HomeMy WebLinkAbout2359 CARLSBAD BLVD; PUMP STA; CB900464; PermitBUILDING PERMIT12/06/91 14:57
Page 1 of 1
Job Address: 2359 CARLSBAD BL $tr:
Permit Type: COMMERCIAL TENANT IMPROVEMENT
Parcel No: 155-200-03-00
Valuation: • o
Construction Type: VN
Occupancy Group: B4 Class Code:
Description: SEWAGE PUMP STATION AND
: FORCE MAIN. CITY PROJ 3299
Permit No: CB900464
Project No: A9000564
Development No:
Fl: Ste:
Appl/Ownr : KEN QUON/CITY OF CARLSBAD
2075 LAS PALMAS DR
CARLSBAD,CA 92009
438-1161
Status: ISSUED
Applied: 03/21/90
Apr/Issue: 12/06/91
Validated By: CD
OWNER
CONTRACTOR
* A*
KEN QUON CIT
2075 LAS P
CARLSBAD
PACIFIC
PO BX 40
CONCORD
Fees Requires
.OWNER
Fees :
Adjustments:
Total Fees:
Fee description
Enter "Y" for Plumbi
Enter "Y" for Electri
Enter 'Y' for Mechanic
20
438-1161
720 3331 (619)
Credits AAA
,00
. 00
, 00
Ext fee Data
- — ,___^_ „ ___„—
N
N
N
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
cRMlT APPLICATION
City of Carlsbad Building Department
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-iiei
1. PERMIT TYPE
A - [^COMMERCIAL [JNEW QTENANT IMPROVEMENT
B -^INDUSTRIAL K)(lEW QTENANT IMPROVEMENT
c - PRESIDENTIAL QAPARTMENT QCONDO QSINGLE FAMILY DUELLING
ODUPLEX QDEMOLITION n^ELocATioN QMOSILE HOME QELECTRICAL
QMECHANICAL DPOOL DSPA DETAINING WALL flsoLAR nOTHER
EST. VAL A/9 1~<eg^
FLAW CK DEPOSIT
VALID. BY
DATE
Q PLUMBING
2. PROJECT INFORMATION PLAN CHECK No.FOR OFFICE USE ONLY
2359 Carlsbad Boulevard
Mountain VlBW DH VPNearest Cross Streets
LEGAL DESCRIPTION Lot No. Subdivision Name/Number Unit No. Phase No.
CHECK BELOW IF SUBMITTED:
C~l2 Energy Calcs |Jf]2 Structural Calcs
ASSESSOR'S PARCEL 155_200-03
QQ 2 Soils Report Cl 1 Addressed Envelope
EXISTING USE PROPOSED USE
DESCTIPTIoH OF UOBK
Construction of Home Plant Sewage Pump Station and Force Main - City Project No. 3299
BLDG. SO. FTG.
3.CONTACT PERSON
WE Kenneth W. Quon
"r Carlsbad STATE ZIPCCOE OAT TELEPHONE (gjg) 438-U61
SIGNATURE
4. APPLICANT DETRACTOR
NAME City of Carlsbad
CITy
5. PROPERTY OWNER
NAME City of Carlsbad
CITY
D AGENT
STATE
OWNER
STATE
FOR CONTRACTOR DOWNER
ADDRESS
ZIP CODE
ADDRESS
ZIP CODE
Q AGENT FOR DUNEB
DAY TELEPHONE
QLESSEE QTENANT
DAY TELEPHONE
6. CONTRACTORNAME Pacific Mechanical Corp
cur Concord
ADDRESS p 0
STATE CAzipcODE 94524 DAY TELEPHONE (619) 720~9331
STATE LIC. # 1^ftQ?n LICENSE CLASS A CITY BUSINESS L1C. # 119o319 tX P . 8/92Dave Backman
SIGNATURE
7.
DESIGNER NAME
CITY
WORKERS
Will iam Koptionak
San Dieao
' COMPENSATION
TITLE Project Mngr DATE
. ADDRESS gggg Hlbert Streetj Su1te 1Q2
STATE CA 2lt> CODE Q?l^l DAY TELEPHONE ffi!9^ Sfifi-^Q?? STATE LIC. # C 14513
Workers' Compensation Declaration: 1 hereby affirm that I have a certificate of consent to self-insure issued by the Director of Industrial Relations,
or a certificate of Workers' Compensation Insurance by an admitted insurer, or an enact copy or duplicate thereof certified by the Director of the
insurer thereof filed with the Building Inspection Department (Section 3800, Lab. C).
INSURANCE COMPANY POLICY NO.EXPIRATION DATE
Certi f icate of Exempt i on: 1 cert i fy that in the performance of the work for which this permi t is i ssued, I shal I not employ any person in any manner
so as to become subject to the Workers' Compensation Laws of California.
SIGNATURE
8. OWNER-BUILDER DECLARATION
Owner-BuiIder Declaration: I hereby affirm that I am exempt from the Contractor's License Law for the following reason:
I as owner of the property or rny employees with wages as their sole compensation, will do the work and the structure is not interred or offered for sale
{Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon,, and who
does such uork himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building
or improvement is sold uithin one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose
of sale.).
I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code:
The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s)
licensed pursuant to the Contractor's License Law).
Business and Professions Code for this reason;
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure,
prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the
Contractor's License Law (Chapter 9, conmencing with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom,
and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant tor a permit subjects the applicant to a civil penalty of not
more than five hundred dollars [1500]).
SIGNATURE DATE
COMPLETE THIS SECTION FOR NON-RESIDENT !AL BUILDING PERMITS ONLY:
IE the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 35505, 255J3 or 25534 of the Presley- Tanner Hazardous Substance Account Act?
DVES X]"°
Is the applicant or future building occupant required to obtain a permit from trie air pollution control district or air quality management district?
DYES £]NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site?
IF ANY OF THE ANSUEftS ARE YES, A F[HAL CERTIFICATE OF OCCUPANCY HAY NOT BE ISSUED AFTER JULY 1, 1989 UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS
1F THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION COMTROL DISTRICT-
9. CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec 3097(i) Civil Code).
LENDER'S NAME LENDER'S ADDRESS
10. APPLICANT'S SIGNATURE
I certify that I have read the application and state that the above information is correct. I agree to comply with all City ordinances and State laws relating
to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO
AGREE TO SAVE INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH KAY IN ANY WAY ACCRUE AGAINST SAID
CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
Expiration. Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building
or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended
Or abandoned at any lime after the gork is commenced for a period of 180 days (Section 303(d) Uniform Building Code).
[J] OWNER GCONTRACTOR PHONE APPROVED BY;
DATE:
WHITE: File YELLOW: Applicant PINK: Finance
& * 9"*?DATE & * "- INSPECTOR
PERMIT # PLANCK #,
JOB ADDRESS £>S>*£T? C*€*&m
TIME ARRIVE: TIME LEAVE:
CD LVL DESCRIPTION ACT COMMENTS
PERMITS
6/15/89
UNSCHEDVLED INSPECTION
DATE ^ -O rg ^ INSPECTOR
PERMIT #PLANCK #
JOB ADDRESS
TIME ARRIVE: TIME LEAVE:
CD LVL DESCRIPTION ACT COMMENTS
PERMITS
6/15/89
CITY OF CARLSBAD
INSPECTION REQUEST
PERMIT* CB900464 FOR 06/02/92
DESCRIPTION: SEWAGE PUMP STATION AND
FORCE MAIN. CITY PROJ 3299
TYPE: CTI
JOB ADDRESS: 2359 CARLSBAD BL
KEN QUON/CITY OF CARLSBAD PHONE:
PACIFIC MECHANICAL CORP PHONE:
KEN QUON CITY OF CARLSBAD, PHONE:
APPLICANT:
CONTRACTOR:
OWNER:
STR:
438-1161
720 9331
438-1161
INSPECTOR AREA PK
PLANCKf CB900464
OCC GRP
CONSTR. TYPE NEW
FL: STE:
REMARKS: MH/CHRIS/720-9331 INSPECTOR
SPECIAL INSTRUCT: SDGE 6/5 - COURTESY BY CITY 6/2?
TOTAL TIME:
CD LVL DESCRIPTION
33 EL Service Change/Upgrade
ACT COMMENTS
***** INSPECTION HISTORY *****
DATE DESCRIPTION
051492 Ftg/Foundation/Piers
050192 Grout
043092 Grout
042492 Rough Electric
042492 Ftg/Foundation/Piers
042392 Rough Electric
042292 Ftg/Foundation/Piers
042292 Steel/Bond Beam
042292 Underground/Conduit-Wiring
042092 Underground/Conduit-Wiring
040992 Footing
020592 Ftg/Foundation/Piers
012392 Ftg/Foundation/Piers
011592 Ftg/Foundation/Piers
011492 Ftg/Foundation/Piers
011492 Rough Electric
010792 Steel/Bond Beam
010792 Steel/Bond Beam
122091 Ftg/Foundation/Piers
121991 Compliance Investigation
121791 Steel/Bond Beam
121691 Ftg/Foundation/Piers
121691 Rough Electric
ACT
AP
AP
NR
AP
AP
NS
PA
PA
CO
CA
AP
AP
AP
AP
PA
PA
PA
PA
DN
NR
NR
PA
PA
INSP
PK
MP
MP
MP
MP
PK
PK
PK
PK
PK
PK
TP
PK
PK
PK
PK
MFC
MPC
MP
PK
PK
PK
PK
COMMENTS
ROOF DECK REBAR
GEN ROOM OK TO GROUT
GEN RM FOUND OK TO POUR
RESCHEDULE 4-23-92
SEE NOTICE 4-22-92
PER CHRIS ON 4/17/92
ISOLATION FOOTING
ROOF (DECK) STEEL
DECK OVER WET WELL
WALLS @ COMMINUTOR ROOM
MTR ROOM DECK
CONDUIT IN DECK
VRTX WALLS,MTR RM DCK
WET WELL WEDGE BTTM
SEE INSP NOTES
SEE INSP NOTES
WALLS ON WEST SIDE/PUMP STA
CORRECTION NOTICE
ADDRESS:
D APPROVED PLANS SHALL BE ON JOB SITE
BUILDING
D FOUNDATION
D REINFORCING STEEL
D MASONRY
D GROUT-GUNITE
D FLOOR AND CEILING FRAME
D SHEATHING
D FRAME
n EXTERIOR LATH
D INSULATION
D INTERIOR LATH OR DRYWALL
PLUMBING
D UNDERGROUND PLUMBING
D UNDERGROUND WATER
D ROUGH PLUMBING
D TOP OUT PLUMBING
D SEWER AND PL/CO.
D TUB OR SHOWER PAN
D GAS TEST
D WATER HEATER
ELECTRICAL
D TEMPORARY SERVICE
D ELECTRIC UNDERGROUND
D ROUGH ELECTRIC
D POOL BONDING
D ELECTRIC SERVICE
D UFER GROUND
a G.F.I.
n SMOKE DETECTOR
•hdn^z* (Q#/JM
-—j
MISCELLANEOUS
D PLENUM AND DUCTS
D COMBUSTION AIR
D CONDITIONED AIR SYSTEMS
D SOLAR
D GRADING
D POOL
n PATIO
D SIGN
D OTHER
WRITE IT - DON'T SAY IT!
