearing plate capable of withstanding 116 lb uplift at joint
2, 163 lb uplift at joint 11 and 152 lb uplift al joint 6.
7) This truss is designed in accordance with the 2018
International Building Code section 2306.1 and
referenced standard ANSl/TPI 1.
8) This truss design requires that a minimum of 7/16-
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
(loc)
13-16
13-16
11
... WARNING· Verify de&i9t1 p•r•meren and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE M/1-7473 rev. 10/0312015 BEFORE USE.
Design valid !Of use only w~h Mffek® connectors. This design is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the buildlng designer must verify the applicability of design parameters and properly Incorporate this design into the overall build!ng design. Bracing indicated Is to prevent buckling of indivk:lual truss web and/or chord members only. Additional temporary and permanent bracing
22-10-7
2-11-3
1/defl
>999
>404
ala
is always required for stability and to prevent collapse with possib"3 personal Injury and property damage. For general guidance regarding the
fabrication, s!orage. delr,ery, erection and bracing oftrussea and truss systems, see ANSVTP/1 Qual/ly Criteria, DSB-89 and SCSI Sul/ding Compoit"11t
Safely /ttfonnatlon avallab"3 from Truss Plate Institute, 218 N. Lee Street. Suite 312, Ale~andria. VA 22314
1x4 *
Ud
240
180
ala
28-8-3 I 30-8-3
7-6-15 2-0-0
8
3x52
26-6-5 28-8-3 I 3-7-13 2-1-14
PLATES GRIP
MT20 220/195
Weight: 116 lb FT-10%
June 5,2020
Nii'
MiTek·
250 Klug Circle
Corona. CA 92880
I
,,
Job Truss
1-A A3
Ramona Lllmber Co., Inc., Ramona, CA-92065,
-2-9-15 1-0-61
2-9-15 1-0-6
'? 2 J,
0 M
~ qi qi
vM
M ~I '? ;:a;> roOO
•M MO 0' 0 0
3x5 11
0-1-6
0-0-6
Scale= 1:58.7
Truss Type Qty Ply 16830
Common Structural Gable 1 1 Job Reference 'o~tional\
4-11-12
3-11-6
6-9-14
6-9-8
Run: 8.33 S May 6 2020 Print: 8.330 S May 6 2020 MITek Industries, Inc. Fri Jun 05 10:20:55
ID:s_y4rtuqutGIY JMmET ap7IlAHx9-dwgvci9q6g5b1 Hk5zugse87zeLJfYPOBqlCKF8z9Mac
11-8-15 18-6-1 26-1-0
6-9-3 6-9-3 7-6-15
2.5x5 =
5X8 11
16 15 14 13 12 11 10 9
Sx8= 3x5= 3x5 ..
4x10=
16-3-0 26-1-0
9-5-2 9-10-0
K7837845
Page: 1
128-1-0
2-0-0 I
{2:0-3-0,0-2-0], [5:0-2-0,0-2-4], [5:0-2-8,0-0-2], [5:0-2-0,Edge], [5:0-1-0,0-1-B], [6:0-1-0,0-1-0], (7:0-1-12,0-2-0), (7:0-3-12,Edge], [17:0-2-4,0-3-0], [18:0-2-8,0-0-8],
Plate Offsets (X, Y): [29:0-2-0,0-0-4]
Loading (psf) Spacing 2-0-0 CSI DEFL '" (loc) 1/defl Ud PLATES GRIP
TCLL (roof) 20.0 Plate Grip DOL 1.25 TC 0.56 Vert(LL) -0.05 17-18 >999 240 MT20 220/195
TCDL 17.0 lumberDOL 1.25 BC 0.23 Vert(CT) -0.16 17-18 >849 180 M18SHS 220/195
BCLL o.o· Rep Stress Iner YES WB 0.78 Horz(CT) 0.01 44 o/a ala
BCDL 10.0 Code IBC2018/TPl2014 Matrix-AS Weight: 193 lb FT= 10%
~ :u 0
LUMBER
TOP CHORD
BOT CHORD
WEBS
OTHERS
BRACING
TOP CHORD
2X4 DF No.1&Btr G
2X4 DF No.1&Btr G
2X4 DF Stud/Std G
2X4 DF Stud/Std G
2) Wind: ASCE 7-16; Vult=110mph (3-second gust)
Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft;
8=45ft; L=26ft; eave:=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) -0-3-5 to
2-8-15, Interior (1) 2-8-15 to 14-4-1, Exterior(2R) 14-4-1
to 17-4-1, Interior (1) 17-4-1 to 30-8-12 zone; cantilever
left and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL:=1.60 plate grip
DOL"'1.60
13) No notches allowed in overhang and 20915 from left
end and 20000 from right end or 12~ along rake from
scarf, whichever is larger. Minimum 1.5x4 tie plates
required at 2-0·0 o.c. maximum between tt,e stacking
chords. For edge-wise notctiing, provide at least one tie
plate between each notch.
Structural wood sheathing directly applied,
except end verticals.
LOAD CASE(S) Standard
BOT CHORD
REACTIONS
FORCES
TOP CHORD
BOT CHORD
WEBS
NOTES
Rigid ceiling directly applied.
(size) 7=15-5-8, 9=15-5-8, 10=15-5-8,
11=15-5-8, 12=15-5-8, 13=15-5-8,
14=15-5-8, 15=15-5-8, 16=15-5-8,
18=0-4-3, 44=15-5-8
Max Horlz 18=-72 (LC 10)
Max Uplift 7=-119 (LC 12), 10=-48 (LC 1),
13=-171 (LC 12), 15=-41 (LC 1),
18=-151 (LC 12), 44=-119 (LC 12)
Max Grav 7=434 (LC 24), 9=189 (LC 3),
10=13 (LC 8), 11=64 (LC 3), 12=71
(LC 3), 13=1189 (LC 1), 14=75 (LC
3), 15=15 (LC 12), 16=149 (LC 3),
18=899 (LC 1 ), 44=434 (LC 24)
(lb) -Maximum Compression/Maximum
Tension
1-2=0/50, 2-3=-400/49, 3-4=-1087/226,
4-47:c-771/151, 5-47::-682/162,
5-48=-36/510, 6-48=-51/366, 6-49=-115/142,
7-49=-190/77, 7-8=0/48, 2-18=-818/304
17-18=0{289, 16-17=0/317, 15-16=0{317,
14-15=0{317, 13-14::0/317, 12-13=-101/110,
11-12=-101/110, 10-11=-101/110,
9-10=-101/110, 7-9=-101/110
5-13=-1034/224, 6-13=-618/227,
5-17=-32/490, 4-17=-521/195, 3-17=-290/809
1) Unbalanced roof live loads have been considered for
this design.
3) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANSlfTPI 1.
4) All plates are MT20 plates unless otherwise indicated.
5) All plates are 1x4 MT20 unless otherwise indicated.
6) Gable studs spaced at 1-4-0 oc.
7) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
8) • This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any ottier members.
9) A plate rating reduction of 20% has been applied for the
green lumber members.
10) Provide mectianical connection (by ottiers) of truss to
bearing plate capable of withstanding 151 lb uplift at
joint 18, 171 lb uplift at joint 13, 119 lb uplift at joint 7, 41
lb uplift at joint 15, 48 lb uplift al joint 10 and 119 lb uplift
at joint 7.
11) This truss is designed in accordance with the 2018
International Building Code section 2306.1 and
referenced standard ANSlfTPI 1.
12) Ttiis truss design requires tt,at a minimum of 7/16~
structural wood sheathing be applied directly to tt,e top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
A WARNING -Verify d<,5/gn par•maters •nd READ NOTES ON THIS AND INCLUDED M/TEK REFERENCE PAGE N/11-7473 n,v. fG/0312015 BEFORE USE.
Design valid for use only w~h MITek® connectors. This design Is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer musl verify the applicability of design parameters and properly Incorporate this design lnlo the overall
building design. Bracing Indicated is to prevent buckling_ of indlvidual truss web and/or chord members only. Additional le_mporary and permanent bracing
is always required for stability and to prevent collapse wilh possible personal injury and property damage. for general guidance regarding the
fabrication, storage. delivery, erection and bracing of trusses and truss systems. see ANSI/TP/1 Quality Crllarla, DSB-89 and SCSI Bui/ding Component
Safely /ntormaUon available Imm Truss Plate lnst~ute. 218 N. Lee Street. Suite 312, Alexandria, VA 22314
June 5,2020
Mii"
Milek·
250 Klug Circle
Corona, CA 92880
Job Truss Truss Type Qty Ply 16830
1 K7837846 1-A B Monopitch 1 Job Reference lootionall
Ramona Lumber Co., Inc., Ramona, CA. 92065, Run: 8.33 S May 6 2020 Print: 8.330 S May 6 2020 MiTek Industries, Inc. Fri Jun 05 10:20:56
ID:hSz3LINQ24xJTO4J5Qv6BlzAl2G-560Ip2AStzDSeRJHWcB5AMf4ElcWH_iK3Pxtnaz9Mab
Page: 1
-2-9-15
2-9-15
[
Scale = 1 :40.2
0-0-12
0-0-12
3-6-9
3-6-9
Plate Offsets (X, Y): [2:0-2-8,0-1-8], [3:0-2-0,0-1-8], [6:0-1-12,0-1-8], [7:0-1-12,0-2-8]
Loading (psf) Spacing 2-0-0 CSI
10-0-8
6-5-15
10-0-8
9-11-12
OEFL '" TCLL (roof) 20.0 Plate Grip DOL 1.25 TC 0.82 Vert(LL) -0.15
TCDL 17.0 Lumber DOL 1.25 BC 0.44 Vert(CT) -0.44
BCLL 0.0* Rep Stress Iner YES WB 0.26 Horz(cn 0.01
BCDL 10.0 Code IBC2018fTPl2014 Matrix-AS
LUMBER
TOP CHORD
BOT CHORD
WEBS
BRACING
TOP CHORD
BOT CHORD
REACTIONS
FORCES
TOP CHORD
BOT CHORD
WEBS
NOTES
2X4 OF No.1&BtrG
2X4 OF No.1 &Bir G
2X4 OF Stud/Std G "Except* 7-2:2X4 OF
No.1&Btr G
Structural wood sheathing directly applied,
except end verticals.
Rigid ceiling directly applied.
(size) 6=0-3-8, 7=0-4-15
Max Horiz 7=184 (LC 9)
Max Uplift 6=-55 (LC 12), 7=-126 (LC 12)
Max Grav 6=477(LC 1), 7=735{LC 1)
(lb) -Maximum Compression/Maximum
Tension
1-2=0177, 2-3=-206/113, 3-9=-171/41,
4-9=-113/75, 4-5=-22/0, 4-6=-290/193,
2-7=-315/191
7-8=0/0, 6-7=-314/394
3-6=-315/275. 3-7=-506/309
1) Wind: ASCE 7-16; Vult=110mph (3-second gust)
Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft
B=45fl; L=24fl; eave=4fl; Cat. II; Exp C; Enclosed;
MWFRS {directional) and C-C Exterior(2E) 0-7-3 lo
3-10-7, Interior (1) 3-10-7 to 14-3-9 zone; cantilever left
and right exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber OOL=1.60 plate grip
OOL=1.60
2) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
3) • This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
4) A plate rating reduction of 20% has been applied for the
green lumber members.
5) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 55 lb uplift at joint
6 and 126 lb uplift at joint 7.
6) This truss is designed in accordance with the 2018
International Building Code section 2306.1 and
referenced standard ANSI/TPI 1.
7) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly lo the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
A_ wARNING -Verily ,kaign par,malMS and RE.AD NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Nlll-7473 ff/V. 10rn3120U BEFORE USE.
Design valid for use only w~h MIT"ek® connectors. This design is based only upon parameters shown, and is for an Individual building component. not
a truss system. Before use, the building designer must verify the appllcablllty of design parameters and properly incorporate this design into the overall
build Ing design. Bracing indicated Is to prevent bucklilg of individual truss web and/or chord members only. Additional temporary and permanent bracing
is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the
(loc)
6-7
6-7
6
fabrication, storage. delivery. erection and bracing of trusses and truss systems, see ANSJ/J"Plf Quality Crllerla, DSB-89 and SCSI Building Componant Safety Informal/on available from Truss Plate Institute, 218 N. Lee Street. Suite 312. Alexandria, VA 22314
3x5 11
1/defl Ud
>775 240
>258 180
ofa ofa
PLATES GRIP
MT20 220/195
Weight: 54 lb FT= 10%
June 5,2020
Nii'
Milek·
250 Klug Circle
Corona, CA 92880
Job Truss Truss Type Qty Ply 16830
K7837847 1-A B1 Monopitch Supported Gable 1 1 Job Reference rontionall
Ramona Lumber Co., Inc., Ramona, CA-92065, Run: 8.33 S May 6 2020 Print: 8.330 S May 6 2020 MITek lndustn·es, Inc. Fri Jun 05 10:20:57
ID:wB0TEN U3wr412mG26paD2EzA127-ZJng1OB5eHLJGbuU4JiKjZCL09?W0T dTl3hRJ 1 z9Maa
Page: 1
8-0-8
2-9-15 8-0-8
M
9 ~
"! M
"1 "T ~ ~ N
9 ~ i 18
~ "1 9 N
107 15 14 13 12
M18SHS 3x14 11
8-0-8
Scale a: 1:38.1
Plate Offsets (X, Y): [2:0-3-4,0-1-12], [3:0-2-0,0-0-8], [7:0-5-1,0-0-12], (16:0-3-8,Edge]
Loading
TCLL (roof)
TCDL
BCLL
BCDL
LUMBER
TOP CHORD
BOT CHORD
WEBS
OTHERS
BRACING
TOP CHORD
BOT CHORD
REACTIONS
FORCES
TOP CHORD
BOT CHORD
WEBS
(psf) Spacing 2-0-0 CSI OEFL '" 20.0 Plate Grip DOL 1.25 TC 0.44 Vert(LL) ,1,
17.0 Lumber DOL 1.25 BC 0.20 Vert(CT) -0.67 a.a· Rep Stress Iner YES WB 0.15 Horz(CT) 0.00
10.0 Code 1BC2018fTPl2014 Matrix-AS
2X4 DF No.1&Blr G
2X4 DF No.1 &Bir G
2X4 OF Stud/Std G "Excepr 16-2:2X4 DF
No.1&Btr G
2X4 DF StudfStd G
Structural wood sheathing directly applied,
except end verticals.
