HomeMy WebLinkAboutDWG 490-1A; PD 15-10; LO RESIDENCE; 01-08STORM WATER POLLUTION PREVENTION NOTES GENERAL SITE MANAGEMENT REQUIREMENTS THE FOLLOWING GENERAL SITE MANAGEMENT REQUIREMENTS SHALL BE ADHERED TO THROUGHOUT THE DURATION OF THE CONSTRUCTION WORK (YEAR ROUND). 1, IN CASE EMERGENCY WORK IS REQUIRED, CONTACT: PETER &-SUNNY LO FROM: ARIZONA AT (TEL.NO.) 480-657-8540 2. DEVICES SHOWN ON CITY APPROVED PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 3. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO 'woRKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 4. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORSEEN CIRCUMSTANCES WHICH MAY ARISE. 5. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO .PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREATE A HAZARDOUS CONDITION. 6. GRADING AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY. 7. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT ( 40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 8. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM AGGREGATE. 9. ALL EXPOSED DiSTURBED AREAS MUST HAVE EROSION PROTECTION BMPs PROPERLY INSTALLED. THIS INCLUDES ALL BUILDING PADS, UNFINISHED ROADS, AND SLOPES. 10. ADEQUATE PERIMETER PROTECTION BMPs MUST BE INSTALLED AND MAINTAINED AND WILL BE UPGRADED, IF NECESSARY, TO PROVIDE SUFFICIENT PROTECTION FROM RUNOFF DURING RAIN EVENTS. 11. ADEQUATE SEDIMENT CONTROL BMPs MUST BE INSTALLED AND MAINTAINED. 12. ADEQUATE BMPs TO CONTROL OFFSITE SEDIMENT TRACKING MUST BE INSTALLED AND MAINTAINED. 13. A MINIMUM OF 125% OF THE MATERIAL NEEDED TOO INSTALL STANDBY BMPs TO PROTECT THE EXPOSED AREAS FROM EROSION AND PREVENT SEDIMENT DISCHARGES, MUST BE STORED ONSITE. AREAS ALREADY PROTECTED FROM EROSION USING PHYSICAL STABILIZATION OR ESTABLISHED VEGETATION STABILIZATION BMPs ARE NOT CONSIDERED TO BE "EXPOSED" FOR PURPOSES OF THIS REQUIREMENT. 14. THE OWNER/DEVELOPER/CONTRACTOR MUST FOLLOW "WEATHER TRIGGERED" ACTION PLAN AND BE ABLE TO DEPLOY STANDBY BMPs TO PROTECT THE EXPOSED PORTIONS OF THE SITE WITHIN 48 HOURS OF A PREDICTED STORM EVENT (A PREDICTED STORM EVENT IS DEFINED AS A 40% CHANCE OF RAIN WITHIN A 5-DAY NATIONAL WEATHER SERVICE FORECAST). ON REQUEST, THE OWNER/DEVELOPER/CONTRACTOR MUST PROVIDE PROOF OF THIS CAPABILITY. 15. DEPLOYMENT OF PHYSICAL OR VEGETATION EROSION CONTROL BMPs MUST COMMENCE AS SOON AS SLOPES ARE COMPLETED. THE OWNER/DEVELOPER/CONTRACTOR MAY NOT RELY ON THE ABILITY TO DEPLOY STANDBY BMP MATERIALS TO PREVENT EROSION OF SLOPES THAT HAVE BEEN COMPLETED. 