HomeMy WebLinkAboutSDP 16-07; OLIVENHAIN MUNICIPAL WATER DISTRICT; FINAL SOILS REPORT; 2020-10-05
5710 Ruffin Road | San Diego, California 92123 | p. 858.576.1000 | www.ninyoandmoore.com
October 5, 2020 Project No. 108425008
Mr. Jason Hubbard
Olivenhain Municipal Water District (OMWD) 1966 Olivenhain Road Encinitas, California 92024
Subject: As-Graded Geotechnical Report OMWD New and Remodeled Operations and Administration Facilities Project 1966 Olivenhain Road Encinitas, California Grading Permit # GR2017-0019
Dear Mr. Hubbard:
In accordance with your request, Ninyo & Moore has provided geotechnical observation and
testing services during earthwork operations for the New and Remodeled Operations and
Administration Facilities project located at 1966 Olivenhain Road in Encinitas, California
(Figure 1). SCST, Inc. performed a geotechnical evaluation for the Building D project dated
March 3, 2016. Subsequently, we performed additional borings and geotechnical laboratory
testing to evaluate the suitability of the soil in the upper 5 feet of the building pad for reuse as
engineered fill. (Ninyo & Moore, 2017) Additionally, a separate building pad preparation summary
letter was prepared for the project (Ninyo & Moore, 2019). This report provides a summary of our
services during remedial grading, building pad preparation, utility installation, and pavement
section construction for the subject project.
SITE AND PROJECT DESCRIPTION
The project consisted of the construction two structural additions to the existing Olivenhain
Municipal Water District Operations and Administrations Buildings. The construction was
performed in two phases, Schedule A and Schedule B. Schedule A included the construction of
an approximately 6,800 square foot structure and Schedule B included an approximately
4,000 square-foot structural addition. The proposed additions are wood framed structures with
steel columns supporting a wood joist system, with stucco and masonry stone exterior finishes.
The foundations consist of a mat slab and individual shallow footings for the columns. Additional
exterior improvements included permeable pavers, concrete flatwork, asphalt concrete
pavement, striping, landscaping, and storm water detention systems.
Geotechnlc~I a. Environment~! Science, ConJultanti
Ninyo & Moore | 1966 Olivenhain Road, Encinitas, California | 108425008 | October 5, 2020 2
GEOLOGY AND SUBSURFACE CONDITIONS
Geologic units encountered during grading operations included fill and alluvium. The referenced
geotechnical evaluation also indicates that Santiago Formation underlies the fill and alluvium at the
site (SCST, Inc., 2016). The subsurface conditions encountered during grading were generally
consistent with the geology described in the referenced geotechnical evaluation (SCST, Inc., 2016).
As encountered, the fill materials generally consisted of brown, moist, loose to medium dense, silty
sand with scattered gravel, cobbles, and boulders. The alluvium generally consisted of various
shades of brown, moist to wet, loose to very dense, silty and clayey sand and stiff to very stiff, sandy
clay. Further detail and descriptions of the earth units encountered are provided in the project
geotechnical evaluation (SCST, Inc., 2016) and supplemental data report (Ninyo & Moore, 2017).
SITE PREPARATION
Site preparation began with the removal of existing foundations, utility lines, vegetation, asphalt,
concrete, and other deleterious debris from areas to be graded. Clearing and grubbing extended
to the outside of the limits of grading and proposed improvements. The debris and unsuitable
material generated during clearing and grubbing was removed and disposed of offsite.
Remedial grading for the building pad included removal of existing fill and alluvium to a depth of
approximately 5 feet below existing grade or deeper. The limits of the removals were extended
5 feet or more beyond the footprint of the building pad. Prior to placing fill, a layer of Tensar TX5
geogrid was placed at the base of the excavation. Some areas of the excavation were found to
be wet and yielding to construction equipment traffic. Prior to placement of the geogrid, these
areas of the excavation bottom were stabilized using ¾ inch crushed rock wrapped in a layer of
nonwoven filter fabric. The approximate limits and depths of the soil removals for the building
pad over excavation are shown on Figure 2.
SUMMARY OF EARTHWORK OPERATIONS
Our field representatives were on-site periodically as requested during earthwork operations for
the preparation of the building pad and site improvements that occurred from February 26, 2019
to August 5, 2020. Removals for the remedial grading of the building pad and exterior
improvement areas were performed in general accordance with the recommendations
presented in the project geotechnical evaluation (SCST, Inc., 2016) and the grading plans
(IEC, 2018). Removal bottoms were observed by a Ninyo & Moore representative prior to
Ninyo & Moore | 1966 Olivenhain Road, Encinitas, California | 108425008 | October 5, 2020 3
placement of fill and were found to be in general accordance with the conditions anticipated in
the project geotechnical evaluation (SCST, Inc., 2016).
Subsequent to the soil removals, the onsite soils were stockpiled for reuse as engineered fill. To
raise the site elevations import soils were utilized to attain finish grade elevations. The
excavated soils, imported fill materials, and aggregate base were placed in thin lifts, moisture
conditioned to near optimum moisture content, and compacted. Utility trench backfill operations
generally consisted of moisture conditioning the trench spoils to near optimum moisture content,
placing in thin lifts, and compacting.
To perform the noted earthwork operations, the contractor utilized a combination of various
equipment including dozers, excavators, loaders, sheep’s foot roller compactors, and water
trucks. Various combinations of construction equipment were used to perform the
overexcavations, removals, and fill placement and compaction operations. Asphalt paving
operations were performed with a combination of a skip loader, paver, smooth drum roller and
rubber tired roller.
LABORATORY TESTING
Laboratory testing was performed on the soils utilized by the contractor during the earthwork
operations. Testing included the evaluation of modified Proctor density/moisture content
relationships for the soils and aggregate base, expansion index, pH and resistivity, and chloride
and sulfate content, and R-value. The Proctor density/moisture content tests were performed in
general accordance with the ASTM International (ASTM) Test Method D 1557, and the results are
presented in Table 1. The Hveem density tests of the asphalt concrete AC materials used on the
project were performed in general conformance with ASTM Test Method D1560 and those values
are presented in Table 2. The soil material placed as compacted fill was tested for expansion
index in accordance with ASTM D4829. The results of these tests are presented on Table 3.
Corrosivity testing was performed on representative samples of the on-site soils to evaluate pH
and electrical resistivity, as well as chloride and sulfate contents. The pH and electrical resistivity
tests were performed in accordance with California Test (CT) Method 643 and the sulfate and
chloride content tests were performed in accordance with CT 417 and CT 422, respectively.
These laboratory test results are presented in Table 4. R-value testing was performed in
accordance with CT 301 on subgrade soils for paved areas and the laboratory results are
presented in Table 5.
Ninyo & Moore | 1966 Olivenhain Road, Encinitas, California | 108425008 | October 5, 2020 4
FIELD TESTING
In-place density and moisture content testing was performed by our field representative to
evaluate the relative compaction of the placement of general compacted fill; trench backfill for
utilities, storm drains, sewer lines, waters lines; and subgrade and placement of aggregate base
materials. In-place density and moisture content testing of these materials was performed by
our field representative in general accordance with ASTM D 6938 (Nuclear Gauge Method).
In-place testing of the AC materials was performed in general accordance with ASTM D 2950
(Nuclear Gauge Method).
The specified compaction for general trench backfill and fill soils was 90 percent relative
compaction. The specified compaction for curb and gutter subgrade, pavement subgrade and
aggregate base, and trench backfill beneath flexible pavements was 95 percent relative
compaction. The specified relative compaction for AC materials was 95 percent relative
compaction. During the earthwork operations, when a field density test was performed that
resulted in less than the specified allowable relative compaction, the area was generally
reworked and a retest was taken. A summary of our field density test results are presented in
Attachment A. The locations of the field density tests are presented on Figures 3 through 6.
CONCLUSIONS
Based on our observations and the results of our field and laboratory tests, it is the opinion of
Ninyo & Moore that the earthwork operations observed were performed in general accordance
with the project plans and specifications, and the referenced geotechnical evaluation. The site is
considered suitable for the intended use and the compacted fill as placed is suitable for the
support of planned structure. Additionally, based on the services performed by Ninyo & Moore
during earthwork operations, the soil engineering and engineering geologic aspects of the work
observed are in compliance with the approved geotechnical report and the grading plans
(Permit No. GP2017-0019).
LIMITATIONS
The observation and testing services outlined in this report have been conducted in accordance with
current practice and the standard of care exercised by geotechnical consultants performing similar
tasks in this area. No warranty, expressed or implied, is made regarding the observations and
conclusions expressed in this report. The reported test results represent the relative compaction and
Ninyo & Moore | 1966 Olivenhain Road, Encinitas, California | 108425008 | October 5, 2020 5
moisture content at the locations tested. It is important to note that the precision of field density tests
and the modified Proctor tests is not exact and variations should be expected.
We appreciate the opportunity to be of service on this project.
Respectfully submitted,
NINYO & MOORE
Kai Vedenoja, PE Senior Project Engineer Mark Cuthbert, PE Principal Engineer
KAV/MC/gg
Attachments: References Figure 1 – Site Location
Figure 2 – As-Graded Geotechnical Map Figures 3 through 6 – Field Density Test Locations Table 1 – Modified Proctor Density Test Results
Table 2 – Asphalt Hveem Density Test Results Table 3 – Expansion Index Test Results Table 4 – Corrosivity Test Results Table 5 – R-Value Test Results Attachment A – Summary of Field Density Tests
Distribution: (1) Addressee
Ninyo & Moore | 1966 Olivenhain Road, Encinitas, California | 108425008 | October 5, 2020
REFERENCES
HB&A Architects, Inc. 2018, Project Plans, Olivenhain New and Remodeled Operations and Administration Facilities, 1966 Olivenhain Road, Encinitas, California: dated August 30.
HB&A Architects, Inc. 2018, Project Specifications, Olivenhain New and Remodeled Operations and Administration Facilities, 1966 Olivenhain Road, Encinitas, California: dated September.
Infrastructure Engineering Corporation (IEC), Inc. 2018, Grading Plans (GR 2017-0019) for: Olivenhain Muinicipal Water District New and Remodeled Operations and Administration Facilities, 1966 Olivenhain Road, Encinitas, California: dated August 30.
Ninyo & Moore, 2017, Summary of Geotechnical Consulting and Testing Services, Olivenhain Municipal Water District (OMWD) Building D, 1966 Olivenhain Road, Encinitas, California: dated December 20.
Ninyo & Moore, 2019, Building Pad Preparation, Olivenhain Municipal Water District (OMWD) New and Remodeled Operations and Administration Facilities Project, 1966 Olivenhain Road, Encinitas, California: dated August 9.
SCST, Inc., 2016, Geotechnical Investigation, Olivenhain Municipal Water District (OMWD) Building D, 1966 Olivenhain Road, Encinitas, California: dated March 3.
Ninyo & Moore | 1966 Olivenhain Road, Encinitas, California | 108425008 | October 5, 2020
FIGURES
SITE
"!o 0 1,500 3,000
FEET
MAP INDEX
San DiegoCounty
1_108425008_SL.mxd 10/2/2020 AOBNOTE: DIRECTIONS, DIMENSIONS AND LOCATIONS ARE APPROXIMATE. | SOURCE: ESRI WORLD TOPO, 2017
SITE LOCATION
OMWD OPERATIONS FACILITY REMODEL1966 OLIVENHAIN ROAD, ENCINITAS, CALIFORNIA
108425008 | 10/20
FIGURE 1
r:, .,
ir
0 <: e J Hom
D"i:>,>I
Buite rcu R.
