Attention: Mr. James Palda
Subject: Project Grading and Final Compaction Report, Carlsbad Senior Housing,
5592 El Camino Real, Carlsbad, California
References: Appendix A
Gentlemen: In accordance with your request and authorization, Advanced Geotechnical Solutions, Inc. (AGS), presents
herein our observations and test results pertaining to the recently completed grading of the building pads
and associated improvements for the Carlsbad Senior housing project located on 5592 El Camino Real,
Carlsbad, California. Based on the results of the testing and observations by representatives of AGS, the
work described herein is considered to be in general conformance with City of Carlsbad Grading Code, the
project plans and specifications, and the recommendations presented in the referenced geotechnical report
(AGS, 2018).
This report addresses grading operations aimed at attaining finish grades for the subject three-tiered
building pads A, B and C as reflected on the 30-Scale Grading Plan, Sheet 5 of 21, Drawing No DWG 516-
7A, prepared by Rick Engineering Company (REC) of San Diego California. Grading for the subject site
was conducted between October 2019 and November 2019. Site development and associated improvements
was conducted between December 2019 and January 2021. Soil engineering observations and geologic
observations collected during grading are summarized in the text of this report and the developed data are
presented in Table 1. The approximate distribution of geologic units, removal elevations and compaction
tests under the purview of this report are shown on the accompanying Plate 1.
1.0 GEOLOGY
The subject site is situated within the Peninsular Ranges Geomorphic Province. The Peninsular Ranges
province occupies the southwestern portion of California and extends southward to the southern tip of Baja
California. In general, the province consists of young, steeply sloped, northwest trending mountain ranges
underlain by metamorphosed Late Jurassic to Early Cretaceous-aged extrusive volcanic rock and
Cretaceous-aged igneous plutonic rock of the Peninsular Ranges Batholith. The westernmost portion of the
province, where the subject site is located, is predominantly underlain by younger marine and non-marine
sedimentary rocks. The Peninsular Ranges’ dominant structural feature is northwest-southeast trending
crustal blocks bounded by active faults of the San Andreas transform system.
February 16, 2021 Page 2 P/W 1905-07 Report No. 1905-07-C-7
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
1.1. Subsurface Conditions
A brief description of the earth materials encountered during grading operations is presented in the
following sections. Based on the referenced reports and our observations during grading, the site
was mantled with topsoil and undocumented fill underlain by Point Loma Formation materials.
1.1.1. Topsoil
The majority of the site was covered with a relatively thin veneer of topsoil approximately
2 to 3.5 feet thick. As encountered, these materials were brown, fine to medium grained
clayey sand in a slightly moist and loose to medium dense condition. These materials were
completely removed during grading.
1.1.2. Artificial Fill - Undocumented
Artificial fill soils were encountered during grading underlying topsoil. As encountered,
the undocumented fill ranged in thickness from 0 to 8 feet. These materials generally
consisted of brown, slightly moist, loose to medium dense, fine to medium grained clayey
sand and very stiff sandy clay. These materials were completely removed during grading.
1.1.3. Point Loma Formation (Map Symbol - Kp)
The site is underlain to the depths excavated by Point Loma formation. These materials can
generally be described as fine to medium grained, brown and gray, mottled orange, clayey
sandstone that is moderately hard to hard and weakly to well cemented. The upper
weathered portion of Point Loma formation materials was removed during grading.
1.2. Groundwater
Groundwater was not encountered during grading within the subject site. It should be noted that
water may develop at a later date, due to fluctuations in precipitation, irrigation practices, or factors
not evident at the time of grading.
2.0 SITE GRADING
The trapezoidal shaped site encompasses approximately 3.2 acres and previously supported multiple
detached dwellings, outbuildings, storage containers, an asphalt paved driveway and parking area, and a
below ground pool. Prior to the commencement of grading operations, the existing onsite structures, surface
vegetation and debris within the proposed limits were removed and disposed of offsite. AGS observed the
installation of permanent shoring walls along the western and eastern limits of the site prior to grading.
Based on AGS’ (2018) geotechnical report, it was concluded that removal and recompaction of the upper
surface soils and retaining wall foundation excavations would be required during site grading operations
for construction of the three-tiered building pads A, B and C and the intermediate retaining walls. Presented
below is a summary of the removals, excavations and fill placement operations.
February 16, 2021 Page 3 P/W 1905-07 Report No. 1905-07-C-7
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
2.1. Unsuitable Soil Removals and Retaining Wall Excavations
Prior to placement of fill onsite, the compressible topsoil, undocumented fill and highly weathered
formational materials were removed. The removal depths for the subject building pads and
retaining walls generally ranged from approximately three (3) to nine (9) feet below existing grades.
Removal bottom elevations onsite were determined utilizing the Grading Contractor’s equipment
and are shown on the accompanying Plate 1. Accordingly, all elevations presented on Plate 1 and
Table 1 are based on this information source. The maximum depth of fill under the purview of this
report is approximately 12 feet corresponding to the retaining wall backfill within Building Pad A.
Temporary backcuts for the retaining walls were sloped at approximate 1:1 (horizontal:vertical)
inclination.
2.2. Northeast Slope Remediation
During our site grading observations on November 15, 5019, it was determined that the
northeastern slope descended more steeply than shown on the 30-scale grading plan (Plate 1). AGS
recommended that the slope be reconstructed at a 1.5:1 (H:V) inclination with BX1200 geogrid
reinforcement every 18 inches. During excavations in this area, an abandoned water line was
encountered, removed and backfilled with slurry. In addition, a large volume of trash, soil and
concrete was also encountered at the northeast property corner and was completely removed prior
to slope reconstruction.
2.3. Compaction Operations
Excavation bottoms were observed by representatives of AGS. The exposed removal bottoms were
scarified to an approximate depth of 6 to 8 inches, brought to slightly above optimum moisture
content and compacted to a minimum of 90 percent of the laboratory maximum dry density in
accordance with ASTM Test Method D-1557. Fill materials, consisting of the soil types
summarized in Table 1, were then placed in thin, loose, lifts (approximately 8 inches), brought to
slightly above optimum moisture content, and compacted to a minimum of 90 percent of the
laboratory maximum dry density in accordance with ASTM Test Method D-1557. Compaction was
achieved by heavy grading equipment, vibratory compactors and handheld compaction tampers.
Compaction tests were taken during the course of grading at approximately every one to two feet
of fill placed. A summary of compaction tests pertaining to grading and compaction testing within
the building pads is presented in Table 1. The approximate locations of these tests are shown on
the accompanying Plate 1.
3.0 DESIGN RECOMMENDATIONS
Based on AGS’s testing and observations during site grading and review of the referenced reports, the
building pads are considered suitable for support of the proposed structures. The materials and geologic
conditions encountered during grading were generally observed to be consistent with those described in the
geotechnical report by AGS (2018). The design recommendations presented in the geotechnical report by
AGS (2018) remain applicable for the project.
February 16, 2021 Page 4 P/W 1905-07 Report No. 1905-07-C-7
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
4.0 ONSITE IMPROVEMENTS
Compaction operations for site retaining walls, utility trench backfill (storm drain, sewer, water, dry
utilities), and surface improvements (street and flatwork subgrade, aggregate base, asphalt) during site
development were observed by representatives of AGS on a full and part time basis. Results of our testing
and observations are summarized in the text of this report and the developed data presented in Table 1.
