HomeMy WebLinkAbout1505 SUNRISE CIR; ; CB051810; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
013-2005 Residential Permit Permit No: CB051 810
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
Applicant:
MARK MCKINNEY
P0 BOX 8182 92067
(858)756-0933
1505 SUNRISE CR CBAD
RESDNTL Sub Type: RAD
2070213900 Lot #: 0
$141,999.00 Construction Type: NEW
Reference #:
0 Structure Type:
0 Bathrooms: 0
GRADER RES-ADD 66 SF MSTR BDR,
366 SF PANTRY/LAUND,4085F DECK,680 SF REMODEL
Status: ISSUED
Applied: 05/20/2005
Entered By: LSM
Plan Approved: 09/13/2005
Issued: 09/13/2005
Inspect Area:
Orig PC#:
Plan Check#:
Owner:
GRADER KEITH E
- 1505 SUNRISE CIR
CARLSBAD CA 92008
Building Permit $675.92 Meter Size
Addi Building Permit Fee $0.00 Add'I Red. Water Con. Fee $0.00
Plan Check $439.35 Meter Fee $0.00
AddI Plan Check Fee $0.00 SDCWA Fee $0.00
Plan Check Discount $0.00 CFD Payoff Fee $0.00
Strong Motion Fee $14.20 PFF (3105540) $0.00
Park in Lieu Fee $0.00 PFF (4305540) $0.00
Park Fee $0.00 License Tax (3104193) $0.00
LFM Fee $0.00 License Tax (4304193) $0.00
Bridge Fee $0.00 Traffic Impact Fee (3105541) $0.00
Other Bridge Fee $0.00 Traffic Impact Fee (4305541) $0.00
BTD #2 Fee $0.00 Sidewalk Fee $0.00
BTD #3 Fee $0.00 PLUMBING TOTAL $111.00
Renewal Fee $0.00 ELECTRICAL TOTAL $20.00
Add'l Renewal Fee $0.00 MECHANICAL TOTAL $37.00
Other Building Fee $0.00 Housing Impact Fee $0.00
Pot. Water Con. Fee $0.00 Housing lnLieu Fee $0.00
Meter Size Housing Credit Fee $0.00
Add'l Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00
Red. Water Con. Fee $0.00 Sewer Fee $0.00
Additional Fees $0.00
TOTAL PERMIT FEES $1,297.47
Total Fees: $1,297.47 Total Payments To Date: $1,297.47 Balance Due: $0.00
FINAL APPROVAL
Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as 'fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
FOR OFFICE USE ONLY
PLAN CHECK NO.c 0 Sit) 0
EST. VAL. i4 i,qqq. 00
Plan Ck. Deposit q3- ac
Validated By________________________
Date_____________
S.— I
Address (include Bldg/Suite #) - Business Name (at this address)
Legal Description Lot No. ion Name/Nu ber uHf %. /2@i'a3 NØQ, T.otal #Qt,units
'F 1? (aW £8rnflb0L FV7 39 Assessor's Parcel # Existing se ool Proposed Use
bAiTI(.,1LA - Qbt,- .QC1 VJAe' vt Ii..±2/t n01a- h1flRZh
Description of Work SO. FT. $p #df stories # of Bedrooms # of Bathrooms
ypsr Orr JP,00 Pai- . &)'-p OWUWe I0F/1 cço
___
t -iL , F4nvtAt9il P k ç, ')
Name Address City State/Zip Telephone if Fax if
=or Aft— IS
Name Address City State/Zip Telephone if
G4LPJ. IO'b )I.J LF. C)F-C).-C. ('Jr$LFwT1J -1S'c'-'U 71ô0 '''t• ( (I
Name Address . City State/Zip Telephone if
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, priorto its
issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law
(Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by any applicant for a permit subects the applicant to a ci il penalty f not more than five hundred Zlars ($5001).
Jriy irw . QeJ J. zosV
Name. - Address City State/Zip Telephone
State License if License Class . City Business License if
Designer Name Address City State/Zip Telephone
State License if
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance
of the work for which this permit is issued.
I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued. My worker's compensation insurance carrier and policy number are:
Insurance Company Policy No. Expiration Date__________________
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS ($1001 OR LESS)
CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as
to become subject to the Workers' Compensation Laws of California.
WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subje t en employer to criminal penalties and civil fines up to one hundred
thousand dollars ($109,000) In additn to thefiost of compensation, damages as provided for in Section 3706 of the Lal6r c(de, interest and attorney's fees.
SIGNATURE_______ DATE -
at I am exempt ;~.- the Contractor's License Law for the following reason:
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale
(Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law). -
o I am exempt under Section Business and Professions Code for this reason:
I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 YES ONO
I (have / have not) signed an application for a building permit for the proposed work.
I have contracted with the following person (firm) to provide the proposed construction (include name I address / phone number / contractors license number):
I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone
number / contractors license number):
I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address / phone number / type
of work):
PROPERTY OWNER SIGNATURE . . DATE
FC—OMPLtTP 1.0141 RESbENflAiNGPERJONLYJ
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0 YES 0 NO
Is the applicant-or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 YES 0 NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES 0 NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
U8TCONSTRUCTION LENDINGAGENCVE TT TST TT1T .2. - T51 .2-
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 30970) Civil Code).
LENDER'S NAME LENDER'S ADDRESS_______________________________________________________
I certify that I have read the application and-state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned
property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES.
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the building Official under the provisions of this Coded shall expire by limitation and become null and void if the building or work
authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned
at any time after the work is commenced for a period of 180 days .(Section 106.4.4 Uniform Building Code).
APPLICANT'S SIGNATURE AM_ I... \1tk DATE
WHI : ie YELLOW: Applicant PINK: Finance
PE. APPLICATION i\
CITY OF CARLSBAD BUILDING DEPARTME
1635 Faraday Ave., Carlsbad, CA 92008
City of Carlsbad Bldg Inspection Request
For: 02/27/2007
Permit# C13051810 Inspector Assignment: PD
Title: GRADER RES-ADD 66 SF MSTR BDR,
Description: 366 SF PANTRYILAUND,408SF DECK,680 SF REMODEL
Sub Type: RAD Type: RESDNTL
Job Address: 1505 SUNRISE CR
Suite: Lot
Location:
APPLICANT MARK MCKINNEY
Owner: GRADER KEITH E
Remarks:
Total Time:
Phone:
lnspector:/t 0
Requested By: DAN
Entered By: JANEAN
CD Description Act Comment
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Comments/Notices/Holds
Associated PCRs/CVs Original PC#
PCR05226 ISSUED GRADER RES-REV TO KIT/FAM RAKE; WALL,ADD WIN BDRM 3
PCR06011 ISSUED GRADER RES-NEW STAIR@DECK; NEW WINDOW @GAR.GABLE,(n)EAVE DETAIL,t
Inspection History
Date Description
02/20/2007 89 Final Combo
02/12/2007 89 Final Combo
02/08/2007 89 Final Combo
09/26/2006 19 Final Structural
09/26/2006 29 Final Plumbing
09/26/2006 39 Final Electrical
09/26/2006 49 Final Mechanical
09/14/2006 14 Frame/Steel/Bolting/Welding
08/29/2006 39 Final Electrical
08/21/2006 29 Final Plumbing
08/14/2006 23 Gas/Test/Repairs
06/14/2006 17 Interior Lath/Drywall