Va leda Ln
L1n::la Sue ~'
F rn v,sr.;
EI& mo n tary
::!' _ M:i11m11,nV ., Tenn'S ~.la tch wil
-=,{: '' y
Geotechnical & Environmental Sciences Consultants
1::
~
,c a
'1>~ s:
<e. .,
7 "'
&.
5 GarlP"0
u,,~ nt
La Co_t.:,
<lVlo H ght
fil" Elem0 nlary r
Seqo1113 ~ay
Dta ueno
r.tddl
1-.,
~1.
C)' s <>;;
§'
""'
0
~ 0-f-
Ue 1,m1teo ...,o
G'"~'
.,
~.,. ,.,,« 14/IJ St
~ 11,,.,
..I'(<
'31!, lJtl)
'!.,
a
~ {.)
I
LJ Co•1.:1
Can~n flJgh
Aven1do \'.''
Olivenhai
/OVER-EXCAVATION ELEVATION(FEET, MSL)117.0AS-GRADED GEOTECHNICAL MAPFIGURE 2NOTE: DIMENSIONS, DIRECTIONS AND LOCATIONS ARE APPROXIMATE. I REFERENCE: INFRASTRUCTURE ENGINEERING CORPORATION, DATED, 7/26/2018.0FEET501000N2 108425008 AGM.DWG AOB
108425008 I 10/20Geotechnical & Environmental Sciences ConsultantsLEGENDLIMITS OF OVER-EXCAVATIONARTIFICIAL FILLQafYOUNG ALLUVIAL DEPOSITS,CIRCLED WHERE BURIEDSANTIAGO FORMATION,CIRCLED WHERE BURIED117.0116.0113.0113.0114.0115.0116.0116.0115.0114.0QyaTsaQaf/QyaQaf/QyaQaf/QyaTsaOMWD OPERATIONS FACILITY REMODEL1966 OLIVENHAIN ROAD, ENCINITAS, CALIFORNIAD 0 0 ~1/1/ 1/ -1/ 12-l.50 ~~ EXISTING BUILDING "A" ~~ / ~ 9660LI IN RD __,, I EXISTING BUILDING "B" CARTER'S HAY AND GRAIN
FIELD DENSITY TEST LOCATIONSFIGURE 3NOTE: DIMENSIONS, DIRECTIONS AND LOCATIONS ARE APPROXIMATE. I REFERENCE: INFRASTRUCTURE ENGINEERING CORPORATION, DATED, 7/26/2018.0FEET20400N3 108425008 FDT1.DWG AOB
OMWD OPERATIONS FACILITY REMODEL1966 OLIVENHAIN ROAD, ENCINITAS, CALIFORNIA108425008 I 10/20Geotechnical & Environmental Sciences ConsultantsLEGENDAGGREGATE BASE FIELD DENSITY TESTASPHALT CONCRETE FIELD DENSITY TESTAB-25AC-32SG-62SUBGRADE FIELD DENSITY TESTSG-39SG-60AB-21AB-17AB-19AB-18AB-20AB-22AB-23AB-25AB-24AC-14AC-13AC-15AC-16AC-18AC-19AC-17SG-41SG-51SG-43SG-57SG-36SG-58SG-50SG-59SG-35SG-49SG-32SG-47SG-61SG-62SG-37SG-42MATCHLINE, SEE FIGURE 2MATCHLINE, SEE FIGURE 3F-70,71,72F-73F-67,68,69F-64,65,66F-57,58,59,60F-78F-102,106F-103F-91F-82F-79S-1F-106FILL FIELD DENSITY TESTS-1SEWER BACKFILL FIELD DENSITY TESTAC-31AC-32X 125.42 . rn&AAoore JV1n9u ,,. EXISTING BUILDING "B" FF=122.2 x124.70 • • • I ,P~ I • f~<o0; <1'\J 1'.?6'··Cb, / ' -\ .. . ,j <! V) • • I I I I I • _,,. _,,. 246 ~ 45 ~--------------------• "\f . ' •
FIELD DENSITY TEST LOCATIONSFIGURE 40FEET20400N4 108425008 FDT2.DWG AOB
108425008 I 10/20Geotechnical & Environmental Sciences ConsultantsAGGREGATE BASE FIELD DENSITY TESTASPHALT CONCRETE FIELD DENSITY TESTAB-16AC-35LEGENDSG-72SUBGRADE FIELD DENSITY TESTMATCHLINE, SEE FIGURE 1MATCHLINE, SEE FIGURE 3U-6UTILITY BACKFILL FIELD DENSITY TESTSD-4STORM DRAIN BACKFILL FIELD DENSITY TESTAB-10AB-9AB-11AB-7AB-15AB-6AB-16AC-35SG-27SG-18SG-17SG-28SG-21SG-30SG-15SG-23SG-26SG-24SG-29SG-31AB-8U-5U-6SG-16SD-4SD-3F-5F-14F-15F-17F-16F-20F-18F-19F-6F-21F-22F-23F-25F-24F-26F-27F-29F-28F-61F-10F-9F-8F-30F-37F-4F-2F-35F-40F-34F-39F-12F-38F-36F-13F-33F-7F-1F-3F-50F-49F-11F-63F-100SG-68SG-69SG-67SG-70SG-71SG-72SG-55SG-56F-62F-46F-100FILL FIELD DENSITY TESTNOTE: DIMENSIONS, DIRECTIONS AND LOCATIONS ARE APPROXIMATE.REFERENCE: INFRASTRUCTURE ENGINEERING CORPORATION, DATED, 7/26/2018.AC-6AC-7AC-8AC-10U-4U-3S-6S-5S-4S-6SEWER BACKFILL FIELD DENSITY TESTF-54,55,56F-51,52,53MATCHLINE, SEE FIGURE 4OMWD OPERATIONS FACILITY REMODEL1966 OLIVENHAIN ROAD, ENCINITAS, CALIFORNIA• • • • • • • p X ~ EXISTIING BUILlllNG ·"-"A" ..., . ....._ FF=122.12 / • • • PROPOS8D BUILDING, , . FF=122'. l2' e • 0 ,.-/ ------.tv F • BO ~ 1 S2 j ~ -MEAz<l20 SF I ¥, -• • • • • • r1111---t1 • I / ~
FIELD DENSITY TEST LOCATIONSFIGURE 50FEET20400N5 108425008 FDT3.DWG AOB
108425008 I 10/20Geotechnical & Environmental Sciences ConsultantsMATCHLINE, SEE FIGURE 2SG-13SG-14SG-7,10SG-8AB-2AB-3AC-4SG-25MATCHLINE, SEE FIGURE 1NOTE: DIMENSIONS, DIRECTIONS AND LOCATIONS ARE APPROXIMATE.REFERENCE: INFRASTRUCTURE ENGINEERING CORPORATION, DATED, 7/26/2018.AC-11AGGREGATE BASE FIELD DENSITY TESTASPHALT CONCRETE FIELD DENSITY TESTAB-33AC-37LEGENDSG-84SUBGRADE FIELD DENSITY TESTF-128FILL FIELD DENSITY TESTAB-28AB-29AC-24AC-25F-127F-113,116F-118SG-54SG-45SG-40SG-48SG-66SG-53AB-26AC-20F-45F-31F-32F-43F-44F-48F-101F-42SG-34SG-38SG-63AB-27AC-22AC-21AC-23F-41F-47F-115F-120F-128F-125F-114,117F-122F-126SG-52SG-46SG-33SG-64AC-33SG-44SG-65F-119W-8WATER BACKFILL FIELD DENSITY TESTW-7W-8W-5W-2W-3W-4W-1W-6AC-12S-8SEWER BACKFILL FIELD DENSITY TESTS-7,8F-108F-75F-110F-89F-105F-83F-95F-81F-124F-84F-88F-96,98F-107F-109F-85F-93F-74F-77F-87F-111,112F-76F-90F-94,97,99F-104F-86F-80F-92S-2S-3U-2U-1U-2UTILITY BACKFILLMATCHLINE, SEE FIGURE 4F-123F-121SG-81SG-82SG-84SG-83AC-27AC-29AC-34AC-26AB-33AB-30AB-31AC-37OMWD OPERATIONS FACILITY REMODEL1966 OLIVENHAIN ROAD, ENCINITAS, CALIFORNIA1.-;.• . / • ;r \ '.":i • • •? STORM DIRAIN LINE C (PRO LE O SHEE-.c • • • • • • • PROPOSBO BUILDll'lG, ·o .. IFF=122.12 • •• • PR!OPOSEID s@IL.DING "D (SOHEDULE IB). SEE SHEET 31 • \ \ \ \ \ \ 621YP \ ~ \ \ ~ \ \ \ \ \ \~ ' \ ' \ \ _J \_.. --\ :. \ NUNEB HEETC-17) \ \ \ \ I • • • • • • •
FIELD DENSITY TEST LOCATIONSFIGURE 6NOTE: DIMENSIONS, DIRECTIONS AND LOCATIONS ARE APPROXIMATE. I REFERENCE: INFRASTRUCTURE ENGINEERING CORPORATION, DATED, 7/26/2018.0FEET20400N6 108425008 FDT4.DWG AOB
108425008 I 10/20Geotechnical & Environmental Sciences ConsultantsMATCHLINE, SEE FIGURE 2MATCHLINE, SEE FIGURE 3AGGREGATE BASE FIELD DENSITY TESTASPHALT CONCRETE FIELD DENSITY TESTAB-32AC-36LEGENDSG-80SUBGRADE FIELD DENSITY TESTF-134FILL FIELD DENSITY TESTSD-5STORM DRAIN BACKFILL FIELD DENSITY TESTAB-4AB-13,14AB-1AB-12AB-5AB-32AC-5AC-1AC-2AC-36AC-3AC-28AC-30F-130,132F-134F-129,131F-133SG-20SG-19,22SG-9SG-5SG-3SG-6SG-1SG-2,4SG-74SG-73SG-76SG-75SD-5SD-1SD-2SG-11AC-9SG-12SG-77,79SG-78,80OMWD OPERATIONS FACILITY REMODEL1966 OLIVENHAIN ROAD, ENCINITAS, CALIFORNIA/ / X 114.29 X 114.19 / /~ / 6" PVC IE=109.18 / / / 111.43 • • • • •
Ninyo & Moore | 1966 Olivenhain Road, Encinitas, California | 108425008 | October 5, 2020 1 of 1
Table 1 – Modified Proctor Density Test Results
Soil Type No. Soil Description Proctor Density (pcf)
Optimum Moisture Content (%)
1 Dark Brown Silty SAND 120.0 11.0
2 Class 2 Aggregate Base 137.5 6.0
3 Yellowish Brown Silty Sand 118.0 10.0
4 Brown Clayey SAND 122.5 11.0
5 Recycled Class 2 Aggregate Base 117.0 15.0
6 Class 2 Aggregate Base 137.5 8.0
Notes: pcf = pounds per cubic foot *Proctor Density provided by the material supplier
Table 2 – Asphalt Hveem Density Test Results
Material Type No. Soil Description Wet Density (pcf)
101 Superior Ready Mix ¾” Type III B3 147.1
102 Superior Ready Mix ¾” Type III B2 145.6
103 Superior Ready Mix ¾” Type III B3 147.5
104 Superior Ready Mix 1/2” Type III C3 146.8
105 Superior Ready Mix 1/2” Type III C2 147.3
106 Greenbook 1/2” Type III C2 146.4
Note: * = Hveem Density provided by the material supplier
Table 3 – Expansion Index Test Results
Location Soil Description Expansion Index Classification
Building Pad (Onsite) Silty Sand 2 Very Low
Building Pad (Import) Silty Sand 2 Very Low
Table 4 – Corrosivity Test Results
Location pH1
Minimum Electrical Resistivity (ohm-cm)1
Sulfate (ppm)2 Chloride (ppm)3
Building Pad (Onsite) 7.8 1960 60 290
Notes: 1Test performed in accordance with CT 643. 2Test performed in accordance with CT 417. 3Test performed in accordance with CT 422.
