Loading...
HomeMy WebLinkAbout2021-10-04; Traffic and Mobility Commission; ; Park Drive Street and Drainage Improvements Project Meeting Date: Oct. 4, 2021 To: Traffic and Mobility Commission Staff Contact: Daniel Zimny, Associate Engineer daniel.zimny@carlsbadca.gov, 760-331-7399 Subject: Park Drive Street and Drainage Improvements Project Recommended Action Support staff’s recommendation to implement the proposed street improvements on Park Drive from Marina Drive to Bayshore Drive as part of the Park Drive Street and Drainage Improvements Project, Capital Improvement Program (CIP) Project No. 6611 (Project). Background The city’s CIP calls for the replacement of the existing retaining wall along the north side of Park Drive between Bayshore Drive and 4650 Park Drive. The existing retaining wall was constructed when this segment of Park Drive was widened in 1989. Staff have determined that this wall is nearing the end of its design life and requires replacement. The earthen embankment supported by the retaining wall is highly eroded resulting in the shortened service life of the facility. Sediment eroded from the slope during rain events deposit onto the sidewalk along Park Drive resulting in temporary closures. City street maintenance and operations crews are dispatched to this location following significant rain events to clear the deposited debris and restore pedestrian access. The Project will replace and extend the existing retaining wall, stabilize the slope, modify the existing drainage system and provide street improvements on the segment of Park Drive between Marina Drive and Bayshore Drive. As part of the public outreach plan, the Project was circulated for public review and comment. Staff received a request to install a new pedestrian crossing with rectangular rapid flashing beacons (RRFB) on Park Drive at the intersection with Marina Drive. This improvement will provide controlled pedestrian access between the multi-housing units on the south side of Park Drive to the on-street parking on the north side of the street. The RRFB crossing also enhances pedestrian safety and facilitates access to the Agua Hedionda Lagoon north shore public entrance at the end of Bayshore Drive. Currently, the only controlled crosswalk on Park Drive within this vicinity is at the intersection with Neblina Drive, approximately 450 feet east of Bayshore Drive, which is also supported by RRFB. The requested RRFB crossing provides a controlled pedestrian crossing on the western approach to the Agua Hedionda Lagoon north shore public access. Item 1 Oct. 4, 2021 Item #1 1 The existing Class II bikes lanes on Park Drive currently terminate at west end of the project area at Marina Drive. This project will extend these Class II bike lanes by an additional 600 feet to Bayshore Drive and on street parking will be maintained in both sides of the roadway. The street will be restriped for additional bike lane improvements when the street is slurry sealed within the next few years. Staff recommend that the proposed RRFB crossing be constructed at the intersection of Park Drive and Marina Drive. Necessary Council Action Staff will finalize the Project construction plan, specifications and cost estimate, and request authorization from the City Council to advertise for constructions bids. Next Steps Staff will finalize the construction plans for the Project following the Traffic and Mobility Commission’s review and feedback. A Coastal Development Permit must also be obtained