HomeMy WebLinkAbout2891 CAMINO SERBAL; ; CBR2021-0761; PermitPrint Date: 03/22/2021 Permit No: CBR2021-0761
Building Permit Finaled
Residential Permit
Job Address:
Permit Type:
Parcel #:
Valuation:
Occupancy Group:
2891 CAMINO SERBAL, CARLSBAD, CA 92009-6996
BLDG-Residential
2552832200
$7,200.00
Work Class:
Lot #:
Project #:
Cogen
Status:
Applied:
Issued:
03/18/2021
03/18/2021
Finaled Close Out:
#of Dwelling Units:
Track #:
Plan #:
Closed - Finaled
TKersPlan Check #:
Inspector:Orig. Plan Check #:Bathrooms:
Final Inspection:03/22/2021
Bedrooms:Construction Type:
Occupant Load:
Code Edition:
Sprinkled:
6.1KW ROOF MOUNT PV, 18 MODS (E-REVIEW)Description:
Project Title:
Property Owner:
SPADA ALFRED AND JANICE FAMILY TRUST
02-06-07
2891 CAMINO SERBALCARLSBAD, CA 92009
Contractor:
SULLIVAN SOLAR POWER OF CALIFORNIA INC
8949 KENNAMAR DR, # STE 101
SAN DIEGO, CA 92121(858) 271-7758
AMOUNTFEE
BUILDING PERMIT FEE ($2000+)$97.22
BUILDING PLAN CHECK FEE (BLDG)$68.05
SB1473 GREEN BUILDING STATE STANDARDS FEE $1.00 STRONG MOTION-RESIDENTIAL $0.94
Total Fees:$167.21 Total Payments To Date:$167.21 Balance Due:$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad CA 92008-7314 ï 760-602-2700 ï 760-602-8560 f ï www.carlsbadca.gov
Building Division Page 1 of 1
{"Cityof
Carlsbad
Plan Check
Est. Value
PC Deposit
Date
B-1 Page 1 of 2 Rev. 06/18
BUILDING PERMIT
APPLICATION
B-
Job Address __________________________________________Suite: __________ APN: _________________________
CT/Project #:_________________________________________ Lot #:_________
Fire Sprinklers: Air Conditioning: Electrical Panel Upgrade
BRIEF DESCRIPTION OF WORK:
________________________________________________________________________
__________________________________________________________________________________________________
APPLICANT (PRIMARY CONTACT) PROPERTY OWNER
Name: ________________________________________ Name: _____________________________________________
Address: ______________________________________ Address: ____________________________________________
City: _________________ State:______Zip: _________ City: ______________________State:______Zip: ___________
Phone: _______________________________________ Phone: _____________________________________________
Email: ________________________________________ Email: ______________________________________________
DESIGN PROFESSIONAL CONTRACTOR BUSINESS
Name: ________________________________________ Name: _____________________________________________
Address: ______________________________________ Address: ___________________________________________
City: _________________ State:______Zip: __________ City: _________________ State:______Zip: _______________
Phone: _______________________________________ Phone: ____________________________________________
Email: ________________________________________ Email: _____________________________________________
Architect State License: __________________________ State License:_____________ Bus. License:_______________
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor’s License Law
{Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he/she is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500}).
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
Addition/New: ____________Living SF, ________ Deck SF, ________ Patio SF, ________Garage SF
Is this to create an Accessory Dwelling Unit? New Fireplace? if yes how many? _____
Remodel: __________ SF of affected area Is the area a conversion or change of use ?
Pool/Spa: __________ SF Additional Gas or Electrical Features? _____________________________
Solar: _______ KW, ______ Modules, Mounted: Roof Ground , Tilt:
Panel Upgrade:
Reroof: ____________________________________________________________________________________
Plumbing/Mechanical/Electrical Only: ___________________________________________________________
Other: ______________________________________________________________________________________
_______________________________________________________________________________________________
CBR2021-0761
$7,200.00
3/18/2021
□
□
□
( City of
Carlsbad
RESIDENTIAL
1
2891 CAMINO SERBAL CARLSBAD, CA 92009
0 YES O NO C))YES G) NO
pv solar roof mount
O v O N
3/2/21
255-283-2200
:()YES Q NO
O v O N,
O v Q N
[Z] 6.1 18 0 0 vO N, RMA:O v@N,
Battery:O v @ N, O v@N
□
□
□
Michael Barron
8949 Kenamar Dr. Ste 101
San Diego CA 92121
8582717758
michael.barron@sullivansolarpower.com
Al Spada
2891 CAMINO SERBAL
carlsbad
(858) 603-2599
Sullivan Solar Power
8949 Kenamar Dr. Ste 101
CA 92009
San Diego CA 92121
8582717758
michael.barron@sullivansolarpower.com
839077
B-1 Page 2 of 2 Rev. 06/18
( OPTION A ): WORKERS’COMPENSATION DECLARATION:
I hearby affirm under penalty of perjury one of the following declarations:
I have and will maintain a certificate of consent to self-insure for workers’ compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued.