Table 5 – R-Value Test Results
Location Soil Description R-Value
East Parking Lot Sandy Silt 67
Private Road Subgrade Silty Sand 58
Ninyo & Moore | 1966 Olivenhain Road, Encinitas, California | 108425008 | October 5, 2020
ATTACHMENT A
Summary of Field Density Tests
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
125.7 117.4118.0
EXCAVATED BOTTOM ON BUILDING D (GL C.5/4.5)
EXCAVATED BOTTOM ON BUILDING D (GL H.10/2.8)
117.0
SLOT CUT SOUTHEAST OF BUILDING A AT GL (H/2.2)
SLOT CUT SOUTHEAST OF BUILDING A AT GL (H/2.6)
SLOT CUT SOUTHEAST OF BUILDING A AT GL (H/2.8)
MAE
MAE
MAT
7/9/19
Finer Fraction (%)
Sand in Cone (lbs) / (MC)
CF7/9/19
CF
CF
CF
MAE
MAE
MAE
MAE
Test
No.
1
2
3
5
9
6
7
4
MAE
Sand + Bottle After (lbs) / (MS)
117.0
118.0
7/9/19
7/9/19 118.0
118.0
CF
CF
NG
CF
Test No.
7/10/19
Test Of CF
WET DENSITY & ROCK CONTENTTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)
680
NG
1760
680
1022
157
765
140
Pass/Fail FAIL
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)
111.7 119.5
Tare (lbs)
Soil + Rock + Tare (lbs)
PASS PASS PASS PASS
Wet Density (pcf)
680683684
1000
683
Laboratory Maximum Density (pcf)
Dry Density (pcf)
Percent Moisture
Project Name:Operations Facility Remodel & Addition Project No:108425008
784
CF
7/10/19
Project Street Address:
Jurisdiction:
684
8
10
95 102
Permit No.:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
115.0
1757
SLOT CUT SOUTHEAST OF BUILDING A AT GL (H/2.8)
1766
23
CF
117.0
117.0
Test Date
7/8/19
7/9/19
7/8/19
1760
10
NG
1766 1766 1760
9
EXCAVATED BOTTOM ON BUILDING D (GL H.15/2.2)
EXCAVATED BOTTOM ON BUILDING D (GL H.10/2.8)
SUMMARY OF FIELD DENSITY TESTS
1
7/10/19
STANDARD& TEST COUNTS108
Sand in Cone + Hole (lbs) / (DC)
1757
MAE
818 933
NG
683
1766
NG
683
5
106 100 97 164
NG
1766
NGNG
6
CF CF
986
124
692 862
683
121.8121.7118.0 118.2
11.1
1
92 90
120.0 120.0120.0 120.0
11.0
107.9 109.6110.3
120.0
11
11.0
91
11.0 11.0 11.0
90 90
PASSPASSPASS
7.2 11.3 8.5
107.6
11.0
9.4
120.0
9.77.1
Coarse Fraction (lbs)
116.2
88 90
PASS
Retest on (if applicable)
Coarse Fraction (%)
4
MOISTURE
90
120.0
108.5
Corrected Maximum Density (pcf)
Soil Type Number
105.2
11.0
6.2
1
9090
Test Location
EXCAVATED BOTTOM ON BUILDING D (GL H.15/2.2)
EXCAVATED BOTTOM ON BUILDING D (GL H.10/2.8)
Elev. or
Depth (ft)
115.0
117.0
CF CF
90
11.0
91
90
109.2
120.0
1
90
94
11
NG
1084891
Sand + Bottle Before (lbs) / (DS)
CF CF CF
NG
Initials
MAE
Test
Of
Block
No.
CF
CF
CF
90
109.1
91
120.0
11.0
120.0
90
11.0
90
1
90
1
112.9
8.2 12.8
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
108.2
PASS
Relative Compaction (%)TEST RESULTS1
108425008_FDT_F_1 Field Density Test Sheet 2013 v 3.0
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
108.9
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
110.8 107.7113.0
120.0120.0
94
120.0
90
118.0 118.0
118.6 121.1 119.7
143
118.0
110.7 106.9
120.0
158 135
NG
722
NG
112146
Sand in Cone + Hole (lbs) / (DC)
1752
715/19
Test No.
737
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
Test
Of
Block
No.
CF
CF
CF
CF
MAE
MAE
MAE
MAE
Initials
90
11.0
Test Location
EXCAVATED BOTTOM ON BUILDING D AT GL (H.8/2.5)
EXCAVATED BOTTOM ON BUILDING D AT GL (H.8/2.8)
Elev. or
Depth (ft)
114.0
114.0
90
92
1
CF
90
92
1
11.0 11.0
120.0
93
120.0
111.9
10.0
Coarse Fraction (lbs)
123.1
Percent Moisture
1
Coarse/Finer Fraction in Max (%)
118.0
119.0
119.0
CF7/12/19
7/12/19
715/19 CF
MAE
MOISTURE
MAE
MAE
MAE
MAE
MAE
CF
CF
CF
11.0 8.9
92
120.0
91
110.9
1
90 90
3
92
10.0
9090
3
90
3111
90 90
11.0 11.0 11.0 11.0 10.0 10.0
9292
7.9
108.0
9.6 11.6 9.2
110.9
7.410.1 9.2
121.3 119.3
CF CF CF
NG
1777
CF
132159136 120 139
1745
Test
No.
Laboratory Maximum Density (pcf)
1752
679
18
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / C.5-D)
1777
12 13
20
685
CF
1916
CF CF
Wet Density (pcf)
15
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
715/19
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
Project Name:Operations Facility Remodel & Addition Project No:108425008
117.0
115.0
14
Test Date
7/11/19
115.0
SUMMARY OF FIELD DENSITY TESTS
679
8441850 900
NG
685
1777
679
867821 771 1310
CF CF
NG
685 679
11
12
679
EXCAVATED BACK FILL ON BUILDING D AT GL (H.8/2.5)
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / C-C .5)
1745
20
NG
1777
NG
17 1814
CF
789
7/11/19
11
715/19
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
Corrected Maximum Density (pcf)
Optimum Moisture (%)
PASS
Specified Relative Compaction (%)
PASS PASS PASS PASS PASS PASSPASS PASSPass/Fail
Retest on (if applicable)
PASSTEST RESULTSSoil Type Number
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
123.0 123.1
13
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
15
19
16
17
7/12/19
7/12/19
Coarse Fraction (%)
Test Of
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / C-C.5)
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / C-C.5)
117.0
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / C-C.5)
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / C.5-D)
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / C.5-D)
120.0
Finer Fraction (%)
679
117.0
NG
685
1745
NG
1745
117.9
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
26
27
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / D-F)
25
7/16/19
681
NG
28
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / F.5-G)
1768
22 23
30
30
CF
NG NG
1768
2926
CF CF
NG
27 2824
NG
CF CF
Test
No.
21
22
23
25
7/17/19
120.0
115.0
CF7/16/19
MAE
MAE
7/17/19 117.0
119.0MAE
Test
Of
7/17/19
118.0
1759 17591768 1759
682679
10.6
116.9 122.8
880
116.8 121.4
8.7
10.010.0
3
118.0
PASS PASS PASS PASS
Wet Density (pcf)
Laboratory Maximum Density (pcf)
114.9 114.9
10.7
90
679
Percent Moisture
120.0 120.3
10.8
Sand in Cone + Hole (lbs) / (DC)812
Project Name:Operations Facility Remodel & Addition Project No:108425008
119.024
Test Date
7/16/19
7/16/19
7/16/19
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / D-F)
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / D-F)
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
117.0
MAE
MAE
MAE
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
CF
NG
877
NG
679
1768
NG
679
131 151
CF
1223 775
1760
137
682682679
820922 940
153 137 112
1768
123173 129
119.8
10.0
3
90
10.0
9090
333
12.9
Coarse Fraction (%)
Finer Fraction (%)
151
PASS
8.7
CF
CF
Sand + Bottle Before (lbs) / (DS)
7/18/19
29
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
90
Soil Type Number
92
118.0
108.1
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTS107.1
9.2
119.3
Initials Test Location
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / C.5-D)
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / D-F)
Elev. or
Depth (ft)
120.0
115.0
MAE
Block
No.
CF
CF
110.9
9.8
106.4
7.5MOISTURE
115.0
21
1768
679Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
CF
CF
CF
118.0
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / F-F.5)
120.0
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / F-F.5)
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / F-F.5)
SLOT CUT BACK FILL WEST OF BUILDING A AT GL (3-6 / F-F.5)
110.7
10.0
33 3
90
91 94
PASS
90
9490
PASS
7/16/19
Test Of CF CF CF
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
805 804
CF
CF
Coarse Fraction (lbs)
MAE
MAE
MAE
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
90
Dry Density (pcf)
Relative Compaction (%)
106.3
9.5
91
3
PASSPASS
118.0
105.7 109.8
118.0 118.0118.0
92
10.0
90
106.9 108.9
118.0
90
3
118.0
93
90
90
10.0 10.0 10.010.0
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
36
37
EXCAVATED BACK FILL ON BUILDING D AT GL (2.5 / H.5)
35
7/19/19
682
NG
38
EXCAVATED BACK FILL ON BUILDING D AT GL (2.5/ H.5)
1771
32 33
40
40
CF
NG NG
1771
3936
CF CF
NG
37 3834
NG
CF CF
Test
No.
31
32
33
35
7/22/19
116.0
117.0
CF7/19/19
MAE
MAE
7/19/19 118.0
117.0MAE
Test
Of
7/22/19
120.0
1771 17751771 1775
682683
10.0
131.8 122.3
697
125.7 120.5
8.6
10.010.0
3
118.0
PASS PASS PASS PASS
Wet Density (pcf)
Laboratory Maximum Density (pcf)
120.7 118.7
11.2
90
683
Percent Moisture
119.5 120.1
10.2
Sand in Cone + Hole (lbs) / (DC)642
Project Name:Operations Facility Remodel & Addition Project No:108425008
117.034
Test Date
7/19/19
7/19/19
7/19/19
EXCAVATED BACK FILL ON BUILDING D AT GL (3.0 / H.5)
EXCAVATED BACK FILL ON BUILDING D AT GL (5 / H.5)
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
117.0
MAE
MAE
MAE
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
CF
NG
574
NG
683
1771
NG
683
149 144
CF
760 800
1775
167
682683683
669795 840
159 129 130
1771
145143 128
128.4
11.0
1
90
11.0
9090
131
10.0
Coarse Fraction (%)
Finer Fraction (%)
154
PASS
10.3
CF
CF
Sand + Bottle Before (lbs) / (DS)
7/22/19
39
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
90
Soil Type Number
99
118.0
116.5
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTS120.5
9.4
127.2
Initials Test Location
CELL TOWER BACK FILL AT GL (7-8 / HB-J)
CELL TOWER BACK FILL AT GL (7-8 / HB-J)
Elev. or
Depth (ft)
112.0
114.0
MAE
Block
No.
