Loading...
HomeMy WebLinkAboutCT 2018-0001; WALNUT BEACH HOMES; FINAL SOILS REPORT; 2020-09-16 16 September 2020 Mr. Kevin Dunn Job No. 17-11664 Rincon Real Estate Group, Inc. 3005 S. El Camino Real San Clemente, CA 92672 Subject: Final Report of Grading Observations and Soil Testing Rincon-Walnut Avenue Residential Project 342 Walnut Avenue Carlsbad, California Dear Mr. Dunn: As requested, Geotechnical Exploration, Inc. hereby presents this report of grading observations and soil testing performed at the subject site. The work reported herein was performed between March 4, 2019, and August 26, 2020. We previously performed a preliminary geotechnical investigation, the results of which were presented in our “Report of Preliminary Geotechnical Investigation” dated November 14, 2017. SITE DESCRIPTION The property is known as Assessor’s Parcel No. 204-132-17-00, Parcel 2, per Recorded Map PM 00425, in the City of Carlsbad, County of San Diego, State of California. Refer to Figure No. I, the Vicinity Map, for the site location. The site, more particularly referred to as 362 Walnut Avenue, consists of approximately 0.57-acre. The lot is located on the north side of Walnut Avenue, in Rincon-Walnut Avenue Job No. 17-11664 Carlsbad, California Page 2 the City of Carlsbad. The property is bordered on the north, at approximately the same elevation, by a multi-family residential property; on the east and west side, at slightly lower elevation, by a multi-family residential property; and to the south at a slightly lower elevation by Walnut Avenue. In general, the lot slopes very gently to the southwest and northeast. For Plot Plan, refer to Figure No. II. The new construction consists of 6 two-unit residential structures with attached garages and associated improvements. The residential structures were constructed of standard-type building materials utilizing a conventional foundation system. SOIL TESTING Representative soil samples were collected during the grading to determine laboratory maximum dry density of the soils per ASTM D1557-12e1. Field density tests were performed at approximate locations shown on Figure No. II, Plot Plan, in accordance with ASTM D6938-17a. The complete list of field density tests results is shown on Table A of Figure Nos. IIIa-h, and laboratory soil compaction test results are shown on Table B of Figure No. IIIi. FIELD OBSERVATIONS 1. Rough grading for the lot was observed and tested between March 4 and 25, 2019, and the results were presented in our “Report of Building Pad Rough Grading Completion” dated March 26, 2019. The building pad soil removal consisted of excavating no more than 3 feet of the existing surface fill soils (with the exception of a section in the permeable driveway area located between Units 2, 3, and 9 where a 6-foot-deep excavation was dug to remove an old septic tank). Prior to backfill of the building pad excavation and the Rincon-Walnut Avenue Job No. 17-11664 Carlsbad, California Page 3 septic tank area, our representative observed that the excavation bottom was founded in dense formational soils. 