Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DWG 446-4L; CT 05-14; VILLAGES OF LA COSTA (OAKS 3.1); 01-22
LANDSCAPE ARCH TEC TURAL PLANS FOR: V LLAGES OF LA COSTA eENEAAL CONDITIONS SHORT FORM f'ROTECTI0N OF LIFE AND PROPERTY I. Contrac.tor shall protoc.t all c.onstrvc.tlon and landsc.aplng Prom damage and, when reqvlr-ed, provide gvards or covering. Any damage shall be repaired or replac.ed at the ContrG1G.tor's expense. Contractors on the Job shall carr!:I the following ln&Vranc.e, (Cl) Y'brker's Compensation, (b) Pvbllc. Comprehensive <Soneral Llablllty, and (c.) Property Damage. In an emergenc.y threatening the safet!:j of life, work or adjoining property, the Contrac.tor ls hereby lnstrvc.ted to act at his dl¾retlon to prevent suc.h loss or ln.Jllr!:j and shall maintain the l'ollowlng minimum llablllt!:j lnsvranc.e c.overage during the c.ontrac.t period. C0VERAeE 6odll!:j lnJUr!:j: $250,000 per lndlvldval, per Oc.c.vrrenc.e Property DG1MG1ge, $100,000 per Occvrrenc:.e, aggregate 2. The Contrac.tor shall C:.Glll5e to be named GIS addltlonal Insured In !WC:.h Contrac.tor's Public Liablllty, Contractor's Protective Llc:.1blllt!:j and Alltomoblle Llc:.1blllt!:j lns11ranc.e pollc:.les the following, (a) Morrow Development (b) <&lllesple. Moodl.j. Patterson., "1404 eenesee Avenue, SI/Ito 140, La Jolla, CA "12051-1::5°5"1. ::5. Contractor shall not c.G1Vse this pollc.y to be c.anc.eled or permit It to lapse, Gll'ld the lnsvranc.e polk:;!:j shall lnc.lvde GI c.lc;:iuse to the effect that the pollG.!:j shall not, at any time during the c.onstrvc.tlon period, be canceled or reduced, restrlc.ted or limited vntll fifteen (15) da!:js after c;:il additional Insureds have received written notlc.e os evidenced b!:j returned receipts of registered or c.ertlfled letters. 4. The Contrac.tor agrees to hold the Owner and Landsc.ape Arc:.hltec.t harmless from any c.lalms arising out of his operations of any of his svl::, c.ontrc:.1c.tors, material supplies, or agents. 5. All locol, munlclpal and state laws, rules and regvlatlons governing or relating to an!:I portion of this work are herei:,y Incorporated Into and made GI port of these spec.lflc.Gltlons and their provision!:> shall be corr led out b!:j the c:.ontrG1G.tor. 6. The contrG1Ctor sholl verll'!:I the locotlons oP all existing utllltles, str11c.t11res, and ser-vlces before commencing work. The loc:.Gltlons of vtllltles, structures ond servlc.es shown In these plons ore approximate onl!:j. Any discrepancies between these plons ond oc.tval field c.ondltlons shall be reported to the oi-iner or londsc:.ope orc:.hltoc.t. 1. The c.ontrac.tor shall protect all existing utllltles ond features to remain on, ond adJoc.ent to, the project site during construc.tlon. ContrG1G.tor shall repair, cit his own expense, all damoge resulting from his operotlons or negllgenc.e. 8. The c:.ontrG1Ctor sholl obtain the pertinent engineering and/or orc.hltec.tvral plans before beginning work. "I. Permits for any c.onstruc.tlon depleted In these plans sholl be obtained i:,y the c.ontroc.tor. 10. Controc:.tor shall have GI valid c.ontrac.tors llc.ense required for the particular work being done. Contractor sholl not allow the llc:.ense(s) to lapse during the c.ontrac:.t period. DEC:L,AAATI0N OF Rl;SPQNSISLE CHAReE CITY OF CARLSBAD eRADINe NOTES I. PRIOR TO THE START OF eRADINe, THE APPLICANT OR APPLICANT'S AeENT 5HALL OBTAIN CITY APPROVAL OF A CONSTRUCTION SCHEDULE AND/OR EXHl61T OUTLININe THE TIMINe OF THE SLOPE PLANTINe AND IRRl6ATION. THE SCHEDULE 5HALL 5HOY'l TIMINe OF CONSTRUCTION OF FREESTANDINe, RETAININe AND CRl6 Y'IALLS IMMEDIATELY AFTER ROUeH eRADINe AS EACH LOCATION IS ACHIEVED. IRRl6ATI0N AND PLANTINe SHALL TAKE PLACE AS eRADINe PROeRESSES. 2. INSTALLATION OF IRRl5ATI0N AS SHOY'IN ON THE APPROVED PLANS 5HALL COMMENCE Jl,UTHIN 10 DAYS OF THE TIME Y'IHEN EACH SLOPE IS ElROUeHT TO eRADE AS 5HOY'IN ON THE APPROVED eRADINe PLANS. S. PLANTINe AND IRRl5ATION FOR THE SLOPE AREAS 5HALL 6E COMPLETELY INSTALLED, AS SHOi,'IIN ON THE APPROVED PLANS, Y'IITHIN :::50 DAYS AFTER THE IRRl6ATI0N INSTALLATION FIRST COMMENCES. _,/ -.,,. •• f ,, 1 PROJECT SITE KEY MAP 1"=!200'-0" © ll'-llt.l6ATION l"LANS ~ l"LANTIN6 !"I.ANS ( ,// ~· ,-"\ I // I HERE6Y DECLARE THAT I AM THI; LAND9GAPE AfsC,HITEC.T OF Y'IORK FOR THIS PROJECT, THAT I HAVE EXERCISED RESP0NSl6LE CHAReE OVER THE DES15N OF THIS PROJECT AS DEFINED IN SECTION 610::5 OF THE 6USINESS AND PROFESSIONS CODE AND THAT THE DESleN IS CONSISTENT Y'IITH CURRENT STANDARDS. \ I UNDERSTAND THAT THE CHECK OF PROJECT DRAY'IINeS AND SPECIFICATIONS 6Y THE CITY OF CARLS6AD AND THE SAN DIEeo COUNTY DEPARTMENT OF ENVIRONMENTAL HEAL TH IS CONFINED TO A REVIEi,.j ONLY AND DOES NOT RELIEVE ME, AS LANDSCAPE ARCHITECT OF Y'IORK, OF MY RESP0NSl61LITIES FOR PROJECT DESl5N. THESE PLANS HAVE 6EEN PREPARED IN SU6STANTIAL CONFORMANCE Y'IITH THE APPROVED LANDSCAPE CONCEPT PLAN, Y'IATER CONSERVATION PLAN, STORM Y'IATER POLLUTION NTI0N PLAN, FIRE PROTECTION PLAN, AND ALL CONDITIONS OF Aff"ROV f'(t:J.""'-TED. TO LANDSCAPINe. 6Y, 7,~~~.-,.a-~)y----------DATE ::f-12-o:/- -HQ, 1411111 FIRM NAME AND ADDRESS, 51LLE5PIE MOODY PATTERSON. INC. '1404 5ENESEE AVE .• ;,TE. 140 LA JOLLA. CA S2Q97-ISS<I '",,If, .to .Mn ~ N. ,ii,, & rl!n .&i. .II, A ill. .!Si ~ """ PHONE NO., (e,5e,J 558-e"!11 FAX, (e,5e,J 55e,.-<:11® 8E§l;,TRATIQN NO.: CA 5e>Z1 EXPIRATION DATE, IQ-07 :.:.---::"-~ ___;:;--~- THE OAKS AREA S. CITY OF CARLS6AD No I E:S INSPECTION PROCEDURES: I. Inspection of the proJec.t shall be perlormed b!:j the Landscape Arc:.hltoc.t oP the work, or his ~slgnoted agent. Refer to the 5pec.lflc.atlons Por the sc:.hedvle oP reqvlred Inspections and required svbmlttals. 2. Following the completion of work, the Landsc.ape Arc.hltoc.t oP the work wlll c.ertlf!j that the Installation has been c.ompletod i:,y submitting the "Final Landsc.ape CerttPlcGltlon Form". A request for a flnol lond5c.ape lnspec.tlon i:,y the c.lt!:j mv5t also be made i:,y c.alllng the lnspec.tlon Reque&t Line. "Final Landscape Certlflc.at:.lon Form" Fax to, 160-"144-e<!4S Landscape lnspec.tton Reqvest Phone Line, 160-602-4602 S. All Irrigation bac:.kf'low preventors shall be tested l::,y GI c.ertll'led tester and re5ults mvst be given to the c.lty and the CGlrlsl::,ad Munlclpol Y'later Dlstrlc.t. Pipe between the meter Gll'ld bac.kf'low preventer shall 1::,e "sc.hedule K hord Copper". Approved c:.ontrac.t bac.kflow testers can be Pound on the C.lt!:j web site at www.cl4grlsbad.cg.11s/pdfdoc..html7p1d=94Q 4. Y'later ser-vlc.e (point of' c:.onnec.tlonJ lnstallotlon !'or landscape shall be In place as required "'"'-to c.olnc.lde with plontlng timing 5pec.lfled In Sec.tlon Y. / ~i----------------------------1 \ SI lf!l!!'r I NC>l!!X SHel!T: TITL-1! SHEET HOLD HARMLESS AND INDEMNIFICATION CLAUSE CONTRACTOR AeREES THAT HE 5HALL ASSUME SOLE RESP0NSl61LITY FOR JOB SITE CONDITIONS DURINe THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDINe SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REGUIREMENT SHALL APPLY CONTINUOUSLY AND NOT 6E LIMITED TO NORMAL Y'IORKINe HOURS, AND THAT THE CONTRACTOR 5HALL DEFEND, INDEMNIFY, AND HOLD THE OY'INER, THE CITY/COUNTY OF LOCAL JURISDICTION, AND THE LANDSCAPE ARCHITECT HARMLESS FROM ANY AND ALL LIA61LITY REAL OR ALLEeED, IN CONNECTION Y'IITH THE PERFORMANCE OF Y'IORK ON THIS PROJECT, EXCEPTINe FOR LIA61LITY ARl51Ne FROM THE SOLE NEeLleENCE OF THE 0Y'INER, THE CITY /COUNTY OF LOC.AL JURISDICTION, OR THE LANDSCAPE ARCHITECT. s+-ll!l!T NO.: L-T-O1 (I) IRRl<SrATION l""L-ANS J...1-O1 THRU J...1-O4 (:::2-S) J...1-O5 (6) l!ll!llll6ATION L-!!:61!N:C, IRRl6ATION CAI-CUL-ATIONS IRRl6ATION :C,l::TAIL-S, 4 NOTeS IRRl6ATION SPECIFICATIONS l""L-ANTIN6 l""L-ANS L-1-O6 (-,) L-1-O"7 TH~ L-1-O"1 (e>-10) L-1-1O THRU L-1-1:::2 (II-le) J...l'"'-O1 THRU L-l""-O4 (14-1"7) 1-1""-OS (le,) l""L-ANTIN<Sr L-!!:<Srl::N:C, :C,l::TAIL-S l""L-ANTIN<Sr NOTI!:S l"'L-ANTIN6 Sl""!!:CIFICATIONS RecYcL-1!:c, """ATe!ll use MAI"' L-l"'-O6 (I "I) L-l"'-O"7 TH~ J...l"'-Oe> (:::20-:::2 I) L-H-O1 (:::2:::2) C:.ALll'OltNIA STATE LAA! 5A"fS YOU -T C:.AU. W :'Re YOU Pie. ~ Gc:::IC'E eEGTIOH 4:Jl6-4:llect 6TA1'!!91'HAT 'l!XGAVA"ffON•, ~!Ne, 11lltl!NCMINe, Of 5 SIP\9, DITGHIN&, 0ttlU.INc9 ~-. '1\IM'eL."'419, _,.,.,Ne, c:.AeLE OR PIPE PLOWINe, C>RIV!Ne. FOIJIOATION PIEIEl!Ne, LAND5(;,l,PI! C>lee!Ne PUH51Ne, l'ENc:e Faff OR AHr OTIElt HAY. OLIR. l'l!!RMIT l'<>R Ple.!t!Ne HILL NOT l9E VALID HITHOUT A C>le AU!RT TIC,ICET NJMl!ll!!R ANO NOTIFIG,ATION THAT nE MARl<OIJT 1-tAe eeeN c:.oMPI..ETEO. 1'IEJIE IS ,'\LSO A !+-PAY HIHDc>H ~TION 4216aoJ IN l+flGH YOU -T c:.oMPL!!Tc nE l'ROPOS!I:> C>I-. IP YOU mL tee:> APC>ITIONAI.. TIMe ee"r"ONO TIE l-4 PAYS. IT t5 "(CUii. AES 01 LetefLIT'f TO ~ .6il.L Die .i'il.eRT. Die AU:RT TOU.. I ALL N.MaeR I& 1-.eoo-221-2600. EN511EERINe Pl.AH Cl DRAWN JR ~1 CITY OF CARLSBAD II SHEETS I L_J_j. PLAilf.llNG DEPARTMENT . 22 ~------~-~-~------------~---,,---.-----,----1 DEVELOPER'S NAME: MORROW DEVEl.0PNENf DATE Pl.AN PREPARED: 11-29-06 BY: CMP APPROVED FOR PLANTINe AND IRRl6ATION ONLY, INC..LUDIN6 PR.EC,ISE LOC,ATION OF PLANTIN6 AREAS. -... -I< CA\.\ www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 LANDSCAPE " ARCHITECTURE & PLANNING APPROVED .... 1ST SVBMI'ITAL 02-09-07 2ND SUBMITTAL 3-15-07 3RD SUBMITl'A.L 4-30-07 4TH SUBMITTAL 7-02-07 MYLAR SUBMlTTAL 7-10-07 JOB NO. 06-038 DATE 04-30-07 SCALE AS SHOWN DAlE TilLE: RECEIVED BY: ' INSPECTOR DAlE TITLC SI IEE I FOR, 61.EST BIJILDER I. T-01 VIL 1 AcS£S a= I.A COSTA TIEO.AKS-SJ t---+-r-----+-------t--t---t--+-----l I ~Pti-¼ 4r, rJL..o=Jt l-1"t-c"1 _PLANNING DATE DA 1E INl11Al DA 1E INITIAL ENGINEER OF WORK REVISION DESCRIPTION OTiiER APPROVAL DAlE INITIAL CITY APPROVAL DWN BY: __ _ CHKD BY: __ RVWD BY: PROJECT NO. C.T 05-14 DRAWING NO. 44b-4L APPROVED FOR. PLANTING AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTING AREAS. www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 M '\ ~1 -D it'. ,r "' p: E c.,JJJ ;;;J\.,!?-1 t\ R C J.j J ·r E C T u ri E t''t P t t\ N l\J 1 J\j G DRAWN JR APPROVED MM 1 ST SUBMITTAL 02-09-07 ZND SUBMITTAL 3-13-07 3RD SUBMITTAL 4-30-07 4TH SUBMITTAL 7-02-07 MYLAR SUBMITTAL 7-10-07 AS-BUILT 11-13-14 JOB NO. 05-038 SCALE AS SHOWN ~ "AS-BULT" TITLE: 'f'IZ-lNC.lf;\..L- RECEIVED BY: INSPECTOR rl-1~-11 DATE DATE II NOTE, IRRIGATION MAINLINE AND APPURTENANC.ES LOC.ATIONS ARE DIAGRAMMATIC.. ALL IRRIGATION EQUIPMENT SHALL BE INSTALLED J/l!ITHIN THE LIMIT OF J/l!ORK, IB" OFF ANY HAR.DSC.APE AND J/l!ITH PLANTING AREAS. ANY PARKJ/l!AY IMPROVEMENTS IN PUBLIC. RIGHT-OF-J/l!AY REQUIRES AN ENC.ROAC.HMENT PERMIT FROM THE C.ITY. NOTE: IRRIGATION EQUIPMENT SHOJ/l!N OUTSIDE OF MAINTENANC.E RESPONSIBILITY AREAS FOR C.LARITY ONLY. ALL EQUIPMENT SHALL BE INSTALLED J/l!ITHIN THE LIMIT OF J/l!ORK LINES. VERIFY ALL LAYOUT IN FIELD J/l!ITH OJ/l!NER'S AUTHORIZED REPRESENTATIVE. NOTE, ALL HEADS ARE TO BE ADJUSTED TO PREVENT OVERSPRAY ONTO BUILDINGS, J/l!ALLS, FENC.ES AND HARDSC.APE. ALL ADJUSTMENTS SHALL ASSURE GOOD SYSTEM C.OVERAGE AND DISTRIBUTION EFFIC.IENC.Y J/l!HILE KEEPING J/l!ATER J/l!ITHIN THE LANDSC.APED PLANTED AREAS. NOTE, C.ONTRAC.TOR SHALL ADJUST ALL HEADS AS REQUIRED TO AC.C.OMMODATE ANY VERTIC.AL OBSTRUC.TIONS THAT MAY OC.C.UR, INC.LUDING BUT NOT LIMITED TO LIGHT POLES, FIRE HYDRANTS, FENC.ES, ETC.. VERIFY ALL HEAD LAYOUT J/l!ITH OJ/l!NER'S AUTHORIZED REPRESENTATIVE PRIOR TO C.OMMENC.ING J/l!ORK. NOTE, C.ONTRAC.TOR SHALL PROVIDE SLEEVING FOR ALL FUTURE PAVED AREAS INC.LUDING FUTURE DRIVEJ/l!AYS, ROADJ/l!AYS, AS J/l!ELL AS ALL C.URRENT PAVED AREAS, PATHS, ETC.. VERIFY ALL SLEEVE LOC.ATIONS IN FIELD J/l!ITH OJ/l!NER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING J/l!ORK. NOTE, ALL RC.V'S AND QC.V'S SHALL BE INSTALLED OFFSET FROM MAINLINE AND ISOLATED V'llTH A BALL VALVE. ALL RC.V'S SHOJ/l!N J/l!ITHIN 15 FEET OF EAC.H OTHER SHALL BE INSTALLED ON A COMMON MANIFOLD. 90 60 ---- Ll-01 1-----1------+------------+---+--+---+---11-AP_PR_o_vE_D --'-f~~J;"--·"'---'\.___;4::.__-_,,~=l """-;ft-U--_ I I-l~. 1 + I _ PLANNING DATE _ 1-----+--+-----------------<c---+----1-----+----t DWN BY: __ _ DATE INITIAL f---D_ATE_-'----INI_TIA_L-+--_DA_T_E -1...I_NI_TIA_L-I CHKD BY: __ ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: PROJECT NO. C.T 05-14 DRAWING NO. 446-4L NOTE: IRRIGATION MAINLINE AND APPURTENANCES LOCATIONS ARE DIAGRAMMATIC. ALL IRRIGATION EQUIPMENT SHALL BE INSTALLED l"llTHIN THE LIMIT OF l"lORK, 1e," OFF ANY HARDSCAPE AND l"llTH PLANTING AREAS. ANY PARKl"lAY IMPROVEMENTS IN PUBLIC RIGHT-OF-MY REQUIRES AN ENCROACHMENT PERMIT FROM THE CITY. NOTE, IRRIGATION EQUIPMENT SHOl"lN OUTSIDE OF MAINTENANCE RESPONSIBILITY AREAS FOR CLARITY ONLY. ALL EQUIPMENT SHALL BE INSTALLED l"llTHIN THE LIMIT Of l"lORK LINES. VERIFY ALL LAYOUT IN FIELD l"llTH Ol"lNER'S AUTHORIZED REPRESENTATIVE. NOTE: ALL HEADS ARE TO BE ADJUSTED TO PREVENT OVERSPRAY ONTO BUILDINGS, l"lALLS, FENCES AND HARDSCAPE. ALL ADJUSTMENTS SHALL ASSURE GOOD SYSTEM COVERAGE AND DISTRIBUTION EFFICIENCY Y'lHILE KEEPING l"lATER Y'llTHIN THE LANDSCAPED PLANTED AREAS. NOTE: CONTRACTOR SHALL ADJUST ALL HEADS AS REQUIRED TO ACCOMMODATE ANY VERTICAL OBSTRUCTIONS THAT MAY OCCUR, INCLUDING BUT NOT LIMITED TO LIGHT POLES, FIRE HYDRANTS, FENCES, ETC. VERIFY ALL HEAD LAYOUT Y'llTH OY'lNER'S AUTHORIZED REPRESENTATIVE PRIOR TO COMMENCING Y'lORK. NOTE, CONTRACTOR SHALL PROVIDE SLEEVING FOR ALL FUTVRE PAVED AREAS INCLUDING FUTURE DRIVEl"lAYS, ROADl"lAYS, AS Y'lELL AS ALL CURRENT PAVED AREAS, PATHS, ETC. VERIFY ALL SLEEVE LOCATIONS IN FIELD Y'llTH OY'lNER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTIN<S Y'lORK. NOTE, ALL RC.V'S AND QC.V'S SHALL BE INSTALLED OFFSET FROM MAINLINE AND ISOLATED Y'llTH A BALL VALVE. ALL RC.V'S SHOY'lN l"llTHIN 15 FEET OF EACH OTHER SHALL BE INSTALLED ON A COMMON MANIFOLD. APPROVED FOR PLANTINiS AND IRRliSATION ONLY, INCLUDINiS PRECISE LOCATION Of PLANTINiS AREAS. / I www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 9203 7-1353 Tel 858 558 8977 Fax 858 558 9188 !LJ\NDS{'.APE A R·.r. · ( '·1 ] --~ 't' ·(' ··j• llJ if{ r:'. · ·r· J r· · · ·• r· u ! : ... .-.. :....I _. .J ....... & PLJ.\l\lNJN(a DATE 04-30-07 DRAWN JR APPROVED MM 1ST SUBMITTAL 02-09-07 2ND SUBMITTAL 3-13-07 3RD SUBMITTAL 4-30-07 -<TH SUBMITTAL 7-02-07 MYLAR SUBMITTAL 7-10-07 AS-BUILT 11-13-14- JOE NO. 05-038 SCALE AS SHOWN D so 60 SCALE!, l 11 = 601 II ..---------,,,r-----:,,-,, A--:S----::B.,-.,U,.,-1 L-::T,,-" -------..-------,---,---------------,------,---,---,----1 fl; GUEST BUILDER IRRIGATION PLAN I SH3EET I CITY OF CARLSBAD ~2 PLANNING, DEPARTMENT ~ , I 61)EST BUILDER ll-l2-l-<-i VILLA6ES OF LA COSTA Ll-02 DATE TITLE:-~:...,:'12-,::_,_,ll--i~c:.-<-1<1....,;f'C..Jli!-.""""'L--""-----------t---t----+----------------+--+---+----+-----1 :=====THE==o.=~=l<S==-=;3=·='======= RECEIVED BY: APPROVED ,a( Ge: ~IL.--ft PLANNING INSPECTOR DATE 1--=-c-ccc-+-c-=ccc-+---------------t-----+---1-----1------1 DWN BY: __ _ DATE INITIAL 1--D_ATE_~I_NI_TIA_L-+-_DA_T_E ~I_NI_TIA_L_, CHKD BY: __ ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: PROJECT NO. C-T 05-14 11 . 1-:;. -~➔ DATE DRAWING NO. 446-4L i_ APPROVED FOR PLANTING AND IRRIGATION ONLY, INC,LUDING PREGISE LOGATION OF PLANTING AREAS. -~------- www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037·1353 Tel 858 558 8977 Fax 858 558 9188 DATE DRAWN APPROVED 1ST SUBMITTAL 2ND SUBMITTAL 3RD SUBMITTAL 4TH SUBMITTAL 04-30-07 JR MM 02-09-07 3-13-07 4-30-07 7-02-07 L J.\ a\J lD :S C t\ P !E MYLAR SUBMITTAL 7-10-07 t\ n 1C J-J I ·r E 1C I u R l: e'l P L ;.\ N J\J i ~J G AS-BUILT JOB NO. 11-13-14 05-038 AS SHOWN ------------ NOTE: IRRIGATION MAINLINE AND APPURTENANCES LOCATIONS ARE DIAGRAMMATIC. ALL IRRl6ATION EQUIPMENT SHALL BE INSTALLED V'ilTHIN THE LIMIT OF V'iORK, It:>" OFF ANY HAR.DSC.APE AND J/'IITH PLANTING AREAS. ANY PARKJ/'IAY IMPROVEMENTS IN PUBLIC RIGHT-OF-J/'IAY REQUIRES AN ENCROACHMENT FER.MIT FROM THE CITY. NOTE: IRRl6ATION EQUIPMENT SHOJ/'IN OUTSIDE OF MAINTENANCE RESPONSIBILITY AREAS FOR CLARITY ONLY. ALL EQUIPMENT SHALL BE INSTALLED J/'IITHIN THE LIMIT OF V'iORK LINES. VERIFY ALL LAYOUT IN FIELD V'ilTH OV'iNER'S AUTHORIZED REPRESENTATIVE. NOTE: ALL HEADS ARE TO BE ADJUSTED TO PREVENT OVER.SPRAY ONTO BUILDIN6S, J/'IALLS, FENCES AND HARDSCAPE. ALL ADJUSTMENTS SHALL ASSURE GOOD SYSTEM COVERAGE AND DISTRIBUTION EFFICIENCY V'iHILE KEEPING J/'IATER J/'IITHIN THE LANDSCAPED PLANTED AREAS. NOTE: CONTRACTOR SHALL ADJUST ALL HEADS AS REQUIRED TO ACCOMMODATE ANY VERTICAL OBSTRUCTIONS THAT MAY OCCUR, INCLUDING BUT NOT LIMITED TO LIGHT POLES, FIRE HYDRANTS, FENCES, ETC. VERIFY ALL HEAD LAYOUT J/'IITH OJ/'INER'S AUTHORIZED REPRESENTATIVE PRIOR TO COMMENCING J/'IORK. NOTE: CONTRACTOR SHALL PROVIDE SLEEVING FOR ALL FUTURE PAVED AREAS INCLUDING FUTURE DRIVEJ/'IAYS, ROADJ/'IAYS, AS J/'IELL AS ALL CURRENT PAVED AREAS, PATHS, ETC. VERIFY ALL SLEEVE LOCATIONS IN FIELD J/'IITH OJ/'INER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING Y'lORK. NOTE, ALL RC.V'S AND QC.V'S SHALL BE INSTALLED OFFSET FROM MAINLINE AND ISOLATED J/'IITH A BALL VALVE. ALL RC.V'S SHOJ/'IN Y'llTHIN 15 FEET OF EACH OTHER SHALL BE INSTALLED ON A COMMON MANIFOLD. \ NOTE A: POC "61" TO BE A I½" POTABLE V'lATER HETER V'llTH A 2" SERVICE LATERAL. BACKFLOV'l SIZE: MASTER VALVE SIZE: FLOV'l SENSOR SIZE: STATIC V'lATER PRESSURE: DESl<SN V'lATER PRESSURE, BOOST REQUIRED, MAXIMUM DEMAND, SET POC, RE<SULATOR @ ESTIMATED AREA SERVED, EST. ANNUAL V'lATER USE: MAV'lA, ROAD STATION: V'lA TER SOURCE INFO OBTAINED, 1.5" V.I.T. SBBG-SOCR 1.5" 1.5" 145 PSI 11 PSI NO 40 6PM 16 PSI 25,144 SQ. FT. I .bS ACRE FT. PER YEAR I.Bl ACRE FT. PER YEAR 10+'10 12-1-06 FROM DAVID BLALOCK @ HUNSAKER (B5B-55B-4500) THE CONTRACTOR SHALL VERIFY LOCATION AND V'lATER PRESSURE BY DIRECT MEASUREMENT IN THE FIELD. IF EXISTIN6 PRESSURE IS NOT AS STATED ON THE PLANS THE CONTRACTOR SHALL NOTIFY THE OV'INERS' REPRESENTATIVE BEFORE PURCHASE OF EQUIPMENT AND BE6INNIN6 INSTALLATION. PURCHASE OF EQUIPMENT AND ANY INSTALLATIONS V'lHEN EXISTIN<S STATIC PRESSURE IS BELOV'l THAT STATED ABOVE SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. NOTE M, CONTROLLER "QQ" SHALL BE A RAIN MASTER/ HYDRO-SCAPE CONTROLLER ASSEMBLY, MODEL II, HSI-BP-DXIB/HSDX-RF/HSEV-RADIO-F/HSEV-ANT-FD/HSEV -6ND /HSRSE-D X/HSFS-I50 FINAL LOCATION OF CONTROLLER, ELECTRICAL SERVICE, AND APPURENTANCES SHALL BE OUTSIDE ANY PUBLIC R.O.V'l. OR EASEMENT AND CONFIRMED V'llTH OV'INER'S REPRESENTATIVE PRIOR TO COMMENCIN<S V'lORK. SGAL=1 111 = ao• NOTE B: POC "62" TO BE A I½" POTABLE V'lATER METER V'llTH A 2" SERVICE LATERAL. BACKFLOV'l SIZE, MASTER VALVE SIZE: FLOV'l SENSOR SIZE: STATIC V'lATER PRESSURE: DESl<SN V'lATER PRESSURE: BOOST REQUIRED, MAXIMUM DEMAND, SET POC RE<SULATOR@ ESTIMATED AREA SERVED, EST. ANNUAL V'lATER USE: MAV'lA, ROAD STATION, V'lATER SOURCE INFO OBTAINED, 1.5" V.I.T. SBBC-SOCR 1.5" 1.5" 145 PSI '10 PSI NO 40 6PM '15 PSI 24,0'16 SQ. FT. 2.04 ACRE FT. PER YEAR I.BS ACRE FT. PER YEAR 10+'10 12-1-06 FROM DAVID BLALOCK @ HUNSAKER (B5B-55B-4500) THE CONTRACTOR SHALL VERIFY LOCATION AND V'lATER PRESSURE BY DIRECT MEASUREMENT IN THE FIELD. IF EXISTIN6 PRESSURE IS NOT AS STATED ON THE PLANS THE CONTRACTOR SHALL NOTIFY THE OV'lNERS' REPRESENTATIVE BEFORE PURCHASE OF EQUIPMENT AND BE<SINNIN6 INSTALLATION. PURCHASE OF EQUIPMENT AND ANY INSTALLATIONS V'IHEN EXISTIN6 STATIC PRESSURE IS BELOV'l THAT STATED ABOVE SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. NOTE BB, CONTROLLER "RR" SHALL BE A RAIN MASTER/ HYDRO-SCAPE CONTROLLER ASSEMBLY, MODELlt, HSI-BP-DXSO/HSDX-RF/HSEV-RADIO-F/HSEV-ANT-FD/HSE V-6ND /HSRSE-D X/HSFS-I50 FINAL LOCATION OF CONTROLLER, ELECTRICAL SERVICE, AND APPURENTANCES SHALL BE OUTSIDE ANY PUBLIC R.O.V'l. OR EASEMENT AND CONFIRMED V'llTH OV'lNER'S REPRESENTATIVE PRIOR TO COMMENCIN6 V'lORK. w CITPYANgr D~P~~E~J3AD ~ .--------.,,.,_--....,,.--------.----,----,--------------,----,----r----,---1 , /4~" AS BUil T" t----t---;---------------+---;------t--+---t GUEST BUILDER IRRIGATION PLAN f/~ J)-!'3-/Lf VILLA~To'rl'tA~TA LI-OB DATE o THE OAKS -!J.I TITLE: I5i2 I NC.I f.._l- RECEIVED BY: APPROVED /q( q? f::1\=4t: t----t---;---------------+---;------t--+---t ::;P~LA;'::N=;N:::::IN:::::G==::::;-;:======::::;;:::::::::DA::::::T::::E ===: DWN BY: I PROJECT NO. I DRAWING NO. DATE INITIAL DATE INITIAL CHKD e-------~---~--RVWD BBYY:.--GT 05-14 446-4L OTI,ER APPROVAL CITY APPROVAL . INSPECTOR I l-\~. l + DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTING AREAS. www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 (J. j\ rv.1 1,rn· r; if"'.'. /0. if) r .. L r'i U j 1,1 J '',,,, if'i J' ~ J\ f{ C }l 1 ·r E C T lJ f{ E 8! P L A N ~~ I i\J (i DATE 04-30-07 DRAlfN JR APPROVED MM 1ST SUBMITTAL 02-09-07 2ND SUBMITTAL 3-13-07 3RD SUBMITTAL 4-30-07 •TH SUBMITTAL 7-02-07 MYLAR SUBMITTAL 7-10-07 AS-BUILT 11-13-14- JOB NO. 05-038 SCALE AS SHOWN DIMENSION CHAIN STARTIN& POINT ON SHEET Ll-O:l RECEIVED BY: DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION D NOTE, IRRIGATION MAINLINE AND APPURTENANCES LOCATIONS ARE DIAGRAMMATIC. ALL IRRIG>ATION EQUIPMENT SHALL BE INSTALLED r'!ITHIN THE LIMIT OF r'!ORK, IB" OFF ANY HARDSCAPE AND r'!ITH PLANTING AREAS. ANY PARKY'!AY IMPROVEMENTS IN PUBLIC RIGHT-OF-r'!AY REQUIRES AN ENCROACHMENT PERMIT FROM THE CITY. NOTE: IRRIG>ATION EQUIPMENT SHOY'!N OUTSIDE OF MAINTENANCE RESPONSIBILITY AREAS FOR CLARITY ONLY. ALL EQUIPMENT SHALL BE INSTALLED r'!ITHIN THE LIMIT OF r'!ORI<. LINES. VERIFY ALL LAYOUT IN FIELD r'!ITH Or'!NER'S AUTHORIZED REPRESENTATIVE. NOTE, ALL HEADS ARE TO BE ADJUSTED TO PREVENT OVER.SPRAY ONTO BUILDINGS, r'!ALLS, FENCES AND HARDSCAPE. ALL ADJUSTMENTS SHALL ASSURE GOOD SYSTEM COVERAGE AND DISTRIBUTION EFFICIENCY r'!HILE KEEPING> r'!ATER r'!ITHIN THE LANDSCAPED PLANTED AREAS. NOTE, CONTRACTOR SHALL ADJUST ALL HEADS AS REQUIRED TO ACCOMMODATE ANY VERTICAL OBSTRUCTIONS THAT MAY OCCUR, INCLUDING> BUT NOT LIMITED TO LIGHT POLES, FIRE HYDRANTS, FENCES, ETC. VERIFY ALL HEAD LAYOUT r'!ITH Or'!NER'S AUTHORIZED REPRESENTATIVE PRIOR TO COMMENCING r'!ORI<.. NOTE: CONTRACTOR SHALL PROVIDE SLEEVING FOR ALL FUTURE PAVED AREAS INCLUDING FUTURE DRIVEY'!AYS, ROADY'!AYS, AS r'!ELL AS ALL CURRENT PAVED AREAS, PATHS, ETC. VERIFY ALL SLEEVE LOCATIONS IN FIELD r'!ITH Or'!NER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING r'!ORI<.. NOTE, ALL RCV'S AND QCV'S SHALL BE INSTALLED OFFSET FROM MAINLINE AND ISOLATED r'!ITH A BALL VALVE. ALL RCV'S SHOY'!N r'!ITHIN 15 FEET OF EACH OTHER SHALL BE INSTALLED ON A COMMON MANIFOLD. 0 S>O 60 SCAL.E:!1 I 11 = 601 DATE INITIAL OATE INITIAL OTHER APPROVAL CITY APPROVAL GUEST BUILDER IRRIGA TI□N PLAN 61.JEST EJI.IILOER VILLA6ES OF LA COSTA THE OAKS -!3.I APPROVED rw PLANNING DWN BY: PROJECT NO. CHKD BY: GT 05-14 RVWD BY: Ll-04 11-~;;.-/ DATE DRAWING NO. 446-4L i' 5YMeOl.. GI V H F (D E& 0 CD ~ @ @ @ @ er, ® ® @ @ @ I@ G I@ @ ilJ) @ lillil ® @ @) @ @ €3 @ @@. @ €, ~ @) @)@ e ~@ © @S © @© @ 9@ @ ©@ 5'1'MBOl.. ll!I NO SYMBOL. @ e Ill NO SYMBOL. NO SYMBOL. IRRIGATION MATERIAL LEGEND MANUFACT. MODEL. NO. I DE5C-Rll"TION 5FM 1"51 RADIU5 DETAIL. RAIN BIRO RAIN BIRO RAIN BIRO RAIN BIRO RAIN Bll'(D RAIN Bll'(D RAIN BIR!:) I-I.INTER I-I.INTER H.INTER H.INTER H.INTER HJNTER I-I.INTER I-I.INTER H.INTER I-I.INTER I-I.INTER RAIN Bll'(D MANUFACT. P.O.C.. Nlec.O HUNTER HUNTER NIA i'<ll..t<INS HUNTER leoo-5AM-PRS-5 POP-I.JP .10, .1::5, .20 "° 5 FT leoo-5AM-PRS-U& POP-lJP .26, .::55, .5.2, 1.05 "° e, FT leoo-5AM-PRS-UIO POP-\.IP .l5'1, .Sl.2, .1"1, I.S\1 "° 10 FT l&oo-6AM-PRS-Ul.2 POP-I.JP .bSI, .&1, 1.::5, .2.b "° 1.2 FT leoo-5AM-PRS-UIS\ POP-IJP ."1::5, 1.25, l.!>5, 5.10 "° IS\ FT l&oo-SAM-PF!.$-IS\EST/&eT POP-LIP .bl, 1..21 "° Sl><ISI FT S\><5O FT SCH.&o NIPPLE WITH 140.2 PRESSURE COMPENSATINe 050(1.00) TRIC.Kl.E PATTERN l!!UB6!..ER, EACH SYM60!.. "° 6FT REPRESENTS THO BUBBI..ERS PER TREE Pe.J-.15/1.Sl/5.0 5HIWB HEAD .15, I.SI, ::5 .0 40 lb FT P6J-I.O/:!.O/4.O SHRUB HEAD 1.0, 2.0, 4.0 40 .20 FT P6H-APV/56Y-I.0/5.O/5.O SHRUB HEAD O.b, 1.0, l.b 40 .2e, FT P6H-ADV/56Y-.2.O/4.O/b.O 5HFWB HEAD O.b, 1.4, 5.1 40 :,:, FT P6H-ADY/56Y-::5.O/6.O/"I.O ROTOR HEAD 1.0, .2.4, 4.3 40 36 FT l-.2O-ADY/36Y-.Sl/l.O/2.O SR ROTOR HEAD .4::5, ."10, 1.1 40 20 FT l-.2O-ADY/36Y-.1SI/I.Sl/5.O SR ROTOR HEAD .6t>, 1.!!I, .2.1 40 .2S\ FT l-.2O-ADY/36Y-l.0/2.0/4.0 ROTOR HEAD 1.0, 1.e,, 5.1 40 eJO FT l-.2O-ADY/36Y-I.Sl/5.O/6.0 ROTOR HEAD 1.4, 2.4, 4."I 40 55 FT 1-.2O-ADY/36Y-.2.O/4.O/t>.O ROTOR HEAD 1.e,, ,.1, 6.0 40 40 FT POP-\.IP5 SHALL. BE U5ED IN THE Rl6HT-oF-HAY AND J/'IHEFI.EYEFI. HITHIN 10' OF ANY HAFI.DSCAPE, TURF OR OTHER AREA HHEF!.E PEDESTRIAN TRAFFIC. MAY OG,G.I.JFI., INSTAl..l.. Al..l.. !SHl'WB HEADS ON 12" POP-UP5 AND Al..l.. 1'1.JFI.F HEADS ON e,• POP-Ul"5. HHEN RADIUS OF SPFI.INKl.EFI. HEADS, REGUIFI.ED FOR PROPER COYEAA6E, 15 l..E55 THAN RADIUS 5HOHN ON l..E6END, THE CONTRACTOR SHALL. EG!UIP HEAD HITH A RAIN Bll'(D '1"C.5" PRE&eUFI.E C.OMPENSATINe SCREEN FOR FLOI'< AND RADIUS CONTROL.. SELI:C,T SCREEN ON PCS NOZZl..E 5C-FI.EEN SEl..ECTION CHART, PROVIDED BY MANUFACTURER, FOR APPROPRIATE FI.ADIU5. HHEN INSTALl..lNe Sf'FI.INKU:FI. HEADS USINe NOZZl..ES THAT FI.EG!UIRE AAG PATTERNS OTHER THAN THE STANDARI:) ARC PATTERNS (!Ibo•, l&o', 1.20', "10', ETC.) THE CONTFI.ACTOR SHAl..l.. USE YAFI.IA51.E AAG OR ADJUSTABl..E NOZZl..ES. RADIUS OF ADJUSTABl..E NOZZI..ES SELECTED TO MATCH SITE CONDITIONS. NOTE, PRECIPITATION RATES ARE IN INCHES PER HOUR (IN/H) BASED ON TFI.IAN6Ul..AR SPACINe, $OSI, DIAMETER OF THROW, C.Ol..l..EC.TED IN ZERO i'<IND CONDITIONS. IRRIGATION MATERIAL LEGEND (PRIVATE LOTS) MODEL. NO. I DESCRIPTION CONNECT DOl'<NSTREAM OF THE EXISTINe el/4" DOMESTIC. ME~ VERIFY SIZE, l..OC-ATION, AND FFI.E55UFI.E IN FIELD, i'<ITH OWNER'S AUTHORIZED FI.CPRESENTATIYE PRIOR TO C.OMMENG-INe HORI< MODEL. NUMBER T-5&o-66 BRONZE BAl..l.. VALVE, l..lNE SIZE, THREADED THO-Pll;C,E BODY. HUNTER FG-)()(><><I MODUI..AR, INDOOR MOUNT IFI.Fl.16ATION C.ONTF!.Ol..LER SIZE AS REG!UIFI.ED, INSTALL. WITHIN 6AAA6E, VERIFY ACTUAL LOCATION IN FIELD HITH 0~ AUTHORIZED Fl.l::FFI.ESENTATIYE. MINI-C.l..11< RAIN SENSOR, MOUNT TO EAVE Of' BL.De. AND lr!IFI.E TO CONTF!.Ol..l..EFI. FER MANUFACTUFI.EFI. INSTFI.UC.TIONS. VERIFY ACTUAL LOCATION IN FIEL.D i'<ITH 01'INER5 AUTHORIZED FI.EFFI.ESENTATIYE. 1.20 VOL. T El..l;C,TRIGAl.. POl'<EFI., PROVIDED BY ELEGTFI.IGIAN, YEFI.IFY ACTUAL l..OC-ATION IN FIELD 5OO-Hl..R SERIES PFI.E5&UFI.E FI.EDUGINe VALVE i'<ITH 10 TO 125 PSI Sf'FI.INe RAN6E, SIZE AND PRE&eUFI.E SETTINe AS NOTED. ASY-1O1-C.C. ANTI-SIPHON Fl.EMOTE CONTFI.OL VALVE, i'<HEN HEADS ARE l..Ov-lER THAN Fl.CY HUNTER P6Y-IOIA-C.C. AN<5LE VAL.YE FOl'lt USE J,.IHl::N IMl6ATION HEADS Al'llE Hl6HEl'lt THAN Fl.CY IN CONJUNCTION i'<ITH HJNTEFI. ATMOSPHERIC. VACUUM BREAKER. INSTALL. AVB-100 ATMOSPHERIC. VACUUM BREAKER PER MANIJF. RECOMMENDATIONS, 6" ABOVE Hl6HEST OUTLET, SIZE AS SHO!r!N. AS APFFI.OVED PVC PIPE 3/4" -11/2" Cl.. . .200 AS l..ATEFI.AL l..lNES 1.2" BEl..01'< 61'!.ADE AS APPROVED PVC PIPE 11/4" 5C-H. 40 AS MAINl..lNES It," BEl..Ov-1 6AADE AS APPFI.OYEO PVG PIPE SCH. 40 AS SI..EEYIN6, Til'IJGE THE DIAMETER OF PIPE OR i'<IFI.E BUNDl..E CARRIED PL.ACE BELOl'l Al..l.. PAYIN6, HARl:)5(;APE, ETG., AND AS DIFI.EGTED BY Oi'<NER'S AUTHORIZED REPRESENTATIVE. AS APPROVED 'lllt>-><>< Alrl6 MUl.. Tl-STRAND IFI.Fl.16ATION CONTROL. V'IIRE, DIRECT BURIAL, l!.I... APPROVED, PER GODE. NUMeEFI. OF MUl..TI-WIFI.E STRANDS SHALL. BE AT l..EAST THREE MORE THAN NUMBER OF VAL.YE STATIONS SHOl'<N PER PRIVATE LOT. SPEARS DS-500 PRE-Fll..l..ED WIRE CONNECTORS, USE ON Al..l.. ir!IRE CONNECTIONS I f'FI.IYA TE LOT C.Al..l.. Ol!T I @~TION# ~!