HomeMy WebLinkAbout2731 SPOKANE WAY; ; CB051039; PermitTotal Payments
738-32
City of Carlsbad
'
1635 Faraday Av Carlsbad, CA 92008
b5-26-26 5 Residential Permit Permit No. CB051 039
Building Inspection Request Line (760) 602-2725
Job Address: 2731 SPOKANE WY CBAD
Permit Type: RESDNTL Sub Type: RAD Status: ISSUED
Parcel No: 1674317100 Lot #: 0 Applied: 03/25/2005
Valuation: $123,420.00 Construction Type: NEW Entered By: LSM
Occupancy Group: Reference #: Plan Approved: 05/26/2005
# Dwelling Units: 0 Structure Type: Issued: 05/26/2005
Bedrooms: 0 Bathrooms: 0 Inspect Area:
Project Title: BALCAR RES-1 122 SF ADD/REMODLE Orig PC#:
EXPAND KITC/FAM RM (DN) MSTR BDR/2ND BDR (UP) Plan Check#:
Applicant:
JAMES CHINN
STE 117
2120 JIMMY DURANTE BLVD 92014
(858)755-5863-
Owner:
BALCAR CHARLES D&LOUISE J
2731 SPOKANE WAY
CARLSBAD CA 92008
Building Permit $620.48 Meter Size
Add'I Building Permit Fee $0.00 Add'I Red. Water Con. Fee $0.00
Plan Check $403.31 Meter Fee $0.00
Add'I Plan Check Fee $0.00 SDCWA Fee $0.00
Plan Check Discount $0.00 CFD Payoff Fee $0.00
Strong Motion Fee $12.34 PFF $0.00
Park in Lieu Fee $0.00 PFF (CFD Fund) $0.00
Park Fee $0.00 License Tax $0.00
LFM Fee $0.00 License Tax (CFD Fund) $0.00
Bridge Fee $0.00 Traffic Impact Fee $0.00
Other Bridge Fee $0.00 Traffic Impact (CFD Fund) $0.00
BTD #2 Fee $0.00 Sidewalk Fee $0.00
BTD #3 Fee $0.00 PLUMBING TOTAL $55.00
Renewal Fee $0.00 ELECTRICAL TOTAL $20.00
Add'I Renewal Fee $0.00 MECHANICAL TOTAL $30.50
Other Building Fee $0.00 Housing Impact Fee $0.00
Pot. Water Con. Fee $0.00 Housing lnLieu Fee $0.00
Meter Size Housing Credit Fee $0.00
Add'I Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00
Red. Water Con. Fee $0.00 Sewer Fee $0.00
Additional Fees $0.00
TOTAL PERMIT FEES $1,141.63
FINAL APIPRØVAL
Insoector: (' Date: Clearance:
NOTICE: Please take NOTICE tTiat approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Cadsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave., Carlsbad, CA 92008 -
FOR OFFICE USE ONLY
PLAN CHECK NO. _°'
EST. VAL. / ?O
Plan Ck. Deposit r , 4/33i 31
Validated By_________________________
Date 51 05
Address (include Bid /Suit #1 Busine s Name (at this address) LT {c4 tiftrt' Oit$ TLT.,4O. 74-4
Legal Description Lot No. Subdivision Name/Number Unit No. Phase No. Total # of units I (e'i - 431 -1 I : O/,/ALOfleO Al ô"
Assessor's Parcel # 2 Aoo'pc
Existi Use 11 i2 '11 '1—' Proposed Use ,, j 2. CG it3.31
Descri tion of Work SQ. FT #of Stories # of Bedrooms # of Bathrooms
ZA re',1 Ican 5 y" dw I Allis 7e L, qj
Name Address City State/Zip Telephone # Fax #
ç) LY1 L-J11 1N" -> t\1 bM1 L1C4%C'A t I 4J 11 T- Cf' 1 WJ -
Name Address I City State/Zip Telephone.#
PROPERTYOWNER' - LS PLO 73t ciYZri5D uv4-çflc
Name Address City State/Zip Telephone #
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law
(Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars I$5001).
Name Address City State/Zip Telephone #
State License # License Class City Business License #
Designer Name Address City State/Zip Telephone
State License #
qq1MPQ[SATL Y.
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance
of the work for which this permit is issued.
I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued. My worker's compensation insurance carrier and policy number are:
Insurance Company - Policy No. Expiration Date___________________
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS ($1001 OR LESS)
CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner-so as
to become subject to the Workers' Compensation Laws of California.
WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred
thousand dollars ($100,000). in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees.
SIGNATURE DATE
[ibWNER BUILb1Ô1Ô1ARATION 7.
I heieby affirm that I am exempt from the Contractor's License Law for the following reason:
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale
(Seó. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
.'Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
I am exempt under Section Business and Professions Code for this reason:
I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 YES ONO
I have not) signed an application for a building permit for the proposed work.
I have contracted with the following person (firm) to provide the proposed construction (include name / address,/ phone number / contractors license number):
. (',..
I plan to provide portions of the work, but I have hired the- following person to coordinate, supervise and provide the major work (include name / address / phone•
number / contractors license number): -
I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include nami! address / phone number / type
of work): -
PROPERTY OWNER SIGNATURE DATE 7,2 c73—
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0 YES 0 NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 YES 0 NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES 0 NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
18 CONSTRUCTlON LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097(i) Civil Code).
LENDER'S NAME LENDER'S ADDRESS __________________________________________________
T. -.
I certify that I have raid the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction. I hereby authorize representatives of the Cit' of Carlsbad to enter upon the above mentioned
property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the building gqclal under the provisions of this Code shall expire by limitation and become null and void if the building or work
authorized by such permit is not m n wi hin 8 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned
at any time after the work is co ence for a e o o 180 days (Section 106.4.4 Uniform Building Code).