from California Coastal Commission (CCC) prior to the City Council’s authorization to advertise for construction bids. The permit application will be submitted late Fall 2021 but the CCC may take over a year to process the permit. Staff coordinated closely with the CCC throughout the design phase to expedite the permit processing time. Once the Coastal Development Permit is obtained, the improvements will need to be constructed between September 15 and February 15 in accordance with the CCC request. Constructing the improvements during these months will avoid both biological impacts during the bird nesting season (February 15 to September 15) and pedestrian access impacts to the Agua Hedionda Lagoon north shore entrance during the summer tourist season. Exhibits 1. Location Map 2. Park Drive Street and Drainage Improvements – 100% Design Submittal Item 1 Oct. 4, 2021 Item #1 2 Item 1 Oct. 4, 2021 Item #1 3 DECLARATION OF RESPONSIBLE CHARGE CITY COUNCIL SCOTT CHADWICK CITY MANAGER 5 5 78 CONSTRUCTION PLANS CITY OF CARLSBAD CARLSBAD, CALIFORNIA AUGUST 2021 FOR PARK DRIVE STREET AND DRAINAGE IMPROVEMENTS VICINITY MAP LOCATION AND KEY MAP CALL TOLL FREE 1-800-227-2600 TWO WORKING DAYS BEFORE YOU DIG Underground Service Alert of Southern California MATT HALL KEITH BLACKBURN TERESA ACOSTA PRIYA BHAT-PATEL - - - - MAYOR COUNCIL MEMBER COUNCIL MEMBER COUNCIL MEMBER TITLE SHEET, VICINITY MAP, LOCATION AND KEY MAP 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION 100% PROGRESS SET G-1 X X Item 1 Oct. 4, 2021 Item #1 4 EXHIBIT 2 GENERAL NOTES AND SHEET INDEX 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION 100% PROGRESS SET G-2 GRADING NOTES GRADING NOTES (CONT)SOILS ENGINEER'S CERTIFICATE REFERENCE DRAWINGS SOURCE OF TOPOGRAPHY PROJECT LOCATION BASIS OF COORDINATES AND ELEVATIONS SHEET INDEX SHEET NUMBER DRAWING DRAWING DESCRIPTION WORK TO BE DONE Item 1 Oct. 4, 2021 Item #1 5 GENERAL NOTES, LEGEND AND ABBREVIATIONS LEGEND CROSS REFERENCING SYSTEM SECTION A DETAIL 1 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION 100% PROGRESS SET G-3 ABBREVIATIONS EROSION CONTROL NOTES TEMPORARY EROSION CONTROL AND IRRIGATION NOTES (CONT) TEMPORARY EROSION CONTROL AND IRRIGATION NOTES CUT AND FILL QUANTITIES Item 1 Oct. 4, 2021 Item #1 6 DEMOLITION PLAN605 Third Street Encinitas, CA 92024760.942.5147 Fax 760.632.0164PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION100% PROGRESS SETD-1GRAPHIC SCALEPLANCONSTRUCTION NOTES:PLANNOTE:Item 1Oct. 4, 2021Item #1 7 PLAN & PROFILE AND SECTIONS STA 0+00.00 TO 4+00.00 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION 100% PROGRESS SET PLAN PROFILE SECTION A SECTION B C-1 GRAPHIC SCALE TYPICAL CMU BLOCK WALL SECTION WALL STA 0+00.00 TO 3+02.57 TYPICAL SOLDIER PILE AND LAGGING WALL SECTION STA 3+02.57 TO 4+83.94 CONSTRUCTION NOTES: EASEMENTS: 3 Item 1 Oct. 4, 2021 Item #1 8 LANEBIKE605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION 100% PROGRESS SET SECTION C PLAN PROFILE PLAN & PROFILE AND SECTIONS STA 4+00.00 TO 8+18.98 C-2 GRAPHIC SCALE TYPICAL STEPPED PLANTED WALL SECTION STA 3+62.30 TO 7+11.57 CONSTRUCTION NOTES: DETAIL 1 EASEMENTS: 3 CONSTRUCTION NOTES (CONTINUED): Item 1 Oct. 4, 2021 Item #1 9 DETAILS - 1 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION 100% PROGRESS SET C-3 CABLE RAILING DETAIL 1 DETAIL 3 PLAN SECTION A-A DETAIL 4PLAN SECTION A-A SEDIMENT TRAP DETAIL 2 Item 1 Oct. 4, 2021 Item #1 10 DETAILS - 2 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION 100% PROGRESS