Act lnsp Comments
CO PD no access 1:15
CA PY
CO PD SEE NOTICE ATTACHED
WC MC
PA MC
WC MC
WC MC
NR PD WANTED FINAL ELEC - NR
CO PD SEE NOTICE ATTACHED
NR PD wants gas meter
AP PY
PA PY ATTIC @GARAGE NEED 5/8 TAPE X
Fl
Inspection List
Permit#: CB051810 Type: RESDNTL RAD GRADER RES-ADD 66 SF MSTR BDR,
366 SF PANTRYILAUND,408SF DECK,680
Date Inspector Act Comments
02/27/2007 89 Final Combo PD AP
02/27/2007 89 Final Combo - RI
02/20/2007 89 Final Combo - RI
02/20/2007 89 Final Combo PD CO no access 1:15
02/12/2007 89 Final Combo PY CA
02/08/2007 89 Final Combo PD CO SEE NOTICE ATTACHED
09/26/2006 19 Final Structural MC WC
09/26/2006 29 Final Plumbing MC PA
09/26/2006 39 Final Electrical MC WC
09/26/2006 49 Final Mechanical MC WC
09/14/2006 14 Frame/Steel/Bolting/Weldin PD NR WANTED FINAL ELEC - NR
08/29/2006 39 Final Electrical PD CO SEE NOTICE ATTACHED
08/21/2006 29 Final Plumbing PD NR wants gas meter
08/14/2006 23 Gas/Test/Repairs PY AP
06/14/2006 17 Interior Lath/Drywall PY PA ATTIC @ GARAGE NEED 5/8 TAPE X
06/07/2006 17 Interior Lath/Drywall PD CO NOT TYPE X
06/05/2006 17 Interior Lath/Drywall PD PA
06/05/2006 18 Exterior Lath/Drywall PD PA
05/17/2006 17 Interior Lath/Drywall PY PA kitchen only
05/08/2006 16 Insulation PY AP
05/08/2006 84 Rough Combo PY AP
05/03/2006 16 Insulation PD CA
04/25/2006 14 Frame/Steel/Bolting/Weldin PY CO SEE NOTICE ATTACHED
04/18/2006 14 Frame/Steel/Bolting/Weldin PD PA DBL SHR WALLS
03/20/2006 11 Ftg/Foundation/Piers PD AP stair ftg
03/16/2006 11 Ftg/Foundation/Piers PY NR NO PLANS
12/20/2005 13 Shear Panels/HD's PD PA SEE NOTICE ATTACHED
12/19/2005 13 Shear Panels/HD's PD CA CALLED/WORK INCOMPLETE 12/19
12/16/2005 13 Shear Panels/HD's PK CO LOAD PATH FROM RIDGE INCOMPLETE
COLUMN CAPS MISSING
12/16/2005 14 Frame/Steel/Bolting/Weldin PK CO
12/01/2005 13 Shear Panels/HO's PD CA NEED REVISED PLAN
11/29/2005 13 Shear Panels/HO's PD CA
11/22/2005 14 Frame/Steel/Bolting/Weldin PD CO NEED PLANS REVISED, MANY
CHANGES
11/22/2005 18 Exterior Lath/Drywall PD WC
10/25/2005 11. Ftg/Foundation/Piers PC PA INTERIOR PIERS
10/20/2005 11 .Ftg/Foundation/Piers PD NR
09/23/2005 15 Roof/Reroof PY AP
09/23/2005 21 Underground/Under Floor PY AP
09/23/2005 24 Rough/Topout PY AP
09/16/2005 11 Ftg/Foundation/Piers PD NR
09/16/2005 22 Sewer/Water Service PD NR
09/16/2005 31 Underground/Conduit-Wirin PD NR
Wednesday, February 28, 2007 Page 1 of 1
City of Carlsbad Bldg Inspection Request
I L%1VIN Tj-t;g For: 05/08/2006
Permit# CB051810 Inspector Assignment: PD
Title: GRADER RES-ADD 66 SF MSTR BDR,
Description: 366 SF PANTRYILAUND,408SF DECK,680 SF REMODEL
Type: RESDNTL Sub Type: RAD
Phone: 7609084278
Job Address: 1505 SUNRISE CR
Suite: Lot 0
Location: Inspector:
APPLICANT MARK MCKINNEY
Owner: GRADER KEITH E
Remarks:
Total Time: Requested By: JEFF
Entered By: CHRISTINE
CD Description Act Comment
16 Insulation
i
Comments/Notices/Hold
Associated PCRs/CVs Original PC#
PCR05226 ISSUED GRADER RES-REV TO KIT/FAM RAKE; WALL,ADD WIN BDRM 3
PCR060I1 ISSUED GRADER RES-NEW STAIR@DECK; NEW WINDOW @GAR.GABLE,(n)EAVE DETAIL,I
Inspection History
Date Description Act lnsp Comments
05/03/2006 16 Insulation CA PD
04/25/2006 14 Frame/Steel/Bolting/Welding CO PY SEE NOTICE ATTACHED
04/18/2006 14 Frame/Steel/Bolting/Welding PA PD DBL SHR WALLS
03/20/2006 11 Ftg/Foundation/Piers AP PD stair ftg
03/16/2006 11 Ftg/Foundation/Piers NR PY NO PLANS
12/20/2005 13 Shear Panels/HD's PA PD SEE NOTICE ATTACHED
12/19/2005 13 Shear Panels/HD's CA PD CALLED/WORK INCOMPLETE 12/19
12/16/2005 13 Shear Panels/HD's CO PK LOAD PATH FROM RIDGE INCOMPLETE COLUMN CAPS MISSING
12/16/2005 14 Frame/Steel/Bolting/Welding CO PK
12/01/2005 13 Shear Panels/HD's CA PD NEED REVISED PLAN
11/29/2005 13 Shear Panels/HD's CA PD
11/22/2005 14 Frame/Steel/Bolting/Welding CO PD NEED PLANS REVISED, MANY CHANGES
11/22/2005 18 Exterior Lath/Drywall WC PD
10/25/2005 11 Ftg/Foundation/Piers PA PC INTERIOR PIERS
10/20/2005 11 Ftg/Foundation/Piers NR PD
09/23/2005 15 Roof/Reroof AP PY
09/23/2005 21 Underground/Under Floor AP PY
09/23/2005 24 Rough/Topout AP PY
Apr 27 06 04:00p Mark I Shirles McKinnes 059 756-9549 p.2
-- -
----
Il /
A r)
1TP :'\. 1 •
i+ 1. z?
—/' ••• •• '\Y -r
t io
OL
, .• - ( ..
1/
____ • •.
( ,IV .• •-'• .: MarkLMcKhney. mhfte d I • P0 lox 811 I y-'' ' \j
•
Rancho Santa Fe. CA 2061-8182
rx5 FP4M Jkj'A
r- ;L .• I 4zot,,,
' t' .;"J' ':':. ... . Y[J ,f.,\ ..
EsGil Corporation
In cPartners flip with government for cBuit(ing Safety
DATE: September S. 2005
JURISDICTION: Carlsbad
PLAN CHECK NO.: 051810 SET: III
PROJECT ADDRESS: 1505 Sunrise Circle
PROJECT NAME: SFD Addition &Remodel for Keith Grader
O CANT
O JURIS.
0 PLAN REVIEWER
0 FILE
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes. PLEASE SEE REMARKS BELOW
LI The plans transmitted herewith will substantially comply,with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
El The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
El The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
El The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person. - ; •rç,
El The applicant's copy of the check list has been sent to:
Esgil Corporation staff did not advise the applicant.that the plan check has been completed.
LI Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephqne #:
Date contacted: (by: ) Fax #:
Mail Telephone Fax In Person
REMARKS: 1. All sheets of the two sets plans must be signed and sealed or stamped by the
California state licensed engineer or aj6hitect responsible for their preparation. The City
Building Official shall review the sp,ial inspection program submitted by the a'jcant.
By: Abe Doliente Enclosures:
Esgil Corporation
0 GA 0 MB i:i EJ 0 PC 9/1/05 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
EsGil Corporation
In efartnership wit/i government for (Bui&ing Safety
DATE: August 27, 2005
JURISDICTION: Carlsbad
PLAN CHECK NO.: 051810
PROJECT ADDRESS: 1505 Sunrise Circle
SET: 1I
1—APPLICANT
rJ PLAN REVIEWER
13 FILE
PROJECT NAME: SFD Addition & Remodel for Keith Grader
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
LII The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
Mark McKinney
P.O. Box 8182, Rancho Santa Fe, CA 92067
LII Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Mark McKinney Telephone #: 858/756-0933
Date contacted: Fax #: - 8549
Mail—felephone Fax 'in Person
LI REMARKS:
By: Abe Doliente Enclosures:
Esgil Corporation
DGA [I MB DEJ El PC 8/22/05 tmsmtl.dot
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax(858)560-1576
1-4
Carlsbad 051810
August 27, 2005
RECHECK PLAN CORRECTION LIST
JURISDICTION: Carlsbad
PROJECT ADDRESS: 1505 Sunrise Circle
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 8/22/05
REVIEWED BY: Abe Doliente
PLAN CHECK NO.: 051810
SET: II
DATE RECHECK COMPLETED:
August 27, 2005
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
Please make all corrections on the original tracings and submit two new complete sets of
prints to: Esgil Corp. or to the bldg. dept. of the juris.
