HomeMy WebLinkAbout2021-10-04; Traffic and Mobility Commission; ; Park Drive Street and Drainage Improvements Project
Meeting Date: Oct. 4, 2021
To: Traffic and Mobility Commission
Staff Contact: Daniel Zimny, Associate Engineer
daniel.zimny@carlsbadca.gov, 760-331-7399
Subject: Park Drive Street and Drainage Improvements Project
Recommended Action Support staff’s recommendation to implement the proposed street improvements on Park Drive from Marina Drive to Bayshore Drive as part of the Park Drive Street and Drainage Improvements Project, Capital Improvement Program (CIP) Project No. 6611 (Project).
Background
The city’s CIP calls for the replacement of the existing retaining wall along the north side of Park
Drive between Bayshore Drive and 4650 Park Drive. The existing retaining wall was constructed
when this segment of Park Drive was widened in 1989. Staff have determined that this wall is
nearing the end of its design life and requires replacement.
The earthen embankment supported by the retaining wall is highly eroded resulting in the
shortened service life of the facility. Sediment eroded from the slope during rain events deposit
onto the sidewalk along Park Drive resulting in temporary closures. City street maintenance and
operations crews are dispatched to this location following significant rain events to clear the
deposited debris and restore pedestrian access.
The Project will replace and extend the existing retaining wall, stabilize the slope, modify the
existing drainage system and provide street improvements on the segment of Park Drive
between Marina Drive and Bayshore Drive.
As part of the public outreach plan, the Project was circulated for public review and comment.
Staff received a request to install a new pedestrian crossing with rectangular rapid flashing
beacons (RRFB) on Park Drive at the intersection with Marina Drive. This improvement will
provide controlled pedestrian access between the multi-housing units on the south side of Park
Drive to the on-street parking on the north side of the street. The RRFB crossing also enhances
pedestrian safety and facilitates access to the Agua Hedionda Lagoon north shore public
entrance at the end of Bayshore Drive. Currently, the only controlled crosswalk on Park Drive
within this vicinity is at the intersection with Neblina Drive, approximately 450 feet east of
Bayshore Drive, which is also supported by RRFB. The requested RRFB crossing provides a
controlled pedestrian crossing on the western approach to the Agua Hedionda Lagoon north
shore public access.
Item 1
Oct. 4, 2021 Item #1 1
The existing Class II bikes lanes on Park Drive currently terminate at west end of the project
area at Marina Drive. This project will extend these Class II bike lanes by an additional 600 feet
to Bayshore Drive and on street parking will be maintained in both sides of the roadway. The
street will be restriped for additional bike lane improvements when the street is slurry sealed
within the next few years.
Staff recommend that the proposed RRFB crossing be constructed at the intersection of Park
Drive and Marina Drive.
Necessary Council Action
Staff will finalize the Project construction plan, specifications and cost estimate, and request
authorization from the City Council to advertise for constructions bids.
Next Steps
Staff will finalize the construction plans for the Project following the Traffic and Mobility
Commission’s review and feedback. A Coastal Development Permit must also be obtained from
California Coastal Commission (CCC) prior to the City Council’s authorization to advertise for
construction bids. The permit application will be submitted late Fall 2021 but the CCC may take
over a year to process the permit. Staff coordinated closely with the CCC throughout the design
phase to expedite the permit processing time.
Once the Coastal Development Permit is obtained, the improvements will need to be
constructed between September 15 and February 15 in accordance with the CCC request.
Constructing the improvements during these months will avoid both biological impacts during
the bird nesting season (February 15 to September 15) and pedestrian access impacts to the
Agua Hedionda Lagoon north shore entrance during the summer tourist season.