Fill materials, consisting of the soil types summarized in Table 1, were placed in thin, loose, lifts brought
to slightly above optimum moisture content, and compacted to the minimum compaction standard of the
laboratory maximum dry density in accordance with ASTM Test Method D-1557. Based on our testing and
observation, the work is considered to be in conformance with City of Carlsbad requirements and the
construction plans and specifications. The tested backfill and surface improvement materials are considered
suitable for their intended use.
5.0 LIMITATIONS
This report presents information and data relative to grading and improvement operations for the subject
site. AGS’ representatives probed and tested at random locations in an effort to determine whether
compliance with the project compaction requirements, specifications, and applicable Building Code was
being obtained. The presence of our personnel during testing operations does not involve any supervision
or direction of the contractor or his work forces.
The opportunity to be of service is sincerely appreciated. If you should have any questions, please do not
hesitate to contact the undersigned.
Respectfully Submitted,
Advanced Geotechnical Solutions, Inc. Prepared by: STEVEN L. JESSUP Staff Engineer
Reviewed by:
_________________________________ __________________________________ ANDRES BERNAL, Sr. Geotechnical Engineer PAUL J. DERISI, Vice President RCE 62366/GE 2715, Reg. Exp. 9-30-21 CEG 2536, Reg. Exp. 5-31-21
Distribution: (1) Addressee (pdf) Attachments: Appendix A - References Table I - Compaction Test Results Plate 1 - Geotechnical Plan
February 16, 2021 Page 5 P/W 1905-07 Report No. 1905-07-C-7
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
APPENDIX A
REFERENCES
Advanced Geotechnical Solutions, Inc., 2018, Preliminary Geotechnical Investigation and 30-scale
Grading Plan Review for Steadfast Senior Care Facility, 5592 El Camino Real, Carlsbad, California, Report No. 1810-04-B-2, dated November 8, 2018.
---, 2019a, As-graded Statement for Building Pad A, Carlsbad Senior Housing, 5592 El Camino Real,
Carlsbad, California, Report No. 1905-07-B-2, dated November 8, 2019.
---, 2019b, As-graded Statement for Building Pad B, Carlsbad Senior Housing, 5592 El Camino Real,
Carlsbad, California, Report No. 1905-07-B-3, dated November 25, 2019.
---, 2020a, As-graded Statement for Building Pad C, Carlsbad Senior Housing, 5592 El Camino Real,
Carlsbad, California, Report No. 1905-07-B-4, dated February 19, 2020.
---, 2020b, As-graded Statement for Carlsbad Senior Housing, 5592 El Camino Real, Carlsbad, California,
Report No. 1905-07-B-5, dated December 21, 2020.
Irwin Partners Architects, 2019, Bid Set and Specifications, Carlsbad Senior Housing, Steadfast Senior
Care Facility, 5592 El Camino Real, Carlsbad, California, dated May 15, 2019.
Rick Engineering Company, 2019, Rough Grading Site Plan, Carlsbad Senior Housing, Steadfast
Companies, dated August 30, 2019.
February 15, 2021
P/W 1905-07
SUMMARY OF LABORATORY
MAXIMUM DRY DENSITY AND
OPTIMUM MOISTURE CONTENT
TABLE I
Page 1 of Table I
Report No. 1905-07-C-7
SOIL TYPE DESCRIPTION
OPTIMUM
MOISTURE
CONTENT
(%)
MAXIMUM
DRY
DENSITY
(pcf)
A Clayey Sand 13.5 116.0
B Yellowish Brown Clayey Silty Sand 15.5 109.0
C Dark Brown Clayey Silty Sand 16.5 112.0
AB Crushed Miscellaneous Aggregate Base 10.5 118.3
AB2 Crushed Miscellaneous Aggregate Base 8.5 135.0
AB3 Crushed Miscellaneous Aggregate Base 9.0 124.5
AC Asphaltic Concrete --147.0
AC2 Asphaltic Concrete --150.0
AC3 Asphaltic Concrete --144.5
AC4 Asphaltic Concrete --148.0
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 2 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
10/28/19 101 NE Fill Slope 214 A 13.5 14.8 116.0 105.2 90 90 N Pass
10/28/19 102 NE Fill Slope 216 A 13.5 15.0 116.0 106.6 91 90 N Pass
10/28/19 103 NE Fill Slope 213 A 13.5 13.5 116.0 106.8 92 90 N Pass
10/28/19 104 NE Fill Slope 215 A 13.5 19.0 116.0 109.2 94 90 N Pass
11/08/19 105FG Bldg A FG A 13.5 15.0 116.0 113.5 97 90 N Pass
11/08/19 106FG Bldg A FG A 13.5 16.9 116.0 110.6 95 90 N Pass
11/08/19 107FG Bldg A FG A 13.5 18.4 116.0 111.5 96 90 N Pass
11/08/19 108FG Bldg A FG A 13.5 15.9 116.0 112.3 96 90 N Pass
11/08/19 109FG Bldg A FG A 13.5 15.9 116.0 111.6 96 90 N Pass
11/18/19 110 NE 1.5:1 (H:V) Slope 214 A 13.5 14.6 116.0 110.4 95 90 N Pass
11/18/19 111 NE 1.5:1 (H:V) Slope 216 B 15.5 17.0 109.0 103.4 94 90 N Pass
11/18/19 112 NE 1.5:1 (H:V) Slope 216 A 13.5 13.7 116.0 108.6 93 90 N Pass
11/18/19 113 NE 1.5:1 (H:V) Slope 218 A 13.5 13.9 116.0 109.7 94 90 N Pass
11/18/19 114 NE 1.5:1 (H:V) Slope 220 A 13.5 14.8 116.0 108.1 93 90 N Pass
11/18/19 115 NE 1.5:1 (H:V) Slope 22 A 13.5 15.0 116.0 110.1 94 90 N Pass
11/18/19 116 NE 1.5:1 (H:V) Slope 226 A 13.5 14.2 116.0 110.0 94 90 N Pass
11/26/19 117FG Bldg B FG A 13.5 13.7 116.0 105.2 90 90 N Pass
11/26/19 118FG Bldg B FG A 13.5 14.8 116.0 109.5 94 90 N Pass
11/26/19 119FG Bldg B FG A 13.5 14.8 116.0 108.4 93 90 N Pass
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 3 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