16. THE AREA THAT CAN BE CLEARED, GRADED, AND LEFT EXPOSED AT ONE TIME IS LIMITED TO THE AMOUNT OF ACREAGE THAT THE CONTRACTOR CAN ADEQUATELY PROTECT PRIOR TO A PREDICTED RAIN EVENT. FOR LARGER SITES, GRADING SHOULD BE PHASED. IT MAY BE NECESSARY TO DEPLOY EROSION AND SEDIMENT CONTROL BMPs IN AREAS THAT ARE NOT COMPLETED, BUT ARE NOT ACTIVELY BEING WORKED BEFORE ADDITIONAL GRADING IS ALLOWED TO PROCEED, AT THE DISCRETION OF THE CITY INSPECTOR. 17. ALL DISTURBED AREAS THAT ARE NOT COMPLETED AND/OR NOT BEING ACTIVELY GRADED MUST BE FULLY PROTECTED FROM EROSION IF lEFT FOR 14 OR MORE DAYS. THE ABILITY TO INSTALL BMP MATERIALS IN A PROMPT MANNER IS NOT SUFFICIENT, BMPs NEED TO BE INSTALLED IN THESE AREAS. 18. BMPs MUST BE STOCKPILED AT VARIOUS LOCATION THROUGHOUT THE PROJECT SITE THROUGHOUT THE YEAR. WHENEVER THERE IS A 40% CHANCE OR GREATER OF A RAIN WITHIN A THREE (3) DAY FORECAST, THE INSPECTOR WILL VERIFY THAT BMPs ARE ADEQUATELY STOCKPILED. BMPs MUST BE STOCKPILED AND READY FOR DEPLOYMENT WHEN THERE IS 50% CHANCE OF RAIN WITHIN A 48 HOUR FORECAST. FAILURE TO COMPLY WITH THIS REQUIREMENT COULD RESULT IN THE ISSUANCE OF A STOP WORK NOTICE OR OTHER ENFORCEMENT ACTION. 19. ALL TREATMENT AND EROSION CONTROL BMPs MUST BE INSPECTED WEEKLY AND PRIOR TO A FORECASTED RAIN EVENT OF GREATER THAN 50%, AND AFTER A RAIN EVENT. IN ADDITION, TREATMENT CONTROL BMPs MUST BE SERVICED AS NEEDED THROUGHOUT THE YEAR. 20. IF SELECTED BMP FAILS DURING A RAIN EVENT, IT MUST BE REPAIRED OR IMPROVED OR REPLACED WITH AN ACCEPTABLE ALTERNATE AS SOON AS IT IS SAFE TO DO SO. THE FAILURE OF A BMP INDICATES IT WAS NOT ADEQUATE FOR THE CIRCUMSTANCES IN WHICH IT WAS USED. REPAIRS AND REPLACEMENT MUST THEREFORE PUT A MORE ROBUST BMP MEASURE IN PLACE. 21. ALL CONSTRUCTION EMPLOYEES MUST BE TRAINED ON THE IMPORTANCE OF STORM WATER POLLUTION PREVENTION AND BMP MAINTENANCE. TEMPORARY. EROSION CONTROL PLANTING AND IRRIGATION ALL PERMANENT AND TEMPORARY EROSION CONTROL PLANTING AND IRRIGATION SHALL BE INSTALLED AND MAINTAINED AS REQUIRED IN SECTION 212 OF THE STANDARD SPECIFICATIONS AND THE FOLLOWING: A. HYDROSEEDING SHALL BE APPLIED TO: 1. ALL SLOPES THAT ARE GRADED 6:1 (HORIZONTAL TO VERTICAL) OR STEEPER WHEN THEY ARE: a. THREE FEET OR MORE IN HEIGHT AND ADJACENT TO A PUBLIC WALL OR STREET. b. ALL SLOPES 4 FEET OR MORE IN HEIGHT. 