HomeMy WebLinkAbout2605 CARLSBAD BLVD; ; CBC2020-0449; RecycleI
w,{':,. '®
WASTE MANAGEMENT
OUMPSITE/LANOFILL
Palomar Landfill (PAL)
5960 El Camino Real
Carlsbad, CA, 92008
DATE OF SERVICE SVC TICKET#
4/17/2020 188335
5/6/2020 192547
5/18/2020 195779
6/9/2020 201476
6/16/2020 203345
6/30/2020 207381
7/20/2020 212798
------·-·-----·-----.
GENERAL CONTRACTOR:
ROSE ENVIRONMENTAL
2605 CARLSBAD BLVD
CARLSBAD, CA.92008
Construction & Recycling Services
5701 S. Eastern Ave., STE 300, Commerce, CA 90040
714-480-2317 (Direct) 866-459-3985 (Fax)
C&O SORT & TRANSFER FACILITY
EDCO CDI Recycling & Buy Back Center
224 S Las Posas Rd
Acct: 350-73993
Sales Rep: Victoria Brown-Delgado
roseenvironmenta!@gmaH.com
Prepared Date: 08/12/2020 San Marcos, CA. 92078
Total Tons RECY
BIN SIZE MATERIAL TYPE Tons RCY RATE% FACILITY
40YO C&D DEMO 4.38 3.77 86.00% EDCO SAN MARCOS (EDD)
40YD C&D DEMO 3.61 3.10 86.00% EDCO SAN MARCOS (EDD)
40YD C&DDEMO 3.29 2.83 86.00% EDCO SAN MARCOS (EDD)
40YD TRASH/ MSW 3.90 0.00 0.00% PALOMAR LANDFILL (PAL)
lOYD TRASH/ MSW 9.27 0.00 0.00% PALOMAR LANDFILL (PAL)
40YD TRASH/ MSW 3.68 0.00 0.00% PALOMAR LANDFILL (PAL)
40YD C&D DEMO 3.51 3.02 86.00% EDCO SAN MARCOS (EDD)
)
Total Tons 31.64
Total Tons Diverted 12.72
Total Tons Landfilled 18.92
Total Diversion 40.20%
EDCO WASTE & RECYCLING
224 S. LAS POSAS RD
SAN MARCOS, CA 92078
(760) 744-2700
SERVICES, INC
Customer: 1024 Ticket : 15898
Date; 04/17/20
COASTWASTE/TINA LOVELACE
5960 EL CAMINO REAL
CARLSBAD CA 92008
Commodity Units
45 C & D MIX 4.38
Rate
In: 11: 38
Out: 11: 4 8
INVOICE
Truck: 5504/5504
Container:
Route: 08645
Origin: 086 CARLSBAD
[Gross(In): 40,140. lbs Scl#l -per TON Tare 31,380. lbs Scl#l Net: 8,760.
TOTAL DUE -Construction & Demolition Diversion Certificate -Diversion Percentage 88%
This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials ,n accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EOCO facility.
CRUZ
EDCO WASTE & RECYCLING SERVICES, INC
224 S . LAS POSAS RD
SAN MARCOS, CA 9207 8
(760) 744 •2700
Customer: 1024 Ticket: 16120
Date: 05/06 /20
COASTWASTE/TINA LOVELACE
5960 EL CAMINO REAL
CARLSBAD CA 92008
In: 9: 04
Out: 9:10
Commodity Units
45 C & D MIX 3.61
{Gross {In): 38,560. lbs Scl#l
Rate
-per TON
Tare 31,340. lbs Scl#l
INVOICE
Truck: 5503/5503
Container:
Route: 08645
Origin: 086 CARLSBAD
Extended ...
Net: 7,220. lbs]
TOTAL DUE
Construction & Demolition Diversion Certificate •· Dlversion Percentage 88%
This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
CRUZ Driver
Jqo 7377-3 r~r /'l2,-::sl17
Ef111 '·'.' .. ,l E & REC_ LING SEP.VICES , INC
.! .!. ' :-. I '~-PO.SJ, . RD ,s_..n ;-11 .•• S, C.'\ 9..:078
17,,(,, 11 ,-'.::'/flO
C -•~ '024 Ticket: 16282
Date: 05/18/20
< ( ,:, . · •. 'E/T I :, VELACE
S , , !:/.;MH.JO I !·Al
Cl· ' •• -;·.·· CP.. ). C 0
(' ,I ii .. , .. ; ..... 4
•· Rate
t ·, · •, 1 MI :,;
In: 9: 55
Out: 10 :01
per TON
INVOICE
Truck: 3995/3995
Container:
Route: 02345
Origin: 0~3-Oe~ANS!OE
CH,J..,~\')
Extended
~
, l n): 3.1,
Units
3.29
q . lbs Scl#l Tare 33,100. lbs Scl#l Net: 6,580. lb:r---
TOTAL DUE -Con-:.1r,,<.l ·,11 ~. Demoltt1on Diversion Certificate•· Diversion Percentage 86%
This r,-1 !,f ,; .,, lhat 11,e company listed above has utilized an EDCO facility to divert construction demolition materials in accordance
with U ~ ri :• quiremcnt. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO lacilily.