I have and will maintain worker’s compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers’ compensation insurance carrier and policy number are: Insurance Company Name: _______________________________________________
Policy No. _______________________________ Expiration Date: _______________________
Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to be come
subject to the workers’ compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful, and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney’s fees.
CONTRACTOR SIGNATURE: _____________________________________________ AGENT DATE: _______________
( OPTION B ): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor’s License Law for the following reason:
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor’s License Law does not apply to an owner of property who builds or improves thereon, and who does such work
himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within
one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor’s License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor’s License Law).
I am exempt under Section __________________Business and Professions Code for this reason:
I personally plan to provide the major labor and materials for construction of the proposed property improvement.
I (have / have not) signed an application for a building permit for the proposed work.
I have contracted with the following person (firm) to provide the proposed construction (include name address / phone / contractors’ license number):
I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone /
contractors’ license number):
I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work):
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
OWNER SIGNATURE: ______________________________________________ AGENT DATE: _______________
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender’s Name: ___________________________________________________ Lender’s Address: ___________________________________________________
ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? Yes No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? Yes No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? Yes No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
APPLICANT CERTIFICATION:
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP
HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF
THE GRANTING OF THIS PERMIT.OSHA: An OSHA permit is required for excavations over 5’0’ deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized
by such permit is not commenced within days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after
the work is commenced for a period of days
APPLICANT SIGNATURE: __________________________________________________ DATE: ____________________
□
□
□
□
□ 1.
2.
3.
4.
5.
RWC803628412 12/1/21
180
180 . CBC section 105.5.
Tri State
□ 3/2/21
Q vES Q No
□
IYes/No
Yes I No
Yes I No
3/2/21
B-50 Page 1 of 6 Revised 08/19
Development Services
Building Division
1635 Faraday Avenue
(760) 602-2719
www.carlsbadca.gov
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
PURPOSE
This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance
requirements apply to their projects. The completed checklist must be included in the building permit application. It may be
necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate
full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach
to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as
specified by the ordinances.
NOTE: The following type of permits are not required to fill out this form
Patio Decks PME (w/o panel upgrade)Pool
If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
an explanation must be provided to the satisfaction of the Building Official.
Details on CAP ordinance requirements are available on the city’s website.
A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be
completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webpage and
download the latest form.
Applicant Signature: ___________________________________ Date: ___________________
Application Information
Project Name/Building
Permit No.: BP No.:
Property Address/APN:
Applicant Name/Co.:
Applicant Address:
Contact Phone: Contact Email:
Contact information of person completing this checklist (if different than above):
Name: Contact Phone:
Company
name/address: Contact Email:
C cityof
Carlsbad
Spada Solar
2891 CAMINO SERBAL/2552832200
Michael Barron/Sullivan Solar Power
8949 Kenamar Drive STE 101 San Diego CA 92121
619-458-4811 mi cha el. barron@sullivansolarpower.com
3/2/21
City of Carlsbad Climate Action Plan Consistency Checklist
Updated 8/15/2019 2
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project.
For alterations and additions to existing buildings, attach Building Permit Valuation worksheet.
Building Permit Valuation (BPV) from worksheet: $_______________
Construction Type Complete Section(s)Notes:
Residential Low-rise High-rise
A high-rise residential building is 4 or more stories, including a
mixed-use building in which at least 20% of its conditioned floor
area is residential use
New construction 2A, 3A,
4A
1B, 2B,
3B, 4A
Additions and alterations:
BPV < $60,000 N/A N/A All residential additions and alterations
BPV
Electrical service panel upgrade only 1A, 4A 4A 1-2 family dwellings and townhouses with attached garages
only
BPV 1A, 4A* 1B, 4A*
*Multi-family dwellings only where interior finishes are removed
and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
Nonresidential
New construction 1B, 2B, 3B, 4B and 5
Alterations:
BPV or additions 1,000
square feet 1B, 5
BPV $1,000,000 1B, 2B, 5 Building alterations of 75% existing gross floor area
2,000 sq. ft. new roof addition 2B, 5 1B also applies if BPV $200,000
CAP Ordinance Compliance
Checklist Item
Check the appropriate boxes, explain all not applicable and exception items, and provide supporting calculations and documentation as necessary.
1. Energy Efficiency
Please refer to Carlsbad Municipal Code (CMC) sections 18.21.155 and 18.30.190, and the California Green Building Standards Code (CALGreen) for
more information when completing this section.