11/26/19 120FG Bldg B FG A 13.5 15.9 116.0 107.6 92 90 N Pass
12/10/19 121S Bldg B Sewer -4 A 13.5 22.8 116.0 103.9 89 90 N Fail
12/10/19 122S Bldg B Sewer -3 A 13.5 22.5 116.0 102.0 87 90 N Fail
12/10/19 121S-R Bldg B Sewer -3 A 13.5 15.0 116.0 106.0 91 90 N Pass
12/10/19 122S-R Bldg B Sewer -3 A 13.5 14.6 116.0 107.1 92 90 N Pass
12/12/21 123S Bldg A Sewer -4 A 13.5 14.2 116.0 109.6 94 90 N Pass
12/12/19 124S Bldg A Sewer -3 A 13.5 13.6 116.0 106.4 91 90 N Pass
12/12/19 125S Bldg A Sewer -2 A 13.5 13.9 116.0 107.2 92 90 N Pass
12/12/19 126S Bldg A Sewer -1 A 13.5 14.6 116.0 105.4 90 90 N Pass
12/12/19 127S Bldg A Sewer -1 A 13.5 13.8 116.0 106.1 91 90 N Pass
12/19/19 128S MH Connection -4 C 16.5 17.1 112.0 102.4 91 90 N Pass
12/19/19 129S MH Connection -4 C 16.5 16.9 112.0 101.6 90 90 N Pass
12/19/19 130S MH Connection -3 C 16.5 17.2 112.0 102.3 91 90 N Pass
12/19/19 131S MH Connection -2 C 16.5 17.8 112.0 102.3 91 90 N Pass
12/19/19 132S MH Connection -1 C 16.5 16.9 112.0 105.4 94 90 N Pass
12/20/19 133S MH Connection -3 C 16.5 18.0 112.0 101.9 90 90 N Pass
12/20/19 134S MH Connection -2 C 16.5 16.9 112.0 106.4 95 90 N Pass
12/20/19 135S MH Connection -1 C 16.5 16.8 112.0 105.1 93 90 N Pass
01/07/20 136SD Line 12 Storm Drain 215 A 13.5 16.2 116.0 106.0 91 90 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 4 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
01/07/20 137SD Line 12 Storm Drain 215 A 13.5 17.4 116.0 106.5 91 90 N Pass
01/07/20 138SD Line 12 Storm Drain 217 A 13.5 16.3 116.0 105.6 91 90 N Pass
01/07/20 139SD Line 12 Storm Drain 219 A 13.5 15.9 116.0 105.8 91 90 N Pass
01/07/20 140SD Line 12 Storm Drain 219 A 13.5 15.2 116.0 106.2 91 90 N Pass
01/13/20 141RT Bldg A Wall 226 C 16.5 17.7 112.0 107.5 95 90 N Pass
01/13/20 142RT Bldg A Wall 226 C 16.5 18.1 112.0 106.6 95 90 N Pass
01/14/20 143RT Bldg A Wall 228 C 16.5 18.2 112.0 107.2 95 90 N Pass
01/14/20 144RT Bldg A Wall 228 C 16.5 19.0 112.0 109.2 97 90 N Pass
01/14/20 145RT Bldg A Wall 230 C 16.5 17.2 112.0 107.4 95 90 N Pass
01/14/20 146RT Bldg A Wall 230 C 16.5 16.9 112.0 106.9 95 90 N Pass
01/14/20 147RT Bldg A Wall 230 C 16.5 17.1 112.0 107.2 95 90 N Pass
01/15/20 148RT Bldg A Wall 226 C 16.5 17.9 112.0 107.0 95 90 N Pass
01/15/20 149RT Bldg A Wall 228 C 16.5 18.4 112.0 107.0 95 90 N Pass
01/15/20 150RT Bldg A Wall 230 C 16.5 19.6 112.0 108.0 96 90 N Pass
01/15/20 151RT Bldg A Wall 232 C 16.5 18.6 112.0 108.7 97 90 N Pass
01/15/20 152RT Bldg A Wall 232 C 16.5 18.4 112.0 107.9 96 90 N Pass
01/15/20 153RT Bldg A Wall 232 C 16.5 19.1 112.0 108.7 97 90 N Pass
01/16/20 154RT Bldg A Wall 234 C 16.5 19.5 112.0 109.1 97 90 N Pass
01/16/20 155RT Bldg A Wall 234 C 16.5 18.6 112.0 108.6 96 90 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 5 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
01/16/20 156RT Bldg A Wall 234 C 16.5 19.7 112.0 107.5 95 90 N Pass
01/17/20 157RT Bldg A Wall 233 C 16.5 20.5 112.0 107.0 95 90 N Pass
01/17/20 158RT Bldg A Wall 233 C 16.5 18.0 112.0 107.2 95 90 N Pass
01/17/20 159RT Bldg A Wall 234 C 16.5 19.0 112.0 107.5 95 90 N Pass
01/17/20 160RT Bldg A Wall 234 C 16.5 17.3 112.0 109.8 98 90 N Pass
01/18/20 161RT Bldg A Wall 235 C 16.5 20.2 112.0 107.6 96 90 N Pass
01/18/20 162RT Bldg A Wall 235 C 16.5 19.5 112.0 106.5 95 90 N Pass
01/18/20 163RT Bldg A Wall 235 C 16.5 18.0 112.0 107.1 95 90 N Pass
01/20/20 164RT Bldg A Wall 234 C 16.5 18.7 112.0 107.5 95 90 N Pass
01/20/20 165RT Bldg A Wall 235 C 16.5 17.0 112.0 110.0 98 90 N Pass
01/20/20 166RT Bldg A Wall 236 C 16.5 19.4 112.0 108.0 96 90 N Pass
01/20/20 167RT Bldg A Wall 236 C 16.5 17.8 112.0 106.4 95 90 N Pass
01/22/20 168S Bldg A -2 C 10 14.9 16.0 115.8 111.3 96 90 N Pass
01/22/20 169S Bldg A -1 C 10 14.9 18.5 115.8 111.2 96 90 N Pass
01/22/20 170RT Bldg B Wall -10 C 10 14.9 15.0 115.8 110.8 95 90 N Pass
01/22/20 171RT Bldg B Wall -9 C 10 14.9 15.1 115.8 110.4 95 90 N Pass
01/22/20 172S Bldg B -7 C 10 14.9 15.6 115.8 112.0 96 90 N Pass
01/24/20 173RT Bldg B Wall -7 C 10 14.9 16.3 115.8 112.2 96 90 N Pass
01/24/20 174RT Bldg B Wall -5 C 10 14.9 16.0 115.8 111.4 96 90 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 6 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
01/27/20 175RT Bldg B Wall -5 C 10 14.9 17.4 115.8 111.2 96 90 N Pass
01/27/20 176RT Bldg B Wall -5 C 10 14.9 17.2 115.8 110.4 95 90 N Pass
01/28/20 177RT Bldg B Wall -3 C 10 14.9 17.0 115.8 110.5 95 90 N Pass
01/28/20 178RT Bldg B Wall -3 C 10 14.9 16.6 115.8 111.4 96 90 N Pass
01/28/20 179RT Bldg B Wall -2 C 10 14.9 16.8 115.8 113.0 97 90 N Pass
01/28/20 180RT Bldg B Wall -1 C 10 14.9 15.2 115.8 112.5 97 90 N Pass
01/18/20 181RT Bldg B Wall -1 C 10 14.9 15.2 115.8 110.7 95 90 N Pass
01/31/20 182S Bldg A -1 C 16.5 19.4 112.0 103.8 92 90 N Pass
01/31/20 183 Bldg B 244 C 16.5 18.9 112.0 104.5 93 90 N Pass
01/31/20 184 Bldg B 246 C 16.5 17.5 112.0 106.4 95 90 N Pass
01/31/20 185 Bldg B 248 C 16.5 18.2 112.0 107.1 95 90 N Pass
01/31/20 186 Bldg B 248 C 16.5 17.7 112.0 105.0 93 90 N Pass
