HomeMy WebLinkAboutPRE 2021-0046; WILSON ADDITION; Admin Decision LetterDecember 3, 2021
Will Warner
111 C Street
Encinitas, CA 92024
SUBJECT: PRE 2021-0046 (DEV2021-0234} -WILSON ADDITION
APN: 167-053-04-00
(°Cityof
Carlsbad
8FILE cory
If!~//~,/ IZ/'1/21
Thank you for submitting a preliminary review for an addition to a single-family residence proposed at
3354 Seacrest Drive. The project site, an approximately 12,000-square-foot lot, is currently developed
with a single-family residence.
In response to your application, the Planning Division has prepared this comment letter. Please note that
the purpose of a preliminary review is to provide you with direction and comments on the overall concept
of your project. This preliminary review does not represent an in-depth analysis of your project. It is
intended to give you feedback on critical issues based upon the information provided in your submittal.
This review is based upon the plans, policies, and standards in effect as of the date of this review. Please
be aware that at the time of a formal application submittal, new plans, policies, and standards may be
in effect and additional issues of concern may be raised through a more specific and detailed review.
Planning:
General
1. General Plan and zoning designations for the property are as follows:
a. General Plan: R-4, 0-4 units/ac. Growth Management Control Point of 3.2 units/ac.
b. Zoning: R-A-10000.
2. The project requires the following permits:
a. Landscaping Permit (if applicable, please see Planning Item No. 9 below)
b. Grading Permit
c. Building Permit
3. The Housing Crisis Act of 2019 (SB 330) established a preliminary streamline application process for
housing projects. It is not mandatory unless applicants seek the vesting and processing benefits
offered under SB 330. Participation in the SB 330 streamline process would occur first, followed by
the formal development application process required under Government Code (Gov. Code)§§ 65940,
65941, 65941.5, and Carlsbad Municipal Code (CMC) § 21.42.050. Acceptance by the city of a
complete SB 330 Streamline Application (Form P-32) and ff;!e will vest the project for 180 days in
accordance with the ordinances, policies and standards in effect at the time the SB 330 Application is
accepted.
Community Development
Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 760-602-4600 I 760-602-8560 f I www.carlsbadca.gov
PRE 2021-0046 (DEV2021-0234) -WILSON ADDITION
December 3, 2021
Page 2
4. New requirements related to the city's goals to reduce greenhouse gas (GHG) emissions will likely
impact development requirements of this project. A formal application submittal will need to include
a completed tfirnate Action Plan Checklist (Form P-30) to determine what requirements will apply to
the project. New GHG reduction requirements are related to energy efficiency, photovoltaic, electric
vehicle charging, water heating and traffic demand management requirements, as set forth in the
California Green Building Standards Code and in Carlsbad Municipal Code Chapters 18.21, 18.30 and
18.51 which is available on the city's website at the following address:
http://www.qcode.us/codes/carlsbad/view.php?topic=18&frames=on
To the extent that new GHG reduction requirements are in effect at the time of application for grading
or building permits, the project will be required to comply with the effective requirements even if
different than what is proposed in the project's planning approvals. GHG reduction requirements may
impact, but are not limited to, site design and local building code requirements. If incorporating new
GHG reduction requirements results in substantial modifications to the project after planning
approvals are obtained, then prior to issuance of grading or building permits, the applicant may be
required to submit and receive approval of a Consistency Determination or an Amendment
application for the project through the Planning Division.
5. As described in the scope of work, this preliminary review is for the addition to an existing single-
family residence. The project includes the addition of a 1,257-square-foot basement garage, 1,211-
square-foot living area on the first floor, and 986-square-foot master suite on the second floor. Staff
supports the proposed residential addition subject to compliance with all applicable standards and
policies, including Carlsbad Municipal Code (CMC} Chapters 21.08, 21.44 and 21.46. Specifically, the
proposed addition complies with the minimum required setbacks of 20 feet at the front and rear, and
10 feet at the sides. The proposed building height does not exceed the maximum allowed height of
30 feet (with a minimum roof pitch of 3:12}. Additionally, the proposed project does not exceed the
maximum permitted lot coverage (40 percent maximum).
6. A maximum of two stories is allowed per CMC 21.08.030(A). The garage level qualifies as a basement
per CMC 21.04.045 if the definition of basement is applied to at least 75 percent of the perimeter of
said level. Please note that basement qualification is measured from the existing or proposed grade,
whichever is lower. ·
7. Per CMC 21.46.130, fences and walls within the front yard setback are limited to 42 inches in height.
Retaining walls and safety guardrails adjacent to the sloping driveway may not exceed 42 inches. The
maximum height for fences and walls beyond the front yard setback is six feet.