Exhibits
1. Location Map
2. Park Drive Street and Drainage Improvements – 100% Design Submittal
Item 1
Oct. 4, 2021 Item #1 2
Item 1
Oct. 4, 2021 Item #1 3
DECLARATION OF RESPONSIBLE CHARGE
CITY COUNCIL
SCOTT CHADWICK
CITY MANAGER
5
5
78
CONSTRUCTION PLANS
CITY OF CARLSBAD
CARLSBAD, CALIFORNIA
AUGUST 2021
FOR
PARK DRIVE STREET AND DRAINAGE
IMPROVEMENTS
VICINITY MAP LOCATION AND KEY MAP
CALL TOLL FREE
1-800-227-2600
TWO
WORKING DAYS
BEFORE YOU
DIG
Underground Service Alert
of Southern California
MATT HALL
KEITH BLACKBURN
TERESA ACOSTA
PRIYA BHAT-PATEL
-
-
-
-
MAYOR
COUNCIL MEMBER
COUNCIL MEMBER
COUNCIL MEMBER
TITLE SHEET, VICINITY MAP,
LOCATION AND KEY MAP
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION
100% PROGRESS SET
G-1
X X
Item 1
Oct. 4, 2021 Item #1 4
EXHIBIT 2
GENERAL NOTES AND SHEET INDEX
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION
100% PROGRESS SET
G-2
GRADING NOTES GRADING NOTES (CONT)SOILS ENGINEER'S CERTIFICATE REFERENCE DRAWINGS
SOURCE OF TOPOGRAPHY
PROJECT LOCATION
BASIS OF COORDINATES AND ELEVATIONS
SHEET INDEX
SHEET
NUMBER DRAWING DRAWING DESCRIPTION
WORK TO BE DONE
Item 1
Oct. 4, 2021 Item #1 5
GENERAL NOTES, LEGEND AND
ABBREVIATIONS
LEGEND
CROSS REFERENCING SYSTEM
SECTION A
DETAIL 1
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION
100% PROGRESS SET
G-3
ABBREVIATIONS
EROSION CONTROL NOTES TEMPORARY EROSION CONTROL
AND IRRIGATION NOTES (CONT)
TEMPORARY EROSION CONTROL
AND IRRIGATION NOTES
CUT AND FILL QUANTITIES
Item 1
Oct. 4, 2021 Item #1 6
DEMOLITION PLAN605 Third Street Encinitas, CA 92024760.942.5147 Fax 760.632.0164PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION100% PROGRESS SETD-1GRAPHIC SCALEPLANCONSTRUCTION NOTES:PLANNOTE:Item 1Oct. 4, 2021Item #1 7
PLAN & PROFILE AND SECTIONS
STA 0+00.00 TO 4+00.00
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION
100% PROGRESS SET
PLAN
PROFILE
SECTION A
SECTION B
C-1
GRAPHIC SCALE
TYPICAL CMU BLOCK WALL SECTION
WALL STA 0+00.00 TO 3+02.57
TYPICAL SOLDIER PILE AND
LAGGING WALL SECTION
STA 3+02.57 TO 4+83.94
CONSTRUCTION NOTES:
EASEMENTS:
3
Item 1
Oct. 4, 2021 Item #1 8
LANEBIKE605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION
100% PROGRESS SET
SECTION C
PLAN
PROFILE
PLAN & PROFILE AND SECTIONS
STA 4+00.00 TO 8+18.98
C-2
GRAPHIC SCALE
TYPICAL STEPPED PLANTED WALL SECTION
STA 3+62.30 TO 7+11.57
CONSTRUCTION NOTES:
DETAIL 1
EASEMENTS:
3
CONSTRUCTION NOTES (CONTINUED):
Item 1
Oct. 4, 2021 Item #1 9
DETAILS - 1
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION
100% PROGRESS SET
C-3
CABLE RAILING DETAIL 1
DETAIL 3
PLAN
SECTION A-A
DETAIL 4PLAN SECTION A-A
SEDIMENT TRAP DETAIL 2
Item 1
Oct. 4, 2021 Item #1 10
DETAILS - 2
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION
100% PROGRESS SET
C-4
LIGHT POLE RELOCATION @ STA 3+30.08 1
OUTLET STRUCTURE DETAIL 2
CURB RAMP GRADING DETAIL 3
Item 1
Oct. 4, 2021 Item #1 11
HORIZONTAL CONTROL PLAN605 Third Street Encinitas, CA 92024760.942.5147 Fax 760.632.0164PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION100% PROGRESS SETC-5GRAPHIC SCALEPLANPLANCONSTRUCTION NOTES:EASEMENTS:Item 1Oct. 4, 2021Item #1 12
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSNOT FOR CONSTRUCTION100% PROGRESS SETSOIL RETENTIOND E S I G N S I N C .VERDURA RETAINING WALL PLANSVERDURA RETAINING WALL GENERAL NOTES1028Item 1Oct. 4, 2021Item #1 13