02/03/20 187S Bldg A -1 C 16.5 18.5 112.0 102.3 91 90 N Pass
02/03/20 188S Bldg A -1 C 16.5 17.3 112.0 103.6 92 90 N Pass
02/03/20 189S Bldg A -2 C 16.5 17.0 112.0 101.9 90 90 N Pass
02/03/20 190S Bldg A -1 C 16.5 16.8 112.0 103.1 92 90 N Pass
02/03/20 191S Bldg A -1 C 16.5 17.4 112.0 102.8 91 90 N Pass
02/03/20 192S Bldg A -1 C 16.5 17.0 112.0 102.2 91 90 N Pass
02/03/20 193S Bldg A -1 C 16.5 17.0 112.0 103.6 92 90 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 7 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
02/04/20 194SD Bldg A -1 C 16.5 18.0 112.0 102.0 91 90 N Pass
02/04/20 195SD Bldg A -1 C 16.5 18.3 112.0 103.2 92 90 N Pass
02/04/20 196S Bldg A -2 C 16.5 16.9 112.0 102.5 91 90 N Pass
02/04/20 197S Bldg A -1 C 16.5 17.0 112.0 103.3 92 90 N Pass
02/04/20 198S Bldg A -1 C 16.5 18.1 112.0 102.6 91 90 N Pass
02/05/20 199S Bldg A -2 C 16.5 18.5 112.0 103.6 92 90 N Pass
02/05/20 200S Bldg A -2 C 16.5 16.9 112.0 107.5 95 90 N Pass
02/05/20 201S Bldg A -1 C 16.5 16.5 112.0 103.3 92 90 N Pass
02/05/20 202SD Bldg A -1 C 16.5 17.3 112.0 104.1 92 90 N Pass
02/05/20 203JT Bldg A -1 C 16.5 14.0 112.0 103.2 92 90 N Pass
02/05/20 204JT El Camino Real -2 C 16.5 14.1 112.0 106.8 95 90 N Pass
02/05/20 205SG El Camino Real SG AB 10.5 12.0 118.3 113.0 95 95 N Pass
02/05/20 206B El Camino Real BG AB 10.5 12.5 118.3 112.7 95 95 N Pass
02/06/20 207JT El Camino Real -1 AB 10.5 12.1 118.3 113.6 96 95 N Pass
02/06/20 208JT El Camino Real -1 AB 10.5 11.0 118.3 112.9 95 95 N Pass
02/06/20 209JT El Camino Real -1 AB 10.5 11.1 118.3 114.5 96 95 N Pass
02/06/20 210JT El Camino Real -1 AB 10.5 10.8 118.3 113.8 96 95 N Pass
02/07/20 211JT Bldg B -3 C 16.5 18.0 112.0 104.7 93 90 N Pass
02/07/20 212JT Bldg B -1 C 16.5 18.3 112.0 103.9 92 90 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 8 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
02/07/20 213JT El Camino Real -1 C 16.5 19.0 112.0 108.0 96 95 N Pass
02/07/20 214JT El Camino Real -1 C 16.5 17.0 112.0 108.2 96 95 N Pass
02/11/20 215RT Bldg C Wall 251 C 16.5 18.0 112.0 108.0 96 90 N Pass
02/12/20 216RT Bldg C Wall 251 C 16.5 18.6 112.0 109.9 98 90 N Pass
02/12/20 217RT Bldg C Wall 252 C 16.5 18.8 112.0 105.9 94 90 N Pass
02/12/20 218RT Bldg C Wall 252 C 16.5 19.0 112.0 106.5 95 90 N Pass
02/12/20 219W NW Tie In 217 C 16.5 17.0 112.0 106.0 94 90 N Pass
02/12/20 220W NW Tie In 220 C 16.5 18.5 112.0 103.2 92 90 N Pass
02/12/20 221JT El Camino Real -1 AB2 8.5 9.5 135.0 130.0 96 95 N Pass
02/12/20 222JT El Camino Real -1 AB2 8.5 9.0 135.0 131.3 97 95 N Pass
02/13/20 223RT Bldg C Wall 254 C 16.5 18.0 112.0 107.5 95 90 N Pass
02/13/20 224RT Bldg C Wall 254 C 16.5 18.4 112.0 109.5 97 90 N Pass
02/13/20 225W Bldg C 257 C 16.5 19.0 112.0 104.0 92 90 N Pass
02/13/20 226W Bldg C 257 C 16.5 20.0 112.0 105.9 94 90 N Pass
02/14/20 227RT Bldg C Wall 254 C 16.5 17.3 112.0 109.5 97 90 N Pass
02/14/20 228RT Bldg C Wall 254 C 16.5 18.4 112.0 107.0 95 90 N Pass
02/14/20 229RT Bldg C Wall 256 C 16.5 19.4 112.0 108.5 96 90 N Pass
02/14/20 230JT Entrance 263 C 16.5 18.9 112.0 104.0 92 90 N Pass
02/19/20 231G El Camino Real -4 C 10 14.9 16.6 115.8 112.0 96 95 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 9 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
02/19/20 232G El Camino Real -2 C 10 14.9 15.4 115.8 111.7 96 95 N Pass
02/19/20 233SG El Camino Real SG C 10 14.9 14.9 115.8 110.2 95 95 N Pass
02/19/20 234SG El Camino Real BG AB2 8.5 9.7 135.0 128.6 95 95 N Pass
02/20/20 235G El Camino Real -3 C 10 14.9 15.3 115.8 110.4 95 95 N Pass
02/20/20 236G El Camino Real -2 C 10 14.9 16.1 115.8 110.5 95 95 N Pass
02/20/20 237SG El Camino Real SG C 10 14.9 16.0 115.8 110.2 95 95 N Pass
02/20/20 238B El Camino Real BG AB2 8.5 9.9 135.0 129.3 95 95 N Pass
02/24/20 231CG Cul de Sac Slope SG C 16.5 17.0 112.0 107.8 96 95 N Pass
02/24/20 232CG Cul de Sac Slope SG C 16.5 18.2 112.0 108.2 96 95 N Pass
02/24/20 232CG Cul de Sac Slope SG C 16.5 16.9 112.0 107.5 95 95 N Pass
02/24/20 234JT Cougar and El Camino Real BG AB 10.5 12.6 118.3 115.4 97 95 N Pass
02/24/20 235JT Cougar and El Camino Real BG AB 10.5 14.3 118.3 116.4 98 95 N Pass
02/24/20 236JT Cougar and El Camino Real BG AB 10.5 13.2 118.3 113.2 95 95 N Pass
02/24/20 237JT Cougar and El Camino Real BG AB 10.5 12.814.1 118.3 116.2 98 95 N Pass
02/25/20 238CG Driveway A - 15+00 SG A 13.5 15.2 116.0 112.5 96 95 N Pass
02/25/20 239CG Driveway A - 14+00 SG A 13.5 14.7 116.0 113.1 97 95 N Pass
02/25/20 240CG Driveway A - 13+00 SG A 13.5 14.7 116.0 112.7 97 95 N Pass
02/25/20 241CG Driveway A - 12+00 SG A 13.5 14.0 116.0 113.0 97 95 N Pass
02/25/20 242JT Cougar Drive BG AB 10.5 12.7 118.3 112.5 95 95 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 10 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
02/25/20 243JT Cougar Drive BG AB 10.5 11.5 118.3 112.9 95 95 N Pass
02/25/20 244JT Bldg B -1 C 16.5 17.9 112.0 104.0 92 90 N Pass
02/25/20 245JT Bldg A -1 C 16.5 17.9 112.0 107.1 95 90 N Pass
02/26/20 246JT Cougar Drive BG AB 10.5 11.2 118.3 115.0 97 90 N Pass
02/26/20 247JT Cougar Drive BG AB 10.5 10.7 118.3 115.7 97 90 N Pass