2. AREAS GRADED FLATTER THAN 6: 1 WHEN ANY OF THE FOLLOWING CONDITIONS EXIST: a. NOT SCHEDULED FOR IMPROVEMENTS(CONSTRUCTION OR GENERAL LANDSCAPING) WITHIN 60 DAYS OF ROUGH GRADING. b. IDENTIFIED BY THE PARKS AND RECREATION DIRECTOR AS HIGHLY VISIBLE TO THE PUBLIC. c. HAVE ANY SPECIAL CONDITION IDENTIFIED BY THE CITY ENGINEER THAT WARRANTS IMMEDIATE TREATMENT. 8. HYDROSEEDED AREAS SHALL BE IRRIGATED IN ACCORDANCE WITH THE FOLLOWING CRITERIA: 1. ALL SLOPES THAT ARE GRADED 6: 1 OR STEEPER AND THAT ARE: a. THREE TO EIGHT FEET IN HEIGHT SHALL BE IRRAGATED BY HAND WATERING FROM QUICK COUPLERS/HOSE BIBS OR A CONVENTIONAL SYSTEM OF LOW PRECIPITATION SPRINKLER HEADS PROVIDING 100% COVERAGE. b. GREATER THAN 8 FEET IN HEIGHT SHALL BE WATERED BY A CONVENTIONAL SYSTEM OF LOW PRECIPITATION SPRINKLER HEADS PROVIDING 100% COVERAGE. 2. AREAS SLOPED LESS THAN 6: 1 SHALL BE IRRIGATED AS APPROVED BY THE CITY ENGINEER, PRIOR TO HYDROSEEDING. THE DEVELOPER SHALL SUBMIT A PROPOSED SCHEME TO PROVIDE IRRIGATION TO THE CITY ENGINEER. THE PROPOSAL SHALL BE SPECIFIC REGARDING THE NUMBERS, TYPES AND COSTS OF THE ELEMENTS OF THE THE PROPOSED SYSTEM. 3. IRRIGATION SHALL MAINTAIN THE MOISTURE LEVEL OF THE SOIL AT THE OPTIMUM LEVEL FOR THE GROWTH OF THE HYDROSEEDED GROWTH. C. HYDROSEEDING MIX SHALL CONSIST OF ALL OF THE FOLLOWING: 1. SEED MIX SHALL CONSIST OF NO LESS THAN: a. 20 lbs. PER ACRE OF ROSE CLOVER b. 20 lbs. PER ACRE OF ZORRO FESCUE c. 3 lbs. PER ACRE OF E SCHOOL CIA CALIFORNICA d. 4 lbs. PER ACRE OF ACHILLEA MILLEFOLIA e. 3 lbs. PER ACRE OF AL YSSUM (CARPET OF SNOW) f. 1 /2 lb. PER ACRE OF DIMORPHOLECA g. ITEMS c,d,e, AND f OF THIS SUBSECTION MAY BE OMITTED ON LOCATIONS WHERE THE AREA BEING HYDROSEEDED IS NOT VISIBLE FROM EITHER A PUBLIC STREET OR RESIDENTIAL STRUCTURES. h. ITEM a OF THIS SUBSECTION MUST BE INOCULATED WITH A NITROGEN FIXING BACTERIA AND APPLIED DRY EITHER BY DRILLING OR BROADCASTING BEFORE HYDROSEEDING. i. ALL SEED MATERIALS SHALL BE TRANSPORTED TO THE JOBSITE IN UNOPENED CONTAINERS WITH THE CALIFORNIA DEPARTMENT OF FOOD AND AGRICULTURE CERTIFICATION TAG ATTACHED TO, OR PRINTED ON SAID CONT Al NERS, j. NON-PHYTO-TOXIC WETTING AGENTS MAY BE ADDED TO THE HYDROSEED SLURRY AT THE DISCRETION OF THE CONTRACTOR. 