To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
The following items have not been resolved from the previous plan reviews. The original
correction number has been given for your reference. In case you did not keep a copy of
the prior correction list, we have enclosed those pages containing the outstanding
corrections. Please contact me if you have any questions regarding these items.
Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
DYes UNo
p
.1
'S
Carlsbad 051810
August 27, 2005
Plans, specifications and calculations shall be signed and sealed by the California state
licensed engineer or architect responsible for their preparation, for plans deviating from
conventional wood frame construction. Specify expiration date of license. (California
Business and Professions Code). Check final sets of plans for signatures.
Specify on the Title Sheet of the plans the gross floor area of each element of this
project, including dwelling, garage, patio and deck. Section 106.3.3.
5. On the cover sheet of the plans, specify any items requiring special inspection, in a
format similar to that shown below. Section 106.3.2.
REQUIRED SPECIAL INSPECTIONS
In addition to the regular inspections, the following checked items will also require
Special Inspection in accordance with Sec. 1701 of the Uniform Building Code.
ITEM REQUIRED? REMARKS
EXPANSION/EPDXY ANCHORS X
DESIGNER-SPECIFIED
OTHER
6. When special inspection is required, the architect or engineer of record shall prepare an
inspection program which shall be submitted to the building official for approval prior to
issuance of the building permit. Please review Section 106.3.5. This will be forwarded
to the city.
15. The cross section should be referenced to sheet 3 not sheet 8. Please refer to
sheets 3, 7 & 8 of the plans.
Clarify the roof framing over the portion of the new garage.
Show the garage door header (5-114"X 11-7/8" PSL) as called out on sheet 9 of the
structural calculations.
Provide strap ties over the ridge of the open beam ceiling.
lTD. Cross section shows ceiling joists over the new family room. Clearly show the size
and spacing of the ceiling joists, otherwise correction 17C applies also.
20. Show on the plan the amperage of the electrical service, the location of the service panel
and the location of any sub-panels. If service is over 200 amps, submit single line
diagram, panel schedule and load calculations.
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite
208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan
review for your project. If you have any questions regarding these plan review items, please
contact Abe Doliente at Esgil Corporation. Thank you.
EsGil Corporation
In tFartnersfiip with government for Bui(Iing Safety
DATE: June 4, 2005
JURISDICTION: Carlsbad
PLAN CHECK NO.: 051810
PROJECT ADDRESS: 1505 Sunrise Circle
SET:I
U APPLICANT
U PLAN REVIEWER
U FILE
PROJECT NAME: SFD Addition & Remodel for Keith Grader
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
LI The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
VN The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans aresubmitted for recheck.
F-1 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
Mark McKinney
P.O. Box 8182, Rancho Santa Fe, CA 92067
LI Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: jvlark McKinney
Date contacted: ~160le05(by;6W)
Mail 1/icIephone V"Fax In Person
LI REMARKS:
Telephone #: 858/756-0933
Fax #: -8549
By: Abe Doliente Enclosures:
Esgil Corporation
[I GA [I MB DEJ El PC 5/23/05 tmsmtl.dot
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
Carlsbad 051810
June 4, 2005
PLAN REVIEW CORRECTION LIST
SINGLE FAMILY DWELLINGS AND DUPLEXES
PLAN CHECK NO.: 051810 JURISDICTION: Carlsbad
PROJECT ADDRESS: 1505 Sunrise Circle
ri
FLOOR AREA: SFD Addn - 520 SF
Garage Addn - 120 SF; Patio- 336 SF
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE INITIAL PLAN REVIEW
COMPLETED: June 4, 2005
STORIES: 1
HEIGHT:
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 5/23/05
PLAN REVIEWER: Abe Doliente
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and access for the disabled. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinance by the Planning Department, Engineering Department, Fire
Department or other departments. Clearance from those departments may be required prior to
the issuance of a building permit.
Present California law mandates that residential construction comply with the 2001 edition of
the California Building Code (Title 24), which adopts the following model codes: 1997 UBC,
2000 UPC, 2000 UMC and 1999 NEC (all effective 11/1/02).
The above regulations apply to residential construction, regardless of the code editions adopted
by ordinance.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
20
1 Carlsbad 051810
June 4, 2005
. PLANS
Please make all corrections on the originals and submit two new complete sets
of prints, to:
Esgil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, California
92123, (858) 560-1468 or to the jurisdictions building department.
Plans, specifications and calculations shall be signed and sealed by the
California state licensed engineer or architect responsible for their preparation,
for plans deviating from conventional wood frame construction. Specify
expiration date of license. (California Business and Professions Code).
Specify on the Title Sheet of the plans the gross floor area of each element of
this project, including dwelling, garage, carport, patio, deck and balcony. Section
106.3.3.
Provide a statement on the Title Sheet of the plans stating that this project shall
comply with the 2001 edition of the California Building Code (Title 24), which
adopts the 1997 UBC, 2000 UMC, 2000 UPC and the 1999 NEC.
On the cover sheet of the plans, specify any items requiring specialinspection, in
a format similar to that shown below. Section 106.3.2.
. REQUIRED SPECIAL INSPECTIONS
In addition to the regular inspections, the following checked items will also require
Special Inspection in accordance with Sec. 1701 of the Uniform Building Code.
ITEM REQUIRED? REMARKS
EXPANSION/EPDXY ANCHORS X
DESIGNER-SPECIFIED
OTHER
When special inspection is required, the architect or engineer of record shall
prepare an inspection program which shall be submitted to the building official
for approval prior to issuance of the building permit. Please review Section
106.3.5. Please complete the attached city form.
. GENERAL RESIDENTIAL REQUIREMENTS
Window area must be at least 1/10 of the floor area and a minimum of 10 square
feet per Section 1203.3. Recheck the existing living and the new breakfast
rooms
Openable window area in habitable rooms must be 1/20 of the floor area and a
minimum of 5 square feet. Section 1203.3. See correction item no. 7
4" Carlsbad 051810
June 4, 2005
9. At least 1/2 of the common wall must be open and have an opening not less than
25 sq. ft., nor one tenth of the floor area of the interior room, if light and
ventilation is being supplied from an adjacent room. Section 1203.1. See
correction item 7.
. ROOFING
10. Specify on the plans the following information for the roof materials, per Section
106.3.3: for the tile roof.
Manufacturer's name.
Product name/number.
ICBO approval number, or equal.
11. Provide skylight details to show compliance with Sections 2409 and 2603, or
specify on the plans the following information for the skylight(s), per Section
106.3.3:
Manufacturer's name.
Model name/number.
ICBO approval number, or equal.
. FOUNDATION
12. Note on plans that surface water will drain away from building and show drainage
pattern. Section 1804.7.
13. The following anchor bolt requirements shall apply in Seismic Zones 3 and 4, per
Section 1806.6.1:
The minimum nominal anchor bolt diameter shall be 5/8-inch (for Seismic
Zone 4 only). Note: This will require a minimum distance from the ends
of sill plates to be 4-3/8" (and a maximum of 12").
Plate washers (minimum size of 2" x 2" x 3/16") shall be used on each
anchor bolt.
14. Note on plan that hold down anchors must be tied in place prior to foundation
inspection. Section 108.5.2.
. FRAMING
15. Provide framing sections through the enlarged bath and the new family room.
Section 106.3.3.
16. Specify all header sizes for openings over 4' wide. Section 2320.11.6.
17. Provide calculations for main vertical and horizontal framing members and
footings. Section 106.3.3.