02/26/20 248JT Bldg B -1 C 16.5 13.1 112.0 99.0 88 90 N Fail
02/26/20 248JT-R Bldg B -1 C 16.5 17.2 112.0 106.9 95 90 N Pass
02/26/20 249JT Bldg B -1 C 16.5 17.1 112.0 107.1 95 90 N Pass
03/02/20 250JT Driveway A -3 C 10 14.9 15.2 115.8 110.4 95 95 N Pass
03/02/20 251JT Driveway A -2 C 10 14.9 16.1 115.8 110.7 95 95 N Pass
03/02/20 252JT Driveway A -1 C 10 14.9 15.5 115.8 111.3 96 95 N Pass
03/02/20 253JT Driveway A -2 C 10 14.9 15.2 115.8 111.7 96 95 N Pass
03/02/20 254JT Driveway A -1 C 10 14.9 15.7 115.8 110.5 95 95 N Pass
03/03/20 255JT Driveway A -3 C 10 14.9 15.0 115.8 110.9 95 95 N Pass
03/03/20 256JT Driveway A -2 C 10 14.9 15.5 115.8 110.9 95 95 N Pass
03/03/20 257JT Driveway A -1 C 10 14.9 15.9 115.8 110.8 95 95 N Pass
03/03/20 258 Adj Bldg A 225 C 10 14.9 14.9 115.8 109.3 94 90 N Pass
03/03/20 259 Adj Bldg A 225 C 10 14.9 16.7 115.8 107.6 92 90 N Pass
03/03/20 260 Adj Bldg A 227 C 10 14.9 15.4 115.8 108.2 93 90 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 11 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
03/04/20 261 Adj Bldg B 229 C 10 14.9 15.8 115.8 109.7 94 90 N Pass
03/04/20 262 Adj Bldg B 231 C 10 14.9 15.3 115.8 106.9 92 90 N Pass
03/04/20 263 Adj Bldg A 233 C 10 14.9 15.4 115.8 108.9 94 90 N Pass
03/04/20 264 Adj Bldg A 233 C 10 14.9 15.0 115.8 108.6 93 90 N Pass
03/04/20 265 Adj Bldg A 233 C 10 14.9 15.5 115.8 111.0 95 90 N Pass
03/04/20 266RT Driveway A Wall 242 C 10 14.9 15.1 115.8 105.4 91 90 N Pass
03/04/20 267RT Driveway A Wall 244 C 10 14.9 15.3 115.8 106.3 91 90 N Pass
03/04/20 268RT Driveway A Wall 244 C 10 14.9 15.6 115.8 105.8 91 90 N Pass
03/04/20 269RT Driveway A Wall 246 C 10 14.9 15.2 115.8 107.6 92 90 N Pass
03/04/20 270RT Driveway A Wall 246 C 10 14.9 16.0 115.8 104.8 90 90 N Pass
03/04/20 271RT Driveway A Wall 248 C 10 14.9 16.5 115.8 105.3 90 90 N Pass
03/05/20 272RT Driveway A Wall 248 C 10 14.9 15.7 115.8 106.7 92 90 N Pass
03/05/20 273RT Driveway A Wall 248 C 10 14.9 15.4 115.8 105.9 91 90 N Pass
03/05/20 274RT Driveway A Wall 252 C 10 14.9 15.6 115.8 107.3 92 90 N Pass
03/05/20 275RT Driveway A Wall 254 C 10 14.9 16.8 115.8 106.1 91 90 N Pass
03/05/20 276RT Driveway A Wall 254 C 10 14.9 16.7 115.8 105.2 90 90 N Pass
03/05/20 277RT Driveway A Wall 256 C 10 14.9 15.1 115.8 106.5 91 90 N Pass
03/05/20 278RT Driveway A Wall 256 C 10 14.9 16.0 115.8 105.3 90 90 N Pass
03/06/20 279 Deck Area 230 C 10 14.9 16.2 115.8 107.7 93 90 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 12 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
03/06/20 280 Deck Area 230 C 10 14.9 16.5 115.8 107.5 92 90 N Pass
03/06/20 281 Deck Area 232 C 10 14.9 15.6 115.8 106.6 92 90 N Pass
03/06/20 282 Deck Area 232 C 10 14.9 17.0 115.8 110.3 95 90 N Pass
03/06/20 283 Deck Area 234 C 10 14.9 15.5 115.8 111.1 95 90 N Pass
03/06/20 284 Deck Area 234 C 10 14.9 16.0 115.8 110.5 95 90 N Pass
03/07/20 285JT Driveway A -2 C 10 14.9 16.1 115.8 110.2 95 95 N Pass
03/07/20 286JT Driveway A -1 C 10 14.9 15.8 115.8 110.5 95 95 N Pass
03/07/20 287JT Driveway A -2 C 10 14.9 16.9 115.8 110.8 95 95 N Pass
03/07/20 288JT Driveway A -1 C 10 14.9 16.4 115.8 111.3 96 95 N Pass
03/07/20 289JT Cougar Place -2 C 10 14.9 15.3 115.8 112.8 97 95 N Pass
03/07/20 290JT Cougar Place -1 C 10 14.9 15.5 115.8 110.1 95 95 N Pass
03/07/20 291JT Cougar Place -2 C 10 14.9 15.7 115.8 111.6 96 95 N Pass
03/07/20 292JT Cougar Place -1 C 10 14.9 15.3 115.8 110.9 95 95 N Pass
03/07/20 293JT Cougar Place -2 C 10 14.9 15.6 115.8 110.3 95 95 N Pass
03/07/20 294JT Bldg A -2 C 10 14.9 15.9 115.8 110.6 95 95 N Pass
03/07/20 295JT Bldg A -1 C 10 14.9 16.7 115.8 111.5 96 95 N Pass
03/07/20 296JT Bldg A -1 C 10 14.9 16.2 115.8 112.7 97 95 N Pass
03/07/20 297JT Bldg A -1 C 10 14.9 15.9 115.8 110.9 95 95 N Pass
03/09/20 298 NW Cul de Sac -2 C 10 14.9 18.0 115.8 107.6 92 90 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 13 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
03/09/20 299 NW Cul de Sac -1 C 10 14.9 16.7 115.8 108.2 93 90 N Pass
03/09/20 300 NW Cul de Sac -2 C 10 14.9 16.9 115.8 107.9 93 90 N Pass
03/09/20 301 NW Cul de Sac -1 C 10 14.9 17.7 115.8 107.5 92 90 N Pass
03/09/20 302 NW Cul de Sac -1 C 10 14.9 15.3 115.8 107.3 92 90 N Pass
03/09/20 303S Adj Bldg A -2 C 10 14.9 15.4 115.8 109.1 94 90 N Pass
03/09/20 304S Adj Bldg A -2 C 10 14.9 16.3 115.8 108.6 93 90 N Pass
03/09/20 305S Adj Bldg A -1 C 10 14.9 16.8 115.8 108.6 93 90 N Pass
03/09/20 306S Adj Bldg A -1 C 10 14.9 15.0 115.8 109.7 94 90 N Pass
03/24/20 307CG Driveway A - 11+70 SG C 10 14.9 15.4 115.8 110.9 95 95 N Pass
03/24/20 308CG Driveway A -11+55 SG C 10 14.9 15.8 115.8 111.3 96 95 N Pass
03/24/20 309CG Driveway A - 11+80 SG C 10 14.9 15.2 115.8 112.5 97 95 N Pass
03/24/20 310CG Driveway A - 12+10 SG C 10 14.9 16.4 115.8 112.2 96 95 N Pass
03/24/20 311CG Driveway A - 12+40 SG C 10 14.9 16.0 115.8 111.7 96 95 N Pass
03/24/20 312CG Driveway A - 12+65 SG C 10 14.9 16.7 115.8 112.6 97 95 N Pass
03/24/20 313CG Driveway A - 12+90 SG C 10 14.9 15.0 115.8 114.0 98 95 N Pass