- 2 ftc/o APPLICANT'S SIGNATURE -- DATE
WHITE: File YELLOW: Applicant PINK: Finance
- --
UNSCHEDULED BUILDING INSPECTION
DAtE
o
INSPECTOR
JOB ADDRESS
> L s e
DESCRIPTION
:CODE :CODE DESCRIPTION ACT COMMENTS
City of Carlsbad Bldg. Inspection Request
For: 02/27/2006
Permit# CB051039 Inspector Assignment: PY
Title: BALCAR RES-1 122 SF ADD/REMODLE
Description: EXPAND KITC/FAM RM (DN) MSTR BDRI2ND BDR (UP)
Type: RESDNTL Sub Type: RAD
Phone:
Job Address: 2731 SPOKANE WY
Suite: Lot 0
Location: Inspector:
APPLICANT JAMES CHINN
Owner: BALCAR CHARLES D&LOUISE J
Remarks:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Comment
Requested By: STEVEN
Entered By: JANEAN
Comments/Notices/Hold I
Associated PCRs/CVs Original PC#
Inspection History
Date Description Act lnsp Comments
12/1212005 17 Interior Lath/Drywall AP BN
12/1212005 18 Exterior Lath/Drywall AP BN
11/23/2005 14 Frame/Steel/Bolting/Welding AP PY
11/23/2005 16 Insulation AP PY
11/23/2005 24 Rough/Topout AP PY
11/23/2005 34 Rough Electric AP PY
11/09/2005 14 Frame/Steel/Bolting/Welding PA PY OK TO INSUL
11/09/2005 24 Rough/Topout CO PY SEE NOTICE ATTACHED
11/09/2005 34 Rough Electric PA PY
11/09/2005 44 Rough/Ducts/Dampers PA PY
10/24/2005 15 Roof/Reroof AP PY
08/30/2005 11 Ftg/Foundation/Piers AP PY
08/30/2005 21 Underground/Under Floor AP PY
,I •
City of Carlsbad Bldg Inspection Request
For: 11/09/2005
Permit# CB051039 Inspector Assignment: PY
Title: BALCAR RES-1122 SF ADDIREMODLE
Description: EXPAND KITCIFAM RM (DN) MSTR BDRI2ND BDR (UP)
Type: RESDNTL Sub Type: RAD
Phone:
Job Address: 2731 SPOKANE WY
Suite: Lot 0
Location: Inspector:
APPLICANT JAMES CHINN
Owner: BALCAR CHARLES D&LOUISE J
Remarks:
Total Time: . Requested By: STEVEN
Entered By: CHRISTINE
CD Description. Act Co ment
VA
14 Frame/Steel/Bolting/Welding 'i
24 Rough!Topout
34 Rough Electric
44 Rough/Ducts/Dampers
Comments/Notices/Hold
Associated PCRs/CVs
Insoection Histo
Date Description Act Insp Comments
10/24/2005 15 Roof/Reroof AP PY
08/30/2005 11 Ftg/Foundation/Piers AP PY
08/30/2005 21 Underground/Under Floor AP PY
08/25/2005 11 Ftg/Foundation/Piers CO PY need plumbing
08/25/2005 12 Steel/Bond Beam CO PY
CONSTRUCTION INSPECTION
AND TES:T:IN:Q iN:cRReAT:ED
273/ fo
261 S PACIFIC DRIVE
SAN MARCOS CALIFORNIA
Office: (760) 752-1099
Fax: (760) 591-3239
Special Inspection Report
PmjectA*Jress Building Permit Number Plan File Number
2735 Spokane Way CBOSI 039 Carlsbad
Prqect Name
Spokane Residence
Architect
James Chinn
Constiuctlon Matedal Design Sttength Source Engineer
Reinforced Conc
Desc,lpllon of Materials
ASTM A307
General Contractor
Gates Construction
7/8 & 5/8U Threaded Rod Sub Contractor
Simpson Strong Tie-SET 22, ICBO #5279
Simpson Hardware ofler
Inspection Date/ Time Anfval/Oepwfwe
23-Sep-05
Provided Special Inspection for the epoxy installation of two (2) 7/8" dia. hold-down anchor bolts for
PHD6, (1)at Dinning Room and (1) adjacent Fireplace both embedded a minimum of 12 1/2" into
existing concrete; and two (2) 5/8" dia. anchor bolts for PHD2, (1) at Laundry Room and (1) adjacent
Garaae Door both embedded a minimum of 9fl into existina concrete.
All holes were drilled using the correct drill bit size, and properly brushed/cleaned. Installation of hold
down anchors is in compliance with ICBO ER-5279, and manufactures specifications.
I HEREBY CERTIFY THAT I HAVE INSPECTED THE ABOVE REPORTED
WORK. UNLESS OTHERWISE NOTED, THE WORK INSPECTED IS TO
THE BEST OF MY KNOWLEDGE IN COMPLIANCE WITH THE APPROVED
PLANS, SPECIFICATIONS, AND APPLICABLE SECTIONS OF THE
GOVERNING BUILDING LAWS.
rCft of San DIego #743
BO#1113681-92
REGISTRAflON NUMBER
2005
Barton Hill, PE 64822 DATE
a751 sPoMiv -UL(
b5- ./u3
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC
10925 HARTLEY ROAD SUITE I
SANTEE CALIFORNIA 92071
619 258-7901
Fax 619 258-7902
Mr. Charles Balcar August 11, 2005
273.1 Spokane Way Project No. 05-1106J4(A)
Carlsbad, California 92008
Subject: Foundation Excavation Observation
Proposed Two-Story Addition
2731 Spokane Way
City of Carlsbad, California
Reference: "Limited Site Investigation, Proposed Two-Story Addition, 2731 Spokan Way,
City of Carlsbad, California," Project No. 05-11004, Prepared by East County
Soil Consultation and Engineering, Inc., Dated March 16, 2005.
Dear Mr. Balcar:
In accordance with your request, we have observed the foundation excavations for the proposed
two-story addition at the subject site.
The footings have been excavated to the proper depth and width into the dense sandstone of the
Santiago Formation, and are in compliance with the approved building plans. Foundation
excavations, soil expansion characteristics and soil bearing capacity are in accordance with the
referenced soil investigation report.
If we can be of further assistance, please do not hesitate to contact our office.
Respectfully submitted,
( I No. C054071 rill ni
Mamadou Saliou Diallo, P.E.
RCE 54071
MSD\md
I I I
EsGil Corporation
In Partners flip wit/i Government for(Building Safety
DATE: May 24, 2005
JURISDICTION: Carlsbad
PLAN CHECK NO.: 05-1039
PROJECT ADDRESS: 2731 Spokane Way
SET:!!
O APPLICANT
u..
0 PLAN REVIEWER
0 FILE
PROJECT NAME: Balcar Residence Addition and Remodel
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
LI The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Fax #:
Mail Telephone Fax In Person
LI REMARKS:
By: Bill Elizarraras Enclosures:
Esgil Corporation
0 GA 0 MB 0 EJ 0 PC 5/17/05 trnsmU.dot
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
EsGil Corporation
In PartnersIiip with government for (Building Safety
DATE: April 6, 2005
JURISDICTION: Carlsbad
PLAN CHECK NO.: 05-1039
PROJECT ADDRESS: 2731 Spokane Way
SET:!
O PPLICANT
U JURIS.
U PLAN REVIEWER
O FILE
PROJECT NAME: Balcar Residence Addition and Remodel
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
LI The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
LI The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
James Chinn
2120 Jimmy Durante #117, Del Mar, CA. 92014
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person cntactc aJnes Chinn (4) Telephone #: 858-755-5863
Date cntt?tf/%/t2S (by: -) Fax #: 858-7557818.6
Mai T lepho ax—/In Person
LI REMARKS:
By: Bill Elizarraras Enclosures:
Esgil Corporation
U GA 0 MB 0 EJ 0 PC 3/28/05 tmsmtl.dot
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
Carlsbad 05-1039
April 6, 2005
PLAN REVIEW CORRECTION LIST
SINGLE FAMILY DWELLINGS AND DUPLEXES
PLAN CHECK NO.: 05-1039 JURISDICTION: Carlsbad
PROJECT ADDRESS: 2731 Spokane Way
FLOOR AREA: 1122 sq.ft. Dwelling Add'n STORIES: 2
HEIGHT: 24'
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE INITIAL PLAN REVIEW
COMPLETED: April 6, 2005
FOREWORD (PLEASE READ):
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 3/28/05
PLAN REVIEWER: Bill Elizarraras
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and access for the disabled. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinance by the Planning Department, Engineering Department, Fire
Department or other departments. Clearance from those departments may be required prior to
the issuance of a building permit.
Present California law mandates that residential construction comply with the 2001 edition of
the California Building Code (Title 24), which adopts the following model codes: 1997 UBC,
2000 UPC, 2000 UMC and 1999 NEC (all effective 11/1/02).
The above regulations apply to residential construction, regardless of the code editions adopted
by ordinance.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
Carlsbad 05-1039
April 6, 2005
. PLANS
1. Please make all corrections on the original tracings, as requested in the correction
list. Submit two sets of plans for residential projects. For expeditious processing,
corrected sets can be submitted in one of two ways:
Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
2. Plans, specifications and calculations shall be signed and sealed by-the
California state licensed engineer or architect responsible for their preparation.
Specify expiration date of license. (California Business and Professions Code).
3. When special inspection is required, the architect or engineer of record shall
prepare an inspection program which shall be submitted to the building official
for approval prior to issuance of the building permit. Please review Section
106.3.5. Please complete the attached form.
4. The foundation plan does not comply with the soils report recommendations for
this project. Please review the report and modify design, notes and details as
required to show compliance: See slab reinforcement (16" O.C. vs. plans 18"
O.C.)