Carlsbad 051810
June 4, 2005
18. Provide calculations for lateral loads, shear panels, shear transfer and related.
Section 106.3.3.
MECHANICAL (UNIFORM MECHANICAL CODE)
19. Specify on the plans the following information for the fireplace(s), per Section
106.3.3:
Manufacturer's name.
Model name/number.
ICBO approval number, or equal.
Show height of chimney above roof per I.C.B.O. approval or UBC Table
31-B.
Note on the plans that approved spark arrestors shall be installed on all
chimneys. UBC, Section 3102.3.8.
ELECTRICAL (NATIONAL ELECTRICAL CODE)
20. Show on the plan the amperage of the electrical service, the location of the
service panel and the location of any sub-panels. If service is over 200 amps,
submit single line diagram, panel schedule and load calculations.
21. Note on the plans that receptacle outlet locations will comply with NEC Art.
210-52(a).
22. Per NEC Art. 210-11(c)3, note on the plans that bathroom circuiting shall be
either:
A 20 ampere circuit dedicated to each bathroom, or
At least one 20 ampere circuit supplying only bathroom receptacle outlets.
23. All bedroom branch circuits now require arc fault protection. Note clearly on the
plans that "Bedroom branch circuits will be arc fault circuit protected." NEC Art.
210-12(b).
PLUMBING (UNIFORM PLUMBING CODE)
24. In the garage, provide an adequate barrier to protect water heater from vehicle
damage. An 18" platform for the water heater does not satisfy this requirement.
UPC, Section 510.3.
25. Show T and P valve on water heater and show route of discharge line to exterior.
UPC, Section 608.5.
26. In Seismic Zones 3 and 4, show that water heater is adequately braced to resist
seismic forces. Provide two straps (one strap at top 1/3 of the tank and one strap
at bottom 1/3 of the tank). UPC, Section 510.5
Carlsbad 051810
June 4, 2005
Provide a note on the plans: In showers and tub-shower combinations, control
valves must be pressure balanced or thermostatic mixing valves. UPC Section
420.0.
New water closets and associated flushometer valves, if any, shall use no more
than 1.6 gallons per flush and shall meet performance standards established by
the American National. Standards Institute Standard A112.19.2. H & S Code,
Section 17921.3(b).
. ENERGY CONSERVATION
Provide fluorescent general lighting (40 lumens per watt minimum) in kitchen(s)
and bathrooms (containing a tub or shower).
MISCELLANEOUS
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections -from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes L3 No L3
32. The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Abe Doliente at
Esgil Corporation. Thank you.
Carlsbad 051810
June 4, 2005
of Carlsbad
I:o:\
1BuiIdIn9Dep
art ment
BUILDING DEPARTMENT
NOTICE OF REQUIREMENT FOR SPECIAL INSPECTION
Do Not Remove From Plans
Plan Check No. 051810
Job Address or Legal Description 1505 Sunrise Circle
Owner 'c-a tt1- & P-kR. Address IBM b0NA P—LS. CtP-CA.
You are hereby notified that in addition to the inspection of construction provided by the
Building Department, an approved Registered Special Inspector is required to provide continuous
inspection during the performance of the phases of construction indicated on the reverse side of
this sheet.
The Registered Special Inspector shall be approved by the City of Carlsbad Building
Department prior to the issuance of the building permit. Special Inspectors having a
current certification from the City of San Diego, Los Angeles, or ICBO are approved as
Special Inspectors for the type of construction for which they are certified.
The inspections by a Special Inspector do not change the requirements for inspections by
personnel of the City of Carlsbad building department. The inspections by a Special
Inspector are in addition to the inspections normally required by the County Building
Code.
The Special Inspector is not authorized to inspect and approve any work other than that for which
he/she is specifically assigned to inspect. The Special Inspector is not authorized to accept
alternate materials, structural changes, or any requests for plan changes. The Special Inspector is
required to submit written reports to the City of Carlsbad building department of all work that
he/she inspected and approved. The final inspection approval will not be given until all Special
Inspection reports have been received and approved by the City of Carlsbad building department.
Please submit the names of the inspectors who will perform the special inspections on each of the
items indicated on the reverse side of this sheet.
(over)
uarisoaa ULOLU
June 4, 2005
SPECIAL INSPECTION PROGRAM
ADDRESS OR LEGAL DESCRIPTION: 1505 Sunrise Circle
PLAN CHECK NUMBER: 051810 OWNER'S NAME: Grader
I, as the owner, or agent of the owner (contractors may not employ the special inspector),
certify that I, or the architect/engineer of record, will be responsible for employing the special
inspector(s) as required by Uniform Building Code (UBC) Section 1701.1 for the construction
project located at the site listed above. UBC Section 106.3.5.
I, as the engineer/architect of record, certify that I have prepared the following special inspection
program as required by UBC Section 106.3.5 for the construction project located at the site listed above.
Signed _ T)ES4 M",
1. List of work requiring special inspection:
El Soils Compliance Prior to Foundation Inspection fl Field Welding
El Structural Concrete Over 2500 PSI El High Strength Bolting
El Prestressed Concrete Expansion/Epoxy Anchors
El Structural Masonry El Sprayed-On Fireproofing
LI Designer Specified El Other
2. Name(s) of individual(s) or firm(s) responsible for the special inspections listed
above:
U V4 TA $L/SaKi 2esc_ bu jjc &)ir eO. 2. 7
3. Duties of the special inspectors for the work listed above:
0 bsawe eeTV-or ccp) xof& 1LL41A
Special inspectors shall check in with the City and present their credentials for approval prior to beginning work on the job site.
74
Carlsbad 051810
June 4, 2005
I VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 051810
PREPARED BY: Abe Doliente DATE: June 4, 2005
BUILDING ADDRESS: 1505 Sunrise Circle
BUILDING OCCUPANCY: R-3/U-1 TYPE OF CONSTRUCTION: V-N
[BUILDING
PORTION
AREA
(Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
SFD Addition 520 per city 141,999
Garage Addn 120
Patio 336
Remodel 680
Air Conditioning
Fire Sprinklers
TOTAL VALUE 141,999
Jurisdiction Code 1cb 1By Ordinance
$675.92 I Bldg. Permit Fee by Ordinance qW
Plan check Fee by Ordinance 1W I
Type of Review: 2 Complete Review Structural Only
_ U Repetitive Fee
[1 Other
Repeats
Hourly
_
I Hour
Esgil Plan Review Fee I $378.52
Comments:
Sheet 1 of I
macvalue.doc
Cit of Carlsbad
BUILDING PLANCHECK CHECKLIST
DATE: 5 PLANCHECKNO.: GB 051 R(O
BUILDING AóDRES: /5T5 C) 1Jv%$i3.e.. Cr
PROJECT DESCRIPTION:
ASSESSOR'S PARCEL NUMBER: 7 Ot ' 1 EST. VALUE:
ENGINEERING DEPARTMENT
APPROVAL
The item you have submitted for review has been
approved. The approval is based on plans,
information and/or specifications provided in your
submittal; therefore any changes to these items after
this date, including field modifications, must be
reviewed by this office to insure continued
conformance with applicable codes. Please- review
carefully all comments attached, as failure to comply
with instructions in this report can result in
suspension of permit to build.
kT1TI
Please see the attached report of deficiencies
marked with 0. Make necessary corrections to plans
or. specifications for compliance with applicable
codes and standards. Submit corrected plans and/or
specifications to this office for review.