Rigid ceiling directly applied.
(size) 10=8-0-8, 11=8-0-8, 12=8-0-8,
13=8-0-8, 14=8-0-8, 15=8-0-8,
16=8-0-8, 17=8-0-8
Max Horiz 17=182 (LC 9)
Max Uplift 1 O=-72 (LC 9), 11 :-8 (LC 8), 12=-6
{LC 12), 13=-16 (LC 12), 14=-9 {LC
12), 15=-378 (LC 1), 16:-298 (LC
12), 17=-24 (LC 10)
Max Grav 10=122 (LC 1), 11=140 (LC 1),
12=118 (LC 1), 13=125 (LC 1),
14=159 (LC 1), 15=108 (LC 8),
16=661 (LC 1 ), 17=193 (LC 9)
(lb) -Maximum CompressionfMaximum
Tension
1-18=0!0, 2-18=0/72, 2-3=-2811103,
3-4=-257/139, 4-5=-223/129, 5-6=-1881120,
6-7=-1471114, 7-8=-104191, 8-9=-22/0,
8-10=-122/171, 2-16=-7021640
16-17:-5021289, 15-16=-75/93,
14-15=-73186, 13-14:-74/88, 12-13=-76190,
11-12=-77/91, 10-11=-77191
3-15=-290/378, 4-14=-128/122,
5-13=-98/104, 6-12=-95/105, 7-11 =-98/90
NOTES
1) Wind: ASCE 7-16; Vult=110mph (3-second gust)
Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25fl;
8=45fl; L=24fl; eave=2fl; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Corner(3E) 2-7-3 to
5-10-7, Exterior(2N) 5-10-7 to 14-3-9 zone; cantilever
left and rig hi exposed ; end vertical left and right
exposed;C-C for members and forces & MWFRS for
reactions shown: Lumber DOL=1.60 plate grip
DOL=1.60
2) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANS1fTPI 1.
3) All plates are MT20 plates unless otherwise indicated.
4) All plates are 1x4 MT20 unless otherwise indicated.
5) Gable requires continuous bottom chord bearing.
6) Truss to be fully sheathed from one face or securely
braced against lateral movement (i.e. diagonal web).
7) Gable studs spaced at 1-4-0 oc.
8) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
9) • This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
10) A plate rating reduction of 20% has been applied for the
green lumber members.
11) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 72 lb uplift at joint
10, 24 lb uplift at joint 17, 298 lb uplift at joint 16, 378 lb
uplift at joint 15, 9 lb uplift at joint 14, 16 lb uplift at joint
13, 6 lb uplift at joint 12 and 8 lb uplift at joint 11.
3x5 ..
9
10
11 1.5x4 11
(loc) 1/defl Ud ,1, 999
1-2 >106 120
10 ,1, ,1,
9 0
:i
PLATES
MT20
M18SHS
Weight: 64 lb
GRIP
220/195
220/195
FT= 10%
12) This truss is designed in accordance with the 2018
International Building Code section 2306.1 and
referenced standard ANSI/TPI 1.
13) This truss design requires that a minimum of 7/16•
structural wood sheathing be applied directly to the top
chord and 112• gypsum sheetrock be applied directly to
the bottom chord.
14) No notches allowed in overhang and 20915 from left
end and 915 from right end or 12• along rake from scarf,
whichever is larger. Minimum 1.5x4 tie plates required
at 2-0-0 o.c. maximum between the stacking ctiords.
For edge-wise notctiing, provide at least one tie plate
between each notch.
LOAD CASE(S) Standard
• EXP. 9-30-2020 *
June 5,2020
A_ WARNING -Verify design parameten and READ NOTES ON THIS AND INCLUDED M/TEK REFERENCE PAGE NI//-T,j73 rev. 10/03/2015 BEFORE USE.
Dasign valld for use only w~h MiTok® connec!ors. This dllsign is basod only U?On paramelors shown, and is for an indivldual building component, not llii' a truss system. Before usu. !he building designer must verify the applicability of design parameters and property Incorporate this design Into the overall
bu;ldlng design. Bracing indicated is to prevent buckling of iodivldual truss web and/or chord members only. Additional temporary and permanent bracing
Is always required for stability sod to prevent collaps& with possible personal injury and property damage, for general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems. see ANSVTP/1 Qu•llly Cr/1,,I,, DSB-119 •nd SCSI Bulldlf1g Componenl
Safely /ntorm•tlon ava;lab\e from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.
-----------·----
Milek·
250 Klug Circle
Corona, CA 92880
SUPPORT OF B.C. OF STANDARD OPEN END
JACK. USING PRESSURE BLOCKS MIi/SAC-7
CAJ.l<P SUB GIRDER
I
i
·r"'
.-... ,__
b(
{.'..
/
/
/
/
Loading (PSF): -
BCDL 10.0 PSF MAX
/ ' / '\
./ "· ['\
-,-,~
I"-.
PARTIAL FRAMING PLAN OF
CALIFORNIA HIP SET WITH
SUB GIRDER
' I"-.
I"\
~
BC of carrier truss
2·(.131")(3,0" MIN) NAILS (typ)
I
3/30/2004 PAGE 1
MITok Industries, Inc.
W~tem OMslon
07/05/2018
'"'' ,,;-"'" M!i" Cllru,o; HelQl!ls,~ &561 iiii.i
MiTek•
JANUARY 6, 2017 Standard Gable End Detail MII-GE110-001
MiTek USA, Inc. Page 1 of 2
Typical _x4 l-Brace Nailed To [YJ□□® 2x_ Verticals W/10d Nails spaced 6" o.c. Vertical Stud == == woo ~~7ud (4) -16d Nails
Milek USA, Inc.
SECTION 8-B ~[ill
A Milek Atllllala r---
{2) -1 Od Nails into 2x6 2x6 Stud or
-,..__ 2x4 No.2 of better DIAGONAL BRACE
4'-0" O.C. MAX TRUSS GEOMETRY AND CONDITIONS
SHOWN ARE FOR ILLUSTRATION ONLY.
SECTION A-A ~ ---------Typical Horizontal Brace
Nailed To 2x Verticals
w/{4)-10d Nails
2 tud
A
*
A
Varies to Common Truss
**
SEE INDIVIDUAL MITEK ENGINEERING
DRAWINGS FOR DESIGN CRITERIA
PROVIDE 2x4 BLOCKING BETWEEN THE FIRST
TWO TRUSSES AS NOTED. TOENAIL BLOCKING
TO TRUSSES WITH (2) -10d NAILS AT EACH END.
ATTACH DIAGONAL BRACE TO BLOCKING WITH
(5) -10d NAILS.
B
(4) -8d (0.131" X 2.5") NAILS MINIMUM, PLYWOO
SHEATHING TO 2x4 STD OF/SPF BLOCK
* -Diagonal Bracing
Refer to Section A-A
* * -L-Bracing Refer
to Section 8-B I ~ ... __ J Roof Sheath in
r7 1'-3" NOTE: 1. MINIMUM GRADE OF #2 MATERIAL IN THE TOP AND BOTTOM CHORDS.
2. CONNECTION BETWEEN BOTTOM CHORD OF GABLE END TRUSS AND
WALL TO BE PROVIDED BY PROJECT ENGINEER OR ARCHITECT.
3. BRACING SHOWN IS FOR INDIVIDUAL TRUSS ONLY. CONSULT BLDG.
ARCHITECT OR ENGINEER FOR TEMPORARY AND PERMANENT
BRACING OF ROOF SYSTEM.
4. "L" BRACES SPECIFIED ARE TO BE FULL LENGTH. GRADES: 1x4 SRB
OR 2x4 STUD OR BETTER WITH ONE ROW OF 1 Od NAILS SPACED 6" O.C.
5. DIAGONAL BRACE TO BE APPROXIMATELY 45 DEGREES TO ROOF
DIAPHRAM AT 4'-0" O.C.
6. CONSTRUCT HORIZONTAL BRACE CONNECTING A 2x6 STUD AND A
2x4 STUD AS SHOWN WITH 16d NAILS SPACED 6" O.C. HORIZONTAL
BRACE TO BE LOCATED AT THE MIDSPAN OF THE LONGEST STUD.
ATTACH TO VERTICAL STUDS WITH (4) 10d NAILS THROUGH 2x4.
(REFER TO SECTION A-A)
7. GABLE STUD DEFLECTION MEETS OR EXCEEDS U240.
8. THIS DETAIL DOES NOT APPLY TO STRUCTURAL GABLES.
9. DO NOT USE FLAT BOTTOM CHORD GABLES NEXT TO SCISSOR
TYPE TRUSSES.
10. NAILS DESIGNATED 10d ARE (0.131" X 3") AND
NAILS DESIGNATED 16d ARE (0.131" X 3.5")
Minimum Stud Without 1x4
Stud Size Spacing Brace L-Brace
2x4 DIAGONAL
L-Brace BRACE
Species Maximum Stud Length and Grade
2x4 OF/SPF Std/Stud 12"0.C. 4-6-3 5-0-7 7-1-7 9-0-5
2x4 DF/SPF Std/Stud 16"0.C. 4-1-3 4-4-5 6-2-0 8-2-7
2x4 OF/SPF Std/Stud 24"0.C. 3-5-8 3-6-11 5-0-7 6-10-15
* Diagonal braces over 6'-3" require a 2x4 T-Brace attached to
one edge. Diagonal braces over 12'-6" require 2x4 I-braces
attached to both edges. Fasten T and I braces to narrow edge
of web with 1 Od nails 8" o.c., with 3" minimum
end distance. Brace must cover 90% of diagonal length.
MAX MEAN ROOF HEIGHT"' 30 FEET
CATEGORY II BUILDING
EXPOSURE B or C
Diag. Brace
at 1 /3 point
if needed
2 DIAGONAL
BRACES AT
113 POINTS
13-6-8
12-3-10
10-4-7
ASCE 7-98, ASCE 7-02, ASCE 7-05 110 MPH
ASCE 7-10 140 MPH STUD DESIGN IS BASED ON COMPONENTS AND CLADDING.
DURATION OF LOAD INCREASE: 1.60 CONNECTION OF BRACING IS BASED ON MWFRS.
Max.
:;frus s@ 24" o.c.
y
~ ~DIAGONAL BRACE SPACED 48" O.C.
/ ATTACHED TO VERTICAL WITH (4) -16d
NAILS AND ATTACHED
TO BLOCKING WITH (5) -1 Od NAILS.
L_ __ HORIZONTAL BRACE
ll,:,a---(SEE SECTION A-A)
07/05/2018
AUGUST 1, 2016
c::::Jc::::J ® DClfJ□ == == WUJ□
MiTek USA, Inc.
~~[ID
A MITek Affiliate
REPLACE A MISSING STUD ON A GABLE TRUSS
1. THIS IS A SPECIFIC REPAIR DETAIL TO BE USED ONLY FOR ITS ORIGINAL
INTENTION. THIS REPAIR DOES NOT IMPLY THAT THE REMAINING PORTION
MII-REP15
MiT ek USA, Inc.
OF THE TRUSS IS UNDAMAGED. THE ENTIRE TRUSS SHALL BE INSPECTED TO
VERIFY THAT NO FURTHER REPAIRS ARE REQUIRED. WHEN THE REQUIRED
REPAIRS ARE PROPERLY APPLIED, THE TRUSS WILL BE CAPABLE OF SUPPORTING
THE LOADS INDICATED.
2. ALL MEMBERS MUST BE RETURNED TO THEIR ORIGINAL POSITIONS BEFORE
APPLYING REPAIR AND HELD IN PLACE DURING APPLICATION OF REPAIR.
3. THE END DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE
SUCH AS TO AVOID SPLITTING OF THE WOOD.
4. WHEN NAILING SCABS OR GUSSETS, THE USE OF A BACKUP WEIGHT IS RECOMMENDED
TO AVOID LOOSENING OF THE CONNECTOR PLATES AT THE JOINTS OR SPLICES.
5. THIS REPAIR IS TO BE USED FOR SINGLE PLY TRUSSES IN THE 2X_ ORIENTATION ONLY.
REPLACE MISSING WEB WITH A NEW MEMBER OF THE SAME
SIZE, GRADE, AND SPECIES A THE ORIGINAL (CUT TO FIT TIGHT)
Page 1 of 1
24"
MAX
ATTACH 8" X 12" X 7/16" O.S.B. OR PLYWOOD (APA RATED SHEATHING 24/16 EXPOSURE 1) (MIN)
TO THE INSIDE FACE OF TRUSS WITH FIVE 6d (0.113" X 2") NAILS INTO EACH MEMBER
(TOTAL 10 NAILS PER GUSSET) COMMON
THE OUTSIDE FACE OF THE GABLE MUST BE SHEATHED WITH (MIN) 7/16" O.S.B OR PLYWOOD.
SEE MITEK STANDARD GABLE END DETAILS FOR WIND BRACING REQUIREMENTS.
TRUSS CRITERIA
LOADING: 40-10-0-10 (MAX)
LOAD DURATION FACTOR: 1.15
SPACING : 24" O.C. (MAX)
TOP CHORD : 2X 4 OR 2X 6 (NO 2 MIN)
PITCH: 3/12 -12/12
BEARING : CONTINUOUS
STUD SPACING :24" O.C. (MAX)
REFER TO INDIVIDUAL TRUSS DESIGN
FOR PLATE SIZES AND LUMBER GRADES
07/05/2018
DETAIL FOR COMMON AND END JACKS MII/COR -8 -20psf 7/9/2015 PAGE1 --®
MAA LOADING (psf) TCLL 20.0 SF,ACING P ates Increase 2-0.0 BRACING MiTek Industries, Inc. 12S
-
TCOL 16.0 ~umber Increase 1.2$ TOP CHORD Sheathed. COrona Ca.