>SCA www.gmplandarch.com DRAWN 9404 Genesee Avenue APPROVED A A A A A A A A A A A A A A A A A B.C. DETAIL. D,E Q I< NIA M 5 T)J,Y DD DD EE 6,DD,EE JR MM ,t.oody Suite 140 La Jolla 1ST SUBMITTAL 02-09-0? APPROVED FOR PLANTIN6 California 92037-1353 2ND SUBMITTAL 3-13-07 :: 0 Tel 858 S58 8977 3RD SUBMITTAL 4-30-07 AND IRRIGATION ONLY, .. -a Fax 8S8 5S8 9188 .. -&TH SUBMITTAL 7-02-07 INCLUDING PRECISE -/( LANDSCAPE MYLAR SUBMITTAL 7-10-07 LOCATION OF PLANTING ARCHITECTURE JOB NO. 05-038 DATE 04-30-07 AREAS. OF CA\.\ & PLANNING SCALE AS SHOWN IBI 1£1 NO SYMBOL. NO SYMBOL. NOTSHOHN NOTSHOHN NO SYMBOL. NO SYMBOL. IRRIGATION MATERIAL LEGEND (POTABLE 0-lATER) MANUFACT. MODEL NO. I DESCFl.ll"TION DETAIL. P.O.C.. POTA51.E IRRl6ATION HATER METER (SEE NOTES FOFI. DESl6NATION AND SIZES). VERIFY ACTUAL l..OC.ATION, SIZE, AND NIA HATER PRESSURE IN THE FIELD FFI.IOFI. TO C.OMMENG-INe HORI< AND PURe,HASINe EGUIPMENT. V'lll..l<INS "115XI.Y~Hl..R SERIES, BACl<Fl..OH PREVENTION ASSEMBl..Y Kl MODEL. 'YBP' HYE STRAINER. Al..l.. l"ll"INe BETl'<EEN 0 METER AND BACl<Fl..OW DEVIGE SHALL. BE 'I<' COPPER OR Fl.ED BRASS. EFB-C.P-D SERIES BRASS MASTER GONTF!.Ol.. VALVE. MASTEFI. VAL.YE SHALL. BE INSTAl..l..ED IN A 'JUMBO' SIZED N VAL.YE elOX HITH l..OC-l<INe el'I.EEN COYEFI. AND 'MGY' HEAT BRANDED ON COYEFI.. DATA IND/VcST IR-.22O PVG Fl..Ov-1 SENSOR, WIRE TO C.ONTF!.Ol..l..EFI. USIN6 F1111D C.Ael..E IN I" CONDUIT, INSTAl..l.. PER MANUFACTUFI.EFl.'S AND IMTITED 61'1.EEN Tec.H OF l..A6UNA HILl..S, CA (&o0-4.21-0'1"1"1) FI.EGOMMENDATIONS. M.ll.. TIPl..E Fl..Oi'< SENSORS FI.EG!UIRE SEPARATE CONDUIT RUNS. NIBCO MODEL. NUMBER T-5&O-66 BFI.ONZE BALL VAL.YE, l..lNE SIZE, THREADED THO-Flec.E BODY. VAL.YE BOX V'IITH 61'1.EEN l..lD, HEAT BRAND LID lr!ITH "BY". RAIN BIR!:) 44LG Gll/lGI< COUPl..EFI. VALVE, INSTAl..l..ED IN 10" ROUND VALVE BOX HITH l..OC-KIN6 61'1.EEN GOYEFI. AND 'G!GY' HEAT BRANDED ON C.OYEFI.. INSTAl..l.. G!GY ON A 11/2" STUB-OUT OFF MAINl..lNE. EACH G!GY SHAl..l.. BE ISOl..ATED FROM THE MAINl..lNE BY A 11/2" BAl..l.. VAL.YE AND INSTALL.ED AT :200' O.G. PER CITY REG!UIFI.EMENTS. J l.. RAIN BIRD PESB GP-PF!.$-D SEFl.11:S PLASTIC FRESSI.IFI.E RE19Ul..ATINe GONTF!.Ol.. VAL.YE, SIZE AS SHOl'<N, INSTAl..l.. ONE VALVE PER P STD. FI.EC.T. VAL.YE eox HITH l..OGl<INe 61'1.EEN GOYEFI. AND 'Fl.CV' HEAT..1'FI.ANDED ON GOYER. VAL.YES SHAL.l.. BE INSTALLED IN MANIFOLDS ISOl..ATED FROM THE MAINl..lNE BY A BALL. VAL.YE. SIZE BAl..l.. VALVE PER THE l..AFI.SEST Fl.CY IN THE MANIFOl..D. RAIN MASTEFI./ IFI.Rl6ATION C.ONTFI.Ol..l..EFI. IN STAINl..E&e STEEL. ENCl..OSUFI.E, SEE NOTES FOR MODEL. AND STATION COUNT. CONTFI.OLl..ER F HYDRO-SCAPE SHALL. HAYE A DESl6NATED RECTAN6UJ..AFI. PUl..l.. BOX INSTAl..l..ED AT PEDESTAL BASE. CONTACT HYDFl.0-SCAPE TO COORDINATE FUFI.CHASE AND INSTAl..l..ATION. HUNTER FI.AIN SENSOFI., H'T'DFl.0-SCAFE i'lll..l.. MOIJNT TO ENGl..OSUFI.E AND HIRE TO C.ONTFI.Ol..l..EFI.. NIA 1.20 VOL. T ELec.TFI.IGAl.. POl'EFI., PROVIDED BY El..l;C,TFI.IGIAN, VERIFY ACTUAL l..OC.ATION IN FIELD ir!ll..l<INS S\00-HLR SERIES PFI.E5SI/FI.E FI.EDUGINe VALVE HITH 10 TO 1.25 PSI Sf'FI.INe Fl.ANISE, SIZE AND FFI.E55UFI.E SETTINe AS NOTED. AS APPROVED PUl..l.. BOXES FOFI. WIRE SPL.IGES SHAl..l.. BE l..OC.ATED APPFI.OXIMAT!:l.. Y S\00' O.C.. AND AT THE ENDS OF Al..l.. Sl..EEYES l!NDER PAYINe. PULL. eoxes SHAl..l.. BE 10' FI.OUND i'<ITH l..OC.l<INcS l..lD AS AFF'FI.OYED PVC SOL.VENT i'<El..D l..ATEFI.Al.. PIPE i'<ITH SGH.40 FITTIN65, ¾"-~" SCH. 40, .2"-~" C.l..A&e 200, DEPTH AS PER DETAIL.. AS APPROVED PVC PIPE MAINl..lNES, DEPTH AS PER DETAIL.,~• , SMAl..l..ER SHALL. BE SOL.VENT i'<El..D SCH.4O WITH SGH.40 SOLVENT l'E.D FITTINSS, 2"-5" SHALL. BE SOLVENT l'ELD GL. 515 V'IITH SCH.60 SOL.VENT i'<ELD FITTlt.65, .21!,"-::5" FITTIN6S SHAl..l.. BE THRUST Bl..OC.l<ED, 4' AND LA"'6EFI. SHAl..l.. BE Cl.. . .200 eASt<ET JOINT WITH l..EEMCO DIJGTll..E lfltON FITTIN65 AND JOINT RESTRAINT. AS APPROVED PVC PIPE AS Sl..EEYIN6, TWICE THE DIAMETER OF PIPE OR HIRE BUNDLE C.AFI.FI.IED FL.ACE BEL.OW Al..l.. FAYINe, HAFI.DSGAPE, ETG., AND AS DIFI.ECreD BY Ol'IINEFl.'5 AUTHORIZED REPRESENTATIVE. Sl..EEYES LINDER ROADS SHALL. BE SCH. 60 PVC,, AND Al..l.. SLEEVES UNDER l"'AYINe(NON-ROAD) SHALL. BE SCH. 40 PVG. SLEEVES I.INDEFI. BFI.OW DITCHES SHAl..l.. BE ENCASED IN C.ONGFI.ETE A MINIMUM OF 6" THIGI< ON Al..l.. SIDES OF PIPE. EXTEND Al..l.. SLEEVES 1.2" MINIMJM PAST HAROSGAFE EDeES, MARI< HAFIDSGAPE GUFI.BS WITH 'IS' IN .2" Hl6H l..ETTEFI.S FOR l..OC.ATION(S.) EXTEND Al..l.. PIPE It>' PAST SLEEVE l"FI.IOR TO ANY FITTIN65. AS AFPFI.OYED IFI.Fl.16ATION CONTROL. ir!IRE SHAl..l.. BE #14UF Alrl6 DIRECT euRIAl.. (IJ.J... APPROVED), C.Ol..OFI. GODE i'<IRE PER C.ONTF!.Ol..l..EFI., A MINIMJM OF THREE: SEFARATE SPARE Pll..OT i'<IRES TO THE END OF EACH MAINl..lNE. ROUTE SPARE WIRES INTO EACH VALVE MANIFOLD l..OGATION, BUNDl..E AND TAPE ALL. HIRE AND INSTAl..l.. ADJACENT TO MAINl..lNE, l..EAVE SPARE i'<IRE ENDS IN THE l..AST VAL.YE MANIFOLD BOX ON THE MAINl..lNE. IFI.Fl.16ATION COMMON i'<IFI.E SHAl..l.. BE '1112UF Ai'<6 DIRECT euRIAl.. (IJ.l... APPROVED). SPEARS YALCON l..ASCO DS-500 PRE-Fll..l..ED i'<IFI.E C.ONNEGTOFl.5, U5E ON Al..l.. lr!IRE CONNECTIONS IN VAL.YE OR PUl..l.. BOXES ONl..Y 5000 SEFI.IES APV, IJSED ON ALL. Sf'FI.INKl.ERS i'<ITH l..01'< HEAD DFI.AINA6E UNGONTF!.Ol..l..A51.E 5Y FACTORY INTE6RAL Sf'FI.INKl.EFI. HEAD CHec.l< VALVE. BFl.-4 PRESSURE FI.E6ULATINcS VALVE TO BE INSTALL.ED ON Al..l.. I.ATEFI.AL l..lNES J,.IHl::Fl,E SFFI.INl<I..EFI. HEADS ARE LOCATED AT AN El..EYATION MORE THAN !50' l..Oi'<ER THAN THE Fl.CY. SET PFI.ES5IJFI.E TO GONTFI.Ol.. PRESSURE DUE TO THIS El..EYATION CHANeE, SIZE PER l..ATEFI.AL l..lNE SEFI.YINe SYSTEM. INSTALL. IN A 10" ROUND VALVE elOX BEL.OW '51'1.ADE. GONTFI.ACTOR TO l..OC-ATE Al..l.. SUCH FFI.V'S IN THE FIELD AND SHOH l..OC-ATIONS ON REC.ORI:) DFI.AHIN65. MANUFACTURED SGH.40 O-FI.INe SW!Ne JOINTS. FOFI.~" SFFI.AY HEADS U5f: ~el.2-212, FOR o/4" TURF fltOTORS USE T're.2-.212, FOR I" SPOFI.T fltOTORS USE 6152-412, FOR I" G!UIGI< GOUPLER VALVES USE 61525-21.2 lr!ITH MALE 6FI.A&e STABll..lZEFI. ELBOI'<, FOFI. ¾" G!UIGI< GOUPl..ER VALVES lJ5E .Slel.2T-.21.2 lr!ITH MALE BFI.A&e STABll..lZEFI. ELBOY'I. VALVE BOXES, SIZE FER EG!UIPMENT LE6END, i'<ITH T-c.oYEFI. l..lDS AND CAPTIVE BOl.. T AND l..OC.-l<IT. FOFI. ROUND DRIP EMITTERS USE MODEL. 510, 1" EC0N0 SHALL. 61: MODEL. 10t>, 10" FI.OUND SHALL. BE MODEL. "110, 1.2" STANDARI:) FI.EC.T. SHALL. 61: MODEL 141"1, 1.2' JUMBO Fl.ec.T. SHAl..l.. BE MODEL. 1.220, SUPER JUMBO SHAl..l.. BE MODEL. 15.24, AND SUPER JUMBO XL. SHALL. BE MODEL 11::50. VALVE 60Xl:5 SHALL. HAYE el..ACI< HDPE BODY AND 61'1.EEN l..lDS IN TURF, BL.AC!< l..lDS IN SHRUB BEDS, AND TAN l..lDS IN FI.OGI< M.ll..C.H. FOR USE IN NON-YEHIGUI.AR TRAFFIC. SITUATIONS ONLY. DO NOT INSTAl..l.. IN CONCRETE OR ASFHAL T. [kii]-C-ONTROLLER /STATION# W-GFM L---VALYE 51ZE 9c:> l!I --- F NIA NIA H DD = EE 6,DD,EE 6 NIA NIA NIA NIA ----~ CITY OF CARLSBAD 2 ~ PLAr+JING DEPARTMENT ...--------.... ---.,,...-------..---,---,----------------,-----r---.----,r----t " AS-BUILT" GUEST BUILDER IRRIGATION LEGEND ~ DATE TITLE: RECEIVED BY: DA TE INITIAL DATE INITIAL DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION INSPECTOR DATE OTHER APPROVAL CITY APPROVAL e,t/EST SIJILOER VILLA6E:5 OF LA ~TA THE OAKS -!J.I APPROfe: ~ PLANNING LI-OS J-t'f,e1 DATE OWN BY: __ _ CHKD BY: __ _ RVWD BY: PROJECT NO. C.T 05-14 I DRAWING NO. 446-4L ~ ~ • ~ I' ' \ I I I POC -PRESSURE CALCS PROJECT LACOSTA OAKS 3.1 POC l#RCV# 61 QQ-2 POC.WATER TYPE POTABLE WATER RCVDEMAND 40 GPM HYDRAULIC GRADE LINE 750 FEET METER ELEVATION 415 FEET PRESSURE AVAILABLE AT POC SET POC PSI REGULATOR_.@. DESIGN PRESSURE # GPM SIZE LENGTH PSI SERVICE LINE 40.00 2" 35.00 1.70 METER 40.00 1.5" BACKFLOW DEVICE 40.00 1.5" FLOW SENSOR 40.00 1.5" MASTER CONTROL VALVE 40.00 1.5" MAINLINE (2.5" CLASS 315) 40.00 2.5" 560.00 0.50 MAINLINE (3" CLASS 200) 40.00 3" 0.00 0.00 ISOLATION VALVES 3 VAA = LINE 0.70 RCVSINGLE STATION 40.00 1.5" SCH. 40 LATERALS (10% OF PSI REQ'D) VAA 3.00 SUBTOTAL + 10% FOR FITTINGS TOTAL LOSSES SPRINKLER OPERATING PRESSURE 30 PSI ELEVATION OF SPRINKLER HEAD(S) ON 407 FEET ZONE: 3.464 PSI GAIN SUM PRESSURE REQUIRED SURPLUS 137% SET RCV PRESSURE REGULATOR jf1 *BOOST REQUIRED: MIN. SUCTION PRESSURE: 0 NONE NPSHr: 0 *contractor to verify PSI at Meter is: 145.1 TDH REQUIRED: 0 POC -PRESSURE CALCS PROJECT LACOSTA OAKS 3.1 POCl#RCV# 62 RR-1 POC WATER TYPE POTABLE WATER RCVDEMAND 40 GPM HYDRAULIC GRADE LINE 750 FEET METER ELEVATION 415 FEET PRESSURE AVAILABLE AT POC . SET POC PSI REGULATOR lfi> DESIGN PRESSURE # GPM SIZE LENGTH PSI SERVICE LINE 40.00 2" 35.00 1.70 METER 40.00 1.5" BACKFLOW DEVICE 40.00 1.5" FLOW SENSOR 40.00 1.5" MASTER CONTROL VALVE 40.00 1.5" MAINLINE (2.5" CLASS 315) 40.00 2.5" 520.00 0.50 MAINLINE (3" CLASS 200) 40.00 3" 0.00 0.00 ISOLATION VALVES 3 VAR = LINE 0.70 RCV SINGLE STATION 40.00 1.5" SCH. 40 LATERALS (10% OF PSI REQ'D) VAA 3.00 SUBTOTAL + 10% FOR FITTINGS TOT AL LOSSES SPRINKLER OPERATING PRESSURE 30 PSI ELEVATION OF SPRINKLER HEAD(S) ON 451 FEET ZONE: -15.588 PSI LOSS SUM PRESSURE REQUIRED SURPLUS 81% SET RCV PRESSURE REGULATOR jf1 **BOOST REQUIRED: MIN. SUCTION PRESSURE: 0 NONE NPSHr: 0 •contractor to verify PSI at Meter is: 145.1 TOH REQUIRED: 0 145 PSI 76 PSI 71 PSI LOSS 0.60 PSI 3.30 PSI 15.00 PSI 0.50 PSI 2.00 PSI 2.80 PSI 0.00 PSI 2.10 PSI 2.29 PSI 3.00 PSI 31.59 PSI 3.16 PSI 34.74 PSI 30.00 PSI -3.46 PSI 61.28 PSI 83.78 PSI 34.98 PSI BOOST IN PSI= 0 PSI 145 PSI 95 PSI 90 PSI LOSS 0.60 PSI 3.30 PSI 15.00 PSI 0.50 PSI 2.00 PSI 2.60 PSI 0.00 PSI 2.10 PSI 2.29 PSI 3.00 PSI 31.39 PSI 3.14 PSI 34.52 PSI 30.00 PSI 15.59 PSI 80.11 PSI 64.94 PSI 54.02 PSI BOOST IN PSI= 0 PSI RUN-TIME CALC LA COSTA OAKS 3.1 T= SO x INTERVAL x PEAK Elo x KC PRx IE TIME= MIN INTERVAL 1.4 WATER 5 DAYS/WEEK PEAK Elo 0.137 KC 0.80 TURF 0.50 SHRUB 0.45 SLOPE 0.70 TREE PR 1.85 SPRAY 0.50 ROTOR 0.30 DRIP 3.00 BUBBLER IE 0.60 SPRAY 0.85 ROTOR 0.90 DRIP 0.85 BUBBLER SHRUB ROTORS T = SHRUB ROTORS SLOPE T= TURF ROTORS T= TURF SPRAYS T= SHRUB SPRAYS T= SHRUB DRIP T= TREE BUBBLERS T= 14 MIN/STA 12 MIN/STA 22 MIN/STA 8 MIN/STA 5 MIN/STA 21 MIN/STA 3 MIN/STA METER '61' / CONTROLLER 'QQ' POTABLE WATER {WUCOLS HIGH 0.7-0.9) {WUCOLS LOW 0.1-0.3, MOD 0.4-0.6) {WUCOLS VERY LOW 0.1) X 0 STATIONS = 0 MINUTES X 0 STATIONS ; 0 MINUTES X 0 STATIONS = 0 MINUTES X 11 STATIONS = 91 MINUTES X 4 STATIONS ; 21 MINUTES X 0 STATIONS = 0 MINUTES X 4 STATIONS = 13 MINUTES TOTAL 125 MINUTES 2.08 HOURS total number of stations: 19 23.07% OF9HR OVERHEAD ZONES: 1.87 HOURS DRIP ZONES: 0.21 HOURS RUN-TIME CALC LA COSTA OAKS 3.1 T= 60 x INTERVAL x PEAK Elo x KC PRx IE TIME= MIN INTERVAL PEAK Bo KC 1.4 WATER 5 DAYS/WEEK PR IE SHRUB ROTORS 0.137 0.80 TURF 0.50 SHRUB 0.45 SLOPE 0.70 TREE 1.85 SPRAY 0.50 ROTOR 0.30 DRIP 3.00 BUBBLER 0.60 SPRAY 0.85 ROTOR 0.90 DRIP 0.85 BUBBLER T= SHRUB ROTORS SLOPE T= TURF ROTORS T= TURF SPRAYS T= SHRUB SPRAYS T= SHRUB DRIP T= TREE BUBBLER$ T= 14 MIN/STA 12 MIN/STA 22 MIN/STA 8 MIN/STA 5 MIN/STA 21 MIN/STA 3 MIN/STA METER '62' / CONTROLLER 'RR' POTABLE WATER (WUCOLS HIGH 0.7-0.9) (WUCOLS LOW 0.1-0.3, MOD 0.4-0.6) (WUCOLS VERY LOW 0.1) X 0 STATIONS = 0 X 0 STATIONS = 0 X 0 STATIONS = 0 X 15 STATIONS = 124 X 8 STATIONS = 41 X 0 STATIONS = 0 X 4 STATIONS = 13 TOTAL 178 2.97 total number of stations: 27 33.06% OVERHEAD ZONES: 2.76 DRIP ZONES· 0.21 MINUTES MINUTES MINUTES MINUTES MINUTES MINUTES MINUTES MINUTES HOURS OF9HR HOURS HOURS LA COSTA OAKS 3.1 POTABLE WATER METER '61' I CONTROLLER 'QQ' ESTIMATED WATER USE EWU (GPD) = ETO x PF x HA x .62 IE ETo = . 0.137 AVG. DAILY Eto 50 per year PF = 0.5 SHRUBS & GROUND COVER (SPRAY&ROTOR) 0.8 TURF (SPRAY & ROTOR) 0.5 SHRUBS (POINT SOURCE & DRIPLINE) HA = 0.62 = IE = ZONE TYPE: SHRUB ROTORS TURF ROTORS SHRUB SPRAYS TURF SPRAYS SHRUB DRIP TREE BUBBLER TOTAL SQ. FEET: ACRE: SEE BELOW FOR SQUARE FOOTAGE CONVERSION FACTOR OF UNITS TO GPD 0.85 ROTORS 0.6 SPRAYS 0.9 DRIP 0.85 BUBBLERS AREA (SQ. FT) 7,694 EWU= 384.39 (Eto X 0.5 X HA X .62)/.85 0 3,872 12,178 0 0 23,744 0.55 EWU= 0.00 (Eto X 0.8 X HA X .62)/.85 EWU= 274.05 (Eto X 0.5 X HA X .62)/.60 EWU= 1.379.06 (Etc X 0.8 x HA X .62)1.60 EWU= 0.00 (Eta X 0.5 X HA X .62)/.90 EWU= 000 (Eta X 0.5 X HA X .62)/.85 EWU = 2037.50 GPD •EWU based on watering &Jays per ooek. 52 wook s per year, with no effective rainfall. 529,749 GPY" MAWA=Eto x 0.8 x AREA x 0.62 DAILY M'IWA: 1,613 588,851 GPY YEARLY MAWA: GPO GPD GPO GPD GPD GPD 1.63 AC. FT/yr 70817.40 CU.FT/yr 1.81 AC. FT. LA COSTA OAKS 3.1 POTABLE WATER METER '62' / CONTROLLER 'RR' ESTIMATED WATER USE EWU (GPD) = ETO x PF x HA x .62 IE ETo = 0.137 AVG.DAILYEto 50peryear PF = 0.5 SHRUBS & GROUND COVER (SPRAY&ROTOR) 0.8 TURF (SPRAY & ROTOR) 0.5 SHRUBS (POINT SOURCE & DRIPLINE) HA = SEE BELOW FOR SQUARE FOOTAGE 0.62 = CONVERSION FACTOR OF UNITS TO GPD IE = 0.85 ROTORS ZONE TYPE SHRUB ROTORS TURF ROTORS SHRUB SPRAYS TURF SPRAYS SHRUB DRIP TREE BUBBLER TOTAL SQ. FEET: ACRE: 0.6 SPRAYS 0.9 DRIP 0.85 BUBBLERS AREA (SQ. FT.) 0 EWU• 0.00 (Eto X 0.5 X HA X .62)/.85 0 EWU= 0.00 (Eto X 0.8 X HA X .62)/.85 4,127 EWU= 292.09 19,969 --- 0 0 24,096 0.55 (Eto X 0.5 X HA X .62)/.60 EWU= 2,261.33 (Eto x 0.8 x HA X .62)/.60 EWU= 0.00 (Eta X 0.5 X HA x .62)/.90 EWU= 0.00 (Eto X 0.5 X HA X .62)/.85 EWU • 2553.42 GPD "EWU based on watering 5<Jays per ooek, 52 waeks per year, IAith no effective rainfall. 663,890 GPY" MAWA•Eto x 0. 8 x AREA x O 62 DAILY MAWA: 1,637 597,581 GPY YEARLYMAWA: GPD GPO GPD GPD GPD GPD 2.04 AC. FT/yr 88749.49 CU.FT/yr 1.83 AC FT. fsR!ITl CITY OF CARLSBAD ----------------------r--------.,,..,.,,,-..,,,,..,,.,..,,...-----------.---,---------------------~--~--l LU PLANNING DEPARTMENT www.gmplandarch.com DRAWN JR 9404 Genesee Avenue APPROVED Mid Suite 140 La Jolla 1ST SUBMITTAL 02-09-07 California 92037-1353 2ND SUBMITTAL 3-13-07 Tel 858 558 8977 311D SUBMITTAL 4-30-07 Fax 858 558 9188 4TH SUBMITTAL 7-02-07 LANDSCAPE MYLAR SUBMITTAL 7-10-07 ARCHITECTURE JOB NO. 05-038 DATE 04-30-07 & PLANNING SCALE AS SHOWN TITLE: "AS-BUil T" GUEST BUILDER IRRIGATION CALCS DATE RECEIVED BY: INSPECTOR DATE (51,)EST Bt/lL.DER VIL.LASES OF LA (;()STA THE OAKS -5./ t----+--+----------+--+----+--+----1 I APPJ~':;.L I 6r~ E:tl-4>1t . PLANNING DA TE INITIAL DATE INITIAL DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL OWN BY: __ _ CHKD BY: __ _ RVWD BY: PROJECT NO. GT 05-14 Ll-06 DATE DRAWING NO. 44b-4L \ / I ) ROTOR HEAD, SEE LE6ENO FOR SPECIFICATION -----, ,--------INSTAU. Sl'Rllt:I.ER !EAD l'UISH l'fTH FINISH 6AADE Ill~ />lEAff, NOTE, !-------SPRAY HEAD, SEE l.E5END FOR SPEG,IFICATION ~ -----IH5TAU. -,~ HeAO 1/2' -I I 1-HXN! l"INISH 6AADE IN 5HRIJB :111111_11 :=~~ : 11111 ' I I 11'11"Ll! SWIN6 JOINT A!>5EM5L Y, b" LAY MIIIIMJM ...----~ '40 PVC ~Te!; FITTIII!; LATEAAI. • 5l'RINKI.ER INLET SIZE LATEl<AL LINE. SEE Sl'EGIFIC,\TIONS FOR TI'!'E Nit) Dl:PTH Rl!aJIRED INSTALL SPRINKLER HEADS b" FROM f'AVINe EDeE IN (!;ROUND COVER AREAS. INSTALL 51"RINKLER HEADS 4" FROM f'AVINe EDeE IN TURF AREAS. INSTALL SPRINKLER HEADS PLUMB. AC>.J.1$T Sf'RA'fS OR NOZZI.E 511'Q:AM TO COVER LANDSCAPE AREA l'IITHOUT OYER51"RAY ONTO f'AVIHe, !'eNCES, liAI.L& OR euu.c:>INeS. DO NOT USE 5I1:)E INLET ON f£Ac:>5 l'IITH INTE6AAI. CHECK VAL YE. ALL TlftAc:>Ec:> CONNEcTION5 TO HAYE TEFLON TAPE OR f'A5TE. @=~~=~~ SPRINKLER E ~ SUPPLY LINE TO HOUSE---, MAINLINE TO IAAl6ATION SYSTEM TEE FITTIN6 INST ALL.Ee:> BY F'I.UMBEl1. VALVE eox (IF 6el.OYl ~-~ BALL VAL YE, F'ER 1.651:Nc:> SCH. bO PVC OR BAA&$ NIPPLE iYP. "'---SCH. bO PVC OR MA~ IJNION IAAl6ATION MAINLINE, PER 1.E5END. ,___ ____ MAI.E AC>APTER T'ff'. f'REseuRE 51/Pf'L Y 1.INE FROM METI!!I!-- .__ ______ ~ REl!IU!.ATOR, PER L.E6END. NOTE, ALL THREADED CONNECTION& TO HAYE TEFLON TAP!! OR PASTE. POINT OF CONNECTION (PRIVATE LOTS) SCALE, N.T.S. 0 0 4&" NOTE, MOUNT ENCI.05URE A5 F'ER MANl/FAC'T\JRE"1.'& RECOMMEIIDA TION _,r--CONTROL.I.ER, SEE LE6END FOR 5l"ECIFICATION. 120 VOLT f'Ol'!El't SUf'FL Y IN J-f!OX, 6'f ~ RIE>lc:> ELEC11'1CAL CONDUIT TO RAIN Sl:N50R (IF 5PECIF1Ec:>) IN RIEJID CONDUIT LOI'! VOL TAef I'll"'= IN RIEJID PVC CONOUIT PVC ELECTRICAL Si'EEP TO EXTERIOR eutLc:>IN6 l'IAl.l. THROUEiH .J-BOX et/lLDIN6 FI.OOR BY OTHERS INSTALL ENCL05Ul<E AS INDIGATEc:> PER PLAN e MANA'AC'T\JRE"1.'& RECOMMENDATION. F!OUTE YllRE& AND &LEE\IE THROl.l6H l'IALI. TO RECTAN6ULAR f'I.A.I. SOX AND TRANSITION TO DIRECT BURY l'IIRE. APPROVED FOR PLANTING AND IRRIS-ATION ONLY, INCLUDINe PRECISE LOCATION OF PLANTING AREAS. rt:-::~--------5HfWB AC>Af'TER SPRAY, SEE LEl5Ellc:> 12,, MIN. FOR SPECIFICATION ~-------SCH bO PVC Nlf'FLE, TWO ReGIUIRED I.EN6TH A5 REGIUI~ ---------IN6 T'ff'E ANTI-DRAIN VALVE FINISHED ~ I _____ UNc:>le'T\JRBEc:> eo11. r ---SCH 40 'PVC 5>c5><T TEE FITTIN6 1.ATEl'AI. x -INKLER INLET SIZE NOTE, IN5T ALL -INKI.ER HEADS 12" FROM FE;Ne,E5 l'W.1.5 OR alll.c:>INee. DO NOT IN5TAl.l. 5f'RINl(;I.ER HEAD l'IITHIN 10 FT OF f'AVINe, ~OR~ !:c:>eeJ. IN5TALL SPRINKLER HEADS PLUMe. AC>.JJST SPRAY TO COYER LANDSCAPE AREA YllTHOUT ~y ONTO PAVIN6, FE;NC.E5, l'IAl.l.5 OR BUll.c:>fNes. ALL THREADED GONNECTION5 TO HAYE TEFLON TAPE OR PASTE. ~NTROLLER---'-11:---- &TAINLE&& &TE!:L----1 1---RAIN 5EH50R. INSIDE A VANDAL l"ESl5TANT ENC~ FRONTENTRY NEMA5R ~ f'Ol'Ellt Sl'IITCH ANc:>----,1-+1 6FI RECEPTACLE COMPACTED &ITE &oil. PVC CONc:>UIT FOR eLEC 'Tl'IC SE!ltVICI: PER NEG CODE ~• PVC CONc:>UtT FOR FLOl'I 5l:N50RMY YllRES G ,,---TERMINAL &11'1f' FOR COHTltOJ. l'llt'le it:Sl--:--~MED AI.UMIIIJM PAD ~+--V.I.T. STFi!ONeeOX GUICKPAD ENC~ MOUNTIN6 P"AD ~;;;;;;;f~-"4" COMMUNICATION CABLE PVG J'-.:....: CONDUIT OF l'tEG!J .;: :3' CONTROL l'IIRE PVG CONDUIT '-----'!<%',c &'GOP/EK eR0UNI, "°° l'IITH lib eA!e: ""°1JND l'lll'lf AND Cl.AMI" NOTE, l'ROYIDE RECTAN6ULAR PULL eox FOR l.01'1 VOi. TA6E CONTROi. HIRE SFLICl:5 AT BASE OF CONTFi!OI..LER. F PEDESTAL CONTROLLER-FRONT ENTRY SCAI.E, N.T.S. FINISH 6RAC>e IN l1JFV' ~ .---PLA&TIC Rl:CTAN6ULAR VALVE eox l'IITH BOLT c:>ol'IN COYER, U5E STAINLESe SOLT, WT, AND l"IASHER. eox TO BE f'1.ACEc:> AT RIGHT AN6LE TO HARc:>SCAPE Ec:>6E. HEAT B11ANc:> 'FS" ONTO Lie:>. ~-Fl.01'1 SENSOR, SEE LE6cND FOR 5PECIFICATION f'YC MAINLIIE FROMMA5TER VALVE '"'---FINISH eRADE IN SHRLe Alc!::Asf 24' l'll"f I.OOP--- L FUNNEL TYPE cONCENmc i.ec:>l)Cl!R FITTINe I" ELECTRICAL---e:::::::::.- CONl:)IJIT TO CONTFi!OLLER ------(4) BRICK 51JF'PORT5 '------:3/4' Fi!OCK, 2 aJelC FEET '--------LANDSCAPE FABRfC NOTE, NO FITTIN,$5 10• f'lf'E O.r>. Uf'STREAM OF SEN50R, NO FITTIN55 5>< PIPE O.D. DOl'INSTREAM OF &ENSoR IN&TAl.l. FI.OYl SEll&OR F'ER THE MANUFAC~!'l.'5 l'l.eCOMMeNDATIONS, l'II.OI./T'e I'll~ THFi!OU5H CONDUIT TO IRl'tl6ATION CONTROLLER. U&E 45 c:>E6REE 6.1.5 TO ACHIEVE MAINLINE DEPTH ON THE DOl'INSTREAM SIDE OF THE FLOl'I SENSOR. www.gmplandarch.com DRAWN 9404 Genesee Avenue APPROVED Suite 140 La Jolla 1ST SUBMITTAL California 92037-1353 2ND SUBMITTAL Tel 858 558 8977 3RD SUBMITTAL Fax 858 558 9188 4-TH SUBMITTAL JR MM 02-09-07 3-13-07 4-80-07 7-02-07 LANDSCAPE MYLAR SUBMITTAL 7-10-07 ARCHITECTURE JOB NO. 05-038 DATE 04-30-07 & PLANNING SCALE AS SHOWN 1.2" MIN. NOTE, --------!lf'RINKI.Ellt HEAD, SEE LE6EIID FOR 5f"ECIFICATION ¢;.==/---------SECURE RISER TO &TAKE l'IITH STAINI.E5& &TEEi. 'l'UIICH-1.0K' Cl.AMP, THO l'lll!<llUll'tED r,.bJ-________ 5HfWB RISER A!;SEMel. Y, se 1;1 I.E6END FOR SPECIFICATION YJ+-+--------REBAF! &TAKE, !14 X 36" I.EN5TH /-"--SCH 40 PVC THFIEAc:>Ec:> COUPI.IN6 ~-TRlf'I.E &l'IINe JOINT A!;SEMel. Y ALI. THREADED CCNNECTIONS TO HAYE TEFI.ON TAPE OR PASTE. IN&TALL -INKLER HEADS PI.UM6. AC>JUST 5f'RAY TO COYER 1.ANc:>SCAf'E AREA l'IITHOUT ~y ONTO PAVIN6, F!;NC,ES, l'IAl.l.5 OR BUll.c:>11165. ON RECYCLED WATE!lt Sl'STEM& USE ' RISER MAAl<:ER". © ~~:~~ HEAD ON RISER TITLE: ,,-----LOH VOLTAeE Ylll'!Ee, :3 MAXIMUM ~ CA51:: OF CONIIECTOl'I. Sll'tlP AND THIST HI~ FOR PROPER C.ONNECTION NOiE:, INSFECT, TEST, AND VERIFY f"ROF'Eft SYSTEM CONNECTION eEFOR!: IN5EFI.TION INTO SEAi.ANT CARTRIDISE. DO NOT !OS !SE 51:Al.ANT CAl'l11'1D6ES. ,,----EAVE OF BUll.c:>IN6 ,,----f'I.ASTIG, Tl!! DOl'IN 5-mAP ---RAIN 5Ell50R, &EE LE6EIID FOR SPECS. ----MOUNTINe MACKET _, ______________ YllRE TO IAAl6ATION CONTROLLE!lt ■-----------------~ l'IIRE l'IITH CABLE TIE BRACKET, !5' 0.C. MIN. "AS-BUil T" DATE RECEIVED BY: DA TE INITIAL 1~---TO HOUSE I YIIATER SUf'PL Y '-~ ALL f'lf'INe ~ ---1 ""L_l--7 ~TOef: I' l'lf;oSIJI..>, TOR (6Y OTHEl't&) 1----FMM l'IATl:R ME=TER AT S~T TO ~/I'-------~ REISUI.ATOR VALYcS (6Y 1.ANDSCAPE CONTI'UIC-TOR/ NOTE, ALL THREADS:> CONNECTIONS TO HAYE TEFLON TAPE OR PA&TE. D POINT OF CONNECTION (PRIVATE LOTS) SCALE, N.T.5. FINISHED ~ IN TVRI" AREA5 ,-------10" R01.1NO PLASTIC VALVE eox l'IITH eot.T c:>ol'IN COYER, USE STAINLESS eol.T, IVT, AND HASll:R. HEAT eRANc:> 'f'B' ONTO Lie:>. ~--24" l'l!Ftl: EXPANSIOII LOOF' (TI'P). t,• ~--FINISH 6RADE ~-ll!!il-lRl.e "1lfJ,6 I_ I ill -.::::==::)----f'YC ELECTl'IGAL 5YlEEF' (IF INST ALI.ED Ill CONDUIT) '----------~F>at!G '----'---------'14' ROG!<, I a.elG FT. .------FINISH 6AADE IN~ Nlf"6 ,----PLASTIC ROI.ti!) VAi.VE BOX l'llill SOLT DOHN GOVER, U5E ST,\INl.a SOLT tllT AND l'iASIER HEAT eAAND 'G(,V' ONTO LIP. -·..---LA5CO SCH. 40 mlf'LE 51'11116 JOINT A55el'-el. Y l'IITH MALE eRA55 ST AelLIZER EI.BOl'I ',---L!'!!Ll-...J---MAINLINI:, see 51"1:CS. t-------. • '6' eAA 5TAlc:fS, a "':v '---------LAN:iScN'ErAeR~ '----------1S/4' '10GK, I a.elG FT. NOTE, . ALL THREAPEP CONIECTION& TO HAYE TEFLON TAPE OR PASTE. GUICK COUP1.E11t VAi.YE KE\" M.l&T Sl'IIYEL FREELY Yl!EN INSERTED INTO LU511'ACK. 1 s8ET I CITY OF CARLSBAD PLANNING DEPARTMENT GUEST BUILDER IRRIGATION DETAILS 5111ST E!l)/J.DER VILLA6ES OF LA COSTA THE OAK.S -!J.I DWN BY: __ _ DA TE INlllAL DA TE INlllAL ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CHKD BY; __ _ CITY APl'ROV,\L RYWD BY: PROJECT NO. C.T OS-14 INSPECTOR DATE ) ~ 2 Ll-01 ~------FINISH eAAPE IN 11JRF AF<l:AS r------l"l.ASTIC. l'OUND VALVE BOX WITH BOLT DOWN COVER, I.el; STAINl.fSS BOLT, NUT, AND i'IASHER. BOX TO !:IE P!.ACl=P tt,• !'ROM HAADSc.APE EDee. 1-ifAT 151V1ND "!'RV" ONTO LID. ~-f'!O!l!SSURE l'U5el!LATOR, $EE LaseND FOR Sl"Ec.lFIC.ATION ij,-i!~,ii~ FINISH BltADe IN SHRUB MEAS f'-7---PVC SCH &o T.O.E. NIPPLE, S" MIN., 2 1'1:G. PVC. SCH 40 SLIP COUPLIN6, 2 REG!. PVC. MAINLINI: TO MAS'Tl:R VAi.Vi:, PIP!: l'!:R Sf'!CS. ~~--(-4) BRICK SUPPORTS 7-=-c::::::=:::::::::=_ __ 5/-4" ~. 2 ct.etc. FT. ,__ _______ LANC>SCAPI: FAl:IRIC,, '-----------eRASS NIPPLE tt'YP). '------------eRASS UNION ,__ _______________ PVC. MAINLINI: FROM l"O.C,,. NOTE:, LISI: -45 DEeRa: l:LLS TO ACHll:VE MAINLINI: C>l:PTH !'ROM $UPPI. Y SIDI: OF THI:~ ~TOR ASeEMel.Y. ALL THRl:ADED c.oNIECTIONS TO HAVE Tl:FLON TAP!: OR PASTE. ~---FINISH eRADE IH '!'URI" AREAS ~-PLASTIC RECTANeUI..AR VALVE eox J-IITH BOLT DOl+I c.ov!:R, USE STAINLESS BOLT, If.IT, AND t,fASHf:R !!IOX TO BE PLACE:D AT Rtelt'i .ANel.e TO HARC>Sc,Af'f 1:1:>e!:. HEAT BRAND "BY' ONTO Lie>. BALL VAL VE, SE:!: 1.£:eENC> FOR SPECIFIC.A TION ~ -4"MIN. g!J -FINISHE:D eRADE IN SHR1S Af/11!:AS ~-1== ~½~~~~~~~~~~~:~t====MAINLINI:, DEPTH AS FER SPEC.S. -l"VC MALe ADAPTER (I OF 2) ---. __ AeOVE eRAC>E • BRASS UNION Elel.Ol'I ~ -SC:,H.eQ UNION '.1---(-4) BRICK SI.JF'f'ORTS ;::=,:::, ~~--AflOVE: eRADE • BRASS NIPPLE: ea.ow eRADI: -SCH.ea NIPPLE ~----:5/-4' ROG!<, 2 CUBIC. FT. ~-----LANC>sc.APE FASRIC. NOTE, BOX TO !:IE INSTALL.EC> AS TO Ai.LOI'! FOR PROPER OFeRATION OF BALL VALVE HANDLE:. INSTALL AT Rl5HT ANel.E: TO HARDSCAl"I: e:,ee, INSTALL VALVE OFF-GE:NTER IN BOX. INST ALL VAL VE BOX EXTENSIONS AS f/11!:GIJlf/ll!:C> TO Ac.HIEVE PROPER VALVE INSTALLATION AT MAINLINI: Dl:PTH. ALL THREAC>E:C> c.ONNEcTIONS TO HAVE: TEFLON TAPE OR PASTE. WR PVC. SC,H.eQ 'llRAC>ED '10' ATMOSPHERIC:. VACI.UM l!lRl:At<eR~ Tl'IO PVC:. E:W.5 AS f/11!:GlUll'l:C> (TYP). -----. I PVC. l.A TERA!.. LINE TO AVB BURIED AS SHOl'IN ON PLANS SLOPE--------. MIN. 6" ABOVE HleHEST OUTI.ET FINISH eRAC>E ---~ j ANel..E VALVE, $EE L.E6EHC> FOR SPECS DRl-sPLIC,,! ---.._ C.ONNEc.TIONS MIN. b' i'BO'II: FINISH 6RADE: NOTE:, ALL THREAC>ED CONNE:CTIONS TO HAVE SW/Ne C,Hl:c.K VAL VE PVC sc:.H. -40 S><T FITTINeS /TYP J TI:FL.ON TAl'f OR PAST!:. . @~~~~;VALVE/ AVB PLACEMENT APPROVED FOR PLANTING AND IRRIGATION ON!. Y, INCLUDING PRECISE LOCATION OF PLANTING AREAS. .., ... -.... -I< DSC 1f,OOd a ,------f'INleH ~E IN TURF Al'IU:AS ,----F'LASTIC,, Rl:CTAN6ULAR VALVE; eox i'IITH eoLT DOv-1111 C,,OV!R, LJSI: STAINLESS l:IOL T, NVT, AND WASHl:R. eox TO Bl: PLAC,,!:C> AT ~6HT AN6L!: TO HARC>SC,AP!: ~-HEAT EIAANC> "MY" ONTO LID. .--MAST!:R CONTROL VALVI:, 5!:f: L.Eel:ND FOR SPl:C,,, INleH ISRADE IN SHRUEI ARl:AS :,ff!,---2-4" WIRE LOOP VALVI: ID TAGS c;. SCH e,o F!:MAL!: ADAPT!:R, (I OF 2) c___ _ __,..yc;, MAINLINE: TO FLOW S!:NSOR, PIP!: Pl:R SPEc;.S, ---(-4) E!RIC,,K SUPPORTS '--------flfi?.A.SS UNION '--------eAASS NIPFI.E: (T'(P). '--------LANC>Sc;.APE FABRIC,, '---------S/-4" ~K, 2 c;.ue1c l"T. '----------------PVC MAINLINE: PIP!: FROM 6AG.KFI.OJ.'l PER SPEc;.S. NOTE:, USE: -45 1'Ce1'1:E: ELLS TO ACHIEVE MAINLINE DE:PTH !'ROM SUPPL. 'r" SIDI: OF TH!: MASTER VALVE A5Sl:Ml:ILY. ALL TH1'l:AC>l:D CONNl:C:.TIONS TO HAVE Tl:FL.ON TAPE OR PASTE. ,----FINISH eAAC>e IN TIJRF AREAS ~-PLASTIC. Rl:c:.T,t,,N<!llJLAA VALVE BOX J-IITH BOLT DO»I COVER, USE STAINLESS SOLT, If.IT, AND l'IASHl:R. BOX TO ee Pl.ACeD AT RleHT ANeLe TO HAAC>SC.Af'f EC>6E. HeAT BRAND 'BY" ONTO LID. PVC BALL VALVf!., ~ 1.eeeNC> FOR 51'1:CIFIC.ATION :□rs• -FINISH61'1AC>!:INSHRUBAREAS -4" MIN. ---MAINLINE:, DEPTH AS PER SPl:c,S, ~~;r~J;:.::::,~::::_ __ DIJAL UNION C,,ONNEC,TIONS AS NOTE:, PART OF BALI. VAL VE, THREADEC> IF SPEC.IFIED IN L.EeE:ND c.:::..:::::;;,s=~~---/4) BRICK SUPPORTS '-------1'/-4" ROCK, 2 CUBIC FT. ------1.ANDSCAPI: FABRIC. BOX TO ee INSTALLeD TO Al.LOI'! FOR PROPl:R OPl:RATION OF BALL VALVE HANDLE. INSTALL AT RleHT ANeLE TO HARC>SCAFe EC>6E. INSTALL VALVE: BOX eXTENSIONS AS RE:GIJIREC> TO AC,,Hll:VE PROPER VALVE INSTALLATION AT MAINLINE Dl:PTI-I. ALL THf/11!:AC>!:C> CONNECTIONS SHALL HAVE: TEFL.ON TA!'!: OR PASTE. BALL VAL VE, TRU-UNION ¾ALe, N.T .S. TOP OF SLOP!: --, '--1.ATEFW. 1.INern'l") ~ A™"5PHl:Fl.lc;. V Ac;.WM ElRl:Al<ER C, roe OF SI.OPE: NOTES, AV5 "C" SHALL ee INSTALL.EC> 6" i'BO'II: Hletl!:ST OUTLET AND PEl't CODE. WHERE HEADS A1'I: LOl'ER THAN Rc.V USE: ANTI-SIPHON ''B" TYPE VAL VE:. "'1Hl:RE HEADS HCE ABOVE RCV U5I! AHel.l: "A' TYPE VALVE AND AVB "C:,". WHEN HEADS ARE i'BO'II: F<e,V USE Sl'l!Ne CHECK VALVES 'C>'. V RESIDENTIAL RCV AT TOE OF SLOPE SCALE, N.T.S. www.gmplandarch.com DRAWN 9404 Genesee Avenue APPROVED Suite 140 La Jolla 1ST SUBMITTAL California 92037-1353 2ND SUBMITTAL Tel 858 558 8977 3RD SUBMITTAL Fax 858 558 9188 4TH SUBMITTAL JR MM 02-oe-07 S-13-07 4-30-07 7-02-07 LANDSCAPE MYLAR SUBMITTAL 7-10-07 .ARCHITECTURE JOB NO. 015-038 DATE 04-30-07 & PLANNING SCALE AS SHOWN 11 :m NOTE:5, I. INSTALLATION MUST CONFORM TO LOCAL CODES 2. C,,ONTI'ACTOR M!ST PROVIDE: BACl<FLOl'I c.eRTIFIC,,ATION. I. REOUCED ~ PRINCIPLE: BACKFL.Ol'I PRl:VENTER, PEl't L1:6eNC> 2. WT'!: STRAINER (IF SPl:CIFll:C>) 5. BRASS NIPPLE:S (L!:H6TH AS ~J -4. FINISH cSRAJ:>f. S. SCH.ea PVC,, FEMALE: AC>APTl:R. b. l"VC. PReSSIJf/11!: SUPPLY LINE, $EE Sf'l:G.IFICA TIONS. "1. 