2. Drilling for the permanent shoring wall located on the northeast portion of the lot was observed on March 19, 2019. A total of 7 holes 24 inches in diameter were drilled for the soldier piles. Each hole was approximately 23 feet in total depth relative to the existing surface grade at the time of the drilling operation. The soldier piles were properly embedded into dense formational soils and were observed to be in compliance to the approved shoring plans. It was observed at a later date that the shoring contractor installed drainage boards on the front side of the wood lagging and Bentonite waterproofing between the drainage boards. PVC pipe weep holes were observed on the bottom of the drainage board that discharges directly into the new BMP basin. 3. The BMP basin bottom was observed and density tested by our representative on April 19, 2019, after placement of 1 foot of soil to bring it up to grade. On August 8, 2019, our representative observed placement of the liner, a perforated pipe wrapped in a filter sock, with a gravel layer on the west half of the basin where the box is located. 4. Trench backfill for the utilities located within the building pad were observed and tested between May 14 and August 14, 2019. The observed and soil tested utilities include the sanitary sewer, the water line for the fire suppression systems, and the general water line. Due to utility trench backfill placement in the building pads, the building pad surface was re-graded and a representative of our firm re-observed and re-tested the building pad soils on August 19 and 20, 2019. The results were presented in our “Report of Building Pad Re-Grading Completion” dated August 28, 2019. Rincon-Walnut Avenue Job No. 17-11664 Carlsbad, California Page 4 5. Trench backfill for the utilities located on Walnut Avenue were observed and tested between October 1 and November 25, 2019. The observed and tested utilities include the general water line, the water line for the fire suppression systems, the sanitary sewer, and the gas and electrical trenches. A portion of the electrical trench was observed and tested within the building pads. The finish base grade for the general water line, the water line for the fire suppression system, and the sanitary sewer was also observed and tested. The asphalt concrete layer was not observed nor tested. 6. Bearing soils for the footing trench excavations were observed intermittently between September 30, 2019, and June 15, 2020. The observed footing trench excavations include all the building units (1-11) as well as the retaining wall along the western property line located around the water valve. The footing excavations were observed to be founded in dense recompacted fill soils. 7. The curb, gutter, and driveway apron subgrade soils were observed and tested on August 25 and 26, 2020. 