BCLL o.o ep Stress Iner YES BOT CHORD Rigid ceiling directly applied.
.BCQL .. ,,,ll:,O .. a,_ • . . ...
MINIMUM LUMBER SIZE AND GRADE i TOPCHORO I BOT CHORD
NOTE:
TOP CHORD PITCH: 3/12~8112
BOTTOM CHORD PITCH: 0/12~4/12
2x4 DF-LNo.1&BTR
2x4 DF-LNo.1&BTR LENGTH OF
AS DESIGN
SPLICE CAN EITHER BE 3X6 MT20 PLATES
OR 22" LONG 2X4 SCAB CENTERED AT SPLICE
WISAME LUMBER AS TOP CHORD ATTACH TO ONE FACE
Wl(.131"X3 O" MIN) NAILS@3" 0.C. 2 ROWS
'-.-~··i ,..,,.,.,.,'
,---~c:-i //
.. -~~
I I ·. -
EXTENStoN
REQ'D 20'-0" Mi\X
PITCH DIFFERENCE BETWEEN TOP AND
BOTTOM CHORD TO BE "2" MIN.
SPACING= 24" O,C,
/
SUPPORT AND CONNECTi6N BY OTHERS OR 2~16d COMMON WlRE
. (0.162'D!A. X 3.51 LGT TOE NAILS SUPPORTS SHALL BE PROVIDED
\,.
/. ; @4'-0" O.C. ALONG THE EXTENSION OF TOP CHORD.
CONN. Wl316d COMMON WIRE (0.162''DIA. X 3.5" LGT) TOE NAILS
/ /
/'
CONN. W/2 16d COMMON WIRE {0 1ei"OIA X 3,6~ LGT) TOE NAILS .,
8-0-0
J
BOTTOM CHORD LENGTH MAY BE 2'·0"
QR A BEARING BLOCK.
I
CONN, Wf3 16<:t COMMON WIRE (0.182"0tA. X 3,5'' LOT) TOE NAILS
CONN, W12 1Gd COMMON WIRE{0.162"D!A. X 3.$') LGT
TOE NAILS OR SEE DETAIL Ml!iSAC-7 FOR PRESSUREBLOCKING INFO,
•-•-"M~•---t
NO'ra: NAILING SHALL BE SUCH THAT THE LUMBER DOES NOT SPLIT.
07/05/2018
CORNER RAFTER 8'-0" SETBACK MIi/SAC -9 -BSB 20-14-2 111112014 PAGE 1 --
-
@ MINIMUM GRADE OF LUMBER
TOP CHORD:2X4 NO.1 & BTR DF-L-GR
LOADING (PSF)
L D
3-0-0
BOT CHORD:2X4 NO.1 & BTR DF-L-GR
STR. INC.: LUMB= 1.25 PLATE= 1.25
REPETITIVE STRESSES NOT USED
TOP 20 14
SPACING : 24.0 IN. O.C.
NO. OF MEMBERS = 1
NOTE: 1. ALL CONNECTIONS TO SUPPORTS BY OTHERS
2. ALL PLATES ARE MITEK MT20
8'-0" SETBACK
12
2.83~5.66 ~
.-1-<------<cXTENSIOOl---~f'
SUPPORTS SHALL BE PROVIDED
ALONG EXTENSION @ 5'-8" O.C. M X
203 PLF
SPLICE MAY BE LOCATED
ANYWHERE IN THE
EXTENSION
3x10 splice plates may be replaced
with 22" 2x4 DF No.2 or btr. scab
o one face with.131x3 min. nails
@ 3" o.c. 2 rows
MiTek Industries, Inc.
Western Division
SUPPORT
1/2" GAP MAXIMUM BETWEEN
SUPPORT AND END OF RAFTER
SUPPORT
R"' 768 + EXT.
R= 326 + OH.
LENGTH OF HEEL PLATE~ (MIN. 4")
11-3-12
' -. ... .. A WARNING Vl'rljy doslgn pQranu,r.,rs and lie.AD NOTES ON TfflS ANP INCL!WED MITEK REFERENCF.; PAGE Mll-7473 BEFORE VS&.
Design vol_1d for use only with MiTek connectors. This design is based only upon parameters showri, arid is !Of on individual building component.
Applicobil,ty of design pmomenters and proper incorporot;on of component 1s responsibility of building designer -not truss designer. Bracing shown
is for lo!eral support of individual web members only. Additional temporary bra_cing to insure stability during comlruction is the respomibillily of !he
erector. Additional permanent bracing of the overall structure is the respomibil1ty of the building designer. For general guidance regarding
fabricat;on. quality control. storage, del;very. efection and bracing. comult ANSI/TPl1 Quallly Criterlci, DSB-89 cind BCSl1 Building Ccimpcinenl
Scil•ly lnlormcillon available from Truss Plate Institute, 583 D"Onolfio Drive. Madison, WI 537 l 9
07/05/2018
C~rus Heights, CA, 9561
". 77 Greenback Lane -,• Suite 109
Milek•
AUGUST 1, 2016 CONVENTIONAL VALLEY FRAMING DETAIL MII-VALLEY1
[VJ□□® == == woo
MiTek USA, Inc.
~~[ID
A MITek Afllllale
------
0-. ,, ,,
:•
' 0-.
v
VALLEY RAFTERS
( SEE NOTE #2)
-------------,, " " ,, :: :: ,, " ,, ,, " ,, ,, " :, ,, " "
0-,, ,, ,, ,, ,, ,,
' ~ ,,
/ ,, ,,
' " '
MiTek USA, Inc.
RIDGE BOARD GABLE ENO, COMMON TRUSS
( SEE NOTE #6 ) OR GIRDER TRUSS
/ I ------------------
" / " :, '~ :: " :: :: :;
" l\ :,/ " ,,
:: ' ,, ,,
" ~ :: :,;/ " " :, " VALLEY PLATE
:: ',~ ~ ( SEE NOTE #4 ) ,:
,: '§ POST ,, ,, ,: I SEE NOTE #8) ,,
'I': [;1/
POST SHALL BE LOCATED
SHEATHING ABOVE THE T
PLAN DRAWING CHORD OF EACH TRUSS.
TRUSS TYPICAL
(24"0.C. I
ON
OP
POST
(SEENOTE#SJ--~ GABLE END, COMMON TRUSS
OR GIRDER TRUSS
TRUSS MUST
BE SHEATHED
GENERAL SPECIFICATIONS
1. WITH BASE TRUSSES ERECTED (INSTALLED), APPLY SHEATHING TO
TOP CHORD OF SUPPORTING (BASE) TRUSSES.
2. BRACE BOTTOM CHORD AND WEB MEMBERS PER TRUSS DESIGNS.
3. DEFINE VALLEY RIDGE BY RUNNING A LEVEL STRING FROM THE INTERSECTING RIDGE OF
THE ( a.) GABLE END, (b.) GIRDER TRUSS OR (c.) COMMON TRUSS TO THE ROOF SHEATHING.
NOTE:
48" O.C. MAXIMUM POST SPACING
LIVE LOAD = 30 PSF (MAX)
DEAD LOAD = 15 PSF (MAX)
D.O.L. INC= 1.15
ASCE 7-98, ASCE 7-02, ASCE 7-05 90 MPH (MWFRS)
ASCE7-10115 MPH (MWFRS)
4. INSTALL 2 x4 VALLEY PLATES. FASTEN TO EACH SUPPORTING TRUSS WITH ( 2) 16d (0.131" X 3.5") NAILS.
5. SET 2 x 6 #2 RIDGE BOARD. SUPPORT WITH 2 x 4 POSTS SPACED 48" O.C .. BEVEL BOTTOM OF
POST TO SET EVENLY ON THE SHEATHING. FASTEN POST TO RIDGE WITH ( 4) 10d (0.131" X3") NAILS.
FASTEN POST TO ROOF SHEATHING WITH ( 3) 10d (0.131" X 3") TOE-NAILS.
6. FRAME VALLEY RAFTERS FROM VALLEY PLATE TO RIDGE BOARD. MAXIMUM RAFTER SPACING
IS 24" O.C .. FASTEN VALLEY RAFTER TO RIDGE BEAM WITH ( 3) 16d (0.131" X3.5") TOE-NAILS.
FASTEN VALLEY RAFTER TO VALLEY PLATE WITH ( 3) 16d (0.131" X 3.5") TOE-NAILS.
7. SUPPORT THE VALLEY RAFTERS WITH 2 x4 POSTS 48" O.C ( OR LESS) ALONG EACH RAFTER.
INSTALL POSTS IN A STAGGERED PATTERN AS SHOWN ON PLAN DRAWING. ALLIGN POSTS
WITH TRUSSES BELOW. FASTEN VALLEY RAFTER TO POST WITH (4) 10d {0.131" X3") NAILS.
FASTEN POST THROUGH SHEATHING TO SUPPORTING TRUSS WITH ( 2) 16d (0.131" X3.5") NAILS.
8. POSTS SHALL BE 2 x 4 #2 OR BETTER SPRUCE PINE FIR, DOUG FIR LARCH OR SOUTHERN
PINE. POSTS EXCEEDING 75" SHALL BE INCREASED TO 4 x 4 OR BE PRE-ASSEMBLED
( 2) PLY 2 x4's FASTENED TOGETHER WITH 2 ROWS OF 10d (0.131" X 3") NAILS 6' O.C ..
07/05/2018
OCTOBER 28, 2016
" [VJ□□ == == w no
MiTek USA, Inc.
~
STANDARD REPAIR FOR ADDING
A FALSE BOTTOM CHORD
MAIN TRUSS MANUFACTURED WITHOUT
FALSE BOTTOM CHORD.
MAIN TRUSS (SPACING= 24" O.C.)
MII-REP10
MiTek USA, Inc. Page 1 of 1
~ REFER TO THE BOTTOM CHORD BRACING SECTION OF
A Milek Atlltlate
VERTICAL STUDS@ 48" O.C .. ATTACHED
WITH ( 3) -10d (0.131" X 3") NAILS AT
EACH END OF VERTICAL (TYP.).
~~ THE INDIVIDUAL TRUSS DESIGN FOR MAXIMUM SPACING
OF CONTINUOUS LATERAL BRACING WHENEVER RIGID
CEILING MATERIAL IS NOT DIRECTLY ATTACHED TO THE
BOTTOM CHORD.
VERTICAL STUDS TO BE 2 x 4 STUD GRADE
(OR BETTER) SPF, HF, OF OR SP.
(BOARD SIZE SPECIFIED IS MINIMUM,
LARGER SIZE MAY BE USED)
I
2 x 4 NO. 2 (OR BETTER) SPF, HF,
NOTES:
OF OR SP FALSE BOTTOM CHORD
(BOARD SIZE SPECIFIED IS MINIMUM,
LARGER SIZE MAY BE USED)
FALSE BOTTOM
TRUSS SPAN
1. LOADING: TOP CHORD: (REFER TO THE MAIN TRUSS DESIGN FOR TOP CHORD LOADING).
BOTTOM CHORD: LL= 0 PSF, DL = 10 PSF.
2. REFER TO THE MAIN TRUSS DESIGN FOR LUMBER AND PLATING REQUIREMENTS.
3. MAXIMUM BOTTOM CHORD PITCH = 6/12.
4. THE END DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID SPLITTING OF THE WOOD.
5. FALSE BOTTOM CHORD ONLY DESIGNED TO CARRY VERTICAL LOAD. NO LATERAL (SHEAR) LOAD ALLOWED.
6. FILLER MAY EXTEND FOR FULL LENGTH OF TRUSS.
07/05/2018
AUGUST 1, 2016 L-BRACE DETAIL MIi -L-BRACE
[YJ□□® == == WOIJ
MiTek USA, Inc.
~[ID
A MITek Alflllate
Nailing Pattern
L·Brace size Nail Size Nail Spacing
1x4 or 6 10d (0.131" X 3") 8" o.c.
2x4, 6,or8 16d (0.131" X 3.5") 8" o.c.
Note: Nail along entire length of L-Brace
(On Two-Ply's Nail to Both Plies)
Nails
WEB
Nails~ / Section Detail
, --E--L•Brace
'Web
SPACING
MiT ek USA, Inc.
Note: L-Bracing to be used when continuous
lateral bracing is impractical. L-brace
must cover 90% of web length.
L-Brace Size
for One-Ply Truss
Page 1 of 1
Specified Continuous
Rows of Lateral Bracing
Web Size 1 2
2x3 or 2x4 1x4 ...
2x6 1x6 ...
2x8 2x8 ...
... DIRECT SUBSTITUTION NOT APLICABLE.
L-Brace Size
for Two-Ply Truss
Specified Continuous
Rows of Lateral Bracing
Web Size 1 2
2x3 or 2x4 2x4 ...
2x6 2x6 ...
2x8 2x8 •••
... DIRECT SUBSTITUTION NOT APLICABLE.
L-Brace must be same species grade (or better) as web member.
07/05/2018
AUGUST 1, 2016
c::::::Jc:::J ® [VJ□□ == == won
MiTek USA, Inc,
~w!i~w A Milek Affiliate
SCAB-BRACE DETAIL
Note: Scab-Bracing to be used when continuous
lateral bracing at midpoint (or T-Brace) is
impractical.
Scab must cover full length of web +/-6".
"' THIS DETAIL IS NOT APLICABLE WHEN BRACING IS "'
REQUIRED AT 1/3 POINTS OR I-BRACE IS SPECIFIED.
APPLY 2x SCAB TO ONE FACE OF WEB WITH
2 ROWS OF 10d (0.131" X 3") NAILS SPACED 6" O.C.
SCAB MUST BE THE SAME GRADE, SIZE AND
SPECIES (OR BETTER) AS THE WEB.