To //&'/' /\ .
Date 19
From
Q Reply Wanted
GNo Reply Necessary
PRINTED IN US*
INSPECTION
DATE so.^^ — INSPECTOR
PERMIT #PLANCK #
JOB ADDRESS &*>*
TIME ARRIVE:TIME LEAVE:
CD LVL DESCRIPTION ACT COMMENTS
**Je^e-V^7 -fy^/- -fu^ &L.M?\<; &h- c^e^e ^c ^^-^
•^^-/
^->^<_
/^T—;
PERMITS
6/15/89
PROJECT MEMO
CITY OF CARLSBAD - ENGINEERING DEPARTMENT
TO:
FROM
SALVATOREJ.GUIDA
CITY OF CARLSBAD
ENGINEERING DEPT
(519) 438-1161 FXl^O
is 9/
PROJECT/PERMIT NO
SUBJECT:
.- r ., Engineer/Apting Agent1 O^&Awi&^ptGte^ $
WHITE/ Job Site; YELLOW - File; PINK - Inspector
STOP WORK
City of Carlsbad - State of California
Office of City Engineer
NOTICE
This site has been inspected and is
deficient in the following area(s):
D Erosion Control
D Drainage Structures
Cl Sewer Lines
D Water Lines
D Trenching and Backfilling
O Asphalt Concrete
D Concrete Work
D No Permit
D Traffic Control
D Improper J-irading
jifother $£'/£l)//l^
/3nt ^fc-££V ^L/ --' Please correct as nPlease^corT^ct as^tib^d
before any further work
below
is done.
ALL BUNDING AND ENGINEERING
DEPARTMENT INSPECTIONS WILL STOP
UNTIL THIS NOTICE IS SIGNED OFF.
DO NOT REMOVE THIS
DETACH and Bring this Portion of Card
lo City Hail. No work can resume until this card
has been signed-off by the City Engineer.
Location
OF CITY ENGINEER - CITY OF CARLSBAD
OITkc nl Citj f.ns-iiwi-i -- Cii>' u(' C
RED. iuf> Silu PINK: fi*i(Wing WHITK:
DATE
VygCHEDVPEP INSPECTION
- /?-?/ INSPECTOR
PERMIT #
JOB ADDRESS { j*e&s
PLANCK #
TIME ARRIVE:TIME LEAVE:
CD LVL DESCRIPTION
PERMITS
6/15/89
ACT COMMENTS
PROJECT MEMO
CITY OF CARLSBAD - ENGINEERING DEPARTMENT
TO:fcLLY
FROM:
DATE: /*?'/#><?/ 19
TlME: X- '
PROJECT/PERMIT NO
rr
'T-/ Oflf
n\ &P -tk* io&sK. .
4v Load ~fi?r ir*?
ty Engineer/Acting Agerff/
WHITE - Job Site; YELLOW - File; PINK - Inspector
CITY OF CARLSBAD
INSPECTION REQUEST
PERMIT! CB900464 FOR 12/17/91
DESCRIPTION: SEWAGE PUMP STATION AND
FORCE MAIN. CITY PROJ 3299
TYPE: CTI
JOB ADDRESS: 2359 CARLSBAD BL
KEN QUON/CITY OF CARLSBAD PHONE:
PACIFIC MECHANICAL CORP PHONE:
KEN QUON CITY OF CARLSBAD, PHONE:
APPLICANT:
CONTRACTOR:
OWNER:
REMARKS: MH/CHRIS/720-9331
SPECIAL INSTRUCT:
STR:
438-1161
720 9331,
438-116!
INSPECTOR
INSPECTOR AREA PK
PLANCK# CB900464
OCC GRP
CONSTR. TYPE NEW
FL: STE:
(619)
TOTAL TIME:
CD LVL DESCRIPTION
12 ST Steel/Bond Beam
ACT COMMENTS
sZ4&st*J>
DATE DESCRIPTION
***** INSPECTION HISTORY *****
ACT INSP COMMENTS
«%7/' *#**/77: fc
SOUTHERN CALIFORNIA SOIL & TESTING, INC
6280 RIVERDALE STREET, P.O. BOX 600627, SAN DIEGO, CA. 92160 (619) 280-4321
747 ENTERPRISE STREET, ESCONDIDO, CA. 92025, (619) 746-4544
COMPRESSIVE STRENGTH TEST REPORT
FILE NUMBER 9121088
PROJECT TITLE Home Plant Pump Station
PROJECT LOCATION 2359 Carlsbad Boulevard, Carlsbad
ARCHITECT
ENGINEER
DATE: May 20, 1992 CONCRETE 1ASTM C39)
MORTAR (UBC 24-22)
GROUT(ASTMC1019)
PRISMS (ASTM E447)
CONTRACTOR Pacific Mechanical Corp.
PERMIT No.
PLAN FILE No.
n
LOCATION IN STRUCTURE Generator Building - roof slab
MATERIAL SUPPLIER Nelson & Sloan
ADMIXTURE(S)
MIX DESIGNATION 89-141
TIME IN MIXER, MINUTES 42
SLUMP, INCHES 3-1/2
SAMPLES FABRICATED BY SA
SAMPLES TESTED BY DRB TRUCK No. 363 TICKET No. 384277
LABORATORY No.
MARK A
DATE MADE
DATE RECEIVED
DATE TESTED
DIAMETER, INCHES
AREA. SQUARE INCHES
MAXIMUM LOAD, LBS
COMPRESSIVE STRENGTH, PSI
AGE TESTED, DAYS
REQUIRED 28 DAY STRENGTH, PSI
UNIT WT./CU. FT. (PLASTIC)
2721
05-15-92
05-18-92
05-20-92
6.00
28.27
95,500
3,380
5
4,000
2722
05-22-92
109,000
3,860
7
2723
05-29-92
127,500
4,510
14
~-
2724
06-12-92
147,750
5,230
28
2725
Discarded
DISTRIBUTION city of Carlsbad
(1) SCS&T, Escondido
SOUTHERN CALIFORNIA
SOIL & TESTING, INC.
REVIEWED BY:
Michael B. Wheeler, R.C.E. #45358
SOUTHERN CALIFORNIA SOIL & TESTING, INC
6280 RTVERDALE STREET, P.O. BOX 600627, SAN DIEGO, CA. 92160 (619) 280-4321
747 ENTERPRISE STREET, ESCONDIDO, CA. 92025, (619) 746-4544
DATE: flay 6, 1992
COMPRESSIVE STRENGTH TEST REPORT
FILE NUMBER 9121088
PROJECT-TITLE Home Plant Pump Station
PROJECT LOCATION Carlsbad Boulevard (Highway 101), Carlsbad
ARCHITECT
ENGINEER PERM'T N°'
CONTRACTOR PMC Mechanical Corp. PLAN FILE NO.
LH CONCRETE (ASTM C39)
O MORTAR (UBC 24-221
Q GROUT (ASTM Cl 019)
D PRISMS {ASTM E447)
n
LOCATION IN STRUCTURE
MATERIAL SUPPLIER
ADMIXTURE(S)
MIX DESIGNATION
TIME IN MIXER, MINUTES
SLUMP, INCHES
SAMPLES FABRICATED BY
SAMPLES TESTED BY
Generator enclosure, 1st lift
Pre-Mixed Mortar
Lime
Field Mixed
D. Hicks
DRB TRUCK No.TICKET No.
LABORATORY No.
MARK
2022 1023 2024
DATE MADE
DATE RECEIVED
DATE TESTED
DIAMETER, INCHES
AREA, SQUARE INCHES
MAXIMUM LOAD, LBS
COMPRESSIVE STRENGTH, PSI
AGE TESTED, DAYS
REQUIRED 28 DAY STRENGTH, PSI
UNIT WT./CU. FT. (PLASTIC)
04-29-92
04-30-92
05-OG-92
2.00
3.14
7,250
2,310
7
1,800
05-27-92
10,700
3,410
28
05-27-92
12,500
3,980
28
DISTRIBUTION (i) city of Carlsbad
(1) SCS&T, Escondido
SOUTHERN CALIFORNIA
SOIL & TESTING, INC.
REVIEWED BY:
Michael B. Wheeler, R.C.E. #45358
SOUTHERN CALIFORNIA SOIL & TESTING, INC
6280 RTVERDALE STREET, P.O. BOX 600627, SAN DIEGO, CA. 92160 (619) 280-4321
747 ENTERPRISE STREET, ESCONDIDO, CA. 92025, (619) 746-4544
DATE: Hay 6, 1992
COMPRESSIVE STRENGTH TEST REPORT
FILE NUMBER 9121088
PROJECT TITLE Home Plant Pump Station
PROJECT LOCATION Carlsbad Boulevard (Highway 101), Carlsbad
ARCHITECT
ENGtNEER PERM1T N°'
CONTRACTOR PMC Mechanical Corp. PLAN FILE NO.
C3 CONCRETE (ASTM C39)
03 MORTAR {U8C 24-22)
Q GROUT (ASTM C1019)
Q PRISMS (ASTM E447)
D
LOCATION IN STRUCTURE
MATERIAL SUPPLIER
ADMIXTURE(S)
MIX DESIGNATION
TIME IN MIXER, MINUTES
SLUMP, INCHES
SAMPLES FABRICATED BY
SAMPLES TESTED BY
Generator enclosure, 1st lift
Pre-Mixed Mortar
Lime
Field Mixed
D. Hicks
DRB TRUCK No.TICKET No.
LABORATORY No.
MARK
2022 2024
DATE MADE
DATE RECEIVED
DATE TESTED
DIAMETER, INCHES
AREA, SQUARE INCHES
MAXIMUM LOAD, LBS
COMPRESSIVE STRENGTH, PSI
AGE TESTED, DAYS
REQUIRED 28 DAY STRENGTH, PSI
UNIT WT./CU. FT. (PLASTIC)
04-29-92
04-30-92
05-OG-92
2.00
3.14
7,250
2,310
7
1,800
05-27-92
10,700
3,410
28
05-27-92
12,500
3,980
28
DISTRIBUTION (i) City of Carlsbad
(1) SCS&T, Escondido
SOUTHERN CALIFORNIA
SOIL & TESTING, INC.
REVIEWED BY:
Michael B. Wheeler, R.C.E. #45358
SOUTHERN CALIFORNIA SOIL & TESTING, INC
6280 RIVERDALE STREET, P.O. BOX 600627, SAN DIEGO, CA. 92160 (619) 280-4321
747 ENTERPRISE STREET, ESCONDIDO, CA. 92025, (619) 746-4544
DATE: May 6, 1992
COMPRESSIVE STRENGTH TEST REPORT
FILE NUMBER 9121088
PROJECT TITLE Home Plant Pump Station
PROJECT LOCATION Carlsbad Boulevard (Highway 101), Carlsbad
ARCHITECT
PERMIT No.ENGINEER
CONTRACTOR PMC Mechani cal Corp. PLAN FILE NO.