8. A landscape permit will be required if proposing to modify 2,500 square feet or more of the existing
landscaped areas. Please note that the Landscape Plans shall be prepared in accordance with the
General Requirements listed in Section 3 of the City of Carlsbad Landscape Manual (February 2016}.
The City of Carlsbad's Landscape Manual document can be found on the Planning Division's web page
at the following address:
https://www .ca rlsbadca .gov /home/showdocument?id= 7032
PRE 2021-0046 {DEV2021-0234) -WILSON ADDITION
December 3, 2021
Page 3
Land Development Engineering:
1. Complete the city's Storm Water Standards Questionnaire (Form E-34). This questionnaire will guide
you and the City in determining what type of reports and storm water mitigation must be completed
to satisfy state and City storm water quality requirements. The questionnaire can be obtained on the
city's web site. Preliminary analysis suggests that the project is a 'Standard Project' and shall provide
two completed Standard Project Requirement Checklist (E-36 Form). The form is available on the city's
website.
2. A preliminary title report dated within 6 months of the application date is required with the submittal
of a discretionary application and final engineering application. On the plans, show and label all
easements listed in said report. If the easement cannot be shown, list the easement on the plan and
state "non-plottable". ·
3. On the site plan, indicate the total proposed impervious area and total proposed pervious area in
square feet.
4. Show all existing and proposed contour lines and spot elevations to determine the existing and
proposed drainage patterns.
5. Lot drainage shall comply with engineering standard GS_-15. Provide a minimum of 2% grade away
from the building if hardscaped and a minimum of 5% grade away from the building for landscaped
per 2016 California Building Code Section 1804.4. Show high points, flowline elevations, percent
grades and show the directions lot drainage using drainage arrows. Show invert elevations of any
proposed storm drain pipes. Verify the invert elevation of the existing storm drain pipe to connect to.
6. Per Carlsbad Municipal Code Section 15.16.060, this project will require a grading permit. On the
grading plans, indicate the volume of grading (cut, fill, import, export, remedial) proposed for the
project in cubic yards. Use NGVD 29 datum for vertical control for all design elevations per city
Engineering Standard Volume 1, Chapter 2. Please be advised that the grading permit process
generally takes approximately six months from initial submittal to permit issuance.
7. Provide a hydrology study to determine the pre-development and post-development discharge flows.
Provide preliminary recommendations to mitigate any increase in flows.
8. Provide a Geotechnical study and include feasibility and recommendations for the proposed
retaining/structural wall. Include recommendations for wall drainage.
9. The proposed retaining/structura·I wall seems to be a non-standard retaining wall. Provide structural
design and calculations by a licensed structural engineer. On the grading plans, show top of wall,
bottom of wall, and top of footing elevations at multiple locations of the retaining wall.
10. Show and label on the plans, the sewer service (lateral) and cleanout and the water lateral and water
meter with backflow.
11. Show existing structures, contour lines and spot elevations on the adjacent properties, up to 25 feet
beyond the property line. Provide multiple cross~sections to illustrate differences in grade.
PRE 2021-0046 (DEV2021-0234) -WILSON ADDITION
December 3, 2021
Page4
12. Provide change in average daily traffic (ADT), as well as the change in water demands (GPM or GPD)
and sewer generation (EDU) resulting from the project. List even if net change is zero.
Building Division:
1. The following concerns should be addressed prior to submitting for plan review:
a.. The "storage" room has no natural light or ventilation -mechanical means necessary.
b. The Master Suite has no openings on three sides. Compliant if 8% light requirement is met.
c. Identify if there will be a business proposed to be run out of this space.
d. Means for sanitation are not proposed for the Master Suite.
e. Identify if the elevator will be a deferred submittal. If not, remove from this proposal.
All necessary application forms, submittal requirements, and fee information are available at the Planning
counter located in the Faraday Building at 1635 Faraday Avenue or online at
https:ljwww.carlsbadca.gov/departments/community-development/planning. You may also access the
General Plan Land Use Element and the Zoning Ordinance online at the website address shown. Please
review all information carefully before submitting.
If you would like to schedule a meeting to discuss this letter with the commenting departments, please
contact Esteban Danna at the number below. You may also contact each department individually as
follows:
• Planning Division: Esteban Danna, Associate Planner, at (760) 602-4629
• Land Development Engineering: Emad Elias, Project Engineer, at (760) 602-2733
• Building Department: Jason Pasiut, Building Official, at (760) 602-2788
Sincerely,
Di~
City Planner
DN:ED:cf
c: Rex and Mary Wilson, 3354 Seacrest Drive, Carlsbad, CA 92008
Emad Elias, Project Engineer
Fire Prevention
Laserfiche/File Copy/Data Entry