SCAB BRACE
MAXIMUM WEB AXIAL FORCE = 2500 lbs
MAXIMUM WEB LENGTH= 12'-0"
2x4 MINIMUM WEB SIZE
MINIMUM WEB GRADE OF #3
Nails~ / Section Detail
B§E ~ Scab-Brace
'Web
Scab-Brace must be same species grade (or better) as web member.
MIi-SCAB-BRACE
Milek USA, Inc. Page 1 of 1
07/05/2018
AUGUST 1, 2016 T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY MII-T-BRACE 2
[VJ□□® == == WOIJ
Milek USA, Inc.
~~[QJ
A MITek Affiliate
Nailing Patter
T-Brace size Nail Size
n
MiTek USA, Inc. Page 1 of 1
Note: T-Bracing / I-Bracing to be used when continuous lateral bracing
is impractical. T-Brace I I-Brace must cover 90% of web length.
Note: This detail NOT to be used to convert T-Brace I I-Brace
webs to continuous lateral braced webs.
Brace Size
for One-Ply Truss
Nail Spacing Specified Continuous
Rows of Lateral Bracing
2x4 or 2x6 or 2x8 10d (0.131' 'X 3") 6" o.c. Web Size 1 2
Note: Nail along entire length
(On Two-Ply's Nail to
WEB
Nails ~ Section Detail T-T-Brace 'Web
Nails~
Web/--
Nails
I-Brace
of T-Brace I I-Brace
Both Plies)
Nails
SPACING
2x3 or 2x4 2x4 T-Brace 2x4 I-Brace
2x6 2x6 T-Brace 2x6 I-Brace
2x8 2x8 T-Brace 2x8 I-Brace
Brace Size
for Two-Ply Truss
Specified Continuous
Rows of Lateral Bracing
Web Size 1 2
2x3 or 2x4 2x4 T-Brace 2x4 I-Brace
2x6 2x6 T-Brace 2x6 I-Brace
2x8 2x8 T-Brace 2x8 I-Brace
T-Brace I I-Brace must be same species
and grade (or better) as web member.
07/05/2018
AUGUST 1, 2016
CY7□□® == == won
MiTek USA, Inc.
~[ID
A MiT ek Alllllate
Nailing Patter
T-Brace size Nail Size
n
T-BRACE / I-BRACE DETAIL MIi -T-BRACE
MiTek USA, Inc. Page 1 of 1
Note: T-Bracing / I-Bracing to be used when continuous lateral bracing
is impractical. T-Brace / I-Brace must cover 90% of web length.
Note: This detail NOT to be used to convert T-Brace / I-Brace
webs to continuous lateral braced webs.
Brace Size
for One-Ply Truss
Nail Spacing Specified Continuous
1 x4 or 1 x6 10d(0.131 "X 3") 8" o.c. Rows of Lateral Bracing
2x4 or 2x6 or 2x8 16d(0.131 "X3.5") 8" o.c. Web Size 1 2
WEB
Note: Nail along entire length
(On Two-Ply's Nail to
Nails ~ / Section Detail
~ T-Brace 'Web
Nails~ Web/-~
Nails
I-Brace
of T-Brace / I-Brace 2x3 or 2x4 1 x4 (') T-Brace 1 x4 (') I-Brace
Both Plies) 2x6 1 x6 (') T-Brace 2x6 I-Brace
2x8 2x8 T-Brace 2x8 I-Brace
Nails
Brace Size
for Two-Ply Truss
Specified Continuous
Rows of Lateral Bracing
SPACING Web Size 1 2
2x3 or 2x4 2x4 T-Brace 2x4 I-Brace
2x6 2x6 T-Brace 2x6 I-Brace
2x8 2x8 T-Brace 2x8 I-Brace
T-BRACE
07/05/2018
T-Brace / I-Brace must be same species and grade (or better) as web member.
(') NOTE: If SP webs are used in the truss, 1x4 or 1x6 SP braces must be stress
rated boards with design values that are equal to (or better) the truss web
design values.
For SP truss lumber grades up to #2 with 1 X_ bracing material, use IND 45 for T-Brace/I-Brace
For SP truss lumber grades up to #1 with 1 X_ bracing material, use IND 55 for T-Brace/1 Brace
AUGUST 1, 2016 STANDARD PIGGYBACK
TRUSS CONNECTION DETAIL
== [VJ□□ == == won
MiTek USA, Inc.
~~[ID
A Milek Atllllele
®
A-PIGGBACK TRUSS, REFER TO MITEK TRUSS DESIGN DRAWING.
SHALL BE CONNECTED TO EACH PURUN
WITH (2) (0.131" X 3.5") TOE-NAILED.
B -BASE TRUSS, REFER TO MITEK TRUSS DESIGN DRAWING.
C -PUALINS AT EACH BASE TRUSS JOINT AND A MAXIMUM 24" O.C.
UNLESS SPECIFIED CLOSER ON MITEK TRUSS DESIGN DRAWING.
CONNECT TO BASE TRUSS WITH (2) (0.131" X 3.5") NAILS EACH.
D · 2 X_X4'-0" SCAB, SIZE TO MATCH TOP CHORD OF
PIGGYBACK TRUSS, MIN GRADE #2, ATTACHED TO ONE FACE, CENTERE
ON INTERSECTION, WITH (2) ROWS OF (0.131" X3") NAILS@4" O.C.
SCAB MAY BE OMITTED PROVIDED THE TOP CHORD SHEATHING
IS CONTINUOUS OVER INTERSECTION AT LEAST 1 FT. IN BOTH
DIRECTIONS AND; 1. WIND SPEED OF 115 MPH OR LESS FOR ANY PIGGYBACK SPAN, OR
2. WIND SPEED OF 116 MPH TO 160 MPH WITH A MAXIMUM
PIGGYBACK SPAN OF 12 ft.
E-FOR WIND SPEEDS BETWEEN 126 AND 160 MPH.ATTACH
MITEK 3X8 20 GA Nail-On PLATES TO EACH FACE OF TRUSSES AT
72"0.C. W/ (4) (0.131" X 1.5") NAILS PER MEMBER. STAGGER NAILS
FROM OPPOSING FACES. ENSURE 0.5" EDGE DISTANCE.
(MIN. 2 PAIRS OF PLATES REO. REGARDLESS OF SPAN)
WHEN NO GAP BETWEEN PIGGYBACK AND BASE TRUSS EXISTS:
REPLACE TOE NAILING OF PIGGYBACK TRUSS TO PURLINS WITH Nail-On
PLATES AS SHOWN, AND INSTALL PURLINS TO BOTTOM EDGE OF BASE
TRUSS TOP CHORD AT SPECIFIED SPACING SHOWN ON BASE
TRUSS MITEK DESIGN DRAWING.
SCAB CONNECTION PER
NOTE DABOVE
E
A
B
MII-PIGGY-7-10
MiTek USA, Inc. Page 1 of 1
MAXIMUM WIND SPEED,_ REFER TO NOTES D AND ORE
MAX MEAN ROOF HEIGHT ,_ 30 FEET
MAX TRUSS SPACING= 24 ~ O.C.
CATEGORY II BUILDING
EXPOSURE B or C
ASCE 7-10
DURATION OF LOAD INCREASE: 1.60
□ET AIL IS NOT APPLICABLE FOR TRUSSES
TRANSFERING DRAG LOADS {SHEAR TRUSSES).
ADDITIONAL CONSIDERATIONS BY BUILDING
ENGINEER/DESIGNER ARE REQUIRED.
D
This sheet is provided as a Piggyback connection
FOR ALL WIND SPEEDS, ATTACH MITEK 3X6 20 GA Nail-On PL.ATES TO
EACH FACE OF TRUSSES AT 48" 0.C. W/ (4) (0.131" X 1.5") PER MEMBER.
STAGGER NAILS FROM OPPOSING FACES ENSURE 0.5" EDGE DISTANCE.
detail only. Building Designer is responsible for all
permanent bracing per standard engineering practices or
refer to BCSI for general guidance on lateral restraint
and diagonal bracing requirements.
VERTICAL WEB TO
EXTEND THROUGH
BOTTOM CHORD
OF PIGGYBACK
FOR LARGE CONCENTRATED LOADS APPLIED
TO CAP TRUSS REQUIRING A VERTICAL WEB:
1) VERTICAL WEBS OF PIGGYBACK AND BASE TRUSS
MUST MATCH IN SIZE, GRADE, AND MUST LINE UP
AS SHOWN IN DETAIL.
2) ATTACH 2 x_x 4'-0" SCAB TO EACH FACE OF
TRUSS ASSEMBLY WITH 2 ROWS OF 10d (0.131' X 3") NAILS
SPACED 4" 0.C. FROM EACH FACE. (SIZE AND GRADE TO MATCH
VERTICAL WEBS OF PIGGYBACK AND BASE TRUSS.)
{MINIMUM 2X4)
3) THIS CONNECTION IS ONLY VALID FOR A MAXIMUM
CONCENTRATED LOAD OF 4000 LBS (@1.15). REVIEW
BY A QUALIFIED ENGINEER IS REQUIRED FOR LOADS
GREATER THAN 4000 LBS.
4) FOR PIGGYBACK TRUSSES CARRYING GIRDER LOADS,
NUMBER OF PLYS OF PIGGYBACK TRUSS TO MATCH BASE TRUSS.
5) CONCENTRATED LOAD MUST BE APPLIED TO BOTH
THE PIGGYBACK AND THE BASE TRUSS DESIGN.
07/05/2018
AUGUST 1, 2016 LATERAL TOE-NAIL DETAIL MIi-TOENAiL
[VJ□□® == == woo
MiTek USA, Inc.
~[ID
A Milek Aflll+al&
MiTek USA, Inc.
NOTES:
1. TOE-NAILS SHALL BE DRIVEN AT AN ANGLE OF 30 DEGREES WITH THE MEMBER
AND STARTED 1/3 THE LENGTH OF THE NAIL FROM THE MEMBER END AS SHOWN.
2. THE END DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH
AS TO AVOID UNUSUAL SPLITTING OF THE WOOD.
3. ALLOWABLE VALUE SHALL BE THE LESSER VALUE OF THE BOTTOM CHORD SPECIES
FOR MEMBERS OF DIFFERENT SPECIES.
SIDE VIEW
(2x4)
3 NAILS
SQUARE CUT I
SIDE VIEW
(2x3)
2 NAILS
Page 1 of 1
TOE-NAIL SINGLE SHEAR VALUES PER NOS 2005 (lb/nail) NEAR SIDE
FAR SIDE
NEAR SIDE
NEAR SIDE
DIAM. SP OF HF SPF SPF-S
" .131 88.1 80.6 69.9 68.4 59.7
z .135 93.5 85.6 74.2 72.6 63.4 0 -'
~ .162 118.3 108.3 93.9 91.9 80.2
.,;
" .128 84.1 76.9 66.7 65.3 57.0 z 0 .131 88.1 80.6 69.9 68.4 59.7 -' to .148 "' 106.6 97.6 84.7 82.8 72.3
.,;
" .120 73.9 67.6 58.7 57.4 50.1 z .128 0 84.1 76.9 66.7 65.3 57.0
-'
0 .131 88.1 80.6 69.9 68.4 59.7 .,; .148 106.6 97.6 84.7 82.8 72.3
VALUES SHOWN ARE CAPACITY PER TOE-NAIL
APPLICABLE DURATION OF LOAD INCREASES MAY BE APPLIED.
EXAMPLE:
(3) -16d (0.162" X 3.5") NAILS WITH SPF SPECIES BOTTOM CHORD
For load duration increase of 1.15:
3 (nails) X 91.9 (lb/nail) X 1.15 (DOL). 317.0 lb Maximum Capacity
.00°
U2
U2
VIEWS SHOWN ARE FOR
ILLUSTRATION PURPOSES ONLY
45 DEGREE ANGLE
BEVEL CUT
45.00°
/
SIDE VIEW
(2x3)
2 NAILS
NEAR SIDE
NEAR SIDE
SIDE VIEW
{2x4)
3 NAILS
NEAR SIDE
NEAR SIDE
NEAR SIDE
,., .. -.~----
_\ _ ----l
I------f
L
\
I
----~ FAR SIDE
SIDE VIEW
(2)l6)
4 NAILS
NEAR SIDE
FAR SIDE
NEAR SIDE
FAR SIDE
SIDE VIEW
(2x6)
4 NAILS
NEAR SIDE
NEARSIDE
NEAR SIDE
NEAR SIDE
j_
07/05/2018
AUGUST 1, 2016 LATERAL TOE-NAIL DETAIL MII-TOENAIL_SP
MiT ek USA, Inc. c::Jc:::J ® [YJ□□ NOTES:
== == woo
MiTek USA, Inc.
~~[ID
A Milak AtHliale
1. TOE-NAILS SHALL BE DRIVEN AT AN ANGLE OF 45 DEGREES WITH THE MEMBER
AND MUST HAVE FULL WOOD SUPPORT. (NAIL MUST BE DRIVEN THROUGH AND
EXIT AT THE BACK CORNER OF THE MEMBER END AS SHOWN.
2. THE END DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH
AS TO AVOID UNUSUAL SPLITTING OF THE WOOD.
3. ALLOWABLE VALUE SHALL BE THE LESSER VALUE OF THE TWO SPECIES
FOR MEMBERS OF DIFFERENT SPECIES.
THIS DETAIL APPLICABLE TO THE
THREE END DETAILS SHOWN BELOW
OE-NAIL SINGLE SHEAR VALUES PER NDS 2001 (lb/nail)
DIAM. SP OF HF SPF SPF-S
"' .131 88.0 80.6 69.9 68.4 59.7 z .135 93.5 85.6 74.2 63.4 0 72.6
--' "' .162 108.8 99.6 86.4 84.5 73.8
'"
"' .128 74.2 67.9 58.9 57.6 50.3 z 0 .131 75.9 69.5 60.3 59.0 51.1 --'
"' .148 "' 81.4 74.5 64.6 63.2 52.5
'"
VALUES SHOWN ARE CAPACITY PER TOE•NAIL.