[Tl CONCRETE (ASTM C39)
C8 MORTAR (UBC 24-22)
D GROUT (ASTM C101 9)
CI PRISMS (ASTM E447)
a
LOCATION IN STRUCTURE
MATERIAL SUPPLIER
ADMIXTURE(S)
MIX DESIGNATION
TIME IN MIXER, MINUTES
SLUMP, INCHES
SAMPLES FABRICATED BY
SAMPLES TESTED BY
Generator enclosure, 1st lift
Pre-Mixed Mortar
Lime
Field Mixed
D. Hicks
DRB TRUCK No.TICKET No..
LABORATORY No.
MARK
2022 2023 2024
DATE MADE
DATE RECEIVED
DATE TESTED
DIAMETER, INCHES
AREA, SQUARE INCHES
MAXIMUM LOAD, LBS
COMPRESSIVE STRENGTH, PSI
AGE TESTED, DAYS
REQUIRED 28 DAY STRENGTH, PSI
UNIT WT./CU. FT. (PLASTIC)
04-29-92
04-30-92
05-OG-92
2.00
3.14
7,250
2,310
7
1,800
05-27-92
10,700
3,410
28
05-27-92
12,500
3,980
28
DISTRIBUTION (l) City of Carlsbad
(1) SCS&T, Escondido
SOUTHERN CALIFORNIA
SOIL & TESTING, INC.
REVIEWED BY:
Michael B. Wheeler, R.C.E. #45358
July 31, 1991
PLANCHECK 90-464 HOME PLANT SEWAGE PUMP STA
KEN QUON:
Confirming our conversation today, the following is required before
the subject building permit can be issued:
(accept 82 Code, etc)
Building Department
iorrections 1 thru 4 dated May 24, 1991.
Plumbing & Elec correctioi
Planning Department
Coastal Permit
Engineering Department
Plans to be signed
The project has been in plancheck since March 21, 1990. Technically
the plancheck expired March 21, 1991- The City can extend its own
plancheck and hjis done so informally.
CARTER^ARNELL
(-^
When the above corrections
the appropriate slip
, two corrected sets of plans or
be submitted for final approval.
-.
ESGIL CORPORATION
9320 CHESAPEAKE DR., SUITE 2O8
SAN DIEGO, CA 92123
(619) 56O-1468
DATE APPLICANT
JURISDICTION:
PLAN CHECK NO:
Corkbcxrl
PROJECT ADDRESS: <2j2>5>9
PROJECT NAME:
W\dL
QPLAN CHECKER
QFILE COPY
QUPS
Pim p
The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
The plans transmitted herewith will substantially comply
with the jurisdiction's building codes when minor deficien-
cies identified iV\ "HAg r£fn&V"l<S b<f.\QU) are resolved and
D
checked by building department staff.
The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
The applicant's copy of the check list has been sent to:
Esgil staff did not advise the applicant contact person that
plan check has been completed.
1 Esgil staff
been co
'ise applicant that the plan check has
'Person contacted:
Date cont
REMARKS
ESGIL CORPORATION v
DGA DAA DRN QDM ICO
ESGIL CORPORATION
932O CHESAPEAKE DR., SUITE 2O8
SAN DIEGO, CA 92123
(619) 56O-1468
DATE:
JURISDICTION:
PLAN CHECK NO:
PROJECT ADDRESS:_
PROJECT NAME: fj&tfg fiA
SET: 21
LfifJT ftsrtsrf ~n*
APPLICANT
jPLAN CHECKE
QFILE COPY
QUPS
PjDESIGNER
The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
The plans transmitted herewith will substantially comply
with the jurisdiction's building codes when minor deficien-
cies identified . are resolved and
checked by building department staff.
The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
; The check list transmitted herewith is for your information.
j The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
The applicant's copy of the check list has been sent to:
JUi Esgil staff did not advise the applicant contact person that
^ plan check has been completed.
I1 Esgil staff did advise applicant that the plan check has
been completed. Person contacted:
Date contacted:
REMARKS:
Telephone I
By:EnclosuresESGIL CORPORATION!
GA DAA DRN @
JURISDICTION: /PffL $%&£> Date plans received by plan checker:
PLAN CHECK NO.: Qfi- 4fr4 H Date plan check completed: 7-30 -*?/ By; CT>
il fl * C O » C-PROJECT ADDRESS: fttHfe lUlkH'je\iJ/l&&' rQf$r ±>fr97fcW
TO: ^p'P f'^^-^-
PLAN CORRECTION SHEET
FOREWORD: PLEASE READ
Plan check is limited to technical requirements contained in the Uniform Building Code, Uniform
Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy
conservation, noise attenuation and disabled access. The plan check is based on regulations enforced
by the Building Inspection Department. You may have other corrections based on laws and ordinances
enforced by the Planning Department, Engineering Department or other departments.
The items shown below need clarification, modification or change. All items have to be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 303(c), of
the Uniform Building Code, the approval of the plans does not permit the violation of any state,
county or city law.
A. PLANS
1. Please make all corrections on the original 3. Please indicate here if any changes have
tracings and submit two new sets of prints, been made to the plans that are not a result
and any original plan sets that may have been of corrections from this list. If there are
returned to you by the jurisdiction, to: other changes, please briefly describe them
and where they are located on the plans.
/"i • iL irv Have changes been made to the p lans not
I resulting from this correction list? Please
check.
. To facilitate checking, please identify, next _ Yes _ No
to each item, the sheet of the plans upon
which each correction on this sheet has been
made and return this check sheet with the
revised plans.
4-. loetofift ffa,P fat Wrn^e fttjp SKWM&
ItJ UPC.
4bi TA) 2,
A-
ft*(//5f* -ffl S/£>t<y Coffefc
t,.
n
All, tfVTC£&*> , fi#tJ5 Vo MAT
<£ Stt&r //
Form No.. PCS.A1390
ELECTRICALPLAN CORRECT IQNSHEET
JURISDICTION:
PLAN CHECK NUMBER : __
PLAN CHECKER: DARRELL MORRISON
/
. Submit complete electrical plans
reflecting the full extent of work to be
performed, including but not limited to
the following as applicable.
*C Submit complete service and feeder one-
' line diagram. KEC 215-5.
Show the Available Fault Current (Isc)
from the Utility Co. and at equipment
where the Isc exceeds 10,000 amps.
Show the ampere interrupting capacity
(AIC) ratings of service and subservice
equipment. KEC 110-9, 230-65.
Show the method used to limit fault
currents to 10,000 amps on branch
circuits. Show fuse letters if used
(i.e., JJN, A3T, LPN).
fi". Show fuse/breaker size(s). KEC 240-6.
Show each building disconnecting means.
KEC 230-84.
8. } Show conduit and wire sizes.
PWL.'S'A* f' " £F "
Specify wire type (AL or CU) and
insulation (i.e. THWN). KEC ART 310.
'. Show the approximate length of feeders.
11. IShow the grounding system required for
V_Xeach building, structure, or service. KEC
250-24, 80(a), 81(c).
x~N^ PML- " Pep"
( LZ.jShow the "nearest electrode" used for each
\—/ transformer secondary ground system(i.e.,
bldg. steel, cold water pipe). KEC 250-
13.1 Show the grounding electrode conductor
V Xsize and wire type (AL/CU). KEC 250-94.
PML^'BCP" r*i/»J 4tS^^ &G- Xr
TM. Submit load calculations. Include long
' continuous loads (LCL) and largest motor
loads. KEC ART 220.
IS. Show/Identify new loads proposed for the
existing equipment.
lo. Indicate cain service size and total load.
17. Specify wiring methods (i.e., EKT, Metal
^ Conduit).
PAGE:
SET:
DATE:~7 I 30 /<?/
/
/•
. Show location of Service(s).
KEC 110-16, 23O-2.
Specify dimensions of equipment rated
1200 amps or more. KEC 110-16(c).
Provide the required access and entrance
to working space for equipment rated 1200
amps or more and over 6 feet wide. KEC
Show location of all panels, load
centers, switchboards, and transformers.
KEC 110-16, 240-24, 300-21.
22.)Provide the required working space about
electrical equipment. KEC 110-16.
HI^J id_2." it*-t /-£&*-!< c'& ''P'C.p
"L2f. Submit complete panel schedule(s).
2^. Provide overcurrent protection on the
secondary side of transformers. KEC 240-
21 Er., 384-16(d).
. Provide required transformer ventilation.
KEC 450-9.
Provide receptacle(s) within 25 feet of
HVAC equipment. tMC 509.
zJ. Provide the required 20 anp 1200 VA sign
circuit(s) and receptacle(s). KEC 600-
6(b)(c).
Provide "uniform" pattern lighting within
sight of multiple switch lighting
controls. CAC Title 24, 5319.
Where the exit system serves a total
occupant load of:
a) 50 or more. Show exit s igns on
lighting plan(s) at all required exits
and specify either self luminous or
second power source (battery or
generator). KEC 700-16/DBC 3314.
b)100 or more. Provide min. 1 ft. candle
at floor level of emergency (exit)
illumination and specify second power
source (battery or generator). KEC 700-
16/DBC 3313.
30. )To speed up the recheckjp.ro.cess, note on
this list for a copy) where each
correction item has been addressed, i.e.^
plan sheet,, specification, etc. Be sure
to enclose the marked^ up list when you
submit the revised plans.
-°" -==-'=
Any questions on electrical corrections please contact the plan checker shown above at Esgil Corporation
at (619) 560-1468, Thank you.
07/13/91
ELECTRICAL PLAN CORRECTION SHEET
JURISDICTION:
PLAN CHECK NUMBER :
PAGE:
SET:
I 2^
PLAN CHECKER : DARRELL MORRISON DATE: 7
A-U-
->LjRP^r*»AJG-MU<7~JAJ
T7V/JS
AF
32.
A
ESGIL CORPORATION
932O CHESAPEAKE DR., SUITE 2O8
SAN DIEGO, CA 92123
(619) 56O-I468
DATE: £
JURISDICTION:
PLAN CHECK NO:
PROJECT ADDRESS:
PROJECT NAME: \±
C%-
Cto SET: Tf
g=>
APPLICANT
[jPLAN CHECKERQFILE COPY
QUPS
r~ DESIGNER
The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
The plans transmitted herewith will substantially comply
with the jurisdiction's building codes when minor deficien-
cies identified fcxAa»O ' are resolved and
checked by building department staff.
The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
The applicant's copy of the check list has been sent to:
Esgil staff did not advise the applicant contact person that
plan check has been completed.
Ij Esgil staff did advise applicant that the plan check has
—' been completed. Person contacted:
Date contacted:
REMARKS:
Telephone #
<Uwv<~T5
reBy: m\ _ _
ESGIL CORPORATION
DGA DAA DRN H
Enclosures
m
m
£H-
^
->
c.~t TTxA-r. V\~"nr,,~c -nr.^ /Vo^tr^^ £.^P\~ to/ ^-s^u^., UTC,UMC-<v_ J <<O -* ^j *^J / = • 1
1^*1 kiec^ . MX -bo ?V*i^ ^^T, O^?\AV,S , 0.<.*Ut(^^ -
Qpf ti ^Ji^"Cl^ P*. v^Ax_^ A \r\T7K ^^-a^rnTL <^,i\<» £*\ - ~r^/rC U^ UAi r^v'i^Oi
'TWf ^ou-.A. -^Vn^'S i TkeM. Co>v.PU ,^/ U it, r^Ca»^*w j-vs dA^c*^^ I f« f'.fJ' B\\wL v(
^'Ppit^^TTT^JCr OA^^^^ ^ t)KTT(5) "\-TC Co^ Pr-^s^< ^T7in-CTC*XCs«cr.