By: Date:
0 A Right-of-Way permit is required prior to
construction of the following improvements: By: Date:
By: Date:
ENGINEERING DEPT. CONTACT PERSON
Dedication Application Name:
. JOANNE JUCHNIEWICZ
0 Dedication Checklist .
City of Carlsbad
O Improvement Application Address: 1635 Faraday Avenue, Carlsbad, CA 92008
0 Improvement Checklist
. Phone: (760) 602-2775
El Future Improvement Agreement CFD INFORMATION
0 Grading Permit Application Parcel Map No:
El Grading Submittal Checklist Lots:
0 Right-of-Way Permit Application Recordation:
Right-of-Way Permit Submittal Checklist Carlsbad Tract:
and Information Sheet
O Sewer Fee Information Sheet
. Carlsbad, CA 9200817314 • (760) 602-2720 • FAX (760) 602-°
BUILDING PLANCHECK CHECKLIST
,IA
/ SITE PLAN
iY' 2ND 3RD
D U 1. Provide a fully dimensioned site plan drawn to scale. Show:
North Arrow F. Right-of-Way Width & Adjacent Streets
Existing & Proposed Structures G. Driveway widths
C. Existing Street Improvements H. Existing or proposed sewer lateral
/ D. Property Lines I. Existing or proposed water service
E. Easements J. Existing or proposed irrigation service
fl U 2. Show on site plan:
/ A. Drainage Patterns
1. Building pad surface drainage must maintain a minimum slope of one
percent towards an adjoining street or an approved drainage course.
2. ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive
drainage of 2% to swale 5' away from building."
B. Existing & Proposed Slopes and Topography
C. Size, type, location, alignment of existing or proposed sewer and water service (5)
/ that serves the project. Each unit requires a separate service, however, second
/ dwelling units and apartment complexes are an exception.
/ D. Sewer and water laterals should not be located within proposed driveways, per
/ standards.
3. Include on title sheet:
( A. Site address
Assessor's Parcel Number
Legal Description
For commercial/industrial buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use,
existing sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
F:8UILDTNG PLANCHECK CKLST FORM.doc 2 Rev. 7114100
IJ BUILDING PLANCHECK CHECKLIST
1 ST 2" 3RD DISCRETIONARY APPROVAL COMPLIANCE
0 0. 4a. Project does not comply with the following Engineering Conditions of approval for
Project No.________________________________________________________
0 0 0 4b. All conditions are in compliance. Date:
DEDICATION REQUIREMENTS
0 0 5. Dedication for all street Rights-of-Way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $ 15.000 , pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows:
Dedication required. Please have a registered Civil Engineer or Land Surveyor
prepare the appropriate legal description together with an 8 W x 11" plat map and
submit with a title report. All easement documents must be approved and signed
by owner(s) prior to issuance of Building Permit. Attached please find an
application form and submittal checklist for the dedication process. Submit the
completed application form with the required checklist items and fees to the
Engineering Department. in person. Applications will not be accept by mail or fax.
Dedication completed by: Date:
IMPROVEMENT REQUIREMENTS
O 0 0 6a. All needed public improvements upon and adjacent to the building site must be
constructed at time of building construction whenever the value of the
construction exceeds $ 75,000 , pursuant to Carlsbad Municipal Code Section
18.40.040.
Public improvements required as follows:
Attached please find an application form and submittal checklist for the public
improvement requirements. A registered Civil Engineer must prepare the
appropriate improvement plans and submit them together with the requirements
on the attached checklist to the Engineering Department through a separate plan
check process. The completed application form and the requirements on the
F:8UILDINO PLANcHECK CKLST FORM.doc 3 -
Rev. 7114100
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3RD
checklist must be submitted in person. Applications by mail or fax are not
accepted. Improvement plans must be approved, appropriate securities posted
and fees paid prior to issuance of building permit.
Improvement Plans signed by: Date:
O 0 0 Construction of the public improvements' may be deferred pursuant to Carlsbad
• Municipal Code Section 18.40. Please submit a recent property title report or
current grant deed on the property and processing fee of $360 so we may
prepare the necessary Neighborhood Improvement Agreement. This agreement
must be signed, notarized, and approved by the City prior to issuance of a
Building permit.
• Future public improvements required as follows:
O 0 0 Enclosed please find your Neighborhood Improvement Agreement. Please return
agreement signed and notarized to the Engineering Department.
Neighborhood Improvement
Agreement completed by:
Date:
of 0 0 6d. No Public Improvements required. SPECIAL NOTE: Damaged or defective
improvements found adiacent to building site must be repaired to the satisfaction
' of the City Inspector prior to occupancy.
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section
15.16.010 of the Municipal Code. .
0 0 0 7a. Inadequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill, import,
export and remedial). This information must be included on the plans.
0 0 0 7b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. NOTE: The Grading Permit must be issued and rough grading-
approval obtained prior to issuance of a Building Permit.
Grading Inspector sign off by: Date:
7c. Graded Pad Certification required. (Note: Pad certification may be required even
if a grading permit is not required.) ,
F:BUlLDING PLANCHECK CKLST FORM.doc 4 Rev. 7114100
BUILDING PLANCHECK CHECKLIST
1ST7/' 2ND 3RD
,JZI El D 7d .No Grading Permit required.
El El El 7e. If grading is not required, write "No Grading" on plot plan.
/
MISCELLANEOUS PERMITS
thY El El 8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or
private work adjacent to the public Right-of-Way. Types of work include, but are
not limited to: street improvements, tree trimming, driveway construction, tying
into public storm drain, sewer and water utilities.
Right-of-Way permit required for:
El El 9. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad
I sewer service area, you need to contact the Carlsbad Municipal Water District,
located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can
provide forms and assistance, and will check to see if your business enterprise is
on the EWA Exempt List. You may telephone (760) 438-2722, extension 7153,
for assistance.
Industrial Waste permit accepted by:
Date:
El El 10. NPDES PERMIT
Complies with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans 'for such improvements shall be approved by
the City Engineer prior to issuance of grading or building permit, whichever
occurs fir-*
11. fl)4uired -fees are attached
3'No fees required
/
WATER METER REVIEW
11th1 0 El •12a. Domestic (potable) Use
'IV ' • Ensure that the meter proposed by the owner/developer is not oversized.
Oversized meters are inaccurate during low-flow conditions. If it is oversized, for
the life of the meter, the City will not accurately bill the owner for the water used
All single family dwelling units received "standard" 1" service with 5/8" service.
FBUI WINO PLANCHECK CKI.ST FORM= • 5 Rev. 7114100
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3RD
If owner/developer proposes a size other than the "standard", then
owner/developer must provide potable water demand calculations,
which include total fixture counts and maximum water demand in gallons
per minute (gpm). A typical fixture count and water demand worksheet is.
attached. Once the gpm is provided, check against the "meter sizing
schedule" to verify the anticipated meter size for the unit.
Maximum service and meter size is a 2" service with a 2" meter.
If a developer is proposing a meter greater than 2", suggest the
installation of multiple 2" services as needed to provide the anticipated
demand. (manifolds are considered on case by case basis to limit
multiple trenching into the street).
0 0 12b. Irrigation Use (where recycled water is not available)
All irrigation meters must be sized via irrigation calculations (in gpm) prior
to approval. The developer must provide these calculations. Please follow
these guidelines:
If the project is a newer development (newer than 1998), check the recent
improvement plans and observe if the new irrigation service is reflected on
the improvement sheets. If so, at the water meter station, the demand in
gpm may be listed there. Irrigation services are listed with a circled "I",
and potable water is typically a circled "W". The irrigation service should
look like:
STA 1+00 Install 2" service and
1.5: meter (estimated 100 gpm)
If the improvement plans do not list the irrigation meter and the
service/meter will be installed via another instrument such as the building
plans or grading plans (w/ a right of way permit of course), then the
applicant must provide irrigation calculations for estimated worst-case
irrigation demand (largest zone with the farthest reach). Typically, Larry
Black has already reviewed this if landscape plans have been prepared,
but the applicant must provide the calculations to you for your use. Once
you have received a good example of irrigation calculations, keep 'a set for
your reference. In general the calculations will include:
Hydraulic grade line
Elevation at point of connection (POC)
Pressure at POC in pounds per square inch (PSI)
Worse case zone (largest, farthest away from valve
Total Sprinkler heads listed (with gpm use per head)
Include a 10% residual pressure at point of connection
3. In general, all major sloped areas of a subdivision/project are to be
irrigated via separate irrigation meters (unless the project is only SFD with
no HOA). As long as the project is located within the City recycled water
F:WUH.DING PLN4cHECK CKLST FORM4oc 6 Rev. 7114100
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3RD
service boundary, the City intends on switching these irrigation
services/meters to a new recycled water line in the future.