2. TYPE 1 MULCH APPLIED AT THE RATE OF NO LESS THAN 2000 lbs PER ACRE. TYPE 6 MULCH (STRAW) MAY BE SUBSTITUTED, ALL OR PART, FOR HYDRAULICALLY APPLIED FIBER MATERIAL. WHEN STRAW IS USED IT MUST BE ANCHORED TO THE SLOPE BY MECHANICALLY PUNCHING NO LESS THAN 50% OF THE STRAW INTO THE SOIL. 3. FERTILIZER CONSISTING OF AMMONIUM PHOSPHATE SULFATE, 16-20-0, WITH 15% SULPHUR APPLIED AT THE RATE OF 500 lbs. PER ACRE. D. AREAS TO BE HYDROSEEDED SHALL BE PREPARED PRIOR TO HYDROSEEDING BY: 1. ROUGHENING THE SURF ACE TO BE PLANTED BY ANY OR A COMBINATION OF: a. TRACK WALKING SLOPES STEEPER THAN 6: 1 b. HARROWING AREAS 6: 1 OR FLATTER THAT ARE SUFFICIENTLY FRIABLE. c. RIPPING AREAS THAT WILL NOT BREAK UP USING ITEMS a OR b ABOVE. 2. CONDITIONING THE SOILS SO THAT IT IS SUITABLE FOR PLANTING BY: a. ADJUSTING THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP BUT NOT SATURATED SEED BED. b. THE ADDITION OF SOIL AMENDMENTS, PH ADJUSTMENT, LEACHING COVERING SALINE SOILS TO PROVIDED VIABLE CONDITIONS FOR GROWTH. E. HYDROSEEDED AREAS SHALL BE MAINTAINED TO PROVIDE A VIGOROUS GROWTH UNTIL THE THE PROJECT IS PERMANENTLY LANDSCAPED OR, FOR AREAS WHERE HYDROSEEDING IS THE THE PERMANENT LANDSCAPING, UNTIL THE PROJECT IS COMPLETED AND ALL BONDS RELEASED. 2. ALL SLOPES SHALL HAVE IRRIGATION INSTALLED AND BE STABILIZED, PLANTED AND/OR HYDROSEEDED WITHIN TEN (10) DAYS OF THE TIME WHEN SLOPE IS BROUGHT TO GRADE AS SHOWN ON THE APPROVED GRADING PLANS. 3. SHOULD GERMINATION OF HYDROSEEDED SLOPES FAIL TO PROVIDE EFFICIENT COVERAGE OF GRADING SLOPES (90% COVERAGE) PRIOR TO OCTOBER 1, THE SLOPES SHALL BE STABILIZED BY AN APPROPRIATE EROSION CONTROL MATTING MATERIAL APPROVED BY THE PUBLIC WORKS INSPECTOR. 4, LANDSCAPING SHALL BE ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLANS FOR THIS PROJECT OR AS DIRECTED BY THE CITY ENGINEER OF PLANNING DIRECTOR. 5. THE OWNER/APPLICANT SHALL ENSURE THAT ALL CONTRACTORS SHALL COORDINATE THE WORK OF THIS CONSTRUCTION SWPPP SHOWN ON ANY GRADING PLANS, LANDSCAPE AND IRRIGATION PLANS, AND IMPROVEMENT PLANS AS REQUIRED FOR THIS PROJECT TIER 2 CITY STORM PREVENTION PLAN SW 15 WATER (TIER 2 427 POLLUTION SWPPP) BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE Erasion Control Sediment Control BMPs Tracking Nan-Storm Water Management BMPs Waste Management and Materials BMPs Control BMPs Pollution Control BMPs ' C C C a ~ ~ .Q 0 :,:; C C -0 :,:; (I) -0 C ~ "' 0 E C <I) C "' <.) <.) C C "' E 0 ~ 0 :J :J 0 'C: ,9-0 0 ~ L L -0 <I) :,:; E (I) :,:; L 2 -0 "' 0, L ~ ~ C :J >, 0, -a C (I) L (I) -"' "' en 0 ·c: '-0-L 0 o~ 0, (l_ (I) C C > L (I) Oo 'C: C <fl C 0 w C (I) "' C 0 a, (l_ a L (I) > "' L 0 (I) (I) (I) 0 C o, en " en ,= (I) 0 C OL 0 ~ al