SET C-4 LIGHT POLE RELOCATION @ STA 3+30.08 1 OUTLET STRUCTURE DETAIL 2 CURB RAMP GRADING DETAIL 3 Item 1 Oct. 4, 2021 Item #1 11 HORIZONTAL CONTROL PLAN605 Third Street Encinitas, CA 92024760.942.5147 Fax 760.632.0164PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION100% PROGRESS SETC-5GRAPHIC SCALEPLANPLANCONSTRUCTION NOTES:EASEMENTS:Item 1Oct. 4, 2021Item #1 12 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSNOT FOR CONSTRUCTION100% PROGRESS SETSOIL RETENTIOND E S I G N S I N C .VERDURA RETAINING WALL PLANSVERDURA RETAINING WALL GENERAL NOTES1028Item 1Oct. 4, 2021Item #1 13 LANEBIKE PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSNOT FOR CONSTRUCTION100% PROGRESS SETSOIL RETENTIOND E S I G N S I N C .PROFILE: VERDURA RETAINING WALL NO. 1PLAN: VERDURA RETAINING WALL NO. 15+006+002030SCALE:60'20'020'40'1" = 20'7+008+00VERDURA RETAININGWALL NO. 12030GEOGRID EXTENTVERDURA RETAINING WALL PLAN & PROFILELIMITS OF DISTURBANCE10' WATER EASEMENT PER MAP 516225' SEWER AND DRAINAGE EASEMENTTO THE CITY OF CARLSBAD PERDOCUMENT NO. 85-207258 RECORDEDJUNE 11, 1985 AS SHOWN ON MAP 12018ABUT PERMANENT SHORINGRETAINING WALL PER END OFWALL TRANSITION DETAIL DON SHEET 12CONNECT 4" SUBDRAIN TO MODIFIEDTYPE F CATCH BASIN PER SECTION A-AON SHEET 71128Item 1Oct. 4, 2021Item #1 14 10XT8XT8XT8XT8XT8XT10XT8XT8XT8XT#XT#XT#XT#XT10XT8XT8XT8XT8XT8XT10XTPARK DRIVE STREET AND DRAINAGE IMPROVEMENTSNOT FOR CONSTRUCTION100% PROGRESS SETSOIL RETENTIOND E S I G N S I N C .CROSS SECTION: WALL 1 - MAX HEIGHT = 13.33'CROSS SECTION: WALL 1 - MAX HEIGHT = 8.67'VERDURA RETAINING WALL CROSS SECTIONSTYPICAL CHIMNEY DRAIN DETAILCROSS SECTION: WALL 1 - MAX HEIGHT = 14.67'1228Item 1Oct. 4, 2021Item #1 15 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSNOT FOR CONSTRUCTION100% PROGRESS SETSOIL RETENTIOND E S I G N S I N C .FRONT OF WALL DETAILVERDURA 40 BLOCK DETAILEND OF WALL TRANSITION DETAILGEOGRID PLACEMENT ON CURVES DETAILGEOGRID CONNECTION DETAILTOP OF WALL DETAILSUBDRAIN PENETRATION DETAIL (IF NECESSARY)XXXXXXTYPICAL V-DITCH/RAILING DETAIL CASE A PLAN VIEWCASE ACASE B CASE C CASE D PLAN VIEWCASE DSECTION A-A9"MAXIMUMSPACING9"MAXIMUMSPACING10 34"18 14"10 34"18 14"FRONT VIEW12 14"8"12 14"SIDE VIEWTOP VIEWXXXXSECTION APLAN VIEWVERDURA RETAINING WALL STANDARD DETAILS1328Item 1Oct. 4, 2021Item #1 16 MASONRY WALL PLAN AND ELEVATION STA 0+00.00 TO 3+00.00 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION 100% PROGRESS SET W-5 ELEVATION - STA 1+50.00 TO STA 3+02.57 MASONRY WALL PLAN GRAPHIC SCALES CONSTRUCTION NOTES: ELEVATION - STA 0+00.00 TO STA 1+50.00 Item 1 Oct. 4, 2021 Item #1 17 SITE PLAN VIEW PARK DRIVE STREET AND DRAINAGE IMPROVEMENTS 9685 VIA EXCELENCIA - SUITE 104, SAN DIEGO, CA 92126 TEL (760) 929-2851 FAX (760) 929-2852 NOT FOR CONSTRUCTION 100% PROGRESS SET PARK D R I V E SEE SHEET ES1.1 PLAN & ELEVATION MARINA DRIVE15 Item 1 Oct. 4, 2021 Item #1 18 ELEVATION VIEW - LOOKING EAST PLAN VIEW - EAST PARK DRIVE STREET AND DRAINAGE IMPROVEMENTS 9685 VIA EXCELENCIA - SUITE 104, SAN DIEGO, CA 92126 TEL (760) 929-2851 FAX (760) 929-2852 NOT FOR CONSTRUCTION 100% PROGRESS SET PARK DRIVE 16 Item 1 Oct. 4, 2021 Item #1 19 SOLDIER BEAM SECTION (CANTILEVER - PERMANENT ) SOLDIER BEAM SECTION (CANTILEVER-PERMANENT) PERMANENT SHORING WALL SECTION STUD WELDING DETAIL TOP OF WALL DETAIL PERMANENT SHORING SECTION PARK DRIVE STREET AND DRAINAGE IMPROVEMENTS 9685 VIA EXCELENCIA - SUITE 104, SAN DIEGO, CA 92126 TEL (760) 929-2851 FAX (760) 929-2852 NOT FOR CONSTRUCTION 