12"><12'><12' C,,ONCF!l:TE TI-IRIJSTE!LOCIG t,, ~ T><T ELL, L.INI: SIZI: 'f. WI I Ek -5xT a.L, LINE SIZf: 10. TYPE 'K' wfl'ER TUelN6 ~Mt,f.A.TER1"1=TER. II. V.I.T. STRONeeOX GlP-"°6F GUICK PAC>, IF !:NC~ IS SFl;C,IFIED, SET 2" i'BO'II: 6RADf 12. FILL BASE: OF GUICKl"AC> l'IITH ¾" ~ TO TOF OF BASE: OF UNIT IS. SiAINLl:55 STE!:L !:NCl.09Uf/ll!: OF SP!:C,IFIED) 1-4. ~ 1'E:6ULATOR (IF Sl"Ec.lFll:C>) 15. BRASS UNION l:l. ALL THf/11!:AC>!:C> C,,ONNl:C:,TIONS TO HAVE 71:FLON TAP!: OR PASTE. -4. ALL BRASS OR COPPER eEL.Oi'I eRADE SHALL HAVE: AWt,fA C.20'! APPROVl:C> PIP!: TAPE. 5. INSTALL PER C:.MI/IID STANDARD C>""5l. 1'1-20. @ ~~~;:~LOV'l DEVICE ELl:CTRI(; ANTI-SIPHON---, c.o=LVAL'/e MIN. 6' AeOVE Hl6HEST OUTI..ET PVC. sc:.H. e,o NIPPI.E __ _, LENe'TH AS REG. (I OF 2J PVC. l.A TERA!. LINEPIPINe NOTE, t,IATl:RPROOF i-llRE: CONNEC,TORS (2 TYP J I 1'0' Hll'I: LOOP FINISH 5RADe 12" MINIMUM PVC. PRESSURE MAIN ALL THReAC>ED C,,ONNl:c,TIONS TO HAVE TEFL.ON TAPE OR PASTE. TOP OF SLOP!:--~ TOE: OF SLOPE: LATERAL. l.lN!!/TYI") NOTI:5, J,tHEN HeAC>S Af/11!: AeOVE Rc.V, LISE Sl'IIN6 CHECK VALVES •c:,v• J/'lHEf/11!: LATERALS C,ONNEC,,T TO Rc.V. INSTALL IN SCI !:AA,!: 6" VALVE BOX. ALL THREADl:C> C.ONNl:CTIONS TO HAVE: TEFLON TAPE OR PAST!:. FINl5H ~ IN TI.W A'F1V,5 n Pl.ASTIC:, ReC.TANeULAR VALVE: BOX l'IITH BOLT C>Ol'IN COV!R, U5I! STAINLESS BOLT, NUT, AND WASHE:R. BOX TO BE PLACl:C> AT RIGHT AN6I.!: TO HARC>SCAPI: EDee. HEAT BRAND 'Rc.V" AND CONTROL STATION # ONTO Lie>. -FINISHSRADE INSHl'tlJBA'f/1V,5 LATl:RAL --- 24" l'lll'E LOOP rl'~ll---VALVE ID T/1>6 ~~..._ ->Hl-----sc.H. t,o PVC. TlftAC>Ec> fLL OR Tl9: ---F::,...\1.----CONTl'OL VALVE, 5a: l.E6ENtl FOR SPECS ~~ f6'XF. ~c---~~ ~~~(TYP). ::,i;c:. :e;.::ic,;::.=..: ""= (4) BRIGK SUPPORTS sc.H. e,o UNION----~ NO're, •---tAAteATION MAINLINE OR MANIFOLD SU6-MAIN ,__ _____ '1-4' l'!OC,I< l!iRAVEL. 2ae1C.FEET '--------1..AND!:iGAPEFABRIC. ALL THl'.!:,<\e>eC> CONNeCTIONS TO HAVE: TEFLON TAPE OR PASTE. IF MAINLINE: OR MANIFOLD SI.IS-MAIN IS AT VALVE DEPTH, TEI! INTO VALVE WITH sett.t,o NIPPLE:, LEN6TH AS REGUIRED. ® ~:_~~~E CONTROL VAL VE ATMOSPHERIC,, VACWM ~-~ MIN.b".Jove HIISHEST ii.ET ~ITTillll l"VC,, SCH. t,o NIPPLE:, --i LENeTH AS REG. 0 OF 2J WR RE:SIST ANT sett. t,o NIPPI.E, LEN61H AS REG. ~-WR f/11!:SISTANT sc.H. e,o THRl:AC>ED 'IO PVC. LA Tl:RAL LINE PIPIN6 FROM Rc,V V. PVC. LAreAAL LINE: PIPIN6 TO HEAPS S><T PVC. sett. -40 FITTINEIS (TYP). NOTE:, ALL THReAC>ED C,,ONNl:c,TioNS SHALL HAVE TEFLON TAPE OR PAST!:. TOE: OF SLOP!: ---.....__ RE:MOTE: C,,ONTFI.OL VAL VI: TOI" OF eJ..OPl:\.l.f:===~~:::=f:::l'-T=/===LA=~===Ll=NE=··=~=.=~==- ......_,___MAINLINE: NOTES, ~ HEAC>S ARE eeLOl'I RCV U5f SPR!Ne c.H!!CI< VALYe AT I.A~. ALL THf/11!:Af)!:C> WNIEC.TloNS TO HAVE: TEFL.ON TAPE OR PASTE. ~ CITY OF CARLSBAD ,---------,.,-A.,,.S_,,,B_U_IL""T'""' --------,,-----,----,----------------,--,----,----,-----i L....:!__j PLANNING DEPARTMENT GUEST BUILDER IRRIGATI□N DETAILS st/EST SIJILDER LI-Ob DAlE TITLE: RECEIVED BY: INSPECTOR DAlE VI/../..A6ES OF LA (¼)STA THE OAKS -!J.I f----+---1--------------1----+-----lf----l------l I APPROJj~ er-t{{-41"ft: 1-l"t-e"1 . PLANNING DATE DA lE INITIAL DA lE INITIAL DA lE INITIAL ENGINEER Of WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL DWN BY: __ _ CHKD BY; __ _ RVWO BY: PROJECT NO. C,T 05-14 DRAWING NO. 446-4L f'li---------IFIRl9ATION MAINLINE INSTALL.ED I&" I I OFF HAl'!D\¾APE ED9E t-------'--'----------H~API! !!D6E I&' TYP. •-------GIJIGK GOIJPU:R VALVE ON SWINE; JOINT IN ROUND VALVE BOX .-H-------SCH. &o FVG Tl!!!, 5'<5x!'> MAINLINE X MANIFOLD SIZE -11-------!'>GH. &o FVG UNION ~ell,-------eALL TYFE ISOLATION VALVE, IF 5Fe<;ll'll!:P ~,../1,------!:IAl.l. TYn 150LATION VALVE, IF Sf'EGIFIED , ,---f~~===== !:>GH. tlO PYG IA-IION i' IFIRl9ATION 5Ue-MAIHLINE, SIZE PER 12 11 T'T'P. ~TVALVE >ls--iJ+:;;;;;;;;;;;::------MINIMUM 12" ee!"AAATION een-eN ALL VALVE BOXl:S "-------Rl:MOTE CONTROL VALVE ~---SCH. &o FVC UNION rl=l=="""Sl/ LAT!:AAL LINE TO SPRINKLERS HOTe, ALL T~ GONNEGTION5 TO HAVE Tl:FLON TAPE OR PASTl= NOre, IF MANIFOLD Sl5-MAIN 15 AT VALVE DEPTH, TEE INTO VALVE WITH !',CHM NIPPl.f, L.fNEITH AS REGUIRED. ., -1 ., ., PW l't;; A cc COMI-WIGATION GAel.f PULL BOX -~·- PW ~ A ~V + STATION# REMOre CONTROL VALVE PW l't;; A MV MASTER CONTROL VALVE PW l't;; A Fi:> l'LOWseNSOR DW ~ A ev eALL VALVE PW ~ A Fl FERTILIZER INJEcTOR PW l't;; A es eA51<eT STl'tAINER PW ~ A MS MOISTURE 5£N50l't PW l't;; A Fe PULL BOX PW ~ A G.CN GIJIGK COUl"LER VAL YI; Pi'i l't;; A FV l'LU5H VAL VE Pi'i ~ A 51.V 51.fevE MARKER PW l't;; A eo MAINLINE el.Oi'i OUT Di'i ~ A PV PAAIN VALVE ' Pi'i ~ A AA.V AIRNACWM RELIEF Pi'i ~ A ! PF Pl!'>K l'IL ~ Pi'i ~ A F!lV ~ RE:9. VALY!; ·--· CONTACT IRRl9ATION CONSULTANT FOR ANY' c>Evlc.E NOT LISTEP. §~~;~.; BOX IDENTIFICATION )lOIC ,AOOd APPROVED FOR PLANTINe ~ " .. AND IRRIGATION ONLY, -:I ... INCLUDING PRECISE * LOCATION OF PLANTING AREAS. ,__ _________ HARPSCAPE ED9E (' I- ~ ::>.. / " I INSTALL MAINLINE I&" Of'F OF HARPSCAPE ED$E SCH.M TEE, MAINLINE K I½" 5xSl<S t'-. ,,.., ~/ ' ~ JJ 6ALL T'\"P1; l!'>OLATION VALVE SCH. bO PVC UNION GIJIGK COUPLfR SGH.&o ~IPLE SWIN9 JOINT AS6EM61..'T' i'ilTH DOUeLl: O-RIN9 SEAL ... , GIJIGK GOUPL.ER VALVE IN A ROUND VAL VE BOX, 5El= LE9END FOR Sf'EGS. - NOre, ALL THReAPeP GONNEC-TION6 TO HAVE Tl=FLON TAPE OR PA!:>'11=. GCV TO eE INSTALl.fP IN PI.ANTIN9 AREA!'> i'IHEN 1"0551el.e. INSTALLATION 1 I > I I > < , , , ,.I, ,l, "' ,.I, ,1,,, J, l,,, 111,.,,,, ,l, .;, '" ,J,,,,, ,i, , ,I, I> tJ "',, -FINISH l5RADE DIMENSION !:I" OR LESS i,• TO 5 1/2' 6' AND LAA.9ER A e " eACKFILL 5HOIJLP ee l"LACfc:> IN 6" LA'T'fRS ANP TAl"PEP I&" 12' 6" 24" X 6" '6' iX 6" www.gmplandarch.com DRAWN JR 9404 Genesee Avenue APPROVED MM Suite 140 La Jolla 1ST SUBMITTAL 02-09-07 California 92037-1353 2ND SUBMITTAL S-13-07 Tel 858 558 8977 3RD SUBMITTAL 4-30-07 Fax 858 558 9188 4TH SUBMITrAL 7-02-07 LANDSCAPE MYL\R SUBMITTAL 7-10-07 ARCHITECTURE JOB NO. 0!5-08B DATE 04-30-07 & PLANNING SCALE AS SHOWN GUICK COUPLI VAL VE BOX ('TYP HIS 1 NOTES, / l::! ' 0 , [# RfG.T ANeULAA. VAL VE BOX (;YP) 0 0 0 0 0 0 12" 12' l::! f I. V/>J..Ye IIO.>e 9H/>J..L 1!11' I "'!II'!""',,.,.. HOT IRON ~IOIH5 OR "1.IA"11NM ASPHALT eA!SeD l'IATERl'ROOF PAINT. ~. GQMTRaL V/>J..VE5 SHALL E1E IHSTi'ileD TO AU.OW ~'1" -Of' V/>J..YE !lOXl!5. ,. LOG-ATE V/>J..\/1!-IN !llW.e OR~ GOVER AA!A5 i'IH!II f'05e1191.l!!. 4. J.oc.ATIOH OF Vl'J..\/1! -.1e SHALL !II! !!TAKl!D !'OR Al"f'l'J:Nl'J.. 8'f LANC>!IGAl'E AR<;H!TEGT ""!OR TO IHST/>J..LATIOH. 5. CEN11:l'I. V/>J..YE !lOXl!S OVER V/>J..YE A!!!!l!Mel.! TO FAc.lLITATE '°""'e;e ."Ill:> MAIN~. 6. SET Vl'J..YE !lOXl!S AT EGUl'J.. ELEVATIONS HITH TOP$ AT FINISH~ IN 1U'IF ARl:AS OR !!' AeoYE FINISH GRAtlE IN -~ i:;oYER ARl:AS. 1. V/>J..YE IIOXl!S SHALi. !II! SET PA•U•I I F1 TO eAC;H 0-AND ~ICUJ.AA TO E!C>ee Of' HteA. I>. DO NOT DEFORM OR COLLAP5E VALVE eox BY' EXCl!!5'1\/I! !!OIL COH"ACTIH5 Al'IOUND BOX. ~-ON l'le<;Y'CU!P 5'f&TEM!! ALL V/>J..\/e IIOxe& AND GlJIGK """'1.IH5 V/>J..YE5 SHAU. BE GLEARJ.'1" COLORS:> f'!.IV'I.E. 8~~;;; BOX LAYOUT r"7-:--,-,-~-:-:,,c. ~-~. ·""'· .-,-;,, .... -:-. -:-. -:--::."'.""".-:--~-1---p~·v1•-. " . ' . . ~ •, . ', ,·. ,; ,. ' ~ - i Ill l :::: :::?::>::::::}:::.::;:.;:..1-:• -'----'<::;::;:l.--~~r:=i~~tr11: ~ I I 501L ,~,:.:.;.:_;.:_;..,4--'----I-I-I---LATERAL LINE 5El= U:6END 1"0R 51"1:CS mlllllllll ':: .)t::t:\:··••,, JmI ~~RE=s m111 111 111~~if~~."3~~ 111= ~F~~~ 1rn111rn 111 111 Ill Ill Ill Ill 111 111rn1 ~¾e~= DIMENSION-VEHICLE A e 6' OR. LESS 36' 1e,11 6' ANP LAR6ER 4f!IH I&'' DIMENSION-VEHICLE A e l3" OR. Ll:ee fl)ll I&" l3" TO S 1/:2" :24" 1&11 6" OR.LA~ 56' I&'' G p 12' 6" 12'' 6" C, D 1211 6' 12' 6" 12' 6" euNDLE CAFIRIEP. EXTEND ALL Sl.fE:VES 12' MINIMUM PAST HARDSCAl'l:: ec:>eE5 BAGl<FILL SHOULD eE l"LAGEP IN 6' LA'l"l:R& ANP TAMPED @~:;_1;~-~ INSTALLATION, POTABLE "AS-BUil T" DATE NOT!!, 'RC,V l-16ATION CON~LVALVE A=1 6V 0 0 IAAJ6ATION GON~LVALVE I. Jii.ECT. VALVE BOX i'ilTH LOGKAel.E COVER. 2. 2" LAeELIN6 PER Sf'EGIFICATION5 :,, CONTROLl.fMGUIPMeNT Pe519NATION 4. VALVE IPENTIFICATION S. ROUND VALVE BOX l"IITH LOGKAel.f COVER ALL VALVE BOX COVERS SHALL eE 1"I.IRF'LE IN COLOR ON REC'T'CLED i'iATeR S'T'S-reMS. GUEST BUILDER IRRIGATION DETAILS 6'/EST S()//.1:JER VILLA6ES OF LA COSTA THE OAKS -~./ LI-Oc::t TITLE: RECEIVED BY: 1----1--+------------1---+--+--+---i I APP~':;_L / C.r. ~Lo'fr ,. ,'f.41"1 I 1-----1-----1--------------l----+---+--+---1 ~-P:;LA~N=;N;:IN:::G:===;--;==========:::;;:::D:::A::T:::E=~· l--,=,-+=.,.,.-i--------------f-:--:=--l-c=:-cc-+-::--7'.=-+==:-:--I DWN BY: ___ , PROJECT NO. I DRAWING NO. INSPECTOR DATE INITIAL ,__DA_TE_~IN_ITI_A_L..._D_ATE_~INl_llA_L_, CHKD BY: ___ 1 C,T 05-14 44~-4L ____________ -----ENGINEER OF WORK REVISION DESCRIPTION O'THER APPROVAL CITY APPROVAL RVWD BY: c;.' DATE ) \ j IRRIGATION 5PEC.IFIC.ATION5 5EC.TION 02811 LAND5c.APE IRRIGATION PART I -GENERAL 1.01 SUMMARY A. IT IS THE INTENT OF THE 5PECIFICATIONS AND DFWIIIN65 THAT THE FINISHED SYSTEM IS COMPLETE IN EVERY Rl:Sl'ECT AND SHALL BE READY FOR OPERATION SATISFACTORY TO THE Oi'MR. 6. THE ~ SHALL INCLUDE ALL MATERIALS, LAeOR, SERVIC.ES, TAANSPOR.TATION, AND EGlUIPMENT NEC.ESSARY TO PERFORM THE ~ Af; INDICATED ON THE DRA,J,,IIN65, IN THESE 5PECIFICATION, AND Af; NECESSARY TO COMPLETE THE CONTAAG-T. 1.02 CONSm!CTION DAArllNSS A. DUE TO THE SC.AU: OF THE DRAWINGS, IT IS NOT P0&5f6U: TO INDICATE ALI. OFFSETS, FITTINeS, 5l.fl:VE5, ETC. rtllCH MAY BE REGIJIRED. THE CONTRAGTOR SHALL CAAl:FUU..Y INVE5Tl9ATE THE 5m!C11JAAI.. AND FINISHED CONDITIONS AFFEC,TINe ALL OF HIS i'IO!'<K AND PLAN HIS i'IORK ACC.ORDINel. Y, MNISHINe 5UC,H FITTIN65, ETC. A5 MAY 6f REGI./IRED TO MEET SUCH CONDITIONS. DR,IJ,,lllle& ARE iSENEAAU.Y Dl~ATIC AND INDICATIVE OF THE t,,IORK TO 6f INSTALLED. THE i'IOl'<K SHALL 6f INSTALLED IN SUCH A MANNER AS TO AVOID CONFLICTS 6ETl'eN IAAIISATION S'T"STEMS, PLANTING, AND AACHITECTUAAL. FEA '11JRE5. 6. ALL 1-1::)RK CALLED FOR ON THE DFWilN65 6'r' NOTES OR DETAILS SHALL 6E MNl!iHED AND INSTALLED i'IHfTHER OR NOT SPECIFIC.ALLY MENTIONED IN THE: SFECIFICATIONS. t-1HE:N AN ITEM 15 SHOWN ON THE PLANS Bl.IT NOT &HO~ ON THE SPECIFICATIONS OR VICE VERSA, IT SHALL 6E DEEMED TO 6f AS SHOl'tl ON 60TH. THE LAND&c.APE ARCHITECT SHALi. HAVE FINAL AUTHORITY FOR CLARIFIC.ATION. C. THE CONTRACTOR SHALL NOT V-OLI.RJLLY IN5TALL THE IAAl6ATION SY5TEM AS SHOiiN ON THE DRAl'IINISS l"tlE:N IT IS 06VICIJ5 IN THE FIELD THAT 065TRI.ICTIONS, SAADE Dll'f'l:Rl:NGES OR Dl&c.Rl:PANGIES IN AREA DIMEN5tONS EXIST THAT MIGHT NOT HAVE 6EE:N CONSIDERED IN EN61NEERINe. SUCH OBSTRUCTIONS OR ...-111 WNCES SHOULD eE 19ROU6HT TO THE: ATTE:NTION OF THE LAND&cAPE ARCHITECT AS SOON AS DETECTED. IN THE EVENT THIS NOTIFICATION IS NOT PERFORl'E), THE IAAl9ATION CONTRACTOR SHALL ASSUME RJLI. RESPON516ILITY FOR ANY REVISION NECESSARY. I.OS GUALITY A55UF<ANGE A. PROVIDE: AT LEAST ONE ENeLISH SP!:AKINe PERSON WHO 5HALL 6E PRESENT AT ALL TIMES DURINe E:XEGUTION OF THIS PORTION OF THE ll<IORK AND HHO SHALL 6E THOROUeHI.Y FAMILIAR HITH THE: TYPE OF MATERIALS 6EIN6 INSTALLED AND THE MANUFACTUREl!.'S RECOMMENDED ME:™ODS OF INSTALLATION AND HHO SHALL DIRECT ALL HORK PERl"ORMED UNDER. THIS SECTION. 6. MANUFACTUREl!.'S DIRECTIONS AND DE:TAILED DAAl'ilN6S SHALL 6E FOLLOWED IN ALL CASES r-1HERE THE MANUFACTURER OF ARTICLES USED IN THIS GONTAAG-T FURNISH DIRECTIONS GOVERINe POINTS NOT SHOy,N IN THE DRAl'IIN6S AND SPECIFICATIONS. C. ALI. LOCAL, MUNICIPAL AND STATE LAYe, RIJl.E5 AND REEiULATIONS 60VERN!Ne OR RE:LATINe TO AN'r' PORTION OF THIS i'IORK ARE Hl:REBY INGORPOFI.ATED INTO AND MADE: A PART OF THE:SE SPECIFICATIONS, AND THEIR l'f<OVISIONS 5HALI. 6E CARRIED Olfl' 6T' THE CONTAAGTOFt ANYTHING CONTAINED IN THE:SE SPECIFIC.ATIONS SHALi. NOT 6E CONSTRUED TO CONFLICT HITH AN'r' OF THE A60VE RULES AND Rl:6ULATIONS OF THE SAME. HO~, r,11-EN THE:SE SPE:C,IFICATIONS AND DFWll!NGS CALL FOR OR DE:SCRl6E MATERIAL&, ViORKMANSHIP, OR CONSTRUCTION OF A BETTER GI.IALITY, HIGHER STANDARD, OR LAMER 51ZE THAN 15 REGUIRED SY THE A60VE RULES AND REel.lLATIONS, THE PROVISIONS OF THESE SPECIFIC.ATIONS AND DAAHINeS SHALL. TAKE PRECEDENCE. D. ALL MATERIALS Slfft.lED FOR THIS ~.ECT SHALL 6E NEl/'4 AND FRE:E FROM ANY DEFECT&. ALL DEFECTIVE MATERIALS SHALL 6E RE:PLACED ll+IEDIATELY AT NO ADDITIONAL G05T TO Of/llNER. E. THE CONTRACTOR SHALL SEC,IJRE THE REGI.IIRED LICENSES AND PERMIT& INGLIJDINl5 PA'r'ME:NTS OF GHN?6ES AND FEES, ISIVE REGUIRE:D NOTICES TO PU6LIC AUTHORITIES, Vl:l<.IFY PERMIT& 5EGURED OR AAAANl5EMENTS MADE: SY OTHERS AFFE:CTIN6 THE i'IORK OF THIS SECTION. 1.04 SU6MITTAL5 A. MATERIAl.5 LIST, I. AFTER Ail'4ARD OF CONTRACT AND BEFORE ANY IRRl9ATION 5YSTEM MATERIALS ARE: DELIVERED TO THE J06 51TE, SUSMIT TO THE: 0HNER A COMPLETE LIST OF ALL IRRIGATION 5'1'5TEMS, MATERIALS, OR ~E5SES P1<0POSED TO 6E MNISHB, AND IN5TALLED A5 PART OF THl5 CONTRACT. 2. SHOW MANIJFACTUREl!.'S NAME AND C.ATALOIS WM6ER FOR EAGH ITEM, MNISH COMPLETE CATALOIS CUTS AND TECHNICAL DATA, FURNISH THE MANIJFACivf<Elt'S REGOMMENDATIONS AS TO THE METHOD OF INSTALLATION. S. NO 5UeSTITUTIONS 11'4ILI. 6E ALI.OHE:D HITHOVr PRIOR Jl'RITTE:N ACCEPTANCE 6Y THE: LAND&cAPE AACHITEGT OR OWNER'S AUTHORIZED RE:PRESENTATIYE. 4. MANIJFACT\.IRE:R'S ~NTIES SHALL NOT RELIEVE THE CONTRACTOR OF Hl5 LIABILITY UNDER THE el.lAAANTEE. SUCH l'lARl<ANTIE5 SHALL ONLY 5UPPLEMENT THE iSIJARANTEE. 6. 5U85TITUTION5, IF THE IRRIGATION CONTRAC,TOR HISHES TO 5U66T11VTE AN'r' EGUIPME:NT OR MATERIALS FOR THOSE EGlUIPMENT OR MATERIAl.5 Ll5TED ON THE IRRIISATION DAAHINeS AND Sl'EC,IFICATIONS HE MAY DO 50 6'r' PROVIDINe THE: FOLLOWING INFORMATION TO THE LANDSCAPE ARCHITECT OR Ol"MR'S AUTHORIZED REPRESENTATIVE AND CITY INSPECTOR FOR APPROVAL. I. PROVIDE A HRITTE:N 5TATEMENT INDICATINe THE REASON FOR MAKINe THE 5U66TllUTION. 2. PROVIDE CATALOIS CIJT 5HEET5, TECHNICAL DATA, AND PERFORMANCE INFORMATION FOR EACH 9U6STITUTE ITEM. 3. PROVIDE IN HRITINe THE DIFFERENCE IN INSTALLED PRICE IF THE ITEM 15 ACCEPTED. 1.05 EXl5TINl5 CONDITIONS A. THE CONTRACTOR &HALI. VERIFY AND 6E FAMILIAR 11'4ITH THE LOCATIONS, 51ZE AND DETAIL OF POINTS OF CONNECTION PROVIDED AS THE SOURCE OF HATER, ELEC,TRICAL SIJPPLY, AND AN'r' TELEPHONE LINE CONNECTION TO THE IRRIISATION SYSTEM. 6. IRRIISATION DESleN 15 BASED ON THE AVAlLA6LE 5TATIC, HATER FRE5eURE: ~ ON THE DFWll!N65. CONTRACTOR SHALL Vl:l<.IFY 5TATIC, HATER ON THE PROJEC,T PRIOR TO TIE 5TART OF GONSTFWCTION. SHOlA.D A Dl&c.REPANCY EXIST, NOTIFY THE LAND&cAPE ARCHITEGT AND OWNER'S AIJTHORJZED REPRESENTATIVE PRIOR TO BEelNNINe CONSTFWC,TION. C. PRIOR TO CIJTTINe INTO THE &OIL, THE CONTRACTOR SHALL. LOCATE ALI. CA6LE5, CONDUITS, 56'IER SEPTIC, TANKS, AND OTHER UTILITIES AS ARE COMMONLY 6ICOUNTWD UNDE~ AND HE SHALL TAKE PROPER PREGAIJTION5 NOT TO DAMAISE OR Dl5TUR6 SUCH IMPROVEMENT&. IF A C.ONFLICT EXl5TS SETl'IEEN TIE SUCH OSSTACLES AND THE: PROPOSED I-IORK, THE CONTRACTOR 5HALI. PROMPTLY NOTIFY THE: LANDSCAPE: ARCHITECT AND OHNE:R HHO HILL ARRANSE FOR RELOCATIONS. THE CONTRACTOR l'IILL PROC,El:D IN THE SAME MANNER IF A ROc.K LAYER OR ANY OTHER SUCH CONDITIONS ARE E:NCOUNTERE:D. i,. THE CONTRACTOR SHALL PROTECT ALI. EXISTINl5 .UTILITIES AND FEATURE:5 TO REMAIN ON AND ADJACENT TO THE: PROJEC,T 5ITE DURING CONSmJCTION. CONTRAc.TOR SHALi. RE:PAIR, AT HIS OHM C05T, ALL DAMAf;E RESULTINe FROM Hl5 OPERATIONS OR NEISLIISENC,E. E. THE IRRIISATION GONTRAc.TOR SHALL C.OORDINATE l'IITH THE i$ENEAAL CONTRACTOR FOR INSTALLATION OF REGI./IRED SLEEVINe AS SfiOy,N ON THE PLANS. 1.06 IN5PEC,TION5 A. THE CONTRACTOR 5HALI. PE:RMlT THE LAND&cAPE: AACHli!:CT, Ol'INER'S Al/T'r!ORIZED ~ATIVE AND CITY INSPEc.TOR TO Vl5IT AND INSPECT AT ALL TIMES ANY PART OF THE l'IORK AND SHALL PROVIDE 5AFE ACCESS FOR SUCH VISITS. B. il'4HERE: THE: SPEGIFICATIONS RE:GI.IIRE: HORK TO 6E TESTED BY THE: c.ONTRACTOR, IT SHALi. NOT 6E COVERED OVER UNTIL AC,c,EPIED 6'r' THE LANOSGAPE ARC.HITECT, OHNER'S AUTHORIZED Rl:PRESENTATIYE, AND/OR iSOVERNINIS AISENGIES. THE CONTRACTOR SHALL 6E SOL.ELY RESPON516LE: FOR NOTIFYINIS THE LANDSCAPE ARCHli!:CT, OWNER, AND iSO\/ERNINe AISENCIES, A MINIMI.JM OF~ HOURS IN ADVANGE, i'IHERE AND l<ff:N THE~ 15 RE:ADY FOR TESTINIS. SHOULD ANY i'IORK 6E COVERED l'IITHOlfl' TE5TINl5 OR ACGEPTANGE, IT &HALI. SE, IF 50 ORDE:RE:O, UNc.OVERED AT THE c.ONTRACTOR'S EXPE:NSE. C. INSPEc.TIONS HILi. 6f RE:GI.IIRED FOR THE FOLLOl'IINl5 AT A MINIMJM, I. 5'r'STEM LA YOIJT 2. ~ TE5T OF IAAIGATION MAIN LINE (F~ HOUR5 AT 125 PSI OR 120lli OF STATIC HATER PRESSURE, HHICH MR 15 ISREATE~ APPROVAL REGl.ltRED SY C.ITY INSPECTOR S. COVEAA6E TEST OF IRRIGATION 5Y5TEM (N'f'MI/AL ~le) B"I' CITY INel'l:,c;TOl'J, 4. FINAL INSPE:CTION PRIOR TO 5TAAT OF MAINTENANCE PERIOD 5. FINAL ACc.EFTANC,E: D. SITE 065!:RVATIONS AND TESTINl5 l'IILL NOT COMME:NCE: l'IITHOlfl' THE RECORD DFWIIINeS AS FRE:PARED BY THE IAAIISATION CONTRACTOR RECORD DFWIIINeS MUST COMPLETE AND UP TO DATE FOR EACH SITE VISIT. E. i'IORK lriflc.H FAILS TESTING AND 15 NOT AC,C,EPTEID l'IILL 6E RETESTED. HOURLY AATE5 AND EXPCN:lU.i ..,F THE LAND&c.APE AAGHITECT, OHNER'S AI./THORIZED REPRESENTATIVE, AND ee>YERNINe A6ENCIES FOR REINSPEC.TION OR RE:TESTINe l'IILI. 6E PAID 6Y THE IAAIISATION CONmACTOR AT NO ADDITIONAL EXPEN5E TO oy,NER, 101 5TOAAISE AND HANDLINe A. USE ALL MEANS NECE5SARY TO ~CT IRRIISATION 5YSTEM MATERIALS 6EFORE, DURING, AND AFTER INSTALLATION AND TO P\IIOTECT THE IN5TALI.ATION i'IORK AND MATERIAl.5 OF ALL OTHE:R TRADE5. IN THE EVENT OF DAMAISE, ll+!EDIATELY MAKE ALL RE:PAIR5 AND REPLACEMl:NTS NECES5ARY TO THE ACCEPTANCE OF THE LANDSCAPE ARCHITECT AND Oy,INER AND AT NO ADDITIONAL G05T TO THE OWNER. 6. EXERGISE GARE: IN HANDLINe, LOADINe, IA-ILOADINl5, AND 5TORING PLASTIC, PIPE: AND FITTINeS UNDER GOVER UNTIL RE:ADY TO IN5TALL. TAANSPORT PLASTIC, PIPE ONLY ON A VEHIGLE l'IITH A BED LONe ENOUGH TO ALLOW THE PIPE TO LAY FLAT TO AVOID UNDUE BENDING AND CONCENTRATED l:XTf:RI-IAL LOAD. 1.0& GLEAM.IP AND Dl5POSAL A. DISPOSE OF HASTE, TAASH, AND DESR.I5 IN AGC,ORDANC,f; l'IITH APPLICABLE LAYe AND ORDINANCES AND AS PRESCRleED BY AUTHORITIES HAVINl5 ~SDICTION. MY NO 51.JC,H HASTE: MATERIAL AND Dl=BRl5 ON THE 51TE. 61.iRNING OF TRASH AND DESR.I5 HILi. NOT Bl: PERMITTED. THE CONTAAG-TOR SHALL. REMOVE AND DISPOSE OF FW6615H AND DESRIS eENEAATED SY HIS HORI< AND 1-1::)RKMf:N AT FRl:GIJENT INTERVAl.5 OR l"tlEN ORDERED TO DO 50 6Y THE OHNER'S Al!THORIZED REPRE:5ENTATIVE. 6. AT THE TIME OF COMPLETION THE ENTIRE: 51TE: V.ILI. 6E CLE.AAED OF TOOLS, EGI./IPMENT, R!J661SH AND DE:BRl5 l'IHICH SHALL 6E Dl5POSED OF OFF-51TE IN A LEISAL DISPOSAL AREA. I.oq MNOVER ITEM& A. RECORD DR,IJ,,IIN6S, I. REGORD ACCURA 11:L Y ON ONE SET OF CONTRAC, T DAAl'IINeS ALL CHANGES IN THE i'IORK CONSTllUTINe DEPARTIJRES FROM THE ORIGINAL c.ONTAAG-T DRAHINeS. 2. THE CHAN6ES AND DIMENSIONS SHALL. 6E RECORDED IN A LEISl61.E AND HORKMANLIKE MANNER TO THE 5ATl5FACTION OF THE Ol'INER PRIOR TO FINAL IN5PEGTION OF HORK, 5UBMIT REGORD DRAHINl55 TO THE LAND&c.APE AAGHITECT OR OHNER'S AliTHORIZED REPRESENTATIVE. 3. DIMENSIONS Ft<OM/TO PERMANENT POINTS OF REFERENC,IE SUCH A5 6UILDING5, 5IDEW,J.K5, C,IJR65, ETC. 5HALL 6E SHOy,IN, DATA ON RE:c.ORD DAAHINGS SHALL 6E RECORDED ON A DAY TO DAY 6A51S A5 THE PROJECT 15 6EING INSTALLED. ALL LEI IERIN6 ON DAAHINeS SHALi. 6E MINIMJM 1/& INCH IN 5IZE. 4. 5HOH LOCATIONS AND Dl:PTH5 OF THE FOLLOWIN6 ITEMS, A. POINT OF CONNE:CTION (INC,LIJDINe HATER ME'TcR5, SACKFLOW PREVENTER5, MASTER CONTROL VALVES, ETC,J B. ROl/TINe OF~~ PRESSURI: LINES (DIMEN510NS 5HO¥tl AT A MAXIMUM OF 100 FEET ALONe ROlfl'INe) C,, GATE VALVES D. AIJTOMATIC, REMOTE CONTROL VALVE5 AND ISOLATION BALL VALVES E:. Gl/lC,K COUPLINIS VALVES AND ISOLATION SALL VALVES F. ROUTIN6 OF CONTROL l'IIRES e. IRRl9ATION cotmwLLER5 H. RE:LATED EGlUIPME:NT (A5 MAY 6E DIRECTED) 5. MAINTAIN RE:c.ORD DAAl'IINGS ON 51TE AT ALL TIMES. WON COMPLETION OF ll<IORK, TRANSFER ALL AS-61.JILT INFORMATION AND DIME:N&IONS TO Rl:PRODIJC,I61.1: 5EPIA PRINTS. 6. AS-61.JILT PLANS FOR ALL ~JEC,TS /60NDED AND NON-eONDED, RJ6l.lC. AND PRIVATE) ARE REGIJIRED TO 6E SIJ6MITTED. sueMITTAL FO A5-6UILT PLANS SHALL 6E A5 RE:GI.IIRED 6T' THE ENelNEERINe AND PLANNINe DEPAR'Tl-ENTS. THE FINAL PLANS SHOLlD 6E PREPARED SY THE LANDSCAPE ARCHITECT FROM DIMENSIONS PROVIDED BY THE GONTAACTOR FINAL AS-61.JILT PLAN5 5HALL 6E DRAFTED Cl.EARLY TO THE SATl5FACTION OF THE C,ITY, AND 6E SUBMITTED TO THE C.ITY AS SIISNED MYLARS TO Elf KEPT AT THE CITY l'IITH THE ORlelNAL 519NED MYLARS. B. CONTROLI.ER CHART&, I. RECORD DFWIIINeS MUST 6E ~ SY LAND&c.APE ARCHITECT AND/OR Ol"MR'S AUTHORIZED Rl:PRE:SENTATIVE eEFORE CHART& ARE PREPARED. 2. PROVIDE: ONE CONTROLI.ER CHART FOR EACH AIJTOMATIC C,ONTROLLEFI. GHAFI.T SHALL. SHOl'I THE ARE:A COVERED 6'r' THE: PARTIC,IJLAR CONTROLLER S. THE CHART 15 TO 6E A RE:DUCED COPY OF THE ACTUAL ''RECORD" DAAHINe. IN THE EVENT THE CON'l'ROLLER SEGI./ENCE 15 NOT LEe161.E l'IHEN THE: DAArllNe IS REDUCED, IT SHALL 6E E:NLARGED TO A RE:ADA6LE 5IZE. 4. l'IHEN COMPLETED AND APPROVED, THE GHART SHALL 6E HERMETICALLY SEALED BE1W:EN THO PIECES OF PLAf;TIC, EACH PIECE BEING A MINIMUM 20 MIL5 IN THICKNE55. C,, D. 1.10 A. OPERATION AND MAINTENANGE MANUAl.5, 1. THO INDIVIDUALLY SOUND COPIE5 OF OPERATION AND MAINTENANC,E MAWALS 5HALL 6E DE:LIVEl'ECi TO THE LAND&c.APE ARCHITEC.T OR Ol'IHl:R'S AUTHORIZED REPRE5ENTATIVE AT LE:AST 10 C.AU:NDAA DAYS l"RIOR TO FINAL IN5PECTION. THE MAWALS 5HALL Dl=&c.Rl6E THE MATERIAL IN5TALLED AND THE~ OPl:RATION OF THE 5'r'STEM. 2. EACH COMPLETE, SOUND MANUAL SHALL INCLUDE THE: FOLLOl'IIN6 INFORMATION, A. INDEX SHEET STATINe CONTRACTOR'S ADDRESS AND TELEPHONE WM6ER, DURATION OF iSIJAAANTEE PERIOD, LIST OF EGI.IIPMENT INCLUDINIS NAME:S AND ADDRESSES OF LOCAL MAWFACTVRl:I< RE:PRE:5ENTATIVES. B. OPl:RATINIS AND MAINTENANGE IN5TRUCTIONS FOR ALL EGlUIPMENT. C. SPARE PAAT5 LISTS AND RE:LATED MANUFACTURER INFORMATION FOR ALL EGlUIPME:NT. EGI./IPME:NT, I. SUPPLY A5 A PART OF THl5 CONTRACT THE FOLLOHIN6 ITEMS, A. THO (2) l'IRENC,HE5 FOR Dl5A55EM6L Y AND ADJJ5TME:NT OF EACH TYPE OF SPRINKLER HEAD USED IN THE IRRIGATION SYSTEM. 6. THRE:E SO-INCH SPRINKLER KEY5 FOR MANUAL OPERATION OF CONTROL VALVES. e,, THO KEYS FOR EACH AVTOMATIC ~I.ER. D. FIVE GI.IIGK COUPl.ER KEY5 l'IITH A BRONZE HOSE THRE:AD '10 DE:eRE:E ~VEL ATTACHMENT AND FIVE COIA"LER LID KEYS. E. FIVE VALVE BOX COVER KEY OR HRENCH. F. ONE 5-FOOT TEE l'IRENGH FOR OPERATINe 9ATE VALVE& S INCHE5 OR LAR6ER (IF USED). IS. SIX EXTRA SPRINKLER HEADS OF EACH SIZE AND TYPE PER IAAl6ATION P.O.C. 2. THE A60VE EGUIPMENT SHALL BE TURNED OVER TO OHNER'S AUTHORIZED Rl:PRE:SENTATIVE AT THE FINAL INSPECTION. COMPLETION AT THE TIME OF THE PRE-MAINTE:NANGE PERIOD IN5PEGTION, THE LAND&cAPE ARCHITECT, Oy,NER'S AUTHORIZED REPRESENTATIVE, AND 60VERNIN6 Aee:NCIES V-OLI. IN5PEG T THE: HORK, AND IF NOT AGCEPTED, HILi. PREPARE A Ll5T OF ITEM5 TO 6E COMPLETED 6'r' THE CONTRACTOR. AT THE TIME OF THE POST-MAINTENANCE PERIOD OR FINAL INSPECTION THE: l'IORK l'IILI. 6E REIN5PEGTED AND FINAL AC,C,EPTANCE: l'IILI. 6E IN HRITINl5 BY THE L.AND5CAPE ARC.HITECT, OHNER'S AIJTHORIZED REPRESENTATIVE, AND i$0VERNINe AISENGIES. B. TIE OHNER'S AUTHORIZED REPRESENTATIVE SHALL HAVE FINAL AUTHORITY ON ALL PORTIONS OF THE J-IORK. C. AFTER THE 5YSTEM HAS SEEN COMPLETED, TIE CONmACTOR SHALL INSTFWC,T Ol'INER'S AUTHORIZED REPRESENTATIVE IN THE OPERATION AND MAINTENANGE OF THE IRRIGATION SYSTEM AND SHALL FURNISH A COMPLE:TE 5ET OF OPEAATINIS AND MAINTE:NANGE INSTl'WC,TIONS. D. ANY SETTLING OF TRENCHES HHIGH MAY OCCUR DURINe THE ONE-YEAR PERIOD FOLLOl'IING ACc.EFTANCE: SHALL. SE REPAIRE:D TO THE OHNER'S 5ATl5FACTION 6'r' THE CONTAAGTOR l'IITHOlfl' AN'r' ADDITIONAL EXPE:NSE TO THE OHNER. REPAIR& SHALL. INCLUDE THE COMPLETE RESTORATION OF ALL DAMAISE TO PLANTING, PAVIN6 OR OTHER 11'ffOVEMENTS OF AN'( KIND AS A RESULT OF THE i'IORK. I.II iSIJAAANTEE A. THE ENTIRE SPRINKLER 5YSTEM, INC,LIJDING ALL HORI< DONE UNDER THIS CONTRACT, SHALL 6E l/NCONDITIONALLY el.lARANTEED AISAINST ALI. DEFEGTS AND FAULT OF MATERIAL AND HORKMANSHIP, INGLUDING SEmlNe OF SACK FIELD AREAS 6ELOl'I 5RADE, FOR A PERIOD OF ONE (I) '!'EAR FOLLOl'IING THE FILINIS OF THE NOTICE OF COMPLETION. SHOULD ANY l"R06LEM HITH THE IRRl6ATION SYSTEM 6E DISCOVERED HITHIN THE OOAAANTEE PERIOD, IT 5HALL BE C,ORRE:C,TED 6Y THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO Ol"MR l'IITHIN TEN (10) C.ALENDAA DA'r'5 OF REc.EIPT OF J,,FI.ITTEN NOTICE Ft<OM OHNER. r,11-EN THE NATURE: OF THE: REPAIRS A5 DETERMINED 6Y THE OWNER CONSTITUTE AH E:MER6ENCY (I.E. BROKEN PRE5SURf LINE) THE OHNER MAY PROCEED TO MAKE REPAIR& AT THE CONTRACTOR'S EXPENSE. ANY AND ALL DAMAeES TO EXl5TIN6 IMPR.OYEMENT RESULTINIS E:ITHER FROM FAULTY MATERIALS OR i'IOl'<KMAN5HIP, OR FROM THE NECESSARY REPAIRS TO COAAECT 5AME, SHALL 6E REPAIRE:D TO THE 5ATISFACTION OF THE Ol'INER 6T' THE CONTAAGTOR, ALL AT NO ADDITIONAL COST TO THE OWNER. 6. el.lAAANTEE 5HALL 6E SUSMITTED ON GONTAACTORS Ol'IN LETTE:RHEAD AS FOLLOJ.'15, OOARANTEE FOR SPRINKLER IRRIGATION 5YSTEM HE HERE:SY el.lARANTEE THAT THE SPRINKLER IAAIISATION 5YSTEM HE HAVE MNISHED AND INSTALLED 15 FREE Ft<OM DEFECTS IN MATERIAL& AND l'IORKMANSHIP, AND THE HORI< HAS BEEN COMPLETED IN ACCORDANGE HITH THE DAAHING5 AND 5PECIFICATION5, ORDINARY 1'EAF1. AND TEAR AND IJIIUSUAL ASUSE, OR NEeLEC,T EXCEPTED. l'IE ~ TO REPAIR OR RE:PLACE ANY DEFECTIVE MATERIAL DURINe THE PERIOD OF ONE YEAR FROM DATE OF FILINe OF THE NOTICE OF COMPLETION AND ALSO TO REPAIR OR REPLACE ANY DAMASE RE5I.A.. TINe FROM THE REPAIRINe OR RE:F'LAC,ING OF SUCH DE:FECTS AT NO ADDITIONAL C05T TO THE: OHNER. HE SHALL MAKE SUCH REPAIR& OR RE:PlAe-EMENTS l'IITHIN 10 CALE:NDAR DAYS FOLI.Ol'IINe HRITTEN NOTIFICATION SY THE 01'11111:R.. IN THE EVE:NT OF OUR FAII.J.IRE TO MAKE SUCH REPAIRS OR REPLACEMENTS l'IITHIN THE: TIME. 5PECIFIE:D AFTER RECEIPT OF HRITTEN NOTIC,f; FROM Ol'INER, HE AUTHORIZE THE Ol'INER TO PROCEED TO HAVE SAID REPAIRS OR REPLACEMENTS MADE: AT OUR EXPENSE AND HE V-OLI. PAY THE G05TS AND CHAR6E5 THEREFORE WON DEMAND. ~...EC,T NAME, ~...EC,T LOCATION, CONTRACTOR NAME, ADDRE:SS, TELEPHONE, 51eNED, DATE:, PART II -MATERIALS 2.01 SUl+1ARY USE ONLY NEH MATERIAl.5 OF THE MANJFACTURER, 5IZE AND TYPE SHOWN ON THE DR,IJ,,IINGS AND SPECIFIC.ATIONS. MATERIALS OR EGlUIPMENT INSTALi.ED OR MNISHED THAT DO NOT MEET LAND&c.APE: ARGHITECT'S, Olff:R'S, OR iSO\/ERNINIS AISENCIES STANDARD& l'IILI. 6E REJEC.TED AND SHALL 6E RE:MOVED FROM THE 51TE AT NO EXFENSE TO THE Ol'INER. 2.02 PIPE A. PRE5SURE SUPPLY LINE FROM POINT OF CONNECTION THROUGH SACKFLOl'I PREVENTION UNIT SHALL 6E TYPE K 'HARD' COPPER i'IPE OR 6RA5S NIPPLES (LENISTH A5 REGIJIRE:D). www.gmplandarch.com DRAWN JR -------------, ---------.. --------,,, .. A_S_B_U_IL-T""'•---------.---,---r----------------r--.---;---.