HomeMy WebLinkAbout2808 ROOSEVELT ST; 101; CBC2021-0180; RecycleDEBRIS RECYCLING REPORT (ACTUAL):
SECTION A Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided in and with
this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Permit No. CBC2021-0180 Print Name Decor Retail S ace
Address
SECTION B
_2_4_51_B_l_m..;..p_al_a_D_r_iv_e_, C_ar_ls_b_a_d_, C_A_. 9_2_0_1_0 ____________ ,Date 07/09/2021
Use this Final Log below to track loads of materials as they leave the Job site.
@@SAVE RECEIPTS@@
Indicate FINAL quantities in 1Qfil for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
A B C
Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility
Reused or Recycled Disposed in (Name, Address, Phone)
Salvaged Landfill
Example; Palomar Transfer Station, 5960 El
01/01/2020 Concrete (broken) 5 tons Camino Real
-760 603-0153
06/14/2021 Mixed C&D Debris 4.82 tons 3.47 tons 1.35 tons Escondido Resource Recovery,
1021 W. Mission Ave. Escondido CA 92025
06/16/2021 Mixed C&D Debris 2.88 tons 2.07 tons .81 tons Escondido Resource Recovery,
1021 W. Mission Ave. Escondido CA. 92025
06/17/2021 Metal .75 tons .75 tons -0-Lee's Metal Recycling, 13151 Lee Drive, Vista, CA.
al>TOTAL 8.45 tons 6.29 tons 2.16 tons
SECTION C
Diversion Rate Achieved ___ 1_4_.7_4 ___ __J/ __ 1_6_.9 _______ = 87 % ~65%□
Total of columns A + B Total of columns A+ B + C DIVERSION
Contractor /Owner Signature , Pro·ect Coordinator Date
Attach the following documentation to this Return completed form and documentation to:
• Original recycling weight tickets, landfill weight tickets
• Original donation receipts with photos and/or itemized descriptions
• Any other relevant information to support Recycling Report
City of Carlsbad
Building Division (1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
Page 2 of 3 Rev. 2110/21
Conversion Table for Common Construction Wa ste
This document is informational onlv. It is here to help vou convert truckload auantities to tons. if necessarv.
Column A Column B Column C
category Material Volume Tons/Unit TQm
Mixed Debris Construction cy X 0.18 =
Demolition cy X 1.19 =
Asphalt/Concrete Asphalt (broken) cy X 0.70 =
Concrete {broken) cy X 1.20 =
Concret e (solid slab) cy X 1.30 =
Brick/Masonry/Tile Brick (broken) cy X 0.70 =
Brick {whole, palletized) cy X 1.51 =
Masonry brick (broken) cy X 0.60 =
Tile sq ft X 0.00175 =
Building Materials (cabinets, doors, windows, etc.) cy X 0.15 =
Cardboard (flat) cy X 0.05 =
Carpet By square foot sq ft X 0.0005 =
By cubic yard cy X 0.30 =
Carpet Padding/Foam sq ft X 0.000125 =
Ceiling Tiles Whole (palletized) cy X 0.0003 =
Loose cy X 0.09 =
Drywall (new or used) 1/2" (by square foot) sq ft X 0.0008 =
5/8" (by square foot) sq ft X 0.00105 =
Demo/used (by cu. yd.) cy X 0.25 =
Landscape Debris (brush, trees, etc.) cy X 0.15 =
Asphalt Composition
Shingles, asphalt Shingle cy X 0.22 =
Unpainted Wood/Pallets By board foot bd ft X 0.001375 =
By cubic yard cy X 0.15 =
Trash/Garbage cy X 0.18 =
Other (estimated weight) cy X estimate =
cy X estimate =
cy X estimate =
cy X estimate =
Total all =
Page 3 of 3
Rev. 2.10.21
C cityof
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2 719
www.carlsbadca.gov
Applicable to ALL NEW CONSRUCTION, ADDITIONS AND ALTERATIONS . You are required to list
materials that will be reused, recycled or disposed from your project. If you have questions about the recycling
requirement or completing this form, please contact Waste Management at (760) 929-9400, a certified C&D
recycler, or the Carlsbad Building Division at (760) 602-2700. Please note: Unless you are self-hauling. Waste
Management or approved haulers must be used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
without a completed Construction Waste Management Plan.
Applicant Information
Permit No. _____________ Project Title Home Decor & Gift Sales Center
Project Address 2808 Roosevelt Drive Suite 101 203-182-04
Contractor Other
Applicant Name Malley, Sean -Vice President □ 0 □--Last First
Applicant Address 2524 Gateway Road, Carlsbad, CA. 92009
Phone ( 760 ) 931-1130 E-mail Address natalie@whiteconstructioninc.com
Applicant Mailing Address _S_a_m_e ___________________________ _
(if different than project address)
Project Type
(check all that apply):
Residential □
Brief Description Tenant Improvement
Commercial
0
Public Building □
Project Size_1_,_1_7_4 _________ Estimated Cost of Project$ ________________ _
(square footage)
Please check the appropriate box:
I ✓ I I plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction.