0 0 12c. Irrigation Use (where recycled water is available)
Recycled water meters are sized the same as the irrigation meter above.
If a project fronts a street with recycled water, then they should be
connecting to this line to irrigate slopes within the development. For
subdivisions, .this should have been identified, and implemented on the
improvement plans. Installing recycled water meters is a benefit for the
applicant since they are exempt from paying the San Diego County Water
Capacity fees. However, if they front a street which the recycled water is
there, but is not live (sometimes they are charged with potable water until
recycled water is available), then the applicant must pay the San Diego
Water Capacity Charge. If within three years, the recycled water line is
charged with recycled water by CMWD, then the applicant can apply for a
refund to the San Diego County Water Authority (SDCWA) for a, refund.
However, let the applicant know that we cannot guarantee the refund, and
they must deal with the SDCWA for this.
0 0 0 13. Additional Comments:
F:BUII.DING PLANCHECIC CKLST FORM.doc 7 Rev. 7114100
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No. CB % / (0 Address. fSS S'(E Q/2 L
Planner ( V . . Phone (760) 602-
APN:
•
I _ Not Project Density: . DU/AC Type of Project & Use: ____AJ'
Zoning :f -1 General Plan: 7'-Lfr1 Facilities Management Zone:JA (jY
•
ÔFD (In/out) #Date of.participation: Remaining net dev acres:______
Circle . (For non-residential development Type of land used created by this
•
• permit
Legend L Item Complete. Item Incomplete - Nieds your action
0 0 Environmental Review Required: YES NO TYPE_.• ..
• DATE OF COMPLETION: . . .
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval: ..
0 0 Discretionary Action Required: YES____ NO TYPE_________
APPROVAL'RESO. NO. DATE_____
PROJECT NO.___________________
OTHER RELATED CASES: . • .
Compliance with conditions or approval? If not; state conditions which require action.
Conditions of Approval: .
Coastal Zone Assessment/Compliance .
Project site located 1n Coastal Zone? YES_. NO____ . .
CA Coastal Commission Authority? YES___ NO____
If California Coastal Commission Authority: Contact them at —.7575 Metropolitan Drive, Suite 103,
San Diego..CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt):
Coásial Permit Determination Form ilready completed? •YES_ NO____
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
Follow-Up Actions: .
1) Stamp Building Plans as Exempr or wCoastal Permit Required' (at m!nimumFloor Plans).
2) Complete Coastal Permit Determination Log as needed.
0 0 Incluslonary Housing Fee required: YES ____ NO
(Effectivedate of lnciusionary Housing Ordinance - May 21, 1 993)
Data Entry Completed? YES___ NO____
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N,
Enter Fee, UPDATEI) .
Site Plan:
oMlN'COUP1TERaldgPlflthkRevchIdst • Rev 01.
setbacks:
Required
Required
Required
Required
Required
Shown_____________
Shown_____________
Shown
Shown
Shown______________
Required '_7 _(' Shown_ '
2'D 0 1. Provide a fully dimensional site plan drawn to scale. Show:. North arrow, property lines,
easements, existing and proposed structures, streets, existing street improvements, right-ot-way
width, dimensional setbacks, and existing topographical lines (Including all side and rear yard
slopes). .' .
" fl 0 2. Provide legal description of property and assessor's parcel number.
Policy 44— Neighborhood ArchItectqal Design GuidelineS
0 0 : 1. Apliabltlty YES_NO X
J 0 0 . 2. Project complies YES NO_______
Zoning:
i. Setbacks:
Front.
interior Side:
Street Side:.
Rear.
Top of slope:
Required________ Shown '701
Required __ ___ Shown _9_-
Required . Shown______________
Required Shown •Z '
Required
•
Shown
0 2. >
R.
ry stru ure
Inter!
ide:
e eparatlori
0 0 3. Lot Coverage:•
0 0 .4. Height . . Required Shown
0 0 5. Parking: Spaces Required Shown .
(breakdown by uses for commercial and industrial' projects required)
Residential Guest Spaces Required . Shown
0 0 Additional Comments
DITO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE____
HADMINcOUNERBId9PInchkROVCNd$t Rev 0001
• City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
12-15-2O05 Plan Check Revision Permit No:PCR05226
Building Inspection Request Line (760) 602-2725
Job Address: 1505 SUNRISE CR CBAD
Permit Type: PCR Status: FNB4N6—
Parcel No: 2070213900 Lot #: 0 Applied: 12/01/2005
Valuation: $0.00 Construction Type: NEW Entered By: LSM
Reference #: CB051810 Plan Approved:
Issued:
Project Title: GRADER RES-REV TO KIT/FAM RAKE Inspect Area:
WALL,ADD WIN BDRM 3
Applicant: Owner:
MARK MCKINNEY GRADER KEITH E
P0 BOX 8182 1505 SUNRISE CIR
RANCHO SANTA FE 92067 CARLSBAD CA 92008
Plan Check Revision Fee $60.00
Additional Fees $0.00
Total Fees: $60.00 Total Payments To Date: $0.00 )tnce Due: $60.00
FINAL APPROVAL
Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
in,&ri2fO
PERMIT APPLICATION
a
4 LI (Al (V
crry OF CAALSBAD BUILDING DE'PARTMENT
1635 Faraday. Ave., Carlsbad, CA 92008
FOR OFFICEUSE ONLY
PLAN CHECK NO.
EST. VAL.
Plan Ck. Deposit
Validated By________________________
Date I -i J. i t1s
9T C_NFL0__RLM~0k!1AN Will
Address (include Bldg/Suite #) -. Business Name (at this address)
. .,
Legal Description
-
Lot No. Subdivision Name/Number . Unit No. Phase No. Total # of units
Assessor's Parcel # . Existing Use Proposed Use
9F1P Description of Work' 50. FT. #of Stories 1/ of Bedrooms # of Bathrooms
; uPSI 2.& Tt Fktt.jj .kLc- w4-' "P0. wtp4. . IPR4
57
LIM p4 _z—i. P ô I t .L4r -L,(V 6 Name Address City State/Zip Telephone# Fax #
-mi O
kwt 4e,
Name Address I City State/Zip Telephone #
Aaaress City State/Zip Telephone # -
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License• Law
(Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged
exemption Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($5001)
Name Address . I City State/Zip Telephone #
State License # License Class City Business License #
Designer Name Address City State/Zip Telephone
State License #
KE0M!ENSnON 35
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declaratiOns:
I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance
of the work for which this permit is issued.
0 I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued. My worker's compensation insurance carrier and policy number are: -'
Insurance Company Policy No. I Expiration Date_________________
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS ($1001 OR LESS)
CERTIFICATE OF EXEMPTION: I certify that in the performance of the work! or which this permit is issued, I shall not employ any person in any manner so as
to become subject to the Workers' Compensation Laws of California. .
WARNING: Failure to secure workers'-compensation coverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred
thousand dollars ($100,000). In addition to the cost of compensation, damages as provided for In Section 3.706 of the Labor code, Interest and attorney's fees.
SIGNATURE . _I . DATE
OMNI MOEN MR'
I hereby affirm that I am exempt from the Contractor's License Law for the following reason:
0 I, as owner of the property or my employees with wages as their sole compensation; will do 'the work and the structure is not intended or offered for sale
(Sec. 7044. Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
I, as owner of the property, am exclusively contracting with licensed contractors t construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
O I am exempt under Section Business and Professions Code for this reason:
I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 YES DNO
1111 / have not) signed an application for a building permit for the proposed work. - -
I have contracted with the following person (firm) to provide the proposed construction (include name I address / phone number / contractors license number):
I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address /phone number I contractors license number):
5. I will provide some of the work, but I have contracted (hired) the following-persons to 'provide the work indicated (include name I address phone number / type of work):
PROPERTY OWNER SIGNATURE . . - , : DATE - -
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk mflagement and prevention
program under Sections 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0 YES 0 NO
Is the applicant or future building occupant required to obtain a-permit from the air pollution control district or air quality management district? 0 YES 0 NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES 0 NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
re
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097(i) Civil Code).
LENDER'S NAME -' - LENDER'S ADDRESS .