5. The soils engineer recommended that he/she review the foundation excavations.
Note on the foundation plan that "Prior to the contractor requesting a Building
Department foundation inspection, the soils engineer shall advise the building
official in writing that:
a) The foundation excavations, the soils expansive characteristics and
bearing capacity conform to the soils report."
6. Show the location, type and size (BTU's) of all heating and cooling appliances or
systems.
7. Every dwelling unit shall be provided with heating facilities capable of maintaining
a room temperature of 70 degrees F at 3 feet above the floor in all habitable
rooms. Show basis for compliance. UBC, Sec. 310.11.
8. Show T and P valve on water heater and show route of discharge line to exterior.
UPC, Section 608.5.
Carlsbad 05-1039
April 6, 2005
9. In Seismic Zones 3 and 4, show that water heater is adequately braced to resist
seismic forces. Provide two straps (one strap at top 1/3 of the tank and one strap
at bottom 1/3 of the tank). UPC, Section 510.5
-10. Specify on the plans the following information for the fireplace(s), per Section
106.3.3:
a) Note on the plans that approved spark arrestors shall be installed on all
chimneys. UBC, Section 3102.3.8
To speed up the review process, note on this list (or a copy) where each correction item
has been addressed, i.e., plan sheet, note or detail number, calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes L3 No U
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to
perform the plan review for your project. If you have .any questions regarding these plan
review items, please contact Bill Elizarraras at Esgil Corporation. Thank you.
I Carlsi,ad 05-1039
April 6, 2005
SPECIAL INSPECTION PROGRAM
ADDRESS OR LEGAL DESCRIPTION: 2-151 5fbr.WS Vs.3AF'(
PLAN CHECK NUMBER: O JO!'1 OWNER'S NAME:
I, as the owner, or agent of the owner (contractors may not employ the special inspector),
certify that I, or the architect/engineer of record, will be responsible for employing the special
inspector(s) as required by Uniform Building Code (UBC) Section 1701.1 for the construction
project located at the site listed above. UBC Section 106.3.5.
Signed
I, as the engineer/architect of record, certify that I have prepared the following special inspection
program as required by UBC Section 106.3.5 for the construction project located at the site listed above.
Signed O L2'
List of work requiring special inspection:
LI Soils Compliance Prior to Foundation Inspection LI Field
LI Structural Concrete Over 2500 PSI LI High Strength Bolting
LI Prestressed Concrete
K
Expansion/Epoxy Anchors
El Structural Masonry Sprayed-On Fireproofing
LI Designer Specified LI Other
Name(s) of individual(s) or firm(s) responsible for the special inspections listed
A.
3. Duties of the special inspectors for the Work listed above: C rp. ,&sc4 ,.s/ 7t. V-772-
Special inspectors shall check in with the City and present their credentials for approval ønor to beginning work on the job site.
Carlsbad 05-1039
April 6, 2005
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 05-1039
PREPARED BY: Bill Elizarraras DATE: April 6, 2005.
BUILDING ADDRESS: 2731 Spokane Way
BUILDING OCCUPANCY: R3/U1 TYPE OF CONSTRUCTION: VN
BUILDING
PORTION
AREA
(Sq. Ft.) .
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Dwelling Add'n 1122 Per City Value 123,420
Air Conditioning
Fire Sprinklers
TOTAL VALUE 123,420
Jurisdiction Code Icb IBY Ordinance
Bldg. Permit Fee by Ordinance -v I $620.48
Plan check Fee by Ordinance IV I $403.311
Type of Review: 21 Complete Review Structural Only
0 Other 0 Repetitive Fee
Repeats El Hourly Hour *
Esgil Plan Review Fee I
Comments:
Sheet I of I
macvalue.doc
f Carlsbad
BUILDING PLANCHECK CHECKLIST
DATE: /
BUILDING ADDRESS:
PROJECT DESCRIPTION:
ASSESSOR'S PARCEL NUMBER:
PLANCHECKNO.: CB 0S/'039
EST. VALUE:
ENGINEERING DEPARTMENT CT Y--( APPROVAL
The item you have submitted for review has been
approved. The approval is based on plans,
information and/or specifications provided in your
submittal: therefore any changes to these items after
this date, including field modifications, must be
reviewed by this office to insure continued
conformance with applicable codes. Please review
carefully all comments attached, as failure to comply
with instructions in this report can result in
suspension of permit to build.
O A Right-of-Way permit is required prior to
construction of the following improvements:
DENIAL
Please see the attached report of deficiencies
marked with 0. Make necessary corrections to plans
or specifications for compliance with applicable
codes and standards. Submit corrected plans and/or
specifications to this office for review.
By: Date:
By: Date:
By: Date:
f /
BUILDING PERMIT: CLO61 EERING AUTHORIZATION
By: Date:
TO ISSUE
FOR OFFICIAL USE ONLY
ATTACHMENTS
1! Dedication Application
Dedication Checklist
0 Improvement Application
U Improvement Checklist
ENGINEERING DEPT. CONTACT PERSON
Name: KATHLFFN M FARMFR
City of Carlsbad
Address: 1635 Faraday Avenue, Carlsbad, CA 92008
Phone: (760) 602-2741
El Neighborhood Improvement Agreement CFD INFORMATION
O Grading Permit Application Parcel Map No:
O Grading Submittal Checklist Lots:
O Right-of-Way Permit Application Recordation:
1j Right-of-Way Permit Submittal Checklist Carlsbad Tract:
and Information Sheet
CA 9200-7314 . (760) 602-2720 • FAX (760) 602R2
7 , 2ND
El
BUILDING PLANCHECK CHECKLIST
A
SITE PLAN
3RD
El 1. Provide a fully dimensioned site plan drawn to scale. Show:
p
orth Arrow 'F Right-of-Way Width & Adjacent Streets
xisting & Proposed Structures ( 9( Driveway widths
xisting Street Improvements /H7 Existing or proposed sewerlateral
roperty Lines (show all dimensions-/ Existing or proposed water service
asements Existing or proposed irrigation service
El 2. Show on site plan:
A. Drainage Patterns
Building pad surface drainage must maintain a minimum slope of one
percent towards an adjoining Street or an approved drainage course.
ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive
drainage of 2% to swale 5' away from building."
B. Existing & Proposed. Slopes and Topography
C. Size, type, location, alignment of existing or proposed sewer and water service (s)
that serves the project. Each unit requires a separate service, however, second
dwelling units and apartment complexes are an exception.
D. Sewer and water laterals should not be located within proposed driveways, per
standards.
El 3. Include on title sheet:
Site address .
Assessor's Parcel Number
Legal Description
/ FE
For commercial/industrial buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use,
existing Sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
Show all existing use of SF and new proposed use of SF.
Example:
• Tenant Improvement for 3500 SF of warehouse to 3500 SF of office.
F:WarmeiiCath$MASTERSBullding Planchock CkIsI form (Génedc).doc' 2 •Rw. 7/14100
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3RD DISCRETIONARY APPROVAL COMPLIANCE
D 0 0 4a. Project does not comply with the following Engineering Conditions of approval for
ProjectNo._______________________________________________________
0 0 0 4b. All conditions are in compliance. Date:
DEDICATION REQUIREMENTS
0 0 5. Dedication for all street Rights-of-Way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $ 15,000 , pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows:
Dedication required. Please have a registered Civil Engineer or Land Surveyor
prepare the appropriate legal description together with an 8 1/2" x 11" plat map and
submit with a title report. All easement documents must be approved and signed
by owner(s) prior to issuance of Building Permit. Attached please find an
application form and submittal checklist for the dedication process. Submit the
completed application form with the required checklist items and fees to the
Engineering Department in person. Applications will not be accept by mail or fax.