A.
See CMC section 18.30.190.
N/A _______________________________
(attach certification)
Single-family -family
Select one:
Duct sealing Attic insulation Cool roof
Attic insulation
later Select one:
Lighting package Water heating Package
1 Select one:
Duct sealing Attic insulation Cool roof
1992 and later Select one: Lighting package Water heating package
B.
or additions . N/A _______________________________
□
III
III
□ ~ $60,000
□
□ ~ $200,000
□ I
□
□
□ ~ $200,000 ~
□ ~ ~
□ ~ ~
A D Residential addition or alteration i2: $60,000 building permit valuation. □
□ Exception: Home energy score 2: 7
Year Built Requirements Multi Requirements
□ Before 1978
□ □ □ □
□ 1978 and □ □
□ Between 1978 and 199 □ □ □
□ □ □
D Nonresidential* new construction or alterations i2: $200,000 building permit valuation,
i2: 1,000 square feet □
City of Carlsbad Climate Action Plan Consistency Checklist
Updated 8/15/2019 3
See CAL – Energy Efficiency.
A5.203.1.1 Choose one:.1 Outdoor lighting .2 Warehouse dock seal doors
.3 Restaurant service water heating (comply with California Energy Code section 140.5, as amended)
.4 Daylight design PAFs .5 Exhaust air heat recovery N/A_______________________________
A5.203.1.2.1
Choose one as applicable:.95 Energy budget .90 Energy budget N/A _______________________________
A5.211.1**
On-site renewable energy N/A_______________________________
A5.211.3**
Green power (if offered by local utility provider, 50% minimum renewable sources)N/A_______________________________
A5.212.1
Elevators and escalators N/A_____________________________
A5.213.1
Steel framing N/A _____________________________
* Includes hotels/motels and high-rise residential buildings
, or alterations that add 2,000 square feet of new roof addition: comply
with CMC 18.30.130 instead.
A. low-rise residential )
s: 1) High-
MC
-rise residential) or 18.30. -rise residential)
Floor Plan ID (use additional
sheets if necessary)
CFA #d.u.Calculated kWdc* Exception
__________________________________
______________________________________________
______________________________________________
______________________________________________
Total System Size:kWdc
kWdc =1,000 + (1.15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du = number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
B.ases roof
CMC section 18.30.130 when completing this section. Note: This section also applies to
high-
Choose one of the following methods:
GFA: __________________ Min. System Size: ______ kWdc
If < 10,000s.f. Enter: 5 kWdc
kWdc x (GFA/10,000) **
**Round building size factor to nearest tenth, and round system size to nearest whole number.
Time-
□
□
□
□
□
□
CMC 18.21.155 and
□
□
□
Green Appendix AS, Division AS.2
□
□
... For alterations ~ $1,000,000 BPV and affecting > 75% existing gross floor area
2. Photovoltaic Systems
□
□
□
□
□
□
D Residential new construction (for building permit applications submitted after 1/1/20 . Refer to 2019 California
Energy Code section 150.1(c)14 for requirements. Note rise residential buildings are subject to nonresidential photovoltaic
requirement (28 below) instead. 2) If project includes installation of an electric heat pump water heater pursuant to C 18.30.150(8)
(high 170(8) (low , increase system size by .3kWdc if PV offset option is selected.
□
□
□
□
(CFAx.572) /
D Nonresidential new construction or alterations ~$1,000,000 8PV and affecting ~75% existing floor area, or addition that incre
area by ~2,000 square feet Please refer to
rise residential and hotel/motel buildings.
□ Gross Floor Area (GFA) Method
□
□If.:: 10,000s.f. calculate: 15
□ Dependent Valuation Method
City of Carlsbad Climate Action Plan Consistency Checklist
Updated 8/15/2019 4
Annual TDV Energy use:*** ______________ x .80= Min. system size: ____________ kWdc
***Attach calculation documentation using modeling software approved by the California Energy Commission.
A.
Please refer to CMC sections 18.30.150 and 18.30.170 when completing this section.
For systems serving choose one:
Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
Heat pump water heater AND PV system .3 kWdc larger than required in CMC section 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1(c) 14 (low-rise residential) Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
Exception: ______________________________________________________________________________
For systems serving units, install a central water-heating system with all of the following:
Gas or propane water heating system
Recirculation system per CMC 18.30.150(B) (high-rise residential, hotel/motel) or (low-
rise residential)
Solar water heating system that is either:
.20 solar savings fraction
.15 solar savings fraction, plus drain water heat recovery
Exception: ______________________________________________________________________________________
B.
CMC section 18.30.150 when completing this section.