APPLICABLE DURATION OF LOAD INCREASES MAY BE APPLIED.
EXAMPLE:
(3) -16d (0.162" X 3.5") NAILS WITH SPF SPECIES BOTTOM CHORD
For load duration increase of 1.15:
3 (nails) X 84.5 (lb/nail) X 1.15 (DOL) = 291.5 lb Maximum Capacity
ANGLE MAY
VARY FROM
30"T0 60°
45.00°
ANGLE MAY
VARY FROM
30°TO 60°
VIEWS SHOWN ARE FOR
ILLUSTRATION PURPOSES ONLY
SIDE VIEW
(2x3)
2 NAILS
X NEAR S1DE
SIDE VIEW
(2x4)
3 NAILS
NEAR SIDE
NEAR SIDE
NEAR SIDE
45.00°
I/
NEAR SIDE
SIDE VIEW
{2x6)
4 NAILS
NEAR SIDE
NEAR SIDE
NEAR SIDE
NEAR SIDE
ANGLE MAY
VARY FROM
30°TO 60'
07/05/2018
Page 1 of 1
45.00°
Roni Gardinier
2008 Cambridge Avenue
Cardiff California 92007
EAST COt:NTY SOIL CONSULTATION
AND E:'iGINEERING, INC
10925 HARTLEY ROAD SlilTE I
SANTEE CALIFORNIA 92071
TEL. 619-258-7901
February 1 1. 2021
Project No. 20-l l-l7G3
Subject: Obsernllion of Footing Excarntions for New Accesso~ Dwelling tnit
2414 Ma_jano Place
Reference•
Carlsbad. California 92009
Geotechnical Investigation for Proposed Accessory Dwelling l'nit. 2-114 Majano
Place. Carlsbad, California 92009, Project No. 20-l l-l7G3, Prepared by East
County Soil Consultation and Engineering. Inc , dated August 20. 2020
Dear \1s. Gardinier
In accordance with your request. we have observed the footing excavations for the new accessory
dwelling unit at the subject site
The footings ha,·e been excavated to the proper depth and width into competent bearing soil,
(Santiago Formation) and are in compliance with the approved building plans Foundation
exca,·ations. soil expansion characteristics and soil bearing capacity are in accordance with the
referenced geotechnical report. In addition. the deepened footing excavations (below a depth of2
feet) may be tilled with lean concrete slurry mix (3-sack maximum). The footing excaYations
abm c a depth of 2 feet should be filled with regular concrete per our report Footings should be
reinforced per our repo11.
In addition, the soils beneath the floor slab ha,·e been properly compacted as recommended in the
referenced geotechnical investigation report.
This oppo11unity to be of service is appreciated. lf you have any questions. or ,, e can be of'
forther service, please do not hesitate 10 call or contact us
Respectti.11ly Submitted.
\1artin R. Owen. PE. GE
Gcotcchnical Engineer
•
Roni Gardinier
2008 Cambridge Avenue
Cardiff, California 92007
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC.
10925 HARTLEY ROAD, SUITE "r'
SANTEE, CALIFORNIA 92071
TEL. 619-258-7901
August 25, 2020
Project No. 20-l 147G3
Subject: Review of Building and Foundation Plans and Foundation Details for
Proposed Accessory Dwelling Unit
2414 Majano Place
Carlsbad, California 92009
Reference: I. Geotechnical Investigation for Proposed Accessory Dwelling Unit, 2414 Majano
Place, Carlsbad, California 92009, Project No. 20-l 147G3, Prepared by East
County Soil Consultation and Engineering, Inc, dated August 20, 2020.
2. Building and Foundations Plans for Gardinier Accessory Dwelling Unit, 7778
Madrilena Way, Carlsbad, California 92009, by James A Chinn, Architect.
Dear Ms. Gardinier:
In accordance with the request of James A Chinn, Architect we have reviewed the above
referenced Building and Foundations Plans and Foundation Details for Gardinier Accessory
Dwelling Unit.
The plans were found to be in accordance with the recommendations presented in our referenced
geotechnical report.
Our firm should observe the foundation excavations for proper size and embedment into
competent bearing soils.
This opportunity to be of service is appreciated. If you have any questions, or we can be of
further service, please do not hesitate to call or contact us.
Respectfully Submitted,
Martin R. Owen, PE, GE
Geotechnical Engineer
...... •······--------------. .. ----·-··.
'
-~---•···
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC.
10925 HARTLEY ROAD, SUITE "I"
SANTEE, CALU'ORNlA 92071
TEL. 619-258-7901
RECEIVED
AUG 2 6 2020
CITY OF CARLSB/\.D
BUILDING DiV:SION
Roni Gardinier
2008 Cambridge Avenue
Cardiff, California 92007
August 20, 2020
Project No. 20-l I 47G3
Subject: Geotechnical Investigation for Proposed Accessory Dwelling Unit
2414 Majano Place
Carlsbad, California 92009
Dear Ms. Gardinier
In accordance with your request, we have performed a geotechnical investigation at the subject site
in order to determine the geotechnical site conditions and provide recommendations for design and
construction of the proposed accessory dwelling unit.
SCOPE OF SERVICES
The following scope of work was performed for this investigation: 1~
0 Site reconnaissance and review of published geologic and geotechnical reports and maps >
pertinent to the project area.
0
0
Subsurface exploration consisting of drilling two test borings in the area of the proposed ADU.
The test borings were logged by our project supervisor
Collection of representative soil samples at selected depths. The obtained samples were placed
in sealed containers and transported to the soil testing laboratory for subsequent analysis.
0 Laboratory testing of samples representative of the types of soils encountered during the
subsurface exploration.
0 Geotechnical analysis of the field and laboratory data, which provided the basis for our
conclusions and recommendations.
0 Production of this report, which summarizes the results of the above analysis and presents our
findings and recommendations for the proposed construction.
1--0
• Geotechnical Inwstigation for Proposed Acccssor~ Dwelling Unit
2414 Majano Place
Carlsbad, California 92009
Page2
August 20, 2020
Project No. 20-1147G3
---------·-------.. -~--· ----------------------
SITE DESCRIPTION AND PROPOSED CONSTRUCTION
The site location is shown on the attached Vicinity Map, Fi1:,'llre I The site is an irregular-shaped
parcel, located on the east side of Majano Place in the City of Carlsbad, California. The property is
presently occupied by a two-story, single-family residence. The building pad is relatively level.
Vegetation consists of grass, shrubs and trees. The parcel is bordered by Majano Place to the west.
Los Pinos Court to the east and similar homes to the north and south
No plans were available at the time of our investigation However, it is our understanding that the
proposed construction will consist of a one-story, wood framed ADU located at the rear, northerly
portion of the lot The ADU will be founded on continuous and/or individual spread footings and
will have a slab-on-grade floor.
SUBSURFACE EXPLORATION AND LABORATORY TESTING
Two test borings were drilled on August 7, 2020, to a maximum depth of approximately 5 feet
below existing grade with a hand auger. The approximate locations of the test borings are shown
on Figure 2. Logs of the test borings are shown on Figure 3.
Following the subsutface exploration, laboratory testing was performed on selected soil samples to
evaluate the pertinent engineering properties of the foundation materials. The laboratory tests
consisted of in-place moisture content and dry density tests and an expansion index test. The tests
were performed in accordance with ASTM standards. The test results are shown on the Logs of the
Test Borings, Figure 3 and on the Results of Laboratory Tests, Figure 4.
SUBSURFACE SOIL CONDITIONS
The subsurface soil descriptions were interpreted from conditions encountered during the subsurface
exploration and/or inferred from the geologic literature. Detailed descriptions of the subsurface soils
and bedrock materials are presented on the logs of the test borings, Fi1:,'llfC 3.
Isipsoil: Topsoil was encountered in the test borings to a depth of 6 inches to 1 foot The topsoil
consisted of dark brown, dry to moist, loose and porous, silty sand with some organics (rootlets).
Fill Fill soils were encountered beneath the topsoil in Test Boring B-2 to a depth of 2 feet. The fill
consisted of tan brown_ moist, loose to medium dense, silty sand.
l;Iedrock-Santiago Formation: Bedrock of the Santiago Formation was encountered below the topsoil
and fill, at depths of I to 2 teet. The bedrock generally consisted of light gray, moist, medium dense to
dense, silty sandstone.
EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC.
• Geotcchnical lm·csti~ation for Pro11osed Accessory Dwelling Unit
2414 Majano Place
Carlsbad. California 92009
Page 3
August 20, 2020
Project No. 20-l147G3
---------------·--··-------------------
SOIL PROPERTIES
a. Compressible Soils
Loose, compressible topsoil and fill were encountered to a depth of I to 2 feet within the area of
the proposed construction. Footings for the proposed ADU should be extended through the topsoil
and fill into the underlying, dense, sandstone bedrock.
b. Expansive Soils
An expansion index test was pe1iormed on a representative sample of the sandstone bedrock.
The results of the test are shown on Figure 4. An expansion index of O was obtained, which
indicates the bedrock is non-expansive.
GROUNDWAT~;R
No groundwater was not encountered in the test borings.
GEOLOGY
From published geologic maps, the site is underlain at depth by sedimentary bedrock of the Santiago
Fom1ation.
There are no known geologic hazards such as landslides, liquefaction-prone areas, or earthquake
faults at the site. However, the proposed residence is subject to ground shaking and possible
damage from earthquakes on nearby, or more distant, active faults.
SEISMIC DESIGN VALUES
Seismic design values are presented on the attached Figure 5.
CONCLUSIONS
Construction of the proposed one-story ADU is feasible from a geotechnical standpoint provided the
recommendations presented in this report are properly implemented during construction.
RECOMMEND A TIO NS
GR,\DJNG AND FILL COMPACTION
a. Site Clearing
The area of the proposed construction should be cleared of vegetation and other unsuitable
materials, which should be properly disposed of off-site. The area should be thoroughly
EAST COUNTY SOIL CONSULTATION AND £NGJNEERING, INC.
Geot~-chnical Investigation for Proposed Accessory Dwelling Unit
24U Majano Place
Carlshad, California 92009
Page 4
August 20, 2020
Project No. 20-1147GJ
inspected for buried objects that need to be rerouted or removed prior to construction. All
holes, trenches, or loose soil pockets left by the removal of these objects should be properly
backfilled with compacted fill materials.
b. Removal and Recompaction of Loose Surface Soils Beneath Floor Slabs
Beneath floor slabs, the existing, loose topsoil and fill, encountered in our test borings to a
depth of l to 2 feet, should be removed and recompacted to at least 90 percent relative
compaction. Actual removal depths should be determined by our field representative.
c. Compaction and Method of Filling
All fill and trench backfill should be compacted to a mm1mum relative compaction of 90
percent as determined by ASTM Dl 557. Fill should be placed at a moisture content slightly
above optimum moisture content, in lifts 6 to 8 inches thick, with each lift compacted by
mechanical means.
d. All grading, fill placement, and compaction should he performed in accordance with the
grading requirements of the City of Carlsbad. Fill placemt-"llt and compaction should be
observed and tested as necessary by our field representative.
TEMPORARY SLOPES
Temporary vertical slopes and excavations should not exceed 5 feet in height. Any temporary slopes
and excavations greater than 5 feet in height should be shored or laid back at a 1: l (horizontal to
ve1tical) slope ratio. CAL-OSHA guidelines for trench excavation safety should be implemented
during construction
EROSION CONTROL
Due to the sandy nature of the on-site soils, areas of recent grading or exposed soils may be subject to
erosion. During construction, surface water should be controlled via berms, gravel/ sandbags, silt
fences, straw wattles, siltation or bioretention basins, positive surface grades or other method to avoid
dan1age to the finish work or adjoining properties. All site entrances and exits must have coarse
gravel or steel shaker plates to minimize oftsite sediment tracking. Best Management Practices
(BMPs) must be used to protect storm drains and minimize pollution. The contractor should take
measures to prevent erosion of graded areas until such time as permanent drainage and erosion control
measures have been installed. After completion of grading, all excavated surfaces should exhibit
positive drainage and eliminate areas where water might pond.
EAST COUNTY SOIL CONSULTATION AND ENGl:'liEERlNG, l:'liC.
Gcotcchnical Investigation for ProJJOscd Accessory Dwelling Unit
2414 Majano Place
Carlsbad, California 92009
·---·------
FOUNDATIONS AND FLOOR SLABS
Pages
August 20, 2020
Pro,iect No. 20-1147G3
• Footings for the proposed one-story ADU should be founded at least 6 inches into dense,
sandstone bedrock Bedrock was encountered in our test borings at a depth of I to 2 feet.
Accordingly, anticipated footing depths will vary from approximately 1.5 to 2.5 feet below
existing grades. Footings should have a minimum depth of 18 inches below building pad grade
or lowest adjacent, finished grade, whichever is deeper.
• Continuous footings should be at least 12 inches wide and reinforced with a minimum of four
#4 ,teel bars, with two bars placed near the top of the footings and the other two bars placed
near the bottom of the footings. Individual footings should be at least 18 inches square and
reinforced with a grid of#4 bars spaced 12 inches on centers (each way) and placed on concrete
blocks at the bottom of the footing.
• Floor slabs should be at least 5 inches thick and reinforced with #4 bars placed at 18 inches on
centers in two directions in the middle of the slab. The reinforcing steel should be supported on
steel chairs or concrete blocks. Floor slabs should be underlain by 2 inches of clean sand over a
I 0-mil visquccn moisture barrier over 2 inches of clean sand. To minimize the potential for
shrinkage cracks, foundation and floor slab concrete should have a minimum compressive
strength of 3,000 psi. Special testing of concrete is not required. Some shrinkage cracks are still
possible.
• An allowable soil bearing value of 2,000 pounds per square foot may be used for the design of
continuous and individual spread footings. This value may be increased by one-third for short
term wind or seismic loads. Total and differential settlements of½ inch may be assumed.