8. Finished surface subgrade soils for exterior flatwork/improvements and the permeable paved driveway were not observed or soil tested. Grading equipment used for compaction consisted of a CAT 950G (tire loader), a CAT 259D (Bobcat), Backhoe with sheep’s foot compaction wheel, and pneumatic hand tampers. A water hose was used, when needed, to increase the soil moisture. Field density tests yielded a relative compaction of at least 90 percent (95 percent in some locations) of maximum dry density at tested locations. Locations with failed tests were remediated by the grading contractor and re-tested to the recommend Rincon-Walnut Avenue Job No. 17-11664 Carlsbad, California Page 5 compaction. Density tests were performed with a nuclear gauge testing apparatus in accordance with ASTM D6938-17a. The maximum dry density of the soils was determined per ASTM D1557-12e1. On-site and imported soils were used during the observed grading and field density testing. In general, the on-site soils consisted of brown silty sand, and the import consisted of dark grey crushed miscellaneous base. The on-site and imported soils were visually classified as low expansive per ASTM D4829. Proper finish drainage for the site is to be implemented by the general contractor prior to completing construction. Field density tests and approximate limits of the graded areas are shown in the attached Plot Plan, Figure No. II. Any future grading and earthwork should be observed by our field representative prior to form and steel reinforcing placement, and just prior to concrete placement. Any future utility or drainage trench backfill, or retaining wall backfill should also be performed under the observation and testing of our firm. Any subgrade testing for pending exterior flatwork should be observed and tested by our firm. A report will be provided issued after additional soil-related work is performed under our observation and testing SITE SUITABILITY AND COMPLIANCE The observed and soil tested areas of the project site are, in our professional opinion, suitable for their intended use. The dense formational soils are, in our professional opinion, suitable to support the recompacted fill, structure foundations, and new exterior improvements. Rincon-Walnut Avenue Job No. 17-11664 Carlsbad, California Page 6 We certify that the soil engineering and engineering geologic aspects of the grading operation are in compliance with the recommendations presented in our geotechnical report dated November 14, 2017, and the approved project plans. LIMITATIONS The findings and opinions presented herein have been made in accordance with currently accepted principles and practice in the field of geotechnical engineering in the City of Carlsbad. No warranty, either expressed or implied, is made. All statements in this grading report are applicable only for the grading operation observed by our firm. The firm Geotechnical Exploration, Inc. shall not be held responsible for fill soils placed without our observations and testing at any other time, or subsequent changes to the site by others, which directly or indirectly cause poor surface or subsurface drainage, water erosion, and/or alteration of the strength of the compacted fill soils. It is not within the scope of our services to provide quality control oversight for surface or subsurface drainage construction or retaining wall sealing and base of wall drain construction. It is the responsibility of the contractor to verify proper wall sealing, geofabric installation, protection board installation (if needed), drain depth below interior floor or yard surfaces; pipe percent slope