Dedication completed by: Date:
IMPROVEMENT REQUIREMENTS
0 U 6a. All needed public improvements upon and adjacent to the building site must• be
I ' constructed at time of building construction whenever the value of the
construction exceeds $_75,000 , pursuant to Carlsbad Municipal Code Section
18.40.040.
Public improvements required as follows:
Attached please find an application form and submittal checklist for the public
improvement requirements. A registered Civil Engineer must prepare the
appropriate improvement plans and submit them together with the requirements
on the attached checklist to the Engineering Department through a separate plan
check process. The completed application form and the requirements on the
F:FarmeiUCathyMASTERS8InId1n9 Plaieck Odsi Form (Gonerc).doc 3 Rev. 7114100
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3RD
El El El checklist must be submitted in person. Applications by mail or fax are not
accepted. Improvement plans must be approved, appropriate securities posted
and fees paid prior to issuance of building permit.
Improvement Plans signed by: Date:
El El El 6b. Construction of the public improvements may be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or
current grant deed on the property and processing fee of $_160.00 so we may
prepare the necessary Neighborhood Improvement Agreement. This agreement
must be signed, notarized and approved by the City prior to issuance of a
Building permit.
Future public improvements required as foIlovv:
El El El 6c. Enclosed please find your Neighborhood Improvement Agreement. Please return
agreement signed and notarized to the Engineering Department.
Neighborhood Improvement Agreement completed by:
Date:
El El El 6d. No Public Improvements required. SPECIAL NOTE: Damaged or defective
improvements found adiacent to building site must be repaired to the satisfaction
of the City Inspector prior to occupancy.
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading. permit are found in Section
11.06.030 of the Municipal Code.
El El El 7a. Inadequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill import,
export and remedial). This information must be included on the plans.
i. tJ El El 7b. Grading Permit required. A separate. grading plan prepared by a registered Civil
I ' ' Engineer must be submitted together with the completed application form
attached. NOTE: The Grading Permit must be issued and rough grading
approval obtained prior to issuance of a Building Permit.
Grading Inspector sign off by: Date:
El El 7c. Graded Pad Certification required. (Note: Pad certification may be required even
it a grading permit is not required.)
F:FanneN(a1h$MASTERS8uiIdng Plancheck Cidet Form (Generic).doc 4 Rev. 7114100
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3R0
El El 0 7d. No Grading Permit required.
El 0 0 7e. If grading is not required, write "No Grading" on plot plan.
MISCELLANEOUS PERMITS
El 0 0 8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or
private work adjacent to the public Right-of-Way. Types of work include, but are
not limited to: Street improvements, tree trimming, driveway construction, tying
into public storm drain, sewer and water utilities.
Right-of-Way permit required for:
El 0 0 9. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad
sewer service area, you need to contact the Carlsbad Municipal Water District,
located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can
provide forms and assistance, and will check to see if your business enterprise is
on the EWA Exempt List. You may telephone (760) 438-2722, extension 7153,
for assistance.
Industrial Waste permit accepted by:
Date:
El El El io. NPDES PERMIT
Complies with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to reduàe surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by
7/ the City Engineer prior to issuance of grading or building permit, whichever
'
occurs first.
El El ii. ( red fees are attached
/ No fees required
WATER METER REVIEW
0 El El 12a. Domestic (potable) Use
Ensure that the meter proposed by the owner/developer is not oversized.
Oversized meters are inaccurate during low-flow conditions. If it is oversized, for
the life of the meter, the City will not accurately bill the owner for the water used.
All single family dwelling units received "standard" 1" service with 5/8" service.
F.0BrmeñKathyMASTERSButIdin9 Planchock Cklst Form (Generic).dac
. 5 Rev. 7114100
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3RD
If owner/developer proposes a size other than the "standard", then
owner/developer must provide potable water demand calculations,
which include total fixture counts and maximum water demand in gallons
per minute (gpm). A typical fixture count and water demand worksheet is
attached. Once the gpm is provided, check against the "meter sizing
schedule" to verify the anticipated meter size for the unit.
Maximum service and meter size is a 2" service with a 2" meter.
If a developer is proposing a meter greater than 2", suggest the
installation of multiple 2" services as needed to provide the anticipated
demand. (manifolds are considered on case by case basis to limit
multiple trenching into the Street).
E E E 12b. Irrigation Use (where recycled water is not available)
All irrigation meters must be sized via irrigation calculations (in gpm) prior
to approval. The developer must provide these calculations. Please follow
these guidelines:
If the project is a newer development (newer than 1998), check the recent
improvement plans and observe if the new irrigation service is reflected on
the improvement sheets. If so, at the water meter station, the demand in
gpm may be listed there. Irrigation services are listed with a circled "I",
and potable water is typically a circled "W". The irrigation service should
look like:
r-I O STA 1+00 Install 2" service and
1.5: meter (estimated 100 gpm)
If the improvement plans do not list the irrigation meter and the
service/meter will be installed via another instrument such as the building
plans or grading plans (w/ a right of way permit of course), then the
applicant must provide irrigation calculations for estimated worst-case
irrigation demand (largest zone with the failhest reach). Typically, Larry
Black has already reviewed this if landscape plans have been prepared,
but the applicant must provide the calculations to you for your use. Once
you have received a good example of irrigation calculations, keep a set for
your reference. In general the calculations will include:
Hydraulic grade line
Elevation at point of connection (POC)
Pressure at POC in pounds per square inch (PSI)
Worse case zone (largest, farthest away from valve
Total Sprinkler heads listed (with gpm use per head)
Include a 10% residual pressure at point of connection
3. In general, all major sloped areas of a subdivision/project are to be
irrigated via separate irrigation meters (unless the project is only SFD with
no HOA). As long as the project is located within the City recycled water
F:FmeñXQthMASTERSBw!ding PlanChecic Cidat Farm (Genetic).doc 6 Rw. 7114100
1ST 2ND 3RD BUILDING PLANCHECK CHECKLIST
service boundary,. the City intends on switching these irrigation
services/meters to a new recycled water line in the future.
12c. Irrigation Use (where recycled water is available)
Recycled water meters are sized the same as the irrigation meter above.
If a project fronts a street with recycled water, then they should be
connecting to this line to irrigate slopes within the development. For
subdivisions, this should have been identified, and implemented on the
improvement plans. Installing recycled water meters is a benefit for the
applicant since they are exempt from paying the San Diego County Water
Capacity fees. However, if they front a Street which the recycled water is
there, but is not live (sometimes they are charged with potable water until
recycled water is available), then the applicant must pay the San Diego
Water Capacity Charge. If within three years, the recycled water line is•
charged with recycled water by CMWD, then the applicant can apply for a
refund to the San Diego County Water Authority (SDCWA) for a refund.
However, let the applicant know that we cannot guarantee the refund, and
they must deal with the SDCWA for this.
13. Additional Comments:
F:FarmeMaIhyiMASTERSBuOding Plancheck Cidat Form (Genedc).doc pev. 7114100
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
Estimate based on unconfirmed information from applicant.
O Calculation based on building plancheck plan submittal.
Address: Bldg. Permit No.
Prepared by: Date: Checked by:
EDU CALCULATIONS: List types and square footages for all uses.
Types of Use: Sq. Ft./Units:_______________
Types of Use: Sq. Ft.IUnits:_______________
ADT CALCULATIONS: List types and square footages for all uses.
