HomeMy WebLinkAbout2743 STIRLING CT; ; CBR2020-1988; Recycle~~--=.-:-.=-=-=-=-=-==== -====-=---=-=-=--=========--==--======·-----==--=rn==
( Ciry of
Carlsbad
RESIDENTIAL t3l~EEN
BUILDING CODE
STANDARDS MAND/.\TORY
MEASURES
CERTIFICATION
CHECKLIST
[ieveJopn,enc Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
8-51
This form, signed and completed, and all recet1,ts for the recyc/ecl materials shall be
u/Jmltted t th Building lnsJJ to pri to Fmal tnspectlot.
Sit~ Oevelc.p,-.-,ent Mandatory
4 .106.2 A plan is developed and implemented to manage storm water drainage during construction. {X)
i .. 10S.3 The site shall be planned and developed to keep surface water away from buildings. (X )
Construction plans shall indicate how site grading or a drainage system will manage all surface water
flows.
Energy Efficiency
4.201.1 Low-rise residential buildings shall meet or exceed the minimum standard design required by (X)
the California Energy Standards.
Water Efficiency and Conservation
Indoor Water Use
4.303.1 Indoor water use shall be reduced by at least 20 percent using one of the following methods: {X)
1. Water saving fixtures or flow restrictors shall be used. 7/01/2011
2. A 20 percent reduction in baseline water use shall be demonstrated.
4.303.2 When using the calculation method specified in Section 4.303.1, multiple showerheads shall not (X)
exceed maximum flow rates. 7/01/2011
4.303.3 Plumbing fixtures (water closets and urinals) and fittings (faucets and shower heads) shall (X)
comply with specified performance requirements. 7/01/2011
Outdoor Water Use
4.304.1 Automatic irrigation systems controllers installed at the time of final inspection shall be weather-(X)
based.
Enhanced Durability and Reduced Maintenance
4.406.1 Joints and openings. Annular spaces around pipes, electric cables, conduits or other openings
in plates at exterior walls shall be protected against the passage of rodents by closing such openings {X)
with cement mortar, concrete masonry or similar method acceptable to the enforcing agency.
Construction Waste Management Plan
4.408.1 A minimum of 65 percent of the construction waste generated at the site is diverted to recycle or (X·)
salvage. Recycled material receipts from approved recyclers must be attached to this form.
4.408.2 Where a local jurisdiction does not have a construction and demolition waste management ( X)
ordinance, construction waste management plan, per form 8-59, shall be submitted for approval to the
enforcing agency.
Building Maintenance and Operation
4.410.1 An operation and maintenance manual shall be provided to th e building occupant or owner. (X)
Environmental Quality
Fireplaces
4.503.1 Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed
woodstove or pellet stove shall comply with US EPA Phase II emission limits where applicable. ( X)
Woodstoves, pellet stoves and fireplaces shall also comply with aoolicable local ordinances.
8-51 Page 1 of 2 Rev. 5/17
Pollutant Control
4.504.1 Duct openings and other related air distribution component openings shall be covered
during construction.
4.504.2.1 Adhesive, sealants and caulks shall be compliant with VOC and other toxic compound
limits,
4.504.2.2 Paints, stains and other coatings shall be compliant with voe limits.
4.J(lt .. 2.3 Aerosol paints and coatings shall be compliant with product weighted MIR limits for
ROC and other toxic compounds. ( .. so,, .. 2.t. Documentation shall be provided to verify that compliant voe limit finish materials
have been used.
,~.so, .3 Carpet and carpet systems shall be compliant with voe limits.
( .. so,i.4 50 percent of floor area receiving resilient flooring shall comply with voe-emission limits
defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or
be certified under the Resilient Floor Covering Institute (RFC!) FloorScore program.
4.f:04.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood used in interior
finish systems shall comply with low formaldehyde emission standards.
Interior Moisture Control
4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations.
ti.505.3 Moisture content of building materials used in wall and floor framing is checked before
enclosure.
Indoor Air Quality and Exhaust
4 .506.1 Exhaust fans which terminate outside the building are provided in every bathroom.
Environmental Comfort
4.507.1 Whole house exhaµst fans shall have insulated louvers or covers which close when the
fan is off. Covers or louvers shall have a minimum insulation value of R-4.2.
4.507.2 Duct systems are sized, designed, and equipment is selected using the following
methods:
1. Establish heat loss and heat gain values according to ACCA Manual J or equivalent.
2. Size duct systems according to ACCA 29-0 (Manual D) or equivalent
3. Select heating and cooling equipment according to ACCA 36-S (Manual S) or equivalent.
Installer and Special Inspector Qualifications
702.1 HVAC system installers are trained and certified in the proper installation of HVAC
systems.
702.2 Special inspectors employed by the owner must be qualified and able to demonstrate
competence in the discipline they are inspecting.
(X)
(X)
(X)
(X)
(X)
(X)
(X)
()()
(X)
(X)
(X)
(X )
(X )
(X)
(X)
I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items
listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016
California Green Building Standards. All receipts for recycled materials have been attached to this form.
