HomeMy WebLinkAbout2021-12-07; City Council; ; Acceptance of bids, award of a contract to Tharsos Inc. for construction of the Villas Lift Station Replacement Project and approval of additional appropriation Meeting Date: Dec. 7, 2021 To: Mayor and City Council From: Scott Chadwick, City Manager Staff Contact: Dave Padilla, Utilities Engineering Manager dave.padilla@carlsbadca.gov, 760-438-2722 Sean Diaz, Utilities Senior Engineer sean.diaz@carlsbadca.gov, 760-603-7350 Subject: Acceptance of bids, award of a contract to Tharsos Inc. for construction of the Villas Lift Station Replacement Project and approval of additional appropriation District: 2 Recommended Action Adopt a resolution accepting bids and awarding a construction contract to Tharsos Inc., a California corporation, for construction of the Villas Lift Station Replacement Project, Capital Improvement Program Project No. 5550, in an amount not to exceed $638,450, and approving an additional appropriation in an amount of $64,000 from the Sewer Capital Replacement Fund. Executive Summary The project will replace portions of the Villas Sewer Lift Station to improve safety and system reliability. This action would award the contract for the project to the company that staff determined to be the lowest responsive and responsible bidder, Tharsos Inc., which provided a $638,450 bid. It would also make an additional appropriation of $64,000 from the Sewer Capital Replacement Fund to cover the increased costs of the project explained below. The City Council’s approval is required under Carlsbad Municipal Code Section 3.28.080, which requires the approval of the City Council for all formally bid contracts when the value exceeds $200,000. Discussion Overview The project site is located at the east end of Winthrop Avenue within a city-owned easement north of Carlsbad Village Drive and west of Tamarack Avenue (Exhibit 2). Construction of the Villas Lift Station was originally completed in 1987. It serves the residential units in the Villas at Calavera Hills. The sewer lift station is maintained and operated by the Utilities Department. Existing gravity-powered sewer mains convey wastewater to the lift station, which moves the wastewater from a lower elevation to a higher elevation. The sewage ultimately discharges into the North Agua Hedionda Interceptor pipeline. Dec. 7, 2021 Item #6 Page 1 of 7 This project will replace the existing pump discharge piping, valves, flow meter and pump motor electrical controls, construct an underground vault and build a weather canopy over the electrical equipment. A vinyl access fence and gate will replace the existing wooden fence and gate. Temporary sewer bypassing will be required during construction to maintain sewer service to the development, and best management practices will be used to reduce public access and noise impacts to the residents. The project is complex and construction space is limited because of the site location. Compact and limited-access construction equipment will be needed to build the new underground vault and replace the station’s components. The project also requires continuous monitoring of the temporary bypass system during construction. Construction contract On July 13, 2021, the City Council approved the project’s plans and specifications, and authorized staff to seek bids for its construction (Resolution No. 2021-165). Staff advertised the project using the city’s formal bidding procedures. The engineer’s estimate for construction of the project was $540,000, which included a construction contingency of $80,000. On Oct. 6, 2021, nine bids were received, all greater than that estimate. They ranged from the lowest bid of $638,450 to the highest bid of $1,169,810. In staff’s opinion, the higher-than-expected bids are the result of the project’s complexity and recent price increases for materials resulting from inflation and the pandemic. Staff reviewed the bid proposals and determined Tharsos Inc., with its bid of $638,450, was the lowest responsive and responsible bidder. Given the need to replace the deteriorating components and the importance of improving the safety and reliability of the lift station, staff recommend award of a construction contract to Tharsos. Carlsbad Municipal Code Sections 3.28.080(C) and 3.28.080(I)(6) requires the approval of the City Council for all formally bid contracts when the value exceeds $200,000. The project is subject to this requirement. Professional services The city will need a consulting firm to provide construction management and inspection services for the project. Staff plan to issue a task order for these services for an amount not to exceed $250,000, which is within the City Manager’s delegated authority under the Master Agreement for As-Needed Horizontal Construction Management and Inspection authorized by the City Council in 2020 (Resolution No. 2020-173). The city will also require a consulting firm to provide engineering services during construction. The City Manager will procure these professional