03/25/20 314 Parking Area 233 C 10 14.9 16.1 115.8 107.2 92 90 N Pass
03/25/20 315 Parking Area 233 C 10 14.9 17.2 115.8 110.0 94 90 N Pass
03/25/20 316 Parking Area 233 C 10 14.9 16.3 115.8 110.1 95 90 N Pass
03/25/20 317 Parking Area 233 C 10 14.9 15.1 115.8 107.1 92 90 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 14 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
03/26/20 318 Parking Area 234 C 10 14.9 16.2 115.8 105.3 90 90 N Pass
03/26/20 319 Parking Area 234 C 10 14.9 16.1 115.8 105.1 90 90 N Pass
03/26/20 320 Parking Area 235 C 10 14.9 16.7 115.8 106.4 91 90 N Pass
03/26/20 321 Parking Area 235 C 10 14.9 16.3 115.8 105.2 90 90 N Pass
03/26/20 322 Parking Area 235 C 10 14.9 16.1 115.8 106.1 91 90 N Pass
03/26/20 323 Parking Area 235 C 10 14.9 15.0 115.8 106.6 92 90 N Pass
03/26/20 324 Parking Area 235 C 10 14.9 15.5 115.8 107.3 92 90 N Pass
03/27/20 325CG Driveway A - 13+00 SG C 10 14.9 15.4 115.8 112.3 96 95 N Pass
03/27/20 326CG Driveway A - 14+70 SG C 10 14.9 15.4 115.8 112.4 97 95 N Pass
03/27/20 327CG Driveway A - 14+90 SG C 10 14.9 16.0 115.8 112.9 97 95 N Pass
03/27/20 328CG Driveway A - 14+50 SG C 10 14.9 16.1 115.8 113.0 97 95 N Pass
03/27/20 329CG Driveway A - 15+05 SG C 10 14.9 16.0 115.8 111.4 96 95 N Pass
03/27/20 330CG Driveway A - 15+40 SG C 10 14.9 15.0 115.8 112.4 97 95 N Pass
03/27/20 331CG Driveway A - 15+70 SG C 10 14.9 16.9 115.8 112.5 97 95 N Pass
03/27/20 332CG Driveway A - 16+00 SG C 10 14.9 17.0 115.8 111.1 95 95 N Pass
03/27/20 333CG Driveway A - 16+30 SG C 10 14.9 16.4 115.8 111.0 95 95 N Pass
03/27/20 334CG Driveway A - 16+45 SG C 10 14.9 15.3 115.8 112.0 96 95 N Pass
03/27/20 335CG Driveway A - 16+90 SG C 10 14.9 15.5 115.8 110.9 95 95 N Pass
03/27/20 336CG Driveway A - 17+20 SG C 10 14.9 15.0 115.8 111.7 96 95 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 15 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
04/15/20 337CG Driveway A - Adj bldg C SG C 10 14.9 16.9 115.8 111.1 95 95 N Pass
04/15/20 338CG Driveway A - Adj bldg C SG C 10 14.9 17.2 115.8 111.2 96 95 N Pass
04/15/20 339CG Driveway A and Cougar Drive SG C 10 14.9 16.7 115.8 111.8 96 95 N Pass
04/15/20 340CG Driveway A and Cougar Drive SG C 10 14.9 16.8 115.8 111.4 96 95 N Pass
04/15/20 341CG Driveway A Westside SG C 10 14.9 17.2 115.8 110.3 95 95 N Pass
04/15/20 342CG Driveway A Westside SG C 10 14.9 16.6 115.8 110.9 95 95 N Pass
04/15/20 343CG Driveway A Westside SG C 10 14.9 16.8 115.8 110.2 95 95 N Pass
04/15/20 344CG Driveway B SG C 10 14.9 17.1 115.8 110.5 95 95 N Pass
04/15/20 345CG Driveway B SG C 10 14.9 16.6 115.8 110.7 95 95 N Pass
04/16/20 346CG**Parking Area - Adj Bldg B Eastside SG C 10 14.9 22.1 115.8 104.5 90 95 N Fail
04/16/20 347CG**Parking Area - Adj Bldg B Eastside SG C 10 14.9 19.6 115.8 106.9 92 95 N Fail
04/16/20 348CG**Parking Area - Adj Bldg B Eastside SG C 10 14.9 20.2 115.8 104.7 90 95 N Fail
04/16/20 349CG**Parking Area - Adj Bldg B Eastside SG C 10 14.9 19.8 115.8 106.9 92 95 N Fail
04/16/20 350CG**Parking Area - Adj Bldg C Eastside SG C 10 14.9 18.6 115.8 104.7 90 95 N Fail
04/16/20 351CG**Parking Area - Adj Bldg C Eastside SG C 10 14.9 20.4 115.8 106.9 92 95 N Fail
04/16/20 352CG**Parking Area - Adj Bldg C Eastside SG C 10 14.9 19.8 115.8 105.9 91 95 N Fail
04/17/20 353S Bldg A Grease Interceptor -1 C 10 14.9 15.6 115.8 110.0 94 90 N Pass
04/17/20 354SD Adj Driveway B -2 B 10 14.0 14.3 112.9 107.0 94 90 N Pass
04/17/20 355SD Adj Bldg C -2 B 10 14.0 16.5 112.9 105.1 93 90 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 16 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
04/17/20 356SD Adj Bldg B -2 B 10 14.0 16.4 112.9 103.3 91 90 N Pass
04/17/20 357SD Adj Bldg B -2 B 10 14.0 16.9 112.9 104.4 92 90 N Pass
04/17/20 358CG Adj Bldg C SG C 10 14.9 16.0 115.8 111.2 96 95 N Pass
04/17/20 359CG Adj Bldg C SG C 10 14.9 16.7 115.8 110.1 95 95 N Pass
04/20/20 360SD Bldg B Courtyard -1 B 10 14.0 17.0 112.9 102.6 90 90 N Pass
04/21/20 361SD Bldg B Courtyard -1 B 10 14.0 16.6 112.9 103.3 91 90 N Pass
04/21/20 362CG Driveway B SG C 10 14.9 15.4 115.8 110.3 95 95 N Pass
04/21/20 363CG Driveway B SG C 10 14.9 15.5 115.8 110.2 95 95 N Pass
04/22/20 364SD Bldg B Courtyard -1 B 10 14.0 16.0 112.9 104.0 92 90 N Pass
04/23/20 365CG Cougar Drive Entrance SG C 10 14.9 15.8 115.8 112.0 96 95 N Pass
04/23/20 366SG Adj Bldg A SG C 10 14.9 15.0 115.8 112.1 96 95 N Pass
04/23/20 367SG Adj Bldg A SG C 10 14.9 15.1 115.8 111.2 96 95 N Pass
04/23/20 368CG Adj Bldg B SG C 10 14.9 15.8 115.8 111.8 96 95 N Pass
04/23/20 369CG Adj Bldg B SG C 10 14.9 15.6 115.8 111.4 96 95 N Pass
04/24/20 370B Driveway A - 16+60 BG AB3 9.0 10.6 124.5 120.3 96 95 N Pass
04/24/20 371B Driveway A - 16+10 BG AB3 9.0 10.7 124.5 121.5 97 95 N Pass
04/24/20 372B Driveway A - 15+25 BG AB3 9.0 10.7 124.5 120.8 97 95 N Pass
04/24/20 373B Driveway A - 14+25 BG AB3 9.0 10.4 124.5 119.8 96 95 N Pass
04/24/20 374B Driveway A - 13+60 BG AB3 9.0 10.8 124.5 120.3 96 95 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 17 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