0^,,x ^!A\O o^^r^A^ . r/UlC* 4 r^sw-A-'^AVai. C?^v 7, e«o^^*Jlc'5 >> -
( i.e , m,n, 3.Sfes/ ^"- v}aJL>> % t^<*A M&^<,^ *
_ *
Appl*^K^T7 "To KiJIir^^ /'Uwi TCAir T/^ns . ^4/^//"77T*i ^ 5^P<c is . a« **&?>»
Ji)/^(j7o7 tsn r4fi«.J AUors tOflibe ^£j bwiTfTLi T7TJ^- Ri^U - tw^TT , A*^. — , _ v — -— • — • ^^ « •>
,^?^prov*J2 7>r^ov~To '*STAU«.U £s^ .
5/31/91 Marty: This is a recent correction sheet for the
"Home Plant Sewage Pump Station". See Item 1 above.
Ken Quon tells me that you approve the 1982 UBC & 1981 NEC
for design. At present we are 1988 and 1987 respectively.
Carter
TTKK 1 In approuf-H- DATE
CORRECT PLANS TO EXISTING CODES DATE
6/13 Marty says 82 and 81 codes never mentioned. Ken says structure
designed in 1987. He will confer with architect. CD
ColL Q\\ tM^r-d 'Xtjv ^6>C£>T^«> (*} {jVi t^CeO - 14-fcff -
i.
«TV
IT
r«T1 1 "~
#
-4
*
.pV**n/ l<Hg^.\J LT-^^o_
^ A.
TT
/'.6 , rxi.n. 3-5 fc*/
Jurisdiction
Prepared 31dg. Dept.
VALUATTON AND PLAN CHECK rZS
NO.
^U TIDING ADDRESS «i 55^. £fc>, r^l/d •
AP-LICANT/COKTACT Tb,J/ K. PHONE NO. 5^,S*r^
•=\JTLDING OCCUPANCY ^~*f
Tt?3 0? CONSTRUCTION
BUILDING PORTION :
^w^cCC cvJU
DESICKiR PHONE —
3T-AJ CONTRACTOR PHONE —
•• ' . / .
"JILDING ARH:^
~ ( ?V^P ^KVN^^^i
1
1
•
/AQUATION
1
I
' Air Condition's:
Commercial . .
Residential
Res. or Corrcn.
Fire S-orinXlers
VALUE
g£o to&& ^~
I
1
'
•
,
•
!
I'e
1 9
@ • •i • i
Total Value ®-o]*^
Building Permit Fee. J,
Plan Check Fee $
SHEET CH OF C 12/87
- 7
ESGIL CORPORATION
9320 CHESAPEAKE DR.. SUITE 208
SAN DIEGO, CA 92123
(619) 56O-14SS
DATE:-30 -
>Q CHECK WO:SET: CH
PROJECT ADDRESS:
PROJECT NAMS: \A
lOURISDlCTJj
CHECKER
,FIL3 COPY•nupsHDESIGK-ER
The plans transmitted herewith have been, corrected where
necessary and substantially comply with the jurisdiction's
building codes.
The pl'ans transmitted herewith will substantially comply
with the jurisdiction's building codes when minor deficien-
cies identified ^ . are resolved and
checked by building department staff.
The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
The check list transmitted herewith is for your information.
The'plans are being held at Ssgil Corp. until corrected
plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person;
The applicant's copy of the check list has been sent to:
- IT" mm~ =- - .._••_- L J" • J. .._—.-- -=- -. -—• J_- -—--.. - _ .. ' - _ ,'_ TfcB
CI ' AA 15 i • _
Esgil staff did not advise the applicant contact person that
plan check has been completed.
Ssgil staff did advise applicant that the plan check has
been completed. Person contacted:
Date contacted:
REMARKS:
Telephone
ESGIL CORPORATIONC3-A^
DGA DAA Dvw D
Enclosures
PBOJCCT
TO: TSi
PiAN CORRECTION SHEET
Planf Check
FOREWORD; PLEASE READ
Plan check is limited-to technical requirements
contained in the Uniform Building Code, Uniform
Plumbing Code, Uniform Mechanical Code, National
Electrical Code and state laws regulating energy
conservation, noise attenuation and access for
the handicapped. The plan check is based on
regulations enforced by the Building Inspection
Department. You may have other corrections
based on laws and ordinances enforced by the
Planning Department, Engineering Department or
other departments.
The items circled below need clarification,
modification or change. All circled items have
to be satisfied before the plans will be in
csnfcrmance with-the cited codes and regulations.
Per Sec. 303 (c), of the Uniform Building Code,
the approval of the plans does not permit the
violation of any state, county or city law.
A, PLANS
^Ni.J Please flake all corrections on the original
-~^ tracings and submit two new sets of prints,
and any original plan sets that may have
been returned to you by" the jurisdiction,
to: «• •*-- v ' "
To facilitate rcchccking, ple83c identify,
next to eoch circled Item, the aheet of
the pUna upon vhich each correction on
this sheet has been made and return this -
check sheet »Uh Iho revised plans.
The following items have not been
resolved from previous plan reviews.
The original correction number has been
given for your reference. Please contact
»e if you have any questions regarding
these items. "
Date plaiwjeeeived by plan checked
Cate .' ^ . plan check
5/_
-k
Li •+?f<MgTL on
.0 \eA.\\a\-
c*[,'<,.
Jurisdiction
Prepared byt Bldg. Dept.
VALUATION AND PLAN CHECK FEE
PLAN CHECK NO. fj±~ Cin^Lt^ CTJ>
ADDHESS
PHONSKO.
BUILDING OCCUPANCY __
TYPE 0? CONSTRUCTION
DESIGNER PHONE
CONTHACT03 PHONE
BUILDING PORTION BUILDING AHS'VALUATION
1-';ULTI?LIEH
VALUE
Air Conditioning
Commercial
Residential
Res. or Coirjii.
Fire 5-DrinXlers
Total Value
Building Permit fte. $.
Plan Check Fee S
C D H ME N TSj
SHEET (T) OF (1 12/87
BUILDING PLANCHECK
ENGINEERING CHECKLIST
.-, X
- ' xlUi DATE: 2°) MflR °)i
n
n
n
n
n
n
n
1s
T
C
H
E
K
h\n
IX
2
N
D
C
H
E
K
:—ft.
<
3
R
D
C
H
E
K
2-!5 !~j.C~j( •-..- "'. -f'lj tr ./i.
PROJECT ID: s^ij'^1! r::P^T%.T- t-- .-.*':• .-'^"V
LEGAL REQUIREMENTS
Site Plan
ITEM COMPLETE
ITEM INCOMPLETE
NEEDS YOUR ACTION
ITEM SELECTED
D
1. Provide a fully dimensioned site plan drawn to scale.
Show: north arrow, property lines, easements, existing and
proposed structures, streets, existing street improvements,
right-of-way width and dimension setbacks.
2. Show on site plan: Finish floor elevations, pad
elevations, elevations of finish grade adjacent to
building, existing topographical lines, existing and
proposed slopes, driveway with percent (%) grade and
drainage patterns.
3. Provide legal description and Assessors Parcel Number.
Discretionary Approval Compliance
4. No Discretionary approvals were required.
5. Project complies with all Engineering Conditions of
Approval for Project No. .
6. Project does not comply with the following Engineering
Conditions of Approval for Project No. PCf\ ^•"/ - 2 **• /
N/W
Conditions complied with by:.
Field Review
Date:
1—[ |—| |—| 7> Field review completed. No issues raised.
nnn 8.
nnn
nnn
Field review completed. The following issues or
discrepancies with the site plan were found:
A. Site lacks adequate public improvements
B. Existing drainage improvements not shown or in
conflict with site plan.
C. Site is served by overhead power lines.
P:\DOCS\HISFORMS\FRM0010.0H REV. 02/27/91
I—I I—I I—I D< Grading is required to access site, create pad or
provide for ultimate street improvement.
I—I I—I I—I E. site access visibility problems exist. Provide onsite
turnaround or engineered solution to problem.
nan F. Other:
Dedication Requirements
n 9. No dedication required.
'—' '—' '—' 10. Dedication required. Please have a registered Civil
Engineer or Land Surveyor prepare the appropriate legal
description together with an 8V1 x 11" plat map and submit
with a title report and the required processing fee. All
easement documents must be approved and signed by owner(s)
prior to issuance of Building Permit. The description of
the dedication is as follows:
Dedication completed, Date By:
Improvement Requirements
I—I I—I lla No public improvements required. SPECIAL NOTE: Damaged or
defective improvements found adjacent to building site must
be repaired to the satisfaction of the City inspector prior
to occupancy.
'—' '—' '—'l2. Public improvements required. This project requires
construction of public improvements pursuant to Section
18.40 of the City Code. Please have a registered civil
Engineer prepare appropriate improvement plans and submit
for separate plancheck process through the Engineering
Department. Improvement plans must be approved,
appropriate securities posted and fees paid prior to
issuance of permit. The required improvements are:
Improvement plans signed, Date: by:
P:\DOCS\MISFORMS\FRM0010.DH REV, 02/27/91
I—'" I—1 I—I*'—','—''—' 13. Improvements are required. Construction of the public
improvements may be deferred in accordance with Section
18.40 of the City Code. Please submit a letter requesting
deferral of the required improvements together with a
recent title report on the property and the appropriate
processing fee so we may prepare the necessary Future
Improvement Agreement. The Future Improvement Agreement
must be signed, notarized and approved by the City prior to
issuance of a Building Permit.
Future Improvement Agreement completed, Date:
By:nnc 13a. Inadequate information available on site plan to make a
determination on grading requirements. Please provide more
detailed proposed and existing elevations and contours.
Include accurate estimates of the grading quantities (cut,
fill, import, export).
I I . .i—i i—i 14 B No grading, required as determined by the information
provided ori1 the site plan.
15. Grading Permit required. A separate grading plan prepared
by a registered Civil Engineer must be submitted for
separate plan check and approval through the Engineering
Department. NOTE: The Grading Permit must be issued and
grading substantially complete and found acceptable to the
City Inspector prior to issuance of Building Permits.
Grading Inspector sign off. Date: by:
Miscellaneous Permits
szfnn 16. Right-of-Way Permit not required.
17. Right-of-Way Permit required. A separate Right-of-Way
Permit issued by the Engineering Department is required for
the following:
L—' '—' '—' 18. Sewer Permit is not required.
'—' '—' '—' 19. Sewer Permit is required. A sewer Permit is required
concurrent with Building Permit issuance. The fee required
is noted below in the fees section.
20. Industrial Waste Permit is not required.
P:\DOCS\MISFORMS\FRM0010.0H REV. 02/27/91
l_4 ' — I I — I 21. Industrial Waste Permit is required. Applicant must
complete Industrial Waste Permit Application Form and
submit for City approval prior to issuance of a Building
Permits. Permits must be issued prior to occupancy.