CF
CF
110.0
8.3
116.1
8.7MOISTURE
119.0
31
1760
681Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
CF
CF
CF
118.0
EXCAVATED BACK FILL ON BUILDING D AT GL (6.3/ H.7)
118.0
EXCAVATED BACK FILL ON BUILDING D AT GL (3.5/ F.8)
EXCAVATED BACK FILL ON BUILDING D AT GL (3.5/ H.5)
EXCAVATED BACK FILL ON BUILDING D AT GL (3.0/ H.5)
110.6
10.0
33 1
90
100 92
PASS
90
9492
PASS
7/18/19
Test Of CF CF CF
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
1327 1139
CF
CF
Coarse Fraction (lbs)
MAE
MAE
MAE
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
90
Dry Density (pcf)
Relative Compaction (%)
108.6
11.5
93
1
PASSPASS
118.0
107.6 109.5
120.0 120.0120.0
95
10.0
91
111.0 114.1
120.0
90
3
118.0
93
90
97
11.0 11.0 11.010.0
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
109.9
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
110.4 106.6110.0
118.0118.0
93
120.0
90
118.0 118.0
120.8 120.2 128.4
180
118.0
115.1 109.7
118.0
141 105
NG
781
NG
158147
Sand in Cone + Hole (lbs) / (DC)
1760
7.24/19
Test No.
774
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
Test
Of
Block
No.
CF
CF
CF
CF
MAE
MAE
MAE
MAE
Initials
90
10.0
Test Location
EXCAVATED BACK FILL ON BUILDING D AT GL (6.75/ J.5)
EXCAVATED BACK FILL ON BUILDING D AT GL (6.2/ J.5)
Elev. or
Depth (ft)
114.0
114.0
90
98
3
CF
90
94
3
10.0 10.0
118.0
93
118.0
110.3
10.1
Coarse Fraction (lbs)
121.4
Percent Moisture
3
Coarse/Finer Fraction in Max (%)
118.0
118.0
118.0
CF7/23/19
7/23/19
7/24/19 CF
MAE
MOISTURE
MAE
MAE
MAE
MAE
MAE
CF
CF
CF
9.7 6.7
91
120.0
93
112.2
3
90 90
3
93
10.0
9090
3
90
3113
90 90
10.0 11.0 11.0 10.0 10.0 10.0
9794
10.2
107.9
9.2 7.9 7.7
116.5
11.213.3 7.1
125.7 118.4
CF CF CF
NG
1760
CF
115118111 154 139
1793
Test
No.
Laboratory Maximum Density (pcf)
1760
684
48
EXCAVATED BACK FILL ON BUILDING D AT GL (4.0/ HB.8)
1760
42 43
50
684
CF
4946
CF CF
Wet Density (pcf)
45
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
7/24/19
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
Project Name:Operations Facility Remodel & Addition Project No:108425008
116.0
116.0
44
Test Date
7/23/19
116.0
SUMMARY OF FIELD DENSITY TESTS
680
908865 784
NG
684
1760
680
771642 705 857
CF CF
NG
684 680
41
42
684
EXCAVATED BACK FILL ON BUILDING D AT GL (6.75/ J.4)
EXCAVATED BACK FILL ON BUILDING D AT GL (6.2/ J.4)
1793
50
NG
1760
NG
47 4844
CF
804
7/23/19
41
7/24/19
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
Corrected Maximum Density (pcf)
Optimum Moisture (%)
PASS
Specified Relative Compaction (%)
PASS PASS PASS PASS PASS PASSPASS PASSPass/Fail
Retest on (if applicable)
PASSTEST RESULTSSoil Type Number
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
121.1 117.4
43
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
45
49
46
47
7/23/19
7/23/19
Coarse Fraction (%)
Test Of
EXCAVATED BACK FILL ON BUILDING D AT GL (6.75/ J.3)
EXCAVATED BACK FILL ON BUILDING D AT GL (6.2/ J.3)
117.0
EXCAVATED BACK FILL ON BUILDING D AT GL (6.5/ JB)
EXCAVATED BACK FILL ON BUILDING D AT GL (6.5/ J.5)
EXCAVATED BACK FILL ON BUILDING D AT GL (3.2/ HB.8)
115.0
Finer Fraction (%)
680
122.2
NG
684
1793
NG
1793
116.2
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
56
57
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (7.2/D.5)
55
7/25/19
681
NG
58
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (7.5/D.5)
1767
52 53
60
60
CF
NG NG
1767
5956
CF CF
NG
57 5854
NG
CF CF
Test
No.
51
52
53
55
7/25/19
118.0
120.0
CF7/25/19
MAE
MAE
7/25/19 116.0
116.0MAE
Test
Of
7/25/19
118.0
1767 17671767 1767
681681
12.6
116.0 115.5
1287
123.5 119.5
11.0
10.010.0
3
118.0
PASS PASS PASS FAIL
Wet Density (pcf)
Laboratory Maximum Density (pcf)
110.4 120.0
8.9
90
680
Percent Moisture
121.4 123.5
8.4
Sand in Cone + Hole (lbs) / (DC)913
Project Name:Operations Facility Remodel & Addition Project No:108425008
116.054
Test Date
7/24/19
7/24/19
7/25/19
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (6.8/D.5)
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (7.2/D.5)
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
120.0
MAE
MAE
MAE
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
CF
NG
928
NG
681
1793
NG
680
130 170
CF
947 816
1767
123
681681681
7961038 847
126 124 130
1793
174145 157
116.0
10.0
3
90
10.0
9090
333
10.1
Coarse Fraction (%)
Finer Fraction (%)
122
PASS
13.2
CF
CF
Sand + Bottle Before (lbs) / (DS)
7/25/19
59
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
90
Soil Type Number
91
118.0
107.0
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTS106.2
9.2
120.6
Initials Test Location
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (6.8/D.5)
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (6.8/D.5)
Elev. or
Depth (ft)
116.0
118.0
MAE
Block
No.
CF
CF
106.1
8.8
113.5
9.6MOISTURE
120.0
51
1793
680Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
CF
CF
CF
118.0
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (7.2/D.5)
118.0
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (7.5/D.5)
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (7.5/D.5)
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (7.5/D.5)
111.3
10.0
33 3
90
90 90
PASS
90
9493
PASS
7/24/19
Test Of CF CF CF
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
789 746
CF
CF
Coarse Fraction (lbs)
MAE
MAE
MAE
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
90
Dry Density (pcf)
Relative Compaction (%)
110.3
8.1
85
3
PASSPASS
118.0
106.0 106.1
118.0 118.0118.0
95
10.0
90
100.7 111.6
118.0
90
3
58
118.0
90
90
96
10.0 10.0 10.010.0
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
110.1
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
112.9 105.8109.2
118.0118.0
93
118.0
90
118.0 118.0
114.4 124.9 120.4
118
118.0
107.1 107.2
118.0
132 138
NG
752
NG
140135
Sand in Cone + Hole (lbs) / (DC)
1767
7/26/19
Test No.
891
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
Test
Of
Block
No.
CF
CF
CF
CF
MAE
MAE
MAE
MAE
Initials
90
10.0
Test Location
EXCAVATED BACK FILL ON BUILDING D AT GL (3.5/ F.5)
EXCAVATED BACK FILL ON BUILDING D AT GL (6.0/ H.5)
Elev. or
Depth (ft)
120.0
120.0
90
91
3
CF
90
96
3
10.0 10.0
118.0
90
118.0
106.1
9.6
Coarse Fraction (lbs)
116.3
Percent Moisture
3
Coarse/Finer Fraction in Max (%)
118.0
120.0
116.0
CF7/25/19
7/25/19
7/26/19 CF
MAE
MOISTURE
MAE
MAE
MAE
MAE
MAE
CF
CF
CF
8.8 9.2
94
118.0
91
113.5
3
90 90
3
93
10.0
9090
3
90
3333
90 90
10.0 10.0 10.0 10.0 10.0 10.0
9496
8.2
110.7
10.1 12.6 10.3
111.3
9.88.1 10.0
117.9 120.7
CF CF CF
NG
1767
CF
149169140 123 140
1747
Test
No.
Laboratory Maximum Density (pcf)
1767
681
68
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (8.5B/D.5)
1767
62 63
70
681
CF
6966
CF CF
Wet Density (pcf)
65
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
7/26/19
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
Project Name:Operations Facility Remodel & Addition Project No:108425008
116.0
118.0
64
Test Date
7/25/19
120.0
SUMMARY OF FIELD DENSITY TESTS
672
1229825 938
NG
681
1767
672
779816 843 782
CF CF
NG
681 672
61
62
681
EXCAVATED BACK FILL ON BUILDING D AT GL (2.25/ H.5)
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (8.2B/D.5)
1747
70
NG
1767
NG
67 6864
CF
700
7/25/19
61
7/26/19
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
Corrected Maximum Density (pcf)
Optimum Moisture (%)
PASS
Specified Relative Compaction (%)
PASS PASS PASS PASS PASS PASSPASS PASSPass/Fail
Retest on (if applicable)
PASSTEST RESULTSSoil Type Number
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
122.8 119.2
63
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
65
69
66
67
7/25/19
7/25/19
Coarse Fraction (%)
Test Of
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (8.2B/D.5)
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (8.2B/D.5)
120.0
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (8.3B/D.5)
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (8.3B/D.5)
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (8.3B/D.5)
116.0
Finer Fraction (%)
672
120.9
NG
681
1747
NG
1747
122.1
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
104.9
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
108.0 113.8109.4
118.0118.0
93
118.0
96
118.0 118.0
122.6 120.6 119.9
119
118.0
112.2 113.3
118.0
141 125
NG
832
NG
923149
Sand in Cone + Hole (lbs) / (DC)
1747
7/29/19
Test No.
819
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
Test
Of
Block
No.
CF
CF
CF
CF
MAE
MAE
MAE
MAE
Initials
90
10.0
Test Location
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (8.5B/D.5)
SLOT CUT BACK FILL SOUTH OF BUILDING B AT GL (8.5B/D.5)
Elev. or
Depth (ft)
118.0
120.0
90
95
3
CF
90
92
3
10.0 10.0
118.0
91
118.0
107.4
10.8
Coarse Fraction (lbs)
119.0
Percent Moisture
3
Coarse/Finer Fraction in Max (%)
115.0
114.0
114.0
CF7/29/19
7/29/19
7/29/19 CF
MAE
MOISTURE
MAE
MAE
MAE
MAE
MAE
CF
CF
CF
10.1 8.5
88
118.0
96
112.1
3
90 90
3
89
10.0
9090
3
90
3333
90 90
10.0 10.0 10.0 10.0 10.0 10.0
9395
9.3
104.2
8.4 7.1 8.4
109.7
9.67.7 7.6
121.6 121.3
CF CF CF
NG
1769
CF
119111117 135 127
1769
Test
No.
Laboratory Maximum Density (pcf)
1747
672
78
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.4B/J)
1769
72 73
80
680
CF
7976
CF CF
Wet Density (pcf)
75
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
7/29/19
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
Project Name:Operations Facility Remodel & Addition Project No:108425008
116.0
117.0
74
Test Date
7/26/19
116.0
SUMMARY OF FIELD DENSITY TESTS
680
973838 758
NG
680
1769
680
134811 776 784
CF CF
NG
680 680
71
72
672
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.4B/F)
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.3B/F.5)
1769
80
NG
1769
NG
77 7874
CF
798
7/26/19
71
7/29/19
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
Corrected Maximum Density (pcf)
Optimum Moisture (%)
PASS
Specified Relative Compaction (%)
PASS PASS PASS PASS PASS FAILPASSFAILPass/Fail
Retest on (if applicable)
PASS
8382TEST RESULTSSoil Type Number
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
118.9 118.7
73
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
75
79
76
77
7/29/19
7/29/19
Coarse Fraction (%)
Test Of
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8/G)
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.4B/G)
114.0
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.3B/F.5)
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8/F)
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.55B/H.3)
118.0
Finer Fraction (%)
680
115.0
NG
680
1769
NG
1769
113.0
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
86
87
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.56B/J.8)
85
7/30/19
681
NG
88
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.3B/J.8)
1756
82 83
90
90
CF
NG NG
1756
8986
CF CF
NG
87 8884
NG
CF CF
Test
No.