Types of Use: Sq. Ft./Units:
Types of Use: Sq. Ft./Units:
Date:
EDU's:
EDU's:
ADT's:
ADT's:
FEES REQUIRED:
WITHIN CFD: 0 YES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) 0 NO
o PARK-IN-LIEU FEE PARK AREA & #:
FEE/UNIT: X NO. UNITS: =$___________
o TRAFFIC IMPACT FEE
ADT's/UNITS: X FEE/AOl:
o BRIDGE AND THOROUGHFARE FEE (DIST. #1 01ST. #2 DIST. #3
ADT's/UNITS: X FEE/ADT: = $_____________
o FACILITIES MANAGEMENT FEE • ZONE:_________
UNIT/SQ.FT.: X FEE/SQ.FT./UNIT: = $____________
o SEWER FEE
EDU's: X FEE/EDU: = $_______________
BENEFIT AREA:
EDU's: X FEE/EDU:________ = $_______________
o SEWER LATERAL ($2,500) = $_______________
o DRAINAGE FEES PLDA :. HIGH fLOW______
ACRES: X FEE/AC:
o POTABLE WATER FEES
UNITS CODE CONNECTION FEE METER FEE SDCWA FEE IRRIGATION
.lof2
Rpv. 7/14/00
PLANNING DEPARTMENT
11 BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Chéc. CB Oro, Address _27
f Planner_ . Phone (760) 602-
APN: (r
WI Type of ,PAojeRt & Use: Net Project Density: _(JU/AC
Zoning:4r7 U General Plan:_ Facilities Management Zone:
CFD (in/out) #_Date of participation: Remaining net dev acres:______
. .
. (For non-residential development Type of land used created by this
Curc$e One permit . . .
Leciend:Item Complete 0 Item Incomplete - Needs your action
0 0 Environmental Review. Required: YES NO ____TYPE . .
(L DATE OF COMPLETION:_________________
Compliance with conditions of approval? it not, state conditions which require action.
Conditions of Approval:
0 0 Discretionary Action Required: YES—NOW'. TYPE_________
APPROVAL/RESO. NO. DATE .
PROJECT NO._________________
OTHER RELATED CASES: .
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval:
O 0 Coastal Zone Assessment/Compliance .
Project site locatedin Coastal Zone? YES . NO . .
CA Coastal Commission Authority? YES___ NO
If California Coastal Commission Authority: Contact them at —.7575 Metropolitan Drive, Suite 103,
San Diego..CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt): .
Coastal Permit Determination Form already completed? •YES_ No____
.If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
Follow-Up Actions:
1) Stamp Building Plans as "Exempt" or Coastal Permit Required (at minimum Floor Plans).
2) Complete Coastal Permit Determination Log as needed.
0 0 Inclusionary Housing Fee required: YES____ NO /
(Effectivedate of lnclusionary Housing Ordinance - May 21, I 993)
Data Entry Completed? YES____ NO
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing YIN,
Enter Fee, UPDATEI)
Site Plan:
I4:\.ADMIN'COUNTER\Bd9PIflChkRevChkI$t .
Raw WDI
Provide a fully dimensional site plan drawn to scale. Show:. North arrow, property lined,
easements, existing and proposed structures, streets, existing street improvements, right-of-way
width, dimensional setbacks, and existing topographical lines (including all side and rear yard
slopes). .'
Provide, legal description of property and assessor's parcel number.
Policy 44— Neighborhood Architectural Design Guidelines
i. Applicability: YES NO________
2. Project complies YES NO________
Zoning: •.
i. Setbacks: . .
Front . Required Shown
Interior Side: Required Shown
Street Side.. Required Shown
Rear Required M Y Shown
Top of slope: Required Shown
2. !VccdOry structure setbacks:
Required . Shown
r Side: Required ' Shown
i'et Side: Required _______________ Shown
Required _______________ Shown
JStru6%ure separation: Required Shown
jIAII
Lot Coverage: Required WV f Shown &'
30 Height: Required Shown
S. Parking: Spaces Required Shown
(breakdown by uses for commercial and industrial -projects required)
Residential Guest Spaces Required Shown
Additional Comments
OK:TO ISSUE AND ENTERED APPROVAL INTO COMPUTER .../l4.!!H_ DATE' 3 '30 "'.
H:ADMINCOUNTER\SIdgPIflchkRe4hk13t OF Rev 9/01
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC.
10925 HARTLEY ROAD, SUITE "I"
SANTEE, CALIFORNIA 92071
(619) 258-7901
Fax 258-7902
Mr. Charles Balcar
2731 Spokane Way
Carlsbad, California 92008
Subject: Limited Site Investigation
Proposed Two-Story Addition
2731 Spokane Way
City of Carlsbad, California
Dear Mr. Balcar:
March 16, 2005
Project No. 05-1106J4
In accordance with your request, we have performed a limited
investigation of the soil conditions at the subject site to
provide the soil engineering criteria for site grading and
recommend an appropriate foundation system for the proposed
addition.
Our investigation has found that the area of improvement is
underlain by fill soils and colluvium to a depth of approximately
2 feet below existing grade. The colluvium was underlain by dense
sandstone of the Santiago Formation to the explored depth of 5
feet.
It is our opinion that the proposed development is feasible
provided the recommendations herein are implemented in the design
and construction.
Respectfully submitted,
L- t,,
Mamadou Saliou Diallo, P.E.
RCE 54071
MSD/md
BALCAR NO. 05-1106J4
GRADING AND EARTHWORK
Site grading should begin with clearing and grubbing, e.g. the
removal of vegetation and deleterious materials. Fill soils and
colluvium under the building pad should be overexcavated, moisture
conditioned within 3 percent over the optimum moisture content and
compacted to a minimum of 90 percent relative compaction (ASTM
D1557). The overexcavation should extend to the dense Santiago
Formation and at least 5 feet beyond proposed perimeter footings.
The actual depth and extent of removal should be evaluated in the
field at the time of excavation by a representative of this firm.
Grading should be performed in accordance with the attached
Appendix A.
An alternative to the overexcavation and recompaction of the
subgrade soils would be to extend all footings to the dense
sandstone of the Santiago Formation.
FOUNDATIONS AND SLABS
Continuous footings are suitable for use and should extend a
minimum of 18 inches for the two-story addition into the properly
compacted fill soils or dense sandstone of the Santiago Formation.
These footings should be at least 15 inches in width and
reinforced with four #4 steel bars; two bars placed near the top
of the footings and the other two bars placed near the bottom of
the footings.
Interior concrete floor slabs should be a minimum of 4 inches
thick. Reinforcement should consist of #3 bars placed at 16 inches
on center each way within the middle third of the slab by
supporting the steel on chairs or concrete blocks "dobies". The
slab should be underlain by 2 inches of clean sand over a 10-mil
visqueen moisture barrier. The effect of concrete shrinkage will
result in cracks in virtually all concrete slabs. To reduce the
extent of shrinkage, the concrete should be placed at a maximum.of
4-inch slump. The minimum steel recommended is not intended to
prevent shrinkage cracks.
Where moisture sensitive floor coverings are anticipated over
the slab, the 10-mil plastic moisture barrier should be underlain
by a capillary break at least 2 inches thick, consisting of coarse
sand, gravel or crushed rock not exceeding 3/4 inch in size with
no more than 5 percent passing the #200 sieve.
5
PROJECT NO. 05-1106J4
INTRODUCTION
This is to present the findings and conclusions of a soil
investigation for a proposed two-story addition to be located on
the south side of the existing residence at 2731 Spokane Way, in
the City of Carlsbad, California.
The objectives of the investigation were to evaluate the existing
soils conditions and provide recommendations for the proposed
construction.
SCOPE OF SERVICES
The following services were provided during this investigation:
0 Site reconnaissance and review of published geologic,
seismological and geotechnical reports and maps pertinent to
the project area
Excavation of two (2) exploratory borings within the limits of
the proposed areas of development. The borings were logged by
our Staff Geologist.