Industrial Waster Permit accepted -
Date : _ By : _
Fees Required
D tyf) 27. Park-in-Lieu Fee
Quadrant: _ Fee per Unit: _
Total Fees: _ ._
D M/A 23. Traffic Impact Fee
Fee Per Unit: _ Total Fee: _
D Mft 24. Bridge and Thorough fare Fee
Fee Per Unit: _ Total Fee:
D *A 25. Public Facilities Fee required.
D lJ/fl 26. Facilities Management Fee Zone: _ Fee:
D M/tf 27. Sewer Fees Permit No. _ EDU's
Benefit Area: _ Fee:
D f^jft 28. Sewer Lateral Required:
Fee: _
0 29. REMARKS: CflfiSTfiL EEiJElDP. PERMIT MOST SE
.^AKJD PLflMS aigjOgQ feV QTV
•2s/ "
ENGINEERING AUTHORIZATION TO ISSUE PERMIT
BY : ^gggaMJg xi xpyar^ig^; DATE :
—7
-7-?/
P:\DOCS\MISFORHS\FRH0010.DH REV. 02/27/91
*
'iA
Af
(N
,- .- _
*Q fQ O
J
o o o11 V V•e -e J=u u t->
a. a. a.
Plan Check No.
Planner.
PLANNING CHECKLIST
Address
Phone 438-1161 ext.
(Name)
2oo-APN:
Type of Project and Use _
Zone Ds Facilities Management Zone
IlS-L^
— j
* r* O-NV-^TI
7 Item Complete
Item Incomplete - Needs your action
1,2,3 Number in circle indicates plancheck number where deficiency was
identified
D D Environmental Review Required: YES )( NO TYPE
DATE OF COMPLETION: *
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval
D D Discretionary Action Required: YES JC NO _ TYPE
APPROVAL/RESO. NO. - DATE:
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval
ia Coastal Commission Permit Required: YES X NO
DATE OF APPROVAL:-^) < i
San Diego Coast District, 1333 Camino Del Rio South, Suite 125, San Diego, CA. 92108-3520
(619) 297-9740
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval ._
STATE OF CALIFORNIA—THE tESOURCES AGENCY PETE WILSON. Governor
CALIFORNIA COASTAL COMMISSION
SAN D.EGO COAST AREA
3111 CAMINO DEL RIO NORTH, SUITE 200
SAN DIEGO, CA 92)08-!72S
(619) 521-8036
COASTAL DEVELOPMENT PERMIT NO. 6-91-34
Page 1 Of 4
On May 7. 199]the California Coastal Commission granted to
City of Carlsbad
this permit for the development described below, subject to the attached
Standard and Special Conditions.
Description:Demolition of a pump station and trickle filter and construction
of a sewage pump station and sewer force main. The 1,900 lineal
foot force main will begin at the new pump station and travel
under Carlsbad Boulevard, State Street, and Laguna Drive to the
Vista/Carlsbad interceptor at the intersection of Jefferson
Street and Laguna Drive.
Site:
Lot Area
Building Coverage
Pavement Coverage
Landscape Coverage
Unimproved area
Zoning
Plan Designation
Ht abv fin grade
1 .21 acres
850 sq. ft
2,600 sq. ft
2,100 sq. ft
47,150 sq.ft.
Open Space
Open Space
29 feet
(5%)
(90%)
West side of Carlsbad Boulevard, south of State Street,
Carlsbad, San Diego County. APN 155-200-01,02,03,
Issued on behalf of the California Coastal Commission by
PETER DOUGLAS
Executive Director
and
IMPORTANT: THIS PERMIT IS NOT VALID UNLESS AND UNTIL A COPY OF THE PERMIT
WITH THE SIGNED ACKNOWLEDGEMENT HAS BEEN RETURNED TO THE COMMISSION OFFICE.
ACKNOWLEDGEMENT
The undersigned permittee acknowledges
receipt of this permit and agrees to
abide by all terms and conditions
thereof.
Date Signature of Permittee
COASTAL DEVELOPMENT PERMIT NO. 6 -91 34
Page 2 of 4
STANDARD CONDITIONS:
1. Notice of Receipt and Acknowledgement. The permit is not valid and
development shall not commence until a copy of the permit, signed by the
permittee or authorized agent, acknowledging.receipt of the permit and
acceptance of the terms and conditions, is returned to the Commission
office.
2. Expiration. If development has not commenced, the permit will expire two
years from the date on which the Commission voted on the application.
Development shall be pursued in a diligent manner and completed in a
reasonable period of time. Application for extension of the permit must
be made prior to the expiration date.
3. Compliance. All development must occur in strict compliance with the
proposal as set forth below. Any deviation from the approved plans must
be reviewed and approved by the staff and may require Commission approval.
4. Interpretation. Any questions of intent or interpretation of any
condition will be resolved by the Executive Director or the Commission.
5- Inspections. The Commission staff shall be allowed to inspect the site
and the development during construction, subject to 24-hour advance notice
6. Assignment. The permit may be assigned to any qualified person, provided
assignee files with the Commission an affidavit accepting all terms and
conditions of the permit.
7. Terms and Conditions Run with the Land. These terms and conditions shall
be perpetual, and it is the intention of the Commission and the permittee
to bind all future owners and possessors of the subject property to the
terms and conditions.
SPECIAL CONDITIONS:
The permit is subject to the following conditions:
1. Offer to Dedicate Open Space Easement. Prior to the issuance of a
coastal development permit, the applicant shall record an irrevocable offer to
dedicate to a public agency, or to a private association acceptable to the
Executive Director, an open space easement over the area shown on the attached
Exhibit "#3" and generally described as the portion of a 100 foot wetland
buffer zone located on the applicant's property extending from and parallel to
the water's edge of Buena Vista Lagoon located immediately off site and found
at elevation 5.5 as shown on a survey done by the City of Carlsbad dated April
24, 1991. The easement shall allow for limited access, e.g. a five foot wide
pedestrian trail, along the entire width of the property within the upper
buffer area. The upper buffer area is defined as the upland 50 feet (farthest
away from the lagoon) of the required 100 foot buffer. The document shall
include legal descriptions of both the applicant's entire pare and
COASTAL DEVELOPMENT PERMIT NO. 6 91-34
Page 3 of 4
SPECIAL CONDITIONS, continued:
easement area. Said open space easement shall prohibit any alteration of
landforms, placement or removal of vegetation, or erection of structures of
any type, unless approved by the California Coastal Commission or its
successor in interest.
The offer shall be irrevocable for a period of 21 years, shall run in favor of
the People of the State of California, binding successors and assigns of the
applicant and/or landowners, and shall be recorded prior to all other liens
and encumbrances, except tax liens. The offer to dedicate shall be in a form
and content acceptable to the Executive Director.
2. Revegetation/Restoration Plan. Prior to the issuance of the coastal
development permit, the applicant shall submit a detailed revegetation plan
indicating the type, size, extent and location of all plant materials, any
proposed irrigation system and other landscape features to revegetate the
required buffer. Native plants similar to those existing in the upland area
surrounding Buena Vista Lagoon and compatible with the freshwater marsh areas
of the lagoon shall be utilized to the maximum extent feasible to re-establish
the area consistent with its previous character. The plan shall also provide
for the removal of the existing non-native and invasive vegetation within the
buffer (iceplant and palm trees) and the replanting of this area with native
upland plantings. The plan shall also indicate that the portion of the access
drive within the buffer must also be removed and revegetated with native plant
materials. Said plan shall be reviewed and approved in writing by the
Executive Director.
3. Erosion Control. Prior to the issuance of the coastal development
permit, the applicant shall submit final grading and erosion control plans
which shall incorporate the following:
a. Grading shall be prohibited in the period between October 1 and
April 1 of any year.
b. All permanent runoff and erosion control devices shall be
developed and installed prior to or concurrent with any on-site grading
activities.
c. All areas disturbed shall be stabilized in advance of the rainy
season (October 1 to March 31 of each year). The use of temporary erosion
control measures, such as berms, interceptor ditches, sandbagging,
filtered inlets, debris basins, and silt traps shall be utilized in
conjunction with plantings to minimize soil loss from the hillsides or
restoration area.
COASTAL DEVELOPMENT PERMIT NO. b 91-34
Page 4 of 4
SPECIAL CONDITIONS, continued:
4. Drainage Plan. Prior to the issuance of the coastal development
permit, the applicant shall submit for the review and written approval of the
Executive Director, a drainage and runoff control plan. This plan shall
document that runoff from impervious surfaces will be collected and discharged
to the street where feasible. Runoff shall be directed away from sloping
areas where possible, and any runoff directed over these areas shall be
retained and discharged at a non-erosive velocity and elevation (below the 5.5
contour) to protect the habitat values of the lagoon from degradation by
scouring or concentrated runoff.
(1034P)
ODD Landscape Plan Required: YES X NO
See attached submittai requirements for landscape, plans
Site Plan:
DD
Zoning:
1. Provide a fully dimensioned site plan drawivto scale. Show; North
arrow, property lines, easements, existing and proposed structures,
streets, existing street improvements, right-of-way width and
dimensioned setbacks.
2. Show on Site Plan: Finish floor elevations, elevations of finish grade
adjacent to building, existing topographical lines, existing and proposed
slopes and driveway.
3. Provide legal description of property.
4. Provide assessor's parcel number.
i. Setbacks:
ana
Front:
Int. ^ide:
(VfA Street Side:
/st Rear:
2. Lot coverage:
. 3. Height:
4. Parking:
Additional Comments
V Required
Required
Required
Required
Required
Required
Spaces Required
Guest Spaces Required
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
OK TO ISSUE AND ENTERED APPROVAL INTO DATE . 5"
PLNCK.FRM
-IT
2560 ORION WAY
CARLSBAD, CA 92008
TELEPHONE
(619)931-2121
ARCHITECT
OCCUPANCY
Citp of Caristoab
FIRE DEPARTMENT
PLAN CHJ=pK REPORT
DDRESS
PAGE 1 OF
APPROVED
DISAPPROVED
PLAN CHECK#
) * f^Q PT7 n<J/3 **< ADDRESS
_ ADDRESS
CONST.TOTAL SQ.FT.
&/g£»O PHONE
./ PHONE
STORIES
DSPRINKLERED DTENANTIMP.
APPROVAL OF PLANS IS PREDICATED ON CONFORMING
TO THE FOLLOWING CONDITIONS AND/OR MAKING
THE FOLLOWING CORRECTIONS:
1.
2.
3.
4.
5.
PLANS, SPECIFICATIONS, AND PERMITS
Provide one copy of: floor plan(s); site plan; sheets
Provide two site plans showing the location of alt existing fire hydrants within 200 feet of the project.
Provide specifications for the following: , ,
Permits are required for the installation of all fire protection systems (sprinklers, stand pipes, dry chemical, halon,
CO2, alarms, hydrants). Plan must be approved by the fire department prior to installation.
The business owner shall complete a building information letter and return It to the fire department.