81
82
83
85
7/30/19
114.0
115.0
CF7/30/19
MAE
MAE
7/30/19 115.0
117.0MAE
Test
Of
7/30/19
118.0
1756 17561756 1756
681681
9.8
119.8 115.9
773
121.5 119.8
7.3
10.010.0
3
118.0
PASS PASS PASS PASS
Wet Density (pcf)
Laboratory Maximum Density (pcf)
124.0 120.0
7.4
90
681
Percent Moisture
116.7 122.5
9.1
Sand in Cone + Hole (lbs) / (DC)949
Project Name:Operations Facility Remodel & Addition Project No:108425008
113.584
Test Date
7/30/19
7/30/19
7/30/19
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.4B/J)
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.2B/J.8)
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
114.0
MAE
MAE
MAE
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
CF
NG
807
NG
681
1756
NG
681
130 141
CF
897 811
1756
172
681681681
663724 805
115 117 123
Curb
123124 112
113.9
10.0
3
90
10.0
9090
333
8.5
Coarse Fraction (%)
Finer Fraction (%)
128
PASS
8.2
CF
CF
Sand + Bottle Before (lbs) / (DS)
7/30/19
89
FAIL
Retest on (if applicable)
Corrected Maximum Density (pcf)
90
Soil Type Number
88
118.0
104.4
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTS84
110.1
8.8
127.1
Initials Test Location
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.2B/J.8)
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.55B/H.3)
Elev. or
Depth (ft)
113.5
114.0
MAE
Block
No.
CF
CF
107.9
7.5
113.0
7.9MOISTURE
116.0
81
1769
680Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
CF
CF
CF
118.0
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.4B/J)
117.0
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.2B/H)
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.3B/H.8)
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.3B/J.3)
114.2
10.0
33 3
90
93 91
PASS
90
9791
PASS
7/29/19
Test Of CF CF CF
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
877 755
CF
CF
Coarse Fraction (lbs)
MAE
MAE
MAE
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
90
Dry Density (pcf)
Relative Compaction (%)
107.6
11.9
97
3
PASSPASS
118.0
110.9 109.1
118.0 118.0118.0
96
10.0
94
114.9 113.6
118.0
90
3
118.0
92
90
96
10.0 10.0 10.010.0
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
96
97
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.3B/J)
95
7/30/19
681
NG
98
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (2.5/H.B)
1756
92 93
100
100
CF
NG NG
1756
9996
CF CF
NG
97 9894
NG
CF CF
Test
No.
91
92
93
95
7/31/19
118.0
117.0
CF7/30/19
MAE
MAE
7/31/19 118.0
117.0MAE
Test
Of
7/31/19
118.0
1757 17571756 1757
683681
8.0
109.8 120.7
1066
106.7 119.2
8.7
10.010.0
3
118.0
FAIL PASS FAIL FAIL
Wet Density (pcf)
Laboratory Maximum Density (pcf)
111.0 122.7
97
7.8
90
681
Percent Moisture
119.9 115.7
9.2
Sand in Cone + Hole (lbs) / (DC)745
Project Name:Operations Facility Remodel & Addition Project No:108425008
118.094
Test Date
7/30/19
7/30/19
7/30/19
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.55B/J.8)
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.55B/H)
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
117.0
MAE
MAE
MAE
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
CF
NG
1053
NG
681
1756
NG
681
88 121
CF
119 822
1755
121
683683681
7621050 751
790 112 89
1756
112114 125
122.8
10.0
3
90
10.0
9090
333
7.4
Coarse Fraction (%)
Finer Fraction (%)
137
PASS
7.0
CF
CF
Sand + Bottle Before (lbs) / (DS)
8/5/19
99
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
90
Soil Type Number
95
118.0
112.5
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTS104.0
5.6
122.1
Initials Test Location
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.55B/H.3)
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.55B/J)
Elev. or
Depth (ft)
118.0
118.0
MAE
Block
No.
CF
CF
112.0
6.3
100.4
5.4MOISTURE
119.5
91
1756
681Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
CF
CF
CF
118.0
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.3B/J.8)
118.0
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.55B/H)
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.3B/J.8)
EXCAVATED BACK FILL ON SCHEDULE B BUILDING D AT GL (8.55B/H)
106.4
10.0
33 3
90
88 95
PASS
90
9095
PASS
7/30/19
Test Of CF CF CF
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
887 915
CF
CF
Coarse Fraction (lbs)
MAE
MAE
MAE
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
90
Dry Density (pcf)
Relative Compaction (%)
111.6
7.9
89
3
PASSPASS
118.0
114.7 110.4
118.0 118.0118.0
96
10.0
97
105.3 113.2
118.0
90
3
9998
118.0
94
90
85
10.0 10.0 10.010.0
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
111.2
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
108.2 113.8110.8
122.5122.5
90
122.5
93
122.5 122.5
123.9 130.9 119.1
133
122.5
117.3 111.0
122.5
134 132
NG
801
NG
120157
Sand in Cone + Hole (lbs) / (DC)
1755
8/6/19
Test No.
715
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
Test
Of
Block
No.
CF
CF
CF
CF
MAE
MAE
MAE
MAE
Initials
90
11.0
Test Location
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (6.5/J.5)
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.5B/F)
Elev. or
Depth (ft)
119.5
117.5
90
96
4
CF
106
90
88
4
11.0 11.0
122.5
92
122.5
112.1
10.9
Coarse Fraction (lbs)
124.3
Percent Moisture
4
Coarse/Finer Fraction in Max (%)
114.0
117.5
117.0
CF8/5/19
8/5/19
8/5/19 CF
MAE
MOISTURE
MAE
MAE
MAE
MAE
MAE
CF
CF
CF
9.2 8.9
90
122.5
91
120.2
4
90 90
4
91
11.0
9090
4
90
4444
90 90
11.0 11.0 11.0 11.0 11.0 11.0
9098
8.1
110.2
9.8 7.9 7.8
110.2
7.98.9 8.9
128.8 119.8
CF CF CF
NG
1755
CF
118120141 121 149
1755
Test
No.
Laboratory Maximum Density (pcf)
1755
1753
108
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.3B/J.5)
1755
102 103
110
681
CF
109106
CF CF
Wet Density (pcf)
105
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
8/5/19
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
Project Name:Operations Facility Remodel & Addition Project No:108425008
115.5
116.0
104
Test Date
8/5/19
117.5
SUMMARY OF FIELD DENSITY TESTS
679
829789 1185
NG
681
1755
681
789824 642 809
CF CF
NG
681 681
101
102
681
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.2B/F)
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.2B/H)
1753
110
NG
1755
NG
107 108104
CF
600
8/5/19
101
8/6/19
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
Corrected Maximum Density (pcf)
Optimum Moisture (%)
FAIL
Specified Relative Compaction (%)
PASS PASS PASS PASS PASS PASSPASS PASSPass/Fail
Retest on (if applicable)
PASSTEST RESULTSSoil Type Number
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
118.1 120.7
103
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
105
109
106
107
8/5/19
8/5/19
Coarse Fraction (%)
Test Of
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.2B/J.8)
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.5B/F)
116.0
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.5B/J.B)
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.3B/J)
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.58B/J.9)
115.0
Finer Fraction (%)
679
120.0
NG
681
1755
NG
1753
118.8
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
110.9
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
111.3 107.2102.5
122.5122.5
84
122.5
88
122.5 122.5
114.5 119.1 118.1
103
122.5
110.2 110.3
122.5
118 109
NG
804
NG
172122
Sand in Cone + Hole (lbs) / (DC)
1753
8/6/19
Test No.
890
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
Test
Of
Block
No.
CF
CF
CF
CF
MAE
MAE
MAE
MAE
Initials
90
11.0
Test Location
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.2B/H.5)
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.2B/H.5)
Elev. or
Depth (ft)
117.0
117.0
90
90
4
CF
112
90
91
116 117
4
11.0 11.0
122.5
87
122.5
107.1
8.4
Coarse Fraction (lbs)
116.1
Percent Moisture
4
Coarse/Finer Fraction in Max (%)
115.0
115.0
116.0
CF8/6/19
8/6/19
8/6/19 CF
MAE
MOISTURE
MAE
MAE
MAE
MAE
MAE
CF
CF
CF
7.8 7.6
90
122.5
90
109.7
4
90 90
4
91
11.0
9090
4
90
4444
90 90
11.0 11.0 11.0 11.0 11.0 11.0
9090
7.3
110.1
7.8 11.3 8.8
110.1
12.56.8 8.6
118.8 122.8
CF CF CF
NG
1753
CF
806133126 112 118
1753
Test
No.
Laboratory Maximum Density (pcf)
1753
679
118
IMPORT BACK FILL ON BUILDING D AT GL (6.8/K.5)
1753
112 113
120
679
CF
119116
CF CF
Wet Density (pcf)
115
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
8/6/19
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
Project Name:Operations Facility Remodel & Addition Project No:108425008
115.0
116.0
114
Test Date
8/6/19
115.0
SUMMARY OF FIELD DENSITY TESTS
679
1261038 929
NG
679
1753
679
703841 829 778
CF CF
NG
679 679
111
112
679
IMPORT BACK FILL ON BUILDING D AT GL (6.3/K.3)
IMPORT BACK FILL ON BUILDING D AT GL (6.3/K.5)
1753
120
NG
1753
NG
117 118114
CF
823
8/6/19
111
8/6/19
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
Corrected Maximum Density (pcf)
Optimum Moisture (%)
PASS
Specified Relative Compaction (%)
FAIL PASS PASS PASS PASS PASSFAIL PASSPass/Fail
Retest on (if applicable)
FAILTEST RESULTSSoil Type Number
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
120.0 110.3
113
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
115
119
116
117
8/6/19
8/6/19
Coarse Fraction (%)
Test Of
IMPORT BACK FILL ON BUILDING D AT GL (6.8/K.5)
IMPORT BACK FILL ON BUILDING D AT GL (6.3/K.3)
116.0
IMPORT BACK FILL ON BUILDING D AT GL (6.3/K.5)
IMPORT BACK FILL ON BUILDING D AT GL (6.3/K.3)
IMPORT BACK FILL ON BUILDING D AT GL (6.3/K.5)
115.0
Finer Fraction (%)
679
124.8
NG
679
1753
NG
1753
119.8
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
126
127
IMPORT BACK FILL ON BUILDING D AT GL (6.8/K.5)
125
8/7/19
646
NG
128
BIOBASIN BARRIER-TOP OF SLOPE--WEST
1753
122 123
130
130
CF
NG NG
1771
129126
CF CF
NG
127 128124
NG
CF CF
Test
No.