Best Management Practice* .s .c: C E en 0 -0 en 2 0 <I) "' <.) (I) (/) en "" <I) "' a, 0 C "' C "CJ en :;::;> -0 (I) 3: C 0 ::::, (BMP) ➔ (I) co< 0 ~ 0 0 3' C L Q -0 w -0 >, 0"' CC 0 (I) Description 0 (I) :3 :J ·-"' L u C 0 0 a, (/) ·-o> 0,-"'" 0 (I) 0 0 "' > "' (I) 2 0 "' 0 C (I) fr: E 0 ~ N u, ~ 0 u o,:;::; (I) (I) C E~ 0 u, X (I) (l_ L C 0 (I) 0 E c< -~ :J .Cl E ~ :.= (/) :.= 3: '-:;:; C 0 .Cl -·-L 0 ·c: "' (]) ·-LJ_ ~ UC u, 1n L ~ "CJ .C: C (I) <.) L IB ~ -0 ,_ (I) . ...,,u "u ,-L 0 (I) L (I) u L~ .() L _Q 0 ·--:"" 0 ~ 0 a ~·-(l_ "CJ (I) (I) C -ae 0 > " ~ .c (I) ~o ~ 0 (I),_ 0 L Q 0 ~ _Q 0 I LU a o 0-01 .So 0 L 0 Q. 0 a~ 0 L X (I) Q L (I) .c L ~ 0 0 ~ L (n C ~o ~ Q_ w I "' 5 WO ui 1/) (/) u [;: ·"' (/) > (/) (/) Q_ (/) fr: 3: Q_ Q_ 0 Q_ 2 (/) 2 (/) -0 I N t') CASQA Designation ➔ sj-t') sj-(/) r--N t') r--IX) -N r--ro "' - - (0 IX) ---I I I I I I I I I I I I I I I I I I I I I I I 0 0 0 0 0 0 w w w w w w w w "' "' (/) (/) (/) (/) 2 2 ::, Construction Activity w w w w w w (/) (/) (/) (/) (/) (/) (/) (/) f--f--z z z z 3: 3= 3: X Grading/Soil Disturbance >< >< X IX X '>< X 1< >< X Trenching/Excavation IX ~ X Stockpiling Ix . y I Drilling/Boring Concrete/ Asphalt Sawcutting I)< Concrete Flatwork X ''>< Paving Conduit/Pipe Installation I)< Stucco/Mortar Work >< IX IX IX Waste Disposal X X X IX Staging/Lay Down Area X X X IX Equipment Maintenance and Fueling >< X X Hazardous Substance Use/Storage . X X X IX Dewatering . Site Access Across Dirt Other (list): Instructions: 1. Check the box to the left of all applicable construction activity (first column) expected to occur during construction. 2. Located along the tap of the BMP Table is a list of BMP's with it's corresponding California Stormwater Quality Assoc.iation (CASQA) esignatian number. Choose one or more BMPs you intend tq use during construction from the list Check the box where the chosen activity row intersects with the BMP column. 3. Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project. -0 C 0 (I) ~ C "' (I) 0 0 ~ en :,:; :s:~ ~ o~ (I) C ,<C C C (I) ~ (I) "' (I) (I) > gi E =i E "' E ~ _: 3: (I) 0 (I) ~ (I) Q_ 0 t'. "' i" "' L "' tJ 0 ~ D 0 uo i-= C •-C NC cc (l_ 0 O O 0 0 O 0 (1)0 (/) 2 I::, 0 2 sj-(/) "' IX) I I I I 2 ::, 2 2 3: 3: 3= 3= >< X X X X X X X X X X X X X X \ CITY OF OCEANSIDE HIGHWAY 78 i,vo ' ~ CITY OF VISTA \ PACIFIC\\ 8 ;3 ~ \''.