04/24/20 375B Driveway A - 12+65 BG AB3 9.0 10.7 124.5 121.6 97 95 N Pass
04/24/20 376B Driveway A - 12+00 BG AB3 9.0 10.9 124.5 121.0 97 95 N Pass
04/24/20 377B Driveway A - 11+25 BG AB3 9.0 10.1 124.5 120.7 96 95 N Pass
04/24/20 378B Driveway A - 10+65 BG AB3 9.0 10.0 124.5 121.4 97 95 N Pass
04/24/20 379B Driveway A - 10+10 BG AB3 9.0 10.2 124.5 119.8 96 95 N Pass
04/24/20 380B Driveway A - 10+20 BG AB3 9.0 9.8 124.5 118.9 95 95 N Pass
04/24/20 381B Roundabout BG AB3 9.0 9.9 124.5 120.1 96 95 N Pass
04/24/20 382B Driveway B - 11+60 BG AB3 9.0 10.1 124.5 120.5 96 95 N Pass
04/24/20 383B Driveway B - 11+30 BG AB3 9.0 10.4 124.5 120.6 96 95 N Pass
04/25/20 384AC Driveway A - 16+60 BC AC ----147.0 141.3 96 95 N Pass
04/25/20 385AC Driveway A - 16+00 BC AC ----147.0 142.4 96 95 N Pass
04/25/20 386AC Driveway A - 15+40 BC AC ----147.0 140.6 95 95 N Pass
04/25/20 387AC Driveway A - 14+75 BC AC ----147.0 141.4 96 95 N Pass
04/25/20 388AC Driveway A - 14+00 BC AC ----147.0 143.1 97 95 N Pass
04/25/20 389AC Driveway A - 13+45 BC AC ----147.0 140.9 95 95 N Pass
04/25/20 390AC Driveway A - 12+75 BC AC ----147.0 139.7 95 95 N Pass
04/25/20 391AC Driveway A - 11+90 BC AC ----147.0 140.6 95 95 N Pass
04/25/20 392AC Driveway A - 11+15 BC AC ----147.0 140.0 95 95 N Pass
04/25/20 393AC Driveway A - 10+25 BC AC ----147.0 142.0 96 95 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 18 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
04/25/20 394AC Roundabout BC AC ----147.0 142.5 96 95 N Pass
04/25/20 395AC Driveway B - 11+60 BC AC ----147.0 143.3 97 95 N Pass
04/25/20 396AC Driveway B - 11+30 BC AC ----147.0 141.2 96 95 N Pass
04/27/20 397SD Bldg A Storm Drain -2 C 10 14.9 15.4 115.8 106.3 91 90 N Pass
04/28/20 398SD Bldg A Storm Drain -2 C 10 14.9 15.7 115.8 105.7 91 90 N Pass
04/29/20 399SD Bldg A Storm Drain -2 C 10 14.9 15.3 115.8 105.5 91 90 N Pass
04/30/20 400SD Bldg A Storm Drain -2 C 10 14.9 15.4 115.8 106.1 91 90 N Pass
05/01/20 401SD Bldg A Storm Drain -1 C 10 14.9 15.0 115.8 105.0 90 90 N Pass
04/30/20 402B Cougar Dr 12+10 BG AB3 9.0 10.0 124.5 119.2 95 95 N Pass
07/14/20 403AC Cougar Dr 12+10 AC AC2 ----150.0 143.8 95 95 N Pass
07/23/20 404B Bldg C Parking BG AB3 9.0 9.0 124.5 120.1 96 95 N Pass
07/23/20 405B Bldg C Parking BG AB3 9.0 9.1 124.5 119.6 96 95 N Pass
07/23/20 406B Bldg C Parking BG AB3 9.0 10.0 124.5 122.3 98 95 N Pass
07/23/20 407B Bldg C Parking BG AB3 9.0 10.0 124.5 120.0 96 95 N Pass
07/24/20 408AC Bldg C Parking BC AC3 ----144.5 139.6 96 95 N Pass
07/24/20 409AC Bldg C Parking BC AC3 ----144.5 138.7 95 95 N Pass
07/24/20 410AC Bldg C Parking BC AC3 ----144.5 142.3 98 95 N Pass
07/24/20 411AC Bldg C Parking BC AC3 ----144.5 140.3 97 95 N Pass
09/21/20 412JT El Camino Real -2 B 10 14.0 15.0 112.9 108.2 95 95 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 19 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
09/21/20 413B El Camino Real -1 AB3 9.0 9.0 124.5 122.1 98 95 N Pass
09/21/20 414AC El Camino Real AC AC3 ----144.5 138.6 95 95 N Pass
09/21/20 415AC El Camino Real AC AC3 ----144.5 139.1 96 95 N Pass
11/24/20 416SG Adj Bldg C SG B 10 14.0 17.0 112.9 102.6 90 90 N Pass
11/24/20 417SG Adj Bldg C SG B 10 14.0 17.2 112.9 103.9 92 90 N Pass
11/30/20 418SG Adj Bldg A SG C 10 14.9 15.2 115.8 112.6 97 95 N Pass
11/30/20 419B Adj Bldg A BG AB3 9.0 9.5 124.5 119.3 95 95 N Pass
12/10/20 420SG Cougar Drive Sidewalk SG A 13.5 14.2 116.0 112.4 96 95 N Pass
12/10/20 421SG Cougar Drive Ramp SG A 13.5 13.9 116.0 113.6 97 95 N Pass
12/10/20 422B Cougar Drive Ramp BG AB3 9.0 9.6 124.5 119.6 96 95 N Pass
12/11/20 423SG Cougar Drive Curb and Gutter SG A 13.5 14.0 116.0 112.4 96 95 N Pass
12/15/20 424B Cougar Drive Approach BG AB3 9.0 12.0 124.5 115.0 92 95 N Fail
12/15/20 424B-R Cougar Drive Approach BG AB3 9.0 10.0 124.5 118.9 95 95 N Pass
01/08/21 425SG Cougar Drive - 10+00 SG A 13.5 15.0 116.0 111.6 96 95 N Pass
01/08/21 426SG Cougar Drive - 11+50 SG A 13.5 14.7 116.0 112.0 96 95 N Pass
01/08/21 427AC Cougar Drive - 12+00 CC AC4 ----148.0 142.0 95 95 N Pass
01/08/21 428AC Cougar Drive - 12+00 CC AC4 ----148.0 144.0 97 95 N Pass
01/08/21 429AC Roundabout CC AC4 ----148.0 140.6 95 95 N Pass
01/08/21 430AC Adj Bldg C CC AC4 ----148.0 141.6 95 95 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
February 15, 2021
P/W 1905-07
FIELD DENSITY TEST RESULTS
TABLE 1 (cont'd)
Page 20 of Table I
Report No. 1905-07-C-7
Depth Rel.Proj.Test Pass
Test or Soil Rock Comp.Spec.Type or
Date Number Location Elev.Type Corr.*Opt.*Field Max.*Field (%)(%)(S/N)Fail
(%)(pcf)
TEST NUMBER/LOCATION/ELEVATION KEY
S - Sewer Trench I - Irrigation Trench SD - Storm Drain Trench E - Electrical Trench JT - Joint Utility Trench W - Water Trench RT - Retaining Wall FT - Footing FG - Finish Grade
SG - Subgrade CG - Curb and Gutter Subgrade B - Base AC - Asphalt Concrete Finish Grade BC - Asphalt Concrete Base Course CC - Asphalt Concrete Cap Course -R,R1,R2 - Indicates Retest
* Rock Correction- Estimated Percent Retained on 3/4 inch (Method C), Maximum Dry Density and Optimum Moisture Content adjusted per ASTM D 4718