Collection of representative soil samples at selected depths.
The obtained samples were sealed in moisture-resistant
containers and transported to the laboratory for subsequent
analysis.
0 Laboratory testing of samples representative of the types of
soils encountered during the field investigation
0 Geologic and engineering analysis of the field and laboratory
data, which provided the basis for our conclusions and
recommendations
0 Production of this report, which summarizes the results of the
above analysis and presents our findings and recommendations
for site development
BALCAR NO. 05-1106J4
SITE DESCRIPTION AND PROPOSED CONSTRUCTION
The subject site is located on the south side of Spokane Way, in
the City of Carlsbad, California. The site is presently occupied
by a two-story house. The property is a previously graded cut and
fill pad that slopes moderately to the southwest. It is our
understanding that the proposed construction will include a two-
story, wood-framed addition to the south side of the existing
house. The structure will be founded on continuous footings with a
slab-on-grade floor.
FIELD INVESTIGATION
On February 7, 2005, two (2) exploratory borings were drilled to a
depth of approximately 5.0 feet with a hand auger. The approximate
locations of the borings are shown on the attached Plate No. 1,
entitled "Location of Exploratory Borings". A continuous log of
the soils encountered was recorded at the time of excavation and
is shown on Plate No. 2 entitled "Summary Sheet". The soils were
visually and texturally classified according to the filed
identification procedures set forth on the attached Plate No. 3
entitled "USCS Soil Classification".
Following the field exploration, laboratory testing was performed
to evaluate the pertinent engineering properties of the foundation
materials. The laboratory-testing program included moisture and
density, particle size analysis and expansion index tests. These
tests were performed in general accordance with ASTM standards.
Page L-1 provides a summary of the laboratory test results.
SUBGRADE CONDITIONS
Fill soils and colluvium were encountered to a depth of
approximately 2 feet below existing grade within the improvement
area. The fill soils generally consisted of medium dense silty
sand with a high moisture content. The colluvium was composed of
clayey sand with a loose to medium dense consistency. Dense
sandstone of the Santiago Formation was underlying the colluvium
to the explored depth of approximately 5.0 feet.
EXPANSIVE SOILS
An expansion index test was performed on a select sample of the
colluvium to determine volumetric change characteristics with
change in moisture content. An expansion index of 37 indicates a
low potential for expansion for the foundation soils.
BALCAR NO. 05-1106J4
GROUNDWATER
Groundwater was not encountered during the course of our
investigation. The proposed addition is located at an elevation of
approximately 200 feet above mean sea level. We do not expect
groundwater to affect the proposed development. Recommendations to
mitigate the effects of seasonal perched water are presented in
the Drainage section of this report.
GEOLOGIC HAZARDS
A review of the available geological literature pertaining to the
site indicates the existence of the Rose Canyon! Newport-Inglewood
Fault Zone approximately 11.0 Km to the west. Ground shaking from
this fault or one of the major active faults in the region is the
most likely happening to affect the site. With respect to this
hazard, the site is comparable to others in the general area.
The proposed addition should be designed in accordance with
seismic design requirements of the 1997 Uniform Building Code or
the Structural Engineers Association of California using the
following seismic design parameters:
PARAMETER VALUE. UBCREFERENCE;
Seismic Zone Factor, Z 0.40 Table 16-I
Seismic Source B Table 16-U
Soil Profile Type SD Table 16-i
Near-Source Factor, Na 1.0 Table 16-S
Near-Source Factor, Nv 1.0 Table 16-T
Seismic Coefficient, Ca 0.44 Table 16-Q
Seismic Coefficient, Cv 0.64 Table 16-R
Based on the absence of shallow groundwater, type and consistency
of the formational material, it is our opinion that the potential
for liquefaction is very low.
CONCLUSIONS AND RECOMMENDATIONS
The following conclusions and recommendations are based upon the
analysis of the data and information obtained from our soil
investigation. This includes site reconnaissance; field
investigation; laboratory testing and our general knowledge of the
soils native to the site. The site is suitable for the proposed
addition provided the recommendations set forth are implemented
during construction.
4
BALCAR NO. 05-1106J4
An allowable soil bearing value of 1,750 pounds per square foot
may be used for the design of the above footings founded into the
properly compacted fill soils or dense sandstone of the Santiago
Formation. This value may be increased by 300 psf for each
additional foot of width or depth to. a maximum value of 4,500
lb/ft2 as set forth in the 1997 Edition of the Uniform Building
Code, Table No. 18-I-A.
Lateral resistance to horizontal movement may be provided by
the soil passive pressure and the friction of concrete to soil. An
allowable passive pressure of 250 pounds per square foot per foot
of depth may be used'. A coefficient of friction of 0.35 is
recommended. The soils passive pressure as well as the bearing
value may be increased by 1/3 for wind and seismic loading.
SETTLEMENT
Settlement of compacted fill soils is normal and should be
anticipated. Because of the type and thickness of the fill soils
under the proposed footings and the light building loads, total
and differential settlement should be within acceptable limits.
TRENCH EXCAVATION AND BACKFILL
Excavations for foundation and on-site utility trenches may be
made vertically for shallow depths and must be either shored or
sloped at 1H: 1V for depths greater than 4 feet. Utilities should
be bedded and backfilled with clean sand or approved granular soil
to a depth of at least one foot over the pipe. This backfill
should be uniformly watered and compacted to a firm condition for
pipe support. The remainder of the backfill should be on-site
soils or non-expansive imported soils, which should be placed in
thin lifts, moisture-conditioned and compacted to at least 90%
relative compaction (ASTM D1557).
DRAINAGE
Adequate measures should be undertaken to properly finish grade
the site after the structure and improvements are in place, such
that the drainage water within the site and adjacent properties is
directed away from the foundations, footings, floor slabs and the
tops of slopes via surface swales and subsurface drains towards
the natural drainage for this area. A minimum gradient of 1
percent is recommended in hardscape areas. For earth areas, a
minimum gradient of 5 percent away from all structures for a
distance of at least 5 feet should be provided. Earth swales
should have a minimum gradient of 2 percent.
BALCAR NO. 05-1106J4
Drainage should be directed to approved drainage facilities.
Proper surface and subsurface drainage will be required to
minimize the potential of water seeking the level of the bearing
soils under the foundations, footings and floor slabs, which may
otherwise result in undermining and differential settlement of the
structure and other improvements.
FOUNDATION EXCAVATION OBSERVATION
Foundation excavations should be observed by our representative
prior to the placement of forms, reinforcement or concrete for
conformance with the plans and specifications and the intent of the
recommendations herein.
LIMITS OF INVESTIGATION
The recommendations provided in this report pertain only to the
site investigated and based upon the assumption that the soil
conditions do not deviate from those disclosed in the borings. If
any variations or undesirable conditions are encountered during
construction, or if the proposed construction will significantly
differ from that planned at the present time, East County Soil
Consultation and Engineering, Inc. should be notified so that
supplemental recommendations can be provided.
Plates No. 1 through 3, Page L-1, References and Appendix A are
parts of this report.
Respectfully submitted,
Mamadou Saliou Diallo, P.E.
RCE 54071
MSD/md
7
574NL
Mdo7aVI
EAST COUNTY SOIL CONSULTATION
& ENGINEERING, INC.