LANEBIKE
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSNOT FOR CONSTRUCTION100% PROGRESS SETSOIL RETENTIOND E S I G N S I N C .PROFILE: VERDURA RETAINING WALL NO. 1PLAN: VERDURA RETAINING WALL NO. 15+006+002030SCALE:60'20'020'40'1" = 20'7+008+00VERDURA RETAININGWALL NO. 12030GEOGRID EXTENTVERDURA RETAINING WALL PLAN & PROFILELIMITS OF DISTURBANCE10' WATER EASEMENT PER MAP 516225' SEWER AND DRAINAGE EASEMENTTO THE CITY OF CARLSBAD PERDOCUMENT NO. 85-207258 RECORDEDJUNE 11, 1985 AS SHOWN ON MAP 12018ABUT PERMANENT SHORINGRETAINING WALL PER END OFWALL TRANSITION DETAIL DON SHEET 12CONNECT 4" SUBDRAIN TO MODIFIEDTYPE F CATCH BASIN PER SECTION A-AON SHEET 71128Item 1Oct. 4, 2021Item #1 14
10XT8XT8XT8XT8XT8XT10XT8XT8XT8XT#XT#XT#XT#XT10XT8XT8XT8XT8XT8XT10XTPARK DRIVE STREET AND DRAINAGE IMPROVEMENTSNOT FOR CONSTRUCTION100% PROGRESS SETSOIL RETENTIOND E S I G N S I N C .CROSS SECTION: WALL 1 - MAX HEIGHT = 13.33'CROSS SECTION: WALL 1 - MAX HEIGHT = 8.67'VERDURA RETAINING WALL CROSS SECTIONSTYPICAL CHIMNEY DRAIN DETAILCROSS SECTION: WALL 1 - MAX HEIGHT = 14.67'1228Item 1Oct. 4, 2021Item #1 15
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSNOT FOR CONSTRUCTION100% PROGRESS SETSOIL RETENTIOND E S I G N S I N C .FRONT OF WALL DETAILVERDURA 40 BLOCK DETAILEND OF WALL TRANSITION DETAILGEOGRID PLACEMENT ON CURVES DETAILGEOGRID CONNECTION DETAILTOP OF WALL DETAILSUBDRAIN PENETRATION DETAIL (IF NECESSARY)XXXXXXTYPICAL V-DITCH/RAILING DETAIL CASE A PLAN VIEWCASE ACASE B CASE C CASE D PLAN VIEWCASE DSECTION A-A9"MAXIMUMSPACING9"MAXIMUMSPACING10 34"18 14"10 34"18 14"FRONT VIEW12 14"8"12 14"SIDE VIEWTOP VIEWXXXXSECTION APLAN VIEWVERDURA RETAINING WALL STANDARD DETAILS1328Item 1Oct. 4, 2021Item #1 16
MASONRY WALL PLAN AND ELEVATION
STA 0+00.00 TO 3+00.00
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION
100% PROGRESS SET
W-5
ELEVATION - STA 1+50.00 TO STA 3+02.57
MASONRY WALL PLAN
GRAPHIC SCALES
CONSTRUCTION NOTES:
ELEVATION - STA 0+00.00 TO STA 1+50.00
Item 1
Oct. 4, 2021 Item #1 17
SITE PLAN VIEW
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTS
9685 VIA EXCELENCIA - SUITE 104, SAN DIEGO, CA 92126
TEL (760) 929-2851 FAX (760) 929-2852
NOT FOR CONSTRUCTION
100% PROGRESS SET
PARK
D
R
I
V
E
SEE SHEET ES1.1
PLAN & ELEVATION
MARINA DRIVE15
Item 1
Oct. 4, 2021 Item #1 18
ELEVATION VIEW - LOOKING EAST
PLAN VIEW - EAST
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTS
9685 VIA EXCELENCIA - SUITE 104, SAN DIEGO, CA 92126
TEL (760) 929-2851 FAX (760) 929-2852
NOT FOR CONSTRUCTION
100% PROGRESS SET
PARK DRIVE
16
Item 1
Oct. 4, 2021 Item #1 19
SOLDIER BEAM SECTION (CANTILEVER - PERMANENT ) SOLDIER BEAM SECTION (CANTILEVER-PERMANENT)
PERMANENT SHORING WALL SECTION
STUD WELDING DETAIL
TOP OF WALL DETAIL
PERMANENT SHORING SECTION
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTS
9685 VIA EXCELENCIA - SUITE 104, SAN DIEGO, CA 92126
TEL (760) 929-2851 FAX (760) 929-2852
NOT FOR CONSTRUCTION
100% PROGRESS SET 17
Item 1
Oct. 4, 2021 Item #1 20
SOLDIER BEAM PLAN SECTION (SOLDIER BEAMS #9-24)
PERMANENT SOLDIER BEAM PLAN SECTION (SOLDIER BEAMS #1-8)
INSIDE CORNER LAGGING DETAIL
SOLDIER BEAM PLAN SECTION (TYPICAL-TEMPORARY)
SOLDIER BEAM SECTION (CANTILEVER-TEMPORARY)