121
122
123
125
8/7/19
118.0
118.0
CF8/7/19
MAE
MAE
8/7/19 119.5
119.5MAE
Test
Of
5/4/20
122.5
1771 17711771 1884
646683
10.0
122.9 134.6
726
124.2 111.9
6.6
11.011.0
4
122.5
PASS PASS PASS PASS
Wet Density (pcf)
Laboratory Maximum Density (pcf)
128.3 125.9
9.8
90
679
Percent Moisture
129.0 122.0
10.0
Sand in Cone + Hole (lbs) / (DC)348
Project Name:Operations Facility Remodel & Addition Project No:108425008
119.5124
Test Date
8/6/19
8/6/19
8/6/19
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.55B/J.8)
IMPORT BACK FILL ON SCHEDULE B BUILDING D AT GL (8.25B/J.8)
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
119.5
MAE
MAE
MAE
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
CF
NG
1219
NG
679
1753
NG
679
100 134
CF
531 923
1884
154
683683683
1371646 693
157 126 183
1753
125211 106
129.8
11.0
4
90
11.0
9090
444
15.4
Coarse Fraction (%)
Finer Fraction (%)
152
PASS
7.9
CF
CF
Sand + Bottle Before (lbs) / (DS)
5/4/20
129
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
90
Soil Type Number
96
122.5
118.0
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTS115.9
6.0
115.4
Initials Test Location
IMPORT BACK FILL ON BUILDING D AT GL (6.3/K.3)
IMPORT BACK FILL ON BUILDING D AT GL (6.3/K.5)
Elev. or
Depth (ft)
117.0
117.0
MAE
Block
No.
CF
CF
122.6
8.1
114.9
12.8MOISTURE
118.0
121
1753
679Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
CF
CF
CF
122.5
IMPORT BACK FILL ON BUILDING D AT GL (6.3/K.3)
118.0
IMPORT BACK FILL ON BUILDING D AT GL (6.3/K.3)
IMPORT BACK FILL ON BUILDING D AT GL (6.8/K.5)
BIOBASIN BARRIER-TOP OF SLOPE--EAST
114.4
11.0
44 4
90
95 100
PASS
90
9391
PASS
8/6/19
Test Of CF CF CF
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
353 1244
CF
CF
Coarse Fraction (lbs)
TJW
TJW
MAE
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
90
Dry Density (pcf)
Relative Compaction (%)
111.8
11.8
93
4
FAILFAIL
122.5
116.7 101.7
122.5 122.5122.5
84
11.0
95
113.7 103.2
122.5
90
4
132131
122.5
83
90
94
11.0 11.0 11.011.0
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
116.8 118.3119.0
122.5122.5
97 97
130.5
162156 168
NG
1961
115
Sand in Cone + Hole (lbs) / (DC)
1881
Test No.
1675
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
Test
Of
Block
No.
CF
CF
CF
CF
DTM
DTM
DTM
DTM
Initials
90
11.0
Test Location
BIOBASIN BARRIER-TOP OF SLOPE--EAST
BIOBASIN BARRIER-TOP OF SLOPE--WEST
Elev. or
Depth (ft)
118.0
118.0
CF
90
95
4
11.0 11.0
122.5
95
122.5
116.3
7.0
Coarse Fraction (lbs)
124.4
Percent Moisture
4
Coarse/Finer Fraction in Max (%)
MOISTURE 10.4 11.2
4
90 90
4
11.0
10.3
Test
No.
Laboratory Maximum Density (pcf)
1881
659
138
1881
132 133
140
139136
Wet Density (pcf)
135
5710 Ruffin Road, San Diego, CA 92123 Test Type:FILL
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
Project Name:Operations Facility Remodel & Addition Project No:108425008
118.0134
Test Date
5/6/20
116.0
SUMMARY OF FIELD DENSITY TESTS
1894 1877
NG
659
1881
CF CF
NG
659
131
132
659
BIOBASIN TOP (FRESHLY CUT AND COMPACTED)
BIOBASIN BARRIER-TOP OF SLOPE--EAST
140137 138134
CF
5/6/20
131
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
Corrected Maximum Density (pcf)
Optimum Moisture (%)
Specified Relative Compaction (%)
Pass/Fail
Retest on (if applicable)TEST RESULTSSoil Type Number
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
129.0 132.3
133
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
135
139
136
137
5/7/20
5/7/20
Coarse Fraction (%)
Test Of
Finer Fraction (%)
108425008_FDT_F_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
PASS
Relative Compaction (%)TEST RESULTS1
95
115.8
95
122.5
11.0
9.1
Initials
EVR
Test
Of
Block
No.
SD
NG
840900
Sand + Bottle Before (lbs) / (DS)
SD SD
95
11.0
97
95
119.3
120.0
4
Test Location
8'' INCH STORE LINE AT FEED STORE PARKING LOT
8'' INCH STORE LINE AT FEED STORE PARKING LOT
Elev. or
Depth (ft)
113.5
113.5
115.8
11.0
10.0
1
9595
MOISTURE
96
120.0
115.7
Corrected Maximum Density (pcf)
Soil Type Number
8.5
Coarse Fraction (lbs)
125.5
97 99
PASS
Retest on (if applicable)
Coarse Fraction (%)
121.2
11.0
5.2
122.5
5.9
4
11.0
122.5
4
126.3
659
5
103 144
1889
NG
6
SD
1086 1017
NG
646
1884
NG
646
9
STORM DRAIN-RD CROSSING--WEST OF CIRCLE
STORM DRAIN-RD CROSSING--WEST OF CIRCLE (ROUGH SG)
SUMMARY OF FIELD DENSITY TESTS
1
STANDARD& TEST COUNTS134
Sand in Cone + Hole (lbs) / (DC)
1886
Permit No.:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
119.5
1886 1884
23
117.0
120.5
Test Date
2/27/19
5/4/20
2/27/19
10
Project Name:Operations Facility Remodel & Addition Project No:108425008
784
SD
Project Street Address:
Jurisdiction:
727
8
10
127 94
PASS PASS
Wet Density (pcf)
727
1436
Laboratory Maximum Density (pcf)
Dry Density (pcf)
Percent Moisture
Pass/Fail PASS
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)
127.4 125.5
Tare (lbs)
Soil + Rock + Tare (lbs)
Sand + Bottle After (lbs) / (MS)
NG
Test No.
Test Of SD
WET DENSITY & ROCK CONTENTTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)
Test
No.
1
2
3
5
9
6
7
4 5/4/20
Finer Fraction (%)
Sand in Cone (lbs) / (MC)
SD5/6/20
SD
SD
SD
DTM
EVR
TJW
TJW
STORM DRAIN INTO BIO BASIN
128.4
5710 Ruffin Road, San Diego, CA 92123 Test Type:STORM DRAIN BACKFILL
108425008_FDT_SD_1 Field Density Test Sheet 2013 v 3.0
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
109.4
PASS
Relative Compaction (%)TEST RESULTS4
90
109.6
89
122.5
11.0
104.5
9.9
Initials
MAE
Test
Of
Block
No.
SM
SM
SM
90
87
11
NG
17591899
Sand + Bottle Before (lbs) / (DS)
SM SM SM
NG
90
11.0
94
90
115.6
122.5
4
Test Location
4'' INCH SEWER TRENCH BULGING D AT GL 2-7/H.5
4'' INCH SEWER TRENCH BULGING D AT GL 2-7/H.5
Elev. or
Depth (ft)
119.5
118.5
111.2
11.0
12.5
4
9090
MOISTURE
92
122.5
113.2
Corrected Maximum Density (pcf)
Soil Type Number
7.5
Coarse Fraction (lbs)
121.7
91 90
PASS
Retest on (if applicable)
Coarse Fraction (%)
8.9 10.1 10.1
110.6
11.0
12.3
122.5
8.8
PASS
11.0 11.0 11.0
8
90 90
4
92 91
120.0122.5 120.0
11.0
113.3
122.5
44
120.5 123.4
134
951 1348
678
5
130 142 134 129
NG
1770
NGNG
6
SM SM
1830620 1303
NG
678
1770
NG
678
1824
9
4'' INCH SEWER TRENCH BULGING D AT GL 2-7/H.5
4'' INCH SEWER TRENCH SCHEDULE B BUILDING D AT GL 8.4B /D-J.B
SUMMARY OF FIELD DENSITY TESTS
1
STANDARD& TEST COUNTS116
Sand in Cone + Hole (lbs) / (DC)
1770
Permit No.:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
119.5
1770 1770
23
SM
118.5
117.5
Test Date
8/26/19
8/26/19
8/26/19
10
1770 1824
Project Name:Operations Facility Remodel & Addition Project No:108425008
784
SM
5/28/20
Project Street Address:
Jurisdiction:
678
8
10
170 179
PASS PASS PASS FAIL
Wet Density (pcf)
606606678
1294
678
Laboratory Maximum Density (pcf)
Dry Density (pcf)
Percent Moisture
Pass/Fail PASS
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)
125.1 129.8
Tare (lbs)
Soil + Rock + Tare (lbs)
Sand + Bottle After (lbs) / (MS)
118.58/26/19
5/28/20 117.0
117.0SM
NG
Test No.
Test Of SM
WET DENSITY & ROCK CONTENTTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)
Test
No.
1
2
3
5
9
6
7
4 8/26/19
Finer Fraction (%)
Sand in Cone (lbs) / (MC)
SM8/26/19
SM
SM
SM
MAE
MAE
MAE
MAE
4'' INCH SEWER TRENCH SCHEDULE B BUILDING D AT GL 8.4B /D-J.B
4'' INCH SEWER TRENCH SCHEDULE B BUILDING D AT GL 8.4B /D-J.B
4'' INCH SEWER LINE A THROUGH PARKING LOT SOUTH OF BLDG D
4'' INCH SEWER LINE A THROUGH PARKING LOT SOUTH OF BLDG D
MAE
TLT
TLT
115.0 120.5120.3
5710 Ruffin Road, San Diego, CA 92123 Test Type:SEWER TRENCH BACKFILL
108425008_FDT_Sewer_1 Field Density Test Sheet 2013 v 3.0
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
PASS
Relative Compaction (%)TEST RESULTS1
95
116.5
95
122.5
11.0
7.9
Initials
MAP
Test
Of
Block
No.
UM
UM
NG
567501
Sand + Bottle Before (lbs) / (DS)
UM UM
95
11.0
91
90
111.3
120.0
4
Test Location
ELECTRICAL MAIN INSIDE BLDG "D".
ELECTRICAL MAIN INSIDE BLDG "D".
Elev. or
Depth (ft)
113.5
113.5
113.8
11.0
7.5
1
9095
MOISTURE
97
120.0
116.1
Corrected Maximum Density (pcf)
Soil Type Number
9.0
Coarse Fraction (lbs)
126.5
95 91
PASS
Retest on (if applicable)
Coarse Fraction (%)
18.0
111.8
11.0
9.0
122.5
12.6
SG29
11.0
95
4
85
122.5
11.0
103.7
122.5
44
125.7 122.4
646
5
180 124 120
NG
1884
NG
6
UM UM
11541926 1741
NG
689
1782
NG
689
9
ELECTRICAL TRENCH BUILDING D AT GL 2-5/H.3
ELECTRICAL TRENCH BUILDING D AT GL 2-2/H.3
SUMMARY OF FIELD DENSITY TESTS
1
STANDARD& TEST COUNTS135
Sand in Cone + Hole (lbs) / (DC)
2356
Permit No.:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
119.5
2356 1782
23
121.0
119.5
Test Date
8/30/19
9/10/19
8/30/19
10
1884
Project Name:Operations Facility Remodel & Addition Project No:108425008
784
UM
Project Street Address:
Jurisdiction:
661
8
10
112 135
PASS PASS FAIL
Wet Density (pcf)
661
642
646
Laboratory Maximum Density (pcf)
Dry Density (pcf)
Percent Moisture
Pass/Fail PASS
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)
122.3 121.3
Tare (lbs)
Soil + Rock + Tare (lbs)
Sand + Bottle After (lbs) / (MS)
118.55/4/20
NG
Test No.
Test Of UM
WET DENSITY & ROCK CONTENTTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)
Test
No.