Project Address: J;?'/.3 6/.;ei-:j
Print Name: Vm!IMJ .J o~
C-/2 Plan Check Number: C& R -J{)}.O -{~
Signed:~\. -.
License Number: R-qlf[:z,._?-
8-51
Date: _::r--+-"/4-=z+-'lz_· /,__ __ rr·
Page 2 of 2 Rev. 5/17
.,
CONSTRUCTION WASTE Deve/o ment Services (r=Cityof '-MANAGEMENT PLAN Carlsbad-;--:-, peg--, . ...:._~rfi+--.1.1 s-s9
Building Division
1635 Faraday Avenue
,~~~ .. l 160-602-2119
~-7-~-3-&_tJ_e_U_;_i,~ e;r,ww.carlsbadca.gov C8f2zoio-JGJ~
'2.011 Section 4.408.1 and Section 5.408.1 of the ~ California Green Building Standards requires at least 65% of non-hazardous
construction debris is recycled and/or salvaged for reuse.
With the submitting of your application for a Building Permit or permit issuance, you must have completed a Construction Waste
Management Plan (CWMP) demonstrating how you will recycle a minimum of 65% of the construction waste generated from
your project.
NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to
collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working
with the City's franchised hauler, Waste Management, one cumulative project receipt is acceptable. However, it is the
Applicant's responsibility to confirm that the bins are collected for C&D Recycling.
1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper
storage and handling procedures t o reduce broken and damaged materials, and reusing materials whenever possible.
2. Waste Management Services can provide 2 roll-off bins, one for commingled construction debris and one for trash. The
commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and
create receipt(s), to demonstrate the project has met a 65% diversion rate or greater.
3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with, the City's exclusive
franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll-off bins for
particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible.
4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up
companies, etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion
receipts from a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to
http://www.sandiego.gov/environmental-services/recycling/cd/index.shtml.
5. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded
from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source
Separated Recycling Facility.
Part 1 -Before the Project Begins
Prior to issuance of a Building Permit, Applicant must submit PART 1 of the Construction Waste Management Plan (CWMP) Table.
a. Submit completed and signed form to City with Building Permit application.
Part 2 -Durin and After the Pro'ect
Prior to receiving inspection for final sign off of the Building Permit or Certificate of Occupancy, Applicant must submit the fully
completed and approved PART 2 of the Construction Waste Management Plan (CWMP) Table.
a. Save all receipts and/or documents from re use facilities, recycling centers, processing facilities, and landfills where
materials were taken.
b. Complete the Debris Recycling Report (DRR) as your project progresses. Recycling/diversion goals are (at a minimum)
65% of the waste generated by your project. .
c. Return completed form to: City of Carlsbad Building Division -1635 Faraday Ave, Carlsbad, CA 92008 or your inspector
prior to requesting final inspection.
Rev. 11112118
{'Cityof
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Deve/op__ment_Service§..
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Many of the materials generated from your project can be recycled. You are required to list materials that will be
reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing
this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building
Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be
used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Applicant Information
Permit No. C gQ ,. d-iD:JD r l'\ ee Project Title
Project Address [}._?-'1,3> ~-k~li..-t.~ ~J-
Applicant Name :£~et=>~ k)~A.N
Last First
Owner Contractor oz
APN
Architect
0
Other
0 --
Applicant Address _ _,_\..,.,\o....,b$""=--,____.__(?--'-'b"""a ... s,+'--'--'~=u-\-:=;__ _ _,AVE-'----''-------=--·-----------------
Phone ( 9J;b ) ?}-o9--1?.3$"
Applicant Mailing Address
(if different than project address)
E-mail Address
Project Type
(check all that apply):
Residential Commercial Public Building ~ □ □
Brief Description t-).gw 6i,g·,~J]~ .. _j, t'r;o1pk IJ ,,.JDt,J !:> +Ck,.Q.s I Qv\.~totr
Industrial □
Project Size ____________ Estimated Cost of Project $-~~='SD~~o_o_~~-----------
(square footage)
Please check the appropriate box:
DI plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction. ffen on self-hauling to a certified recycling facility and will provide all receipts after construction
D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE
MANAGEMENT.
Acknowledgement: I certify under penalty of perjury under the laws of the State of Ca lifornia that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief. ~
Print Name_\;-J~~-~~~:)~~~~'.lP~~~~-Signature ~ ~ Date
Page 1 of4 Rev. 11/12/18
\,
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
(cont'd) not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
SECTION A Permit No. egg~ ..... ~ Project Title
Project Address J.o/f:!> She..{;~ Cf.
Applicant Name :::S-~~ ~ Phone
APN
Last First
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
Material Type
Complete this line of the toble only if
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Asphalt & Concrete
Brick/ Masonry / Tile
Mixed Inert Debris
Car et
Carpet Padding/ Foam
Cardboard
Cei ling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Roofing Materials
Sera Metal
Stucco
Other:
TOTAL
SECTION C
To meet 65% Diversion Require
Contractor/Owner Signature
Estimated
Waste Quantity
(tons)
00 lB'>
A B C
Place a ( ✓) check
next to items to be
reused or salvaged
Place a(✓) check next
to items to be
recycled
Place a(✓) check next
to items to be
disposed at landfill
\OQ Q x 0.65 =--~-*~-~-> ___ tons
Total Estimated Waste from abave Minimum Required Diversion
VZ .. Zf
Page 2 of 4 Rev. 11112/18
PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final
building approval.