TIMBER LAGGING BRACE DETAIL
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTS
9685 VIA EXCELENCIA - SUITE 104, SAN DIEGO, CA 92126
TEL (760) 929-2851 FAX (760) 929-2852
NOT FOR CONSTRUCTION
100% PROGRESS SET 18
Item 1
Oct. 4, 2021 Item #1 21
·
·
·
·
·
SOLDIER BEAM SCHEDULE
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTS
9685 VIA EXCELENCIA - SUITE 104, SAN DIEGO, CA 92126
TEL (760) 929-2851 FAX (760) 929-2852
NOT FOR CONSTRUCTION
100% PROGRESS SET 19
Item 1
Oct. 4, 2021 Item #1 22
YIELDLANEBIKE
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION
100% PROGRESS SET
PLAN
SIGNING AND STRIPING PLAN
AND DETAILS
S-1
GRAPHIC SCALE
PARK DRIVE STRIPPING DETAIL 1
PLANGRAPHIC SCALE TELESPAR FLASHING BEACON DETAIL 4
CONTINENTAL CROSSWALK MARKING DETAIL 2
SIGN LEGEND
SIGN INSTALLATION DETAIL 3
NOTE:
Item 1
Oct. 4, 2021 Item #1 23
YIELDLANEBIKE
FINAL STABILIZATION PLAN
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION
100% PROGRESS SET
PLAN
CONSTRUCTION NOTES:
GRAPHIC SCALE
PLAN
LEGEND:
EC-1
Item 1
Oct. 4, 2021 Item #1 24
LANEBIKE
NOT FOR CONSTRUCTION100% PROGRESS SET605 Third Street Encinitas, CA 92024760.942.5147 Fax 760.632.0164PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTPLANTING PLANLANDSCAPE PLANTING PLANSSTA 0+00 TO 8+17.92SHEET KEY MAPPLANTING PLANSECTION A - TYPICAL PLANTER WALLLP-15 GALLON CONTAINER PLANT LEGEND (COASTAL SAGE SCRUB PLANTINGS)Item 1Oct. 4, 2021Item #1 25
NOT FOR CONSTRUCTION100% PROGRESS SET605 Third Street Encinitas, CA 92024760.942.5147 Fax 760.632.0164PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTLANDSCAPE PLANT LEGEND,SEED MIX, & PLANTING DETAILSPLANT LEGENDLP-2SEED MIXCMAEECCCCMCMCMCMCMCMCMCMCMCMAEAEAECCCCCCECECECECSCEPCGBPSCSCSCSCEPEPEPEPCGCGCGCGCGCGBPBPBPBPBPBP5 GALLON CONTAINER PLANT SYMBOLS Item 1Oct. 4, 2021Item #1 26
NOT FOR CONSTRUCTION100% PROGRESS SET605 Third Street Encinitas, CA 92024760.942.5147 Fax 760.632.0164PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTLANDSCAPE PLANTING NOTESPLANTING NOTESPLANT ESTABLISHMENT PERIOD / MAINTENANCE NOTESGENERAL LANDSCAPE NOTESLP-3CLEARING & GRUBBING NOTESPLANTING NOTES (CONTINUED)EXISTING CONDITIONS NOTES:SLOPE / GRADED AREA TREATMENT NOTESItem 1Oct. 4, 2021Item #1 27
LANEBIKEIRRIGATION PLAN
IRRIGATION LEGEND:
NOT FOR CONSTRUCTION
100% PROGRESS SET
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFT
IRRIGATION PLAN
LI-1
LANDSCAPE IRRIGATION PLANS
STA 0+00 TO 8+17.92
POINT OF CONNECTION - SCHEMATIC VIEW:
5 GALLON CONTAINER PLANT LEGEND
(COASTAL SAGE SCRUB PLANTINGS)
PRESSURE LOSS CALCULATION FOR LOWEST PRESSURE SYSTEM
SHEET KEY MAP
LATERAL LINE PIPE SIZING CHART:
Item 1
Oct. 4, 2021 Item #1 28
NOT FOR CONSTRUCTION
100% PROGRESS SET
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTLANDSCAPE IRRIGATION
LEGEND, NOTES & DETAILS
IRRIGATION LEGEND
LI-2
IRRIGATION NOTES
Item 1
Oct. 4, 2021 Item #1 29
NOT FOR CONSTRUCTION
100% PROGRESS SET
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTLANDSCAPE IRRIGATION DETAILS
LI-3
1
1
—
Item 1
Oct. 4, 2021 Item #1 30
NOT FOR CONSTRUCTION
100% PROGRESS SET
605 Third Street Encinitas, CA 92024
760.942.5147 Fax 760.632.0164
PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTLANDSCAPE IRRIGATION DETAILS
LI-4
Item 1
Oct. 4, 2021 Item #1 31