Loading...
HomeMy WebLinkAbout2313 CAMINO ROBLEDO; ; CBR2021-1097; PermitPrint Date: 07/08/2021 Permit No: CBR2021-1097 Building Permit Finaled Residential Permit Job Address: Permit Type: Parcel #: Valuation: Occupancy Group: 2313 CAMINO ROBLEDO, CARLSBAD, CA 92009-9356 BLDG-Residential 2552726100 $0.00 Work Class: Lot #: Project #: Cogen Status: Applied: Issued: 04/18/2021 04/21/2021 Finaled Close Out: #of Dwelling Units: Track #: Plan #: Closed - Finaled Plan Check #: Inspector:Orig. Plan Check #:Bathrooms: Final Inspection:07/08/2021 Bedrooms:Construction Type: Occupant Load: Code Edition: Sprinkled: INSTALL TESLA POWERWALL BATTERY BACK UP TO EXISTING SOLAR (E-REVIEW)Description: Project Title: Contractor: SEMPER SOLARIS CONSTRUCTION INC 1805 JOHN TOWERS AVE EL CAJON, CA 92020-1116(619) 807-1253 AMOUNTFEE PLUMBING, ELECTRICAL, AND MECHANICAL PERMIT $175.00 Total Fees:$175.00 Total Payments To Date:$175.00 Balance Due:$0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. 1635 Faraday Avenue, Carlsbad CA 92008-7314 ï 760-602-2700 ï 760-602-8560 f ï www.carlsbadca.gov Building Division Page 1 of 1 {"Cityof Carlsbad APPLICATION MISSING FOR THIS PROJECT 1 Building Permit Inspection History Finaled PERMIT INSPECTION HISTORY for (CBR2021-1097) BLDG-Residential 04/18/2021Application Date:Permit Type:Owner: Cogen 04/21/2021Work Class:Issue Date:Subdivision:CARLSBAD TCT#88-03-02 UNIT#02 04/21/2022Expiration Date:Status: IVR Number: 32841 Closed - Finaled 2313 CAMINO ROBLEDO CARLSBAD, CA 92009-9356 Address: Scheduled Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection InspectionActual Start Date 07/08/2021 BLDG-34 Rough Electrical 161403-2021 Scheduled Tim Kersch Incomplete COMMENTS PassedChecklist Item BLDG-Building Deficiency No BLDG-35 Solar Panel 161402-2021 Scheduled Tim Kersch Incomplete COMMENTS PassedChecklist Item BLDG-Building Deficiency No BLDG-Final Inspection 161401-2021 Passed Tony Alvarado Complete COMMENTS PassedChecklist Item BLDG-Structural Final July 8, 2021: No electrical Storage battery back-up/PV Solar System Deficiencies. 1. Existing Approved-Low Profile photovoltaic solar system with roof panels system. Installed per engineer plans and detail specifications-approved. 2. Verified electrical plans and schematics, cold water bond and UFER ground, identification placard and labels, and grounding system-approved. 3. New Additional electrical Storage battery backup system per engineered single line diagram plans and detail specifications, scope of work-approved. Yes BLDG-Electrical Final July 8, 2021: No electrical Storage battery back-up/PV Solar System Deficiencies. 1. Existing Approved-Low Profile photovoltaic solar system with roof panels system. Installed per engineer plans and detail specifications-approved. 2. Verified electrical plans and schematics, cold water bond and UFER ground, identification placard and labels, and grounding system-approved. 3. New Additional electrical Storage battery backup system per engineered single line diagram plans and detail specifications, scope of work-approved. Yes Thursday, July 8, 2021 Page 1 of 1 {cityof Carlsbad