1
2
3
5
9
6
7
4 9/11/19
Finer Fraction (%)
Sand in Cone (lbs) / (MC)
UM5/4/20
UM
UM
UM
TJW
MAP
MAE
MAE
ELEC TRENCH-RD CROSSING--WEST OF CIRCLE (ROUGH SG)
ELEC TRENCH-RD CROSSING--WEST EDGE OF CIRCLE (ROUGH SG)TJW
125.9
5710 Ruffin Road, San Diego, CA 92123 Test Type:UTILITY TRENCH BACKFILL
108425008_FDT_U_1 Field Density Test Sheet 2013 v 3.0
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
5710 Ruffin Road, San Diego, CA 92123 Test Type:WATER TRENCH BACKFILL
138.2 138.5144.3
6'' INCH WATER LINE AT STA. 10+03
6'' INCH WATER LINE AT STA. 10+40
6'' INCH WATER LINE AT STA. 10+38
6'' INCH WATER LINE AT STA. 10+39
MAE
MAE
MAE
4/26/19
Finer Fraction (%)
Sand in Cone (lbs) / (MC)
WM4/26/19
WM
WM
WM
MAE
MAE
MAE
MAE
Test
No.
1
2
3
5
9
6
7
4
Sand + Bottle After (lbs) / (MS)
111.04/26/19
4/26/19 112.0
113.0WM
NG
Test No.
Test Of WM
WET DENSITY & ROCK CONTENTTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)
Pass/Fail PASS
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)
125.6 141.0
Tare (lbs)
Soil + Rock + Tare (lbs)
PASS PASS PASS PASS
Wet Density (pcf)
605605605
1475
605
Laboratory Maximum Density (pcf)
Dry Density (pcf)
Percent Moisture
Project Name:Operations Facility Remodel & Addition Project No:108425008
784
WM
4/26/19
Project Street Address:
Jurisdiction:
604
8
10
133 53
Permit No.:OMWD Plan File No.:
1966 Olivenhain Road, Encinitas, Ca 92024
112.0
2059 2059
23
WM
114.0
113.0
Test Date
4/26/19
4/26/19
4/26/19
10
2059 2059 2059
9
6'' INCH WATER LINE AT STA. 10+00
6'' INCH WATER LINE AT STA. 10+00
SUMMARY OF FIELD DENSITY TESTS
1
STANDARD& TEST COUNTS126
Sand in Cone + Hole (lbs) / (DC)
2059
1261 1173
NG
605
2059
NG
605
5
83 120 108 105
NG
2059
NGNG
6
WM WM
1326
106
1332 1328
605
128.0 139.0
2
95 95
137.5137.5 137.5
6.0
130.0
137.5
12
6.0 6.0 6.0
95 95
PASS
6.9 6.3 6.5
137.4
6.0
2.4
137.5
5.010.5
Coarse Fraction (lbs)
126.0
95 100
PASS
Retest on (if applicable)
Coarse Fraction (%)
MOISTURE
95
120.0
114.0
Corrected Maximum Density (pcf)
Soil Type Number
113.4
11.0
10.8
1
9595
Test Location
6'' INCH WATER LINE AT STA. 10+00
6'' INCH WATER LINE AT STA. 10+03
Elev. or
Depth (ft)
111.0
111.0
95
11.0
100
95
137.7
120.0
2
95
95
22
NG
26331531
Sand + Bottle Before (lbs) / (DS)
WM WM WM
NG
Initials
MAE
Test
Of
Block
No.
WM
WM
WM
95
113.8
95
120.0
11.0
130.0
12.5
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
130.0
PASS
Relative Compaction (%)TEST RESULTS1
108425008_FDT_Water_1 Field Density Test Sheet 2013 v 3.0
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
5710 Ruffin Road, San Diego, CA 92123 Test Type:SUBGRADE
119.7 127.7130.1
CURB AND GUTTER ON THE SOUTHEAST SIDE OF ROUNDABOUT
CURB AND GUTTER ON THE SOUTHEAST SIDE OF ROUNDABOUT
112.0
CURB AND GUTTER SOUTH SIDE OF OMWD PRIVATE ROAD AND 80 FEET WEST OF RANCHO SANTA FE ROAD.
CURB AND GUTTER SOUTH SIDE OF OMWD PRIVATE ROAD AND 80 FEET WEST OF RANCHO SANTA FE ROAD.
ROADWAY ON THE EAST SIDE OF ROUNDABOUT
MAE
MAE
MAE
3/3/20
Finer Fraction (%)
Sand in Cone (lbs) / (MC)
CG3/4/20
CG
CG
CG
MAE
JCG
JCG
JCG
Test
No.
1
2
3
5
9
6
7
4
MAE
Sand + Bottle After (lbs) / (MS)
116.5
112.3
3/4/20
3/5/20 112.3
112.0
CG
CG
NG
CG
Test No.
3/5/20
Test Of CG
WET DENSITY & ROCK CONTENTTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)
682
NG
1755
682
1122
163
1111
152
Pass/Fail FAIL
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)
121.8 129.3
Tare (lbs)
Soil + Rock + Tare (lbs)
PASS PASS PASS FAIL
Wet Density (pcf)
682682658
957
683
Laboratory Maximum Density (pcf)
Dry Density (pcf)
Percent Moisture
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
784
CG
3/5/20
Project Street Address:
Jurisdiction:
658
8
10
146 150
Permit No.:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
115.8
1925
CURB AND GUTTER SOUTH SIDE OF OMWD PRIVATE ROAD AND 80 FEET WEST OF RANCHO SANTA FE ROAD.
1925
23
CG
115.0
114.2
Test Date
3/3/20
3/3/20
3/3/20
1755
10
ng
1759 1755 1755
9
CURB SUBGRADE @ NORTH OF EXISTING CARTER'S STORE
CURB SUBGRADE @ NORTH OF EXISTING CARTER'S STORE
SUMMARY OF FIELD DENSITY TESTS
1
3/5/20
STANDARD& TEST COUNTS149
Sand in Cone + Hole (lbs) / (DC)
1925
MAE
1097 1078
NG
658
1925
NG
658
5
147 132 150 138
NG
1759
NGNG
6
CG CG
917
138
1310 1248
683
129.7128.7132.9 134.6
11.2
4
100 95
122.5 122.5122.5 122.5
11.0
116.7 116.6123.1
122.5
44
11.0
95
11.0 11.0 11.0
10
95 95
PASSPASSPASS
9.3 9.5 9.5
119.0
11.0
10.8
122.5
9.310.5
Coarse Fraction (lbs)
129.6
90 97
PASS
Retest on (if applicable)
Coarse Fraction (%)
4
MOISTURE
96
122.5
117.3
Corrected Maximum Density (pcf)
Soil Type Number
109.7
11.0
11.0
4
9595
Test Location
CURB SUBGRADE @ NORTH OF EXISTING CARTER'S STORE
CURB SUBGRADE @ NORTH OF EXISTING CARTER'S STORE
Elev. or
Depth (ft)
115.8
114.2
CG CG
95
11.0
95
95
116.7
122.5
4
95
89
44
NG
1976675
Sand + Bottle Before (lbs) / (DS)
CG CG CG
NG
Initials
JCG
Test
Of
Block
No.
CG
CG
CG
95
123.1
100
122.5
11.0
122.5
95
11.0
95
4
95
4
109.3
8.0 10.3
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
116.6
PASS
Relative Compaction (%)TEST RESULTS4
108425008_FDT_SUBGRADE_1 Field Density Test Sheet 2013 v 3.0
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
118.6
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
117.6 117.7116.3
122.5122.5
95
122.5
96
135.5 122.5
129.1 129.8 126.5
128
122.5
130.8 132.1
135.5
143 150
NG
1669
NG
161136
Sand in Cone + Hole (lbs) / (DC)
1919
5/4/20
Test No.
1268
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
Test
Of
Block
No.
ST
ST
ST
ST
JCG
JCG
JCG
JCG
Initials
95
11.0
Test Location
PRIVATE ROADWAY @ STATION 10+25
PRIVATE ROADWAY @ STATION 10+60
Elev. or
Depth (ft)
115.5
116.0
95
97
5
ST
95
96
4
11.0 11.0
122.5
95
122.5
116.6
9.7
Coarse Fraction (lbs)
127.9
Percent Moisture
4
Coarse/Finer Fraction in Max (%)
121.2
121.5
114.5
CG5/4/20
5/4/20
5/4/20 CG
TJW
MOISTURE
TJW
TJW
TJW
TJW
TJW
CG
CG
CG
11.6 11.0
91
122.5
97
120.1
4
95 95
5
97
8.0
9595
4
95
4444
95 95
11.0 11.0 11.0 8.0 11.0 11.0
9798
6.4
111.9
4.2 5.4 6.4
118.9
10.29.7 8.1
136.3 139.2
CG CG CG
NG
1884
CG
103103129 108 87
1884
Test
No.
Laboratory Maximum Density (pcf)
1919
656
18
CURB & GUTTER-@ BIOBASIN PERIMETER-WEST
1919
12 13
20
646
CG
1916
CG CG
Wet Density (pcf)
15
5710 Ruffin Road, San Diego, CA 92123 Test Type:SUBGRADE
5/4/20
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
115.0
123.0
14
Test Date
3/27/20
115.7
SUMMARY OF FIELD DENSITY TESTS
646
12661869 2814
NG
656
1919
646
9501059 835 776
ST ST
NG
656 646
11
12
656
PRIVATE ROADWAY @ STATION 11+16
PRIVATE ROADWAY @ STATION 11+65
1884
20
NG
1884
NG
17 1814
ST
976
3/27/20
11
5/4/20
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
Corrected Maximum Density (pcf)
Optimum Moisture (%)
PASS
Specified Relative Compaction (%)
PASS PASS PASS PASS PASS PASSPASS FAILPass/Fail
Retest on (if applicable)
PASS
22TEST RESULTSSoil Type Number
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
131.2 129.1
13
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
15
19
16
17
3/27/20
3/27/20
Coarse Fraction (%)
Test Of
CURB & GUTTER-WEST OF CIRCLE--SOUTH SIDE
CURB & GUTTER-WEST OF CIRCLE--SOUTH SIDE
115.0
CURB & GUTTER-WEST OF CIRCLE--E PARKING STALLS AREA
CURB & GUTTER-WEST OF CIRCLE--E PARKING STALLS-SWALE
CURB & GUTTER-@ BIOBASIN PERIMETER-EAST
122.7
Finer Fraction (%)
646
130.7
NG
646
1884
NG
1884
119.1
108425008_FDT_SUBGRADE_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
26
27
PERMEABLE PAVING PARKING STALLS
25
5/19/20
608
NG
28
ACCESS ROAD, APPROACH TO GATE
1881
22 23
30
30
PL
NG NG
1935
2926
PL PL
NG
27 2824
NG
PL PL
Test
No.
21
22
23
25
5/19/20
116.5
120.0
PL5/19/20
JCG
JCG
5/19/20 122.0
122.0JCG
Test
Of
5/26/20
122.5
1935 19351935 1924
600662
10.5
129.5 126.8
753
125.2 128.1
7.3
11.011.0
4
122.5
PASS PASS PASS PASS
Wet Density (pcf)
Laboratory Maximum Density (pcf)
129.2 131.5
9.5
95
659
Percent Moisture
131.3 125.0
6.0
Sand in Cone + Hole (lbs) / (DC)1088
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
120.024
Test Date
5/6/20
5/6/20
5/6/20
CURB & GUTTER SOUTH OF BLDG HANDICAP PARKING
CURB & GUTTER SOUTH OF BLDG HANDICAP PARKING
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
120.5
DTM
DTM
DTM
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:SUBGRADE
PL
NG
1502
NG
659
1881
NG
659
133 138
CG
718 1057
1794
120
662662662
1108651 626
135 111 147
1881
139126 107
125.4
11.0
4
95
11.0
9595
114
11.1
Coarse Fraction (%)
Finer Fraction (%)
103
PASS
8.9
PL
PL
Sand + Bottle Before (lbs) / (DS)
5/26/20
29
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
95
Soil Type Number
97
122.5
118.3
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTS119.6
8.3
127.1
Initials Test Location
CURB & GUTTER-WEST OF CIRCLE--NORTH SIDE
CURB & GUTTER-@ BIOBASIN PERIMETER-WEST
Elev. or
Depth (ft)
121.5
114.5
TJW
Block
No.