to the outlet, etc. In the event that any changes in the nature, design, or location of the building or improvements are planned, the conclusions and recommendations contained in this report should not be considered valid unless the changes are reviewed and the conclusions of this report modified or verified in writing. Rincon-Walnut Avenue Job No. 17-11664 Carlsbad, California Page 7 This opportunity to be of service is sincerely appreciated. If you have any questions regarding this letter, please contact our office. Reference to our Job No. 17-11664 will help expedite a response to your inquiry. Respectfully submitted, GEOTECHNICAL EXPLORATION, INC. _______________________________ ______________________________ Jaime A. Cerros, P.E. Richard A. Cerros, E.I.T. R.C.E. 34422/G.E. 2007 Staff Engineer Senior Geotechnical Engineer VICINITY MAP Rincon Walnut Avenue Project 362 Walnut Avenue Carlsbad, CA. Figure No. I Job No. 17-11664 Site Thomas Guide San Diego County Edition pg 1106-E6 213Indicates Approximate Location of Field Density Test719169659372709067926889668788586359866460628561164163195146148147739620179921111098951994181297429386157222326293025312432272833363437353842433940417876774744794645484981805450515583845752538256151314167475196156199192122112115116121113119114120153123117124100159168169101144102145105104108167143194103106154158118130155157191198129152125161193160209176142182141175174183177140206207188189202201205203204211212135133134184179178185213149127111190197128126131150151132166107165110200109170LEGEND18013918613818113718713617117217316221017-11664-P2.aiRincon Walnut Avenue Project362 Walnut AvenueCarlsbad, CA.Figure No. IIJob No. 17-11664 (September 2020)PLOT PLANREFERENCE: This PLOT PLAN was prepared from an existingundated GRADING PLAN by PASCO LARET SUITER & ASSOC.and from on-site field reconnaissance performed by GEI. Scale: 1” = 10’(approximate)NOTE: This Plot Plan is not to be used for legal purposes. Locations and dimensions are approximate. Actual property dimensions and locations of utilities may be obtained from the Approved Building Plans or the “As-Built” Grading Plans.Rough GradingField Density Test LocationsWALNUT AVE TABLE A - SUMMARY OF FIELD DENSITY TEST RESULTS (ASTM D1557 and/or ASTM D6938)ApproximateWaterDry Degree ofTestElevation ContentDensityCompaction Compaction No. Date of Test Test Location (Feet) (%) (pcf) (%) Curve No.Remarks1 3/5/19 Unit 6,7,8 Pad FSG -2 10.1 121.2 9312 3/5/19 Unit 6,7,8 Pad FSG -2 9.0 120.0 9213 3/5/19 Unit 6,7,8 Pad FSG -2 9.8 118.8 9114 3/5/19 Unit 6,7,8 Pad FSG -2 10.3 117.9 9015 3/5/19 Unit 6,7,8 Pad FSG -2 8.6 124.6 9516 3/5/19 Unit 6,7,8 Pad FSG -2 9.2 119.5 9117 3/5/19 Unit 6,7,8 Pad FSG -210.4 121.6 9318 3/5/19 Unit 6,7,8 Pad FSG -19.7 119.2 91 19 3/5/19 Unit 6,7,8 Pad FSG -18.8 124.3 95110 3/5/19 Unit 6,7,8 Pad FSG -18.0 118.1 90 111 3/5/19 Unit 6,7,8 Pad FSG -110.3 121.7 93112 3/5/19 Unit 6,7,8 Pad FSG -18.9 122.9 94 113 3/5/19 SepticTank Pit BackfillFSG -4 9.1 121.3 93114 3/5/19 SepticTank Pit BackfillFSG -4 9.6 120.0 92 115 3/5/19 SepticTank Pit BackfillFSG -3 10.8 117.7 90116 3/5/19 SepticTank Pit BackfillFSG -3 10.0 119.4 91 117 3/6/19 Unit 6,7,8 PadFSG 9.6 120.5 