100% PROGRESS SET 17 Item 1 Oct. 4, 2021 Item #1 20 SOLDIER BEAM PLAN SECTION (SOLDIER BEAMS #9-24) PERMANENT SOLDIER BEAM PLAN SECTION (SOLDIER BEAMS #1-8) INSIDE CORNER LAGGING DETAIL SOLDIER BEAM PLAN SECTION (TYPICAL-TEMPORARY) SOLDIER BEAM SECTION (CANTILEVER-TEMPORARY) TIMBER LAGGING BRACE DETAIL PARK DRIVE STREET AND DRAINAGE IMPROVEMENTS 9685 VIA EXCELENCIA - SUITE 104, SAN DIEGO, CA 92126 TEL (760) 929-2851 FAX (760) 929-2852 NOT FOR CONSTRUCTION 100% PROGRESS SET 18 Item 1 Oct. 4, 2021 Item #1 21 · · · · · SOLDIER BEAM SCHEDULE PARK DRIVE STREET AND DRAINAGE IMPROVEMENTS 9685 VIA EXCELENCIA - SUITE 104, SAN DIEGO, CA 92126 TEL (760) 929-2851 FAX (760) 929-2852 NOT FOR CONSTRUCTION 100% PROGRESS SET 19 Item 1 Oct. 4, 2021 Item #1 22 YIELDLANEBIKE 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION 100% PROGRESS SET PLAN SIGNING AND STRIPING PLAN AND DETAILS S-1 GRAPHIC SCALE PARK DRIVE STRIPPING DETAIL 1 PLANGRAPHIC SCALE TELESPAR FLASHING BEACON DETAIL 4 CONTINENTAL CROSSWALK MARKING DETAIL 2 SIGN LEGEND SIGN INSTALLATION DETAIL 3 NOTE: Item 1 Oct. 4, 2021 Item #1 23 YIELDLANEBIKE FINAL STABILIZATION PLAN 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTNOT FOR CONSTRUCTION 100% PROGRESS SET PLAN CONSTRUCTION NOTES: GRAPHIC SCALE PLAN LEGEND: EC-1 Item 1 Oct. 4, 2021 Item #1 24 LANEBIKE NOT FOR CONSTRUCTION100% PROGRESS SET605 Third Street Encinitas, CA 92024760.942.5147 Fax 760.632.0164PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTPLANTING PLANLANDSCAPE PLANTING PLANSSTA 0+00 TO 8+17.92SHEET KEY MAPPLANTING PLANSECTION A - TYPICAL PLANTER WALLLP-15 GALLON CONTAINER PLANT LEGEND (COASTAL SAGE SCRUB PLANTINGS)Item 1Oct. 4, 2021Item #1 25 NOT FOR CONSTRUCTION100% PROGRESS SET605 Third Street Encinitas, CA 92024760.942.5147 Fax 760.632.0164PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTLANDSCAPE PLANT LEGEND,SEED MIX, & PLANTING DETAILSPLANT LEGENDLP-2SEED MIXCMAEECCCCMCMCMCMCMCMCMCMCMCMAEAEAECCCCCCECECECECSCEPCGBPSCSCSCSCEPEPEPEPCGCGCGCGCGCGBPBPBPBPBPBP5 GALLON CONTAINER PLANT SYMBOLS Item 1Oct. 4, 2021Item #1 26 NOT FOR CONSTRUCTION100% PROGRESS SET605 Third Street Encinitas, CA 92024760.942.5147 Fax 760.632.0164PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTLANDSCAPE PLANTING NOTESPLANTING NOTESPLANT ESTABLISHMENT PERIOD / MAINTENANCE NOTESGENERAL LANDSCAPE NOTESLP-3CLEARING & GRUBBING NOTESPLANTING NOTES (CONTINUED)EXISTING CONDITIONS NOTES:SLOPE / GRADED AREA TREATMENT NOTESItem 1Oct. 4, 2021Item #1 27 LANEBIKEIRRIGATION PLAN IRRIGATION LEGEND: NOT FOR CONSTRUCTION 100% PROGRESS SET 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFT IRRIGATION PLAN LI-1 LANDSCAPE IRRIGATION PLANS STA 0+00 TO 8+17.92 POINT OF CONNECTION - SCHEMATIC VIEW: 5 GALLON CONTAINER PLANT LEGEND (COASTAL SAGE SCRUB PLANTINGS) PRESSURE LOSS CALCULATION FOR LOWEST PRESSURE SYSTEM SHEET KEY MAP LATERAL LINE PIPE SIZING CHART: Item 1 Oct. 4, 2021 Item #1 28 NOT FOR CONSTRUCTION 100% PROGRESS SET 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTLANDSCAPE IRRIGATION LEGEND, NOTES & DETAILS IRRIGATION LEGEND LI-2 IRRIGATION NOTES Item 1 Oct. 4, 2021 Item #1 29 NOT FOR CONSTRUCTION 100% PROGRESS SET 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTLANDSCAPE IRRIGATION DETAILS LI-3   1 1  —   Item 1 Oct. 4, 2021 Item #1 30 NOT FOR CONSTRUCTION 100% PROGRESS SET 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 PARK DRIVE STREET AND DRAINAGE IMPROVEMENTSDRAFTLANDSCAPE IRRIGATION DETAILS LI-4 Item 1 Oct. 4, 2021 Item #1 31