--'Rc.::0:c,A,_,__~ ' ' ' ,'' OCEAN l L ·",.:_~· .. · CQsfA, \ I \ \ \ \ \ \ \ I CITY OF ENCINITAS . ',,-. VICINITY MAP T.B. PG. 1147-Jl NOT TO SCALE SHEET INDEX: SHEET 4: TITLE SHEET SHEET 5: EROSION CONTROL PLANS APN: 223-2so-07-oo SITE ADDRESS: 3325 VENADO STREET CARLSBAD CA, 92009 AREA OF DISTURBANCE AREA OF DISTURBANCE 26,000 S.F. (THIS AREA INCLUDES BUT IS NOT LIMITED TO OFF-SITE WORK INCLUDING PUBLIC IMPROVEMENTS AND TEMPORARY DISTURBANCE SUCH AS VEHICLE AND EQUIPMENT STAGING AREAS, CONSTRUCTION WORKER FOOT TRAFFIC, SOIL/GRAVEL PILES, UTILITY TRENCHES, BACKFILL CUTS AND SLOPE KEYWAYS) CONSTRUCTION THREAT: LEGEND (DELETE ITEMS NOT USED ON THE SITE MAP) CONSTRUCTION THREAT TO STORM WATER QUALITY (CHECK BOX): DESCRIPTION SE-1, SILT FENCE SE-3, SEDIMENT TRAP SE-5, FIBER ROLL SE-6, GRAVEL BAG TR-1, STABILIZED CONSTRUCTION ENTRANCE NS-1, WATER CONSERVATION PRACTICES EC-2, PRESERVATION OF EXISTING VEGETATION EC-4, HYDROSEEDING EC-8, WOOD MULCHING WM~1, MATERIAL DELIVERY AND STORAGE WM-2, MATERIAL USE WM-3, STOCKPILE MANAGEMENT WM-4, SPILL PREVENTION AND CONTROL WM-5, SOLID WASTE MANAGEMENT WM-8, CONCRErE WASTE MANAGEMENT SYMBOL • • SE-3 --.f'R-FR-FR- 'cx:::ccccccco:::o' rGfH1l1 NS-1 EC-2 EC-4 EC-8 WM-1 WM-2 WM-3 WM-4 WM-5 WM-8 WEATHER TRIGGERED ACTION PLAN THE DEVELOPER SHALL DEPLOY STANDBY BEST MANAGEMENT PRACTICE MEASURES TO COMPLETELY PROTECT THE EXPOSED PORTIONS OF THE SITE WITHIN 48 HOURS OF A PREDICTED STORM EVENT (A PREDICTED STORM EVENT IS DEFINED AS A FORECASTED, 40% CHANCE OF RAIN BY THE NATIONAL WEATHER SERVICE), IN ADDITION TO BMPs IMPLEMENTED YEAR-ROUND INCLUDING PERIMETER CONTROL, WIND EROSION CONTROL, TRACKING, NON-STORM WATER CONTROL, WASTE MANAGEMENT, AND MATERIALS POLLUTION CONTROL. THE NATIONAL WEATHER SERVICE FORECAST SHALL BE MONITORED AND USED BY THE DEVELOPER ON A DAILY BASIS. IF PRECIPITATION IS PREDICTED (40% CHANCE OF RAIN), THEN THE NECESSARY WATER POLLUTION CONTROL PRACTICES SHALL BE DEPLOYED WITHIN 48 HOURS AND PRIOR TO THE ONSET OF THE PRECIPITATION. THE DEPLOYMENT OF THE BMPS SHALL INCLUDE BUT NOT BE LIMITED TO GRAVEL BAGS AND SILT FENCES. A MINIMUM OF 125% OF THE MATERIAL NEEDED TO INSTALL STANDBY BEST MANAGEMENT PRACTICES MEASURES TO PROTECT THE EXPOSED AREAS FORM EROSION AND PREVENT SEDIMENT DISCHARGES MUST BE STORED ON-Sl,TE. AREAS THAT HAVE. ALREADY BEEN PROTECTED FROM EROSION USING PHYSICAL STABILIZATION OR ESTABLISHED VEGETATION STABILIZATION BMPS AS DETERMINED BY THE CITY OF CARLSBAD ARE NOT CONSIDERED TO BE "EXPOSED" FOR THE PURPOSES OF "WEATHER TRIGGERED ACTION PLAN". AN