DEBRIS RECYCLING REPORT (ACTUAL}:
SECTION A Acknowledgement
I certify under penalty of perjury under the laws of the State of Ca lifornia that the information provided in and with
this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Permit No. ~Be -a,.o;)D,. Bffi Print Name
Address 39.t/~ -s/,-e I,~ C.-4--.
SECTION B Use this Final Log below to track loads of materials as they leave the job site.
@@SAVE RECEIPTS@@
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
A B C
Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility
(Name, Address, Phone)
Example:
01/05/2018 Concrete (broken)
Diversion Rate Achieved
Reused or Recycled
Salvaged
5 tons
Disposed in
Landfill
~~
Palomar Transfer Station, 5960 El
Camino Real
-760 603-0153
,,
''-,, I'
Contractor /Owner Signaturei_~_)LJ5;J.~t:Q4_A:~=:::::::::=:='.'.~~la-t4il-_ 1-/ rz. /-z /
Attach the following documentation to this Report:
• Original recycling weight tickets, landfill weight tickets
• Original donation receipts with photos and/or itemized descriptions
• Any other relevant information to support Recycling Report
Return completed form and documentation to:
City of Carlsbad
Building Division (1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
.I
Page 3 of 4 Rev. 11/12118
Conversion Table for Common Construction Waste
This document is informational onlv. It is here to help vou convert truckload auantities to tons if necessarv.
Column A Column B Column C
Category Material Volume Tons[Unit Tons
Mixed Debris Construction cy X 0.18 =
Demolition cy X 1.19 =
Asphalt/Concrete Asphalt (broken) cy X 0.70 =
Concrete (broken) cy X 1.20 =
Concrete (solid slab) cy X 1.30 =
Brick/Masonry/Tile Brick (broken) cy X 0.70 =
Brick (whole, palletized) cy X 1.51 =
Masonry brick (broken) cy X 0.60 =
Tile sq ft X 0.00175 =
Building Materials (cabinets, doors, windows, etc.) cy X 0.15 =
Cardboard (flat) cy X 0.05 =
Carpet By square foot sq ft X 0.0005 =
By cubic yard cy X 0.30 =
Carpet Padding/Foam sq ft X 0.000125 =
Ceiling Tiles Whole (palletized) cy X 0.0003 =
Loose cy X 0.09 =
Drywall (new or used) 1/2" (by square foot) sq ft X 0.0008 =
5/8" (by square foot) sq ft X 0.00105 =
Demo/used (by cu. yd.) cy X 0.25 =
Landscape Debris (brush, trees, etc.) cy X 0.15 =
Asphalt Composition
Shingles, asphalt Shingle cy X 0.22 =
Unpainted Wood/Pallets By board foot bd ft X 0.001375 =
By cubic yard cy X 0.15 =
Trash/Garbage cy X 0.18 =
Other (estimated weight) cy X estimate =
cy X estimate =
cy X estimate =
cy X estimate =
Total all =
Page 4 of 4
Rev. 11112/18
11/11/zp -Difw" 11 Z 13/vtJ e~~ !> j'e,1> /tJJ I ',1
It /1~ /i.o Pit it,,lf/l 7-8/vtr ~.tr;,$ '3111> /Bj
It I <5 /2 o C4 ~l>.iPM-/) -z_ 5/~ c'~j ?"t> //?.$
·' .-PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
(760)603-0153
000999 -CASH AND CHECK CUSTOMER
ADDRESS
carlsbad, CA 92008
Contract: RESI -GATE Yr . 2
GROSS 11,300
TARE
NET
Tracking Qty:
9 ,040
2 ,260
0 .00
Qty Unit Description
1. 13 TN MSW
Scale I n
Tare Out
54 Ticket #: 2168218
Weighmaster : gomezda
In : November 17 , 2020
Out : November 17 , 2020
Vehicle: a40025
Ref :
BOL :
INBOUND
CASH
Rate Extension
$79 .09 $89 .37
Tax
$0 .00
Origin : CARLSBAD 100%
] PALOMAR TRANSFER STA
5960 EL CAMINO REAL
CARLSBAD, CA 92008
11/rl/2020
CREDIT CARD
MC SALE
08:05:55
Card 11 XXXXXXXXXXXX6196
Ch~ Card: Union Bank Debit
AID: A0000000041010
SEQ r1. 9
Batch .: 13
INVOICE 10
Approval Code: 063026
Entry Method: Chip Read
Mode: Issuer · PIN Bypassed
fax Amount: $0.00
SAlE AMOUNT isg.37
CUSTOMER COPY
Signature :
Total
Paid
Change
.EDIT CARD-SCALE
8 :05 am
8 :05 am
Total
$89.37
$89 .37
$89 .37
$0.00
me