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate I agree to comply with all
City ordinances and State laws relating to building construction. I hereby, authorize representatives of the Citt of Carlsbad to enter upon the above mentioned
property for inspection purposes. I ALSO ,AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF-THE GRANTING OF THIS PERMIT. -
OSHA: An OSHA permit Is required for excavations over 5'0 deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work
authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit Is suspended or abandoned
at any time after the work is commenced for a period of 180 days (Section 106.4.4 Uniform Building Code). - - -
APPLICANT'S SIGNATURE NP V.LAS(,_'_-_-_- __- DATE
WHITE: - YELLOW: Applicin PINK: Finance - • '
.
3
EsGil Corporation
In 24rtners flip with government for (Building Safety
DATE: December 12, 2005
JURISDICTION: Carlsbad
PLAN CHECK NO.: 051810 Rev 1 (PCR05-226) SET: I
PROJECT ADDRESS: 1505 Sunrise Circle
PROJECT NAME: SFD Addition for Keith Grader
-APPLICANT
O JURIS.
Id PP LA
U FILE
The plans transmitted herewith have been corrected where necessary and substantially comply'
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The checklist transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Lii Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Fax #:
Mail Telephone Fax In Person
REMARKS: Revision I includes ch header size because of additional window.
By: Abe Doliente Enclosures:
Esgil Corporation
LI GA LI MB 0 EJ [I PC 12/5/05 trnsmtl.dot
9320 Chesapeake Drive, Suite 203 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
Carlsbad 051810 Rev 1 (PCR05-226)
December 12, 2005
I VALUATION AND PLAN CHECK FEE
rye.
JURISDICTION: Carlsbad PLAN CHECK NO.: 051810 Rev 1
(PCR05-226)
PREPARED BY: Abe Doliente DATE: December 12, 2005
BUILDING ADDRESS: 1505 Sunrise Circle
BUILDING OCCUPANCY: R-3/U-1 TYPE OF CONSTRUCTION: V-N
BUILDING
PORTION
AREA
(Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code I I #N/A
1994 UBC Building Permit Fee W
I #NIAJ
1994 UBC Plan Check Fee 1 W I #N/AI
Type of Review: r7l Complete Review J Structural Only
El Other El Repetitive Fee Repeats Hourly Hour *
Esgil Plan Review Fee I #N/AI
Comments:
Sheet I of I
macvalue.doc
Carlsbad 051810 Rev 1 (PCR05-226)
December 12, 2005
VALUATION AND PLAN CHECK FEE
REVISED - 12/27/05 - Abe
JURISDICTION: Carlsbad PLAN CHECK NO.: 051810 Rev 1
(PCR05-226)
PREPARED BY: Abe Doliente DATE: December 12, 2005
BUILDING ADDRESS: 1505 Sunrise Circle
BUILDING OCCUPANCY: R-3/U-1 TYPE OF CONSTRUCTION: -V-N
BUILDING
PORTION
AREA
(Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code 1cb I By Ordinance
Bldg. Permit Fee by Ordinance
Plan check Fee by Ordinance V
I $60.001
Type of Review: D Complete Review 0 Structural Only
0 Repetitive Fee
El Other
Repeats Hourly 0.51 Hour "
Esgil Plan Review Fee I $48.001
* Based on hourly rate
Comments: Forgot to enter plan check fee.
Sheet I of 1
macvalue.doc
PCR05226 1505 SUNRISE CR CBAD
GRADER RES-REV TO KIT/FAM RAKE
I.2/i /DS 0 66&-)L- w/o4- L8 O& 8 iD
BULDJNO A1115 pL,%NNNG
-. IING
Al'EP -TO 6LJ4f'd"T V
RE FAPPRIFORM
HEALTh DEPT \J
(9 'v c~ft4 S To-. FROM
j
•
• çT- Pc7? A4
________
CPDFORM
ii I EE
ul- ry
I R
CORR -ORE
jVI1\)
(fTv •
* City of Carlsbad
1635 Faraday Av CarIsbad CA 92008
03-06-2006 Plan Check Revision Permit No: PCRO6O1 1
Building Inspection Request Line (760) 602-2725
Job Address: 1505 SUNRISE CR CBAD
Permit Type: PCR Status: PENDING
Parcel No: 2070213900 Lot #: 0 Applied: 01/23/2006
Valuation: $0.00 Construction Type: VN Entered By: LSM
Reference #: CB051810 Plan Approved:
I Issued:
Project Title:. GRADER RES-NEW STAIR@DECK Inspect Area:
NEW WINDOW @GAR.GABLE,(n)EAVE DETAIL,INT
Applicant: Owner:
MARK MCKINNEY GRADER KEITH E
P0 BOX 8182 1505 SUNRISE CIA
RANCHO SANTA FE 92067 CARLSBAD CA 92008
Plan Check Revision Fee $120.00
Additional Fees $0.00
Total Fees: $120.00 Total Payments To Date: $0.00 Balance Due: $120.00
FINAL APPROVAL
Inspector: Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these tees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified tees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
f!vptinn, nf whir'h *,nii hnua nruiniik, hon ,iiun n NflTl(F aimilwtn thk nr na tn whith tho atAtuta e*f limit2tinna hna nruiniidi, nthanuica ovnirorl
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave., Carlsbad, CA 92008
(include Bldg/Suite #)
FOR OFFICE USE ONLY
s PLAN CHECK II
EST. VAL.
Plan Ck. Deposit____________________
Validated By_________________________
Date_______________________
Name (at this
Legal Description Lot No. Subdivision Name/Number Unit No. Phase No. Total It of units - __
Assessor's Parcel It Existin Use Proposed Use
, GAY k LAAve. Wit LL
Description of Work
NC
FT. #of Stories ^T Eyks-r %1.U'- ' 4 C LO ea'r . . -
Aaaress City State/Zip Telephone #
RP 01 ff
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit1 to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law
(Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged
exemtion ,ll yv violation of Section 7031 5 by ny applicant for permit subjects the,appllca?t to a1civilpnalty of not more than fivp hun,jed dollars I$5001)— S
Name ( Address - City State/Zip Telephone I/
State License # 72.... License Class 1 City Business License It
Designer Name Address City State/Zip Telephone
State license It
WQR MPENSAYN [ -
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:.
I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance
of the work for which this permit is issued. . ( i have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued. My worker's compensation insurance carrier and policy number are: -
insurance Company Policy No Expiration Date__________________
(THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR' ONE HUNDRED DOLLARS ($1001 OR LESS)
CERTIFICATE OF EXEMPTION: I certify that in the pOrformance of the work for which this permit is issued, I shall not employ any person in any manner so as
to become subject to the Workers' Compensation Laws of California.
. .
WARNING: Failure to secure workers' compensation coverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred
thousand dollars ($100,006), In addition to the cost of compensation, damages as provided for In Section 3706 of the Labor code, Interest and attorney's fees.
SIGNATURE - . . DATE
L7LWNER BUILDER DECLARAT1Oj. q.
I heieby affirm that I am exempt from the Contractor's License Law for the following reason: - •.
I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale
(Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply, to. an owner of property who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
I, as owner of the property, am exclusively contracting with licensed contractors to
i.
construct the project (Sec. 7044, Business and Professions Code: The • Contractor's License Law does not apply to en owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's license Law).
. -. 0 I am exempt under Section
.- Business and Professions Code for this reason: .
1' . I personally plan to provide the major labor and materials for construction of the propsed property improvement. 0 YES 'ONO
I (have / have not) signed an application for a building permit for the proposed work.
I have contracted with the following person (firm) to provide the proposed construction- (include name I address / phone number / contractors license number):
- I plan to provide portions of the work, but I have-hired the following person to coordinate, supervise and provide the major work (include name / address / phone number I contractors license number): .
6. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone number / type of work):
PROPERTY OWNER SIGNATURE . - . . . DATE
BW NQ: IT Jad
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 0, YES .,0,_N0 ..-_ .......
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 YES 0 NO
Is the facility to be constructed within 1.000 feet of the outer boundary of a school site? 0 YES 0 NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
csc Gcy mgp
hereby affirm that there is a construction (ending agency for the performance of the work for which this permit is issued (Sec. 30970) Civil Code).