10925 HARTLEY RD.. SUITE I. SANTEE, CA 92071
(619) 258-7901 Fax (619) 258-7902
e47zy
BALCAR NO. 05-1106J4
PLATE NO.2
SUMMARY SHEET
BORING NO. 1
DEPTH SOIL DESCRIPTION Y M
Surface FILL SOIL
brown/ tan, wet, medium dense, silty sand with gravel 18.4
1.0' COLLUVJIJM (Qal)
brown, moist to wet, loose to medium dense, clayey sand with gravel
2.0' SANTIAGO FORMATION (Tsa)
tan, damp to moist, dense, silty, fine grained sand 103.7 14.8
5.0' refusal, bottom of boring, no caving, no groundwater
boring backfilled 2/7/05
-----------------------------------------------------------------------------------------------------------------------------------
BORING NO.2
DEPTH SOIL DESCRIPTION Y M
Surface FILL SOIL
brown/ tan, wet, medium dense, silty sand with gravel
1.0' COLLUVIUM (Qal)
brown, moist to wet, loose to medium dense, clayey sand with gravel 106.5 17.9
2.0' SANTIAGO FORMATION (Tsa)
tan, damp to moist, dense, silty, fine grained sand
5.0' refusal, bottom of boring, no caving, no groundwater
boring backfilled 2/7/05
-----------------------------------------------------------------------------------------------------------------------------------
CLASSIFICATION RANGE OF GRAIN SIZES
U.S. STANDARD GRAIN SIZE IN
SIEVE SIZE MILLIMETERS
BOULDERS Above 12 Inches Above 305
COBBLES 12 Inches To 3 Inches 305 To 76.2
GRAVEL 3 Inches to No. 4 76.2 to 4.76
Coarse 3 Inches to% Inch 76.2 to 19.1
Fine 3/ Inch to No.4 19.1 to 4.76
SAND No. 4 to No. 200 4.76 to 0.074
Coarse No. 4 to No. 10 4.76 to 2.00
Medium No. 10 to No. 40 2.00 to 0.420
Fine No. 40 to No. 200 0.420 to 0.074
SILT AND CLAY Below No. 200 Below 0.074
GRAIN SIZE CHART
Rr.
0
- 0 to 20 30 '0 50 60 70 00 00 laO
uaulo uMur (u..
PLASTICITY CHART
00
K
so
40
30 U
20
I0
MAJOR DIVISIONS SYMBOL DESCRIPTION
GW GRADED GRAVELS OR GRAVEL- SAND WELL
MIXTURES. LITTLE OR NO FINES
GP - POORLY GRADED GRAVELS OR GRAVEL-SAND
MIXTURES. LITTLE OR NO FINES
GRAVELS
(MORE THAN V,
OF COARSE __________
GM SILTY GRAVELS, GRAVEL-SAND-SILT MIXTURES FRACTION
>NO. 4 SIEVE
COARSE
GRAINED SOILS
SIZE)
GC CLAYEY GRAVELS, GRAVEL-SAND-CLAY MIXTURES
(MORE THAN Y OF SOIL>
NO. 200 SIEVE SIZE) . Sw. WELL GRADED SANDS OR GRAVELLY SANDS.
LITTLE OR NO FINES
SANDS
(MORE THAN Y2
OF COARSE
SP POORLY GRADED SANDS OR GRAVELLY SANDS,
LITTLE OR NO FINES __________
SM SILTY SANDS, SILT-SAND MIXTURES FRACTION
< NO. 4 SIEVE
SIZE)
SC CLAYEY SANDS, SAND-CLAY MIXTURES
SILTS &
ML INORGANIC SILTS AND VERY FINE SANDS, ROCK
FLOUR, SILTY OR CLAYEY FINE SANDS OR CLAYEY
SILTS WITH SLIGHT PLASTICITY
FINE GRAINED
SOILS
(MORE THAN Y2OF SOIL <
NO. 200 SIEVE SIZE) .
CLAYS
LIQUID LIMIT
<50
.
_________
CL INORGANIC CLAYS OF LOW TO MEDIUM
PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS,
SILTY CLAYS, LEAN CLAYS
OL
________
ORGANIC SILTS AND ORGANIC SILTY CLAYS OF
LOW PLASTICITY
SILTS &
MH INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS
FINE SANDY OR SILTY SOILS, ELASTIC SILTS
CH
.
INORGANIC CLAYS OF HIGH PLASTICITY, FAT
CLAYS
CLAYS
LIQUID LIMIT
>50 OH ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY,
ORGANIC SILTY CLAYS, ORGANIC SILTS
HIGHLY ORGANIC SOILS Pt PEAT AND OTHER HIGHLY ORGANIC SOILS
CLASSIFICATION CHART (UNIFIED SOIL CLASSIFICATION SYSTEM)
EAST COUNTY SOIL CONSULTATION BALCAR PROJECT NO. 05-1106J
AND ENGINEERING, INC.
10925 HARTLEY ROAD, SUITE "I" PLATE NO. 3
SANTEE, CALIFORNIA 92071 MARCH 16, 2005
I U.S.C.S. SOIL CLASSIFICATION I I
BALCAR NO. 05-1106J4
PAGE L-1
LABORATORY TEST RESULTS
RESULTS OF EXPANSION INDEX TEST
An expansion test in conformance with ASTM D4829 was performed on a representative sample of
on-site soils to determine volumetric change characteristics with change in moisture content. The
recorded expansion of the sample is presented as follows: -
INITIAL SATURATED INITIAL DRY
MOISTURE MOISTURE DENSITY EXPANSION
CONTENT% CONTENT% LB./CU. FT. INDEX LOCATION
13.2 271 97.6 37 B-i @ 1.5'
RESULTS OF PARTICLE SIZE ANALYSIS
':-•
(ASTM D-22)
•
.
..
.t..
'.. o!Iuv1u '
Z.•& •.
.P.rcntPassin..
'
\--' Saiiti i.n Formation
:- .-•
- 3" 100
2" 95 - - its 93 - -
1/2" 91 100 -
3/8" 91 98 -
#4 89- 98 - '100
#8 88 . 97 99
#16 - 85 94 . 95
#30 76 87 . 78
#40. 65 79 61-
#60 47 65 32
#100 33 . 54 14
#200 24 48 6
USCS SM SC: SP-SM
S BALCAR NO. 05-1106J4
REFERENCES
"1997 Uniform Building Code, Volume 2, Structural Engineering Design Provisions", Published
by International Conference of Building Officials.
"Maps of Known Active Fault Near-Source Zones in California and Adjacent Portions of
Nevada", Published by International Conference of Building Officials.
"Geologic Maps of the Northwestern Part of San Diego County, California, Plate No. 1,
Geologic Map of the Oceanside, San Luis Rey, and San Marcos 7.5' Quadrangles, San Diego
County, California", by Siang S. Tan and Michael P. Kennedy, 1996.
10
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC.
10925 HARTLEY ROAD, SUITE I
SANTEE, CALIFORNIA 92071
(619) 258-7901
APPENDIX A
RECOMMENDED EARTHWORK SPECIFICATIONS
1. General Description
The intent of these specifications is to obtain uniformity and adequate strength in filled ground so
that the proposed structures may be safely supported. The procedures include the clearing and
preparation of the land to be filled, processing the fill soils, the spreading, and compaction of the
filled areas to conform with the lines and grades as shown on the approved plans.
The owner shall retain a Civil Engineer qualified in soil mechanics (herein referred to as engineer)
to inspect and test earthwork in accordance with these specifications. The engineer shall advise the
owner and grading contractor immediately if any unsatisfactory conditions are observed to exist
and shall have the authority to reject the compacted filled ground until such time that corrective
measures are taken, necessary to comply with the specifications. It shall be the sole responsibility
of the grading contractor to achieve the specified degree of compaction.
Preparing Areas to be Filled
All brush, vegetation and any biodegradable refuse shall be removed or otherwise
disposed of so as to leave the areas to be filled free of vegetation and debris. Any uncompacted
filled ground or loose compressible natural ground shall be removed unless the report recommends
otherwise. Any buried tanks or other structures shall be removed and the depression backfihled to
the satisfaction of the engineer.