---t GUEST BUILDER IRRIGATl□N SPECS ~ LEJ Ll-10 ,osc 9404 Genesee Avenue ~od Suite 140 La Jolla APPROVED FOR PLANTING California 92037-1353 Tel 858 558 8977 AND IRRIGATION ONLY, Fax 858 558 9188 INCLUDING PREC.ISE LANDSCAPE APPROVED MM 1ST SUBMITTAL 02-09-07 2ND SUBMITTAL 3-13-07 3RD SUBMITTAL 4-30-07 4TH SUBMITTAL 7-02-07 MYLAR SUBMITTAL 7-10-07 DATE TITLE: RECEIVED BY: 61/E5T Bl/II.DER VILJ.A6ES OF LA C,OSTA THE OAK.S -~./ IAPP~~( CJ: ~(:Cit l·\~ . ..,7 LOCATION OF PLANTING ARC:HITEC:TURE JOB NO. 05-038 DATE 04-30-07 t====jt===j===============================~====~====t====~===::::: ;:;· P;:L~A~N~Nl~N::::G==::::,-;:::=~~~=:=.;==:;,:=::D~A~T~E~~~ DWN BY: ---PROJECT NO. DRAWING NO. DA'IE INITIAL DA'IE INITIAL CHKD BY: --CT 05-14 446-4L DA TE INITIAL AREAS. & PLANNING SCALE A.S SHOWN INSPECTOR DATE OTHER APPROVAL CITY APPROVAL RVWD BY: ENGINEER Of WORK REVISION DESCRIPTION ' ) IRRIGATION SPECIFICATIONS (CONT'D) PART II -MATERIALS B. PRESSURE 51JFPL Y LINES 2 INCHe IN DIAI-ETER AND UP TO 2.5 INCHES IN DIAME'l'ER DOl'INSTREAM OF BACKFLOl'I PREVENTION UNIT SHALL Bf CLASS 515 SOLVENT l'>IE1.D PVC. PIPIN6 SHALL CONFORM TO ASTM DZl4I. C. PRESSURE SUPPLY LINES 5 INCl-!ES IN DI/\Mc'TER AND UP TO I, INCH!$ IN DIAMETER DOrlNSTREAM OF BAc.i<.FLOH PREVENTION UNIT SHALL BE CLASS 200 6ASKET JOINT PVC. PIPIN6 SHAU. CONFORM TO ASTM D224I. D. PRESSURE SUPPLY LINES I.& INCHES IN DIAME'TeR AND SMALLER OF THE BACKFLOY'I Pf/ij:VENTION UNIT SHALL BE SCtEDUI..E 40 SOLVENT f'IELD PVC CONFO~IN6 TO ASTM Dlil,5. E. NON-PRESSI.Jru: LINES .15 INCH!$ IN DIAMETER AND~ DOl'INSTREAM OF TI£ fl.EMOTE CONTROL VALVE SHALL BE SCH. 40 PVC. F. RECYCLED (RECLAIMED) !'IA~ PVC PIPE TO BE ~-CODED ~LE IN COLOR MAAKED ON mo SIDES l'IITH RECLAIMED l'IATER l'IAl<NIN6 STATEMENTS 'C.AIJTION-RECYCLED /RECLAIMED) l'IATER'. ~CLAIMED l'IATER PIPIN6 MJST BE ACCEPTED BY LOCAL RECLAIMED l'IATER ~NIN6 AeENCIES. RECYCLED l'IATER PIPE SHALL BE USED ONLY ON RECYCLED SYSTEM. NON-f'RESalRE PIPIN6 SHALL CON~ TO ASTM Dlil,5. 6. ALL SPECIALIZED PIPIN6 SHALL BE AS INDICATED ON THE ~IN6 LE6END OR DETAILS. 2.o!5 METAL PIPE AND FITTIN65 A. BRASS PIPE SHALL BE 1,5 PERCENT RED BRASS, ANSI, !PS STANDARD 125 POUNDS, SCHEDlU 40 SC~ PIPE. B. BRASS FITTIN65 SHALL BE MEDIUM BAASS, SCREHED I25-POUND CLASS. C. Col I Ek ?IPE SHALL BE 'HARD' TYPE I<. OR AS NOTED ON THE ~IN6 LE6END OR DETAILS. D. , , Flmt-165 SHALL BE SOLDERED TYPE. 2.o4 PLASTIC PIPE AND FITTIN65 A. PIPE SHALL BE MARKED CONTl1'lJOIJSL Y Y'IITH MANUFAC11JRER'S NAME, NOMINAL PIPE SIZE, SCHEDULE OR CLASS, PVC TYPE AND eRADE, NATIONAL SANITATION FOI.KIATION APPROVAL, COMMERCIAL STANDARDS DE516NATION, AND DATE OF EXTRUSION. B. ALI. PLASTIC PIPE SHALL BE EXTRUDED OF AN IMPROVED PVC VIR61N PIPE COMPOUND IN ACCORDANCE Y'IITH ASTM D224I OR ASTMDliM. C. ALI. PVC RTTIN65 SHALL BE STANDARD YEl6HT SCHEDULE 40 AND SHALL BE IIU:CTION MOLDED OF AN IMPROVED V1R61N PVC. FITTIN6 C.OMPOUND. SLIP PVC FlmN65 SHAU. BE THE "DEEP SOCKET" 6RACKETED TYPE. TIR:ADED PLASTIC FITTIN65 SHALL BE INJECTION MOLDED. ALI. TEES AND EU..5 SHALL BE SIDE .SATED. ALL FITTIN65 SHAU. CONFORM TO AST1'1 D2466. D. ALL~ NIPPLES SHALL BE STANDARD YEl6HT SCHEDULE bO Y'IITH MOLDED ~A"5 AND SHALL CONFORM TO AST1'1 Dlil,5. E. ALL SOLVENT CEMENTIN6 OF PLASTIC PIPE AND FITTIN65 SHALL BE A THO-STEP PROCESS, US!Ne PRIMER AND SOLVENT CEMENT APPLIED PER THE MAIVFACTI.IRER'S RECOMMENDATIONS. CEMENT SHALL BE OF A FLUID C,ONSISTENCY, NOT 61:L-Lli<.E OR ROP'r'. SOLVENT C.EMENTIN6 SHALL BE IN CONFORMANCE Y'IITH ASTM D2564 AND ASTM D2b55. F. l'H:N CONNECTION 15 PLASTIC. TO METAL, FEMALE ADAPTERS SHALL BE HAND Tl6HTENED, PLUS ONE MN l'll1rl A STRAP ~NCH. JOINT COMPOUND SHALL BE NON-LEAD BASE TEFLON PASTE, TAPE, OR EGUAL. 2.o5 BAc.KFLOl'I ~NTION UNITS A. THE BAc.KFLOl'I f'REVENTION UNIT SHALL BE OF THE MANUFAC'TlJRER, SIZE, AND TYPE INDICATED ON THE DRAl'IIN65. B. THE BACKFLOl'I PREVENTION UNIT SHALL ee INSTALLED IN ACCORDANCE Y'IITH THE ~Gll)J~ SET FORTH BY LOCAL CODES. C. THE BACKFLOl'I PREVENTION A55EMBL Y SHALL CONSIST OF BRASS PIPIN6, UNIONS AND FITTIN65. 2.o6 VALVES A. .SATE VALVES, I. .SATE VALVES SHALL BE OF THE MANIJFACTURER, SIZE, AND TYPE INDICATED ON THE DRAY'IIN65. 2. .SATE VALVES SHALL BE CONSmuc.TED OF A BRONZE BODY, BONNET AND DISC, AND A MALLEABLE IRON HANDl'IHEEJ. . .SATE VALVES SHALL HAVE~ CONNECTIONS. 5. ALL 6ATE VALVES SHALL HAYE A MINIMUM l'IORl<.IN6 PRE55LIRE OF NOT LESS THAN 150 PSI AND SHALL CONFORM TO Ml'IA STANDARDS. B. BALL VALVES, I. BALL VALVES SHALL BE OF THE MANJFACTURER, SIZE, AND TYPE INDICATED ON THE DRAl'IIN65. 2. BALL VALVES SHALL BE c.ONSn;wc.TED OF A BRONZE BODY, STAINLESS STEEL SALL AND STEM MALLEABLE IRON HANDLE BALL VALVES SHALL HAVE THREADED CONNECTIONS. . ' . 5. ALL BALL VALVES SHALL HAYE A MINIMUM rt:>Ri<.IN6 ~ OF NOT LESS THAN 150 PSI AND SHALL CONFORM TO AY'll'IA STANDARDS. C.. GIJIC.i<. C.OUPLER VALVES, I. GIJICK COUPLER VALVES SHALL BE OF TI£ MANUFAC'TlJRER, SIZE, AND TYPE INDICATED ON THE ~IN65. 2. GIJICK COUPLER VALVES SHALL BE BRASS Y'IITH A HALL THICKNESS c$1.1AAANTEED TO l'IITHSTAND NORMAL l'IORKIN6 ~ OF 150 PSI l'IITHOUT LEAKAISE. VALVES SHALL HAVE FEMALE THREA"5 OPENIN6 AT BASE, WITH THO-PIECE BODY. VALVES TO BE OPERATED Oi'l.Y l'll1rl A COUPLER KEY, DE515NED FOR THAT MPoSE. COUPLER KEY IS INSERTED INTO VALVE AND A POSITIVE, l'IATERTl61-1T CONNECTION SHALL BE MADE BETIEN THE COUPl.ER KEY AND VALVE. HIN6E COVER SHALL BE THE LOCl<.1116 TYPE CONSTRUCTED OF BAA55 li!TH A RUBBER-LIKE VINYL c.ovER. 5. VINYL GIUICI<. COUPLER GOVER FOR ~LAIMED l'IATER GIUICI<. COUPLER VALVES TO BE PURPLE IN COLOR l'IITH THE l'IORD5 'l'IARNIN6-l'<Ec.YC.LED (RECLAIMED) AATER-DO NOT DRINK PERMANENTLY MARKED ON LID FOR RECYCLED SYSTEM. D. AUTOMATIC CONTROL VALVES, I. AUTOMATIC. C.ONTROL VALVES SHALL BE OF THE MANIJFAC~R, SIZE, AND TYPE INDICATED ON THE DRAl'IIN65. 2. AUTOMATIC. CONTROL VALVES SHALL BE ELECTRICAL.LY OPERATED. E. ANTI-DRAIN VALVES: I. ANTI-DRAIN VALVES SHALL BE OF THE MAHJFACTURER, SIZE, AND TYPE INDICATED ON THE DAAl'llt-165. 2. ANTI-DRAIN VALVES SHALL HAVE Ie,-e, STAINLESS STEEL SPRIN65 AND VALVE STEMS i'IITH BUNA-N SEALS. 5. ANTI-DRAIN YALVES l'IILL HAYE ~ED c.oNNEc.TIONS THE SIZE OF THE RISER OR PIPE THEY A~ TO BE INSTALLED ONTO, OR THE NEXT AVAILABLE SIZE. NO SLIP CONNECTION ANTI-DRAIN VALVES ARE ALLOYED. 2.01 VALVE BOXES A. VALVE BOXES SHALL BE FABRICATED FROM A ~ l'IEATHER-RESISTANT PLASTIC. MATERIAL RESISTANT TO SIJNLl6HT AND CHEMICAL ACTION OF SOILS. B. THE VALVE BOX COVER SHALL BE l5REEN IN COLOR AND ~D li!TH BOLTS. C. THE GOVER AND BOX SHALL BE CAPABLE OF SUSTAININ6 A LOAD OF 1,500 POUNDS. D. VALVE BOX EXTENSIONS SHALL BE BY THE SAME MANUFAC~ AS THE VALVE BOX. E. AUTOMATIC CONTROL AND MASTER VALVE BOXES SHALL BE 16'Xll'Xl2' RECTAN6ULAR SIZE. VALVE BOX c.ovERS SHALL BE 'HEAT BRANDED" IN 2" Hl6H LETTERS l'IITH EITHER 'RCV' li!TH THE VALVE IDENTIFIC.ATION toeRS OR 'MCV'. F. SPECIALITY 'J.l-180' BOXES MAY BE INDICATED ON DRAl'IIN65 AND SHALL BE 25"Xl5'Xl2' RECTAN6ULAR SIZE. 6. BALL VALVE, .SATE VALVE, AND GIUIC.K c.oUPLER VALVE BOXES SHALL BE C.IRCIJLAR 10' SIZE:. VALVE BOX COVERS SHALL BE 'HEAT BRANDED' IN 2" Hl6H LETTERS l'IITH EITHER •~v•, '6V", OR 'OC,V". H. VALVE BOX COVER !=OR RECLAIMED SYSTEMS SHALL BE PURPLE IN COLOR AND PERMANENTLY MARl<.ED li!TH THE l'IORD5 "AARNIN6-REC.YC.LED (RECLAIMED) l'IATER -DO NOT DRINK" FOR RECYCLED IRRl6ATION SYSTEM. 2.01, IRRl6ATION CONTROLLER A. CONTROLLER SHALL BE OF THE MANUFACTURER, SIZE AND TYPE INDICATED ON THE DRAl'IIN65. B. THE CON'T1<0LLER ENC~ SHALL ee OF THE MANUFACTURER, SIZE AND TYPE INDICATED ON THE DFW>IIN65. THE ENc.l.05I.JRE SHALL ALSO ENCLOSE THE CONTROLLER ELECTRIC.AL METER. C. THE CON'T1<0LLER SHALL BE OF THE MANUFAC'TlJRER, SIZE AND TYPE REGllJIRED BY '['11'! M.NGff"AU])' f:B. 2.0'! ELECTRIC.AL A. ALL ELECTRICAL EG!JIPMENT SHALL BE NEMA TYPE 5, l'IATERPROOFED FOR EXTERIOR INSTALLATIONS. B. ALL ELECTRICAL rt:>Ri<. SHALL CONFORM TO LOCAL CODES AND ORDINANCES. 2.10 LOI'! VOLT A6E CONTROL l'IIRIN6 A. REMOTE CONTROL l'IIRE SHALL BE DIRECT-euRIAL ~ TYPE, SIZE AS INDICATED ON THE ~INe!:>, AND IN NOC.ASE SMALLER THAN 14 6AU6E. B. CONNEc.TIONS SHALL BE EITHER EPOXY-sEALED PACl<ET TYPE OR PENN-TITE CONNECTOlcS. C.. COMMON Y'IIRES SHALL BE l'IHITE IN COL.OR, AND IN NO C.ASE SMALLER THAN 12 6Al.16E. CONTROL l'IIRE5 SHALL BE RED (WHERE mo OR MORE CONTROLLERS A~ USED, THE CONTROL Y'IIRES SHALL BE A DIFFERENT COLOR FOR EACH CONTROLLER. THESE C-OLOR5 SHALL BE NOTED ON THE "RECORD DRAl'IIIN65" PLANS LOCATED ON CONTROLLER DOOR). D. 6ROUND Y'IIRES SHALL BE 6REEN IN COLOR, AND IN NO CASE SMALLER THAN 6 6A!.16E. E. PROVIDE A 24, LON6 EXPANSION LOOP FOR ALL DIRECTIONAL c.HAN6ES IN c.ONTROl. l'IIRE ROUTIN6. 2.11 IRRl6ATION HEADS A. SPRINl<.LER HEADS SHALL BE OF THE MANUFACTURER SIZE, n'PE, li!TH RADIUS .OF THROY-l, OPEAATIN6 PRESSURE, AND DISCHAR6E RATE INDICATED ON THE DRAl'IIN65. B. POP-IP HEAD5 AND RISER HEADS SHALL Be USED AS INDICATED ON THE DRAl'IIN65. C. IRRl6ATION HEADS FOR RECYCLED SYSTEM SHALL HAVE ~ RECYCLED (RECLAIMED) l'IATER Y'IARNIN6 COVER. PART Ill -EXEC.UTION 5.01 SITE CONDITIONS A. INSPEc.TION&. I. PRIOR TO ALL~ OF THIS SECTION, CAREFULLY INSPEc.T THE INSTALLED Y'IORi<. OF ALL OTHER TRADES AND VERIFY THAT ALL SUCH l'IORi<. 15 COMPLETE TO THE POINT l'IHERE THIS INSTALLATION MAY PROF'ERLY COMMENCE. 2. VERIFY THAT IRRloATION SYSTEM MAY BE INSTALLED IN STRICT Ac.CORDANc.E Y'IITH ALL PERTINENT CODES Al>t) Rl:c$I.ILATION5, THE ORl6INAL DE516N, THE REFERENCED STANDARDS, AND THE MANUFACTURER'S RECOMMENDATIONS. B. DISC.REPANc.lES, I. IN THE EVENT OF DISc.REPANc.Y, IMMEDIATELY NOTIFY THE LANDSCAPE ARCHITECT OR Ol'INER'S AUTHORIZED ~F'RESENTATIVE. 2. DO NOT PROCEED rllTH INSTALLATION IN AREAS OF DISCREPANCY UNTIL ALL Dl~ANc.lES HAYE.SEEN ~SOLVED. C.. ISRADES, I. BEFORE 5TARTIN6 Y'IORK, CAREFULLY c.HECI<. ALL 6AADE5 Tc;; DEIERMINE THAT Y'IORK MAY SAFELY PROCEED, i<.EEPIN6 WITHIN THE SPECIFIED MATERIAL DEPTHS l'IITH RESPEc.T TO FINISH 6RADE. 2. FINAL 6RADE5 SHALL BE AU.EPIED c,'( THE EN6INEER BEFORE rt:>Ri<. ON THIS SECTION WILL BE ALLOY'IED TO BEGIN. D. FIELD MEASlJREMENTS, I. MAKE ALL NECESSARY MEASLl<EMENTS IN THE FIELD TO ENSURE PREc.lSE FIT OF ITEMS IN ACCORDANCE WITH THE ORl6INAL DESl6N. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL IAAl6ATION MATERIALS l'IITH ALL OTHER l'IORI<. 2. ALL SC.ALED DIMENSIONS ARE APPROXIMATE. THE CONTRACTOR SHALL c.1-ECK AND VERIFY ALL SIZE DIMENSIONS PRIOR TO PROCEEDIN6 rl!TH l'IORI<. UNDER THIS SECTION. 3. EXERCISE EXTREME CARE IN EXCAVATIN6 AND l'IORl<.IN6 NEAR EXISTIN6 IJTILITIES. CONTRACTOR SHALL BE ~ONSIBLE FOR DAMMES TO UTILITIES V>!Hlc.H ARE CAUSED BY HIS OPERATIONS NEeLECT. E. Dl~TIC. INTENT, THE DAAY'IIN65 ARE ESSENTIALLY DIAISRAMMATIC.. THE SIZE AND LOCATION OF EGUIPMENT AND FIXT\JRES A~ DRAl'N TO SCALE l'll£RE POSSIBLE. PROVIDE OFFSETS IN PIPIN6 c.HAN6ES IN EGIJIPMENT LOCATIONS AS NECESSARY TO CONFORM l'IITH sn;wc.~ AND TO AVOID OBSTRUCTIONS OR CONFLICTS l'IITH OTHER l'IORi<. AT NO ADDITIONAL EXPENSE TO Ol'INER F. LAYOUT, I. PRIOR TO INSTALLATION, THE CONTRACTOR SHALL STAKE OUT ALL PRESSURE SUPPLY LINES, ROIJTIN6 AND LOCATION OF SPRINl<.LER HEADS, VALVES, BACKFLOrl PREVENTER, AND AUTOMATIC. CONTROLLER. 2. LAYOUT IRRl6ATION SYSTEM AND MAKE MINOR ADJJSlMENTS REGIJl~D DUE TO DIFFERENCES BE'IWEEN SITE AND DRAY'IJN65. Y'IHERE PIPIN6 15 5HOJ/'lN ON ~IN65 UNDER PAVED AREAS, BUT RUNNIN6 PAAALL.EL AND ADJACENT TO PLANTED AREAS, INST ALL THE PIPIN6 IN THE PLANTED AREAS. 6. l'IATER SUPPLY CONNECTIONS TO, OR THE INSTALLATION OF, THE l'IATER SUPPLY SHALL BE AT THE LOCATIONS SHOl'IN ON THE DRAl'llt-165. MINOR CHAN6ES CAUSED BY ACTUAL SITE CONDITIONS SHALL BE MADE AT NO ADDITIONAL EXPENSE TO Ol'INER. H. ELECTRICAi. 51:RVIC.E, I. C,Olff:C,TIONS TO THE ELECTRIC.AL SUPPLY SHALL BE AT THE LOCATIONS SHOl'IN ON THE DRAl'IINOO. MINOR c.HAN6ES CAUSED BY SITE CONDITIONS SHALL BE MADE AT NO ADDITIONAL EXPENSE TO Ol'INER. 2. CONTRACTOR SHALL MAKE 120 VOLT CONNECTION TO THE IAAl6ATION CONTROLLERS. ELECTRICAL POl'IER SOURCE TO CONTROLLER LOCATIONS SHALL 6E PROVIDED BY OTHERS. 5.02 TRENCHIN6 A. EXCAVATIONS SHAU. BE 5TAAl6HT l'IITH VERTICAL SIDES, EVEN ISRADE, AND SUPPORT PIPE CONTIH.IOUSLY ON BOTTOM OF TRENCH. TRENc.HIN6 EXCAVATION SHALL FOLLOl'I LAYOUT INDICATED ON DAAY'IIN65 TO THE DEPTHS BELOl'I FINISHED 6RADE AND AS NOTED. ~ LINES oc.c.uR UNDER PAVED AREA, THESE DIMENSIONS SHALL BE CONSIDERED BELOl'I SIJB6RADE. B. PROVIDE MINIMJM COVER OF 1e, INCHES ON PRE56IJRE SUPPLY LINES 2 1/2 !Ne.HES AND SMALLER. PROVIDE MINIMJM COVER OF 24 INCHES ON ~ SUPPLY LINES 5 INCHES, AND 56 !Ne.HES OF GOVER ON PRESSURE SUPPLY LINES 4 INCH AND LAReER. C.. PROVIDE MINIMUM COVER OF Je, INCHES FOR CONTROL l'IIRES. D. PROVIDE MINIMJM COYER OF 12 !Ne.HES FOR NON--PRl:55l.'RE LINES. E. PIPES INSTALLED IN A COMMON TRENCH SHALL HAVE A 4 INCH MINIMUM SPACE EIETl'IEEN PIPES. F. PROVIDE SAND BACKFILL A MINIMUM OF 4 INCHES OVER AND UNDER ALL MAINLIIE PIPIN6. 5.05 BACKFILLIN6 A. BACKFILL MATERIAL ON ALL LINES SHALL BE THE SAME AS ADJACENT SOIL FREE OF DEf:lRIS, LITTER, AND ROC.i<.5 OVER 1/2 INCH IN DIAMETER 6. BACKFILL SHALL Ell: TAMPED IN 4-INGH LAYERS UNDER THE PIPE AND UNIFORMLY ON BOTH SIDES FOR THE FULL l'IIDTH OF THE TRENCH AND THE FULL LEN6TH OF THE PIPE. BACKFILL MATERIALS SHALL BE SUFFICIENTLY DAMP TO PERMIT THOIWU6H COMPACTION, FREE OF VOIDS. 6ACl<.FILL SHALL BE COMPACTED TO DRY DENSITY EGIJAL TO ADJACENT UNDISTURBED SOIL AND SHALL CONFORM TO ADJACENT 6AADES. C.. FLOODIN6 IN LIEU OF TAMPING 15 NOT ALLOl'IED. D. UNDER NO C.IRc.UMSTANc.ES SHALL mJc.i<. l'IHEELS 6E USED TO COMPACT BACKFILL. E. PROVIDE SAND BACKFILL A MINIMUM OF 6 INCHES OVER AND UNDER ALL PIPIN6 UNDER PAVED AREAS. ~ CITY OF CARLSBAD ,-------------_________ ,--------...--------...---------.---r----.----------------,---...--~--...---1 ~ PLANNING DEPARTMENT "AS-BUil T" GUEST BUILDER IRRIGATION SPECS ~ 2 APPROVED FOR PLANTING AND IRRl<SA TION ONLY, INCLUDING PREC-15E LOCATION OF PLANTING AREAS. t: -.... JllSCA ~oody " .. :I www.gmplandarch.cpm 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 LANDSCAPE ARCHITECTURE & PLANNING DRAWN JR APPROVED MM 1ST SUBMITTAL 02-09-07 2ND SIJ13MITTAL 3-13-07 3RD SUBMITTAL 4-80-07 4TH SUBMITTAL 7-02-07 MYLAR SUBMITTAL 7-10-07 JOB NO. o~-oaa DATE 04-80-07 SCALE AS SHOWN DATE TITLE: RECEIVED BY: INSPECTOR DATE SI/EST SI.Ill.DER VIJ.LA6ES OF LA COSTA THE OAJ<.S -5./ LI-II l----+---+-----------1-------+----l--~f----11-AP_PR-'--'re=~'-"-+1-cr:.._-_t:('-"t=>'-<P=*.____ ,.1,l;j,0-1 l---+--+----------------1---+--¼---+---I ~f:';;L;:;AN::;N;;IN;:G:::::::=:::::;-;:::=::;::;=:::::::;:;=::::::=:::::;-;::::D::::AT::::E::::::=:~ DWN BY: ---PROJECT NO. DRAWING NO. CHKD BY: --C, T 05-14 44.-..-4L RVWD BY: ,;; DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DA TE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL l / ~ ~ t ~ IRRIGATION SPECIFICATIONS (CONT 1O) !l.o4 A. PIPING UNOER EXISTING PAVEMENT MAY BE INSTALLED BY JACKING, eofi<ING, OR HY'DAAULIC DRIVING. NO H'!'IiRAULIC DRIVING IS PERMITTED UNDER ASPHALT PAVEMENT. B. GUTTING OR BREAKING OF EXISTIN6 PAVEMENT IS NOT PERMITTED. c.. C.AREFULL'T' INSPECT ALL PIPE AND FITTINISS BEFORE INSTALLATION, REMOVING DIRT, SC.ALE, BI./RRS REAMIN6. INSTALL PIPE vllTH ALL MAAl<INISS UP FOR VISUAL INSPECTION AND VERIFICATION. D. Fe10VE ALL DENTED AND DAMMED PIPE SECTIONS. E. ALL LINES SHALL HAYE A MINIM.IM c.LEAAANC,E OF 6 !Ne.HES FMM EACH OTHER AND 12 INCHES FROM LINES OF OTHER TRADES. F. PARALLEL LINES SHALL NOT BE INSTALLED DIRECTLY OVER EACH OTfE!'I. 6. IN SOLVENT l'IEI.DIN6, USE ONL 'T' THE SPECIFIED PRIMER AND SOLVENT CEMENT AND MAl<E ALL JOINTS IN STRIC.T Ac.CORDANCE WITH THE MANUFACTURER'S RECOMMENDED METHODS INC,LIJC)IN6 vllPING ALL EXCESS SOLVENT FROM EACH WELD. ALLOW SOLVENT 11:1.DS AT LEAST 15 MINUTcS SE'l1JP TIME eEFORE MOYIN6 OR flANDLIN6 AND 24 HOURS CURii-le TIME BEFORE FILLINe. H. PVC PIPE SHALL BE INSTALL.ED IN A MANNER WHlc.11 vllLL PROVIDI: FOR EXPANSION CONTRACTION AS~ B'T' THE PIPE MANUFACTURER. I. C.ENTERL.OAD ALL PLASTIC, PIPE PRIOR TO PRE5SlA'<E TESTIN6. J. ALL THREADED PLASTIC-TO-PLASTIC CONNEC.TIONS SHALL BE ASSEM6I.ED USING TEFLON TAPE OR TEFLON PASTE. K. FOR PLASTIC.-TO-METAL CONNECTIONS, l'lORK THE METAL CONNECTIONS FIRST. USE A NON-flARDENINe PIPE DOPE AN ALL THREADED PLASTIC.-TO-METAL CONNECTIONS, EXCEPT WHERE NOTED OTI-IERvllSE. ALL PLASTIC-TO-METAL CONNECTIONS SHALL BE MADE l'IITH PLASTIC. FEMALE ADAPTERS. L. ALL c.ONNEC,TIONS BE1W:EN PVC LATERAL LINES SHALL BE MADE USINe sc.H. 40 PVC. FITTIN6S i<'IITH COMPRESSION ADAPTERS. ALL c.ONNEC,r!ONS BE1W:EN DRIPPERLINES TO BE MADE USIN6 ~ION FITTIN6S OF MANUFACTURER OF THE DRIPPERLINE. LISE NO PIPE DOPE, TEFLON TAPE, PRIMER OR SOLVENT C.EMl:NT ON c.oMF'RESSION FITTIN6S. !I.OS CONTROLLER A. THE EXACT LOC.ATION OF THE CONTROL1.ER SHALL BE Af'PROVEC) B'T' THE LANDSGAPE ARCHITECT OR Ol'INER'S ,l,JJTHOFI.IZED i.errnrATIVE BEFORE INSTALLATION. THE EL.EGTRICAL SERVlc.E SHALL BE COORDINATED vllTH THIS LOCATION. B. THE IRRl6ATION CONTRACTOR SHALL BE RESPOHSIBl..c FOR THE FINAL ELECTRIC.AL HOOK UP TO IRRl6ATION ~LLER. C. THE IRRl6ATION SYSTEM SHALL BE PR06RAMMED TO OPERATE DURIN6 THE PERIODS OF MINIMAL USE OF THE PESl6N AREA. D. INSTALL CONTROLLER ENCLOSURE AS RECOMMENDED B'T' THE MANUFACTURER.. 3.o6 CONTROL i"IIRIN6 A. LOi"I VOLTA6E CONTROL WIRIN6 SHALL OGGUP1' THE SAME TRENc.11 AND SHALL BE INSTAl.l.fD ALOH6 THE SAME l'!Ot/TE AS THE PRESSURE SUPPL 'T' Lil-ES WHENEVER POSSIBLE. B. i+IERE MORE THAN ONE WIRE IS PLAc.ED IN A TRENc.11, THE l'IIRIN6 SHALL BE TAPED T06ETI-IER IN A BUNDLE AT INTERVALS OF 10 FEET. BUN1'LE SHALL BE SECURED TO THE MAINLINE l'IITH TAPE AT INTERVALS OF 20 FEET. C.. ALL CONNECTIONS SHALL BE OF AN APPl<OVED TYPE AND SHALL oc.CIJR IN A VALVE BOX. PROVIDE AN It, INCH SERVlc.E LOOP AT EACH CONNEC.TION. D. AN EXPANSION LOOP OF 12 INCHES SHALL BE PROVIDED AT EACH vllRE CONNECTION AND/OR DIRECTIONAL CHAN6E, AND ONE OF 24 INCHES SHALL BE PROVIDED AT EACH REMOTE CONTROL VALVE. E. A CONTINUOUS RUN OF WIRE SHALL BE USED BE1WEEN A CONTROL.I.ER AND EACH REMOTE CONTROL VALVE. UNDER NO CIRCUM&TANCES SHALL SPLIC.!:S BE USED WITHOUT f'll1.IOR N'f"flt:NAL. 3.01 VALVES A. AUTOMATIC CONTROL VALVES, BALL VALVES, 6ATE VALVES, AND GIIJICK c.oUP1.ER VALVES SHALL BE INSTALLED IN THI: APPROXIMATE LOCATIONS INDICATED ON THE DRAWINeS. B. VALVE SHALL BE INSTALLED IN SHRUB AREAS WHENEVER POSSIBLE. C.. INSTALL ALL VALVES AS INDICATED IN THE DETAIL DRAWIN6S. D. VALVES TO BE INSTALLED IN VALVE BOXES SHALL BE INSTAl.l.fD ONE VALVE PER BOX. E. REMOTE CONTROL VALVES AND GII/ICK COUPLER VALVES SHALL BE ISOLATED FROM THE MAINLINE BY' A BALL VALVE SIZED f'fR THE LA~T RC.V. IN THE MANIFOLD OR I 1/2 INCH FOR Gt:-.V.'5. 3.0t, VALVE BOXES A. VALVE BOXES SHALL BE IN5TAl.l.fD IN SHRUB AREAS WHENEVER P0$51BLE. B. EAc.11 VALVE eox SHALL BE INSTALLED ON A FOOOATION OF !l/4 INCH 6RAVEL BACKFILL, 2 aiBIC, FEET MINIMUM. VALVE BOXES SHALL BE INSTALLED WITH THEIR TOPS 1/2 INc.11 ABOVE THE SURFACE OF SVRROIJNC)IN6 FINISH 6AADE IN LAWN AREAS AND !l INCHES ABOVE FINISH 6RADf IN 6ROUND GOVER AREAS. 3.0CI BACKFLOH FREYENTERS A. INSTALL BACKFLOW PREVENTER UNIT AS INDIC.ATED IN THE DETAIL DRAWlt-!SS. B. INSTALL BACKFLOW ASSEMELIES AT LOCATIONS APPROVED IN THE FIELD AND AT HEl6HT REGIIJIRED BY LOCAL CODES. C.. INSTALL l'l'l'E STRAINERS AND PRESSURE RE191.1LATORS ON THE BACKFLOl'l ASSEMBL 'T'. D. IF BAc.KFLOW PREVENTER IS INSTALLED ADJACENT TO A SUILDINe, WALL, OR OTHER OBSTRlJCTION, INSTALL UNIT SO THAT THE TEST COGKS ARE FACIN6 OUTWARD Ai"IA'T' FROM THE OBSTRlJCTION. E. INSTALL BACKFLOW ENCLOSURE AS REC.OMMEIIDED BY THE MANUFACTURER APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTINe AREAS. <> -...., • \\l>SC,\p ;,.oody i JI, . • CA\.\ 3.10 SFRINKLER HEADS A. SPRINl<I.ER HEADS SHALL BE INSTALLED AS INDICATED ON THE DRAWIN6S. B. SPAC,1116 OF HEADS SHALL NOT EXCEED MAXIMUM INDICATED ON THE DRAll'IIN6S. C. RISER NIPPLES SHALL BE OF THE SAME SIZE AS THE RISER OPBIIN6 IN THE SPRINKLER BODY. D. POP-LIP SPRINKLER HEADS SHALL NOT BE IN5TAl.l.fD USING SIDE OUTLET OPENIN6S. E. RISER NIPPLES ON REC'l"GLED vlATER SYSTEMS SHALL BE IDENTIFIED i"IITH ADHESIVE VINYL MARKERS BEL.OW SPRINKLER HEAD AND A MINli'tJM OF 10 INCHES ABOVE FINISH 6RADE. 3.11 MISC.EU.ANEOV5 EGIIJIPMENT A. INSTALL ALL ASSEMBLIES SPECIFIED HEREIN ACCORDING TO THE RESPECTIVE DETAIL DRAWIN6S OR SPECIFICATIONS, USIN6 BEST STANDARD PRACTICES. 6. GIJIC.K GOIJPLER VALVES SHALL BE SET APPROXIMATELY 12 INc.11!:S FROM WALKS, CURBS, HEADER BOARDS, OR PAYED AREAS WHERE APPLICABLE. C,, UNLESS DESl6NED AS AN IN1'c6RAL PART OF THI: IRRl6ATION HEAD, ANTI-DRAIN VALVES WILL BE INSTALLED UNDER E',119..'T' HEAD. THE ANTI-DRAIN VALVE WILL BE THI: SAME DIAMETER AS THI: RISER AND BE INTE6AAL TO THE RISER ASSEMBLY. D. INSTALL RAIN SENSOR AS INDICATED ON THE DRAWIN6S AND AS RECOMMENDl;D B'T' THEMAt,1.JFACTIJRER. 3.12 FLUSHIN6 THE SYSTEM A. PRIOR TO INSTALLATION OF SPRINKLER NOZZLES, THE VALVES SHALL BE OPENED AND A FULL HEAD OF vlATER LISE1' TO FLUSH OUT THE LINES AND RISEl<S. B. SPRINKLER NOZZI E5 'SHALL BE INSTALLED AFTER FLU5Hltle THE SYSTEM HAS BEEN COMPLE'Tl:D. 3.13 ADJJSTIN6 THE SYSTEM A. CONTRACTOR SHALL ADJJST VALVES, ALl6N HEADS, AND CHEc.K c.oYERA6E OF EACH 5'T'5TEM PRIOR TO COYEAA6E TEST. B. IF IT 15 1'1:TERMlNED BY THE LANDSc.APE ARCHITEC.T OR OWNER'S AUTHORIZED REPRESENTATIVE THAT ADDITIONAL ADJJSTMENTS OR NOZZLE c.llAN6ES J/'flLL BE REGIIJIRED TO PROVIDE PROPER C.OYERME, ALL Nl::Gl::55AR'T' c.llANeES OR ADJJSTMENTS SHALL BE MADE PRIOR TO ANY' PLANTIN6. C. THE ENTIRE SYSTEM SHALL BE OPERATIN6 ~'T' BEFORE ANY' PLANTIN6 OPERATIONS COMMENc.E. D. AUTOMATIC, CONTROL VALVES ARE TO BE ADJJSTED SO THAT THI: SPRINKLER HEADS OPERATE AT THE FRE5SUR!: RECOMMENDED B'T' THE MANIJFAC.TURER. 3.14 TESTIN6 AND OBSERVATION A. DO NOT ALLOW OR C.AIJSE ANY OF THE WORK OF THIS SECTION TO BE c.o\/1:RED UP OR ENCLOSED UNTIL IT HAS BEEN OBSERVED, TESTED AND AC,(,Efll:D B'f THE LANDSGAPE ARCHITECT, OvlHER, AND OOVERNIN6 A6ENCIES. B. THE CONTRACTOR SHALL BE SOLEL 'T' RESPONSIBLE FOR NOTIF'T'IN6 THE LANDSCAPE ARCHITECT, OJl'NER, AND 60YERNIN6 A6ENCl!:S, A MINIMUM OF 4t, HOURS IN ADVAfa, vlHERE AND WHEN THE WORK IS READY FOR TESTIN6. C. MN THE SPRINKLER SYSTEM IS COMPLETED, THE CONTRACTOR SHALL PERFORM A c.oYEAA6E TEST OF EACH SYSTEM IN ITS ENTIRETY TO DETERMINE IF THE vlATER COVERA6E FOR THE PLANTED AREAS IS COMf'l..E'TE AND ADEGIIJATE IN THE PRESENCE OF THE LANDSCAPE ARCHITECT. D. THE GOHTRACTOR SHALL R!F!NISH ALL MATERIALS AND PERFORM ALL WORK REGIIJIRED TO ~T AN'f INADEGUAGIES OF CO\IERA6E DUE TO DEVIATIONS FROM THE PLANS, OR rlHERE THE SYSTEM HAS BEEN WILLFULLY INSTALLED AS INDICATED ON THE DRAl"IINISS WHEN IT IS OBYIOUSL 'T' INADEGII/ATE, vllTHOIJT BR.IN61N6 THIS TO THE ATTENTION OF THE LANDSGAPE ARCHITECT. THIS TEST SHALL BE ACCEPTED B'T' THE LANDSGAPE Al<G,HITECT AND ACGOMPLISHED BEFORE ST ARTIN6 ANY' PLANTIN6. E. FINAL INSPECTION WILL NOT COMMENCE WITHOUT RECORD DAAl'IINeS AS PREPARED B'T' THE IRRJ<;;ATION CONTRACTOR. 3.111 MAINTENANc.E DURIN6 THI: MAINTENANc.E PERIOD THI: ~C.TOR SHALL ADJl,IST AND MAINTAIN THI: IRRl6ATION SYSTEM IN A FULL'!' OPERATIONAL CONDITION PROVIDIN6 COMPLETE IRRISATION COVERA6E TO ALL INTENDW PLANTIN6S. 3.16 COMPLETION GLEANIN6 CLEAN-UP SHALL BE MADE A5 EACH PORTION OF THE vlORK PR06RESSES. REFIJ5E AND EXc.ESS DIRT SHALL BE REMOVED FROM THE SITE, ALL WALKS AND PAVING SHALL BE BROOMED, AND ANY DAMME SUSTAINED ON THE WORK OF OTHERS SHALL BE REPAIRED TO ORl61NAL CONDITIONS. END OF SEC. TION I. GENERAL GMP IRRIGATION NOTES ALL LOCAL MUNICIPAL AND STATE LAY-e, RULES AND l'<E6ULATIONS 60Yf:RNIN6 OR RELATING TO ANY' Pafi1.TION OF THIS l'<ORK ARE HERl:6'1" INCORPORATED INTO AND MADE A PART OF TI-IE5E .. SPECIFICATIONS AND THEIR PROVISIONS SHALL BE CARRIED OUT 6'1" THE CONTRACTOR. IN CASE OF CONFLICT l3E:'Tl'EEN THE SPECIFICATIONS, DAAWIN6S, AND/OR CODE, THE MORE: STRIN61:NT REGUll'<EMENT SHALL PREVAIL. :2. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EXISTIN6 UTILITIES, 5TRUCl1.JRES AND SERVICES BEFORE COMMENCING Y<ORK. THE LOCATIONS OF UTII..ITIES, STRUCTIJRl:5 AND SERVICES SHOWN IN THESE PLANS ARE APPROXIMATE ONLY'. ANY DISCREPANCIES BETJ;,11:EN THl:5e PL.ANS AND AC'T\JAL FIELD CONDITIONS SHALi.. BE REPORTED TO THE OWNER'S REPRESENTATIVE. !3. THE CONTRACTOR. SHALL OBTAIN THE PERTINENT ENelNEEFl.lN6 OR ARCHITEC'ltJRAL PLANS BEFORE BEGINNING l'IORI<. 4. THE CONTRACTOR. SHALL OBTAIN ALI.. NECESSARY' PERMITS REG!UIRE1' TO PERFORM TIHE l'IORI< INDICATED HEREIN BEFORE 6EGINNIN6 WORK. 5. THE MAINLINE AND SLEEVING IS DIMFI.AMMATIC. ALL PIPING IS FOR DESl6N CLARIFICATION ONLY AND SHALL BE INSTALLED HITHIN LIMIT OF Y<ORK 60UNDARIE5 AND IN 5HRU6 PLANTING AREAS 1+11:RE POSSIBLE. AVOID ANY' CONFLICTS BETWfl:N THE SPRINKLER SYSTEM, PLANTIN6 AND ARCHITEC'ltJRAL FEA Tl.IRES. 6. IAAl6ATION EGIJIPMENT AS SHOWN IS DIAeRAMMATIC. INSTALL ALL Tl-IE IRRIGATION REMOTE CONTROL VALVES, GIJICK COUPLERS, MASTER VALVES, FLOI-I SENSORS, BACKFLOl-'6, AIR/VACUUM DEVICES, 6ALL VALVES, AND ANCILLARY EQUIPMENT, IN SHRIJ6 PLANTING AREAS 1+11:N FEA516LE OR AS APPROVED l'Y OWNER'S REPRESENTATIVE AND THE LANDSCAPE IR.Rli5ATION J:ll:Sl6NER. 1. DO NOT WILI..RJLL'I" INSTALL ANY !:GIJIPMENT AS SHOWN ON THE PLANS WHEN IT IS OBVIOIJ5 IN THE FIELD THAT UNKNOWN CONDITIONS EXIST THAT~ NOT EVIDENT AT Tl-IE TIME THESE PLANS I-IERE PREPARED. ANY' SUCH CONDITIONS SHALL BE eF!.OUeHT TO THE ATTENTION OF THE 0~'5 Rl:PRESENTATIVE PRIOR TO ANY Y<ORK OR THE IAAl6ATION CONTRACTOR. SHALL ASSI.IME ALL RESPONSl61LITY FOR ANY Fll;LD CHANeES DEEMED NECESSARY BY THE OWNER. e,, IN5TALL ALL EGUIFMENT A5 5H01-1N IN THE DETAILS AND SPECIFICATION5. CONTRACTOR SHALL BE RESPONSIBLE TO COMPL 'I" WITH LOCAL CITY, COUNTY AND STATE REGIJIREMENTS FOR 60TH l:GllJIPMENT AND INSTALLATION. "I. AC'T\JAL LOCATION FOR THE INSTALLATION OF THE 6ACKFLOW PREVENTER, REC'l"CLED CROSS CONNECTION TEST VALVE, PUMP STATION AND THE AUTOMATIC CONTROLLER IS TO BE DETERMINED IN THE FIELD 6'1" THE OhHER'S AUTHORIZED REPRESENTATIVE. 10. CONTRACTOR. 15 TO PROVIDE THREE (5) ADDITIONAi.. PILOT Wll'<ES AND ONE (I) COMMON WIRE TO THE END OF THE MAINLINE RUN IN TWO DIRECTIONS FROM THE CONTROLLER. THE ADDITIONAL WIRE SHALL BE EXTENDED 10', MAKIN6 A COIL TO FIT INSIDE A RECTANGULAR PULL eox. LABEL THE I..ID OF THE PULL eox 'SW'. II. ALL PIPE UNDER PAYED AREAS, HARDSCAPE, OR A5 DIReCTED B'1" 0~ REPRESENTATIVE TO BE INSTALLED IN SLEEVING, TWICE THE DIAMETER OF PIPE OR Wll'<E 6UNDLE CARRIED. ALL 2' AND 5' SLEEVING SHALL BE PYC.1220 SCH. 40, TYPE I, 6RADE 2 MATERIAL CONFORMINe TO ASTM STANDARD D-11$-4. ALL 4" AND LAR6ER SLEEVING SHALL BE PYCl220 CLASS 200 SDR:21, TYPE I, eRADe 2 MATERIAL CONFORMINe TO A5TM STANDARD D-2241. SLEEVES UNDER eR.01-1 DITCHES SHALi.. BE ENCASED IN CONCRETE A MINIMUM OF 6" THICK ON ALL SIDES OF PIPE. SLEEVES TO EXTEND AT LE.AST 12" PAST THE ED6E OF PAVIN6. 