ADEQUATE SOURCE OF EQUIPMENT AND WORKERS SHALL BE AVAILABLE FOR DEPLOYMENT OF "WEATHER TRIGGERED BMPS". OWNER'S CERTIFICATE I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPs) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO AVOID THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; ANb (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 2 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND SIGNED OFF BY THE CITY OF CARLSBAD. P,ETE LO pll-,Jt.,b DATE DATE ENGINEERING & SURVEYING SINGLE SOURCE DEVELOPMENT CONSULTANT 310 VIA VERA CRUZ, #205 SAN MARCOS, CA. 92078 (760) 510-3152 Ph / (760) 510-3153 Fax l?lJ HIGH □ MEDIUM OWNER/APPLICANT: NAME: SUNNY .& PETE LO ADDRESS: 11480 N. 99th ST., SCOTTSDALE, AZ 85260 TELEPHONE NO.: 480-657-8540 EMERGENCY CONTACT: NAME: SUNNY & PETE LO ADDRESS: 11480 N. 99th ST., SCOTTSDALE, AZ 85260 TELEPHONE NO.: 480-657-8540 I SH7EET I CITY OF CARLSBAD I SHEETS I ~------------------------------1 ENGINEERING DEPARTMENT . 8 NAME OF PREPARER: _ _,c;DO"'U"°GceLc,AS"--"E~ . ..sL:e.OG"'A"'N,__ __ _ QUALIFICATION OF PREPARER: CIVIL ENGINEER ADDRESS: ,,.,~3_10_VI_A_VE_R_A_C_R_U_Z~, L#_20_5 _____ _ /-~S~AN~M~A~R=CO=S~C~A~92=0~7~8 _____ _ I : •' 3152 39726 R.C.E,/CERT. NO. C 39726 C/V\\.. 12/31/17 09/13/16 LIC. EXP. DATE DATE CITY STORM WA rER POLLUTION PREVENTION PLAN TIER 2 TITLE SHEET FOR: DWN BY: BMW CHKD BY: ~ RVWD BY: ~ THE LO RESIDENCE VEN ADO STREET CARLSBAD, CA PROJECT NO. PD15-10 DRAWING NO. 490-1A (.'.) z >--w > D:'.·2 ::J 0 (/) u : . "'clQ (/) w c.'.lu z Cl:'. Cl:'. @ W(.'.) W,::J Zo (.'.)Q z w ... ' _J _J -=c <( 2 I-Lil Ul. , <(....:... o"-u N 0,Lf) I·,... un ZI <( 0 0::: ~ Lf) (/) ' " 0 Q:'., z w ww Zz ('.)0 ZI WORK. ~------------------------------------------------------------------------------------------------------------------------------------------------------w~ 9/73/2016 3 09 PH R: \Projects\7373-Sunny Lo\7373-GP04,dwg : I I I I Cl ll p ~ 2 Cl 2 C: s: tu ~ o· ll );, § 2 Cl 2 C g Ol m :0 1. SET POSTS AND EXCAVATE A 4 BY 4 IN (10 BY 10 CM) TRENCH UPSLOPE FROM AND ALONG THE LINE OF POSTS. 4 IN (10 CM) 3. BACKFILL AND COMPACT THE EXCAVATED SOIL. SILT FENCE NOT TO SCALE I SC-1 I O'MIN, SE-6 r-' 1 r SUPPLY WATER-'--j-+._.._ ~SPiLLWAY TO WASH Q9 ill / \ ;:; USE GRAVEL BAGS, STRAW BALES OR OTHER APPROVED METHODS TO CHANNELIZE RUNOFF TO BASIN AS REQUIRED WHEELS IF ,-p ~ NECESSARY 0 f---0 w <( w z"' w f---> (/) EXISTING EDGE OF PAVEMENT NOTE: 0 UNOFF DIVERSION RIDGE 