• Lateral loads may be resisted by an equivalent fluid passive soil pressure of 300 pounds per
cubic foot. A coefficient of friction of 0 4 may also be used. If passive and friction values are
used together, the friction value should be reduced by one-third.
• All footing excavations should be inspected and approved by our field representative. Footing
excavations should be thoroughly cleaned prior to inspection.
• For design purposes, total and differential settlements of\1, inch may be assumed.
DRAINAGE
Adequate measures should be undertaken so that drainage water is directed away from the
foundations, footings, floor slabs and the tops of slopes via rain gutters, downspouts, surface swales
and subsurface drains towards the natural drainage for this area. As required in the California
Building Code, a minimum gradient of 2 percent is recommended in hardscape areas adjacent to
the structure. In exposed soil areas, a minimum gradient of 5 percent away from the structure for a
distance of at least 10 feet should be provided. If this requirement cannot be satisfied due to site
EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC.
Geotcchnical ln,·estigation for Provosed Accessory Dwelling Unit
2414 Majano Place
Carlsbad, California 92009
Page6
August 20, 2020
Projt-ct No. 20-1147G3
limitations, drainage can be accomplished with a swale in accordance with Section 1804 4 of the
California Building Code. Earth swales should have a minimum gradient of2 percent
Surface water should be directed to approved drainage facilities. Proper smface and subsurface
drainage will be required to minimize the potential of water seeking the level of the bearing soils
under the foundations, footings and floor slabs, which may otherwise result in undermining and
differential settlement of the structure and other improvements.
LlMlTATIONS OF INVESTIGATION
Our investigation was perfom1ed using the skill and degree of care ordinarily exercised, under similar
circumstances, by reputable soil engineers and geologists practicing in this or similar localities. No
other warranty, expressed or implied, is made as to the conclusions and professional advice included in
this report. This report provides no warranty, either expressed or implied, concerning future building
performance Future damage fium geotechnical or other causes is a possibility.
This report is prepared for the sole use of our client and may not be assigned to others without the
written consent of the client and ECSC&E, Inc.
The samples collected and used for testing, and the observations made, are believed representative of
site conditions; however, soil and geologic conditions can vary significantly between exploration
trenches, boreholes and surface exposures. As in most major prc.:jects, conditions revealed by
construction excavations may vary ,vith preliminary findings. If this occurs, the changed conditions
must be evaluated by a representative of ECSC&E and designs adjusted as required or alternate
designs recommended.
This report is issued with the understanding that it is the responsibility of the owner, or of his
representative to ensure that the information and recommendations contained herein are brought to the
attention of the project architeLi and engineer. Appropriate recommendations should be incorporated
into the structural plans. The necessary steps should be taken to see that the contractor and
subcontractors carry out such recommendations in the field.
The findings of this report are valid as of this present date. However, changes in the conditions of a
property can occur with the passage of time, whether they are due to natural processes or the works of
man on this or adjacent properties. In addition, changes in applicable or appropriate standards may
occur from legislation or the broadening of knowledge. Accordingly, the findings of this report may
be invalidated wholly or partially by changes outside of our control. Therefore, this report is subject to
review and should be updated after a period of two years.
ADDITIONAL SERVICES
The review of plans and specifications, field observations and testing under our direction are integral
parts of the recommendations made in this report. If East County Soil Consultation and Engineering,
Inc. is not retained for these services, the client agrees to assume our responsibility for any potential
claims that may arise during construction. Observation and testing are additional services, which are
provided by our firm, and should be budgeted within the cost of development.
EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC.
Gcotechnical Investigation for Pro11oscd Accessory Dwelling Unit
2414 Majano Place
Carlsbad. California 92009
Page 7
Allj.'IISI 20, 2020
Pro,ject No. 20-1147G3
This opportunity to be of service is appreciated. If you have any questions, or we can be of further
service, please do not hesitate to call or contact us.
Respectfully Submitted,
Martin R. Owen, PE, GE
Geotechnical Engineer
Attachments: Figures l through 5
EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC.
Gcotechnical hn-cstigation for Proposed Accessory Dwelling Unit
2414 Majano Place
Carlsbad, California 92009
-~! -:C ., M .at
C?t st.»a
j\
wa -rut S.r.'lerce~~.,.
!!
f
::.
( I~
FIGURE 1
VICINITY MAP
0 2414 Majano Pl.
Carlsbad. CA 92009
P:1ge8
August 20, 2020
Project No. 20-l 147G3
t •
EAST COUNTY SOIL CONSULTATION AND ENGL~EERlNG, INC.
Gcotcchnical lmestigation for Pro1>osed Accrssm1 D\\elling Unit
2414 Majano Place
Carlsbad, Califomfa 92009
FIGURE 2
LOCA TlONS OF TEST BORINGS
LEGEND
Pagc9
Au~ust 20, 2020
Project No. 20-1 U7G3
8-2 • APPROXJMATE LOCATION OF TEST BORING
EAST COU TY SOIL CONSULTATION AND ENGINEERING, INC.
Geotechnical Investigation for Pro11osed Accessory Dwelling Unit
24 U Majano Place
Carlsbad, California 92009
DEPTH
Surface
10'
3.0'
DEPTH
Surface
0.5'
2.0'
4.0'
FIGURE 3
LOGS OF TEST BORINGS
BORING B-1
SOIL DESCRIPT!Ol\
TOPSOIL
dark brown, moist. loose, silty sand with rootlets
BEDROCK-SANTIAGO FORMATION
light gray. moist, dense, silty sandstone
bottom of boring, no caving, no groundwater
Boring backfilled 5/20/2020
BORING B-2
SOIL DESCRIPTION
TOPSOIL
dark bro,m, moist, loose, silty sand with rootlets
FILL
tan bro,,11. moist. loose to medium dense, silty sand
BEDROCK-SANTIAGO FORMATION
light gray, moist. dense, silty sandstone
bottom of boring, no caving, no groundwater
Boring backfilled 5/20/2020
Y = DRY DENSITY IN PCF
M = MOISTURE CONTENT IN%
Page 10
August 20, 2020
Project N<> 20-1147GJ
y M
y M
110.7 13.9
EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC.
·----------·~
GL'Otcchnkal lmestigation for Proposed Accessory Dwelling llnit
2414 Majano Place
Carlsbad, California 92009
----------·--·--
• ~ST
LOCATION
I B-1,~ !S
FIGURE 4
RESULTS OF LA.BORATORY TESTS
INITIAL
MOISTURE
CONTENT
(%)
9.8
EXPANSION INDEX TEST
(ASTM D 4829)
I SATURATED INITIAL EXPANSION
! MOISTURE DRY INDEX
CONTENT(%) DENSITY
(PCF)
18.9 1 · 107.3 t)
'------'------~-----~----~--
Page 11
August 20, 2020
ProjL'Ct No. 20-l 147G3
EXPANSION
POTENTIAL
NON-
EXPANSIVE
EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC.
Gcotccbnical Investigation for Proposed Accc~so1)' Dwelling Unit
2414 Majano Place
Page 12
Au~,ust 20, 2020
Pro.iect No. 20-IU7GJ Carlsbad, California 92009
FIGURE 5
SEISMIC DESIGN VALllES
The following CBC seismic design values may be used.
2414 Majano Pl, Carlsbad, CA 92009, USA
I I f
Oate
Duign Code Reference Document
Risk c..tegory
Site Class
Type Value
Ss l.023
S: 0.37
S,.,s 1.116
S~•l null -See Section 11 4.8
S.:s 0.744
SJ: null -See Se-ction H.4.8
Type Value
soc null -See Section 11.4 8
F. 1091
F. null -See Section 11.4.8
Description
O.scription
8/17/2020, 3:07:32 PM
ASCU-16
a
D · Stiff Soil
MCE-ground motion. (for 0.2 second period)
~~CE~ ground motion. (for ! Os period)
Site-modified spectral acce-lerntion value
Site-mudified specoal acceleration value
Numeric seismic design value at 0.2 second SA
Numeric seismic de~ign value at 1 0 s~ond SA
Seismic design category
Site amplification factor at 0.2 second
Site amplification factor at 1.0 second
EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC.
{Cityof
Carlsbad
This form must be completed by the City, the applicant. end the appn,pnai. school dlslricts and returned to the City prior
to Issuing a bulldlng permit. lhe City win not Issue any bulldtng permit without a c:umpleted sdlool IN form,
Proiect # & Name:
Permit#:
Project Addnlsa:
Asaeaaor's Parcel#:
Project Applicant
(Owner Name)
CBR2020-1377
L,::, V c.D
tl!:C 1 6 2020
2414 MAJANO Pl~ , ,
IT 1 (h-1-.., P._ ;--; L ~-) ;_\-'\ O
2550810800 BUI( Qi\'(' [JI' IP l DivlCN
TIIUST GARDINIER RONI
Residenllal SqU819 Feet:
New/Additions: -------------It-
Second DwelUng Unit: =864:::;_ ___________ _
Commen:1a1 Sq-Feet:
New/Add'dions: ______________ _
City Cenilication:aty of Carlsbad Buiklillfl Division Date: 11/02/202D
Certllication of~ The -ew:uting 1h18 dedarallon ("Owner') cedlfies
under penally of pe,jury -(1) 1he ~ pnwided -Is ""'11ICt and we to lhe
beet of the Owner's ia-tedge, and -lhe Owner will lie an ama,lded certification of
payment and pay tile addltlonel fee If Owner ~ an -in the n..,.ber of
dwelling units or aquare footage attar the buldi1g pormlt Is iuued or W tna 1.-
detennination of w1ila or -footage is found to be incomlct, and -(2} tna Owner Is
the owner/deve1_. of the -deaalbed prajecl(a). or -the PfflOII ew:uting this dedaratian 1s audloriz8d to a1gn an behalf of the owner.
• Celtebad Unified Schoul Dlnlct
6225 El CaminO Real
Carlsbed CA 92009
Phone: (760) 331--5000
Ill Enctnlta 11n1on 8clloOI Dllltrlct
101 South RanchO Sanla Fe Rd
Encinilall, CA 92024
Phone: (760) 944 ◄300 x11ee
San Dlllgullo Union H.8.
684 Requeza Or.
Encinitas, CA 92024
Phone: (760) 753-6491 Ext 5514
(By Appl. Only)
• San --Unified Sch. . 255 Pico Ave Ste. 100
San Man:os, CA 92089
Phone: (780) 290-2649
Contact Katherine Maroelja
(By Appl.only)
-Villla Unified Scho.,I Dlnlc:I 11!!!!1 1234 Arcadia Drive
Vlsla CA 92083
Phone: (760) 726-2170 x2222
SCHOOL DISTRICT SCHOOL FEE CERTIFICAffON
(To be completed by the school dlstrk:t(s))
THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS
FOR THE PROJECT HAVE BEEN OR WILL BE SATISFIED.
The u»d••lgnad, balng dlllJ' llllthoibed bi U. -II I le School~ -tin. tllllt tlNL deu,ap•, bulW..,
or owner ha utfafled the obllg-for 8dlool fac:IUU.. 1111a la 1D ~ that the applicant llalied on page 1
ha paid •H --ar complaled aa.. ■ppllcallle 9Chool mllllJlltlon dR8mlnlld bJ the Scllool Dlatrlct. The City may,_ building parmlla for ... ~-'7,/4.. A,l,(t,..
Slgnalunt of Aulholiz:ed School Dlslrk:tOlllclal:_ -----------------John Addleman / -/,
Tille.: ___ _::.D:!:.i1:::;·cr.:,;.t.:,:anr:..;n,;..f.:.Jl,,_,_)r,..,r.~rji.i.r"'...,lll&.__ __________ 0.: //. //5' (,i?O
Fh:"': ,;;•I M.v1::r:cmes.tn Dlogulto Union High School District
Name of School District: __ ----------Phone: zw-753--htM/
community• Economic Development -Bulldl119 Division
1635 Fanldav Avenue I Carlsbad, CA 92008 I 760-602-2719 I 7fi0.602-8558 fax I bullding@cartsbadca.gov
Ccityof
Carlsbad
CERTIFICATION OF SCHOOL FEES PAID
This fo~m must be completed by the City, the applicant, and the appropriate school districts and returned to the City prior
to Issuing a bulldlng permit. The City wlll not issue any building permit without a completed school fee form.
Project# & Name:
Penni!#:
Ill cartebad Unffled School District
CBR2020-1377 6225 El Camino Real
CarlSbad CA 92009
Project Address:
Assessor's Pan:el #:
,,-Phone: !r-; ~ 2414 MAJANO PL 2
/ 2550810800 ii Encinitas Union School Diitrlct
I 101 South RanchO Santa Fe Rd
TRUST GARDINIER RONI Encinitas, CA 92024 Project Applicant:
(Owner Name) RE'..,_••-,.,' ··\ ''""•'·.en, ,,,~ ",.J' ~ ~ ~ ':/ i,.-',;,.,.,.'
~ ----PhOne: (760) 944--4300 x1166 ,
~ u---~ Resldantlal Square FN
New/Additions:
t
DEC 1 6 2020
Second Dwelling Unit:
Commercial Square F
864 CITY 0.'· ,~ · -·,i :~; ·.\D " BO/LU:r<~~ L_-. ;\.":'Si(.);·✓
eet
New/Additions:
City Certification: City of cartsbad Building Division Date: 11/02/2020
ars. The person executing this declaration ("Owner') certifies Certification of Applicant/Own
under penalty of peljury that
best of the Ownefs knowted
payment and pay the add
dwelling units or square loo
determination of units or aquare
the owner/developer of the
declanition Is authorized to 8111
(1) the information provided above Is conect and true to the
ge, and that the Owner wiU file an amended certificetion of
itional fee ff Owner requests an increase in the number of
tage after the building pennlt is issued or ff the initial
loolage is found to be incorrect, and thet (2) the Owner is
above described projec:l(s), or that the person executing this
· non behalf of the Owner.
