HomeMy WebLinkAbout1866 SPYGLASS CT; ; CB151887; Permit'
06-19-2015
Job Address:
Permit Type:
Parcel No:
Reference #:
PC#:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Plumbing/Mechanical/Electrical (PME) Permit
Permit No: CB151887
Building Inspection Request Line (760) 602-2725
1866 SPYGLASS CT CBAD
PME
2073853400 Lot#:
DEMATTEO RES-NEW 125 AMP ELECT
0
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
PANEL FOR A PHOTOVOLTAIC INSTALLATION BE SEPARATE PERMIT
Owner:
ISSUED
06/1812015
RMA
06/1812015
0611812015
Applicant:
CALIFORNIA PREMIER SOLAR CONSTRUCTION DEMATTEO ANTHONY&PATRICIA FAMILY 2007 TRUST 09-1
P O BOX 460267
ESCONDIDO CA 92046
760 489-5800
Plumbing Fees
Electrical Fees
Mechanical Fees
Other PME Fees
TOTAL PERMIT FEES
Total Fees:
Inspector:
1866 SPYGLASS CT
CARLSBAD CA 92008
$0.00 Total Payments To Date: $0.00 Balance Due:
Clearance:
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or seivice fees in connection with this project. NOR DOES IT APPLY to any
f x i nsofwhi h uhav r vi I n iv n N Tl E i ·1 r hi ora whi he t flimitai nsh i 1
'
Inspection List
Permit#: CB151887
Date __ lnsl'e_ction Item
07/08/2015 39 Final Electrical
Wednesday, July 08, 2015
Type: PME
Inspector Act
PD AP
DEMATTEO RES-NEW 125 AMP ELECT
PANEL FOR A PHOTOVOLTAIC INSTALL
Comments
Page 1 of 1
J:ns--. iliiiii'E
A~ S<-mpra Energy ulillly'
ELECTRIC UNDERGROUND METER & SERVICE LOCATION
Customer Copy
Notification #: 300000048188 Job#: 1TB: 1106-H6
Wanted Date: ON INSPECTION Date Prepared: 0€/10/2015
Customer Type: Residential(1-2 Units) Service Type: UG REWIRE (NO TRENCHING)
Project Title: DEMATTEO RESIDENCE (SOT)
Project Address: 1866 SPYGLASS CT I Project City: CARLSBAD
Additional Address Info:
Customer POC: Danny Funderburk Customer Phone#: 760 975 4302
SDGE Contact: Service Coordinator Contact Info: WENDY JENSEN,760-476-5611
D Traffic Control Permit Required 0 SDG&E Application Required-Call: 1-800-411-7343
Excavation/Encroachment Permits Required By:
Municipal Inspection required By: CITY OF CARLSBAD I Temp Service Charge due on First Bill $ 0.00
SERVICE ATTACHMENT POINT AND/OR METER LOCATION:
Install new 125-amp meter panel at existing location over existing conduit and service conductors. Customer assumes responsibility
for existing SIDA condition. If SIDA conductors cannot be reconnected for any reason, customer will not be reconnected until they
trench and replace SIDA conductors with 3-inch conduit from the panel to the source. Call SDG&E Service Coordinator Wendy at 760-
476-5611 to schedule a morning disconnect with an afternoon reconnect provided that the City/County releases inspection to SDG&E by
2:00 PM on the same day the crew is scheduled. To avoid delays with reconnection, your permit should read (Customer Outage
Involved). Please contact the Net Ener v Meterino Team at: (858) 636-5585 reoardino installation of Photovoltaic.
Station ID #: 783-55 Structure#: 03600467390 I Joint Trench With:
Handhole Installed By: Handhole Lid Shall Read: Standards Page:
Ladder Arms: Stop Trench: from Pole Riser Quad:
Bend Installed By: Bend Type: Bend Info:
Conduit Installed By: Conduit Size:
Service Panel Rating: 125 Number/Size of Main Switch: 1@125 I Voltage: 120/240
# of Wires: 3 Phase: 1 Utilities Maximum Contribution to Fault Current: 10000
Metering: Self-Contained Meter Clips: 4
Meter height --4'0" min. (3'0" min. for multiple installation) --6'3" max. From finish grade to centerline of meter base. Meters are required to
be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition.
Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E
office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address
and unit number.
PROCEDURE FOR INSTALLATION
1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES.
2. Phone Service Coordinator at 760-476-5611 for the following:
-3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process.
-After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do
not cover conduit without inspector's written approval to backfill.
-When trench is backfilled and compacted, CALL FOR INSPECTION.
-If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT.
3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection
Additional Information: D Right of Way Required Assessor's Parcel Number:
City/County inspection should be received prior to 2:00 p.m. on the same day as the disconnection of service to allow the SOG&E
crew enough time for reconnection of the service on the same day.
If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will
be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no
liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of
construction unless it is through negligence of SDG&E.
Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements.
Building address and/or houseline must be permanently identified prior to meter set. Information on this sheet is void after six (6) months.
Keep this notice with building permit.
Planned By: Steven Ossey Phone#: 7604755612