12'1vilN. t ALL AREAS OF SIGNIFICANT VEHICLE TRAF~IC (SITE ENTRANCES, ACCESS ROADS, PARKI_NG LOTS, ETC.) SHOULD BE STABILIZED IMMEDIATELY AFTER GRADING TO PREVENT EROSION AND CONTROL DUST. SITE ENTRANCES AND EXITS ARE ESPECIALLY IMPORTANT. USE GRAVEL APPROACHES TO LIMIT TRACKING OF SEDIMENT OFFSITE: STABILIZED CONSTRUCTION ENTRANCE NOT TO SCALE I TC-1 I ~~i~s~~D $~eg~Nc8 THE FACE OF THE SLOPE VARIES BETWEEN 2.4 M AND 6.0 M OJ OJ NOTE: INSTALL FIBER ROLL ALONG A LEVEL CONTOUR. TYPICAL PIJ3ER ROLL _INSTALLATION 20 10 0 _J N 20 SCALE IN FEET SCALE: 1" = 20' 40 NOT TO SCALE I SC-5 I I' C 39726 I_·: ENGINEERING & SURVETING SINGLE SOURCE DEVEtOPMEl\'T CONSUtTA<"IT 31 0 VI_A VERA CRUZ, #205 SAN MARCOS, CA. 92078 (760) 510-3152 Ph / (760) 510-:3153 Fax I :' i SE-5 (TYP.) ·,2_, . ---0 ', ~~~-:+----\ -I I -' I ' \ $ '& i:,, <,I ~-:f,i'., I \ f ' " I EC-2 I . SE-,5 (TYP.) "'Q_J,<...:?'J),'...J'. 4' MIN. TYPICAL BERM AT THE: TOP OF ALL FILL SLOPES NOT TO SCALE ' 3 BAGS HIGH (MAX.) 2 BAGS HIGH (MIN.) ( ) ( ) ) NOTE: LOWER BAG ROW TO BE BURIED 6" UNDER GRADE. <D GRAVEL BAG CHECK DAM NO SCALE I sC-6 I ~i 1 ;:o I (/) I ri7 rt7Ul -I SW 15-427 TIER 2 SWPPP .------'-<----------~--~~------if sH.BEn __ , CITY OF CARLSBAD I sH.BEETsl :=:::;;:::::::::-==::;=:.::E:::N:::G:::IN::::E_E::R:::IN:::G::;.':D::::EP::A:::R:::r::M::EN::T=· :::==:=.~:::::::::::~ N.AME OF PREPARER: -~D=O~U~G=LA'""s~·=E~: =LO=G~A~N~--- QUALIFICATION OF PREPARER: CIVIL ENGINEER ADDRESS: 110 VIA VERA CRUZ, #205 / AN MARCOS, CA,92078 f _· J I ; / / / l/ PHONt/N I ,, / I ,39726 12/31 /17 R.C.E./CERT. NO. LIC. EXP. DATE 09/13/16 DATE EROSION CONTROL PLANS FOR: THE LO RESIDENCE VENADO STREET CARLSBAD, CA AP __ PR_ ovrn_.: // -__ .I_ -__ ,u' JASON s. GELDERT .::::::CC":::-:=:'.'.25.~~:'i::''-::-::-:7::--==~;:-:-,:-:--l(,>·/4· ~/_{, CITY ENGi ER RCE 63912 EXPIRES 9 30 16 DATE DWN BY: CHKD BY: RYWD f)Y; -· BMW KC KC- PROJECT NO. PD15-10 DRAWING NO. 490-1A (') z ;,': w y -· ¢,:: 2: DO r~ ~Q ' V) I W \ll u ~ij ,w (') w :') Zc, c..90 z ~~ '..J <( '<( f-2 Vl W '<( •-"'-0'-._ u i_ N 0Lfl ·I..-~ on zl -<l'. 0 Ct: ~ : l[) li ~ :::,'. 0 <l'. co •-{'-.. z,__, 0o fr'. z W• ww z :z 00 ·----------------------•---------------------------------------------------•-------------•----------------------------------------------------•------••R■:■\■Pilirc■1■ec■t•s•\■73•711.3■-■Slli,_■,n■n•y■L■o■\■7■3■L■-c•r■oP•o•s•_•dv■vg ___ 10•/■J■/■2110■1F•,•9•:1114■-■"■:~■-■--·r ~ ! I I jl I' j 11 II '