1:2. ALL QUICK COUPLER VALVES TO BE INSTALLED IN SHRUB OR 6ROUND COYER AREAS l',IHl:RE POSSIBLE. ALL GUICK COUPLER VALVES TO BE INSTALLED AS 5HOI-IN ON THE INSTALLATION DETAILS. INSTALL ALL GIJICK COUPLER VALVES I-IITHIN 16' OF H~APE. 1:3. ALL HEADS ARE TO BE INSTALLED I-IITH THE NOZZLE, SCREEN AND Af<C.S SHOWN ON THE PLANS. ALL HEADS ARE TO BE AD..lJSTED TO PREVENT OYERSPRA'I" ONTO 6UILDINeS, WALLS, FENCES AND HARDSCAPE. THIS INCI.IJDE5, 6UT NOT LIMITED TO, ADJUSTMENT OF DIF1"'USER PIN OR AD..lJSTMENT . SC.REI-I, REPLACEMENT OF PRE5SIJRE COMPENSATING SCREENS, REPL.ACEMENT OF NOZZL.ES I-IITH MORE APPROPRIATE RADIUS UNITS AND THE REPLACEMENT OF NOZZLES I-IITH .ADJU5TA6LE Af<C. UNITS. WHEN VERTICAL 065TRUCTIONS <PROP5, 5TfitEET Ll6HT5, TREES, ETCJ INTERFERE v.llTH THE SPRAY PATTERN OF THE SPRINKLER HEADS PREVENTING PROPER COYERA6E, THE IRRl6ATION CONTRACTOR SHALL Fll;LD AD..lJST THE SPRINKLER S'l"STEM 6'1" INSTALLIN6 A QUARTER CIRCLE OR HAI..F CIRCLE SPRINKLER HEAD ON EACH SIDE OF THE 065TRUCTION SO AS TO PROVIDE PROPER COVERAGE. ALL AD.JJ5TMENT5 SHALL BE MADE AT NO ADDITIONAL COST TO THE Ol"iNER. 14. THE IRRl6ATION CONTRACTOR SHALL ADJUST THE PRE5SIJRE REeULATOR ON EACH ELEC'T'RIG CONTROi.. VALVE SO THAT THE SPRINKLER HEAD FARTHEST AND HIGHEST IN ELEVATION FROM ITS l'<ESPECTIYE CONTROL VALVE OPERATES I-IITHIN THE OPERATING PRESSURE SHOWN ON THE IRRl'5ATION LE6END. NOT TO EXCEED FIVE (5) PSI ABOVE THE 61VEN OFERATIN6 PRES~ FROM THE SPECIFIED PRESSURE LOCATED ON THE IRRl6ATION LE6END. 15. THE IRRl6ATION S'l"STEM DE51GN 15 BASED ON THE MINIMUM OPERATING PRESSURE AND THE MAXIMJM FLOW DEMAND SHOWN ON THE IRRIGATION DAAWINeS AT EACH POINT OF CONNECTION. THE IAAl'5ATION CONTRACTOR SHALL VERIFY WATER F'Re55URE VIA DIRECT FIELD MEA5UREMENT PRIOR TO CONSTRUCTION. REPORT ANY DIFFERENCE BETI-IEEN THE I-IATER PRE5SIJRE INDICATED ON THE DAAWIN6S AND THE ACTUAi.. PRE~ READINe AT THE IRRl6ATION POINT OF CONNEC,TION TO THE 01-!NER'~ AUTHORIZED REPRESENTATIVE. IN THE EVENT PRE5SURE DIFFERENCES ARE NOT REPORTED PRIOR TO 5TART OF CONSTRUCTION, THE IAAl15ATION CONTRAGTOR SHALi.. ASSUME FULL RESPONSl~II..IT'T' FOR ANY REVISIONS, AND COSTS ASSOCIATED WITH SAID REVISIONS. 16. SHOULD FIELD CONDITIONS REGUIRE PIPE INSTALLATION OTHER THAN THAT 5HOl<iN ON PLANS, THE CONTRACTOR SHALL 1..IMIT EXCESS FLOW AND SIZE ALL PIPE NOT TO EXCEED A YEI..OCITY OF 5 FEET PER SECOND ~) IN PVC PIPE AND CAST IRON PIPE. FLOW THROUGH ANCILLARY EGUIPMENT, STEEL AND COPPER PIPE SHALL NOT EXCEED A VELOCITY OF 1 )!z FPS. ALL AD.JJSTMENTS SHALL BE MADE AT NO ADDITIONAL COST TO THE OWNER. 11. ELECTRICAL POI-IER SOI.IRCE FOR THE IRRl'5ATION CONTROLLER AND/OR BOOSTER PUMP 5HALL BE PROVIDED UNDER THE l;LECTRICAL SECTION OF THE SPECIFICATIONS. IT SHALL BE THE RESPONSl61LITY OF THE IRRl'5ATION CONTRACTOR TO COORDINATE ELECTRICAL SERVIC.E WITH THE 6ENEAAl. CONTRACTOR AND SHALL MAKE THE FINAL CONNECTION FROM THE ELECTRICAL SOIJRC,E TO THE CONTROLLER AND/OR BOOSTER PUMP. 16. CHECK VALVES SHALL BE USED TO PREVENT ALL LOW HEAD DRAINAiSE. 1"1. FINAL IAAl15ATION AS-6UII..T PLANS WILL BE REG!JIRED TO BE REVIEWED AND APPROVED B'1" THE CITY AND FINAL MYLARS WILL BE REGIJIRED TO BE APPROVED AND Sl6NED 6'!' THE CITY PRIOR TO THE PI..ANNINe DEPARTMENT Sl6NIN6 THE PERMIT CARD. ~ CITY OF CARLSBAD ~ 2 www.gmplandarch.com DRAWN IR -----------~ ---------.--------......... A.,.s,,,..."'s""u""1L""T"""---------,.---,---,----------------,--,--,--,--i GUEST BUILDER IRRIGATION SPECS ~ PLANNING DEPARTMENT Ll-12 9404 Genesee Avenue APPROVED MM Suite 140 La Jolla 1ST SUBMITTAL 02-09-07 California 92037-1353 2ND SUBMJ'ITAL 3-13-07 Tel 858 558 8977 3RD SUBMITTAL 4--30-07 Fax 858 558 91811 4TH SUBMITTAL 7-02-07 LANDSCAPE MYLAR SUBMITTAL 7-10-07 ARCHITECTURE JOB NO. 05-03B DATE 04-30-07 & PLANNING SCALE AS SHOWN DATE TITLE: RECEIVED BY: INSPECTOR DATE 6l/EST SIJILDER VILLAGES OF LA COSTA THE OAKS -5./ IAPPtt_[ 6r-f:/!.;,r i•l"T•c:>"7 t====j=====t==============================~=====t====~====t===~ ~-P;:;L;:A;::NN;:l;;N::'::G==::::;--;:::=::::;:::~~==-;==,;;D:';A~T~E~~ OWN B'f: ---PROJECT NO. DRAWING NO. CHKD BY: --C,T 05-14 44b-4L RVWD BY: DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL ) 1 ~ ' ~ I I • • • t3(3 • I I I I I I APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTING AREAS. ,J::) a ,: I /2 1 ! \ CONmACTOR TO INSTALL 6AASSl'"AVE 2 IN l!!ASMl!!NT L TO HE~4Aiti ) / ,, I ~i 1,397.4 ' / l y, +.; .. J ..... e ,•'f, !,,/' . /_.,.,, I I / ' '·: : : iititb0Ni5COV!!tll& NOTE, ALL SI.OF! AREAS SHALi. el! PI.AIITED 1'1111-1 Ml'OFORIM l"ARVll"OLIIM 'l'UTAH Glll!Et(' l'!R PLANTINLS L.l!SIM:I. ALI. $LOI'!$ SHALL Rl!alV! STIW'I MATTINl5 AS !'ER STANl)AAtl I CIF' Tie CIT'f CIF' ~ l!RO&ION ~L M!!A51N5. STRAl't MAT SHALL Bl: U5l!3' IN l"LACI! CIF' ~ CROI". NQ'T'!!, M"fOf'OFIU,f PARVll'OLIUM 'PUTAH GREEK' FL.ATS• I&' O.C. w.AATHON IIE' 1W I, ~TOR $HAI.I. CONTACT Tie LAN0SC.llf'e AAGIIITl!CT f'll!OI'. TO ee61i't!INl5 LANPeCAl"I! ~ SO TtfAT THI! L>.Nt;SCAI'!! Ai'IGHITl!CT CAN lleVll:N M l'l'O~T IITILIT'f LOCATlote AN!) N!Vlet!! l"LANS ACC~INel. 'I" TO l'IJLL 'I" ecMl!N ALI. I/T'ILIT1e5 P'lliOM Vll!i'l 2. Nff ~ HITHIN TI£ CA"1.SBA1' ~ Cl.fAR zote SHAl.l. BE '6' BOX il'IITH A MINIMUM&' CI.EAA 6e,it::EN FINISH 6AADE AIO THE "Im CANOl'1'. !!. ALI. iol.Ol"l!5 1'' AMP IMPl!ll. !'AGINl5 l'IAIC MIG 5HAl.L rcecelV! 5'1'1'.AA MATTINS l'l!R l!ROSION CON'!'i'OL .xL,S .,,y ~ ASSOCIATeS. 4, ALL 'l1'll9!S SltALI. l'lll!MAIN OIITSICle OP' Tie GAL~ SI~ 1'15TANCe COMl1'0R. 5. ALL ,,-m $HAI.I. el! I.CCAT!!D A MINIMUM OP' 5' ~ !'AYINl5 ANO ~• P'lliOM M~ ANP ~ LINes. 'l1'll9!S eHALL I'll LCGAT!!D A MINIMM CIF' 10' P'lliOM 5"11'11!1!T Llel-lT'5. S"11'11!1!T 'l1'll9!S 5HALL Be l"I.ACl!O TO Ml!l!'T CIT'f Cl/' CA'II se.i.i, S"11'11!1!T "Tm 9TANDAAt!S. ~~-/, 1, w l ,',,JiJ.'.cl ,,.--CONTRACTOR TO INSTALL 6AASSFA\/I: 2 IN EASMENT KEY 1VIAP i' ~ ', 'j\ '"[ 1 t"·\:1 .l f I 'iC/(,1 4 l L ·-•·. v: ,.,. . .J '\, ♦ (t) :. "'-♦ • /J_lo •, ~v •♦ f) ~ff) AL!.. SL.OFES S''--1/ AND UNDER I" AC IN6 FUe!.. IC ll'IA!..f<S SHAL.L. l'tECE IV!: S TAAi"\ MATTIN~ FER E!'tOSION CONTROL SH!!!ET$ IS"I"' HUNSAf<ER ASSOCIATl!S /1 // txJ·) 1 () ' ;\., ·-~ . fl'L.ANTIN6 I...N!!Nl:I ARel/T1J& IH:DO 'MARINA' /4T ANDARO KOELRB/lcRIA PANIGULA TA 2 KOEL.1'Ml:RIA PANIGULATA 14 0t-'Erft051"0Ef(()5 EXGEI.SIF., 42 ( t• '\ ffllSTANIA GONl"El'.TA 2 '-. _,/ TRISTANIA GONl"El'.TA 6H1'IWl96 Gl'TY. SVM. 2n © 244 ® 2' © II!! @ 32b ® ~ @ 2'2 0 ,~ ® "° @) AeAVE ATTB«JATA 'Nl:NA' ARel/T1J& UNEPO -MJI.TI STEM Cl:ANOTHU5 '.JJLIA M!.1'5' Cl5111S X l'IJRPURal5 ICJIIFOFIA WAAIA MYOPORIJM l"ACIFfGlR,1 ROSMAR11'1/5 'T1!5GAN Ill.IE' SALVIA Ml~LL.A 'HOT LIPS' Te.lCHRIUM i'l'WTIC,ANS ~TRIN61A F!WTIGOSA ~ 6Rlsae HORIZONTAi.iS ,ie MAM PARTHENOGISOOS TRIGUSPICIATA 60 COMMQNNAMI S~iffl 60LDENRAIN iffl 60LDENRAIN mEE NEW ZEALAND GHRISTi'IAS fflEI: eRl56ANE BOX BRl56ANE BOX eLUE l'OX TAIL ASAVE S~fflEI: 11'111..D LILAC ~ Rfe>IIOTl"om MYOPORIJM 'IIJ5C,AN llLIE ~ HOT LIPS SALVIA lllJ!lH 61:RMANDER G0"5rF<051:MAR'l' GAML.~ Sf'RfADIN6 Sl,l,ISfT LANTANA Dl:EllteAASS fOIHTAIN6RASS Ml:XIC,AN FEATIIE!I. 6RA5S eERKELE'T'!lEDEiE !lOSTON 11/Y f 1ffl 24" BOX 24" BOX '6' BOX 24" BOX 24"BOX ,t,• BOX i;,iii: 5 SAL 55AL !SAL 55AL 15AL I 5AI. 56AL 15AL 5 SAL 56AL 55AL 16AL SID! I 6AL • :30' O.C. I 6AL o 42" Ot:, .• 16AL I 6AL, I&' 0£-. SID! ~u :~ ~-r-('TYi"). CITY OF CARLSBAD www.gmplandarch.com DRAWN JR 9404 Genesee Avenue APPROVED MM Suite 140 La Jolla 1ST SUBMITTAL 02-09-07 California 92037-1353 2ND SUBMITTAL 3-13-07 Tel 858 558 8977 3RD SUBMITTAL +-30-07 Fax 858 558 9188 4TH SUBMITTAL 7-ma-o? LANDSCAPE MYLAR SUBMITTAL 7-10-07 ARCHITECTURE JOB NO. 08-038 DATE 04-30-07 & PLANNING SCALE AS SHOWN PLANNING DEPARTMENT ...--------,,.,-A-S_B_U-IL-T'""' --------,,----,----.-----------------,----,---.---,----1 GUEST BUILDER PLANTING PLAN DATE llll.E: RECEIVED BY: INSPECTOR DATE 61/E5T SIJILOER V/LJ.A6ES OF LA COSTA THE OAKS -~.I l-----+--+------------4----+---l-----+---I I APPR~-l 4r-~!..ctl: _PLANNING DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DA TE INlllAL DA TE INlllAL OlliER APPROVAL CITY APPROVAL DWN BY: __ _ CHKD BY: __ _ RVWD BY: PROJECT NO. C.T 05-14 LF-01 DRAWING NO, 446-4L \ \ I ! \ I ! :L KOB.REUTEl<IA PANIGIJIATA eiOI.DfNFVJN iREE 2 KOE1.~IA PANIGIJIATA eiOI.DfNFVJN iREE S,1%1! 24'BOX '6' BOX ~ o~EXCEl.5.e NEH ZEAi.AND c-HRl5TMA5 iREE 24' BOX 42 ( :, ) TRl5TANIA GONFl:RTA 2 '-... ,/ TRl5TANIA GONFl:RTA 6Rl&e11Nf eox 24' BOX Bl'l&BAflf eox '6' BOX 20 * MAYE ATl?M/ATA 'tl(NA' 'le © AABU1115UNl:DO-MJLTl51EM Bl.I.I: FOX TAIL MAYE 5'l'l'W'llEAA'f iREE HILD LILAC, ~ 5 eAL 5 eAL. 16AL. 5 eAL. I 6AL. I 6AL. 56AL I 6AL. 5 6AL 5 SAL 56AL 16AL iizi!! 2n @ GEANOTltlS 'J!LIA PltEI.P&' 244 @ Gl5TU5 X ~ Z © KNIPOFIA WAAJA REP HOT POKl:R M'I'~ @ M'l'OP°"1A'! PAGIFICUM @ ROSMARlll.!5 '1\.15GAN eu.E' @) SALVIA Ml~ liOT LIP&' 0 TEll(;tftlUM 1'1'1!1.11'1'AN5 'TU5CAN flUJE FIIOSEMARY HOT LIP& SAL \/IA eu&lf6ERMANDER 571 @ l'ESTRINelA FRIJTIGOSA C,OA5T Ft05EMAAY GARMELC,Rcl;l"!:R 5PRl:ADIN6 ~ LANTANA !50 8 ~NOTH.I& 6Rl!iEIJS HORIZONTAL.I& ~ (9 LANTANA MON1'EVIDEN515 ~!Ne $UNSET' driY. SYM. 20& 182 I02 (e ~IA 1'116eN!i @ F'ENNl$ETIJM SET Aa11M 'GIJl'RB,!,1' ® STIPA lcNJl!:>SIMA DEERSRASS FOUNTAINSAAS6 MEXIGAN FEATr!ER 6RASS I 6AL. • 50' O.C,, I 6AL • 42' 0.G. 16AL ~;~;1 G~™A-1~ EIERKf1.E'( 5E06I: I 6Al., If>" O.G. 51%!! ~ MA,-.,, PARTflENOG!seu& TRlaJePIDATA l!OSTOII IVY NOTE, Al.I. 51.me A~ SHALi. Bl! l'LAtl'l!D l'!ITH MYOl"o,u,f l'AA\lll"OLIUM MAI!~• P1!1t l"I.A)ITJN5 IMENI:>. Al.I. eL.Gll'S &f!AI.I. ~ 5TIW'I MAiTIN6 A5 Pl!lt 5TAND~ I (JI(' 'IHI! Gl'l'I' (JI(' GARl..SeAl:I ~ION eON'!'MI. H!ASIJlltl!S. 5TIW'I MAT SHALi. Bl! U5l!P IN l'LACl! <Jr' c;o~ QI.OP. ~ M'(Of'ORU,t PAA\/IFOLIUM 'Pl.ITAi! CREEK' MYOPO!WM FLATS• If>' Ot:,, NOT!!, HYBRID l'ESGl.e $01' I. ~~ 5HAI.L GOIIT AGT THI! ~ ~ITIICT l'l'IIOR TO l!ll!61NNIN6 I.ANDeGAl'I! ~ eo 11'IA T TH!! LAN!,Sc;Ai"!! ~'!?CT GAN ~11!1'1 Tie ~..eGT 1/TILITY LOGATION5 AN:> Re\11111!! l'I.AN5 ~IN6LY TO 1'14.1. 'I' 9'mN Al.I. UTILITI!& ~ Vll!l'l 2. IWf '!REE l'tlTHIN TH: GAAI.SBAD CORNER GLEAA ZONES SHALi. BE 36' BOX l'tlTH A MINIM.t-1 f>' GI.EAR ee;,EEN FINIS!-! 6RA1'E AND 11-E TREE GMIOPf. 5. Al.I. 5LOl'5 5' AND IM)!R FACIN6 PISI.IG NAI.IG 5HAU. IIEG!IV! &'IMl'I MATTIN5 P1!1t ~ION GONTIIOi. .1 E,5 ..rf ~ AeeOC.IA'l5. 4. Al.I. TRl!l!6 SHALL "!MAIN Ol/1'6101! OF M GAL'!111AN5 &l&HT Dl&TANel! C<;Mii;:Olll 5. ALL Tlll!I!& SHAW. Bl! I.OGA'l!D A MINIMJM OF !!' FfllOlo! f'AVIN& AND i' !'ROM MTEll AND $1:N!!R LIN!!&. TRl!l!6 5HAI.L I!! LOGA'l!D A MINIMJM OF 10' !'ROM &TR&T L161!TS. 5,,,.,-TRl!l!6 SHAU. I!! l"I.AGfJ:) TO Mee'!' GITY OF GAIUe,l,I:) 5m!ET Tl'U!I!: &TAND~. APPROVED FOR PLANTIN6 AND IRRl6ATION ONLY, INCLUDIN6 PRECISE LOCATION OF PLANTIN6 AREAS. .. -... -I< 111sc ~od .. Fl~ ZONES FIRE ZONE: !2 Fl~ zoNe I I .. 1: --~,'(("' I \l!(°'* f ~'(· ·t,;')f-. ~.I ('li/. t~1f~ '"' . . -.l( ~. .. ,• t-• t~l ·--' I r· ,-I,-· I ' ' r . . J-r ~, . . ' ,,.-- / www.gmplandarch.com DRAWN JR 9404 Genesee Avenue APPROVED MM Suite 140 La Jolla 1ST SUBMITTAL 02-09-07 California 92037-1353 2ND SUBMlTTAL 3-13-07 Tel 858 558 8977 SRD SUBMITTAL 4-30-07 Fax 858 558 9188 4TH SUBMITTAL 7-02-07 LANDSCAPE MYLAR SUBMlTl'AL 7-10-07 ARCHITECTURE JOB NO. 05-038 DATE 04-30-07 & PLANNING SCALI! AS SHOWN I I I 1 • • • I I I l I I I / I i I I I / \...._··-. ..f'' "'<:J "' t--~ "-,~ \ \ \ \ ........ KEY ~ CITY OF CARLSBAD ~ .---------,n,-A_S_B_U_IL--T'""' --------,,----,---~---------------,--,---,---,----t ~ PLANNING DEPARTMENT ~ GUEST BUILDER PLANTING PLAN LP-02 DATE TITLE: RECEIVED BY: INSPECTOR DATE SLIEST Sll/LDER VILLASES OF /..A (X)STA THE OAKS -!J.I IAP~~J~/ or:. ~t~t\: "1·1'i,.,, t=====t===j===============================~====~====~====~===::::: ~-P~L~A~NN~l~N:::G==::::::,,::::=~:;:;~~;==,i=;;D~A7,T:;;;E~~ DWN BY: ---PROJECT NO. DRAWING NO. CHKD BY: --C.T 05-14 446-4L RVWD BY: DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL OA TE INITIAL OTHER APPROVAL CITY APPROVAL P'J..ANTIN6 U!6!!Nt) CilTY eVM ' • r ~ 44 ISi ) ARllll1U5 l.tEOO MARINA' -STANDARD , ' $: I t::oel.~IA l'ANtCU.ATA J 2 --KOEL~IA l'ANla.t.ATA 140~,~~ 42 ( :, ) TRl&TANIA C,()f,F!:RTA 2 '-.. ./ TRl&TANIA C,()f,F!:RTA SH1!IJB5 CilTY. e'Y'k. 20 * MAVE ATTl:NJATA 'IIOvA' 4S © ARllll1U5 l.tEOO -MJL Tl &TEM 21'1 © CEANO'lrlU& '..IA.IA l'la.F5' 244 ® GI& l\JS X f'LIRf'U<El6 2' © KNIPOFIA WA'f/JA 113 @ M'l'Of'IOIOf PAGIFIGUM 32b ® ROSMARllolJS '11.eGAN llW:' :1'16 @ &ALVIA MIGROf'H'r'I.LA 'HOT LIPS' 252 © TI:IJGlfl.lUM FMIGAN& 371 @ HS'f'RJlofelA ~GO&A 30 @ GEANOTHlJ5 GRlsai& HORIZONTALIS $ e LANTANA MONTEVIDENSIS WEAPIN6 SL!eET' Cil'TY. SVM. &TlWtll':RR'T' TREE 24' BOX EiOI.DEl«AIN TREI: 24' BOX " !56 BOX NEH Zl:ALAND CIIRl!:i'!MA& TREE 24' BOX 6Rl&6ANE eox 24' BOX 6R1&6ANE BOX !56" BOX BUE FOX TAIL MAVE S~ TREE HII.DLIJ.AG ROGKRO$E Je>HOTPOKER M'f OPORIJ,f l\JSGAN eu.e ROSEMARY HOT LIF5 &ALVIA BUSH iSERMANDER C,OAf,T ROSEMART' C.AAMEl CAW ER SFRl:AC)ING Sl-"l$ET LANTANA SID 56AI. 56AL leAL 5 eAL leAL 16AL 56AL leAL 5 eAL 5 eAL 5 eAL leAL :20& @ ~"'"" l&:Z EB l'fNNISETa-1 SETAGBJM 'GUFRfl.1,1' 102 . @ STIPA TSIJl551MA DEER6RAS6 FO\.NTAINaRA5& MEXIGAN FEA11-IER 6FWlS I eAL I 30" O.G. I eAL I 42' O.G. leAL ~;~;, ~T.MJL~ BERJ<aE'I' SED6E vlN!e &ID 4& M4M PARTHl:IIOGISSUS 'IRICUSPIDATA BOSTON IVY 15 6AL., ~ dMltOUND cdV!!iiiii &ID QTY. eYM. NOTE, ALL lil.al'!l AAl!,I,! 9HAL1. 1!1! f"LANT!!P f'Gl!i ~ l"AAVll'OLIUM 'P'IJTJo,H ~• l"l!lt f"LANTIN:lo J.e61!ND. AU. SLOl'l!S SHAU. Rl!a!IVI! &TRAN MATTIN6 Af, l"l!lt STAN0MP I Clf' THI! Gl'TY' Clf' G,r.M !115"1::> i,os10N ~ ~. STRAN MAT SHAU. l!I! let) IN l"LAc:I! Clf' ~ CMJO. ~ M'l'OPORIN PARVIFOLIUM MAIi G!IEEK' FLATS I ft;' O.G. NOT&, tl'feRJD FE5CUE I. GONTAAGTOfll SHALL GONTAGT TH!~ AJII.GHITl!CTl'l'IOR TOSl!&INNIN& L.ANDeeAJII! ~ $0 'r1'1AT THI! L.ANDSCAI'! AlltC,HITl!CT CAN --,11!1'1 THI! ~.J!GT 1/l'IW'TY LOGATIONS AN!:> fll!I/ISI! l"LAN& AGGOIIDIN6L Y TO PW. Y 6'.fll!!N ALL UTILITIS l'fltOM Vll!l'I. 2. Hff TREE HITHIH THE CARL5eAD CORNER CLEAR ZONES SHAU. !!E !St,' eox J,oilTH A MINIMJM a· Cl.EAR 6ETIEN FINISH eAADE AND TH: TREE CANOPY. 5. AU. loLOl"IS S' ANt> ~ l'AGIN6 PUel.JG K,1,1.1($ SHAU. Rl!G!!M! $'TRAW MATTIN6 PER EROSION CONTROi. i1L,.i BY HAolSA!<ER AeeeelATl!5. 4. ALL 'T1'lleES SHALL Rl!MAIN OUTSll:iE OF THI! GAL TRANS $16HT DISTANa! eoMIDOR. 5. AU. TRl!l5 SHALL BE LOCATED A MINIMJM OP 5' f'lilOM PAVIN6 AND 1' l'fltOM fi'IA~ AN0 5l!lel LINe. ~ SHAU. ee LOCAT!D A MINIHJM Clf' 10' f'ROlol STRE!T Ll61!T$. $TRl!l!T TRl!E& Sl!AI.L BE t'LAc:e) TO Ml!!T Cl'TY (If' '""" 56"1::> STRl!l!T 'f1e! STANDAAD5. }ll>SCA "°Ody APPROVED FOR PLANTING .. .. AND IRRIGATION ONLY, -:I .... INCLUDING PRECISE * LOCATION OF PLANTING AREAS. CA\.\ CARLSBAC> CORNE:R---<... CI.E:AR I. I NE: .r--CARLSBAC> CORNE!lit. c1..eA11t. I.IN!! ' ~+; ·,\_ . ~v \. ~(J i i / I ,.,,.. ~,, ,,,,r , " I ' / I, ~ :;...'V,JI" ~'<'~ ~+;~ ,, 0\ D Lfl 4.2 1 g, \\\ \\ l fJ 4 1.107 . I '·--~.:~J ,,-.,-~-~---"·"--, ''\,\. ,1 ' \ \ 60 "' ., KEY /\ . \;;· A ' . ,;. ~ CITY OF CARLSBAD www.gmplandarch.com DRAWN JR -------------. ---------..--------..... A-S--8-U-IL-T"'""--------,.---,---,-----------------,---,---,---,---; GUEST BUILDER PLANTING PLAN ~ PLANNING DEPARTMENT LP-03 9404 Genesee Avenue APPROVED MM Suite 140 La Jolla 1ST SUBMITTAL 02-09-07 California 92037·1353 2ND SUBMITTAL 3-13-07 Tel 858 558 8977 3RD SUB MITT AL 4-30-07 Fax 858 558 9188 4TH SUBMITTAL 7-02-07 LANDSCAPE MYLAR SUBMITTAL 7-10-07 ARCHITECTURE JOB NO. 06-038 DATE 04-30-07 & PLANNING SCALE AS SHOWN DATE TITLE: RECEIVED BY: INSPECTOR DATE 61.JEST 131.J/J..OER VI/.LA6ES OF LA COSTA THE OAJ<:5 -!J.I IAPPRn'.::t~( (t, ~..off: f,l'1•C>'T t====jt===j==============================~=====t====i====+===~ ~-P~l~A~NN~l~NG===:;--;::=:::;;;;:::;::;:;::,~=::::,;=:cD~A~T~E~~ OWN BY: ---I PROJECT NO. I DRAWING NO. CHKD BY:__ GT 05-14 446-4L RVWD BY: . DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DA TE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL \ I j i I \ \ I ! j ~-CONTIV<CTOFi. TO INSTALL cSrli.ASSl"'AVl: .:2 IN eASME!NT <,,-:; - ~,A. ~ ~ ' ' . " :-_T' z t, .J __ n vr\ ,, J '¾"'--./✓' ALL SLOl"'eS S' AND UNDE:R l"ACINcSr l"U5LIC lf'IALKS SHALL l'Q:?Cl:IVl: STiltA~ MATTINcSr 1"!::Fi. l:"-OSION CONTROL SHE:E:TS 6'T" I-IUNSAKE:R ASSOCIATl:S ('TYl"'). SIZ! NOTE:, Au. $1.0!'!! AN!A5 !lHALI. ele l'I.AN1!:I) 1'11'!1'1 MY~ l"ARVll'OLHJM MAK c:Rl!l!I(' 1'1!1t l"LANTIN6 LJISel.lP. Au. ~ eHAl.l. N!alVI! $'Tl'tAN MATTn-i. A! P'l!R $TANI'~ I Cl/' M C,ITV Cl/' C,AIUe,l,D !!IQ$IQN ~ ~-$TRAN MAT &HALL. eE ueec, IN l'I.Aee Cl/'~ CM!'. ~ MYOP0!<1J,1 PAAVIFOI.IUM MAIi GREEK' MYOF'()lsl.lM l'LA TS f It," Ot:,. NOT!!, 'MARATHON IIE' MF HY!lRID FESGLe 50D I. GOIITRAC,TO!t SIIAI.I. eoNi'AC,T M LANDSCAl"I! .w.fn!C,T l'RIOR TO 111161NNIN6 LANE)SC,Al"I! i'k:IRK SO THAT M LANE)SC,Al"I! AIIGHITl!C,T C,AN Rl!l/ll!JIII M l'RO.l!CT IJTll.l'l"r' LDGATIONS AND Rl!Vl!e l"LANII AC,C,ORD~ 'T" TO l'IJU. 'I" SC!tl!l!N Al.!. IJTILITl!e ~ Vll!l'l 2. Alff TFe YIITI-IIN THE CARLSBAD C,ORIIER Cl.EAR ZOtES SHALL eE "6" EIOX l'll'IH A MINIMA-I e,• CLEAR EIETH:fN FINISH EiRADE AND THE m:E C.ANOP'r'. :,, Al.!.~ S' AND lhlDl!llt FAC,IN6 f'U!!LII: l'IAI.J($ SIIAl.l. l'EC,l:M! $i1'W'I MATTIN6 1'1:11, EROSION~ &leT$ BY' ~ ~IA'!!!&. 4. Au. 'IN!e5 $IIAI.I. teMAIN Ol/!'Slc,t!! Clf' THI! C,AI.TRANS &IISHT 1:'l&TANl:I!! <:<,Mll:'Oll APPROVED FOR PLANTING AND IRRIGATION ONL. Y, INCLUDING PRECISE LOCATION OF PLANTING AREAS. St>" eox-- www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 LANDSCAPE ARCHITECTURE & Pl.ANNING •, ·, DRAWN APPROVED 1ST SUBMITTAL 2ND SUBMITTAL 3RD SUBMITTAL 4TH SUBMITTAL MYLAR SUBMITTAL JOB NO. DATE '· t, \ \ \\ \' '· \\ JR Ml( 02-09-07 8-13-07 4-S0-07 7-02-07 7-10-07 05-038 04-30-07 SC.ALE AS SHOWN ~,..o?; l . " \\' . ' ,. ' \ f -' "' ,_,~,' " . ' . ,, '\, ,"' V' S6"60X -I :'.o :,11 7' i ;f (, ' \ ' ' •' ( ~· ', f <-...,, -~ 11 ts ,,_ ~ -t ~ > _s,-a 'J + + + 1"-""-~ ~ • ' " , "7 + ' ' '~ --CAFi.LS6AC:, CORNE:R CLE:AR LINe D '\ , ..... ., ' \ PLANTIN6 Ll!6!!NI:) AAE!lJ11.l5 IH:00 'MARINA' -STANDARD S5 ,___.__, KOEI.Ra/TERIA PANlaJLATA 2 '--1.✓ t<Oa.~IA PANIGI.JL.ATA 14 0~,~ l:XCEJ.51)5 42 ( Z• ) TRISTANIA CONFl:RTA 2 '-.. _,/ TRISTANIA CONFl:RTA <ilTY'. S"l"M. 20 • MAYE ATl'ENJATA 'NO./A' 45 © AAE!lJ11.l5 l..a?O -HA.Tl STEM 2n 244 25 m, ,26 3'16 252 :577 50 © ® © @ ® 0 0 @ @ GEANOm/S 'JA.IA F'IEl.f'S' C,15TUS X ~ KNIPOFIA WAAIA MYOPORIA'I PAC,IFIC,IJM R05MAAIHUS 'Mc-AN E!l.lE' SALVIA MICROPH'r'LLA 'HOT LIPS' 'l!:lJC,Hfl.lUH F"1/Tlc-ANS teTRINelA FRUTlc-osA GEANOTI-IJS 5RISE15 HORIZONTAL.JS ~~ "~-'. ~~~ t>5 (§) LANTANA MOHTEVIDEN515 '5f'REAC11Ne !il,lllfET' 20& 16.:1 102 @ ~IA Rl61!N$ $ PENNISEllJM SET AalJM 'i,UFRflJ\,1' @ STIPA TcltllSSIMA ~;~;1 C,~1\ML~ vlNB @ MAlvi PAATIIENOC,ISSIJS TRli:;Lle,P~TA 9c::> 6c::> ' J,!! c:cMMON NAM!!! 00I.Dl:HRAIN m:E 00I.Dl:HRAIN TRl;f BRISBANE eox flRISBANc eox l!J.IA: FOX TAIL ASAVE s~m:e l'IIJ.D LIL.Ac- ~ "1:DHOTFOKeR MYOPOl<IJM 'IVSC,AN Ell.IA: ~ HOT LIPS SAL.VIA llUSl-!eERMAIVER WAST~ DEER~ FaJl,IT'AIN ~ MEXICAN FEATH:R 6RASS 6ERKEI.E'r' ~ BOSTON IVY 24' eox 24' BOX '6' eox 24• eox 24• eox ;!6' BOX Si%!! 5 SAL 56AL I SAL 56AL I 6AL I 6AL 5SAI. 16AL 56AL 5 6AL 5 SAL I SAL 51%1! I SAL t 50" Ot:,. I 6AL t 42" Ot:,. 16AL I 6AL, 16' O.C.. 51%1! 15 SAL.,!OO!l, CITY OF CARLSBAD PLANNING DEPARTMENT [ji] --------..----...---------...---..----.----------------,---,----r----,---1 "AS-BUILT" GUEST BUILDER PLANTING PLAN DATE Tln.E: RECEIVED BY: INSPECTOR DATE 61/EST 81/ILOER VI/.../..A6ES OF LA COSTA THE OAKS -5./ F'-04 I _AP~J1='.:=f=---D(~q!t'-~~/aj~),<;>~•tt~----l·I',. 07 ~====~====~==============================~=====;====~====~===~ :::· P~L~A~N~Nl~N:::G==::::;-;::::=~::;:::~~;::::=~D~A:;:T~E~~ DWN BY: ---PROJECT NO. DRAWING NO. REVISION DESCRIPTION DA TE INITIAL DA TE INITIAL CHKD BY: --C,T 05-14 446-4L RVWD BY: DA TE INITIAL ENGINEER Of WORK OTHER APPROVAL CITY APPROVAL I --- I :1 ' 0 l'!OOT 6AL.L ® Gl'!OHN-1" AE!OVE FIN15H SRADI!! @FINl5H6AAC>e 0 l"INl5H el'ADE AT $1...0PE @ :2 X t'I.OOT 6AI.L DIA AND I X i:,EPTH @ 15.AGK FILL MIX (SEE NOTES) MAX 1,1 G) l"elltTIL.IZE!lt ~ SOILS ~T) @ SEE PAVING DETAILS 0 TOP OF PAYINe (§) :2" Hlet-1 1'1ATl:R1Ne 6AelN /IF l'IEG'D) ® UNDISi1JfteED NATIVE SOIL @) STl'AH MAT EROSION C.ONTl'!OI. II ~UJ, I JJ~W~W~W~W: @ --7 0 ........... 11 -I ....... - =11 -II ITT TTT ~3' MIN.J 0 :2" DIA X 10' Loc:>eEPOL.E PINE STAKE /:2 lltEGl'D) @ Rl6HT OF i'IAY @ VINYL TREE TIE /:2 l'!EGl'D) 0 5'-0" MIN. . @ SEE TlltEE PL.ANTING DETAIL. @ 1:2" MIN. G) TlltEE~ @ROOreALL {3)6"MIN. @ PREVAILING l'IIND AXIS @ fflJNK TO eE ::I' eeHIND R.0.1'1. ~TIE:E I -,Jll,,,~.~. ~+--1-4"_~ .. -.= .. =,-. ,-. .,.J1, l-, ___ lc:>ei'IALK ®----,-------,,"T""t----1 ,a::><11:>-<t)·-----+:,• MIN. PLAN VIEi'! eo:tANIGAL NAMC/GAJM,QR'T'IT'?J"'M GOMMQNNMC 5''1"' 44 AAeuTVS l.tlEDO 'MARINA' -STANDARD STRAleEM:1' TREE 24• eox "5>--<,__, l<OEL~IA PANICULATA OOLDENRAIN TREE 24' eox 2 '--'--" ~IA PANICULATA 001.DENRAIN TREE '6'60X !EH ZEALAND CHRISTMAS TI'U:!: 24' eox A 5HRUS/TREE PLANTING DETAIL NT5 s TREE STAKING DETAIL HTS GROUNDC.OVER PLANTING DETAIL NTS 14 o~I~~ 42 ( :. \ TRl!>TANIA c;ot,IFcRTA 2 '-/ TRISTANIA c;ot,IFcRTA BRlseANE eox BRISBANE eox 24' eox '6'60X D b n li--1-----1@ II II II II ,------(4 CD VINE ATTAGHEO TO 5Ul'll"AGE l'IITH CLEAR EPOXY VINE TIES @ l'l'I"! RY STAKES-TO eE l"EMOYeO @ EXISTING ~AGE 0 Gl"OHN-1" AeoVE FINISH el'ADE: © 4' Hl6H i'IATERING eAelN (IF REGUll'!EO) @ PL.ANT TAel.ETS G) FINISH BRADE @ !!!AGKFILL MIX (SEE SPEc.SJ 0 :2Xl'!OOT6AL.L OIA @ UNDIS~O NATIVE SOIL ® l"OOTeAL.L VINE PLANTING DETAIL NTS ,----,2 G) CONCRETE SIDE ~ OR HAR!:)SC.Af"E IMPROVEMENT A$ INDICATED ON PLAN • @ DEEF'ROOT L624-2 ' \,. b b © SIJ65AAC)E ., ,-...'4' --<:, .. , .. ·.. . . '• . . "·: . G) PLANra PER PLAN ~ '·.-··,.·.•~;:: •. :_..~·· .·:.::•_ . ,. ·:~/s: .. .-. . :: .:: , , . . . . .. ·. ·. :· .':• ... ,.·, : ..... . . . ... ,., ·• :•· 0 ••M• 0 0 0 •• ·, © CONCRETE CUR6 OR HARDSC,Af"E IMPROVEMENT A$ INDICATEC) ON PLAN c::: = ==-= = = = = = f'l.AN E ROOT BARRIER .... Nra APPROVED FOR PL.ANTING AND IRRIGATION ONLY, INCL.UDING PRECISE LOCATION OF PLANTING AREAS. GRA55CRETE PAVING Ql!!TAIL I eMN!2 I 6RASISGRETE :I 11JRF HITH 1/2' TO :,14• SOIL MAT 9 CONCRETE PAVING PER Pl.AN 4 6' HIDE GONGRETE ED6E 6' DEEP- MONOLITHIC POUR 01"SAND ©CLASS II 6A!lE ""'-K HITH ~ HASI-EDSHARPSAND(),ftx UNIFORM!. Y mOR TO GOlf'AC,TIOII) 0srea REINFORG,1Ni5 l'ER MANl',IG~ ~ATK,N5 {!)GOlf>AC.iED ~ PER SOIL!> Rl:PORT 0PLANTINiS ~ PER PLAN5 ~ \ Jft~ I" 1¾ I 00U 20 ,ii, 211 244 2' 11, :!26 :,ctf, 2'2 ,21 ,0 e,, * MIAVE ArmllATA 'lll:NA' © AAelJ1\IS l.tlEDO -M:ILTI STEM © CEAH01lile '.JJLIA f'HELPS' ® CISTUS X PIJRPIJREUS © IQIFOFIA WHI.IA @ 1'!l'OPOJ'JJH PACIFIW-1 ® ROSMAA.INUS 'TIJ5CAN euJE' 0 SAL VIA MICROPl!Y'I.LA llOT LIPS' 0 ffllCHl'IIIM Fl'IJTICANS ® JeiRINe:ilA FRl/l1COSA @ CEANOTHl!e eRISl:IJS HORIZONT ALIS 0 LANTANA MOKTEVIDl:NSIS 'SPREADIN6 Sl.tlSET' euE FOX TAIL AeAVE S~TREE i'tLD LILAC ~ RED HOT~ MYOPORIJM Mc.AN euJE l'IOSEMARY HOT LIPS SAL VIA El!JSH~ WAST~ SPREADIHe SUN!>ET l.AIITANA &1%1! Wei!!!! 5 eAL 5 EilAL leAL 5 EilAL I 6AL 16AL 5 GAL 16AL 5 l5AL 56AL 5 eAL 16AL ilZI! Gm'. ei'M. :IOti @ ~IA Jllle&i! DEE:R6AA$ I 6AL • 30' O.G. I 6AL e 42' O.G. 16AL 162 E!) PENNISl:i\M SET AGaM 'GIJ'lall,f FOUolTAIN 6AA5S MEXICAN FEATHER 6RA5S 102 ® !>TIPA TellJl961MA ~;~;, G~~ICOLA I 6AL, 16' 0.C. @ MAM PARTH:NOG,ISSUS iRIGIF.i"IDATA BOSTON IVY 15 6AL.,I~ QTY. ei'M. NOTE, ALL at.OP!! AffVc SHALL el! 1"I.AN'1?l:I IIIIT!I M'r'Ol"O\Qf f'AAVll'OLM-1 MAH GQI!(' l'l!lit "1.ANTINI I ■sr,c:,, ALL eLOl"I!$ 9H,l,I.L ~ ST\ltAll'I MATT1N6 ,-. l'!llt &TMIC'AIII:) I O'I' TH! GI'!'!' O'I' GAAUIB ID l!IIOSION GDll'1'l'IOL Ml!ASUN!&. &mAl'I MAT llHALI. el! ue, IN l"LAGI! O'I' Wi!llt GMP' . ~ MYOPORIJM PARVIFOLIIIM MAH CREEK' ITGDI 'MARATHON IIE' T1JRF lfl"BRII) FESGIJE FLATS• 16' O.G. SOD Ll.2J NOT!!, I. GON'l'AA(;TO!t llHALI. CONTACT TH! LANC)SGAl"I! ~T!eT i'!tl~ TO ee&INNIN6 LANP5GAl"I! l'IOl'IK 90 THAT THe LANPeGAl"I! AlltGHITl!GT GAN ~lfi'I THI! ~T UTILITY I.Q(;ATION& AlC JlleV!lie !"LAll5 AeGOlll:ilN61. 'r' TO l"W.Y ~ ALL I/TILITll!5 ""'1M WK 2. Mt( TREE HITHIN THE CA!tl.56',t> ~ GLfAA. %Ole !itWJ. l9f ,e,• eox l'tT!I A MIHlt-U-1 6' CLEAA. ~ l'INl!ill ~ At,ID THE TREE CANOPY. ,. ALL eLOl'l!5 !l' MC IJNg!llt l'ACINS N!LIG HALl<S 5l!ALl. ~ ST\ltAll'I MATT1Nlt l'l!lit ~ION GON'T1'.0I. .1C,:S BY~ ASeOGIATl!S. 4. ALL m1!5 5l!ALl. IU!MAIN OIJT&IDl! Cf' M ~TAANS 516H1" lmTANGe GOMl1'0JII. !. ALL Tllll!l!!i !!HALL Bl! LOGATl!!D A MINIM.M O'I' 5' l"ltaM l"AVINS ANl.) i' 1'11::lM HATl!lt ANl.) !!l!l'9. LIM!S. Tllll!l!!i ~ CITY OF CARLSBAD ~2 ------------, ---------,---------,, • ..,.A""S....,,.8-Ul,-L"'T"..---------r---r---,----------------,---,----,--,--; AREA 3.1 -PLANTING LEGEND AND DETAILS 6f/EST BIJILDER LP-05 www.gmplandarch.com DRlWN JJI ~ PLANNING DEPARTMENT L_Ej VILJ.A6ES OF LA (¼)STA TIE OAK.S -~.I 9404 Genesee Avenue APPROVED MM Suite 140 La Jolla 1ST SUBMITTAL 02-09-07 California 92037-1353 2ND SUBMI'ITAL 3-13-07 DATE Tel 858 558 8977 SIID SUBMITTAL 4.-S0-07 TITLE: Fax 858 558 9188 4TH SUBMITTAL 7-02-07 LANDSCAPE MYLAR SUBMITTAL 7-10-07 ARCHITECTURE JOB NO. 05-098 DA.TE 04-S0-07 & PLANNING SCALE AS SHOWN RECEIVED BY: REVISION DESCRIPTION INSPECTOR DATE t------+--+------------+----i----t---;-----1 I APPR/t~~ ( <a:;. E:tJ..Jt I. ,<?.e-z 1----+--+----------------t---+----t---;---1 ;;;· P~LA:::N:::;N;::IN;:::G:::::::==;-;::::=======;;:::::D'::AT::::E==~ DWN BY: I PROJECT NO, I DRAWING NO. DA TE INITIAL DA TE INITIAL CHKD BY 1----"-----l1----'----1 ' --C.T 05-14 446-4L OTHER APPROVAL CITY APPROVAL RVWD BY: . DA TE INITIAL ENGINEER OF v,,:JRI( ' \ \ I I I I. 2. 9. 4. PLANTING NOTES: AI..L TRl!I!& l'IIITHIN A &!"!!Cl!& eHALL HAV!! MATc.HIN6 l"O!l'M. AL.I.. I..ANO&c:.Al"l!C> A~e TO ~IV!! "'1.ITOMAT!C> IMl6ATION. ~ TO f"I..ANTIN6 ~IFIC::.ATIONI!, FOR $011.. 1"!11.!!t"AAATION, l"l!RTll..I:Z:ATION, MUl..c::.HIN6, ANC> OTHeR ,'DC>ITIONAI.. f"I..ANTINc& INl"OlllMATION. AL.I.. l"'I..ANT MAT!:!111.IAI.. &HAL.I.. 15! Af"l"'lltOV!!C> e'f TH! I..ANC>ec::.Al"'e ARc:.HITl!c::.T l"'ltlOI". TO INl!,TAI.LATION. !5. l"INAL I..OC:.ATION OI" Al.I.. l"'I..ANT MAT!:!111.IAl..1!, &HAI..L 15! euBJ!(;T TO TH! Al"l"ROVAI.. OI" TH! ~Al"I! Alltc:.HlffC:.T. 6. ,. C:.ONTRAc:.TO!' eHAI..I.. NOTll""I' 01'\iNeR'S "'1.ITHORIZ!C> Rl!~TATIVE 4& HOURI!, l"'RIOI". TO C:.OMMl!!Nc:.l!M!NT OI" l'IIORK TO c:.ooRC>INAT! l"ROJ!(;T INeP"l:!C:.TION ec:.iee>Ul..l:!e. I!,!!! Cl!!TAII..I!, ANO &l"!!Gll"IGATION& l"OR &TAl<IN6 Ml!!THOC>, 1"1..ANT l"IT C>IME!Nl!,ION& ANC> 15AGl<.l"II..I.. Rl!GlUIRl!Ml!NTe. &. II" GONl"I..IGTe Al'tl&I:! 151:!Tl'lll!li!N 1!,IZ!! OI" ARl:!Ae ANC> 1"1..AN&, GONTl'tAGTOI". TO c:.oNTAGT I..ANC>eGAl"I! ARc:.HlffC:.T l"Ollt l'tl:!$01..UTION. l"AII-Ul'tl:! TO MAI<!:! &UC:.H C:.ONl"I..IC:.Te KNOl'IIN TO TH! 1..ANC>loc::.Al"I! Alltc:.Hlffc:.T l'IIIU. ~I.. T IN GON'T'l'tAC:.TOl''I!, 1..IABII..IT'I" Tc:> l'tl:!1..C,,::.ATE TH! MATERIAi..$. "I. C:.ONTl'tAG TOI' &HAI.I.. euBMIT fl'HOTO& OI" Al.I.. ~ NOT ALl'tl:!AC>Y T~l!!C> B'I' LANc,1!,GAl"I! Alltc:.Hl~T. fl'HOTo& IIHOIJl..l:I INc::.L~I:! A l"l!IQQN l"OI". &GAi.i:! l"'Ul'tl"'oel:!e. AL.I.. l!!OX TRl!I!& &HALI.. 15! OI" ®Al.IT'!" Ae C>l:!T!:!111.MINl:!C> 15'1' THI! ~NC>&C:.Al"'I:! Al'tc:.HITl!c::.T. MATEl'tlAI.. l"QIJND IJN&UITASI..E! l"Olt TH! C>E!&l6N 0111. &l"!!Gll"IC:.ATION INTENT 1'1111..1.. Bili Rl:!J!(;ffC>. 10. IT II!, TH! C:.ONTIII.Ac::.TOl't'lii l'tl:!6f"c:>Nel15I1..IT'I" TO l"URNl&H l"I..ANT MAT!:!111.IAL.e l"l'tl:!! OI" l"'l:!1!,T5 °"' l"'I..ANT e>lseAel:!e. l"Rl!-el:!l..l!c:,T!C> Ol't 'TMcee>' MATl!lltlAI.. MU6T el:! INel"'l!c::.T!C> el'!' TH! GONTlltAGTOl't ANO C:.l!!l'tTll"ll!!C> f"l:!&T ANC> C>lel:!A&I:! !"Ill.I!!!. IT 16 TH! C:.ONTlltAGTOl't'lii Ol!LldioATION TO 1"4A~NT'I" Al.I.. l"'1..ANT MAT!:!111.IAl..1!, l"'l:!llt TH! Sl"'!!c:.ll"IGATION&. II. C:.ONTl'tAGTOl't &HALI.. ell! l'tl:!51"'0N&l151..I:! l"c:>llt MAl<IN6 Hl~I" l"AMII..IA" i'IITH AL.I.. ~l:!MfltOUNC> UTILITll:!6, l"lf"l:!LINl:!e ANC> &TlltUGTl.ll'tl!!&. C:.ONTl'tAGTOI". !!,HALI.. TAtc:I:! $0LI:! ~ON6I15I1..IT'I" l"Ollt AN'!' ,::.ol!,T INc:.l.ll'tl'tl!!C> C>UI! TO C>AMAe OI" $Ale> UTII..ITl5. 