Water heating system derives at least 40% of its energy from one of the following (attach documentation):
Solar-thermal Photovoltaics Recovered energy
Water heating system is (choose one):
Heat pump water heater
Electric resistance water heater(s)
Solar water heating system with .40 solar savings fraction
Exception: ______________________________________________________________________________________
3. Water Heating
A D Residential and hotel/motel new construction
□
□
□
□
□
□
□ □
□ □
□ □ □
individual dwelling units
multiple dwelling
18. D Nonresidential new construction
Please refer to Carlsbad Ordinance
□
□
□ □ □ □ □
□
CMC 18.30.170(6)
□
City of Carlsbad Climate Action Plan Consistency Checklist
Updated 8/15/2019 5
Calculations: Total EVSE spaces = .10 x Total parking (rounded up to nearest whole number)
EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number)
EVSE other= Total EVSE spaces – EVSE Installed
(EVSE other may be “Capable,” “Ready” or “Installed.”)
*Major alterations are: (1) for one and two-
or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit
trical, and/or plumbing
systems are proposed.
B. Nonresidentia Exception : ______________________________
Total Parking Spaces
Proposed
EVSE Spaces
Capable Ready Installed Total
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
0-9 1 1
10-25 2 1
26-50 4 2
51-6 3
-100 9 5
101-150 12 6
151-200 9
201 and over 10 percent of total 50 percent of Required EV Spaces
A.
when completing this section.
One and two-family residential dwelling or townhouse with attached garage:
One EVSE Ready parking space required Exception : _______________________________
Multi-family residential: Exception : ______________________________
Total Parking Spaces
Proposed
EVSE Spaces
Capable Ready Installed Total
4. Electric Vehicle Charging
A D Residential New construction and major alterations*
Please refer to Carlsbad Ordinance CMC section 18.21.140
□ □
□ □
family dwellings and townhouses with attached garages, alterations have a building permtt valuation ~ $60,000
valuation ~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, elec
R 0 I new construction (includes hotels/motels) □
10 2 5 8
□ □ □ □ 75
□ 76 --17 -
City of Carlsbad Climate Action Plan Consistency Checklist
Updated 8/15/2019 6
An approved Transportation Demand Management (TDM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
City staff will use the table below based on your submitted plans to determine whether or nor your permit requires a TDM plan. If TDM is applicable to your
permit, staff will contact the applicant to develop a site-specific TDM plan based on the permit details.
Use
Emp ADT for
first 1,000 s.f.
Emp ADT/
1000 s.f.1
Office (all)2 20 13
Restaurant 11 11
Retail3 8 4.5
Industrial 4 3.5
Manufacturing 4 3
Warehousing 4 1
1 Unless otherwise noted, rates estimated from ITE Trip
Generation Manual, 10thEdition
2 For all office uses, use SANDAG rate of 20 ADT/1,000 sf to
calculate employee ADT
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Office: 20,450 sf
1. 20,450 sf / 1000 x 20 =
Retail: 9,334 sf
1. First 1,000 sf = 8 ADT
2. 9,334 sf - 1,000 sf = 8,334 sf
3. (8,334 sf / 1,000 x 4.5) + 8 =
Acknowledgment:
I acknowledge that the plans submitted may be subject to the City of Carlsbad’s Transportation Demand Management Ordinance. I agree to be contacted should
my permit require a TDM plan and understand that an approved TDM plan is a condition of permit issuance.
Applicant Signature: ______________________________________________________ Date: ___________________
Person other than Applicant to be contacted for TDM compliance (if applicable):
Name (Printed): _________________________________________________________ Phone Number: ________________
Email Address: _________________________________________________________
5. : Nonresidential ONLYD Transportation Demand Management (TDM)
Employee ADT Estimation for Various Commercial Uses
Sample calculations:
rDM plan and understand that an ap
~ 8 ~jf/
409 Employee ADT
46 Em lo ee ADT
3/2/21
Building Permit Inspection History Finaled
PERMIT INSPECTION HISTORY for (CBR2021-0761)
BLDG-Residential 03/18/2021Application Date:Permit Type:Owner:TRUST SPADA ALFRED AND JANICE
FAMILY TRUST 02-06-07
Cogen 03/18/2021Work Class:Issue Date:Subdivision:CARLSBAD TCT#88-03-03
ARROYO LA COSTA UNIT#03
09/20/2021Expiration Date:Status:
IVR Number: 32192
Closed - Finaled 2891 CAMINO SERBAL
CARLSBAD, CA 92009-6996
Address:
Scheduled
Date
Inspection Type Inspection No. Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
03/22/2021 03/22/2021 BLDG-35 Solar Panel 153157-2021 Passed Tim Kersch Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-Final Inspection 153158-2021 Passed Tim Kersch Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
Monday, March 22, 2021 Page 1 of 1
{cityof
Carlsbad