FIRE PROTECTION SYSTEMS AND EQUIPMENT
The following fire protection systems are required:
D Automatic fire sprinklers (Design Criteria: ; __)
D Dry Chemical, Halon, COa (Location: .• )
D Stand Pipes (Type: •, . , : )
D Fire Alarm (Type/Location: , > , •• .' )
7. Fire Extinguisher Requirements:
Sft One 2A rated ABC extinguisher for each
' extinguisher not to excied^iwt erf tn
mextlngulsher With a minimum rating ol
sq. ft. or portion
to be locate*
trtbr:
6. Additional fire hydrant(s) shall be provided
EXITS
9. Exit doors shall be openable from the Inside without the use of a key or any special knowledge or effort.
10. A sign stating, " This door to remain unlocked during business hours" shall be placed above the main exit and
doors
11. EXIT signs (6" x 3V letters) shall be placed over all required ex lit s and directional signs located as necessary to
clearly indicate the location of exit doors.
GENERAL
Storage, dispensing or use of any flammable or combustible liquids, flammable liquids, flammable gases and
hazardous chemicals shall comply with Uniform Fire Code.
13. Buildlng(s) not approved for high piled combustible stock. Storage In closely packed piles shall not exceed 15 feet
in height, 12 feet on pallets or in racks and 6 feet for tires, plastics and some flammable liquids. If high stock pil-
ing Is to be done, comply with Uniform Fire Code, Article 81.
14. -Additional Requirements. : :
f&PT. -fb/L
/ft
.15. Comply with regulations on attached sheet(s).
Plan c.ami»l_/f
Report mailed to architect Met with Attach to Plans
CITY OF CARLSBAD
STRUCTURAL CALCULATIONS
FOR THE
HOME PLANT SEWAGE PUMP STATION
PROJECT NO. 3299
ALMGREN & KOPTIONAK, INC,
CONSULTING ENGINEERS
DATE
JOB
SHEET
SUBJECT
C4 -1C
ALMGREN & KOPTIONAK. INC,
CONSULTING ENGINEERS
DATE
JOB ,
SHEET
SUBJECT
— S <
~-n *n C-
Tr i Wv» q^/'^nr X uj"1 &wr
(
C=>
/.
0
/" 7 /2
- f
/#7i/d7
»A'^>7
h JS
. ,
' k;
Jy*
'
c- s
z-r
L •*.1 '
-
/ -\ U. W-/
/ -7 Xf'f*
v
X
- > N:
•^ " * ^
-77 ACT
y-r-*
//r
//->-£-$./ f '^i//>.
1-} i ' '/ p *-£ .' ^ P.
A-'5)- •
^
"'7;
> c-
> Z-•'•?.*
/ f // . /
f/
2-) /
~
7/f9-n
f 7
(r- CO'" / -/ ^A^ty c^-vT' ^
,- M
s>
ft
.1
>
*_J
• •
* ^£» J , t
*r
J
&{./;.&? s
Y * " ' 'if*,* - -i
X ,
(.'-a
-/7
T
V^A^?•& -i£ r~ + * 'Z £yLy~*
:^Jf-tctJA. £yfr*7*
r
^^f—
NLi u_ J;
1!
i
*
^X. ^K.
i
/?
J
st*
I (
:9JSroot.AND v*"£S' COITION Jf '-; .1,
.-,-. -*.~~:, ••;. = !<-«• ii- D\. is: is;:-.:- .'
:"<. . '.tt'.i :•-•--'S: '.ns • -f. -. =j,i-r- "•-..i. j«- :-i-.:i^: -iic- •-: - -.s ;•-.<•".•; •••::•",•<*. '-KJCT^SES :*c:-i:ij. .i-Li'
'; *i;0 9*C«MLL SMALL CONFO«« TO
. l'BJCl>J«t M*!tti ^Su-'ti TH»T
»S 3£**lLED 0*< T«E
-'SE~ II »LL JOINTS
JOINTS HOTvtO BT rnt
TM£ LOCtT :C
SC(C:'!C*ll.
i.sc .; i'f IA. r -OK
:-hr ic:. '.-' -i '•• - ":";'„•-»£ r TCC i-sF t: »;s: ;• -•"j-*»
JE.'-JFOaC INC ST(£L
S*1*(.L SE SUBJECT TO
icjiscaIE; SHALL MOT BE
•i£ 5-9UISED, Cl^OSED
:-i • - ' St 5-9*V ON T
-s -T -" Os * -*',^ Si.— _i:f* tt'-r1.1 ti-io• ;• 'ox', :;: JNS :0!.
--••: ;ii^i *sE ' - f
-7*—
.-iKTt« ;...
6. -c:-i»
C. ~f*Q\i:
T.iT*uf 1'ON S-»LL vti.fQii
LIMITS AST" C-90
STi c-:?o
i*-£ MO* 5
;C50 'SI "JM
-AI.-S IIALL 3( .aouTfS SOLID.
-on; ANC Mi icn of AL j-i^u" »o*« SMALL CON*O«M
:r:;*-IONS «o» *LU"itj« 5T»uc'u«es" sr TH(
is^o::-i:rov. "ML£5S ST-SSWISE INDICATED,
?3. -fcr;:s»oar:«s SIAL^ 3£ J.»»L.ED TO S>TE»IO« o^ »LL WALLS
3t,:n jLC-~Ti3'- -11.50 iNO •-••O(B JASC SLi» AS sn3«n.
)! -f". '-liSLf '-:
'EE*.
•*: • i.'..±~ ;c>i <-*L; s»-i-.v» »f, *t e •« v.-i-i'.i: r -. ?;:;. *f -".;s.
•TSOSTITIC «fAD TO
i"' ICT iccaio i*
qv i-sr
- ;'.-' r
..'- -i 2' -S"r.-trj
•-;,.-*.' • ' - . '- ?•. -: T-:.-S.
'.; £ 5
." - -^ - :- :-!•-•. re ••>.: • ; -i-_ ;-.-, 1---=.:
! -;-;» ;i -;-•-':.• '-: ^ ... ; r; •-•-'.••On
s-Z^
*'
,2>T =
*J
V
:..£fLd7 __.±
^/
/ ''1
^V
A
i /A 2.
^ 5,7 «:
^7
_ jr^rf**
i
,7
A? -/> A
/6-y
ft,"
&, / *- /^^ /s 7fi'^ /tx
'— 7-0, •
tt
^ . y/
//'/
*'"•_:i/-. _r. • -"' * *—ft-*,
_ . .
../..*&
/?iT
/:./, "f
"y
1~ ^ t/
^, r* /i ^
"3 i
\
#1-
7
*Ts
X
A? -
= - 'et*
-_ f
4.
'/-&
•/•a
<
- , GO 1
ff
2.-L,
.4^
i,<Z
!*L
-7/-1
.49.3
'-7
r
r
r
r
r
r
r
o,.
r*
r^
r
r
r
,t*\
-/r
cl2£
r^
r
r
./
r
r
r
r
r
r
r
r
:-o
- n
/
\
•=- £»o
r
r
r
r
r
r
r
r
ALJ /=.|*fc^JK"A*-»Pi^^a^^.^.^J^_^,^,^^tJM^
// £ ^V £>.SdK//V- ^7
7
[I
r ,r
1
'" TiI / IM III
I. I.
r
r
r
r
r
'"/• -T^
<i_^1'<?^r
V?
. •*
""/r «. «.S u
(/ ± **,& (r.r'-At?) =• f-7*
^- /£,& ''it /, IS, X r
76 '« ,/*/^
/ z,
r
r
r
r vW
7,*
^My', ,j-A X -
r
r
r
r
r
r
r
XT 7-0
i^,x y
r
r
r
r
'y
!,A)
s
T •
r
r
r
r
O, ^
/
r^/%
r
r
C ^ .'*./T(. ^ /.
r .^
r
r
r
~ f&* o y
r
r
r
r
r
r
r
s^- <t»
'' 4
I*
r
r
r
r
r
-7-
/"Y
r
r
r
I
7
\ t
r
r
.LI::
f
r
//
5* *t >4*b
r > /,- •
^^
/v
r
r
r
r
r
r j
i*
<?.
c 6-r
</•
r
r
r
(<10
So,/
<f<3.0
£.1
r
r
r
r
r
r
r
r
r
r
r
r
.
r
r
.
L
7 -
7J7?•./
r
r
/ I
£2
-L c Z
/r«
/,*•£
,3(10
r
V-'V
*?•?
-i-3,
r
r
=^V
>/-?4/v
>- . /.
^ —
TO
0.
f.S
AJ
r
r
r
r
r
r
r
r
r
r
r
r
r
r
fv n*irs1 VJs^1*/ $*r * 'Q \ s*1
^> .,• -^ -r- 1-f* *J** f,S ^vrI Tri- ^A^T
£>-O AA.O.
r . T-. vint
r
r
r
r
f.fr
r Ix
r
r
r
—
r
r
r
r
r
U&C,C«FTR. MjAN
r
r
r
r
r
f-I—I V
r
r
r
r
t r
xX
®
t i
\i
U
i •I :! t
; »i it ;
:,j
r
r
r
r
r
r
r
r
A Ha
«ft
; 2.
/
.r/*/
'r.
7'
~.+
r
r
r
rir
*),
. obf
r
-f = 2y. %
/ 7 ^
r
r
r
r
, ?£• ~
r
r
r
r
Sir.
r
r
r
r
r
r
r
**»*.%-
r
r
r
r
r
r
r
•SS"
OO
('7'tfix't-'-t)'-
r
r
r
r
r
r
r
r
r $V
r
r
*~
/;/
*y e
Af
79* ft-*-79
/. s
v
£**V^ A?,-/
An V/7'
2>'**V<r ta-f.
^L
^)y
•2k^,»»
r 92.
r
r
r
r
r
r
r
A
r
r
r
r
r
r
I. i;
r.
r
R
r
r
r
t
r
r
r
r
r.
VI
VJm-\
^. - -f oo.
±D.e.. _.;£>_
lEZ.
2"r
r —L.
r
R I
iZco Ab Come, bed
TVA<M4.__l<(v
1 /i.v \
AT- .. I
^ooss
(4o-r
~ • — (•
r
r_
r_"
rir
r.
r
r
I\J-^*i^fc»
h-
r
r
r
r
io
I loo lb^> ,
- - —"5
Z&~J
-TrcoTfo
«* fe>-
-. C_s'
?o' • J
(^J2--c-) fc..TiAdo*-fl
-±j.oX
t1
e6 Ji L.
.Z&T)
r -
r
r Jb
Q.
O
4-n-8
r
•2.4
2-9
. yl iov'2tp
r
r;
r
r
r
r
r
r
r
r
r
r
Atx..vjj .rru
An,sb ..Mil ^fee.
'Be
**<l 1' x
£o/uiueCTK>Ut>Bt
OF
TD
.•=>
r
L
•JF =
r
r
r
^
Vjd iLL,
CDvlTti^BaTE-
r
r
r
r
r -
-t -
OP Qbie.'Bou-
OF..__LA
r
""piipe.
17oo Ibs
r V iu*
t
r
.4-.
r
r
•t
r
r
r
r
r
f
^5<V..
Mvwo^ —
*..-2^
^
U.'be 4?>.j2o
r
; i
r
r
r
r
^
i_
LL
U
3
10
Vw
/"
. 2. Ac pSc.)JOoad _______
.