Moisture Dry Density
** Saturated Soil: Recommended Removal Prior to Concrete Placement. Removal not Performed per General Contractor.
01/08/21 431AC Adj Bldg C CC AC4 ----148.0 141.2 95 95 N Pass
01/11/21 432AC Driveway A - 10++50 CC AC4 ----148.0 140.8 95 95 N Pass
01/11/21 433AC Driveway A - 11+30 CC AC4 ----148.0 141.4 95 95 N Pass
01/11/21 434AC Driveway A - 13+50 CC AC4 ----148.0 142.0 95 95 N Pass
01/11/21 435AC Driveway A - 13+00 CC AC4 ----148.0 141.3 95 95 N Pass
01/11/21 436AC Driveway A - 14+50 CC AC4 ----148.0 142.3 96 95 N Pass
01/11/21 437AC Driveway A - 15+50 CC AC4 ----148.0 140.7 95 95 N Pass
01/11/21 438AC Driveway A - 16+50 CC AC4 ----148.0 142.1 96 95 N Pass
01/11/21 439AC South Parking CC AC4 ----148.0 142.6 96 95 N Pass
01/11/21 440AC Middle Parking CC AC4 ----148.0 141.2 95 95 N Pass
01/11/21 441AC North Parking CC AC4 ----148.0 142.3 96 95 N Pass
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
0
250
I
--·
,-....__
-----------L----1..------
,
INTERIOR WALL &
WALL 7
SEE DETAIL 7
. SHEET 20
1:1 SLOPED
TEMPORARY BACK
CUTS AT BASEMENT
WALLS
13' -0" -4' -0"'
SECTION I-I
OVERF LOW TYPE-B ----
CURB INLET
4' OPENING TO
HIE CURB
' 0
8.85.'
FG 22 1.35
I
I 1: 1 SLOPED
TEMPORARY BAG.,__........,
CUTS AT BASEMENT
WALLS
1 f-o· 4•-0·
SECTION J-J
l'itOT1[1
FENCE TO BE VONSTRUCTED AT MINIMUM
6' HIGH MADE OF COMPOSITE PANELING
PEil IREX HQR!IONS OCSl(;N
DEEPENED
FOOTING
TYPE I CATCH
BASIN
TG 220.25
afe
Kp
LEGEND
ARTIFICIAL FILL -DOCUMENTED
•
'i\ <"' ' o\ ,,.., \
~..., ~\;.
7.85'
DETIDO -7. 75'
'
2·3.B75"0RIFICE _ _..,...., O -6.17' FL 216.02 '1
POINT LOMA FORMATION
(BRACKETED WHERE BURIED}
APPROXIMATE LOCATION OF GEOLOGIC CONTACT ¾\
Q, \ •
0.8125" ORIFICE 2 --5.75' z _L_ ---(QUERIED WHERE UNCERTAIN}
\ 3.25 -~
30 Ml IMPERMEABl E LI NE f 1-l'oPE ~oMEMei/UI '
fi :; ,f. ti O oa. $\MIL~
3"' AST!A NO. 33 6" GRAVEL \
.3" AST!A NO.. 8 CHOKER LAYER\
ASTM NO. 57 STONE I :i" .
3" DEAIJ STORAGE , I
8" PERFERA TED
UNDERDRAIN
0.6875" LOW Fi..OW
ORI.FICE
Fl 212.75
3" NON-FLOAJING
MlJLCH
BIOFILT,RATION
SOIL MEDIA
PER SPECS
ON SHEET 10
APPROXIMATE LOCATION OF REMOVAL
APPROXIMATE LOCATION OF COMPACTION TEST
APPROXIMATE LOCATION OF GEOGRID REINFORCED
SLOPE
NO. DELTA OR BRG. LENGTH
24" HOPE OUTLET
PIPE @ 0.4% 1 N68" 55' 12"W
N21" 04' 48"E
1.00'
90. 67'
12"NON-PERFERATEO
UNDERDRAII-I
2
3
4
5
N66" 04' 48" E 3. 58'
N20" 59' 45" E 222. 88'
N67"30'00"E 39, 87'
TA
REMARKS
1 0 .. PVC
1 0" PVC
·1 O"' PVC
1 O" PVC
., 0" PVC
BASIN BOTTOM TYPICAL SECTION
DETAIL FOR BIOFIL T.RA TION BASIN
212.5
(PVT)
6 ' N67' 30' OO"W
7 1 N69" 00' 15'"W
8 '
'
N69"04'31"W
28,90' 1 0 " PVC
103. 42' 8" PVC
57.05' 8" PVC
NT$ 9 : N83"20'02"W 40. 5 7' 8" PERFERATED PVC
10 N63" 41 ' 29"W 35.66' 8" PERiFERATED PVC
111 N15"57"08"E 24.50' 1 '2"' PVC
NOTE: NOTE:
SEE SHE ET 7 FOR WALL PLAN SEE SHEET 11-21 FOR RET.
'I/ALL DETAILS &
12 N05" 28: 09" E 69. 4 3' 24" HOPE
13 NBO' 33' 46"W 42. 99' 24" HOPE
14 N70' 12' 03"'W 43. 92' 24" HOPE
NOTE: BACKFILL INFORMATION 1s I N07" 27' 35" E 2. 66' 1 8" HOPE
RETAINING WALL WATERPROOFING BY TREMCO 16 ' N09" 26' 14" E 2. 27' 1 8" HOPE
SEE DElAlLS ON SHEET 20 -·--
17 ' N1 o• 35' 20" E 2. 84' 1 8" HOPE
18 N21 • 1 9 ' 2'4" E 2. 47' 1 8" HOPE
19 N1 9" 47' 5,7" E 3. 70' 1 8" HDPE
20i N19"47'57"E 4. I 7' 1 8" HDPE
GEOTECHNICAL PLAN PLATE 1 21 I N68" 34' '18"W 5.04' 8!! PVC
2:2 N69' 01 '05"W 5. 04' 8" IPVC
2'3 N69' 24 ' 41 "W 5.04 ' 8" IPVC
2•4, N69"24'41"W 5. 04' a•· IPVC
Project# Report# Date:
P/W 1905---07 1905--07-C-7 Feb. 2021
25 N69" 24' 41 "W 5. 04' 8" PVC
II AS B:UIIL T"
RCE __ _ EXP ____ _ DATE -· • II/ REVIEWED BY•
JOHN D. GODDARD R.CE. lJOll7 { DtTE
INSPECTOR DATE
~ CITY OF CARLSBAD ~1 t-----+--+---------------+------+---t----+----1 LU ENGI.NEIERING DEPARTMENT l{l_J
t------+--+----------------t----+---t------+----1
t------+--+----------------+----+---t------+----l GRAD'lNG PLANS FOR:
SUMMIT SENIOR CAIRLSBAD
ROUGI-I GRADING SITE PLAN
SOD.201 7-0006/CUP 2017-0007
GR2019-0005 HOP2017-0003/SUP2017-0002
APPROVED..:-------:---~ .A'; JASON S. ~GE, OERT
FOB & ~ ··...U 9~h
t------+--+----------------+----+---t------+----l CITY E"NGINEER RCE 63912 EXPIRES '9/30/2D DAiif''
PROJECT NO. DRAWING NO.
MS2017-0004 516-7A
g
~
i
G "" '" 8-.~ s~ -· "-,8
~N
I
~I on oil, ou Es ,, ..
~§ •• ~ ~ C< ~i iJ
;g
f!' :?
ii ii a~ ~~ -e
--ww •• "" '."'. ~ ;;
uu ,,
LL 0 0 ~J • . '" ... ---~ er , . -.. ' ·~ ~!.:i """ --· ,,, --.; -,, "'