San Dtegu
684 Requeza Dr.
Encinitas, CA 92024
Phone: (760) 753-6491 Ext 5514
(By Appl. Only)
~ San Man:os Unified Sch, Dlstttct
255 Pico Ave Ste. 100
San Marcos, CA 92069
Phone: (760) 290-2649
Contact: Katherine Marcelja
(By Apptonly)
Lffi Vista Unffled School District
1234 Arcadia Drive
Vista CA 92083
Phone: (760) 726-2170 x2222
SCHOOL DISTRICT SCHOOL FEE CERTIFICATION
(To be completed by the school district(s))
THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS
FOR THE PROJECT HAVE BEEN OR WILL BE SATISFIED.
The undersigned, being duly authorized by the applicable SChool District, certlfl• that the devel_, builder,
or owner has satisfied the obligation for school facilities. This is to certify that the applicant listed on page 1
has paid all amounts or completed other applicable school mitigation d-lned by the SChool District. The
City may Issue building permits for this project.
Signature of Authorized S~I Distrid Official: ~~4 ;i),hcldS
TIU;i?w~ tW: • ,
Name of School District: brl(! ltz1/;r2 J,/n1fJt} 2l,J)5f
Community & Economic Development -Building Division
Date:
Phone: 1110, 9'/9,(/!i)O
K/U,t,
1635 Faraday Avenue I tarlsbad, CA 92008 I 760-602·2719 I 760-602-8558 fax I building@carisbadca.gov
I
(Cityof
Carlsbad
SEWER DISTRICT CERTIFICATION
1111 Leucadia Wastewater District
1960 La Costa Ave.
Carlsbad, CA 92009
(760) 753-0155
-V■llecitos Water District
201 Vallecltos de Oro
San Marcos, CA 92069
(760) 744-0460
The following project has been submitted for building permits:
Plan Check #: Permit#: CBR2020·1377
Property Owner: GARDINIER RONI
Project Address: 2414 MAJANO PL # 2
Assessor's Parcel #: .:.25:::5:,0:::Bc:.10:::8:,00::.... ___________________ _
Project Description: GARDINIER: 864 SF DETATCHED ADU
City certification: City of Carlsbad Bull ding Division Date: November 02, 2020 -~-----~~------
Please Indicate in the space below that the owner has entered Into an agreement to have your
agency provide public sewer service to the premises, and/or If the existing service Is adequate
for this project and all required conditions have been satisfied.
Permits will not be Issued until this form Is completed and returned to our office. . ....... ................................ . ................. --..................................... ............................................................... ......... . . ' . ' : : : This space to be completed by District Personnel : . . . . . . . . : I certify the district requirements for sewer service have been satisfied. : . . . . . . . . . . . . . .
1 Approved by: c/24,.,..,.,.. ~a Date: jq;/,,f / ;;lo ~
i FIELD SERVICES SPECIALIST 1 , Title: , . ---------------------------. : : ................................................................................................................................................................................................................. .,
Community & Economic Development -Building Division
1635 Faraday Avenue, carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8S60 f I www.carlsbadca.gov
LEUCADIA WASTEWATER DISTRICT
SEWER SERVICE PERMIT
Permit Number S1lQsm
P it,. fo--· .; ·j·-~ :: ; .'~I-./1."'t. i;\~, •· ':" ·., · ''":-<; •.";,',. : • . , .,. • :: • -··· ,,;; ,-jj, './:; · 'fJl'ffl R .. ,, ... uon.~ .. :•~ -. )~ ..... (:,~;-.:.•-· .. -~..Y.~-.· .... \. _ ... ~, ..... ,_.· -.~1_;,· • •• .•
New Service D Change to Existing Service 181
Type of Pennlt:
Supplemental Pennit
Preexisting Pennlt No:
New Permit No:
Number of Additional
EDU Granted:
Domestic 181 Industrial O Food Services Establishment 0
Private Pump Station O ADU Waiver 181 Multi-Unit Lateral D
005122
S005122
Date Issued: __
Date Issued: 12/14/2020
Existing EDU: 1.0 Total EDU to Date: 1.50
Speclal Conditions Required and Attached: Yes D No L8I
Date Issued:
By: IAN RIFFEL
Print Name
fees Collected: •~:.If.~t~\f.'
Tax Billing to
Commence July 1, ml,
EnclnJ, w.stewat.. ·. ~-~ ~
Required: Yes D
Pennit Number:
12/14/2020
tfla.~-rt.O s~
Capacity Fee: $ 2.544.50
Reimbursement Fee: $ _
No L8I
Prorated Sewer
Service f'ee: $ 0.00
Total Fees:$ 2,544.50
Date Issued: . . .. ' .. _.. ""': ..... -.,.,~N\.:<. ~ i f:-:/~ ~. · ~:-_... .. -: · ),;
.. Jt~i' ....................... ~"'--~-..... .,~-~ -
Name and Address, Phone: RONI GARDINIER (760) 633-5746, 2414 MAJANO PLACE
CARLSBAD, CA 92009. NEW 864 DETACHED ADU. 1
Assessor's Parcel Number: 255-081-08-00
Type of Building: ADU Number of Units: 1
Page 1 of 4
STORM WATER POLLUTION PREVENTION NO.!£.~
A.l.l 1'1!.ctS'SAA" (O(Jlf'll!:NT J.>jO 1,0.7!:.t<IAl'S S;l;lit Sf
A.~.\!;.A,SL( °" 9Tt !O tACli.!lATr /0..P·C iNSi.\UJt,.),I
Cf' E!fOS!CU o\',:D SCT)~f>H w.'.TROI. 8UP1 M'i /!MN !S (UWWl
2. Th( 0~/CO>t;-JU,ClOA $H->,U, l<(STOltt AU t!<OSlefl
UlN".ROl DEW'B 1'0 'M'.JRKN;'.; OkntR 10 wt SAt5FACf-0N
(£ TH[ OTY lN$P[ClM AfTrR t,I.Q< l!l.m-Cff i,;.c-~ ~ANrM,L
1W: O~!J?/CC,i.mAC100 ~Alt lN'.irm ,\OOIT-OflAL LJWSlG>. CONTI<Ol l.CAS,11£5 AS 11.\Y !l( RCQ<.,J<:!:D BY Tl-IE Cl"(
INSl'rclOll l)l,,'f 10 •kCOilf'Lri! ~11:».'C O,:,(RAt-Ot;S ~
l!NfOO(Sfill tllm:usrf,,NCfS l'tffie½ LIAY Ml\st
.t Ail. RD,IOVABU 0R01!Cnvt ocvas 9-lilll. El! N f'LAH
.I.T ~ [140 or [AOi ~IN\, DAY W!-0. TH( 11\.! (5) 0A" IVJN f'R06ASlun fMCalSf tx:C((l):$ fOHY ?EW'i~
(tl)X). Sl.l At-0 CT!tER UM$ ~Alt H rt<'JJCVW MTill:
UCH ll-'iliiAlL
5. ML :::RAvt:L BAGS SHAll CC!>T,t,!)l 3/• csCH IH/ll.!;;11 .1,com::.1;rr..
ij_ ADECUAl( EJ!QSi{'1<1 At.O Sfl'l!!MNl e,_•,1,n~a., ANO f'!!Uolf.TUI
l>l!01£C-:.O~ BEST l,01,.>,:ACDJ()H P!V,CTict utASI.JPH uus;
9( WSlt.LllO Ah-,:\ t.U,;1HA11i(O,
TliE CffY ,N'SH.C1QR ~At~ H,Vf !)!£ ,\JT'flCf<JTY ro Al~
'!HIS f'l, ... u-J DlJfi:lijC. !JR am,su: ccmsm.1cn0t. AS uu.o£D ro iJ.SJR( COUPLIAt«'! l'ITH CITY STOllll W"-.lUl WAU'fl' l![()ULATIONS
OWNER'S CT:_RTIF!CA TE:
i \/1.CCIUT.J,Ml mt\ A00.0\llfl)(;:( Tl!J,_'; ; 111.>'S' (1) !MPl.!-'l~T
llESi fi1J,N1,_t:'.00.T P!\ACTICtS (MS) OVR,!<O CONlTWCTICH J,_(1'MlltS ro Tl!( lilAXltiAI nrv.r PAACUU.IH iO A't')ll) Tl< 1,11:euu.111,1. or PWUTA/11'$ SW! IS 511llo![Jo/T ~ 10 AVYO M: 1:XP0$1J:1C Cf smRII WA.WI ttl C.."li~'i"!l'\X;1'IO>I i!RATtl:I POU\lt.i..,,TS, A'<l) (1} ;t,O>i(!!{ !0, AIIO AT 1-U Tlltlts.
co,F\.I' 'Mll< WlS CW( M'J'R0.0 N111 CO!i~TllVCOCfl !/V,I>,'~
ntl'l)l)(:t<OOT Tl£ t'Nl!AOON or 1:1,:t i;cNSTRUCrotl ACTlVrfi Ui'.'Tll Tl£ COOSW.Ji:tOO W(lR)( ,S (:zyl<~"!_ MO A?Plttl\!l)
!lY Clf"'Of"UR!..~
'/JI
"
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
E-29
CB,', -;ow·/~ 17
SW
---'ll '
i " tn i •
i I H, ! ! r ! j ]!,,l Ii-I t • j I i s l l, h ii·i j! Hib M
j I £. k • i l iJ f H u H i_ ~ ' 6 • ~J%
~ ~ . ~ ~ ~ • 1. • . • ; I~ -I .., "'l "' ' • ''' " " ~' ,,,,:" 8 •·• • " 12'+=-+-• i
-,-i=;:-
I '-·-··
fe1tr.,,:1,i,n,
1. CN11:1 t"• /,.0'< fa tile It!\ o' o:: IIPt,,c::tl, W,,Jl"""lion oc!M1~ (/hl w,,,,-.,) t~l•\! lo C,:,:,.,' ~ ,,..,u11a:t,:r.
t ~= ~p\ ~ ~~! t v~ tt..1,':il!J c'!-;~;~ ~• i:-ih1~r• ~=r:{'U ~~t 5='!:i~1f)~t,'j;= {,g.Yf;J ~J.,,:._""""'· o---
3. ~~-b t"-' C¼Q~ ~hvci;,,, !>w>d~""'• for "''"""'!.,... "": Of\~ ,, !'s• t¼n,; ~ --to o;,yly tM., b :•.-,,~jilt\..
SHOW THE LOCH"IONSOFALL CliOSEN BMA ABOVE
ON THE PROJECTS SITE Pt..AN-£ROS!DN CONTROL PJ.AN
SEE THE REVERSE SIDE OF THIS SHEET FOR A SAMPLE EROSION CONTROL PLAN
C<l'\$\'l.it!>Oh J">,;"'>i b SW,,-!hi.er Oud~y (::,--1:i&,)
0111n"..N ci(u:,w
,
f
REY 02/HI
A~ S{•mpra Lnt~rgy vM1ty·
ELECTRIC UNDERGROUND METER & SERVICE LOCATION
Customer Copy
Notification #: 300000344738 Job#: 530000196400 I TB: 1147-G3
Wanted Date: ON INSPECTION Date Prepared: 07/02/2020
Customer Type: Residential(1-2 Units) Service Type: UG SERVICE REWIRE/RELOCATION
Project Title: RONI GARDINIER-NC SOT
Project Address: 2414 MAJANO PL J Project City: CARLSBAD
Additional Address Info: 2414 MAJANO PL #2
Customer POC: RANDY RIMMER Customer Phone#: 619-548•8886
SDGE Contact: Service Coordinator Contact Info: SUSAN PRICKETT,760-476-7611
I I Traffic Control Permit Required I XISDG&E Application Required-Call: 1-800-411-7343
Excavation/Encroachment Permits Required By: Customer
Municipal Inspection required By: CITY OF CARLSBAD I Temp Service Charge due on First Bill$ 0.00
SERVICE ATTACHMENT POINT AND/OR METER LOCATION:
Install new 200amp 'dual meter panel at new location as shown on sketch (provide 36" separation from SDGE gas riser).Maintain 3x3
clear & level working space at panel (SDGE SG507)and label panel with serving addresses.Customer to provide all excavation,
trenching, 3~conduit, backfill, compaction, ¾" pull tape,& surface repair from handhole to new meter panel.Call 800-411-7343 to
place billing application for new meter. Call 760-476-5611 prior to trenching to arrange a joint meet with SDGE trench inspector &
to schedule a disconnecVreconnect provided SDG&E receives City inspection by 2pm on the same day the crew is scheduled. Contact Net
Meterina al:www.SDGE.com/NEM for all Solar auestions.Place a placard on panel defininq all Solar infomation.
Station ID#: 1117-417 Structure#: SH429730 I Joint Trench With:
Handhole Installed By: Handhole Lid Shall Read: Standards Page:
Ladder Arms: Stop Trench; from Pole Riser Quad:
Bend Installed By: SDG&E Bend Type; HANDHOLE Bend Info: 3" 90 DEG 36"R 0660
Conduit Installed By: CUSTOMER Conduit Size: 3"
Service Panel Rating: 200 Number/Size of Main Switch: 200MAX I Voltage: 120/240
# of Wires: 3 Phase: 1 Utilities Maximum Contribution to Fault Current: 10000
Metering: Self-Contained Meter Clips: 4
Meter height --4'0" min. (3'0" min. for multiple installation) --6'3" max. From finish grade to centerline of meter base. Meters are required to
be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition.
Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E
office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address
and unit number.
PROCEDURE FOR INSTALLATION
1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES.
2. Phone Service Coordinator at 760~76-7611 for the following:
-3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process.
-After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do
not cover conduit without inspector's written approval to backfill.
-When trench is backfilled and compacted. CALL FOR INSPECTION.
-If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT.
3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection
Additional Information: L_Pight of Way Required Assessor's Parcel Number:
To minimize the electrical outage, you are advised to schedule a morning disconnect with an afternoon reconnect. There is no charge
for this service. Before you change out your meter consider (1) SDG&E needs advance notice to schedule a crew and
(2) SOG&E will not reconnect the service without municipal approval on the new panel. Please contact the City regarding
pennits and inspections.