92118 3/6/19 Unit 6,7,8 PadFSG 10.4 118.7 91 119 3/6/19 Unit 6,7,8 PadFSG 10.7 120.0 92 120 3/6/19 Unit 6,7,8 PadFSG 9.0 118.6 91 121 3/6/19 Unit 6,7,8 PadFSG 10.4 118.1 90 122 3/6/19 Unit 6,7,8 PadFSG 11.0 117.3 90 123 3/6/19 Unit 6,7,8 PadFSG 9.9 119.8 92 1243/11/19Unit 9 PadFSG -2 9.4 121.8 93 1253/11/19Unit 9 PadFSG -2 10.6 122.5 94 1263/11/19Unit 9 PadFSG -2 8.7 123.5 94 1273/11/19Unit 10 PadFSG -29.9 118.7 91 1283/11/19Unit 10 PadFSG -2 10.9 121.3 93 1Figure No. IIIa293/12/19Unit 9 PadFSG -1 9.7 120.7 92 1Job No. 17-11664Notes: 1) Curve number refers to Table B 2) FSG denotes finish subgrade elevation 3) FBG denotes finish base grade elevation 4) FPG denotes finish pavement grade TABLE A - SUMMARY OF FIELD DENSITY TEST RESULTS (ASTM D1557 and/or ASTM D6938)ApproximateWaterDry Degree ofTestElevation ContentDensityCompaction Compaction No. Date of Test Test Location (Feet) (%) (pcf) (%) Curve No.Remarks303/12/19Unit 9 PadFSG -1 10.6 118.0 90 1313/12/19Unit 9 PadFSG -1 8.4 127.6 98 1323/12/19Unit 10 PadFSG -1 10.0 125.5 96 1333/12/19Unit 10 PadFSG -1 11.4 117.8 90 1343/13/19Unit 10 PadFSG -2 10.2 119.5 91 1353/13/19Unit 10 PadFSG -2 8.8 118.9 91 1363/13/19Unit 10 PadFSG -1 7.9 124.6 95 1373/13/19Unit 10 PadFSG -1 9.1 123.7 95 1383/13/19Unit 11 PadFSG -2 10.0 117.5 90 1393/13/19Unit 11 PadFSG -2 9.9 124.0 95 1403/13/19Unit 11 PadFSG -2 11.3 118.6 91 1413/13/19Unit 11 PadFSG -1 10.6 120.5 92 1423/13/19Unit 11 PadFSG -1 8.0 119.3 91 1433/13/19Unit 11 PadFSG -1 11.4 123.1 94 1443/14/19Unit 1 PadFSG -2 10.2 121.8 93 1453/14/19Unit 1 PadFSG -2 9.8 120.7 92 1463/14/19Unit 1 PadFSG -2 9.6 122.5 94 1473/14/19Unit 1 PadFSG -1 9.8 123.7 95 1483/14/19Unit 1 PadFSG -1 10.7 121.3 93 1493/14/19Unit 1 PadFSG -1 11.0 122.4 94 1503/14/19Unit 2 PadFSG -2 10.6 118.6 91 1513/14/19Unit 2 PadFSG -2 8.4 123.4 94 1523/14/19Unit 2 PadFSG -2 8.9 121.2 93 1533/14/19Unit 2 PadFSG -2 9.3 120.7 92 1543/15/19Unit 2 PadFSG -1 9.0 123.1 94 1553/15/19Unit 2 PadFSG -1 10.7 119.9 92 1563/15/19Unit 2 PadFSG -1 7.4 121.7 93 1573/15/19Unit 2 PadFSG -1 8.0 119.2 91 1Figure No. IIIb583/15/19Unit 3 PadFSG -2 10.6 120.6 92 1Job No. 17-11664Notes: 1) Curve number refers to Table B 2) FSG denotes finish subgrade elevation 3) FBG denotes finish base grade elevation 4) FPG denotes finish pavement grade TABLE A - SUMMARY OF FIELD DENSITY TEST RESULTS (ASTM D1557 and/or ASTM D6938)ApproximateWaterDry Degree ofTestElevation ContentDensityCompaction Compaction No. Date of Test Test Location (Feet) (%) (pcf) (%) Curve No.Remarks593/15/19Unit 3 PadFSG -2 10.9 117.9 90 1603/15/19Unit 3 PadFSG -2 9.7 123.1 94 1613/15/19Unit 3 PadFSG -1 8.6 124.5 95 1623/15/19Unit 3 PadFSG -1 10.8 119.4 91 1633/15/19Unit 3 PadFSG -1 8.2 118.6 91 1643/15/19Unit 3 PadFSG -1 9.1 123.8 95 1653/15/19Unit 4 PadFSG -2 9.4 122.6 94 1663/15/19Unit 4 PadFSG -2 9.9 118.1 90 1673/15/19Unit 4 PadFSG -1 10.1 120.5 92 1683/15/19Unit 4 PadFSG -1 8.0 119.6 91 1693/18/19 Unit 5 Pad FSG -2 6.8 122.4 94 1703/18/19 Unit 5 Pad FSG -2 7.4 121.6 93 1713/18/19 Unit 5 Pad FSG -1 7.9 120.8 92 1723/18/19 Unit 5 Pad FSG -1 6.9 123.1 94 1733/19/19 Driveway Area FSG -1.5 8.3 124.6 95 1743/19/19 Driveway Area FSG -1.5 9.4 126.0 96 1753/19/19 