12. GONTl'tAGTOI". &HAL.I.. NOT 1'11I1..1..l"Ul..l..'1' l"l'tQC::.t=l:!C> l'IIITH C:.ON&TlltUGTION Al!, Dl!l!,I6Nl:!D l'H!N IT I& OBVIOUI!, THAT UNl<NOll'IN OBeTlltUGTIONe ANC>/Ol't 611tAC>I:! C>ll"l"l:!Rl!Nc:I:!& 1:!Xl&T THAT MA'!' NOT HA\/1!! 15!1:!N KNOl'IIN CIIJl'llN6 C>l:!6I6N. 15Uc::.H C::.ONOITION& $HAL.I.. el:! IMMl!C>IATEL'I' 15fltOU6HT TO TH! ATTl:!NTION OI" TH! LANOeGAl"'I:! Alltc:.HITl!c:.T. TH! C:.ONTl'tAGTOllt &HALI.. A~ !'UL.I. Rl!et'"ON&ll3ILIT'I" l"Ollt ALL Nl:!c:.l:!e&Al't'I' Rl!Vl&ION6 C>UI! TO l"AII-Ul'tl:! TO 6IY!! SUCH NOTll"IC:.ATION. 19. GONTl'tAGTO" et-!AL.I.. 151:! l'tl:!5l"'ONelBI..I:! l"c:>R AN'!' GOOl'te>INATION l'IIITH &Uec.ON'T'l'tAGTOl'tf> Ae lltl!QUllltl!!C> TO AGc::.oMl"l..leH l"LANTINc& 01"'1:!AATIONe. 14. GONTl'tAGTOl't TO Rl!C:.l:!IY!! 91'1'1! ~ TO +o.I0. C:.ONTRAc:.TOllt 5HAL1.. OBTAIN L!~ OI" 6l'tAC>I:! C:.!111.Tll"IGATION ~ ~ l"'ltlOl't TO l"'lltOJl:!CT l:!Xl:!c:.UTION. 15. l"I..ANT MATl:!RIAI.. OIUANTITII!& Al'Q! 6IVl!N l"Ol't C:.ONVl!Nll!Nc:.I! ONL'I'. 1"1..ANT &'!'MeOl.6 ANC> l!,l"l:!Gll"l!!P &l"AC::.11116 &HAL.I.. TAKI:! l"'Rl!G!!Pl!Nc:.I!. C:.ONTRAc:.TO!' &HALL V!!l'tll""I' !"I.ANT MATl!RIAI.. C:.UANTITIIS fOE!R !"LAN. 16. A MINIMUM OI" 9" 01" OMANIC:. MUI..GH &HALI.. 1111! AC>C>l!J:) IN NON-Tl.ll'tl" l"LANTIN6 A~ l'IIITH 61.0l"l!e LI:!$!!, l!,ffl!I" THAN 9d TO C:.OY!!l't THI! SOIL llUlltl"AGI! c:.oMl"Ll!TEI.. 'I'. ti. TRl!e f"LANTl!J:) l'IIITHIN !5' OI" l"UeLIC:. l!,IJ:)l:!l'\IAI..IG &HAL.I.. Bl! INST.ALI !!P l'IIITH 111.00T 15Al'tlltll:!llt9 A~V!!C> 13'1' THI! C::.IT'I'. www.gmplandarch.com 1'08CA 9404 Genesee Avenue \A<>Ody Suite 140 La Jolla California 92037-1353 u .. Tel 858 558 8977 -i Fax 858 558 9188 -' DRAWN APPROVED 1ST SUBMITTAL 2ND SUBMnTAL 3RD SVBMITTAL 4TH SUBMITTAL JR .... 02-09-0? 3-18-07 4-30-07 7-02-07 APPROVED FOR PLANTING AND IRRISATION ONLY, INCLUDINS P8fC,15E LOCATION OF PLANTING AREAS. LANDSCAPE MYLAR SUBMITTAL 7-10-07 ARCHITECTURE JOB NO. 05-038 DATE 04-30-07 & PLANNING SCALE AS SHOWN SPEC.IFIC.ATIONS FOR HYDROSEEDING I. H'l'C>lltO&E!E!C> MIX "A" Al. '!'&&UM 'GARl"!T 01' eNOl"I' 6AZANIA Rl61!Ne 'l"ll!&TA l'Q!C>' AL 'l'96UM 'fltO'I' AL C::.Al'tl"'l:!T' H"r'C>lltO&l!l!C> MIX "B" ~LZIA c:;ALll"OlltNIC:.A I..Ul"INUe Al'Q!IOIIU!U& MIMUI..Ue l"UNIGeu& F'OUND&/ AC,~ 9 10 9 f"OUND&/AC,~ 5 e, 9 MINIMUM% F'I.JRl'TY /oSERM. "',&/&o "',0/60 "',&/&o MINIMJM% F'I.JRIT'I" /eERM. "',&/&o "',0/60 "',2,/&o (AL.I.. SEED AVAII..ABI..E THROl./9H H'l'DROPL.ANT, ATTN, R06 MC<SANN 160-i44-1960 II. HYDROSEEDIN6 SU6f"EN6I0N OR SLURRY eoMf"O&ITION iSRE:eN l'IOOD MULCH FERTILIZER (16-16-16) AZ-TAC, 6INDeR FERROUS SULFATE OR IRON CHELATE Ill. Al"f"Ll(:.ATION f"III.OC:.l!C>Ulll.l!I!, ANO l!c.Lilf"Ml!NT 2,250.0 1..6/AC,. 400.0 LB/AC-. 150.0 Le/AC. :2.& <5Al..5/ AC,, A. l!c.Ulf"Ml!NT -H'l'l:)R"'1JL.IC::. l!GlUlf"Ml:!NT usei:, l"c:>I". TH! A'"'°l..lc:;ATION 01" THI! l'!!!llTII..IZl!l't, sel!J:) ANC> eLUllt"'I' 01" l"'ltl!l"Al'tl!!C> l'IIOOC> l"UI..I" &HAL.I.. 151! OI" THI! "&Ul"I!" H'!'l,fltO-&l!l!!C>l!llt" T'l'l"I! AS Al"f"l'tOV!!C> e'f TH! C::.IT'I' OI" c:;Ai'tL,&15AJ:) I..AlllJ:)l!,GAl"I! IN&l"l!c::.T°". THI& l!<llllll"Ml!!NT &HAL.I.. HAVI! A BUii.. T-IN A6ITATION $'1'$Tl!M ANJ:) Ol"l!lltATIN6 eAl"AGIT'I" eul"l"lell!NT TO MITATI!, ~. ANC> HOMOdlol!Nl!OUSI.Y MIX A 91..Ulltllt'I' c:;ONTAININ6 NOT LI!&& THAN 404! OI" l"IBI!" MUl..eH !"I.US A C:.c:>Mellll!!P TOT AL c:>I" ,-l"l!lltTIL IZ!!i't. SOLie>& l"Ol't l!Ac:.H 100 6ALI..ONS OI" 1"4Aff". THI! &I..Ulltlt'T" Dl&T!I.IBUTION LINl:!5 SHAL.1.. ell! 1..Alltdlol! l!NOU6H Tc:> l"'Rl!Vl!NT 5T""""A61! ANi:, eHALL 151:! l!<IIUll"l"l!P l'IIITH A seT OI" H'!'J:)lltAUI..IC::. &!"AA'!' NO:z:%1..1!& l'IIHlc::,+,I l'IIIL.I.. l"ROVIDI! A GONTl"'10Uf, NON-l"I..UGTUATIN6 J:)leGHAMI!. THI! &l..l.ll'tllt'!' TANK &HAL.I.. HAY!! A MINIMUM GAl"AGIT'I" OI" 1500 6AL.I..ON& AN!:) &HALI.. ell! Mc::x/NTl!J:) ON A TlltAVl!L.I1116 UNIT, l!I~ 91!1..l"-f"lltOl"IIL.l..l!C> c:>llt ~ e'I' A &l!l"AAAff UNIT, l'IIHIC::.H 1'1111 .. L l"LAC:.I! THI! &I..Ulltlt'T" TANK Sl"lllA'!' NOZ:Z:1..1!6 l'IITHIN SUl"l"IGll!NT l"'lltOXIMIT'I' TO THI! Al'l!Ae TO 151! ~- 15. l"l'Q!l"AAATION -THI! SL.Ultl't'I' l"l'Q!l"AAATlc:>N &HAL.I.. TAKI:! l"LAc:.I! AT THI! SIT! OI" l'IIOlltK ANO &HALL. Bl!dl,IN e'f AJ:)J:)I1116 l'IIATl!l't TO THI! TANK l'H!!N TH! l!N6INI! 16 AT HALl"-THlltOTTL.!!. l'IIHl!N TH! 1"4AT!l't 1..l!Vl!I.. HAS ~ THI! Hl!l6HT OI" THI! MITATOl't &HAl"T, ,s.c,c:,i:, l'Q!-C::llltc:.UI..ATION SHAU. ell! 1!6TAeLl&Hl!l:> ANO, AT THIS TIMI!, THI! 61!1!!:) &HAL.I.. Bl! AJ:)J:)!!C), l'!!!llTII..IZ!!R& &HAL.I.. THl!N el! ADC>l!C>, l"c:>1..1..0l"ll:!J:) B'I' l'\IOOJ:) l"UI..I" MUI..GH. MUl..eH &HAL.I.. ONL 'I' 1111! AC>C>!!P TO THI! MIXTU!tl!! Al"Tl!lt THI! &t=l:!C> ANO l'IIHl!N THI! TANK 16 AT 1..1:!AST ONl!-THI~ (119) P'll..1..1:!P l'IIITH l'IIAT!l't. THI! l!N6INI! THMTTI..I! &HAI.I.. SI! Ol"'l:!N!!P TO 1"\.11..1.. &l"l!l!P l'IIHl!N THI! TANK I& HAL.1"-1"I1..1..!!P l'IIITH l'IIATEIII.. ALI.. TH! l'IIOOC> l"UI.I" MULC::.H &HAL.I.. 15! AJ:)J:)l!J:) B'I' THI! TIMI!: THI: TANK II> Tl'IIO-THIIII.C>& (219) TO THl'tl!E!-l"c,l,ll't.THe {e/4) l"UI..L &l"AA'l'INc& &HAL.I.. C::.OMMl!Nc:.I:! IMMe:)IATl!I. 'I' l'IIHl!N THI! TANK I 6 l"UL.1... C::.. Al"l"L.IC::.ATION -THI: Ol"l!AATOl't &HALL Sl"lllA'I' THI! &1-0f"l!S l'IIITH A UNll"c:>l'tM, Vl&IBI..I:! GOAT 13'1' U&IN6 THI! ~ C:.OI..OI'. OI" THI! l'IIOOJ:) l"ULI" A5 A 6Ul1'1:!. THI! 9I...Ullltl".'I' 5HALI.. Bl! Al"l"Lll!D IN A &l'lll!l!l"IN6 MOTION, IN AN Alltc:.HI!!:) !IT!ltl!AM &O Ae TO l"ALI.. I..IKI! AAIN, ALI..Ol'IIIN6 THI! l"IOOP l"I~ TO E!UII..C> ON l!Ac:.H OTHl!R UNTIL A 6001:) GOAT I& Ac.Hll!V!!C>, ANO THI! MATl!l'tlAL 16 &f"lltl!AJ:) AT THI! "-1:!GlUllll.l:!C> AAT! l"I:!" AC-l'tl!. l:l. ALL l!Al'tE 6l"OTii $HAL.I.. 15! 1'1:!sel!t)l!C> l'IITHIN NINl!T'I' (10) DA'r"e TO THI! SATl$1"Ac:.TION 01" THI! c:;IT'!' 01" c:;Alltl..&BAI:) INet'"l!C:. TO". I:!. f"llf.lOlll TO THI! Ac:.Gl:!l"TANG.I! 01" THI! H'!'C>lltOet:l:!J:)l:!CI A~ i,v THI! elT'l''9 IN51"1!eTO!', A el:!l'tTll"leATION lll!!l"Ol'tT MUST 151:! e/JeMITTl:!D el'!' A l'tl!6I&Tl!l'tl!C> I..ANC>&eAl"I! Alltc:.HITl!eT, STATIN6 THAT THI! ~IN6 l'IIA& J:)ONI! Aec::.o!ltPIN6 Tc:> THI! l"'lltO..l!c::.T &l"l!Gll"IGATION ANC> THAT ITe 6ROWTH I& AJ:)l:!cmJAT!l..'I' l:!&TAel.let-+l!D TO l"l'tl!Vl!!NT l!fltO&ION. I". THI! eo\/l!!l't C:.lltOI" (I.I!. H.5. MIX "A" ANC>/01' H.&. MIX '15") &HALI.. Bl! Al"f"l..ll!C> AT A AATI:! ANO MANNl:!llt &Ul"l"IC:.ll!NT TO f"lltOVIC>I! 105\!o GO~I! l'IIITHIN !30 J:)A'!'6. ,---------,.,-A-S ___ B_U-IL..,.T',,..' ---------,,----""T""---,----------------,--,---,---,--; DATE ~ CITY OF CARLSBAD ~ PLANNING DEPARTMENT AREA 3.1 -PLANTING NOTES 61.113T Bl/lLOER VILLA6ES OF LA COSTA THE OAKS -S.I TITLE: RECEIVED BY: 1-----+--+------------+---+---+--+----t I A_P_PRp,.:..:.)/E;=~=--..... ,-=¢r:i...:':.....,E,J='~'41----1-11·<>7 I . PLANNING DA TE . DA TE INITIAL DA TE INITIAL ENGINEER Of WORK REVISION DESCRIPTION INSPECTOR DATE OlHER APPROVAL DA TE INITIAL OWN BY: CHKD BY; __ _ CITY APPROVAL RVWO BY: PROJECT NO. C.T 05-14 I DRAWING NO. . 44b-4L I \ I / \ I ! l"L.ANTI N5-ANP MAINTENANCE! 1.0~ 1.01 l"erl'or-m all planting "'"'° malntenanc,e ....,rk "'" lndlc,ateo "'"" 5pec,1'1ec,, c,omplete. 1.0!2 Th• Gondltlone or ;he C:.on;rac,1: "'"" bhe <Seneral Spec::IPic,atlone are a part: or thle S..c,tion. 1.09 CONTMJ., Th• eelec,tfon oP herblc::lon, appllc::at:lon ratee, ano mebhoc,e are to be perP<>r"meo uMoer the c::<>l'ltro I "'"" guloal'lc::e "' ., State oP C:.al!Pori'lla l!c::eneec, peat """t:rol a<:fvlec:,r aMd appllc,ator. 1.04 I..AeoAATOR'f ANAL'f$1S, Provide l.:,borato~ eoll• """"l!j6ill c,onrormlng to the Pollo,.ing, A. T••t1ng to be p•r,ormeo by th• eon anc, ,.lc:,nt J.abc,ratory, 41!2 So. !.~"• ear,ta Ana, c:.A "l::z,11, (i14J ffe esse. 15. eubmlt the Pollo"'l1'19 eoile eamplee t:o the lab<>rat~ at the c,ommenc,eme!'lt oP .. Ol"k, I. Native eoil, Ten repreHntat:lve eamplee oP native eoil to be land11c::aped at loc,atione•"°"'n ""ple1n11 ,..,;1, thle eymbol. t"er,orm t,,.., (2) f>o116 Teete Cit e,:ic,h lo.,.,,;tor,_ (One (I) at grouno level to 10" deep, and one (I) at ::Z4" -!:16" depthJ !2. Import eoll, One (I) r•pr•••ntattve aampl• ror ee1c,n 100 c:;ul:oic, ~roa ano/or .Ollf"U. C:.. ,.l,:ic,e eac:;h aampl• In ., &tur~ c,ont:olner, properly ldentlPleo, labelec,, Cll'ld dated. t:>. l"rovtc,e report oP reault& to the o .. ner, J.andac::ap• Arc,hitec::t, City lnepec::tor and Ni'let'<I I Con;rac,tor. I!. All teet1119 &ervic,e& &holl be polo Por by the l.anditc,ope controc::tol". ::Z.O 61!N!!RAI.. CONCIITIONS ::Z.01 All e<>aled olmen&lone Cll"e approxlmote. Cheek. one, ver1'y all elte dlmenitlon• and r..,.lve Ol'lner'" repr-•n;ctlv•'• apprc,vol prior to proeeeolng !'11th l'lork under thie &e<>l:lon. ::Z.02 Coordlnote lnal:<,llotlon oP oil plant materlala, to avoid lnterPere/'lc::e "''th other c,one;ruc,tfon. 2.0S tc:eep tlw preml••• <>leCll'I and Pree oP ex<.••• e°'ulpment, mat..-10l11, Cll'IO debrl• lnc::loenl:<,I to -k. ::Z.04 l"rotec,t "'ork "'"" l'lork. oP othere Cit oil time• In p-"ormanc,e oP l'IOrk. 2.0S C.OrePully note all r1n111h greld-bePore c::ommenc,tng ,.ork. Iller.tore ony Plnir.h gradec,hangec, ourlng eo..-.. oP thla, "'ork to original or Intended gradee. e.o ON-Sl"I'!! oeel!lllVATION 9.01 The Poli.,...lng elte vlell:a •hall be mode by Ol'lner'• repr•••ntatlv•. Th• Gol'ltr0<.torehall r•.,.u••• r•vl•"' In l'lrlt:lng In advanc:.e oP the time elt. vlelt ta ,._.,.u1rec,. Advonc::e not:IPlc,atlon Por the bele>N elt:• visit• l'hc:III be re'\ulrec, oe , .. 11 ..... , A. l"re-Job c,onrerenc::e, , delyr., City tnepec,tor to attend alee, B. P'lnol grode l"evle,., 4& houre C. ,.lant mat.rial rev,_, 4& hour"& i:;,. ,.lc:,nt la~ revtel'I, 4& houre I!. 5"11 preparation and plontlng operatlone (c,ne (I) tree !'11th eac,h type oP epec,IPled •taking ahol I be approveo prior to planl:lng treea), 4& houre P'. l"re-rnatnt.nonc,e, i d¥ IS>. l"lnal aec,epi:Cll'l<,e, , do,ja 5.02 t, Controc::tol" re ... ueew. o elt. vl< one, the r.lte 111 not ,ouno to be In Cll'I ""c:;eptaole c,c,noltlon to hold the revl-, !:ha hourly '••• oP the pereonnel c,allec, ror l:h• &It. vlalt ehall be paid bo:j the C<>l'ltrat.tol" ond eholl be deduc::t:ad ,rom hla t.ontr""t prlc::e. e.oe No elte vlalt& l'hc:III c::ommenc,e "'ithout c,ii lteme not:ed In prevloua obaervat:ton .-.port• either c,omplet:ad or remedied uni••• 61/c::h eompli..,.,. hc:111 been .. olvec, by the o .. ner. 51te vlelta thot are ac,heduled, but the Contra,:;...,. hoe Polleo to ,:ic,c,ompllr.h punc,hll•t: l:ot&k.a or prepore "'"•°'uat.ly ,or deetred 1nepec,tfone, eholl make the Gontrat.tor reeponelble ror relmlouralng the l."'"cle<:.ape Arc,htt•..t at: hie c,urrent hourly billing rate pw• t:ran"'Portc,tfon eoata. No ,urth•r fnepec,tlone shall beec,h•dulec,untll thi& c::harge hoe been paid and rec,elved by 1.anc:lec,ap• Arc,hlt.c,t. 4.0 MATl!fltlAJ.5 4.01 cll!Nl!RAJ., l"rc,vlde mat.rlole oP ~t o.uolit~ obtainable, "'hic,h c,omply et:rJc,tly "''th or.,..l119• and epec,1'1c,at:1one. 4.02 5TATl!!M!!NTe OP' CONl"l!II.MATION, Sulomlt ot time oP dellv•~ lnvolee et:.,t•ment& <>erttPylng °'uantltt•• by bulk. ond/c,r "'•lght:, Por all orgontc, amenoment& and Pertlllzere. Silomtt ""PPll•re' .,.rt,r1c,at.• oP c,ompil"'""" "'lih the .. epec,!Plc,otlone. ~dom aampl-may be 1:<,un by c,...,•r'• r•pr•••nt:otlve ror """' l!je le. 4.0S otlt6ANle ~T, t:>erlv•d Prom "'°"" or !:>ark., gronulc:11" In nature, etablllzed .. 1th nitrogen and ,..,.tlfled .. ,th mlnerale, and having the ro110 .. 1ng pr-opertlaa, . A. Orgon1c, C<>l'lt.nt, Minimum "10 ~ weight. 15. ,.Ol"tlc,le 51ze, Minimum "I~ pcu.e1ng 4 meeh ec:reen Minimum ~ poa•l"S e, mellh K-r..,n. C. Nltrogan eont.nt, O.lillll bae•o on dry _,ght ror red"'°"d aa..ctuet. o.,,r, boeed on ory ,..,ght for ,,r &ONduet. I .Olll i:>c=Hd on ory ... tght ror PII" or pine bork.. NOT!!, ,.,ne -..duet le not ,:ic,c:;eptable. t:>. Mlnerollzec,, O.llll total Ir-on. I!. 5<:lllnit\f, Maximum c::onduc,tlvlty 5.5 mm/em at !2!S degr••• e. 4.(),4 P'l!ltTIJ.1.:Z:l!flt ANt:> MINl!fltAl.5, A. P'errle ..,t,ate, P'e::Z (504) e minimum 20lli P'e, "'" met:olllc,. e. &ypeum, Cellc:lum eu!Pote, eA S04 +-1:20, ::ZO!li eA 16$ c,omt:>tneo •uttur. C. 5"11 aulfur, Minimum "15lll element:ol eulPur. P. Commer<.i<:11 P'ertlllzer, Ammonium aulPate 21-0-0 Ammonium nltrote !l,4,-0-0Ammonklm phor.phat. 16-20-0 6-20-20 Beet Co., or e°'uol, Por eoil preparotlon 1::Z-1::Z-l::Z Beat Co., or e°'u<:11, Por eoil preparatl<>l'I 16-6-& Ber.t co., or • .,.ual, ,..,. matntenanc:.e I!. AgrlPorm ::Z0-10-5 (::ZI g..om) planting l:abletr.. P'. """"-'"""'•r l"lue, 5,9,1, 50% humue, :2$ &011 penetrant 1'"1-1 4.lil -4.i. NOT!!, ACilJAJ. AMl!!NPMl!NTe TO Bl! t:>l!TEl'MIMl!!t:> B'f SOil.& N:!FcAr.'I" OBTAINl!r:> l"e!lt lll!C,TION 1.04 ABOVI!. 4.0!5 r'l.ANT MATl!lll.lAJ.5, Gluantlty and elz:e or plc,nte o& atate.. on the ,.lone and l"lont I.let. No root bound matertc=Ta 0110 ... d. l"ICll'lt& eholl t:>e Pre•h and vtgoroue, or normal 9"0 .. th, ond Pr-ee oP dl6eaeee, l'leede, harmPul lneec::te, or their" lneec,t egge ond ICll"V.:,e. A. F'lante ehall c,omply ,.,;1, C.Ollfori'lia &tot. C)aportment oP Agrk:ulture'• regulation ror nu,...ry ll'lllpeetlone, rule&, ond rating•. All planta 5hclll hova o n<>r"mal habit or gr""'bh ond 11hall be •ound, Fiealthy, vlgoroue, and Pr•• 0, lneec,t lnP•etatlone, plant: dieea•-• eunec,alde, rreah <11:>rael<>l'le oP the bar-I<., exeeeelve oloraelona, or other obJec,tl<>l'labl• dlaPlguremente. Tr-•• trunke e.holl be eturdy ond ... 11 hardened. All plant• ehall have normally "'•11-developec, loranc,h eye...,,. """ vtgoroua and Plbroue r-oot eyet.m•. l"t,•re <.ontalner-gro .. n plane c,re Prom Hveral eourc,ea, the root. o, not ,.,..,. thon t...o (::Z) plont• oP eaeh epec,I•• or vc:rtet:y Prom a,:ic,h r.ourc,e 1'1111 be lnepec,te... In""'•• the somple plant& are Pounc, to be dePec,tlve, the 1-andec,ape Ar<:.hit.c,t re•erv•• the right to re Jec,t the entire lot or lot& .,, plont& l"epr-nted by dere<.;lve •amplee. Th• J.andec,ape Ar"c::hit:ec::t le the eole Judge oe tc, ,:ic,c:•ptc:ol:>lllty. Any plontr. rendered um,ultabl• ,or plCll'l"ng t:,ec,CIU&e oP thle tn•p•c.tlon 1'1111 be c:onaldel"ed "'" eampl•• anc, ,.,11 loe provided at the C<>l'larac:.tor-'e expen••· e. The minimum c:,c,c,eptable &lze Por all ehruloe, meaeurec, bePore pruning "''th th• bronc::hee In normal poeltlon, ehall c,c,nPorm to the mea61/rem11tnl:a utiltzed by Htnee Nureery. l"lonte larger In etze thon epec:.1'1eo moy be ur.•o "''th the approve=! oP the l.Cll'lo&c::ap• Arc,hftec,t, but the ur.• oP larger plont& 1'1111 c,au&e no c,hange In c,c,ntroc,t prlc,11>. All tree •I:cee &hall c,c,nPorm to the minimum •lz•• lnolc::at.d per "'P•c,IPiec, c,ont:o1n..-el%e ar. <.ontolneo In the Valleyc,rnt Tr•• eompany c,at:Cllog. C. F'lante ,.111 be eubJ•<.t l:o revl•"' ror "'""•ptanc,e or r•J•c:tlon at: plac,e oP gro .. t:h on/or on proJec,t elte at any time beror-e or dur-tng progren or ,.ork., Por •lze, variety, c::onditton, lotent dal'ec,te, anc:I lnJurtee. 111.emove r•J•c::t.d planta rrom <e lmmeolotely "'"" repi,:ic,e "'Ith ,:ic,c:;eptable plonte. P. At no time ehall tr-• or plant rnot.l"lale t:,e pruneo, trimmed or topped prior to dellvery; any ., ltematlon oP they •hap• be c,c,ndu.:ted only "'Ith the approval oP Cine, In the preeenc::e oP the 1-and&c::ape. · I!. l"rote<.t e1II plant. Prom oamaglng eun ano l'llnd. Pamage may be c,auee ror r•J•c::tlon even a'bel" Initial ,:ic,c:;ept:onc::e. P'. louioetltutea are not permltteo uni••• epec,i,tc,olty approved In "'rlttng. 4.0f> Ol!l!t:> MIXl5, A. Ell!l!t:>, A& 11pec:;1'1ec,, dellverec:I to the Jot> elte, unmixed In separate ••aled c,ontalnere. l!oc,h c,ont:otnel" muet bear the •••d r.uppller-'e lobele lndfc,atlng the c,ontalner l'letght, ••.., type, eeed purity, Cll'IO germination p..-c,entag..111. All c,ontalnere ehall t:,e labeleo ac:;c,orolng to •ta!:• ond Pec,eral •••d 10 .. e. 5ompl•• may be taken Por beating t:o eneure that !:he •••d epec,IPic::atlon• hove been m•I:. 4.0i 'TUR,. ANt:> CSRAeeee · A. Hydraulic, S.ec,fng I. e_.,, l"rer.h, c,ieon, "'°"' c,rop r.eec,, premixed by euppller. "fl'k:lrren'e I.C1nd11c::op•r• Mix P'eec,ue Slend" -Mix Cldventure, muetard, ond arid Per.c::uee ,.hic,h are 10°"6 pure ond have ., germ1not1on rat. oP "IM. ::z. l>'looo c,elluloee r1ber, P'lret quollty c::ommerc::lol graoe. !5. &oil etc:11:>lllz..-, l!c,ology contr.,le M-etnct..-. Spread ot o rate "' eio Iba. ,.er on• (I) ""re. 4. P'ertlllzer, 1i-1e-s urea Pormalo•¥• Plr11t '\uallty c,omm..-c,tal grade. !5. t:>ellver to the Arc,hltec::t., t:>ealer'a guo.-anteeo e\atement 0, c,ompoeltlon ond perc,ent oP purity oP Ned mix lo\! dealer. 4.0& 5TAl<IN6 ANP 61N'IN6 MAtl!f'tlAJ.5, A. TIQ!I! 5TAl<l!:S, 2" diameter x 10' long, I (one) piec,e eounc:I treated pine e1nc, unlPol"m alze, polnte.. of: one enc,. 5tCll<.e e1• o•l:all•d. S. Tl!!&, ~bber, vinyl 'C:.lnc,f'I-Tle' ae manuP.,.,l•ired by V.1.T. 4.0CI 111,00T 15AMll!flt, 1510-l5A!ll.!ll.ll!flt 15 6al. Tr••• -t..o (2) ,.,th rour (4) pan•I• re ... u1red ::Z4" 1'ox tr-• -t"'° (2) l'llth Plve (5) panel• ,. • .,.ulreo ef>" Box k••• -t..o (2) ,.,th Hven ("1) panel• re.,.ulred 4&" Box tr•-ond larger -per manuPoc,turer'e rec,ommenoat:lone 4.10 MUl.eH, A. Pouble 6.-lnc, All 15ork by etue 111.ll:lbon J.ande<.ap• Supp lie• (il4) 6!55-!:16b6, or approved e°'uol. Submit eomp I• to City lnepec::t:or ror opproval prior to Jot:> r.tte oellvery. S. Mulc:;h oepth to be ot leaat 5" uni ... noted obherl'llee on Pral'llnge. 5.0 INeTAJ.J.ATION t"MCl!l:IIJRI!& 5.01 l"INI! 6~1N5-/eoll. ~AAATION A. dH!NI!~, t,c, not ,.ort<, eoil "'hen the moisture c,c,nt.nt 16 ,.., greot that exc::eaelve c,c,mpoc,ttc,n ,.,11 oc:;c,ur, nor ,.hen It Is 110 "~ ;hat ouet "'" rorm or that c,iooa 1'1111 not breok readily. Apply "'"'t.r IP nec,eeaary to provide Ideal rno111ture c::ontent Por tilling and plan,1ng. ,..r,orm Pine grc:101ng 11'1 euc,h o ""'Y o• to ont1c::1pote the Plnl&h grelde aPt.l" the lnetol latlon oP eoll t.ondltlonera. l'lemc,ve or redlatrlbul:e axe::••• 6011 berore oppltc,otlon oP 6011 omendmant&. Molntoln oil ,i.,,.. llnee, oralnog• 11 .. e11.,., and pattern• or. eho"'" on the prac,Jee grading pion provided by the proJ-t <.!vii engineer. S. Obtc,fn c::ert1P1c,atlon Prom proJec,t c,ivll engln-r that: Pinal grad•• to 1/10 Poot hove been eetobliehed pl"lor to c,c,mmenc,lng landac::aplng operotlon11. l"rovlde Por lnc,orporatlon oP all amendmenta, eettllng, etc,. Se reepon11lble Por ehaplng all planting ar-eae ""' lnc,fc,atec, on t:>rc=Nlnge. C. Th• lrrlgmlon eyatem ehall be Pully operational, l"evi. ... .,, one, approved by land•c::op• arc::hltec,t ond c,ity lnepec,tor prior-to plonttng. r:,. Rl,.,.lt,15., Ill.Ip eoll In non-elope areae I••• than 4,1 In tl'lo (2) oppoalng c,frec,tlon• to o mlnlmem depth oP 6 ,.,..h•• to r-•ll•v• <.ompoc,tton. e. P'INleH, 6rade all planting c,reae to e1110 .. Por 6011 am•ndmente anc, mulc,h a• epec,!Pleo. fl'lhere no gr®•• ar-e ehol'ln, 9"ade bet"'••n ex1atl"9 or Plx•o c,ontrole (euc,n ae .. e111<.&, c,urbe, c,atc,h baalne) ano elevat1on11 eho,.n to provide a emooth "'"" c::ontll'!Ual plane. fltok.e "'"" level ae nec,eee.ary to obtain true ond even eur,.,., __ Ma1nt:.,1n oil •"'ole• on l!nglneer'e plan and grade to droln. P'. l'lemove and diapOH oP roc,k.& over S-inc:;h dlomet.l", c::on11truc::t1on delorie, ,._.,,., •""· "'lthln bhe limit& oP the proJec,t prior to opptytng eoll amendment&. 5.02 5011. l"!ll.l!F'AAATION A. CRUANTITll!e, Uniformly opply to eoc,h l,000 '"'ore Peet "' plontlng c:reo, NOT!!, Tt-11! P'OJ.I..Oi"!IN6 AMl!Nt:>Ml!NTe A~ ~ e1i::,i::,1t,15. ~ ON!..,,, AeilJAJ. CRUANTITII!& ANP MIXl!e eHAJ.1-151! Pl!: /IS'(f.,,Nl!t:> IN Ac;c;Olltt,ANCI! i"!ITH SOIL.5 ~ORT OBTAINl!t:> l"l!l'1t ITEM 1.04 ABOVI!. Nll:rogen-r.tat:>111:ceo organic: amendment, 6 C'f Ammonium phor.phate 6/20/20, 15 u, Agrtc,ultural gpum, 100 I.S ec,11 IIUIPur, 2CI" U, 6ro-,.o .. er "lu11, 160 I.S Iron eulPat., 6 I.S e. t:>ISTRIElUTION, Pl•trlbute the organic, omenoment ond r..-tiltzer c,ver tlw plontlng are to o ,nt,orm ::Z '"""••· e.c::ure c,pproval Prom ""'"•r'e repl"eeentatlve prior to "'°rk.lng amendment. Appl"ovai .. 111 not be given IP thta proc,edure le not ueed. C. CUI. TIVATION, fl'b-1<. Into eoll ~ c,ultlvatlon, 11peldlng or rototllllng to a depth or ot lecu.t 6 tnc::hee. P'lnlah grodee to emooth Plnleh belol'I adjac::ent paving ond c,urba. Remove all debrle and "'••d& ,rom ette. P. BAc;t<l"ll-1. MIX, etoc,1<.plle a euP'1<.lent '\Uanttty oP opproved eoll Pound on <e, Pree .,, ,.....,,. ond debris, Por mixing as bac::k.PIII mot.rial&. Supplement =-•It. eoll ..1th appr-ovad Import eoll, or. ,. • .,.ulred. Mix amount,.,,. 10 c::ublc:: yord& aa folio"'"' 6 c,uble yc:ll"o& on-11lte eoll 4 c::ubl<. yards e>l"gon1c, omendment ::ZO pounoe Perrtc, eulPata ::ZO pounde ammonium phot1phate l&o pound• '6ro-l"o"'•r t"lua' U.e .:.ore not to el:aln ec,nc,rete !'11th Perri<: eulPate. Clee1nlng oP etatned c:.onc,l"ete I• r-eapon11lbtlltt, of Contr,:ic,l:or. 5.o& l'leet:> AeATEMENT, Upon !:he c,ompletlon oP the 1rr1got10n eyet.m and c=Pter all exletlng weed& ond 9"""'th have been removed Prom ;he p lontl"9 are.:,, p•rlorm the Pollo,.lng "'••d Clbatement program. i"!Clt.r all or•a• Pour (4) timer. '""IIY ror t .... nty-one (::ZI) c::oneec::utlve day• anc, until -•d -•d• hove germlnot.d. c • .,.. "'"'terlng Por three (!5) dc,ye. Apply o non-eelec,tfve h•rblc:lde (Round-Up) per- monuPo.:.turer'• rec,ommendat:lone to ereldlc,ate the germlnot.o .... ., •. Alto .. h11trblc,lde to kill oil ,.eede. fltok.e or hoe oPr all deeld .....,. to a depth oP ? lnc,h belo,. the r.url,:ic,e oP the &oil. IP pel"ennlol "'-d• or gra•••• etlll exlet, re .. ater- rour (4) l:lmer. dolly Por Pourt.en (14) c::oneec::utlve doy• until ne,. gr-o"';t,, appeare. l'leapply a herblc:;lc,e "'Ith a dye lndfc,at:or. l'lemc,v• .... eta oPter nerblc:lde hos hod 61/PPlc::lent time to k.11 I. 5.04 r'J.ANTIN5- A. l"Rl!l"'LANT Al"'l'"!II.OV AJ.S, Obtain approval oP plant foc,atlone,, plontlng ho lee, pre-mixed bac::k.PIII, °"" plant&. I. Tr-eee ond ahrub• ehall not be plant.o untll c,onetrvc,tlon l'IOrk In ;he areo ha• been c,ompleted, r1nc,I grodee and ... olea eatat:>llehed, .... ., obatement pr-ovldeo, and the plonttng oreoa properly grooed ond prepc:ll"ec,. ::Z. &take plant lo.:otlone or plac,e approvec, q,uant:ltlaa oP plant• In c::ontc:11ner11 on loc::otlone. Sec::ur• approval bePore exc,ovotlng pita, me1klng nec,eual"\,I adJuatmentr. ae dlrec,ted. e. et«Ue/Tlltl!I! t"L.ANTIN6, I. l!xc::avol:e pite "'Ith &c::Or"IPled vertlc::ol eldee ond bottom, no r.mailel" than the Pollol'llng e1z .. ,CRuonttty, o) I g.:,llon plonta -ti" deep, 12" In dlometer. Pepth .,, rootball ond t"'° (::z) time• .. , .. th. t:,) 5 gallon plCll'lt& -12' deep, ::Z4" In olamet.r. t:>epth c,f rootboll and t..o (::Z) tlmee .. , .. th. c,) ii, gallon plant• -lti' deep, !!O" In diameter. t:>epth oP rootboll and tl'lo (::z) tlm•• .. , .. th. c,) Eloxeo ;r--Pepth oP rooi,t:,c,11 and t"'° (2) !:Im•• wlotn. ::Z. No treer. shall be plonted within 2' of a pavec, eurPac,e (I.e., c,c,nc,r-et• paving, c,urt:>, !'loll) unleu epec,fflc,ally lnd1"<::lt.d on pion• and only .. 1th the epec,lfieo root barl"ler. !5. C:,.,ntolner plant& eholl l::>e i:>ac,kPilled ,.,th amend11td eoil per eoile report rec,ommendotlone. · 4. l"art:lolly rePIII hole to o lwlght tho; l'lhen Cl plont le plac,ec, the c,ro"'n le ellghtly above the r1nteh gl"ade. U.e. Prlable unamended l!IOII Por oll boxeo tr•••• epec::IPled boc::kPIII mix ror oil other c,c,ntalner plonte and tomp to c::ompoc::t. 5. t:>epoelt 6ro-l"o .... r planting tabl•• per manuP,:ic,turer'• rec:ommendottone In pl"'"t pit•. 6. P'orm •hallo"' bor.in c:round eoge of rootbc:111 by depl"ee11ng e,oll •lightly belo"' Plntahed gr®•· P'orm baeln rime. Keep bor.ln "'!thin outer edger. oP l"OOtboll. i. lndlVlduatly hCll'ld "'oter eaeh plant to eoturote l"Ootball ano adJc=c::ent eoll lmmedlat.ly aPt.r ple1nt1ng. &. AdjUllt Por eettleme!'lt ond grod• oreor. c:round plonl:a to Pinleh grodee ond diapo•• oP exc::eu eotl. 'I. lnetall "Arbor 6uaroe' on all tr••• In tur, aree1e. 10. l'lemove n11r11•.-y et:ok.ee one, guy or etake tr-• deelgneltec, "'Ith etCll<.e or e.t:oke• on .. 1nct..ol"o eloe or l:t'•• oe detolled. C. eet"AJ.ll!R F'J.ANTIN5-, l'lemove ••poller etCll<.e •upport at tlma oP plonttng "'lthout damc=ge to plant and troln ••poller to the aoJ,:ic,•nt "'"''' or •uppor• cu. det:.,iled. P. ~ INeTAJ.J.ATION, !"Ian!: grounc,c,c,vere In all deelgnated areae. I. t"lont rootec, c,utttnge "'"" dlvlelone ,rom Plate Into molet eoll and In neat, etralght: ro,.e at •p•c,IPl•d Interval•. ::Z. Smooth eoil obout plants ond leave areae In neot aMd clean c,ondltlon. ~taln alight depr-alon around eac,h plant. t:>o not bury the c,ro,.n oP th• plC1nt. 9. Hc,nd "'Clt•r groundc,ov•r plant. at leoet t..Jc,• ., ,._k, =re,ully anc, Individually ,.,th elo,. """ etream oP .. at:.r, to eneur• that. r.oll Ir. eet:l:l•d around root., but being c,c:rePvl not: to ""'•h aoil oPP oP plontr.. Not more thc,n ona-l'lc=IP hour l'hc:III elopr.• Prom the tlm• any 9"e>undc,c,ver I• plant•d until It le -••rec,. P'orm a he11P c,up-111<.e c=rrong•m•nt Por all plant. "" elop••· t:>o not alio"' plant• to d~ oul; bePore ,.hlle being planted. 4. Appl~ preemergent herblc::lde IW!II.P'L.AN-i5 per monuP,:ic,turer'e rec,ommendatlon• to groundc,over ar-onl~, c,f't:er oll plontlng floe been c,c,mpletec,. P'ollo" mC1nur0<.turar'e lnetruc,tlone. The .. ork. ahall t:,e under the olrac::t.lon oP a regl•••'"•" peat c::ontrol adviaor. t!. M'fl::'~t:>l!P 6"'0I./Ni:;,c;ovl:R I. Arter eoll preparation, er.t:ot:>llr.hment 0, Pinal grodee and "'••d """trol, the eurPac,e i.l'lo (::Z) tnc,hee, oP eoll eholl t:,e loc,r,_., by horr""' or roto,11 ler Cll'IO Ploat.d lev• I ond ll"r~o Juet prior to p I anting. 2. t"reparat:lon, The r.Turry preparmlon ehall take pl,:ic,e ot the alt• oP ,..,,.t,; ond ehall begin ~ adding l'!Clter to the ;cnk ,.hen the engine le at: half-throttle. "'1hen the l'IOt.r level hoe reoc:;hec, the height oP t.he agitator ehc=Pt, good rec,lrc::ulatlon eholl be -1:obll11hec, and ot th111 time the •-d ond c,hemtc::ol act..1t1ve ehall be Cldded. P'•rl:lllzer eholl bhen be c,dded rollo,...o by "'""d pulp mulc::h. The "'ooo pulp mvl.:h ehall only be added to the mixture oPter the tank la ot laoet: one-thtl"d PIiied .. 1th "'""'•r. The engine l:hrottl• o,hall t:,e c,penec, to Pull epeec, ,.t,en the tank. la holP-Pllled ,.,th "'e1t.r. All the "'°od pvlp mulc,h ehall be Cldoeo by the time !:he ,.,,.,k 1111 ""'o-thlr"oe. to three-fourt:he Pull. Spraying eholl c,ommenc,e '1v• (5) minute• aPt.r Clddltlon oP the c,hemlc::ol additive ~en the tonk. le rutl. Appllc::otlon rota, !"tb'er 1,500 lloe. per ,:ic,re hed, hydroeeed mix 'A' IOlioe/c,c,r•. 6ro-F'o..er t"lue 1,100 b. per "'"'•· 6ro-f".,...... ~ontrolled ~lee=•• (1!2-&-&) ::zoo Iba. p•r ,:ic,r• '"Note, l"or-ec:,11-prepp•d arec,a, apply 900 Iba. 6ro-"o"'•r HI- Nitrogen (14-4-'I) per ,:ic,re In the elurry only. NOTE: THE FOLLOWING AMENDMENTS ARE FOR SIDOING PURPOSES ONLY. ACTUAL AMENDMENT QUANTITIES ANO MIXES SHALL BE DETERMINED IN ACCORDANCE WITH THE BOILS REPORT OBTAINED PER ITEM 6.02 ABOVE. 