I ✓ I I plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE
MANAGEMENT.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name Natalie Ortega, Project Coordinator Signature Project Coordjnator Date 07/09/2021
Page 1 of 3 Rev. 2.10.21
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
(cont'd) not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
SECTION A Permit No. ____________ Project Title Dynamis Space
Project Address 2808 Roosevelt Drive, Suite 101 APN 203-182-04
Applicant Name Ortega, Natalie -Project Coordinator Phone (760) 931-1130
Last First
SECTION B Complete the following tabl~ with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
Material Type
Complete this line of the table only if 4.0
only using WASTE MANAGEMENT
roll-of/ bins.
Mixed C&D Debris
As halt & Concrete
Brick / Mason / Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows circle all that a I )
Car et
Carpet Padding/ Foam
Cardboard
Ceilin Tile acoustic
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Un ainted Wood & Pallets
Roofin Materials
Sera Metal
Stucco
Other:
TOTAL
SECTION C
Estimated
Waste Quantity
(tons)
To meet 65% Diversion Requirement (estimate)
Contractor/Owner Signature I .I. I ... '1. .,
A
Place a(✓) check
next to items to be
reused or salvaged
B
Place a(✓) check next
to items to be
recycled
X
C
Place a ( ✓) check next
to items to be
disposed at landfill
________ .x 0.65 = ___________ tons
Toto/ Estimated Waste from above Minimum Required Diversion
, Project Coordinator Date 07/09/2021
Page 2 of 4 Rev. 711120
Escondido Resource Recovery
1021 W Mi ss i on Ave
Escondido . CA 92025
(760) 745 -3203
Customer: 0000 Ti cket: 28615
Date: 06/14/21
Q DEMO
Corrmodity Un its Rate
INVOICE
In: 10:52 Truck : 3191/3191
Out: 11:10 Container :
Route: 08614
Origin: 086 Carlsbad
14 MIXED C & D 2.41
[Gross(In): 15 .460. lbs Sc l#S
98.00 per TON
Tare 10.640 . l bs Scl#5
Extended
Charge
236 .18
Net: 4.820. lbs]
PA ID CREDIT CARD 236.18
Construction & Demolition Diversion Certificate --Diversion Percentage 72%
This certifies that the company listed above has utilized an EDCO facility to di
with LEED requirement . The diversion tonnage is based on an overall tonnage per
'
RAFAELA Driver
Escond ido Resource Recovery 1021 W Mission Ave
Escondido. CA 92025 (760) 745-3203
Customer: 0000 Ticket: 29903
Date: 06/16/21
Q DEMO
Commodity Units Rate
INVOICE
In : 10:34 Truck : 3191/3191
Out: 10:56 Conta i ner:
Route: 08614
Origin: 086 Carlsbad
14 MIXED C & D 1.44
[GrossCin): 13.320. lbs Scl#5
98.00 per TON
Tare 10.440. lbs Scl#5
Extended
Charge
141 .12
Net: 2.880. lbs]
PAID CRED IT CARD 141.12
Construction & Demolition Diversion Certificate --Diversion Percentage 72%
This certifies that the company listed above has utilized an EDCO facility t o di
with LEED requirement. The diversion tonnage is based on an overall tonnage per
RAFAE LA Driver
1111111111111111111111 \IIIII IIIII Ill lllliil 1111111
C i# 1 P ,10 'REPLICA OF #1458291 Customer opy ,.. ,
@ Lee's Metal Rec v cl•,:1 _9
~--4%Effl.¥!JDj~~aG~~~,:liw· L------
-,. --7 -•-1:PO RC257442 001 1315 UH, DI Vista c~. 92U8-> ,oO·, .::~ ~
Tit'<atit 145834
Gross fare
Printed on Thursday
06/1712021
03:26:51PM
Weight ltl : 03:15:30 PM
Weight OUT : 03:25:13 PM
Started hy Kelsey K
Pnld by Kelsey K
Net Price Amount
LIGHT IRON
12060 10560 1500 S120.00 GT $80 36
G,oss ~'\'&ighnn ste1 l<else,, K
Tare l/Ve1gh~1ast9r_ Kelsei,· K
PRECISION DEMOLITION
Total--> S80.36
Pay by A TM: $80. 00
SERVICES ID/Lic e >1aa
ua••
ow11ership: I hereby S!i'lte t tia1 I am the lawful owner of the
material described heron, that I have a right to sell same. that an
State redemption material listed is in fact vatid State redem ption
material and that fo.r payment received in full, hereby
acl<nowfedged, I sell and conwiy title or same to LEE' s MET Al
RECYCLING.
X
•i9na.t.ure
Ho111s of Opi!ratio11
l;,1onda,• Thrn Frida i 8am-'1 JOpnc
Satwdav 8am-1 prn
\'J.:1Jt,eo tv Deputy W;,1Qhni.3ster
l,f·JSS 1N~IOl1Ua•;t;H Kelsey K
Tar,; Weli;inl.-laste,. K&ISE:) "
•:,riH s \'1Gi1Jlilila5ter s,r,n .
t"".1.n.g•rpr .int