Driveway Area FSG -1.5 8.0 125.0 96 1763/19/19 Driveway Area FSG -1.5 7.9 123.9 95 1773/19/19 Driveway Area FSG -1.5 8.8 127.0 97 1783/19/19 Driveway Area FSG -1.5 9.6 125.4 96 1793/25/19 Unit 1 Pad FSG 9.8 118.8 91 1803/25/19 Unit 1 Pad FSG 10.2 120.5 92 1813/25/19 Unit 1 Pad FSG 9.7 122.7 94 1823/25/19 Unit 2 Pad FSG 8.1 117.6 90 1833/25/19 Unit 2 Pad FSG 8.4 122.1 93 1843/25/19 Unit 2 Pad FSG 10.7 120.5 92 1853/25/19 Unit 3 Pad FSG 7.5 119.3 91 1863/25/19 Unit 3 Pad FSG 10.6 119.6 91 1Figure No. IIIc873/25/19 Unit 3 Pad FSG 9.7 117.9 90 1Job No. 17-11664Notes: 1) Curve number refers to Table B 2) FSG denotes finish subgrade elevation 3) FBG denotes finish base grade elevation 4) FPG denotes finish pavement grade TABLE A - SUMMARY OF FIELD DENSITY TEST RESULTS (ASTM D1557 and/or ASTM D6938)ApproximateWaterDry Degree ofTestElevation ContentDensityCompaction Compaction No. Date of Test Test Location (Feet) (%) (pcf) (%) Curve No.Remarks883/25/19 Unit 4 Pad FSG 9.8 124.4 95 1893/25/19 Unit 4 Pad FSG 9.7 125.2 96 1903/25/19 Unit 4 Pad FSG 8.0 118.3 90 1913/25/19 Unit 5 Pad FSG 7.3 123.9 95 1923/25/19 Unit 5 Pad FSG 8.4 121.8 93 1933/25/19 Unit 5 Pad FSG 8.6 119.9 92 1943/25/19 Unit 6 Pad FSG 7.8 119.4 91 1953/25/19 Unit 6 Pad FSG 7.9 122.6 94 1963/25/19 Unit 6 Pad FSG 8.2 118.2 90 1973/25/19 Unit 7 Pad FSG 10.1 123.3 94 1983/25/19 Unit 7 Pad FSG 9.7 123.5 94 1993/25/19 Unit 7 Pad FSG 9.1 120.5 92 11003/25/19 Unit 8 Pad FSG 8.9 117.8 90 11013/25/19 Unit 8 Pad FSG 7.9 122.0 93 11023/25/19 Unit 8 Pad FSG 10.4 119.3 91 11033/25/19 Unit 9 Pad FSG 10.9 125.0 96 11043/25/19 Unit 9 Pad FSG 9.8 119.7 92 11053/25/19 Unit 9 Pad FSG 7.4 120.4 92 11063/25/19 Unit 10 Pad FSG 8.1 125.4 96 11073/25/19 Unit 10 Pad FSG 7.6 121.9 93 11083/25/19 Unit 10 Pad FSG 8.5 120.5 92 11093/25/19 Unit 11 Pad FSG 9.8 122.6 94 11103/25/19 Unit 11 Pad FSG 9.1 117.4 90 11113/25/19 Unit 11 Pad FSG 9.3 118.8 91 11123/25/19 Unit 11 Pad FSG 9.0 119.9 92 11134/19/19 Botton of Bio Basin FSG -5 9.4 119.8 92 11145/14/19 Sanitary Sewer Backfill FSG -5 8.6 121.9 93 11155/14/19 Sanitary Sewer Backfill FSG -4 8.2 122.5 94 1Figure No. IIId1165/15/19 Sanitary Sewer Backfill FSG -2 8.8 120.4 92 1Job No. 17-11664Notes: 1) Curve number refers to Table B 2) FSG denotes finish subgrade elevation 3) FBG denotes finish base grade elevation 4) FPG denotes finish pavement grade TABLE A - SUMMARY OF FIELD DENSITY TEST RESULTS (ASTM D1557 and/or ASTM D6938)ApproximateWaterDry Degree ofTestElevation ContentDensityCompaction Compaction No. Date of Test Test Location (Feet) (%) (pcf) (%) Curve No.Remarks1175/15/19 Sanitary Sewer Backfill FSG -2 9.4 117.6 90 11185/15/19 Sanitary Sewer Backfill FSG -5 10.6 118.6 91 11195/15/19 Sanitary Sewer Backfill FSG -4 8.7 119.9 92 11205/15/19 Sanitary Sewer Backfill FSG -2 9.4 120.6 92 11215/15/19 Sanitary Sewer Backfill FSG -2 9.1 117.9 90 11225/15/19 Sanitary Sewer Backfill FSG-1 8.8 120.5 92 11235/15/19 Sanitary Sewer Backfill FSG -2 10.5 119.4 91 11245/15/19 Sanitary Sewer Backfill FSG -3 8.0 118.0 90 11255/17/19 Sanitary Sewer Backfill FSG -6 9.6 122.6 94 11265/17/19 Sanitary Sewer Backfill FSG -4 7.9 123.4 94 11275/17/19 Sanitary Sewer Backfill FSG -2 8.4 117.8 