51. Applic,atfon, The opereltor ehall •pray th• .,,. • ., ,.,th a uniform vlalble c::oat by uelng bhe green c,olor oP the "'ood pulp cu, a guide. Th• elurry 1>holl be applleo In ., •-•ping motion, In an al"c,hed e,;ream "" oe to Pall like roln, olio"'l"9 bh• .. ood Plbere materlol to epread at: the re.,.vlr-ed rate per oc,re. P'. I.All'IN/6"'""'59 f"I.ANTIN6 I. Hydroe.eeo i....... lnel:alleltlon o) Arter 111011 preparation, ••tabllehment oP final grader. and weed c,ontrol, th• eurPac,e tl'lo (::z) lnc,hee or aoll llhall be looaenec, by hc:ll"ro"' or l"e>totiller and Ploof:..:! level and Irrigated Juet prior to plantl"9. b) l"reporotl<>l'I, The elurry preparation r.holl tak.e pl=• at bhe elte oP "'"rk and e.holl begin by adolng !'later" to !:he tCll'lk ~•n the engine 1111 at hair-throttle. l't,en the "'otel" level hoe re.,.,hed the height or the ogttotol" ehaPt, good rec,trc,ufotton eholl be ••tabliehed and at thle time tlw eeed ond c::hemt<:.ol Clddltlve 6hall be odded. l"ertilizer ehall then be aoded Pollo"'•d bo:j "'""d pulp mulc:;h. Th• .. ood pulp mulc,h eholl only be adc,ec, to the mixture arter the t:Cll'lk ie c,t leoet one-thll"d PIiied ,.,th .. ot:.r. Th• engine throttl• ehall be opened to Pull •p••d M•n the tank I• holP-fllled ,.,th .. ot.l". All l:lw "'ood pulp mulc,h ehall be odded bo:j bhe time the t:onk le t...o-thir-d& to thre•-Pourthe Pull. Spraying &hall c,ommenc,e Plve (!5) minute• arter c,c,dftlon oP the c,hamleal oodlt.lve ,.t,en th• tank I• Pull. Appllc::Cltion rote, l"lber 1,500 Iba. per ac:r• Seeo 49e Iba. p•r ,:ic,re (I lb. per 100 e.P J ctro-t"o"'er l"lur. 1,100 1"6. per ac,re .,,..,_p.,....,. Controlled l'leleCIN (l::Z-&-e) ::zoo Iba. per= ... •Note, P'or eoli-pl"epped area•, apply !500 lloe . .,,.o- F'e>l'ler HI-Nitrogen (14-4-"I) per ,:ic,re In the elurry only. c,) Appllc::otlon, The operator •hall apray ;he area l'llth a un!Porm vlelble c,oat by uelng the green c,c,ic,r oP the wood pulp oe o guide. The elur~ sholl be opplleo In o -•eplng motion, 111 on c:11"<.hed ewom eo oe to rail ltke l"aln, oll.,...tng the "'ood '1bere material to epread at the re'\ulred rate p•r ac,re. 2. t"ROTeCTION, l"rotec::t oil turP areoe agotnet damaga, lnc::luding eroelon and treepaee. l"rovloe ~tever-P,:ic,llitlee and eoPegue1rd& are ne<.e11kl!'"y to ,:ic,c,omplleh thle. TCll<.e epec:.lal c,are to prevent eror,fon. All '""""'9•• 5hclll be the Gontro<.tor's r•"'Ponetbllii:y during the IIPe oP !:he eon;rac:.t:. 6. 6UAAANTl!I! ANt:> R1!1"LACl!Ml!NT, I. ehri,t,e and groundeover, 6uarontee until end oP matntenonc::e period and ac:;c,ept:Clnc,e. ~plac::e any plCll'lte that die or lo•• Por-m ond elze a• orlglnolly r.pec,IPleo even though bhey have token root and or• 9"0l'ling aPtel" the olebac,lr. or loee oP rorm or elze. ::Z. Tre••• 6ue1rant:.• all k••• In "'rltlng to five In ., healthy c::onoltlon Por one (I) year c=Pter malntenonc,e period expire• ond pro_Jec,t ie oc:;c,epteo by O"'n•r. -.pfoc,e deeld or unh•althy tr••• Immediately. t:>et.rmlnatlon or ;t,,• neeo Por r•pf,:ic,•ment •hall be p•r-\h• Ol'<ner'e r•preuntat.lv•. All r•pl,:ic,•ment&, lnc::ludl"9 p !anting, et:Cll<.tng, tr .. 1n1ng, etc::., 11holl be "'" orlglnally epec,IPled, i'ilthout <.oat to tlw O"'"er. H. CL.l!AIU" I. Art.,. all plc:,m,lng op•ratlone ar• c:;omplete, r•mov• all troeh, •-•• aoil, empty plant c,ontc,lnere, and rubbleh Prom the property. l'lepair ,.....,.., rut:e, or other mark.& In the grounc, <.aueed by t:hl• l'!ork and leav• the ground In a n•at and oroerly <.ondltlon. ::z. I.eave the •It• In broom-c,lean c,ondltlon, "'"" l'IOt!lh do"'n all areo• ... 1t:htn ;he pr-oJec::t •Ite. J.eov• .... 11<.e In c,leon and ..,,. <>on.:Otlon. 6.0 MAINTl!NANCI! A. Th• eontr0<.tor ehall c,ont:lnuouely me1tnt:Clin loncle<:.ape ond Irrigation In <:111 area• lnv.,lved In thle eontrac::t our1ng th• progr••• oP the "'"rk and during the malntenO/'lc::e period until Plnol c,c:,c:;ept:Cll'l<.e oP the "'°rk by the 1-ondec,ape Arc,hltec,t and the o ... ner. lffl'roper malnt.enanc,e or por.r.lble poor c,onolt:lon oP ony planting of: the termlne1tton oP th• ec,heduleo mall'ltenonc,e pel"iod rnoy c,aur.e poetponement oP the Pln<:11 .:ompletlon dClt.e oP the C<>l'ltroc::t. Malnt.nanc::e ehal I be c,ontlnued by the eontrac::tor until all .. ork le ac,c,eptable. In order to c,arry out: the plant malnt.enanc,e .. ork, the Contr,:ic,t:or ehall Puri'lieh euPric,fent men Cll'lo ade.,.uelte e°'ulpment to per,orm the l'IOl"k during t.he rnolnt.nanc,e perioo. Malntenan<.e perloo &hol I not r.t:ort until all element. oP c::onetruc::tlon, plontlng, and Irrigation Por t:he entire pl"ojec::t ore In ,:ic,c:;ordonc::e with t:>ra"'tnga and Spec::IPlc::otlona ond ac,c:;eptec, by the o .. nel". The Contro<.t eholl re'\veet Cll'I lnepe<.tlon to begin the malntenanc,e perloo aPter-all plantlng and r-elotec, "'°'"k ho& been completed. l"rior to the dote oP '1nal lnep•c,tJon, the C:,.,ntre1c,t.or aholl ""°'ulre rrom the 1-andec,ap• Arc,hft.c:;t approveo reproduell:>le prlnte and Pinal I~ rec:;ord Prom the Jot> rec:;ord ut al I c::hang•• moo• ourlng c,onatruc,t:ion, lc=bel ..,.,,a pl"inte "Rec:;orc, t:>ral'llnga," and deliver to th• L.andr.c:;ap• Arc,hftec,t. l"riol" to the delte oP Plnal lnepec,tlon, the Contr,:ic,tor l'hc:III oellver to the 1-ondec,ope Arc,hfi:ec:;t the "J.and•<.op• ond Irrigation 6uaranl:••" 0111 re ... ulred. B. """•" the Cc,n;rac,tor hae c,c,mpl•t.d oll the landec,ope one, lrrl~tlon "'°'k, he r.hall ra.,.ueet lnep•c,ti<>l'I by th• 0...n•r ond Arc,hit:eet. A "punc,h liet:' ... 111 be d•v•loped Pr-om thle lnepec,tlon. Molnt.nanc,a period ("10 daye) ... 111 not begin untll all punc,h Ile!; Item& are c,omplet. e1nd 0<.eepted by O"'"•r anc:I Arc::hit.c,t. Irrigation malntenanc::e la inc,luc:led In the doove. I. et:reet gutter• and c,ur"6 Ol"e to be lnc::ludec, In the debrl11/elltat1on removal progr-am. ::Z. "'1a1nt:.,1n ode°'uat. prot•c,tJon Por people anc, property and be r1nanc::1ally re•ponalble Por damog•• and lnJurl••· lllepair damage• al: no adoltlonal =•• to the O...ner. c:.. t"J.ANTINdo ARl!A, I. f/'leec, and c,ultlvote all areae of: 1nt.rvale oP not mor• ;hon I:•" (IO) do!je. ::Z. l"•rror-m .. ot.rlng, Pertillzlng, epl"oytng, ond peat c::ontrol oe deemed nec,eeeary ~ •pec,JPfc, elt. c,ondltlone. i::,. t..Ai"!N A!ll.l!A, I. t5egln mc,fnt.nanc::e tmmec,Jotely orter •""h portion oP turP la planted. eont1nue Por at leo•t: '10 doye c=Pt:er c::ompletlon oP oil turP .. ork "'"" cu. muc,h longer, prior to c,c,mpletlon oP proJec,t, anc, "'""•p;cnc,e by the O"'"er cu. neo:e•eory to -1:at:>ll•h a.:c,eptat:>le turP. ::Z. Maintain l.....ne to "'Cit.ring, ,ertlilzlng, "••ding, rno"'l1'19, trimming, ano c,ther" operotlon• euc::h a• rolling, regl"odlng, Cll'lo l"eplontlng "" requlrec, to eetablieh ., •moobh, ac,c,eptaole la,.n ,ree or erooed or bare areae. Gomplet. Plrr.t c,utttng ae c,frec,teo by 1-and&c,ape Al"c,hltec,t. e. lnspec,t lal'ln areae bet: .. een t:h• 15th ond :20th daye .,, malnt.nonc::e period and reopply 1-,, mat..-10l(matc::h 1n1t1e11 appllc,ai:l<>!'I) to oll bare areoe lorger than 6" x 611. l!.l'"RUNIN6, I. Uno..-no c:;trc,ume,tanc::e& .. 111 &tripping of lo,..r branc,hee on young ti"•-be permitted. 1.o .. ..-branc::hee ehall be retained ln o "tlpped-boc,lr." Or" pinc::lwd c::ondltlon "''th ae muc,h Pollag• oe poaeible to promote eoliper trunk gro .. th (tapered trunk.) 1-"""•r branc::h•• may be <.ut: Pluah "'Ith l:h• t:runk. <>l'll!j aPter the tr•• I& obi• to et:and ere£t "'lti'lout: el:<,ktng or other" euppol"t. ::Z. l!vergreen tr••• 11hall be thtnnec, and •hoped "'hen neo:••""""Y to pr•vent "''nd and 111:orm '""mage. The primary pruning or dec,lduoue tr•-11holl be done dul"ing the dormant ••=n. t:>amaged tr••• or thOH NI: c::onetltute health or ec=Pet:y hazarde ahall be pruned ot ClnY time oP the Y9CII" cu. re'\ulred. "· 5TAl<IN5-ANP 61N'IN5-, Stoke• and guye r,l,all be lnep•c,t.c, to prevent gll"ollng or trunk.& or loranc,hee "'"" to prevent rulol:>lng that c::au•-bar-k "'"unde. 6. l"fe!t:) CONTROi., l<eep b<aln• and area• bet...een plant•,,._ oP ... .ctr.. U.. rec,ommendeo and l•gally approvec, herl::>lc,fc,er.. Avoid Prea_uent 11011 c,ultlvof:lon thot de11tre>!je ehe1ilol'I roote. I.hie mul<.hee to help prev•nt -•d •••d germination. All herbtc,fdee ehall only be opplieo ~ ., lic,enaed applic,at:cr. H. INel!CT ANP Pl51!A51! c;oNTROJ., Maintain o reoeonable c,ontrol .. 1th opproved melt.rial• ond applied by ltc::eneed appli<.c:1...,.11>. I. l"l!fltTII.IZATION, I. P'ertlllze all plonttng area• "''th the Pollo,.lng, At 90-day lntervala, apply 6 lloe/1,000 e.P. 16-6-& c,ommerc,tal Pertillzer ..,. cu. l"equtreo lo\! bhe eolle l"eport. J. ~I.Aei!Ml!NT OP' TRl!l!S.re+-IRUee, l'leplac,e dead, dying, anc, mle11lng tree• l'llth like 111:ce, c,ondltlon, and variety "'""•pl:Clble to bhe o .. ner at the Contrac,1:ol"'r. expenH. I<. fllll!F'J.ACl!Ml!NT OP' t..Al"!N, llleploc::e domageo or deod lo"'" areoe l'lith aod. I.. l!ll.!ll.16ATION S'fe'T'l!M, I. Syetem lnepec,tf<>l'I, eontr,:ic,tor &hall c,hec::k all eyet.me Por proper operation. l.atel"ol llnea ehall l::>e Pfuehec, out c=Pt.r-l"ernovlng the loet aprlnk.ler head or t...o at •=h •no oP the lot.rol. All heade c:re to be ooJur.t.d ... nec,eeo,ary for unlmp•d•d c,overag• ano to pravent overeproy onto bullol"99, l'llnoo,.e, "'"" pavement.. ::z. c:.onrollere, Set and program automatic: c::ontroll•r• ror .. aeonal !'later r9"'ulrement11. 6lv• Ol'll'ler'e repreeentatlv• a key to c,ontroller• Cll'IO lnetruc:.tlona on hol'I t:o tum"" ay•tem In c:;or.e oP emergenc,y. 51. l'lepalre, lllepolr oil oomog•• to irl"tgl:ltlon •y•t:.m ot: Contl"Q<;tor'e exp•n••· lllepalra llhal I t:,e made .. ,thin one (I) .. oterl"9 period. M. 5011. l"RE!,.A!II.ATION ANO AME!NPMl!NT NOTE!, Tl-le FOJ.J.Oi"!lt,15. AMl!NPMl!NTS Afltl! P'OR Sli::,c,lt,15. F'U!ll.!"05E:5 ON!. 'f. AC TVA!. AMl!Nt:>Ml!NT CRUANTITIH ANt:> MIX!/!e at!AJ.J. SI! Pl!'T'l!RMIN!!t:> IN Ac;e;o!tt>ANCI! i"!ITH THI! 9011.5 Rl!:t"O!II.T OBTAINl!t:> F'l:fll ITEM 5.02 ABOVE:. I. S..c::lr.PIII soil shouic, be 100!11 native sit• soil that ha• been eleared of <:111 debrt. and roc,k ond broken up and mode Pl"lat:>le. The follol'llng additive& i:,e t:>lended thoroughly Into baekflll soil at the tlm• of planting and oil plC1nte ehould be thoroughly ...oter•d In lmmedlotely upon c::ampl11ttlon oP lnetallatlon 6ro-Power pr.,ou<.te ore svppil•d In 50 pounc:I !:>age, nat: bulk. The lnstal 11"9 ""ntrac,tor ""'" i:,e r•'\vlreo to ewmlt """f'ty baga upon c,ompletl<>l'I oP work to c,c,nPll"m appllc,ai:lon. Th• 6ro Power 5-:5-1 form.ifatl<>l'I mof:11trlol ""'" t:,c, us"'" with or without th• soil penetrant: c:,nd the ero Power 12-&-e ,ormulelt.ion mat11trial ahi>uld b.!> used In 4 to 6 c,e5lrec,, pl=ee .:ont<>c,t us Por approprlot• rec,ommendotlone Por eae of same. The gypr.um one, llm• c,an be applleo In their finely gr-ound PoNl'ltl. 100% oP the ~ovnd moterle1I •hould P"'" through ., 10-rneeh 5c,reen and at l"""'t 50% of tho mal:<!rJc:.IJ> tb-"Mld "'"'" throuah a 100 me•h &C:l"lltlltn. c.oNTAl-5!<0-POt,,,IER~OJl\lel". · . SIZe 5-5-1 1:2-e-& ISYFSUM 1..IME I.In..-1.0 tbsp .:25 tbsp 1.0 tioep I gol .5 c,up 2.0 tl:>ep 0.25 c,up 4.0 tl:>ep 5 gc:tl 1.0 "up 5.0 tbsp 0.5 <.up 1.0 c:.up 15 gal 1.5 c,upe .25 .oup 1.0 c,up 1.5 c,upe 24''1:>o>< !5.0 ""P" .5 c:;up 2.0 """" 2.0 .oupe, ,O'box 3.5 ,:upa .15 c,up :2.::ZS .:upe 2.5 <.upe 36"1:>ox 4.0 c:.up• 1.0 c::up 2., ,:;upe 5.0 c:.upe 42''1:>ox 4.5 eupe 1.5 C::"f' 3.0 c,upr, 5.5 ""P'l 4&''1:>ox ,.o c:,ups 2.0 ""Ft' !5.5 eupe 4.0 c:.up• 5~"1:>ox b.O ""I'" 2.5 c,up• 4.0 eup• 4.5 c:.upr. 60 "oox &., eupe 5.0 eupo 4.5 c,upe 5.0 .:up" i2"box •I.O ,:;upe 4.0 ""P" 6.0 eup• 5.5 c:.up• IP bac,kPIII &oil 1$ rnoee t:>londed, •ame mot11trlols c,on be added at: the folloHl"9 rate• P",. c::ublc:. ~rd of &oll. 1..i= <SRO-POYER <SRO-POJl\leR IS'!'P.SUM ,-,,_ METHOD 5-5-1 12-&-& Maea Ellend 10 1..loe 2 lloe 2 lbr. 111:>r. For general loroadeae.t of material• on the eurPac,e of soll&, the eom• mat.,,.l<::lle eon be appll"d to th• eolle at the Pollol'llng rote• por 1,000 •o.uor• Peet: of plontoc:I '°'""' and thoroughly ,.atc,reo In r.uc:.h that eoil• are l'<et to o mlnlmlm depth• o¥ e," prtor to F'lont l1'1$t"llotlan. c5F<O-POt.-eR. ISl<.0-POl<'El'l Ml!THOD ,-5-1 12-e,..e, ISYPSIJM J.IME eroadeaat 5, lb5 2 11:,e 20 11:>r. 10 11:>r. IP rnot.,,.,.,.i. c:an be c,ro&& rippeo Into to ., soil to a minimum depth of b', the some mat.,rlal• c:an be appllec, at the Pollowlng rat11t& per 1,000 eq,uar• f-t af plC1nted ar""' ano watered In thorooghly r.uc:h that oils ore w•t to ., minimum depth ~ 12" at leaet onc::e prior to F'lontln(!. eRO-PO~ c5f<O-POl<'El'l METHOP 5-5-1 12-&-e 15YPSUM L.IMI! croee. "-'P i,o lb& ao 11:>r. :200 Iba 50 II•• IP mote!"lola ore oppll"'" through h,.jdror.e11tolng pro.:..sa, ;he eome mat.,,.lal• c,an be aoded dir11tc,tly Into th" hydroeeed •lurry ond applled at the Pc,lfoHlng rater, per 1,000 e°'uare ,.,.,t to non-pr<0par"d soil. (Note, If hydr"•""" i. opplleo to eoile thelt hov• alr<0ad~ been pr11tpc:ll"lltd with the adoltlvee noted unoer Elr-oadc,aat or Cro•• Rip m11tthoo:le, &o-Power 14-4-"I c,an t:,c, add•d to hydro•eed 11lvrry at the rot" of i pounds per i,000 e°'uare feet oP pr.,pored &oil aur,ac,e and the following t-y<:1ros11teo material appllc:atlons Nould not apply In aodltlon to the 14-4-'1) 5!<0-POJl\leR ISRCI-POJ,<,IER METHOD 5-!5-1 12-ti-& iS'l'Pel.JM 1..11-11: HydrOll>"llt" 55 lloa :2 llos 20 I"" 5 lloe Again, It ,,. lmportc:,m, that al broadc,aet or-eroe• rlpp"'" •"ii adoltlv•• t:,c, thoroughly water•o lnl:o sc,ll5 aPter appllc.atl"n ond prior to planting. Hydroseed materials eh.,uld be appll"d to thoroughly mol•t•n•d eolla. ln•tallotlon •oll molntenan<.e r,houlo be lmplomentod 011 Pollc,1-19. In all areas, 45 dc,y11 after c,omrnenc,<0ment of ln11t:Clllatlon malntenonc,e, ero-Pol'<er 5-:5-1 "°" be gon.,,.al broeldc,aet over all planting e1rea11 at th• rate oP 25 lb&/1,000 square f•et. All materlole ahould t:,c, thoroughly Irrigated Into aolle lmm<0olately oPt<0r appllc,otlon. IP 1net:Cllle1tlon malntenanc,o perloc, Is '10 dc,ye In duration, ero-Pow.,,. &lo Releoee 12-e,...& In the 4 to 6 month r•I"=• Pormulatlon """ be loroadc,aet .,v.,,. all planting ar....,. at. the rate of 15 lbr./1,000 s,:1,uar• Poet g!jp9Um c,t. the rate of 20 1.,,.;1,000 •q,uc:re f•et bet..•en day e,o .,,,., day M. Thia appllc,c,tfon ""'"'d t:,c, In aodltlon to the doy 45 appllc,atlon. All moterl"le ehould t:,c, lrrlg<lted thorou9hly Into &oil• lmmodlot.<01~ c=Pter appllc:.atlon. ENP OF SECTION CITY' OF CARL.&eAD l!ROSION CONTROi. NOTES SJ.OF1::5 6d OR STEEPER REGLIIRINe EROSION CONTROi. ~ AS ePECIFIE:D HEREIN SHA!.!. eE "1'1'1:ATED HITH ONE OR MORE OF THE l"OU.OWINe PI.ANTINe 5TANDAl'<D5. STANDARD, Ill -COVl:R CROl"/REINFO!'CE:D &TRA)'II MATTINe, COVER CROP SHAJ.1.. BE A SEEO MIX T'fPICAJ.I. 'f MADE UP 01" GUICI< eERMINATINe AND PAST CO\IERINe ~. CI.OYJ:R.5, AND/O!II. HIL.D FI.Oi<'ll:l"it5. 5UeMIT THE SP!!:C,IFIC see:D MIX FO!II. CIT'f APPROVAi. PRIO!lt TO APPI.ICATION. THE COVER CROP SHAJ.L. eE APPI.IED AT A RATE AND MANNER 51./FF_ICIENT TO PROVIDE '!Olli COVERASE )'llfTHIN THIRT'f (!50) DA'f5. REINFORCED STRAW MATTIN15 SHA!.!. eE REGlUIRED l'H=N P1..ANTINl5 OCCURS ee-n-ei:N Al.1151.eT IS AND APRIL IS. TYPE OF REIN~l:D 5'f"RA)'li MATTINl5 SHAU.. Ell: AS A~VE:D EIY THI: CITY' AND STAKEt, TO THI: SLOPE AS RcCOMMENDl:D 6Y THI: MANUFAC"TURER. 11:2 -15R01.1ND COVER, ONE HUNDRED (10096) PERCENT OF THE AREA S+-IAJ.J. 6E PL.ANTING )'IIITH A ISROUNDCOV!:R KNOHN TO HAYE 1:XC.EL.LI:NT SOIL. 61NDIN15 CHARACTERISTICS (PL.ANT!:t, FROM A MINIMUM SIZE OF FLATTED MATERIAi.) AND SPACED TO PROVlt'E FUl-1. COVEAA\SE WITHIN ONE '!"EAFI). 11!5 -1.0)'11 S+-IRI.IElS I.OW 5PREADINl5 Y'IOOOY' &HRIJBS (PI.ANTE:D FROM A MINIMUM OF 2-3/4 INCH J.INl:1"5) SHA!.!. COVl:R A MINIMUM OF 5!:VENT'f (10%) PE'RCENT OF THE SLOPE' FACE (AT MATURE SIZE:). #4 -TRE!:5 ANC:>/O!II. 1..AR.e!: SHR!.eS TRl:f:5 AND/Of'lt LA~ 5HRUl5S 5HAU.. Ell: (Pl.ANTED FROM A MINIMUM OF I 15AJ.J.ON CONTAINERS) AT A MINIMUM RATE OF ON!: (I) PER THO HUNDRED (200) SGUARE FEET. el.OPES -b,I OR STEEPER AND, A. :5' OR U:eS IN Vl!RTICAJ. HEll9HT ANP ARE ADJACENT TO l"IJ61.IC HAJ..KS OR STREETS Rl:GUIRE: AT MINIMUM STANPARD Ill. 6. 3' TO&' IN VERTICAi. HE:lc9HT R!:Gll.JIRE STANDARDS Ill, 112, AND 113. C. IN EXC.ESS OF e,• IN VERTICAi. Hl:1$HT REGUIRE: STANDAf'i<DS 111, 112, 113 AN!:) 114. AREAS 6RADE:O l"L.AT'll:R THAN 6, I R!:Gll.ll"1: STAND ARC> !II (Cc::>Vl!:I'< CROP) WHl!N THE:'f HAYE ON!!: OR MORE OF THE:FOU.OWINe CONDITIONS, A. -SHl!ET SRADl:D PADS NO'!" SCHl:DUJ.E:D FO!lt IMPROVEMENTS WITHIN 6 MONTHS OF COMPI.ETION OF ROUe!-1 15RADINl5. e. -A POTENTIAi. l:ROelON PR06L.l!:M AS DETERMINl:t, eY THE CITY'. C. -lt,ENTIFIS:, 6Y THE CITY' AS Hl$HJ. Y Vl51BL.E AREAS 'l"O THE f'UEIJ.IC OR HAVE 5PE'CIAJ. CONPITIONe THAT WARRANT IMM!:DIATE TREATMl!NT. CITY OF CARLSBAD Pl.ANNING DEPARTMENT .--------..----...--------..---,-----r---------------,----,---,---r-----i " AS-BUil T" ~ AREA 3.1 -PLANTING SPECIFICATIONS 61.JEST l!fJ()/J.DER. APPROVED FOR PLANTING AND IRRIGATION ONLY, INC.LUDING PREC.ISE LOC.ATION OF PLANTING AREAS. ::: -... * \lllBCA ;,.oody " .. I ()f: C"\.\ www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 LANDSCAPE ARCHITECTIJRE & PLA.NNING DRAWN JR APPROVED MM 1ST SUBMITTAL 02-09-07 2ND SUBMITTAL 8-15-07 3RD SUBMITTAL 4-S0-07 TITLE: 4 TH SUBMITI'AL 7-02-07 RECEIVED BY: MYLAR SUBMITl'AL 7-10-07 JOB NO. 05-038 DATE 04-30-07 SCALE AS SHOWN INSPECTOR DATE DATE VILLA6ES OF LA C.OSTA THE OAKS -5./ LP-01 I APPR'ff!f, [ q:, l:;J\..pir 1 . , ...... "7 ~=====~===~~==============================~====;====~====~====: ;;· P;;:L;;A;::N;:Nl;:;:N:::G==:::::;-;::::::=========:;-;::::D~A=TE::::~~ DWN BY: ---I PROJECT NO. I DRAWING NO. CHKD BY: --C,T 05-14 446-4L RVWD BY: . DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DA TE INITIAL OTHER APPROVAL CITY APPROVAL ~ e!"!!!Cll"ICATIONS 1.0 SG-OI"!:! 1.01 01!:l"INITIONS A. Own ... , MOl'f.l'IO~ ~T CA!llL.SeAC> CA e. C.O,,l:r-ac.tor, An lnc:llvldlial or c.ompa~ c.onl:r-=tlng .. 1tt, ti,., Own• .. to pr-ovl .. • mater-la le, perPorm work., anc:I ••rvlc.•• Por i,t,e pro j<lc.t. C::.. Sub-c::.onl:r-=tor-, An ln .. lvl .. vol or c.ompa~ c.antrac.tlng wi.h i,1,e C::.ontra .. tor to prov! .. • n'l<>terlale or p•rform "'ork., or i:>oi,1,, Por " top•c.f,ic. portion oP the pro J ... I:. D. 1-oM ...... "P• Arc.l,lt•c.t, -riie ICll'ldec.ap• "'"l,ft.c.t&Jr-ol Plrm oP R.JM D••lgn c&roup, '""· I!!. Contr-oc.t Doc.ument11, "The ogr-ment, terme "on .. ltlo,,,., ,. .. 1tten lntttruc.tlo,,,., .. ,..,,.Inge and epe"lflc.atlo,,,., 111,op dr°""lnge ond c.1,onge o .. d•rtt c:,pprov•d t:>!j th• owner ord l••u•d i:,y tt,• 1-ondt.c.ap• Arc.1,itec.t. 1.02 ~ OI" ~. Th• "'ork. to l:>d done tmder ti,• c.onl:r-ac.t c.onelet• oP PumIet,1r19 c:,11 mote .. fc:,la, c:,11 eq,ulpment c:,nd per-Porm1n9 the "'ork. req,ul .. ed t:>!j tn.ee epec.lflc.otrone and i,1,e d .. al'lln911 nec.e••~ ,., .. th• p .. op ..... omplettc,n oP the l'lork.. 1.05 l"L.ANS AND Sl'"l!!c::.ll"IC::.ATION!o, Th••· •p-li'lc.atlone a ... Intended to c.ove .. all lat,., .. , mote .. lal, and et..nda .. d• oP landec.ap• a .. c.hrt.c.t:u .. al and mec.l,anlc.al i"IOrl<mc::tnehlp to be emplo!j<fd In ti,., "'ork. ehc"'n on the plane or c.alled Po .. In th••• •pec.1P1 .. al:lone o .... eoaonably Implied by l:erme oP eome. Th• plane and •p•c.lfi..atrone ., ... Intended to .. omplement one another-and ~ part or the work. thot m"Y be mentron•d In one and nol: p .. •••nted In th• othe .. , 51,c:,II b• don• 1:1,• •-ae If It l,ad c, mine, .. natur-e wl,ic.h m"Y not be •p•;-.JPl .. ally mentloMd, but ,.t,lc.h may be .. •aaonably aeeum•d oe nec. .. ttary ro .. the c.onetr-u;-.ttc,n or ;-.ompletlon oP thle ,.c, .. k. ehall be p•rform•d t:>!j th• C.0,,1:r-ac.tor i,t,• •am• oe IP el'lo..in on th• dral'llnge or dee;-.rfbed In the •p•c.1,ieattc,ne. In gene .. al, exc.•pt that th• L.andec.ap• Ar-.-.hrt..-.t'e lnt.rpr•t..tlon eh .. 11 al..iay• take p .. •c.ed•nc.e over th• dra..irn9• and larg• detail• ov•r-email ec. .. l• dr .. w1n9to. Flgu .. ••• WM•n giv•n, ,.t,c:,11 be Pollo,..d In p .. •P• .. enc.e to eeal• meaeuremenl:6. 1.04 INTl!llll"lllleTATION O!" l"I.AN$ AND l!l"l!!c::.ll"IC::.ATIONS, Th• 1-ondtoc.ap• ,..,.,._hlt.c.t ... 111 ll'lterpr-•t the meaning oP ~ port oP h plane cond top•;-.iP1"atlone .. 1oout "'hl;-.h ~ mittunderetan .. lnge may arlee, and 1,lf, dec.lttlon ,.1, .. 11 be P1n .. 1. el-,ou ,.. th• .. • appe .. ,.. to be .. ny ... re, .. o.. dle .. repan;-.y In o .. t:,et..i••n the pl .. n• .. nd epec.1PIc...t1on•, h C::.ontr-ac.to .. •l,all ... p ... ;he m .. tte .. to the Landec.ape Arc.l,1te;-.I: Por .... Ju•l:ment bePor• pr-.. c.ee .. lng l'llth the l'IOr"k.. el,c,uld the C::.ontr-.. c.tor pre,;-.•• .. ..ilth th• work. ... 1th .. ut eo r•P•rrlng the mcotter, he d.,.,. ,. .. on l,ie ol'ln reeponelblliioy and an~ l'IOr"k. th .. t ... q,u1r-e• ... mov .. I .. nc110 .... •plac.ement shall be provided by th• C::.Ontr-.. c.tor at no ad .. ltlon .. I c.oet. 1.05 L.ANi::>Sc::.Al"I!! A\ltc::.I-IIT:c::.T'S l"LINc::.TION, 'lh• Lande;-.c:1pe Ar .. hlteet ithall provide perl .. dl;-., limited on-111t. 01:>eerv .. tron "' the ,.o .. k. In pr-.. gr••• p• .. the .. ,.ner'& req,ueeb bo .. evl-, In gene .. al, the exec.utk:>n "' de1111gn Intent. .. nd lnto•rpret the latid11c. .. pe do;-.umente. He I• Agent. .. , !lh• o ... n ... 1. .. i,1,• •xt•nt p .. ovlded In the epe.-.IP1 .. at:1one .. nd ..ihen rn epe.-.1 .. I lnetan.-.ee h• lit .. u,hcrlzed by the o,.ner , .. ac.t ... 1nwpret.er .. , th• .. on .. lblone "' I.he e .. ntr-ac.t .. nd ae Judge oP It• p• .. ,o .. manee, he •h .. 11 eld• n•lther ... 1th o,.ner n .. r ,.11.1-, the C::.Or,tr-.... to .. but ue• nht .. utt1 .... 11.y und•r the eontr-.. c.t to enPc:,r .. • 11.e PalthPul perform .. r,;-.•. He t, .. e bl,e .. rght , .. •top "'"l"k el'lould thl• bee.om• nec.•11 .. ry to eneur• the proper exec.utlon oP the ;-.ontr .. c.t. 1.oe 0~'5 l'U!:Sl"ONSIBILIT'T'", Sy •nt...rng Into .. gr-m•nt. O...ner gu .. r .. nt.He C,c,nt. .. aetor Pund• a .. • .. vall .. bl• .. nd ehall make t.lm•ly progr••• papnt. to the C::.ont.r .. c.t .. r dUl"lng th• .-. .. u.-.• oP i,t,e work. The owner ,.i, .. 11 Pumltth all eurv•y• and ••tabllel, all pr-opeMy llnee and r-e•l:r-I;-.tlone. All oth•r llnea, gradee, .. nd dlmenelone el,all be .. ta&llei'l•d by th• c::.om ...... ,., ... Unleff othe!"l'II•• epe .. lPl•d, the Ol'ln•r •hall make available to the C::.Onl:r-aetor all utlllblee r•q,ulr•d to p•rform the l'lork .. , no ;-.o•t to th• C::.Ontr .. c.tor. 1.0"7 G,ONTRAC,TOR'S Rl!Sl"ONSISILITll!!S, The Contr-a .. tor eh .. 11 give •,P14'f•nt evpervlelon to l>he l'lork., uelng hie beet eklll or .... tt.ntlon. l'tl•n a""ent P .. om th• Job, he wll appoint. .. n l!!nglleh-•p•ak.lr19 1tupervl111or c. .. p .. bl• oP dlttc.ur,elng matte,-,. l'llth bl,e 1-ondec. .. pe Arc.l,lt.c.t on the alte .. nd to mcok.e <=•c.lalon• on the C::.Ontra;-.tor'11 beha!P. He ,.1,all c.arePully atu~ and c.ompar-• all dr-lng•, •p• .. IPl .. ..tlone, .. n .. other lnetr-uc.tlona Por the ,.c,rk.. ~ ,;c:,rk. lnc:llc.ated In .. mcomer wl,1.-.h """Id m .. k.e It di,Pic.ult to pr-odlic.e dr°""lnge .. n .. tope;-.1P1c.at1on11, ., .. bet...een topee!Plc. .. tron• Cll'ld loc.al ordlnaMft or re•tr-1 .. t'°"11, enoll be .. •P•rr-• .. t.o the L.conde .. ape Arc.l,ltec.b Por lm...pretatlon or c.orr-ec.tlon be,or• p .. oc.•edlng ..ilth l'lork.. 1.oe l!!XAMINA TlON 01" $IT!! AND l'IOAA, A. Th• C::.Ontr .. eto .. wll ex .. mln• the p .. ojeet. elte, pl,yalc.al ;-.ondlbk:>na, and eurrouridlng .. , the propo•• .. ,.c,rk. and Ju .. g• ,., .. l,imee!P bh• natu .. • oP th• ,;ork. to be done prior to 111ut:>mItt1ng .. bid. e. 'lh• plan• Po .. the ,.c, .. k. ehol'I ;-.ondltlone .,. t.h•y ar• evpp0tted or believe .. by ti,., L.an .. ..-...pe Arc.hit.el> to •xI11t. It le Cont .... .-.to .. 'e reeponell:>lli~ t .. lnPorm 1-ondac.ape Ar;-.hlte;-.b .. , any v .... 1at1on bet-•n pl .. n• .. nd a;-.wal elte ;-.c:,n .. ltlone pr1 .... to etartlng any ,.c,l"k. ei,ould C::.Onl:r-ac.tor begin ,.c,rk. l'lithout ve .. !Pylng IP plan• matc.h elte c. .. ndlf>lon•, C::.Ont.r .. c.tor aeeumee all .. eaponelbllli:y ,.,,. any , .. ,.... h• might ln;-.ur. LOOI SAl"l!'IY C::.otll!5 AND flltl!l9<UL.ATION5, The c .. nt .. ac.tor ,.1,all Pamlllarlz• hlml>e!P ..ilth and will c.omply l'llth all P•der-al, etate, .. nd I .... a1 '°""•• ordlnar,;-.e, .. uln, .. n .. reguf .. tlone IMlu .. ,ng C::.allfornl .. -oeHA SaPety 0,-0.,,-,. per-talnlr19 to t.h• perP .. rmar,;-.e oP the ,.c,rk.. 1.10 C::.ONSTI'Wc::.TION 5Al"l!!iY, The deelgn, adeq,uac.y, and aaP•ty oP ere.-.tlon, exc.av .. tlon, brae.mg, ehorrng, temp .. r .. ry euppom, •t.-.. le the eol• .-.. ponelbillty oP h C::.Ontrac.tor. Th• Contrac.tor le retoponeible Por the et .. bllli:y oP i:n• el:r-uc.l:ur•• ond •x .. avatlone and ei'lall provide th• ne.-.....,ry br .. elng to provld• etat:>111~ c:!Yrlng the •ntl .. • c.onel:r-uc.t.lon pr-ogr•••· Obeerv .. tlon vlelt.• to the ell.• t:>!j th• 1-ondec.ap• Arc.hlte.-.t or hie c.on11ultant1 ehall n .. t. lnc.lude lnep• .. tlon oP the c:,t,ov• It.me. I.I I l"l!!Rf'ORMANC::.1!! AND l"A'T'Ml!!NT SONi::>S, IP ,.......,,r.d, i,1,• c .. ntr-ac.bor eh .. 11 deliver to O..in•r t,.c, eur•t\j boi1c:le ,.,th good an .. euP¥iel•nt evr•tr••· The loorde ,.i, .. 11 be maintained by the Contr-.. c.tor In Pull p.,,.. ... ond .,,.,._._ .. unbll c.ompleblon and ac.c.eptanc.e oP th• "'or"- A. M .. ter-Ial .. nd 1 .. t:,c:,r t:,c:,n .. In the 111um oP 50511 .. P ti,• c. .. ntr-ac.t prlc.e. e. "'•rform .. nc.• loon .. In the evm oP 50SII oP th• c.ontrac.t. p .. ,._. c.on .. ltloned to "over .. 11 guaranten oP th• .-.ontr-.. .-. t.. 1.12 INelAllANc.1!!, The C::.onl:r-ac.to .. ei'lall deliver to Ol'ln•r .. ..-tlPlc.atee oP Ineurane• ..,. evl<=lenc.• oP c.over .. g• ... 1th owner and L.andttc.ap• Arc.hrt..-.t. ll111ted .. ,. .. ddltk:>nal ln111ur-•d. A. ~,k..,.•' Gompeneatlon lneuraMe and !!!mploy• .. '• L.iabllity lr,61Jl"'on~•; I!!. c::.omprehen111ve Liabill~ lneu, .. n .. • ,.1,h limit. oP not I••• th .. n t$00,000 pe .... ~ on• p•r-aon .. nd 11,000,000 per .,ny .. n• c:,;-.c.urrenc.e .. ,. to bo .. lly Injury or de..tl, an .. l.2!50,000 p• .. o;-.;-.urr-en .. • .,. to p .... p•l"ty c:lamage. 1.19 L.ANi::>SC::.Al"I!! ARc::.HITl!!C::.T'& L.IAl!!IL.ITT', The Ol'ln.,. an .. C::.ont.rac.tortt, rec.ognlzlng the lnhe .. ent rlak.e ;-.c:,nnec.ted "Ith c.on•truc.tlon, cogr•• to limit .. ny -.. nd .. IT 11 .. bllli:y, c.laim Por .. am .. gee, c.oet .. P ... , • .,..., or •,cp.,,••• to be l•vl•d agaln•t the 1-onde;-.ape Areh1te .. t on ...... ount oP .. ny deelgn de,•;-.t, .,.,..., .. , oml•alon, or p .. o,•eeronal n•gllg•""• to .. aum not bo •x"•• .. th• .. mount oP the L. .. nc:,ec.ape Arc.l,ltec.t'• P••· 1.01 1.0:2 SUl"eRVISION, The C::.onl:r-ac.tor eh .. 11 eupervlee and dlr-e;-.t the e,rI .. 1ent performanc.e of the ..iork. In =c.ordaM• with hill beet ek.111, .. ttent1on, and Judgment. He el,all be aolely r-eeponelbl• Por-the meanr,, method111, teehnlq,uee, ••q,uenc.eit, and p .. c:,;-.edu .. •• oP eonel:r-uc.tlon .. nd •hall be rnpon,alble to ••• tl,at th• Plnltth•d ..iork. ;-.ompllee Pully "Ith the c::.ontra .. t: i::>oc.ument.e. He ahall have ..... p .. eeentatlv• In .. harge ..ii,.:, ,.t,all be .. .