City inspection should be received prior to 2:00 p.m. on the same day as the disconnection of service to allow the SDG&E
crew enough time for reconnection of the service on the same day,
If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will
be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no
liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of
construction unless it is through negligence of SDG&E
Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements.
Building address and/or houseline must be permanently identified prior to meter set. Information on this sheet is void after six (6) months.
Keep this notice with building permit.
Planned By: Teri Bowers I Phone#: 7604765616
soa;
A~ Sempra Energy ut,tity =
CUSTOMER TO TRENCH
AND INSTALL NEW J"
CONDUIT FROM
HANDHOLE TO NEW
PANEL LOCATION
{APPROX 35FT! ,,--;--------------.. .,,...... .. ......... , ...
, '
/ ' , ' , ' , ' , ' , ' , ' , ' , . , . , . , . , .
2414
&
2414 #2
. .
5H42945Go \
, ' ' ~ l MAJANO Pl
' • • • • • ' • • • • • ' • ' ' ' ' ' ' • ' • ' ' ' ' ' ' ' ' ' ' , ,
' ,
' ,
' ' ' ' • • ' • •
1117-417 e:/
1-25 NOD
03302569170
ELaosouE
EXISTING
UG SERVICE
(TO BE REMOVED)
Project Address: 2414 & 2414 #2 MAJANO PL, CARLSBAD Notification #: 3-344738
Planner Name: TERI BOWERS Planner Phone#: 760-476-5611
Last Revised: July 2, 2020
INST ALL NEW 200AMP
DUAL ELECTRIC METER
PANEL IN NEW LOCATION
(PROVIDE REQUIRED 15"
CLEARANCE FROM SOGE
GAS RISER)
Know what's below.
Call 811before JOUdig.
t
N
I
I
C Cicyof
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Building Division
1635 Faraday Avenue
{760) 602-2719
www.carlsbadca.gov
This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance
requirements apply to their projects. The completed checklist must be included in the building permit application. It may be
necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate
full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach
to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as
specified by the ordinances.
NOTE: The following type of permits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
.o111 If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
an explanation must be provided to the satisfaction of the Building Official .
.o111 Details on CAP ordinance requirements are available on the city's website .
.o111 A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be
completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webpage and
download the latest form.
Project Name/Building
PermitNo.: GARDINIER ADU
Property Address/APN: 2414 MAJANO PLACE
Applicant Name/Co.: JAMES CHINN
BPNo.: C1sR2.o2.o --rs+?
ApplicantAddress: 2120 JIMMY DURANTE BLVD. #114 DEL MAR, CA. 92014
Contact Phone: 858-755-5863 Contact Email: jameschinn400@gmail.com
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
B-50
Contact Phone:
Contact Email:
Page 1 of 6 Revised 08/19
City of Carlsbad Climate Action Plan Consistency Checklist
Use the table below to detennine which sections of the Ordinance Compliance checklist are applicable to your project.
For alterations and additions to existing buildings, attach Building Pennit Valuation worksheet.
Building Pennit Valuation (BPV) from worksheet: $130,464.00
A high-rise residential building is 4 or more stories, including a
J ~ Residential Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor
area Is residential use
0 New construction 2A, 3A, 1B, 2B,
4A 3B,4A
~ Additions and alterations:
□ BPV < $60,000 NIA -NIA All residential additions and alterations
~PV ~ $60,000 ~' 1-2 family dwellings and townhouses with attached garages
□ Electrical service panel upgrade only I A,~ 4A only
*Multi-family dwellings only where interior finishes are removed
□ BPV ~ $200,000 1A, 4A* 1B, 4A* and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
D Nonresidential
□ New construction 1B, 2B, 3B, 4B and 5 I
□ Alterations:
□ BPV ~ $200,000 or additions ~ 1,000 1B, 5 square feet
□ BPV ~ $1,000,000 1B,2B,5 Building alterations of~ 75% existing gross floor area
□ ~ 2,000 sq. ft. new roof addition 2B,5 1 B also applies if BPV ~ $200,000
.: .... ,,
·.: ., . \ ':·· ·.' .' . ' . . '. ''_-·, : ,, . ·: ,': -''.·" ' . . . --.· .. ,,," -: 1.·' . <-., ,_ .... 'I• !' 'f1, ( • :.-.
Please refer to cartsbad Municipal Code (CMC) sections 1821.155 and 18.30.190, and the catifomia Green Building Standards Code (CALGreen) for
more i formation when completing this section.
A Residential addition or alteration :!: $60,000 building permit valuation. D NIA. _________ _
CMC section 18.30.190. D Exception: Home energy score 2: 7
(attach certification)
Year Built Single-family Requirements Multi.family Requirements
□ Before 1978 Select one:
□ Duct sealing □ Attic insulation □Cool roof □ Attic insulation
□ 1978 and later Select one:
□ Lighting package □ Water healing Package
D Between 1978 and 1991 Select one:
D Duct sealino D Attic insulation □Cool roof
~2andlater Select one:
D Lighting package □ Water heating package
B. D Nonresidential* new construction or alterations :!: $200,000 building permit valuation,
or additions :!: 1,000 square feet □ NIA
Updated 8/15/2019 2
City of Carlsbad Climate Action Plan Consistency Checklist
See CMC 18.21. 155 and CALGreen Appendix A5, Division A5.2-Energy Efficiency.
AS.203.1. 1 Choose one: D . 1 Outdoor lighting D .2 Warehouse dock seal doors
D .3 Restaurant service water heating (comply with California Energy Code section 140.5, as amended) D NIA, _________ _
D .4 Daylight design PAFs D .5 Exhaust air heat recovery
AS.203.1.2.1
Choose one as applicable: D .95 Energy budget D .90 Energy budget D NIA
AS.211.1"'
D On-stte renewable energy D NIA
A5.211.3"'
D Green power (tf offered by local utiltty provider, 50% minimum renewable sources) 0 NIA
AS.212.1
D Elevators and escalators D NIA
AS.213.1
D Steel framing 0 NIA
• lndudes hotels/motels and high-rise residential buildings
"' For alterations~ $1,000,000 BPV and affecting > 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply
wtth CMC 18.30.130 instead.
2. Photovoltaic Systems
A. 0 Residential new construction (for low-rise residential buitding permit applications submitted after 1/1/20). Refer to 2019 California
Energy Code section 150.1(c)14 for requirements. Notes: 1) High-rise residential buildings are subject to nonresidential photovoltaic
requirement (28 below) instead. 2) If project includes installation of an electric heat pump water heater pursuant to CMC 18.30.150(8)
(high-rise residential) or 18.30.170(8) Qow-rlse residential), increase system size by .3kWdc if PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc*
sheets if necessary)
roof plan sht.4 864 1 1.78
elec. heat pump w/h .3
Total System Size: 9-. • {) f-1
kWdc = (CFAx.572) 11,000 + (1.15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du = number of dwellings per plan type
if proposed system size is less than calculated size, please explain.
Exception
D
D
D
D
kWdc
B. D Nonresidential new construction or alterations i!!$1,000,000 8PV and affecting ~75% existing floor area, or addition that increases roof
area by ~.000 square feet Please refer to CMC section 18.30.130 when completing this section. Note: This section also applies to
highi'lse residential and hotel/motel buffdings.
Choose one of the following methods:
0 Gross Floor Area (GFA) Method
GFA:
D if< 10,000s.f. Enter: 5 kWdc
Min. System Size:
D If~ 10,000s.f. calculate: 15 kWdc x (GFA/10,000) ...
__ kWdc
... Round building size factor to nearest tenth, and round system size to nearest whole number.
D Time-Dependent Valuation Method
Updated 8/15/2019 3
City of Carlsbad Climate Action Plan Consistency Checklist
Annual TDV Energy use:* ... ______ x .80= Min. system size: _____ kWdc
.... Attach calculation documentation using modeling software approved by the California Energy Commission.
3. Water Heating
A ~ Residential and hotel/motel new construction
Please refer to CMC sections 18.30.150 and 18.30.170 when completing this section.
i2I For systems serving Individual dwelling units choose one:
D Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
li2l Heat pump water heater AND PV system .3 kWdc larger than required in CMC section 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1(c) 14 (low-rise residential)
D Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
0 Exception:
D For systems serving multiple dwelling units, install a central water-heating system with all of the following:
D Gas or propane water heating system D Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low-
rise residential) D Solar water heating system that is either: D .20 solar savings fraction D .15 solar savings fraction, plus drain water heat recovery
D Exception:
B. D Nonresidential new construction
Please refer to Cartsbad Ordinance CMC section 18.30.150 when completing this section.
D Water heating system derives at least 40% of its energy from one of the following (attach documentation):
D Solar-thermal D Photovoltaics D Recovered energy
□Water heating system is (choose one):
0 Heat pump water heater
0 Electric resistance water heater(s)
□Solar water heating system with .40 solar savings fraction
D Exception:
Updated 8/15/2019 4
City of Carlsbad Climate Action Plan Consistency Checklist
4. Electrlc Vehlcle Charging
A ~ Residential New construction and major alterations*
Please refer to Carlsbad Ordinance CMC section 18.21.140 when com lettn this section.
ne and two-family residential dwelling or townhouse with attached garage: r--,"""'--L'I
ne EVSE Ready parking space required ~ Exception : NO GARAGE
□Multi-family residential· D Exception ·
Total Parking Spaces EVSESoaces -Caoable Ready I ,-,
I
Galrulations: Total EVSE spaces = .10 x Total parking {rounded up to nearest whole number)
EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number)
EVSE other= Total EVSE spaces -EVSE Installed
(EVSE other may be ·capable," "Ready" or "Installed.")
Installed l Total
I
*Major alterations are: (1) for one and tv«>-family dwellings and townhouses with attached garages, alterations have a building permit valuation i? $60,000
or indude an electrical service panel upgrade; (2) for multifamily dwellings {three units or more without attached garages), alterations have a building permit
valuation i? $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing
systems are proposed.
B D Nonresldentlal new construction (Includes hotels/motels) D Exception ·
Total Parking Spaces EVSE Soaces
Proposed Capable I Readv I Installed I Total
10 2 I 5 I 1 I 8
Calculation: Refer to the table below:
Total Number of Paridno Soaces provided Number of reQUired EV Soaces Number of renuired EVSE Installed Soaces
□ 0-9 1 1
10-25 2 1
26-50 4 2
~ 51-75 6 3
D 76-100 9 5
101-150 12 6
□ 151-200 17 9
n 201 and over 10 percent of total 50 oercent of Reauired EV Soaces
Updated 8/15/2019 5
City of Carlsbad Climate Action Plan Consistency Checklist
5. 0 Transportation Demand Management (TOM): Nonresidential ONLY
AA approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employ8eilenerated ADT.
City staff will use the table below based on your submitted plans to determine whether or nor your permit requires a TOM plan. If TOM is applicable to your
permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details.
Acknov.iedgment
Employee ADT Estimation for Various Commercial Uses
Emp ADTfor
first 1,000 s.f.
EmpADTI
1000 s.f.1
Office (all)2 20
Restaurant 11
Retai13 8
Industrial 4
Manufacturing 4
Warehousin 4
1 Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 1(1hEdition
13
11
4.5
3.5
3
1
2 For all office uses, use SANDAG rate of 20 ADT/1,000 sf to
calculate employee AOT
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample calculations:
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf = 8 ADT
2. 9,334 sf -1,000 sf = 8,334 sf
3. 8,334 sf/ 1,000 x 4.5 + 8 = 46 Em Jo ee ADT
:itll-Glf€e111Sbad's Transportation Demand Management Ordinance. I agree to be contacted should
at)or!Hl!d TOM plan i a condition of permit issuance.
Person other n leant to be contacted for TDM compliance (if applicable):
Name(Printed): JAMES CHINN
EmaHAddressjameschinn400@gmail.com
Updated 8/15/2019
Date: 6-18-20
Ph N ber: 858-755-5863 one um . ____ _
6
' .
( City of
Carlsbad
Permit#: C/3l?: 20ZO-1377
HEIGHT
CERTIFICATION
B-60
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Assessor's Parcel Number: "ZSS -061 -oe
Site Address: 2414-M4.J4t.i0 Pl..406
Owner's Name:
This is to affirm that on 3 -Z 2 -Z / (date) the structure being constructed on the
site was surveyed by, or under the direction of, the undersigned. The height from the lower of natural or
finished grade to the highest finished point of the roof ridge elevation, or any part of the structure
immediately above, was found to be in conformance with the approved plans.
Surveyed height measurement (top of roof sheathing) at point{s) identified in approved plans as the
highest point(s) of the structure above lower of natural or finished grade elevation.
(Attach 8 :K''x 11" sheets showing elevatton(s) of structure where measurement(s) were taken and
location on site plan where they were taken>
Total thickness of roofing materials (i.e. felt and roofing) to be installed after sheathing inspection, not to
exceed: 0.
Total Height: _______________ 14_,7~----------
For additional infom:iation, please contact me at (phone number) (,,/9 -8 SI· Z I Z Z
Seal of Registration ~e ...... , ......... .
or Licensed Land Surveyor
NOTE: Property owner or project applicanVdeveloper may not certify building height.
Planning Division Acknowledgement·--------------Date·~ ____ _
PROJECT PLANNER
B-6 Page 1 of 1 Rev. 03120
EAST ELEVATION 1/4''=1'-0"
Cl.ASS "A ASSEMBLY CONC.
~-----TII..E ROOF "BORA!.: ESR-1017
0~ EQU.A.... MATCH EXIST,
~--7/8/ STUCCO ON PAPER BACKED
'1~"i.o_:_ lA'iH, TYO,, MA.TCH EXIST.
ATI"'C: VENTII.A TION: ---e~ S.F.1150 • 5.8 S.F. li!!Q.
USE: (4) 14· x 16' LOW. VENTS
= 6~ S.F. PROVIDED
[
i I--
I I
/
/
/
/
~--r ROPOSE
A.D.U.
APPROX. LOCA-
OF EXIST. PALM
I
I
I I