90 11285/17/19 Sanitary Sewer Backfill FSG -2 10.0 121.2 93 11295/17/19 Sanitary Sewer Backfill FSG -7 8.7 119.4 91 11305/17/19 Sanitary Sewer Backfill FSG -2 9.2 121.4 93 11315/17/19 Sanitary Sewer Backfill FSG -2 9.9 122.0 93 11325/17/19 Sanitary Sewer Backfill FSG -2 8.8 118.2 90 11335/22/19 Sanitary Sewer Backfill FSG -5 9.6 119.8 92 11345/22/19 Sanitary Sewer Backfill FSG -3 9.8 118.1 90 11355/22/19 Sanitary Sewer Backfill FSG -1 8.9 127.4 97 11365/24/19 Fire Line Backfill FSG -4 8.6 120.5 92 11375/24/19 Fire Line Backfill FSG -3 9.9 122.6 94 11385/24/19 Fire Line Backfill FSG -2 10.0 119.4 91 11395/24/19 Fire Line Backfill FSG -1 8.8 118.2 90 11405/24/19 Waterline Backfill FSG-3 9.4 117.8 90 11415/24/19 Waterline Backfill FSG -2 10.1 119.5 91 11425/24/19 Waterline Backfill FSG -1 8.6 122.1 93 11438/9/19 Waterline Backfill FSG -3.5 10.6 118.1 90 11448/9/19 Waterline Backfill FSG -2 9.9 121.0 93 1Figure No. IIIe1458/9/19 Waterline Backfill FSG -1.5 8.7 120.3 92 1Job No. 17-11664Notes: 1) Curve number refers to Table B 2) FSG denotes finish subgrade elevation 3) FBG denotes finish base grade elevation 4) FPG denotes finish pavement grade TABLE A - SUMMARY OF FIELD DENSITY TEST RESULTS (ASTM D1557 and/or ASTM D6938)ApproximateWaterDry Degree ofTestElevation ContentDensityCompaction Compaction No. Date of Test Test Location (Feet) (%) (pcf) (%) Curve No.Remarks1468/12/19 Waterline Backfill FSG -1.5 10.0 119.1 91 11478/12/19 Waterline Backfill FSG -2 11.3 117.6 90 11488/14/19 Waterline Backfill FSG 7.8 123.9 95 11498/14/19 Waterline Backfill FSG -2 7.9 124.4 95 11508/14/19 Waterline Backfill FSG -2.5 6.2 113.4 87 1 Test Failed see #1511518/14/19 Waterline Backfill FSG -2.5 8.3 117.2 90 1 Re-test #1501528/14/19 Waterline Backfill FSG -1.5 7.1 117.4 90 1 Service1538/14/19 Waterline Backfill FSG -1.5 7.1 118.1 90 11548/14/19 Waterline Backfill FSG -1.5 7.0 122.2 93 11558/14/19 Waterline Backfill FSG -1.5 9.3 118.9 91 11568/14/19 Waterline Backfill FSG -1 8.9 118.3 90 1 Service1578/14/19 Waterline Backfill FSG 6.3 119.7 92 11588/14/19 Waterline Backfill FSG -0.5 6.7 123.7 95 11598/14/19 Waterline Backfill FSG -0.5 7.0 124.6 95 11608/19/19 Building 1 Pad 55 6.2 123.0 94 11618/19/19 Building 2 Pad FSG 7.4 124.4 95 11628/19/19 Building 3 Pad 54.5 (FSG) 6.1 125.8 96 11638/19/19 Building 4 Pad 54.5 (FSG) 7.4 122.7 94 11648/19/19 Building 5 Pad 54 (FSG) 7.1 120.1 92 11658/20/19 Building 11 Pad 55 (FSG) 6.3 125.4 96 11668/20/19 Building 10 Pad 55 (FSG) 6.8 119.9 92 11678/20/19 Building 9 Pad 55 (FSG) 6.8 123.8 95 11688/20/19 Building 8 Pad 54 (FSG) 6.5 125.4 96 11698/20/19 Building 7 Pad 54 (FSG) 6.8 125.0 96 11708/20/19 Building 6 Pad 54 (FSG) 6.9 122.3 94 117110/1/19 Waterline in Street FSG-2' 7.4 117.9 90 117210/1/19 Waterline in Street FSG-1' 8.8 121.6 93 117310/1/19 Waterline in Street FSG 9.0 124.5 95 1Figure No. IIIf17410/15/19 Waterline in Street FSG 8.8 125.6 96 1Job No. 17-11664Notes: 1) Curve number refers to Table B 2) FSG denotes finish subgrade elevation 3) FBG denotes finish base grade elevation 4) FPG denotes finish pavement grade TABLE A - SUMMARY OF FIELD DENSITY TEST RESULTS (ASTM D1557 and/or ASTM D6938)ApproximateWaterDry Degree