LENDER'S NAME .. LENDER'S ADDRESS_______________________________________________________
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate: I agree to comply with all
City ordinances and State laws relating to building construction. I hereby authorize representatives of the Citti of Carlsbad to enter upon the above mentioned property for inspection 'purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS. COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0 deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work
authorized by such permit is not commenced within 18 ays from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is.co
'
mmencedy!
,
pe Lo. o 0 danPection
APPLICANT'S SIGNATU c,
106.4.4 Uniform r
u1o o DATE
WHITE: File YELLOW: Applicant PINK: Finance
EsGil Corporation
In (Partners flip with government for(Building Safety
DATE February 24, 2006 0 APPLICANT
JURISDICTION: Carlsbad 0 PLAN REVIEWER
0 FILE
PLAN CHECKNC.: 05-1810 Rëv2 (PCR06011) SET: II
PROJECT ADDRESS: 1505 Sunrise Circle
PROJECT NAME: SFD Addition for Keith Grader
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.°
LII The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
LI The plans transmitted herewihhave significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
LI The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
LI The applicant's copy of the check list is 6nclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
Esgil Corporation staff did. not advise the applicant that the plan check has been completed.
LII Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Fax #:
Mail Telephone Fax In Person
REMARKS: Revision 2 includes new stairs at deck.
By: Abe Doliente Enclosures:
Esgil Corporation
D GA 0 MB 0 EJ 0 PC 2/23/06 trnsmtidot
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
EsGil Corporation
4,
In cPartne .cliip wit/i governmenfor BUi(&ng Safety
DATE: February 3, 2006 /
JURISDICTION: Carlsbad 0 PLAN REVIEWER
0 FILE
PLAN CHECK NO.: 05-1810 Rev 2 (PCR06011) SET: I
PROJECT ADDRESS: 1505 Sunrise Circle -
PROJECT NAME: SFD Addition for Keith Grader
LI The plans transmitted herewith have been corrected where necessary and substantially co
m
p
l
y
with the jurisdiction's building codes.
LI The plans transmitted herewith will substantially comply with the jurisdiction's building cod
e
s
when minor deficiencies identified below are resolved and checked by building department st
a
f
f
.
LI The plans transmitted herewith have significant deficiencies identified on the enclosed check
l
i
s
t
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at
E
s
g
i
l
Corporation until corrected plans are submitted for recheck.
El The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applica
n
t
contact person.
The applicant's copy of the check list has been sent to:
Mark McKinney
P.O. Box 8182, Rancho Santa Fe, CA 92067
Eli Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Mark McKinney Telephone #: 858/756-0933
Date co?tacted:: 3—O (by: 1f\) Fax #:
Mail /Telephone ,'x In Person
LI REMARKS:
By: Abe Doliente Enclosures:
Esgil Corporation
DGA [I MB DEJ E] PC 1/26/06 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
Carlsbad 05-1810 Rev 2 (PCR06011)
February 3, 2006
GENERAL PLAN CORRECTION LIST
JURISDICTION: Carlsbad
(PCRO6O11)
PROJECT ADDRESS: 1505 Sunrise Circle
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 1/26/06
REVIEWED BY: Abe Doliente
PLAN CHECK NO.: 05-1810 Rev 2
DATE REVIEW COMPLETED:
February 3, 2006
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,.
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
Please make all corrections on the originals and submit two new complete sets of prints to:
Esgil Corp. or to the bldg. dept. of the juris.
To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located-on the plans. Have changes been made not resulting from this list?
U Yes D -No.
tar1sbad 05-1810 Rev 2 (PCR06011)
February 3, 2006
Provide lateral analysis for the new stairway.
Show the required footings, grade beams, base plates, post to footing connection and
post to beam connection.
The jurisdiction has .contracted with Esgil Corporation located at 9320 Chesapeake Drive,
Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform
the plan review for your project. If you have any questions regarding these plan review
items, please contact Abe Doliente at Esgil Corporation. Thank you.
S
Carlsbad 05-1810 Rev 2 (PCR06011)
!ebrua!y 3, .2006
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 05-1810 Rev 2
(PCRO6O11)
PREPARED BY: Abe Doliente DATE: February 3, 2006
BUILDING ADDRESS: 1505 Sunrise Circle
BUILDING OCCUPANCY: R-3/U-1 TYPE OF CONSTRUCTION: V-N
[BUILDING
1PORTION
AREA
(Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code ICb IBy Ordinance I
Bldg. Permit Fee by Ordinance V
Plan Check Fee by Ordinance V
Type of Review: 0 Complete Review El Structural Only
I I
I $120.001
O Repetitive Fee
I Repeats
Based on hourly rate
Comments:
- El Other
Hourly1 ii Hour*
Esgil Plan -Review Fee- -- - I $96.00I
Sheet I of I
macvalue.doc
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
,Plan Check No. 2 Pt!_FZ bG 1! Address 150 CSLtrY,-t.....Q.X
Planner Chris Sexton Phone (760) 602-4624
APN: 7 O ( - ?
.9 1 Type of Project & Use: Q d Net Project Density:3. is a Zoning:_Pi_ General Plan:_iQ LYV Facilities Management Zone: /
CFD (In/out) #_Date of participation: Remaining net dev acres:______ 0)
. . (For non-residential development: Type of land used created by thi Circle OM permit:________________________________________________
I Legend: IS Item Complete 0 Item Incomplete - Needs your action
EYö 0 Environmental Review Required: YES___ NO_VrYPE_________
DATE OF COMPLETION:________________
Compliance with conditions of approval? if not, state conditions which require action.
Conditions of Approval:
0 Discretionary Action Required: YES___ NO V' TYPE________
APPROVALJRESO. NO. DATE_____
PROJECT NO.___________________
OTHER RELATED CASES:_________________________________________
Compliance with conditions or approval? if not, state conditions which require action.
Conditions of Approval:
'b 0 Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES__'NO___
CA Coastal Commission Authority? YES___ NO___
If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103,
San Diego CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt):
Coastal Permit Determination Form already completed? YES____ NO____
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
Follow-Up Actions:
Stamp Building Plans as "Exempt or "Coastal Permit Required" (at minimum Floor Plans).
Complete Coastal Permit Determination Log as needed.
2040'0 lnclusIonary Housing Fee required: •YES ____ NO
(Effective date of inciusionary Housing Ordinance - May 21, 1993.)
Data Entry Completed? YES___ NO___
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N,
Enter Fee, UPDATEI)
Site Plan:
H:ADMlMCOUNTER8ldgPlnchkRsvCt*lst Rev 001
o'e 0 Provide a fully dimensional site plan drawn to scale. Show: North arrow, property luie s.
easements, existing and proposed structures, streets, existing Street improvements. r
i
g
h
t
o
f
.
w
a
y
width, dimensional setbacks and existing topographical lines (including all side Ono Tear v
a
r
slopes).
Provide legal description of property and assessor's parcel number.
Policy 44- Neighborhood Architectural Design Guidelines
ET*[] 0 Applicability: YES NO-!-
[3 0 0 Project complies YES_ NO________
Zoning:
2'D 0 1. Setbacks:
Front Required QC) Shown
Interior Side: Required )' Shown 72 ,
Street Side: Required____________ Shown____________
Rear. Required /'.jt Shown 30'
Top of slope: Required _Shown____________
0 0 0 2. Accessory structure setbacks:
Front Required Shown
Interior Side: Required Shown
Street Side: Required Shown -1000-
Rear Required z Shown
Structure separation: Required Shown
ø'D 0 3. Lot Coverage: Required 07 T im Shown____________
0 4. Height: Required ' _30 Shown £
B"D 0 5. Parking: Spaces Required Shown
(breakdown by uses for commercial and industrlai projects required)
Residential Guest Spaces Required Shown
0 0 0 Additional Comments__________________________________________
_
_
_
_
I /
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER 3 11ILJ,DATE_lfI / (
H:.ADM0UNER8Id9PtnthkRsvCh1dst
r_esi