The natural ground which is determined to be satisfactory for the support of the filled
ground shall then be plowed or scarified to a depth of at least 12 inches (12").
After the natural ground has been prepared, it shall then be brought to the proper
moisture content and compacted to not less than 90 percent of maximum dry density in accordance
with ASTM D1557-91.
Where fills are made on slopes greater than 20 percent, horizontal benches shall be cut
into the firm natural ground. The initial bench at the toe of the fill shall be at least 15 feet in width
on firm undisturbed natural ground. The width of all succeeding benches shall be at.least 6 feet.
,
APPENDIX 2
3. Fill Materials
All material shall be approved by the engineer and shall consist of materials free from vegetable
matter, and other lumps greater than 6 inches in diameter. If, during grading operations, soils are
found which were not encountered and tested in the preliminary investigation, tests on these soils
shall be performed to determine their physical characteristics. Any special treatment recommended
in the preliminary or subsequent soils reports not covered herein shall become an addendum to
these specifications.
4. Placing and Compacting Fill Materials
When the moisture content of the fill material is below that specified, water shall be
added until the moisture content is near optimum to assure uniform mixing and effective
compaction.
When the moisture content of the fill materials is above that specified, the fill material
shall be aerated by blading and scarifying or other satisfactory methods until the moisture content is
near optimum as specified.
After processing, the suitable fill materials shall be placed in layers which, when
compacted, shall not exceed six inches (6"). Each layer shall be spread evenly and shall be
thoroughly mixed during the spreading insure uniformity of materials and moisture in each layer.
After each layer has been placed, mixed and spread evenly, it shall be thoroughly
compacted to not less than the density set forth in paragraph 2 (c) above. Compaction shall be
accomplished with approval types of compaction equipment. Rolling shall be accomplished while
the fill material is at the specified moisture content. In place density tests shall be performed in
accordance with ASTM D1556-90.
The surfaces of the fill slopes shall be compacted by means of sheepsfoot rollers or other
suitable equipment. Compacting operations shall be continued until the slopes are stable and until
there is no appreciable amount of loose soil on the slopes.
5. Inspection
Sufficient inspection by our firm or the Soil's Engineer of record and/or his/her representative shall
be maintained during the filling and compacting operations so that he/she can verify that the fill
was constructed in accordance with the accepted specifications.
6. Seasonal Limits
No fill material shall be placed, spread, or rolled if weather conditions increase the moisture
content above permissible limits. When the work is interrupted by rain, fill operations shall not be
resumed until the moisture content and density of fill are as previously specified.
All recommendations presented in the attached report are a part of these specifications.
2
e 1 of 3) CF-1R -CERTIFICATE OF COMPLIANCE: RESIDENTIAL
WAW%lflI E"
Project Adds M1kH c25
Pt UUJVI cpo - P-1 Vc. 7
Compliance Method (Package or Computer) Climate Zone
Building Permit #
Plan Check / Date
Field Check / Date
GENERAL INFORMATION
Total Conditioned Floor Ares 11 74 ft Average Ceiling Height: ft
Conditioned Slab Floor Area 14 f12
Building Type: ) Single Family 'X Addition
(check one or more) Multi-Family Existing-Plus-Addition
Front Orientation: (
Out
/ South / East / West / All Orientations
ck 2 front orientation in degrecs from True North and circle one)
Number of Stories
Number of Dwelling Units:
Floor Construction Type:
___ _ ____
(circle one or both)
RADIANT BARRIER (reciuired in climate zones 2.4. 8-15) Required for this submittal_ yes
BUILDING ENVELOPE INSULATION
Component
Type
Frame Type
wd = wood
stl = steel
Cavity
insulation
R-Value
Sheathing
insulation
Total R-
Value'
Assembly
U-Factor'
R-Value
Location/Comments
(attic, garage, typical, etc.)
Wall Z -4 ? _____ _____
%JPAA
Wall
Roof 70 1
Roof
Floor FL i
Floor
Slab Edge
For prescriotive compliance. Total R-Value ant) ASsemoly u-racior are not reguircu lur u wuuu-lIaIuIu .v .........
insulation reauirements for the Prescriptive Package,
FENESTRATION
Shading Devices
Fenestration
#lType/Pos.
Orien-
cation
Area
(ft2)
Fenestration
U-Factor
Fenestration
SHGC
Exterior
Shading An.
Overhangs/
Fins
Front
Front
Left .+0 _______ _______ _______
Left
Rear
Rear
Right
Right
Skylight
Skvliht
Compliance Forms August 2001 A2
C040450/-v 37
05/26/2885 07:49 8587558186
.4 ,N.Y-26-2005 THU 07:15 AM CITY OF CARSLBD
DESIGN BUILD PARTNER PAGE 03
FAX NO. 760 602 8558 P. 03
of. Carlsbad '
This form must be completed by the City, the applicant, and the appropriate school districts and returned to the City
prior to issuing a building permit. The City will not issue any building permit without a completed school fee form.
Project Name: . .
Building Permit .
Check-Number:
Project Address:
A. P. N.:
Project Applicant
(Owner Name):
Project Description:
Building Type:
Uc.\1
41 00
2.?. ' fija S1'o4 4s
Residential: Number of New Ewelling Units
Square Feet of Living Area in New Dwelling
Second Dwelling Unit: Square Feet of Living Area in SDU
Residential Additions: Net Square Feet New Area 1 VOL
Commercial/Industrial: Square Feet Floor Area
City Certification of
Applicant Information:
CjJad Unified School District Marcos Unified School District
225 El Camino Real Mafa Way
Carlsbad CA 92009 (331-5000) Marcos, CA 92069 (290-2649)
En1ii!s Unton scnool District San Dlcgwto Union High School District
10 1 South Rancho Santa Fe Rd 710 Encinitas Blvd.
Encinitas, CA 92024 (944-4300 ext 166) Encinitas, CA 92024 (753.649)
Certification of Applicant/Owners. The person executing this declaration ('Owner') certifies under penally of perjury that (1) the
information provided above is correct and true to the beat of the Owner's knowledge, and that the Owner will file an amended
certification of payment and pay the additional fee if Owner requests an increase In the number of dwelling units or square
footage after the building permit is issued or if the initial determination of units or square footage is found to be incorrect, and
that (2) the Owner is the owner/developer of the above deacribed project(s), or that the person executing this declaration is
authorized to sign on behalf of the Owner.
Signature: Date: S e? O .S
Revivcd
163 Faraday Avenue • Carlsbad, CA 92008.7314 • (760) 602-2700
4/20/00 Building Counter 9 (760) 002-2719' FAX (780) 602-8558
05/26/2005 07:49 8587558186
. .WAY-26-2005 THU 01:16 AN CITY OF CARSLBD
DESIGN BUILD PARTNER PAGE 04
FAX NO. 760 602 8668 P. 04
SCHOOL DISTRICT SCHOOJ.FEE CERTIFICATION
(To be completed by the school dist(ct(s))
THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE
PROJECT HAVE BEEN OR-WILL BE SATISFIED.
SCHOOL DISTRICT: .
The undersigned, being duly aUthorized y...heip1icabIe S6IooI District, d6fifie6 that the
developer, builder, or owner has satisfied the obligation for school facilities. This is to certify that
the applicant listed on page 1 has paid all amounts or completed other applicable school
mitigation determined by the School District. The City may issue building permits for this project.
SIGNATURE OF AUTHORIZED SCHOOL
DISTRICT OFFICIAL
TITLE
NAME OF SCHOOL DISTRICT
DATE
PHONE NUMBER
GA* kfV) GA LEN FRE AN
DEPUTY SUPERINTENDENT
CARLSBAD UNIFIED SCHOOL DISTRICT