ofTestElevation ContentDensityCompaction Compaction No. Date of Test Test Location (Feet) (%) (pcf) (%) Curve No.Remarks17510/15/19 Waterline in Street FSG 7.9 124.8 95 117610/22/19 Waterline in Street FSG 7.7 126.6 97 117710/22/19 Waterline in Street FSG 8.8 124.0 95 117810/22/19 Fireline / Sewer in Street FSG 9.1 130.0 99 117910/22/19 Fireline / Sewer in Street FSG 7.0 125.8 96 118010/22/19 Fireline in Street FSG 6.8 124.3 95 118110/22/19 Fireline in Street FSG 8.4 124.7 95 118210/22/19 Waterline in Street FBG 11.2 113.8 95 218310/22/19 Waterline in Street FBG 12.0 114.4 96 218410/22/19 Sanitary Sewer in Street FBG 10.6 113.0 95 218510/22/19 Sanitary Sewer in Street FBG 9.4 113.6 95 218610/22/19 Fireline in Street FBG 11.8 114.3 96 218710/22/19 Fireline in Street FBG 10.0 115.9 97 218811/6/19 Electric Trench in Street FSG-3' 8.0 119.3 91 118911/6/19 Electric Trench in Street FSG-1' 9.7 117.8 90 119011/6/19 Electric Trench on-site FSG-3' 10.7 121.8 93 119111/6/19 Electric Trench on-site FSG-3' 7.2 119.5 91 119211/6/19 Electric Trench on-site FSG-3' 9.8 118.1 90 119311/6/19 Electric Trench on-site FSG-3' 8.3 122.3 94 119411/6/19 Electric Trench on-site FSG-2' 7.5 123.3 94 119511/6/19 Electric Trench on-site FSG-2' 10.2 121.9 93 119611/6/19 Electric Trench on-site FSG-2' 10.1 119.5 91 119711/7/19 Electric Trench on-site FSG-2' 9.4 122.7 94 119811/7/19 Electric Trench on-site FSG-1' 10.3 117.4 90 119911/7/19 Electric Trench on-site FSG-1' 8.5 120.0 92 120011/7/19 Electric Trench on-site FSG-1' 7.1 118.7 91 120111/7/19 Electric Trench in Street FSG-3' 8.6 119.3 91 120211/7/19 Electric Trench in Street FSG-1' 8.0 119.3 91 1Figure No. IIIg20311/8/19 Electric Trench in Street FSG-3' 8.7 121.7 93 1Job No. 17-11664#VALUE!Notes: 1) Curve number refers to Table B 2) FSG denotes finish subgrade elevation 3) FBG denotes finish base grade elevation 4) FPG denotes finish pavement grade TABLE A - SUMMARY OF FIELD DENSITY TEST RESULTS (ASTM D1557 and/or ASTM D6938)ApproximateWaterDry Degree ofTestElevation ContentDensityCompaction Compaction No. Date of Test Test Location (Feet) (%) (pcf) (%) Curve No.Remarks20411/8/19 Electric Trench in Street FSG-2' 9.5 123.2 94 120511/8/19 Electric Trench in Street FSG-1' 10.0 124.1 95 120611/25/19 Electric Trench in Street FSG-1' 7.8 119.3 91 120711/25/19 Electric Trench in Street FSG-1' 8.2 120.1 92 12088/26/20 Curb and Gutter FSG 9.4 124.5 95 12098/26/20 Curb and Gutter FSG 9.8 123.8 95 12108/26/20 Driveway Apron FSG 8.7 124.1 95 12118/26/20 Driveway Apron FBG 6.9 132.8 96 32128/26/20 Curb and Gutter FBG 7.1 131.6 95 32138/26/20 Curb and Gutter FBG 7.6 133.1 96 3Figure No. IIIhJob No. 17-11664Notes: 1) Curve number refers to Table B 2) FSG denotes finish subgrade elevation 3) FBG denotes finish base grade elevation 4) FPG denotes finish pavement grade Job No. 17-11664 Figure No. IIIi TABLE B LABORATORY COMPACTION TEST RESULTS (ASTM D1557) Compaction Maximum Optimum Test Source of Dry Density Water Content Curve No. Description of Material Material (pcf) % 1 (SM) SILTY SAND; Brown On-site 130.8 8.2 2 (CMB) CRUSHED MISCELLANEOUS BASE; Import 119.4 10.3 Dark Gray 3 (GW) WELL-GRADED GRAVEL WITH SAND; Import 138.5 5.8 Gray