engineering services at a cost to the city of no more than $100,000 per agreement year in accordance with his authority under Carlsbad Municipal Code Section 3.28.060(D). Options Staff provide the following options for the City Council’s consideration: 1. Accept bids and award a construction contract to Tharsos in an amount not to exceed $638,450 Pros: Dec. 7, 2021 Item #6 Page 2 of 7 • The company was the lowest responsible and responsive bidder • Improvements can be completed at the earliest opportunity Cons: • Requires additional funding because the contract award amount is above appropriated funds 2. Reject all bids and re-issue the bid solicitation Pros: • None identified Cons: • Delays start of construction of necessary improvements • Will likely result in higher bids and increase the cost of the project • Likely to require additional funding appropriation Staff recommend Option 1 for City Council’s approval– accept bids and award a construction contract to Tharsos for the construction of the project in an amount not to exceed $638,450. Fiscal Analysis The construction contract cost of $638,450 plus a contingency cost of $95,768 results in a total construction cost of $734,218. Costs for staff engineering, administration and services for construction management, inspection, material testing and engineering services during construction and communications are $307,727, for a total project cost of $1,041,945. An additional $64,000 appropriation from the Sewer Capital Replacement Fund is required to complete the project. There are sufficient funds available in the Sewer Capital Replacement Fund to cover this increase. A summary of the estimated costs and available funds is shown in the table below: Villas Lift Station Replacement, Capital Improvement Program Project No. 5550 Total appropriation to date $1,090,000 Total expenditures and encumbrances to date $111,803 Total available funding $978,197 Construction contract (Tharsos) $638,450 Construction contingency (15%) $95,768 Construction management, inspection, material testing and communications services (estimated) $250,000 Engineering services during construction $7,727 Staff engineering and administrative costs (estimated) $50,000 Total estimated project costs $1,041,945 Remaining balance ($63,748) Additional appropriation needed $64,000 Dec. 7, 2021 Item #6 Page 3 of 7 Carlsbad Municipal Code Section 3.28.040(C)(5) authorizes the City Manager or designee to approve change orders in the amount equal to the contingency set at the time the project is awarded. That amount is $95,768 for this project. Next Steps Once the contract documents are fully executed, staff will issue a purchase order, schedule a pre-construction meeting with the contractor and issue a notice to proceed for construction of the project. Construction is estimated to begin in January 2022. The duration of the construction contract is 130 working days, excluding rain days and change orders that may extend it, with an estimated completion in July 2022. Staff will engage the consultant for management of the construction contract and inspection services for the work upon execution of the agreement for construction management and inspection services. Once the project is successfully completed, a notice of completion to release bonds will be recorded. Environmental Evaluation The project classifies as a maintenance project and is exempt from environmental review according to California Environmental Quality Act Guidelines sections 15302 - Replacement or reconstruction of existing facilities, and 15303 - New construction or conversion of small structures. None of the exceptions described in Section 15300.2 are applicable to this project. A notice of exemption was filed with the San Diego County Clerk on July 20, 2021, in compliance with Section 21152(b) of Public Resources Code. Public Notification This item was noticed in accordance with the Ralph M. Brown Act and it was available for public viewing and review at least 72 hours prior to the scheduled meeting date. Before construction starts, the public will be notified of construction activities through signage, email, the website and other city communication channels. The construction contractor will also be required to notify the public of construction activities with signs, door hangers, letters to residents and/or “NO PARKING” signs, as applicable Exhibits 1. City Council resolution 2. Location map Dec. 7, 2021 Item #6 Page 4 of 7 RESOLUTION NO. 2021-263 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS, AWARDING A CONSTRUCTION CONTRACT TO THARSOS INC. FOR CONSTRUCTION OF THE VILLAS LIFT STATION REPLACEMENT PROJECT AND APPROVING ADDITIONAL APPROPRIATION OF $64,000 EXHIBIT 1 WHEREAS, the City Council has determined it necessary, desirable, and in the public interest tc replace portions of the Villas Lift Station, Capital Improvement Program (CIP) Project No. 5550; and WHEREAS, on July 13, 2021, the City Council adopted Resolution No. 2021-165 approving plans and specifications and authorizing