-. .. mpetent •upe .. lnt•ndent .. nd dlreet th• p .. ogreff oP th• l'lork. and ,.t,c •i'lall be authorlz• .. t .... •c.•lv• lnel:r-uc.tlon• .. nd to .. .-.t. ,., .. the Contr-a.-.to .. on .. 11 m .. tte .. e r•lat1ng to the "'ork.. 1.05 ®AL.ITT' OI" LAe0111. AND JIIIO!llKMANSHII", A. At .. 11 tlm• .. ,.-r c.omm•n;-.ement oP the ..ior-k., C::.Ontr .. ;-.tc:, .. &hall p .. oVld• an .. deq,u .. te "'ork. P ......... p c.omp•l.•nt, •ultably q,u .. llP!ed .. nd traln•d perttonn•I to eurv•y .. nd lt:l\j out the w .. rk. an .. .-. .. natr-u;-.t. the proJ•;-.t and •h .. 11 .... u•• r,uc.h ,.c,rk. 1orc.• to •xe .. ut• the ""'rk. rn c.onformanc.• with the beat t .. ad• p .. ac.tlc.ea, , .... , .. om Paulte .. nd d•P•;-.t. In .. .-. .. o .. dcon .. • ,.,th h req,u1r•ment1> "' h c.ontra .. t Do;-.umente. 15. ~ evt:>c.antr .. c.tor or-, .. .,.. .. .,. •mp loyed upon th• "'ork. ,.1,c,, In t:h• .. pinion .. f th• 1-on .. ac.ape Arc.l,itec.t and/ .... Ol'll'le .. , le non- c.ooper-.. tlve, or ..il,o •hall prove .-. .. r•I••• or ln;-.ompet.nt, ah .. l I be lmmedl.,tely remove .. , .. .,., the .,.., .. k. by the C::.Ontr .. ;-.1:or, Men nottPled to do ao, .. n .. •hall not be r•-•mployed on ti'l111 proJec.t. 1.04 QLIAL.ITT' O!" MAT!!!ll,IAl-5 AND l!(ilU!"""'11!Ni", All moi:er-1 .. le and •q,ulpment IMorporate .. Into th• ,.., .. k. •h .. 11 l:>d n-tml••• other-,.ill• •p• .. 1Pi.. .. 11y provld•d In the c::.ontr-a.-.t 2'oc.umente. Mater-1 .. Ie and eq,ulpment not other"l'lle• d•elgnated t:,y d•i:all• .. •pe .. 1r1 .. at1on• eh .. 11 be oP the beet c.omm.,.c.lol q,uallty an .. ,.1, .. Ir be evltabl• , .... h pUl"po•• Intended. IP re"lulr-ed by Ol'll'let'", C,c,nl:r-ac.tor ei'lall Puml•h evldenc.e eai:IePac.t.ory to own.,. .,. to the k.ind .. nc:1 q,u .. nty oP m .. ter,ale an .. eq,u1pment. All material• and •q,ulpment •h .. 1I be lnetall•d p•r th• manuPac.tur-•r• .. •c.ommendatl .. ne. I.OS 51JBSTITVTION5, A. SUbmlt eut:>etI1:utIone of m .. ter-1 .. I• or method• pr-opo111ed to ;-.lty lnep• .. tor-an .. L.ondttc. .. p• Ar;-.1,Jte..t In .... 1t1ng ,., .. appr .. val ., .. den1 .. I one "'••"-pr-10 .. to 111ut:>mrttal of bl ... 51/t:>et.ltutl .. ne wlll be .. pp .. ov• .. only IP mote .. 1 .. Ie ., .. method• .. ,.. dem .. netr-.. bly evperlor In q,uallty. ManuPac.tur-er'• llter .. tur-e alone m .. y not be eutPl;-.lent evld•n;-.e .. f proof .,, aupe .. lorlty. A req,ueet for a eul:>et.11:utlon c.on•tll:utee .. repreeent..tlon that work.ertt and ;-.onl:r-a;-.to,... ,. .. ,ve .. 11 ;-.lalme fc:, .. additional labo .. ., .. mcot..-1 .. 1 c.oete ..it,1c.l, m~ be;-.om• eul:>Nq,u•ntly app .. r•nt by the ue• oP euc.h •ut:>et.ltuted m..terk:11111 or produ .. t111. It le the C::.Ont.ra .. to .. 'e .. •eponell:>I111.y t .. prov• th .. t the r-•q,u•eted 1tulo1ttI1:utIon le In Pac.t 11eq,ual.11 e. IP mor• ti'lan one manura .. t:urer '" •p•c.lP!ed In theee topec.1P1.-. .. t1one, It ill the C::.ont ...... tor'e option to ••l•c.t th• on• ,.i,,,,._i,, h• m .. y d•a1 .. e to ue•. IP mo .. • th .. n one Plnillh or-etyl• le .. v .. llabl• In ti,• Item •p•;-.IPled, th• Conl:r-ac.tor ltt obligated to .. 11.,,. th• o..,,er to m .. k.e the eel•et1on. 1.06 LIST O!" SU~TOl'tS AND !WeL.l!!TTIN6 l"IO!llK, A. No part oP th• .. on•i:ruc.tlon ,.c,rk. al,all be done ... pl•;-.•wo .. k. nor ehall It be lePt to a aubc.ontr .. c.t.o .... rter the ex ... utlon of the o .. 1g1n .. I c.ontr-.. c.t •xc.ept ae .. utho .. lz• .. In wr-ltlng. In ;-.a•• port oP th• "'orl< 1,.,.. II 11hould b• eubl•t, th•H gener .. I c.ondltlone ehall govern •a"h I.rad• lneoP .. r ae th•y may appfy to th• ...,,-k. oP that l:r-ade. e. No eut:>c. .. ntr .. c.t m~ b. aer,Jgned .. ,.. l:r-aneP• .... •d ex;-.•pt ae autho .. lze .. In .,.,..,ting by the C::.Ontr-.. .-.t ..... C. ,-,... c::.ontr-ac.tor 11hall, cot al I '1mee, be r-e11po,,,.lble Por the aeelgne .. ., .. t .... nafer .. ed ,.c,rk. to th• .. .,_ •xt•nt ae IP th• .. e111lgn•d or t.ronaferre .. ,.c,rk. to the •ame •xtent .,. 1P he "'•r• .. olng, ., .. h .. d done, the "'ork.. D. Th• C.Onl:rac.to .. ,.i, .. 11 eut:>mlt t .. th• o-r a llet .. P th• eub .... nt: .... c.to,... ..iith ... talle of tl,e portion• oP the l'IOr"k. t .. be p.,.,.,,..,. .. t:>!j ea.-.h. SUt:>Gont .... .-.to,... el,all be eubJeet to th• .. pp .. ov .. 1 .. P h o .. ner-and L. .. ndec.ap• Arc.l,itec.t. 1.0, l'"ATl!!Ni'e, In th• ev.,,t that any p .. tente ...... tl;-.le, mot.rial, or-pro~••• I• to l:>d Inatalle .. or u .. d In the performan .. • oP the ,....,.k. ae eho...n on the plore or partrc.ular ep•c.lP1c.atIone th•r•Por, th• C::.ontr-ac.tor ,.1, .. 11 pay the royalty .-.h .... ge .. bl• and ehall eove, "--•P• and beor th• owne .. ond L.ande .. cope Arehltec.t 1,armleee Prom all dam .. ge, ;-.oet•, and •xp•n••• by reaaon oP the , .. nure to pay the .. oyalty .-.h .. rge .. ble Po .. the uee thereof; an .. any loee to tl,e o ... ner In the event tli .. t h OWl'ler-le •nJoln•d Prom ue1ng eu .. h pat.,, .... artle.l• or mate .. 1 .. I111 .. nd th• lr,;-.ldental damage c.auee .. t:>!j th• loee ot uee cond damage to owner'• prop•rty In t"emovrng eame, th• c.0111!. of .. epl .. c.lng the ar-tlc.l• ., .. mater1 .. Ie i,t,e uee oP "'hlc.h ltt enjoln•d. ,.,..ovlded ,urther, the l,ond for P .. lthPul p•rform .. nc.e el,all be deemed to exp .. eeely appl~ to thle prov1a1 .. n .. , th• epec.lf1c.at1<:>na. 1.oe l"l!!!llMITS, LICl!!NSl!!S, AND INSl"l!!c.TION!o, A. The Contr .. c.tor al,all obtoln .. nd pay Po .... 11 per-mite together l'lith .. 11 ln.pe;-.tlone r-eq,ul .. ed In c.onne.-.tlon l'llth the ,..,,.k. to be done under the c.ont .. ac.t, unl•H oth.,.1'11•• "P• .. lfl•d bel .. l'I. e. The C::.ontr .. .-.t.or ,.,11 pr-ovld• .. nc:1 pay , .... any epec.1 .. I .... c.ontlnuoue ln•pec.tlol'I of the l'IOl"k .. .,ne un .. •r th• ;-.onl:r-ac.t, ,.t,en r,pe.-.lal or c.antlnuoue lnepec.tlon 111 not.• .. be lol'I. 1.0"! L.Al"l5, O!llPINANc.l!!S, ~L.E:5, AND lllE:IWI.ATIONS, The C::.Ontrac.to .. sl,all glv• all not.1.-.ee r-eq,ulr•d t:,y and wll otn•r,.,,... Pully eomply ..ilth .. 11 , .. ,.., or .. ,n .. nc.ee, rul••• and reguratione appll.-. .. bl• to the ;-.c:,mm•nc.em•nt. p .. oee.outlona, .. nc1 .-.ompl•tl .. n oP the ,.c,rk.. In the evel'lb C::.Ontr .. .-.t., .. .,.,. ... v•• ., .... lee.over• thot the C::.Oni:rc:,c.t 2'0.-.ument.• ., .... ,,y po .. tion i,l,•r•oP ..... In any ,. .. y at v .... 1 .. nc.e ,.,th any eu~h 1 .. ,..,, or-.. lnanc.ee, rui••• or- r•gul .. t.1 .. ne, C::.Ontr-.. ;-.tor ehall prompi>ly give 1-ondec.ap• Ar.-.hlt. .. t: ,,.,..ltt.n notl.-.• h .. eoP. Should C::.ontr-.. c.to .. perPorm .. ny "'ork. k.n"""lng that It le c.antr .. ry to an11 euc.h I-•, ., .... 1nanc.ee, rul•• or regul .. tlona, and .. ,thout euc.1, notlc.e to L.an .. ec. .. pe Ar;-.hlte;-.t, Conl:r-ac.tor-eh .. 11 bear .. 11 .. oete .. n .. •xp•n••• arlelng tn .... , .. .,,,, and .,.,.0.-.1 .. te .. the .. e,.lth and lndermlPy .. n .. 1,.,1 .. harm!••• ONn.,. .. nc:1 an~one dl .. ec.t.ly ., .. lndlre~tly employed by O..ine .. In;-.ludlng th• '-""dee.ape Arc.Filte;-.t , .. om and agalnet all ;-.lalme, liabilli:y, damage, lo•••• .. nd •xp•nen, Inc.lud1ng, ..ilwut llmlt...tlon, attom•ye' Peee arlttlng In eonne;-.tlon th• .. •l'llth. 1.10 SAl"eTT' AND l"l'tOTl!!c::.TION, C::.onl:r-ac.t.or ehall .. omply l'lith .. 11 .. ppll.-. .. bl• '""'"• or-dln .. nc.ee, rulee, regulatlon111, .. nd ord•r• or all govemmental .. gene.lea .. nd .. utho .. ltlee having Jur-iedlc.blon Por the ttaP•t~ "' p•r-eone· or p .. operty Prom d .. m .. g•, loee, or In.JU .. y and eh .. I1 be reaponelbl• ,., .. 1n1tI .. t1ng, maintaining and •upervlelng all ... ,.ty pre;-.autlone and p .. ograrne In c.onne;-.t.1 .. n "'"" t,he wo .. k. C::.Onl:r-aeto .. el, .. 11 take .. 11 pre .. autl .. ne ne.-.eeeory tor the eoPety oP and •h .. II provide all p .. ote.-.tlon n-••• .. ry to pr•v•nt d .. mage, loee, or Injury to, A. All ,.c, .. kmen and .. ,her p•reone .. ,, or about the 111lte and .. II .. th ... P•,...one "'"" m~ be aPPec.t•d by th• w .... k.; e. Th• ,.c,rk. 11:ee!P .. nd .. 11 m .. t ... 1 .. Ie and •"luipment lnc.orpor .. ted or to b• lnc. .. rporated th•r-•ln, ..ihethe .. In etor-ag• on ., .. oPP the elte; C. All oh .. p .. ope .. ty .. ,, ac:ljac..,,t to an .... t,out tt,e 111lt., lr,;-.ludlng, "'lthout limitation, l:r-•••• el,rut:>e, l°""ne, w .. I"-", pavementa, ro .. dl'la\jl>, etru;-.1:urea, an .. utllltlee ,.t,I;-.h are nc:>t deelgnated tor .. emov .. r, ... 10.-.atlon, or repl .. ;-.ement .. ,.. port oP the "'ork. . I.I I l!!Xl5T!Neo UTILIT'T'" L.INl!!e, l!!x;-.•pt ae In .. ,.-. ...... by the d .... l'llnge .. ,.. ap•;-.1P1.-...tI .. ,,,., t.he C::.Onl:r-a;-.to ..... 111 not be liable for the re-rout.Ing .. , •xletlng .. c.tlve un .. ergr .. un .. lln•• whl;-.h m .. y l:>d dl1t .. over•d c:!Yrlng the progreee oP ..iork.. Conl:r-ac.t.or •hall v•rlf'\j lc:,;-.atlon c,P exlatlng utllltl•• ,;Jti'I approprlc::lt. utlllty .-.omp .. nlee pr-10 .. to •tarting l'lork.. c::. .. nt .... elo .. eh .. 11 be 11 .. bl• for .. amage .. .,ne to •xletlng utlllt;lee. contra .. tor •hall .... n,aet 1-eoo Dl6 AL.l!ltT .. nd have all existing utilltl•• lo;-.ate .. prior to c.ommen .. ement of ;-.onal:r-uc.t.ron. 1.01 1.02 N!l"AIRIN6 I~ ~RI<. A. All portion. oP the "'ork. t:h .. t mcoy be broken or Injure .. by =c.ident or In the ;-.c:,u,...• oP or on .. .-.c.ount. .. , loull .. lng op•r .. t.lon• or by r•a•on oP any oth• .. .-. .. uee l'li'lateoeve .. dur-lng th• p .. ogree11 oP the ,.., .. k., ,.i, .. 11 be c. .. r-ePully and ne .. t.ly ... p .. lr-ed ., .... ec.onr.truc.ted Clnd the wl, .. I• l•Pb In Pr.-.t .-., .. ,.,. eondltlon and tur-ne .... v ... to h o-r r-eady , .... u••· e. ehoul .. any part oP the "'"rk. oP thI111 ;-.c,nl:r-ac.t. be ;-.ut Into ., .... amag• .. t:,y oh.. .. .. ntr .. c.to,..., th• o ... ne .. and p .... ty c.au•1ng evc.h d .. m .. ge enall mak.e adjuetmenl:6 bet"'••n them••iv•• ... latlv• t;o ....... netru .. tlon, rep.,,,.. .. n .. payment. 1.09 MUTUAL. l'tl!5l"ONSlllllL.IT'T'" OI" SU~ON'l"!llAc::.TO!llS, l!aeh •ubc.ontr .. eto .. •hall perform the ,..,,.k. of the c.ont .... .-.t ao thot It ,;Ill pr-ope .. ly ;-.c:,o .. dln .. t.• ,.,th and Pit th• wo .. k performed t,y other •ubc.ontr-.. c.tortt. He el,al I give •ac.h .. the,.. eubc.ontra;-.tor every ,...,. .. nat:,le opportunlt.y to perro .. m hi .. ,..,,..k., etore m .. terlal•, .. nd plac.• eq,u1pment the .. •Po .. , an .. Pit th•I .. ..iork to the "'"rk. of other evbc.ontr-.... tor-e. 1.04 C.OOl"l:k,,,TION ~!TH ~, A. l!!ac.h •ubc.onl:r-ac.t;or ,.i, .. 11 .-.o .. per .. te ,.,th othertt In the exe.-.utlon oP .. , ,. .. ,.k. and eh .. 11 n .. t Interfere ,.,th mater-1 .. 1, appllanc.e•, c:>r "'ork.men oP other •ut:>c.onl:r-ac.t.ora. e. All eubc.ont .... .-...,,... •ngaged In .,.o .. k. .. , the •li:e ehall have, lneora .... , pr-=t1.-. .. bl•. eq,ual u11e oP th• p .. •mle.,. an .. , .. .-.111t1ee. In eae• oP dleogr••ment r-•gardln9 euc.l, uee, the matte .. eh .. 11 be r•P•rr-•d , .. th• owner,"'"" d ... 1e1on relative t .. e .. 1d uee eh .. 11 gov•rn . I.OS OJIIINl!:lll'S RIIS+IT TO DO JIIIORK, O"'n•r may, at It. aol• opt'°", per-Porm, or c.ont. .. ac.t .. lrec.tly "Ith othe .. c.ont.rac.to,... Por-t:he perf .. rmanc.e oP othe .. ... ork. .. •lat•d to the p .. oJ•;-.t on e,uc.h t•rme and .. on .. ltlone ae 01'11'1• .. •hall, In It• eol• .. , ... r•t1on, ;-.1,ooe•. 1.06 l"lllOVISIONS l"Olll l!XT!llAS, No n•,; l'lork. of ~ k.ind ah .. 11 be c.oneldere .. an •xtro uni••• .. ••par-at• ••tlm .. te 1111 s,lven for ,. .. ,d "'" .. "- bePore It ltt c.ommenc.• .. an .. until eam• le app .. oved by h O...ner-exc.ept P .... extr-.. ,.c,r-1<. or-.. •r•d t:>!j th• O,;ne ............... Ing to unit pri;-.•• wi'tlc.h have been bid. ~ extr-.. ,.c,rk. perform•d, n .. , authorized ae p .. ovlde .. aloov•, et,.,11 not be pal .. Por t:>!j th• owne ... 1.0"7 Tl!5T5 AND IN51"1!:CTIONS, A. The Ol'll'ler ehall have t;he right. to t.et, lnr,pec.t, anc:I approve or req,ulr• th• te111t:1ng, ln•p-tlon, an .. appr-ov .. 1 oP .. 11 mater1 .. I11 and .....,,pm•nt Puml•hed and all ... o .. k. p•rPormed under th• c::.ontr .. et Dc:,;-.umente. In addition, If the Contrac.t Doc.ument:e or the !awe, o .. d1n .. Mee, rul••• regu latr .. n., or any .. th.,. oP the public. authority having Jur-lttdlc.tlon req,ulr-• th• "'ork. or any portion hr-eoP to be epe .. 111 .... lly ln•p•c.ted, the C:.onl:r-ac.tor 11hall arr-ang•, p .. y Po .. , .. nd deliver ._.,.1,i,Ic.at.• of ln•p•c.tlon, teetlng, ond approval t .. owner. Ill. The c::. .. ntr-....to .. el, .. 11 n .. t .. over up any "'ork. req,u1 .. 1ng lnepe;-.tlon until the ,. .. .,. hae been approved by the app .. op .. 1 .. te avthorlty. IP "'" .. "-ahould be c.ov• .. •d up bePor• being ln•p• .. ted, the C::.ont.r .. ;-.tc:, .. ,.,11 be .. eq,ul .. •d to .. •mov• •uc.h por-tk:>ne oP th• ,.., .. k. ae may be nec.•••.,,-Y to .. lec. lo•• the p .... t In q,ueetlon. l.oe 5HOI'" D~!Ne5, c::.ontr-.. ;-.tor •hall p .. ovlde c.ompl•t• ,.t,op drawlngtt Por all It•m• epe;-.IP!ed Por el'lop c:1r .. ..irn9 11Yt:>mlttal. et,c,p dr-lnge ehall ,,, .. , .... ._ .. 11 .,.,._ .. , .. , methods of .. tt. .. c.hment and Pln\,.t,. Sl'lop c:1r .. ..irnge ehc:111 be .. pp .. ov•d pr-lor to Pat:>rlc.ablon. I.I I Al"l"L.ICATION l"Olll ~611l1!!5e l"AYMl:NTS, Att c:,P ti,• end .. p ea;-.h ;-.alen ...... month c:lurlng e .. nel:r-u;-.t;tc,n, but In n .. ev•nt mor• often than "'""• m .. nthry, contr-ac.tor eliall eut:>mlt to o ... n ... tor revl•,; and .. pprov .. 1 .. c.ompl•t•ly Plll•d out .. nd e19ne .. App11.-. .. t1 .. n ,., .. l" .. ym•nt ;-.c:,ve .. 1ng th• ,....,.k. c.ompleted .. ,. oP the d .. te or euc.h .. pp11c:-.. t1 .. n. l!! .. c.l, eueh App11 .... t1on for l" .. yment ei'lall be ....._omp .. nl• .. by Pully-exe;-.uted un .. ond1t.Ion .. I ... , • .,..,. and ...,,vertt ,.t,e .. et:>!j all p• .. •=• and par-t,.,. ..iho p..-Porm•d lat:,c:,r, eubc.ont.r-.. c.t ,.c,rk. or oth•r Nrvl;-.•• upon th• p .. ojec:-t, or who eold, l•a••d, Puml•hed, or othe!"l'lle• euppll•d to or , .... th• uee .. P ., .. to be ;-.on•um• .. In th• proJ•;-.1. eq,ulpment, mot. .. lale, .. ppnan.-.••· .. ,.. oth• .. goo .. •, r•I•.,.. and w .. Ive, to .. nd IMlud1ng the date ot eu;-.1, .. ppI1.-. .. tIon, .. 11 mec.hanlc.'• lien, •top notlc.•, •q,ultat:>I• ll•n and 1 .. t:,c:,r and mcoter-lal l:>ond r-lghlo• on the p .. ojec.t. 1.12 Ol"INl!!l','S llll6HT TO eusl"l!!Ni::> Olll CANc::.l!!L. l"IO!lll<, A. Th• (.Ql'lt,,-.. .-.t entered Into un .. •r th••• •p-lPl.-. .. t.lon• may be t•rmlnated t:>!j t.h• O..iner without 11 .. blllty ,., .. d .. m .. gee, wheneve .. the 01'11'1• .. le p .. •v•nted t:>!j op•r .. tlon oP la,;, .. ,, Ac.t .. , &od, or t:>!j th• o,rIc:-1 .. 1 .. .-.t.Ion oP the publle, Peder-al, r,tate, o .. mun1c.1paI autl'lo .. ltl•e ,,. .. ., c. .. mpl•tlng th• work. c.c:>ntemplat•d 1,.,.e,mder . e. In th• •v•nt oP euc.h eanc.•11 .. tlon, th• c::.ont .... e, .... .,1,.,11 be p .. Id ,., .. th• ..iork. .. c.tually doM bePo .. • notlc.• oP c. .. n.-.•11 .. tlon le given to the C::.Ontr .. c.tor-. IP tl,e eonlorac.t provide• Por p .. yment. bo the c::. .. n1:r-.. .-.t .. r- on th• bael5 oP unit prlc.•• ••!. forth therein, th• amount dli• th• C::.ol'ltr .. c.to .. upon .. anc.•11 .. tlon ah .. 11 be ;-.omputed on t.h• t:>ael• oP eu .. h tmlt p,1 .. ee. IP the c.ont;rac.t provide• Por tl,e p .. yment; oP a Pixed evm Por th• ent.1 .. • l'lork., .... ~ .. •Plnlte po .. tlon th..-e .. P otne .. than .. Ul'llb oP mea•u .. ement, i,t,e C:.ontroc.to .. eh .. 1I be paid the ... m• proportion oP 11u .. l, r,um upon .. an .. •llatiol'I that the ,.., .. k. don• bea .. e to th• total l'IOl"k., ., .. de;lnlte portion t.he .. eo,, to be perPormed under tl,e c.onl:r-ac.t. c. Not.lcoe oP euc.1, ~ .. nc.ellatlon el,all be given In ,. .. 1t:Ing .. nd ah .. 11 be d•poelted In the tinli:ed Sates mall In .. eealed •nv•lop• "!ti, po11tage prepaid .. nd dl .. •;-.ted to the C.ontroeto .. at hi• ad .... •" ae Plied with the Ol'lner-. 1.01 l!!Xi!!!N5ION OI" TIMI!!, In the event It 1111 .. eeme .. ne;-.•eeary by th• owne .. t .. extend the t:lme .. , c:-ompletlon oP the ,.c:,rk. to be .. one tmder th••• epec.IP1 .... t1ona, eve.I, extenelon ,.t,all, In no ""'Y• ... 1 ... ,.. ory guaranty glv•n by the C.onl:r-ac.tor-pur-euant to the provlr,Jc:,ne c:,P th••• epe;-.IPic...tlon•, or the .-.ont .. ac.t l•t h• .. •unde .. , or to rell•v• • ., .. rel• .. •• th• evretlee oP th• bonde •-.-.ute .. pu,...u .. nt; to the eol .. pr-ovlelone . 1.0:2 C::.L.1!:AN-IJI", At all t.lmee dlir-lng the c.ourtte oP th• work., the Conl:r-ac.tor ,.i, .. 11 keep t.h• alt. Pre• Prom .. .-..-.umulatlone oP w.,,.t,e .,., .... , .. ,,., .. ubl::>lel,, and othe .. d•t:>rltt .. nultlng th• "'"rk. Cll'ld el,all t .. k.e .., .. h ac.tlon oe le n•c.••e .. ry , .. pr•v•nt .. nd c. .. nt .... I duet. At h e .. mpl•t.I .. n .. , the ..iork., C::.ontr-ac.to .. ehall .. emov• .. 11 temporar-y el:r-uc.i:111"••• to .. le, .. on1truc.t1 .. n •q,ulpment, c:,nd mac.hlnery, eur-plue mater1 .. Ie, l'l .. et• materlale, rulobleh, .. nc:1 debrle P .. om .. nd about. the elte an .. ai'lall l•av• th• •It• .-.1 ... n and .. •ady Por u•• t:>!j ti,., Own•r. 1.09 c.oMl"Ll!!TION, A. C::.Ompletlon ,,. ... ,,n ... a• be1r19 l'lhen .. 11 c.ondltlone oP the c.ontra;-.t riave been ac.c.omplillhe .. ln;-.IYdlng the epec.lfl• .. malnt•nanc.e p•rlod. e,pec.lfleally ,.t,en all lteme are IN>talled, the ar•ae c.l•aned .. nd the malntenanc.e pe .. I0 .. eabl5Pac.tor-lly ;-.ompl•te .. , and ..il,en .. 11 ep•;-.lal tool• Cll'ld •q,ulpment, ln•truc.tlon•, ..... 1tten guarani:e••• ae- bullt pl .. n•, lien r•l•a••• and any lteme ...... ulred by the C::.onkac.tor Do;-.um•ni:e have been prop• .. ry exec.ut•d an .. deliver• .. t.o the o ... ner. e. The L. .. nc:1ec. .. p• Ar.-.hltec.t •i'l .. 11 hav• Pull autho .. 1ty to ac.c.ept or .. •J•;-.t th• .. ontr-ac.t It.me an .. 1'1111 p .. omptly not!Py the 01'11'1• .. oP c.ompletlon. 1.04 6UAIIIANTl!!I!!, In .. ddltlon to tope.-.1'led gu ...... nteee p .... vld•d Po .. In tl,e ••par .. te ••;-.tlon• oP the tope;-.1P1c. .. t1one, the C::.ont .... .-.t., ... 1, .. 11 guarantee In ..irltlng all .. or1<.m .. nehlp .. nd material• to be Pr•• from defec.t tor-.. perlo .. oP one y. .. r Prom th• d .. te of =;-.eptanc.e oP tt,e l'IOr"k. by t:he O,;ner-,.,tt,out: addlt.1 .. nal .-. .. et to th• O..n• ... I .O"I 9AMl"L.e, C::.Onl:r-ac.t .. .-ehall prov, .. • eomplee ,o .. all rnate .. 1a111 11pe;-.IP1ed t .. lnelude ... mplee. All eampl•• ehall be .. pproved l:>y Ol'll'ler-'• Repree•ntatlve In "'rlttng p .. lor to delivery to the proJe;-.t alte. 1.10 Tl!!Ml'"Ol'lA!ll'!" l"Ac::.IL.ITl!e A. l!!re;-.t .. nc:1 p .. ope .. ly malnt. .. ln .. , .. 11 tlm•• ..... eq,ul .. ed t:>!j ;-.c:,ndltlon. cond progr-oP th• "'"rk., .. 11 n • .-. ........ y .. nd req,u1 .. ed pr .. t • .-.trv• t:,c:,rrlc.adee, 1nc.lud1n9 a 6' height ;-.t,arn link., t•mpor .. ry .. onetruc.tton P•nc.• ..ilth .,.. .. _ gate, P•n .. ••• and othe .. aaP•guard• ,...,. th• pr-otec.tlon oP ..iork.ere .. nc:1 the public.. V• .. IPy limit• oP a .. •a with owne .. prlo .. t .. lnetall .. t:lon. 11+,•r• th••• barrlc.ad•• and Penc.n ar• vl•lbl• to the public., paint, or oth•l"l'II•• Plnl111h them In a manne .. ac.;-.•ptabl• to the L.Cll'lde.-. .. pe Ar .. h1tec.t. e. At all t1me11 during c.onetruc.tlon or •re.-.tlon oP proJ•;-.t or It111 .. ompon•nt part•, pr-ior to .. ompletlon of t.h• etr-uc.1:ur .. 1 Pr .. m• or pl=-ment and p.,...,_nt c.onnec.t.lon of c.omponent member• to the .1:r-u.-.1:11,...,1 frame, p .. ovide, lnet .. II, an .. m .. 1ntaln p .. op.,.ly deelgne .... nd c.onetru;-.t. .. tempor-.. ry bra;-.Ing oP .. deq,u .. te et .. ength to prev.,,t dlelo .. atlon, dltltortlon, ._ .... c.1<.1ng, , .. I11ng-0PP, ., .. any other damage to the ,.c,rk. ., .. any oP It. c.omponent p .. rte .. ue to Poreeeeabl• no .. mal exc.enlv• ... 1nd11 anc:I earth"lu .. k.e P ........ , ... ithout ad .. ltlonal c.011t to owner. 111ep .. 1r o .... epla;-.e .. t no added ...,.t, damage portion• oP "'ork. oP .. omponent part.. C::.. l"rovld• 6' ht . .-.h .. in link. t:,c:,,..,-1.-...de .. round drlpllne oP ex111tlng l:r-H• to be prot.c.te... M .. 1nt .. 1n t:>ar .. 1 ....... , and pr-event any m .. terl .. l• etor .. g• .... vel,l;-.ular ac.c.••• ,.,thin prote .. te .. are ... l"ll'U!: l"RQTl!C::.TIONl"lll06IIIAM l"OL.IC::.11!!5 AND l'tl!:~1Jlllll!:Ml!!NT5 I" .e l'U!:~U I l'tl!:Ml!:NTe i=>••lgn, ln•t .. 11 .. t1on and modIPIUltlon or •x1etIng veget .. tlon el, .. 11 be In ;-.onf .... m .. nc.• ..iltl, one oP th• following "c.ondltlone" ., .. ae r•q,u1 ..... or mad!PI• .. t:>!j the City. It ,.1, .. 11 be the reap .. nelblllty of the appllc. .. nt to develop a pl .. n ..ihlc.h meete the ,. ... p .. oteeblon r•q,ulrem•nte. l!:nvlronmental c.onetr-.. 1nt1t ., .. oh .. r-eetr-I;-.ttc,n plac.ed upon the dev•lopm•nt el,all not be eonelde .. ed Ju11t1,ieat1 .. n , .... m .. dH'1 .... t1on or ayt:,c, .... 1n..t1on "' Pl .. • p .. ot..-.t1 .. n et .. nda .. de,. The elt• planning ot the development ehall 111e1tlefy t,oth th• Plre pr-ot.ec.tlon etandar-de and •nvlrc:>nm•ntal c.onetr-.. Inte. 1".9-1 C:.ONDITION A -MANUl"Ac::.TIJl'tl!!i::> SL.Ol"I: l"ll'tl!: l"l'IOTl!!CTION (Se• App•nc:llx 1".2) l"e .. t..lne l:o m .. n mcode •lop•• abutting high rlek. Pl .. • areae ae deec. .. lbed unde .. Sec.tlon II C.I Sl!!C::.TION A-I -m•aeured l'lorlzontally :20' outl'I ...... Prom th• out.lyln9 •dg• oP •l:r-u;-.tur-e( e). I. l"l .. nt. .. "'"" g .... und c.ove .. ., .. '""' gr"""lng •l,rub epe;-.lee (leee than 5' In 1,eight) i<nOl'ln to 1,av• Pl .. • reta ...... nt q,u .. lltl••· :2. No tre•• ., .. ehr-ul:>e al I ...... d. 5. lrr-1g..t• ... Sl!!c::.TIO!il A-:2 -meaeured ., .... 1Zontall:1 :20' outwar .. Pr-om th• outlying edge oP Se;-.tlon A-1. I. l"lante .. with ,.,,. ..... ter u•• nat:ur .. llzing plant •pee.I•& k.n .. "'" bo have lo" Pue! .-.1,ar-.. ,._ terl•t 1.-.e. :2. No l:r-••· .. 11 ........ 9. lr-r1g .. ted. Sl!!c::.TION A-5 -mea•ured outl'lar-d Prom the c:,utlylr19 edge of A-2 t .. lnc.lude the remainder c:,P the ....... t:,et,..en Se~tion A-:1 .. nd h1gt, .. iek. Pl .. • a .. ..,. ... d••c.rlbed und• .. S.;-.tlon II C.. Horlzoni:col .. ,,...,,, ... Pr-.. m the 11tr-ueture(111) to tmtre .. ted high risk. .,,. • .,. •"1011 not be lee• than 60'. I. l"l .. nted l'lith '""" .... t.,.. uee nal:ur-allzlng plant tope;-.lee known to h .. v• lo,; Pue! ;-.har ........ ,.ti..e. :2. r .... ,. are all .. w• .. but a,h .. 11 not be plant•d c.loeer th .. n :20' ap .... t. 9. Irrigated. I" .5-:2 C::.ONDITION S -NATlVI!: 51..0l"ee -~IL.2'L.ANCI l"ll'U!: SLll"l"lltl!!S9I0N (S.• App•n .. lx I" .:2) l"•l'"talne to .. ,. • .,. ..tie .. • ... mov .. 1 oP •nvlronment. .. lly eene1t1v• n .. t.,v• vegetation I• reel:r-lc.ted ,.ltl,ln h Plr• ••;-.tlone. Sl!CTION SI -m•oeur•d 20' horl.zontall\j Prom the outlying edge oP the ,otr-uc.l:ur•e) ..,,.. .... d th• envlronment .. lly .... 1:r-1c.ted area oe dePlne .. ~ th• C::.itl.j . I. i'temov .. I oP t,1gt, fu•T an .. mo .. erate h .. z .. rd tope.-.1e111" ... ll•ted In Appendix 1".I. :i. l"l .. ntlng ,.,ti, ground c.ov•r ., .. lol'I grol'llng ehrub •peel•• (le,oe than S' In helgl,t) l<n .. wn to hav• ,i,-• reta .. dant q,volltle• ., .. ae othe!"l'llit• .. eq,ul .. ed t:>!j th• C::.lioy. 5. No l:r-••• or ahrul:>e .. 11owe ... 4. Irrigated. el!!C,TION e2 -meaeur• .. 1,c, .. 1zont..lly 20' outw .. rd Prom th• outlying edge oP eI. I. lllemoval of "high Puel •p•col••• .. ., llttted In Appendix 1".I. 2. !llemoval t:>!j ,.., ... 1:1v• pruning oP up to 60% oP tl,e volum• oP th• "mod•rc::tt. Pu•! •p-ln" ae lleted In App•ndlx l".I. 5. Replantlr19 ,.,th naturalizing , .. ,. Pu•! ep• .. '••· 4. Tr••• an .. I .. rg• l:r-•• ,., .. m ehrut:>e (•.g. o .. "-", 51/mae, Tolj<)n) ,.h1 .. 1, ar-• be1n9 r•taln• .. •l,c:,11 be pr-un•d t .. provld• .-., ... ,.or .. • •q,u .. I to three tlm•• th• 1,•Jghl: o, th• e.urr-oundlng tmderetory plant ma1:e .. 1 .. I or 6', ..ihlc.hever le high•r. Dead and •x.-.-Iv•ly tl'llggy grc:,,.tt, ,.1, .. 11 alee, b• .. emov•d. 5. lrr1g .. t• ... Sl!!CTION es -meaeu ..... l,c:,r1zontally 20' outwar .. , .. .,m th• out.1y1r19 •dg• oP S...tlon e:2. Th• out. .. •dg• "' ee ,.1, .. 11 exten .. hcrlz:ontallly to a point at l•a .. t 60' Prom •truc.t:u .. ••· I. Remov.,I ~ "high fuel spec.I••• ae llet•d In Appendix F'.I. 2. lltemov .. 1 t:>!j ••l•c.tlve pruning oP up to 4"ll oP h volume oP the 'mod.,. .. t. ,u•I ep•;-.ln" ae llete .. In Appendix F'.I. 5. rr .. ,. ord , .... ge l:r-•• Porm ,.t,rut:,,. (e.g. Oak.e, sum .. e, Toyon) l'lhl;-.h are b•lng retained ,.i, .. 11 be prun• .. to provld• .. I.ar .. n .. • eq,u .. I to th .. •• times h heigl,t ot the •urroun .. lng und•retory plant mat.rial ., .. 6', wl,iel,•v• .. I• hlghe... Dead .. nd ex~-lvely twiggy gro,;th el,QII .. ,,.., be t"emove ... 4, Non-lrr-lg .. ted. I" .5-4 Maint•nan .. • .. ,._ ... ,.,. ,.t,c;1II l:>d provided to th• Plre prot.ec.tlon ar-. 1".9-5 DebrI• and l:r-immlng• pr-oduc.ed by thlmlr19 ah .. 11 be rem .. ved Pr .. m h 11ft. .. ,.. ehall be c.onv•r-ted to mul;-.h by a c.hlpp1n:,i mac.hln• .. nd evenly dl111p•r••d ..ver-the a .. .., t,o a m .. x1mum depth .. , 4'. 00' oP the n..tlve tmdl1>i:lll"be .. .,,.. .... 1".9-1 Th• l"lr• Dep .. rtment m .. y .. •q,ulr-e do.-.um•ntar-y photograph• oP elopn at the time c,f treat:ment.. l"i,otograpn. "'' II ... ., .. 1n In po•••••lon oP the City aa ..... , ... enc.• ,., .. Putur-e malni:er,an;-.e lnr,pec.tlone by th• C::.It.y. NATIVl!:S Adenoetoma Pae;-.lc.ula1:Ym c::,l,amltte Arteml111la c.al!Pomlea C...l!Pomla eaget:>rueh l!! .. 109onum f ... .-.1 .. ulatum Suc.kwheat SalVI .. •p-lee s .. g• other •pe.-.I•• ae topec.lPled by the C::.li:y i::>OMl!5T1CS Ac.ac.10 11peel•• Ac:-.. .-.1 .. C..drue epec.lea C::.ed .... Gupr••eue epe.-.1.,. ~ .. .,.,. Podonae .. vla;-.oea Hopeeed l!!ueh l!!uealyptue epecolee l!!uealyptue ..lmiperue ep• .. I•• Juniper l'"ennlttel:um l"ountaln $1" .... !'"Inv• top•c.ree l"ln• oth•r ape;-.!•• ar, •p-lfled t,y th• City MOi::>l!!lllATI!! HAZA!lli::> Sl"l!Cll!!5 Het•rom•I•• arbut!P .. 11.. Toyon Malo&ma laur-in.. L.aur-•I St./mac. Ghler.-.u• c:!Ymoe.. !Serub Oak. ~• Jntegr!Poll.. L•m .. n .. de e. .. ry Ayloc.oc.uc.ue bl-c.olo.. Ml6&k:>n Manzanita other •pee.I•• ... epe.-.lP!ed by h C.li!:I· CITY OF CARLSBAD PLANNING DEPARTMENT ~ ----------.,,---------,,----r---.-------------,---,--.---,--; " AS-BUil T" AREA 3,1 -PLANTING SPECIFICATIONS APPROVED MM 6/JEST /!!Jl)//.DER DRAWN JR LP-0 1ST SUBMITTAL 02-09-07 VILLA6ES Or LA (;()STA APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDIN5 PRECISE LOCATION OF PLANTIN5 AREAS. www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 LANDSCAPE ARCHITECTURE & PLANNING 2ND SUBMl'ITAL 3-13-07 DATE TIE OAKS -!!I.I 3RD SUBMITTAL 4-30-07 ~Tl:,::TLE~•=====;;;;.;;;;:::;;;,;~;=======:.i...--l--+---------------!---l---l--+--l I APPRQllE[)..f } "'-•I~ I 4TH SUBMITTAL 7-02-07 RECEIVED BY: __ .a.f"l_--'-_-.,..\"(-'-.... ~-t--.ecr:=~~!!!2i~~~=.._---~-j.\~o1 MYLAR SUBMITTAL 7-10-07 :;P;L~AiN~N~l~N:::G===:;;==~~~~~==:,;=:~D~A;:,T;E::=::::=:=,~- DWN BY: ---PROJECT NO. DRAWING NO. CHKD BY: --C,T OS-14 446-4L RVWD BY: JOB NO. 0&-038 DATE 04-30-07 SCALB AS SHOWN INSPECTOR DATE DA 1E INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL 011-IER APl'ROVAL CITY APPROVAL ) )