3,600
r
r
r
r
r
.a _.» __Z3•
-•It-—
-OV-
i 4V\ i cjlk CO!bV
-it--
I; !.
r
r -f
K
T'ii-
r
;! c
3.5 (2")
y
A
2.25 .ft bpa
>.l _ Dtea r -OCX?0
^^•KCIHIV V DO 59
v-
/*'
17* MAX
(KACMAt.)
SECTION
2*4 AOOfcOx 4S-Q* LA
HAUNCH DETAIL
VCHAMFCR
ELECTRICAL
APPLICATION 3 U !"!
CUSTOMER NAME
JOB NAME
DEALER/CONSULTAWT
JOB NUMBER
CITY GF CARLSBAD
HOME PLANT
RJM ASSOCIATES INC
S3-2422
ANALVST
DATE
- GAS GR DIESEL
ENGINE 3PEED-RPM
APPLICATION
ENGINE FAN
SYSTEM VOLTAGE
FREQUENCY
LIGHTING LOAD
OTHER NON-MOTOR LOAD
MOTOR RUNNING LOAD
M 0
1. HP KW EFF. KW
1 20 14 .372 17
2 2O 14 .372 17
35 3 -333 4
IRVING GOLDS
01-13-33
DIESEL
1300
STANDBY
YES
430
60 HZ
1 KW
12 KW
33 KW
TOR C A L
(MfcrlM ^LJl_>K.czlJ
CODE ROTOR
AMPS
B 151
B 151
F 33
TE ENGINE MODEL
GENERATOR FRAME
GENERATOR aRNG. NO
"( 3TD SIZE )
TOTAL RUNNING LOAD
ENGINE RATING
MAX ALLOWABLE VOLT
- ACTUAL VOLTAGE DIP
CULATIQMS
^if^TI I&l tt-'lil C?lf-'tJ£.HL. I UHL. tvW pPsVH
SKVA STARTED MULT.
67 0 ,1 . OO
67 14 1.03
27 23 1 . 1O
320SNA
363
7W7S20
51 KW
53 KW
DIP 20.0 "/.
9.4 %
„____ pf-KITrlU 1 LJr£ . U»M 1
STARTER TAP-
TYPE
2 25
2 25
1 1 00
S. £
certrcr1^* * I-^LP'
SKVA
17
17
29
STARTER TYPES: l«None; 2*Resistor, Reactor, Impedance
3=Auto Trans-former , 4=» ' Y 'Start, Delta Run
ASSOCIATES, I IMC
9845 ERMA RO, SAN DEIGO, CA 92131
(629) 586-6272
JOB NAME: HOME PLANT SEWAGE PUMP STATION
DESIGNER: STAN CONNER
DATE: 18-Jan-S8 O7:58 AM
JOB * 2422
HOME2422.WK1
I OtMS
1 PUMPS at 20hp - 480 volts, 3 phase at 1257.
2 PUMPS at 20hp - 48O volts, 3 phase at 1OO7.
HYDRAULIC UNIT at 5hp - 48O volt, 3 phasa at 10O7.
PANEL A
PANEL G
TOTAL VOLT AMPSs
926O8 VOLT AMPS at 48OY/277 VOLTS - 3 PHASES - 4 WIRESs
TOTAL AMPSs
2OO AMP SERVICE
28,046
44,874
6,316
8,991
4,381
92,6O8
111.4
MOMP PI ANT 5PWARF PUMP STAT
ADDENDUM TO
PRELIMINARY GEOTECHNICAL EVALUATION
PUMP STATION, CITY OF CARLSBAD
NORTH OF THE INTERSECTION OF
STATE STREET AND CARLSBAD BOULEVARD
CARLSBAD, CALIFORNIA
PREPARED FOR:
MR. BILL KOPTIONAK
ALMGREN & KOPTIONAK
9968 HIBERT STREET, SUITE 102
SAN DIEGO, CALIFORNIA 92131
OCTOBER 26,1987
PROJECT NO. 100239-02
Almgren & Koptionak October 26,1987
Project No. 100259-02
Table of Contents
Page
Site Description 1
Proposed Site Development 2
Field Exploration and Laboratory Testing 2
Subsurface Conditions 2
Conclusions and Recommendations 3
Illustrations
Figure 1A - Site Location Map
Figure 2A - Site Plan
Figure 3A - Lateral and Uplift Pressure Diagrams
Appendices
Appendix A - References
Appendix B - Boring Log
Geotechnical Consultants
October 26,1987
Project No. 100239-02
Almgren & Koptionak
9968 Hibert Street, Suite 102
San Diego, California 92131
Attention: Mr. Bill Koptionak
Subject: Addendum to "Preliminary Geotechnical Evaluation,
Pump Station, City of Carlsbad, North of the Intersection of State
Street and Carlsbad Boulevard, Carlsbad, California."
Gentlemen:
This addendum to our previously submitted report (Appendix A, Reference 1), presents
the results of additional subsurface investigation performed at the revised location of the
facility. The purpose of this study was to evaluate the site materials relative to the results,
conclusions and recommendations presented in the referenced report, and to modify these,
or present new recommendations for the design and construction of the planned facility.
Site Description
The subject property consists of a roughly triangular shaped lot just north of the inter-
section of Carlsbad Boulevard and State Street in Carlsbad, California (Figure 1A). The
site is relatively level at an approximate elevation of 31 feet (MSL) and has no significant
vegetation. A 100 foot diameter trickling filter tank structure exists approximately 12 feet
north of the northern boundary of the site, at approximately the same elevation.
To the south, the site descends at a slope ratio of approximately 5:1 (horizontal to vertical)
to a railroad right-of-way at approximate elevation 22 feet (MSL). To the east, a slope as-
cends toward Carlsbad Boulevard at a slope ratio of approximately 5:1 (horizontal to verti-
cal), to approximate elevation 37 feet (MSL).
Soil Engineering • Geology • Groundwater
10225 Barnes Canyon Road • Suite A-II2 • San Diego, CA 9212! • (619)457-0400
1.1,1.
Almgren & Koptionak October 26,1987
Project No. 100239-02
Proposed Site Development
The proposed site development will include construction of a partially underground sewage
pump station. Based on preliminary plans and sections (Appendix A, Reference 2 and 3),
the dry and wet well will be approximately 28 feet deep. A diesel generator room will be
located southeast of the wells founded at, or close to, the existing ground surface. We un-
derstand that only minor grading will be required, thus the site will remain at approxi-
mately the existing grade.
Field Exploration and Laboratory Testing
Subsurface conditions at this new location were evaluated by drilling one test boring (B-
1A) to a depth of approximately 35.5 feet below existing grade. A geologist was present
during the drilling operation to log materials encountered and to obtain representative soil
samples. A boring log is presented in Appendix B, and the boring location is shown in Fig-
ure 2A. Sampling in the boring consisted of relatively undisturbed ring samples obtained
using a sampler driven into the soil with a 140 pound hammer, dropping 30 inches. The
number of blows required for 12 inches of penetration is shown on the boring log.
Laboratory tests were performed on representative soil samples obtained from the ex-
ploratory boring to evaluate in-place moisture and density characteristics, and all samples
were visually classified. The test results are presented on the boring log (Appendix B).
Subsurface Conditions
Based on our subsurface investigation and review of the map by -Weber, 1982, the geologic
formation present at the site is the Eocene Santiago Formation. About 11 feet of beach
deposits, followed by approximately 5 feet of man-made fill overlie the Santiago Forma-
tion. Groundwater was encountered at a depth of about 30 feet in the boring. Detail
descriptions of the materials encountered are presented on the boring log (Appendix B).
Generalized descriptions of the materials encountered are as follows:
,u
Almgren & Koptionak October 26.1987
Project No, 100239-02
o
The fill material generally consisted of brown firm silty sandy clay, and clayey
silt, with some gravel.
/
o Beach Deposits
These deposits consisted of generally gray-green, dense, silty fine sand with
zones of brown-orange oxide stains, and occasional coarse sand pockets.
o Santiago Formation
The Santiago Formation as observed, consisted of weakly cemented in-
terbedded very dense sandy siltstone and silty sandstone, with minor amounts
of clay and occasional coarse sand or fine gravel.
CONCLUSIONS AND RECOMMENDATIONS
Conclusions
The results of this additional investigation indicate that the subsurface conditions are sim-
ilar to those reported in our earlier report (Appendix A, Reference 1). Considering the
geotechnical aspects of design and construction, the conditions at this proposed location
appear generally more favorable, than those of the prior site. Because the revised location
is at a higher elevation than the previous site, the depth to groundwater is greater. After
evaluating the soil moisture data from this subsurface investigation in relation to the data
from the original site, and the general topography, adaptation of a design groundwater
level of 20 feet (MSL) is, in our opinion, appropriate. The depth of undocumented man-
made fill appears less than 5 feet, and the fill is underlain by the beach deposits, which are
competent bearing materials. The formational material is very dense, with varying degrees
of cementation, and is predominantly granular.
Almgren & Koptionak October 26,1987
Project No. 100239-02
Excavation can, in our opinion, be accomplished with normal mechanical excavating
equipment. However, depending on the size and power of the equipment, loosening of the
formaticnal material may occasionally be required, and can, in our opinion, be accom-
plished by utilizing a mechanical "bull point" or rock breaker.
In general, we conclude that the recommendations presented in our earlier report for this
project (Appendix A, Reference 1) are valid, other than as modified below:
Recommendations
These recommendations are based on current site conditions and our understanding of the
proposed construction. If the site is modified by grading or the location of the proposed fa-
cility is changed, our office should be contacted to review these changes and provide addi-
tional recommendations as appropriate. It should also be noted that the recommendations
presented herein are in addition to, or modify the recommendations presented in our ear-
lier report for this project (Appendix A, Reference 1), and should therefore be read only in
conjunction with the earlier report.
Earthwork
o Fill Materials
The onsite formational materials and beach deposits are generally
suitable for use as compacted fill, provided they are free of debris.
The existing fill materials, due to their apparent significant clay con-
tent, are considered reusable only as backfill and in the uppermost 2
foot zone, to provide a semi-impermeable barrier for surface water
migration into the deeper backfill.
u
Almgren & Koptionak October 26,1987
Project No. 100239-02
Foundations
Unless a perimeter subdrain is installed at a lower elevation, and directed
offsite, a groundwater elevation of +20 feet (MSL) should be considered for
design.
o Wet and Dry Well Foundation Mat and Walls
We recommend that the foundation mat and walls be designed for the
uplift and lateral pressures shown on Figure 3A, "Lateral and Uplift
Pressure Diagrams."
o Generator Foundation
The loads of the generator structure may be transferred to the under-
lying dense beach deposits, rather than to the formational materials,
as recommended in our previous report This can be accomplished by
removing the undocumented fill to the top of the beach deposits, re-
placing it with structural fill and using conventional footings and slab-
on-grade (Option A in earlier report), or by deepening the footings to
bear 1 foot minimum into the beach deposits and using a structural
slab (Option C in the earlier report). Supporting the building frame
on drilled piers (Option B of the earlier report) is not considered eco-
nomically viable due to the relative shallowness of the fill. Detailed
recommendations on Options A and C are presented in the earlier
report. . . .