9:43 AM Roll Otf Dispatch Closed T1c~et Dispiay ~/i~/~U~U
350-73993 ROSE ENVIRONMENTAL
Opened by CHERRER4
Closed by LBELTRAN
2605 CARJ'.,SBAD BLVD CARLSBAD CA
Ticket 201476 Driver code KM.ACE
Dumpinfo:Site PAL T Tkt 226XXXX
92008-2208
Requested
Qty
by YOLANDA
3.90 Tax
Points
comments exist for this
Load type S/0 Equipment code
5627041860 ....... o_..-
Status Code * Additional ticket*
Date Time
Dispatched: 6/09/2020 12 :17
Loaded/ Drop off: 13:13
Restart Ticket:
Arrived at customer:
Stop Ticket:
Arrived at landfill:
Finished at landfill: 14:30 Ticket completed:
Svc
DTN
TRF
40D
Quantity
3.90
1.00
1.00
Price
47.52
80.65
233.92
Special Description
EDCO REJECTED LOAD
edco rej load-tl
Job#
Time
13:01
13 :39
14 :30
Waste
Type
MSW
MSW
Tax T/P
T
T
T
Bottom
F3=Exit Fll=View Dates Fl2=Prev Fl3=Additional Comments Fl7»Top Fl8=Bottom
F20=Profile
9:4~ AM Roii o~~ Dispatch ciosea Ticxet D1spiay ~1i~1~u~u
350-73993 ROSE ENVIRONMENTAL
2605 CARLSBAD BLVD CARLSBAD CA
Ticket 203345 Driver code KJCAR
Dumpinfo:Site PAL T Tkt SBOXXXX
Load type DNR Equipment code
92008-2208
Opened by CHERRER4
Closed by LBELTRAN
Requested by YOLANDA 5627~
Qty 9 .27 Tax ~
Points O
Status Code • Additional comments exist for this ticket•
Date
Dispatched: 6/16/2020
Loaded/ Drop off :
Restart Ticket:
Finished at landfill:
Time
12:57
13 :36
14:20
Time
Arrived at customer: 13 :14
Stop Ticket:
Arrived at landfill: 13 :59
Ticket completed: 14:20
Svc Quantity Price
47.52
233 .92
Special Description Job#
Waste
Type
DTN 9 .27
100 1.00 MSW
Tax T/P
T
T
F3=Exit Fll=View Dates Fl2=Prev Fl3=Additional Comments
F20=Profile
Bottom
Fl7sTop Fl8cBottom
9:41 AM Roll Oft Dispatch Closed Ticket Display ~/1 ~/~U~U
350-73993 ROSE ENVIRONMENTAL
Opened by TBROWN38
Closed by LBELTRAN
2605 CARLSBAD BLVD CARLSBAD CA
Ticket 207381 Driver code KJSAL
Dumpinfo:Site PAL T Tkt 266XXX:X
Load type S/0 Equipment code
92008-2208
Requested
Qty -0
Status Code * Additional
by YOLANDA
3.68 Tax
Points
comments exist for this ticket•
Date Time
Di spatched: 6/30/2 020 10 :57
Loaded/ Drop off: 12 :32
Arrived at customer :
Stop Ticket :
Restart Ticket : Arrived at landfill:
Finished at landfill : 13 :28 Ticket completed:
Svc Quantity Price
48 .22
233 .92
Special Description Job#
DTN 3 .68
40D 1. 00
Time
11:18
12 :58
13:28
Waste
Type
MSW
Tax T/P
T
T
Bottom
F3=Exit Fll=View Dates Fl2=Prev Fl3=Additional Comments Fl7=Top Fl8=Bottom
F20=Profile
EDCO WASTE & RECYCLI NG SERVICES, INC
224 S . LAS POSAS RD
SAN MARCOS, CA 9 2078
(760) 744 -2700
Customer: 1024 Ticket: 17144
Date: 07/20/20
COASTWASTE/TINA LOVELACE
5960 EL CAMINO REAL
CARLSBAD CA 92008
Rate
In: 9 :09
Out: 9:18
Commodity Units
45 C & D MIX 3.51 -per TON
INVOICE
Truck: 5503/5503
Container :
Route : 08645
Origin: 086 CARLSBAD
Extended
Charge
(Gross (In): 39,360. lbs Scl#l Tare 32,340. lbs Scl#l -Net: 7,020. lbs]
TOTAL DUE -Construction & Demolition Diversion Certificate •· Diversion Percentage 86%
This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective E0CO facility.
CRUZ r/;e~