the City Clerk to advertise to receive bids for the project; and WHEREAS, on Oct. 6, 2021, nine sealed bids were received for construction of the project; and WHEREAS, the lowest responsive and responsible bid was submitted by Tharsos Inc. in an amount of $638,450; and WHEREAS, Carlsbad Municipal Code (CMC) Sections 3.28.080((} and 3.28.080(1)(6) require the City Council to award all formally bid contracts when the value exceeds $200,000; therefore, the project is subject to this requirement; and WHEREAS, CMC Section 3.28.040(()(5) authorizes the City Manager or designee to approve change orders in the amount equal to the contingency set at the time of project award, which is $95,768 for the project; and WHEREAS, appropriation of additional funds from the Sewer Capital Replacement Fund to CIP Project No. 5550 in an amount of $64,000 is required to complete construction of the project; and WHEREAS, the City Planner has determined that the project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Sections 15302 (replacement or reconstruction of existing facilities), and 15303 (new construction or conversion of small structures). None of the exceptions described in CEQA Section 15300.2 are applicable to this project. A notice of exemption was filed in the office of the San Diego County Clerk on July 20, 2021, in compliance with Section 21152 (b) of Public Resources Code (CEQA). Dec. 7, 2021 Item #6 Page 5 of 7 LOCATION MAP Sunny Creek RdRancho Pa n c h oPROJECT SITE VICINITY MAP AVECOSTALA BLVDCA R L S B A D RD ALGA PALOMAR AIRPORT RD EL CAMIN O REALRANCHOSANTA FERD POINSE T TI A LANE ALICANTERD ELFUERTEOLIVENHAIN RD. M E L R O S E D R . FARADAY COLLEGEBLVDPA S E O DEL NORTEAVE A V E N I D A E N C I N A S CANNON RDMONROESTCARLSB A D VILLAGE D R MARRON TAMARAC K AVE RD LAKECALAVERA LAGOON AGUA HEDIONDA LAGOON BATIQUITOS LAGOON A V I A R A PKWY POINSETTIA LANE PROJECTSITE PROJECT NAME VILLAS LIFT STATION REPLACEMENT PROJECT 5550 EXHIBIT2NUMBER Exhibit 2 Dec. 7, 2021 Item #6 Page 7 of 7 Acceptance of Bids and Award of Contract for the Villas Lift Station Replacement Project Dave Padilla, Engineering Manager Sean Diaz, Senior Engineer December 7, 2021 {city of Carlsbad TODAY’S PRESENTATION •Project Background •Summary of Proposed Improvements •Bid Summary •Next Steps •Recommended Action ITEM 6: Villas Lift Station Replacement Project {city of Carlsbad RECOMMENDED ACTION Adopt a resolution: •Accepting bids and awarding a construction contract to Tharsos Inc. for the Villas Lift Station Replacement, Capital Improvement Program Project No. 5550 in an amount not to exceed $638,450 •Approving additional appropriation in an amount of $64,000 from the Sewer Capital Replacement fund ITEM 6: Villas Lift Station Replacement Project { City of Carlsbad •Constructed in 1987 •Located at the Villas at Calavera Hills within a utility easement •Owned and operated by the city •Pumps wastewater to the city’s collection system •Project will improve system reliability and worker safety ITEM 6: Villas Lift Station Replacement Project BACKGROUND -SUMMARY { City of Carlsbad ITEM 7: Villas Lift Station Replacement Project V LLAS LIFT STATION SITE •Relocate valves and piping to an underground vault •Replace electrical and communication controls •Construct a protective canopy over the electrical controls •Replace fence and gate ITEM 6: Villas Lift Station Replacement Project PROPOSED IMPROVEMENTS { City of Carlsbad BID SUMMARY Contractor Bid Price Bunker Construction, Inc.*$566,986 * Tharsos, Inc.$638,450 HPS Mechanical, Inc.$780,184 Jon Kay dba Kay Construction Co.$804,905 Downstream Services, Inc.$838,658 LB Civil Construction $885,140 AToM Engineering Construction Inc.$888,398 Ferreira Coastal Construction Company $1,027,730 Blue Pacific Engineering & Construction $1,169,810 * Bid withdrawn, non-responsive •License status •DIR registration •Signatures and notarization •Bid security or bond •Experience record and references •Insurance •Debarment or discipline record •Non-collusion declaration •Discrepancies or errors ITEM 6: Villas Lift Station Replacement Project BID EVALUATION { City of Carlsbad Tharsos, Inc. •Lowest responsible, responsive bidder •Positive experience record •Bid amount: $638,450 ITEM 6: Villas Lift Station Replacement Project BID EVALUATION { City of Carlsbad •Execute contract documents •Contract for construction management and inspection services •Schedule pre-construction meeting •Issue a notice to proceed for construction ITEM 6: Villas Lift Station Replacement Project NEXT STEPS { City of Carlsbad RECOMMENDED ACTION Adopt a resolution: •Accepting bids and awarding a construction contract to Tharsos, Inc. for the Villas Lift Station Replacement, Capital Improvement Program Project No. 5550 in an amount not to exceed $638,450. •Approving additional appropriation in an amount of $64,000 from the Sewer Capital Replacement fund ITEM 6: Villas Lift Station Replacement Project { City of Carlsbad ITEM 6: Villas Lift Station Replacement Project THANK YOU { City of Carlsbad