Drainage
Should significant economies result from lowering the design groundwater
level, a perimeter subdrain at a lower elevation can be installed. Modified
design pressure diagrams can be prepared to reflect the modified subdrain
Almgren & Koptionak October 26,1987
Project No. 100239-02
elevation. General recommendations for design of underground drainage
are presented in the earlier report.
Construction Considerations
o Shoring
Due to the close proximity of the adjacent trickling filter structure, it
is recommended that the portion of well excavation below 15 feet (i.e.,
in the formation) not be laid back, but be shored. The proximity of
other settlement sensitive underground structures may otherwise
guide selection of shoring or laying back of excavation slopes. Laid
back slopes should in all cases be at slope ratios no steeper than 1:1
(horizontal to vertical).
o Special Precautions
The close proximity of the power line guywire anchors to the west of
the site should be considered prior to planning the excavation.
Construction Observation
The recommendations provided in this report are based on conditions disclosed by our sub-
surface investigation. The interpolated subsurface conditions should be checked in the
field during construction. We recommend that final project drawings be reviewed by our
office prior to construction.
We recommend that all footing excavations be observed by a representative of our firm,
and that testing and observation of fill placement be performed by a representative of this
firm to evaluate compliance with recommendations provided in this and the earlier report.
Almgren & Koptionak October 26,1987
Project No. 100239-02
The field investigation, laboratory testing and geotechnical analysis presented in this report
have been conducted in accordance with current engineering practice. Our observations
are based on one test boring located on the site and our recommendations reflect the con-
ditions encountered therein. Variations may exist, and conditions not observed nor de-
scribed in this report may be encountered during construction. If conditions different from
those described in this report are encountered, this office should be notified and additional
recommendations, if applicable, should be requested.
We appreciate this opportunity to be of service, and if you should have any questions re-
garding this matter please contact this office.
Very truly yours,
NINYO & MOORE
Jan A. Dahlgren
Associate
V bV V4*^U& < T « +t V&-K-J v^AAt
Principal Geologist
X""/E. Moore, RCE 281
Principal
JAD/SWJ/REM/eg
Distribution: (2) Address
REFERENCE: 1986 Aerial Foto-Map Book.
2000
Scale In Feet
4000
NORTH
SITE LOCATION MAP
CITY OF CARLSBAD
PUMP STATION FACILITY
CARLSBAD, CALIFORNIA
PROJECT NO.
100239-02
DATE
10/87 FIGURE 1 A
TRICKLING FILTER
B-1A
LEGEND
Approximate location of exploratory boring
BASE MAP IS AN UNTITLED, UNDATED SKETCH, FURNISHED BY
ALMGREN & KOPTIONAK. ALL DIMENSIONS ARE APPROXIMATE.
NORTH
20
Approximate Scale in Feet
40
SITE PLAN
CITY OF CARLSBAD
PUMP STATION FACILITY
CARLSBAD, CALIFORNIA
PROJECT NO
100239-02
DATE
10/87 FIGURE 2A
u tt
V
u
Finish grade
Elevation +20 MSL
Bottom of Mat Elevation
60.YPSF
J ,.i i 'J i -i
62.4X X PSF
91.2XX
\
\
\
\
ASSUMED CONDITIONS
1. At ml condttlom Ko equate 0
2. Ysoll (moist) equate 120 PCF
NOT TO SCALE
LATERAL AND UPLIFT PRESSURE DIAGRAMS
CITY OF CARLSBAD
PUMP STATION FACILITY
CARLSBAD, CALIFORNIA
PROJECT NO,
100239-02
DATE
10/87 FIGURE 3 A
APPENDIX A
Almgren & Koptionak October 26,1987
Project No. 100259-02
APPENDIX A
References
1. Ninyo & Moore, 1987, "Preliminary Geotechnical Evaluation, Pump Station,
City of Carlsbad, North of Intersection of State Street and Carlsbad
Boulevard, Carlsbad, California," dated April 30.
2. Untitled, undated site topography and sketches of facility location, furnished
by Almgren & Koptionak.
3. Almgren & Koptionak, Inc, untitled, undated, schematic drawing of facility
plan and sections.
APPENDIX B
MAJOR DIVISIONS
COARSE GRAINED SOILS(More then 1/2 ol «oH > no. 2OO »t*v« »lx«)•Xm
e
*•"5
wedo0"«ds:
1!
go
uS5I
•o
3
GRAVELS
(More then 1/2 of
co art* friction >
no. 4 ileve lilt)
SANDS
(Mor* thin 1/2 of
coirte friction <^
no. 4 ileve »lze>
SILTS & CLAYS
LL < 50
SILTS & CLAYS
LL > 50
HIGHLY
ORGANIC SOILS
SYMBOLS
GW
GP
GM
GC
SW
SP
SM
sc
ML
CL
OL
MH
CH
OH
Pt
TYPICAL NAMES
We* graded grave* or oreveHeand mtaturoe, tot* or no fto*«
Poorly graded grevele or gravet-iend mlituree. little or no linn
Sllty gravele. grtYiJ-tind-illt mixture!
Clayey gravele, grave(-«end-etay mixture*
Wtll grtdtd *cnd* or grtvtUy «tnd«, IIUI* or no 1tn»t
Poorly gridid undo or gravelly undi, llttto or no fln»«
Sllty iindt, itnd-tllt mlxturta
Sliyty ••ndt, und-clty mixturit
Inorganic •»»• ind very tin* ttndt. rock flour, sllty or cltyty
flno imdi or cltyty illtl wtth iKgM pUstkKy
inorginlo eUyi of low to medium plutlclty. gravelly cltyi.
• indy efeyi, illty clcyi, (tin eUye
Orgi"le eilti tnd orgtnlo *tRy cltya of low pbittcKy
Inorgante iHti, mteiceoue or dlatomaceou* fin* eandy or
iflty lollc. elettlo allli
Inorgenlo claye of high plaetklty. fat claya
Organic clay* ot medium to high pliatlclty. organic itfty claye.
organic illtt
Peat and other highly organlo lode
CLASSIFICATION CHART (Unified Soil Classification System)
CLASSIFICATION
BOULDERS
COBBLES
GRAVEL
coaria
line
SAND
coara*
medium
fin*
SILT & CLAY
RANGE OF GRAIN SIZES
U.S. Standard
Slevo Size
Abov* 12"
12" to 3"
3" to Ho. 4
»" !• J/4"
9/4" t« N«. 4
No. 4 to No. 200
H». 4 |« H«. 10
N«. 10 t« H«. 40
H«. 40 1* N«.JOO
Below No, 200
Grain. Size
In Millimeter*
Above 308
306 to 70.2
78.2 to 4.78
TI.I u ie.t
te.t t« 4.re
4.70 to 0.074
4.r* t« i.oo
t.OO U 0.410
0.4>0 I* O.OM
Below 0.074
60
40
± 50
- 20
10
CL
MLry^ML a OLI
CH
MH a OH
GRAIN SIZE CHART
10 20 30 40 90 60
LL (L!««U Limit), %
PLASTICITY CHART
70 10
U.S.C.S. METHOD OF SOIL CLASSIFICATION
DEPTH (Feet) 15-
^
—•
15-
20-SAMPLESjf3m
.DrivenBLOWS/FOOTMOISTURE (%)?„*.
*
X.*DRY DENSITY (PCF)(Qro-
F CLASSIFICATIONU.S.C.S.DATE DRILLED BORING NO.
GROUND ELEVATION SHEET OF
METHOD OF DRILLING
DRIVE WEIGHT DROP
SAMPLED BY 1 OGGED BY
DESCRIPTION
j
"Standard penetration test
• •
-/y/nyovty BORING LOGoore1^^^ ^^B^ Explanation of Boring Log
PROJECT NO. DATE RQURE
s
0LL
frUJo
5-
10-
20
HM
<
"3
^~i
—
"
,t
o
Es
e
_>
ba
j
!
!
.
M1
1L
W
03
••••*••*
29
42
49
IJSJ|fft
5
iu
W
O3
hH» MM***
L3.4
L2.5
5.6
7.0
3.4
3.0
11.9
11.7
s_*^
Oa
>
UJ
>oco
•«•* m^m^
106.3
105.5
104.6
iio.i
111.2
109.0
117.9
fl/A
2
< w
$»
*$W =<
o
]sc
ML/CL
SM
SM
SM-ML
M Msy\
DATE DRILLED 10/19/87 BORING NO. B-1A
GROUND ELEVATION 31'- (MSL) SHEET 1 OF 2
METHOD OP DRILLING 6" Diameter Hollow Stem Auger (2)
DRIVE WEIGHT 140 Ibs . nROP 30"
SAMPLED BY RAR ' f^fiKfn BV RAB
DESCRIPTION
FILL:
Brown, damp, firm, sandy CLAY with gravels.
Brown to dark brown, damp, firm, clayey SILT and brown, dry,
silty CLAY; some sand.
BEACH DEPOSITS:
Mottled gray-green to gray-brown, damp, dense, slightly silty,
fine-grained SAND; occasional zones with orange iron oxides.
Becomes brown-orange , increase in oxides at 6.5 feet.
Becomes gray-green with occasional layers of coarse-grained
sand and zones of black minerals at 10.0 feet.
Siltier, trace to some clay.
SANTIAGO FORMATION:
Interbedded, green-gray, damp to moist, silty, coarse-grained
SANDSTONE and coarse-grained, sandy SILTSTONE; weakly cemented.
- CONTINUED -
BORING LOG
L%P^B» ^P^^_ Carlsbad Pump Station
City of Carlsbad, California
PROJECT NO. DATE
100239-02 10/87 FIGURE B X
DEPTH (Feet) I20-
25-
30-
35-
40 Bulk ~...~. ff.^ . SAMPLESDriven {;
;
-;
'
!
i BLOWS/FOOT100-4
LOCH
LQQ4 MOISTURE (%)10.5
18.2
12.0
11.4 DRY DENSITY (PCF)118.3
123,5 CLASSIFICATIONU.S.C.S.DATE DRILLED 10/19/87 BORING NO. B"1A
GROUND ELEVATION 31'~ <MSL) SHEET 2 OF 2
METHOD OF nmi i lun 6" Diameter Hollow Stem Auger (2)
DRIVE WEIGHT 14° lbs ' DROP 3°"
SAMPLED BY BAB LOftRPp ny BAB
DESCRIPTION
SANTIAGO FORMATION:
Interbedded, green-gray, damp to moist, silty, coarse-grained
SANDSTONE and coarse-grained, ^ sandy SILTSTONE; weakly cemented.
Total Depth =35.5 feet.
Apparent ground water @ approximately 30.0 feet. {1}
Backfilled 10/19/87.
NOTES :
1. Added water to hole at approximately 15.0 feet.
2. Changed from hollow stem auger to solid stem auger
at approximately 17.0 feet.
_jy/nyo«/y\BORING LOG
»J^jr ^5^^_ Carlsbad Pump Station
City of Carlsbad, California
PROJECT NO. DATE C,*M,M » o100239-02 10/87 FIGURE B-^