CG
CG
115.8
7.4
116.6
10.2MOISTURE
122.0
21
1884
646Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
CG
CG
PL
122.5
PERMEABLE PAVING PARKING STALLS
122.0
PERVIOUS CONCRETE PARKING STALLS
AC PAVING APPROACH AT WEST OF PARKING STALLS
ROUNDABOUT OFF OMWD ACCESS RD
116.5
11.0
44 4
95
98 95
PASS
95
9596
PASS
5/4/20
Test Of CG CG CG
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
1671 1656
PL
PL
Coarse Fraction (lbs)
JMS
JMS
JCG
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
95
Dry Density (pcf)
Relative Compaction (%)
118.2
8.1
96
4
PASSPASS
120.0
120.8 115.9
122.5 122.5122.5
98
11.0
99
117.2 117.6
120.0
95
4
122.5
97
95
95
11.0 11.0 11.011.0
108425008_FDT_SUBGRADE_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
36
37
CURB AND GUTTER, SOUTHEAST PARKING LOT, BUILDING SIDE
35
6/5/20
696
NG
38
CURB AND GUTTER, SOUTHEAST PARKING LOT ENTRANCE
1813
32 33
40
40
CG
NG NG
1813
3936
CG CG
NG
37 3834
NG
CG CG
Test
No.
31
32
33
35
6/5/20
120.5
121.1
CG6/5/20
ADF
ADF
6/5/20 121.1
118.2ADF
Test
Of
6/5/20
122.5
1813 18131813 1813
696696
8.2
134.9 139.4
1861
136.8 121.7
8.7
10.011.0
1
118.0
PASS PASS PASS PASS
Wet Density (pcf)
Laboratory Maximum Density (pcf)
134.4 125.7
8.8
95
689
Percent Moisture
134.4 124.2
6.6
Sand in Cone + Hole (lbs) / (DC)1304
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
117.834
Test Date
6/3/20
6/5/20
6/5/20
CURB AND GUTTER, SOUTHEAST PARKING LOT, BUILDING SIDE
CURB AND GUTTER, SOUTHEAST PARKING LOT, BUILDING SIDE
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
118.2
ADF
ADF
ADF
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:SUBGRADE
CG
NG
1932
NG
696
1813
NG
696
186 126
CG
1760 2478
1813
147
696696696
23651966 2301
150 201 94
1812
142108 134
122.6
11.0
4
95
8.0
9595
334
6.1
Coarse Fraction (%)
Finer Fraction (%)
99
PASS
9.3
CG
CG
Sand + Bottle Before (lbs) / (DS)
6/5/20
39
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
95
Soil Type Number
96
120.0
115.0
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTS120.2
12.2
124.2
Initials Test Location
ACCESS RD, WEST OF GATE
SIDEWALK AND PERMEABLE PAVERS AREA AT BUILDING B
Elev. or
Depth (ft)
122.0
121.4
JMS
Block
No.
PL
SW
128.1
13.3
120.7
4.9MOISTURE
116.0
31
1794
608Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
CG
CG
CG
135.5
CURB AND GUTTER, SOUTHEAST PARKING LOT, BUILDING SIDE
117.6
CURB AND GUTTER, SOUTHEAST PARKING LOT, STREET SIDE
CURB AND GUTTER, SOUTHEAST PARKING LOT, STREET SIDE
CURB AND GUTTER, SOUTHEAST PARKING LOT, STREET SIDE
114.3
8.0
53 5
95
98 95
PASS
95
9794
PASS
5/26/20
Test Of PL SW CG
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
1476 1830
CG
CG
Coarse Fraction (lbs)
ADF
ADF
ADF
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
95
Dry Density (pcf)
Relative Compaction (%)
126.7
9.8
95
5
PASSPASS
118.0
115.0 112.5
122.5 135.5135.5
96
10.0
97
128.1 113.1
118.0
95
3
118.0
95
95
99
11.0 8.0 10.010.0
108425008_FDT_SUBGRADE_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
128.3
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
114.9 112.2115.6
117.0117.0
99
135.5
96
122.5 118.0
124.4 135.8 116.9
156
135.5
111.6 119.2
118.0
138 124
NG
1081
NG
88157
Sand in Cone + Hole (lbs) / (DC)
1747
6/20/20
Test No.
1190
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
Test
Of
Block
No.
CG
CG
CG
CG
MAT
MAE
MAE
MAE
Initials
95
15.0
Test Location
CURB AND GUTTER, NORTH OF THE TRASH ENCLOSURE
CURB AND GUTTER, NORTH OF THE TRASH ENCLOSURE
Elev. or
Depth (ft)
118.5
118.5
95
95
3
CG
95
98
5
15.0 15.0
117.0
95
117.0
111.0
11.1
Coarse Fraction (lbs)
123.3
Percent Moisture
5
Coarse/Finer Fraction in Max (%)
117.0
119.0
121.6
SW6/19/20
6/19/20
6/19/20 SW
TJW
MOISTURE
TJW
TJW
TJW
TJW
TJW
SW
SW
SW
9.0 8.0
97
118.0
97
128.5
5
95 95
4
95
11.0
9595
5
95
3535
95 95
15.0 8.0 10.0 10.0 10.0 8.0
9595
4.2
114.1
3.4 4.0 4.8
112.2
4.510.9 5.7
115.4 124.0
SW SW SW
NG
1896
SW
8683104 79 69
1896
Test
No.
Laboratory Maximum Density (pcf)
1747
676
48
SIDEWALK-EAST OF BLDG
1747
42 43
50
648
SW
4946
SW SW
Wet Density (pcf)
45
5710 Ruffin Road, San Diego, CA 92123 Test Type:SUBGRADE
6/19/20
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
116.2
115.5
44
Test Date
6/8/20
118.6
SUMMARY OF FIELD DENSITY TESTS
645
7551150 1159
NG
676
1747
648
521819 1392 679
CG CG
NG
676 648
41
42
676
CURB AND GUTTER, ADJACENT TO BUILDING B
CURB AND GUTTER, ADJACENT TO THE RETENTION BASIN
1876
50
NG
1896
NG
47 4844
CG
500
6/8/20
41
6/20/20
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
Corrected Maximum Density (pcf)
Optimum Moisture (%)
PASS
Specified Relative Compaction (%)
PASS PASS PASS PASS PASS PASSPASSPASSPass/Fail
Retest on (if applicable)
PASSTEST RESULTSSoil Type Number
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
125.2 124.9
43
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
45
49
46
47
6/8/20
6/8/20
Coarse Fraction (%)
Test Of
SIDEWALK-EAST OF BLDG
SIDEWALK-EAST OF BLDG
121.6
SIDEWALK-EAST OF BLDG
SIDEWALK-EAST OF BLDG
SIDEWALK-EAST OF BLDG
120.0
Finer Fraction (%)
645
134.1
NG
648
1896
NG
1876
119.6
108425008_FDT_SUBGRADE_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
56
57
SIDEWALK-SOUTH OF BLDG-TOP OF MAIN ENTRANCE STAIRS
55
6/29/20
638
NG
58
PARKING LOT SG-EAST OF BLDG-MIDDLE AREA
1873
52 53
60
60
PL
NG NG
1873
5956
PL PL
NG
57 5854
NG
SW SW
Test
No.
51
52
53
55
6/29/20
121.8
120.3
SW6/29/20
TJW
TJW
6/29/20 121.0
119.0TJW
Test
Of
6/29/20
122.5
1873 18731873 1873
638638
9.3
128.5 129.7
729
120.9 127.8
4.0
8.011.0
4
135.5
PASS PASS PASS PASS
Wet Density (pcf)
Laboratory Maximum Density (pcf)
130.4 130.2
8.3
95
645
Percent Moisture
117.3 133.5
4.9
Sand in Cone + Hole (lbs) / (DC)670
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
120.554
Test Date
6/22/20
6/22/20
6/29/20
SIDEWALK-SOUTH OF BLDG
SIDEWALK-SOUTH OF BLDG
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
117.0
TJW
TJW
TJW
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:SUBGRADE
PL
NG
593
NG
638
1876
NG
645
118 131
SW
574 603
1873
119
638638638
586570 573
127 94 148
1876
13686 75
124.1
11.0
4
95
11.0
9595
443
4.6
Coarse Fraction (%)
Finer Fraction (%)
89
PASS
8.6
PL
PL
Sand + Bottle Before (lbs) / (DS)
6/29/20
59
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
95
Soil Type Number
97
122.5
118.3
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTS119.5
7.5
128.9
Initials Test Location
SIDEWALK-EAST OF BLDG
SIDEWALK-EAST OF BLDG
Elev. or
Depth (ft)
121.6
121.7
TJW
Block
No.
SW
SW
119.8
5.6
114.5
9.6MOISTURE
118.5
51
1876
645Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
SW
SW
PL
118.0
SIDEWALK-SOUTH OF BLDG-BOTTOM OF MAIN ENTRANCE STAIRS
120.5
PARKING LOT SG-EAST OF BLDG-NORTH AREA
PARKING LOT SG-EAST OF BLDG-NORTH AREA
PARKING LOT SG-EAST OF BLDG-NORTH-PERMEABLE PARKING AREA
128.4
10.0
35 4
95
98 98
PASS
95
9595
PASS
6/22/20
Test Of SW SW SW
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
804 525
PL
SW
Coarse Fraction (lbs)
TJW
TJW
TJW
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
95
Dry Density (pcf)
Relative Compaction (%)
112.1
7.5
97
4
PASSPASS
122.5
119.9 116.9
118.0 122.5122.5
98
11.0
98
119.0 119.9
122.5
95
4
122.5
95
95
97
10.0 11.0 11.011.0
108425008_FDT_SUBGRADE_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
114.1
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
117.1 114.1114.5
118.0118.0
97
122.5
97
118.0 118.0
122.0 128.6 125.6
107
118.0
115.8 113.0
122.5
133 95
NG
605
NG
172125
Sand in Cone + Hole (lbs) / (DC)
1873
7/1/20
Test No.
584
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
Test
Of
Block
No.
PL
PL
PL
PL
TJW
TJW
TJW
TJW
Initials
95
11.0
Test Location
PARKING LOT SG-EAST OF BLDG-MIDDLE AREA
PARKING LOT SG-EAST OF BLDG-MIDDLE-PERMEABLE PARKING AREA
Elev. or
Depth (ft)
118.5
117.0
95
95
4
PL
95
96
4
11.0 10.0
122.5
97
122.5
119.3
8.1
Coarse Fraction (lbs)
129.0
Percent Moisture
4
Coarse/Finer Fraction in Max (%)
117.5
116.0
122.0
PL6/29/20
6/29/20
6/29/20 PL
TJW
MOISTURE
TJW
TJW
TJW
TJW
TJW
SW
SW
PL
9.0 5.8
96
122.5
96
119.7
3
95 95
3
97
10.0
9595
3
95
3443
95 95
10.0 11.0 11.0 11.0 10.0 10.0
9798
6.0
113.3
4.3 7.7 11.8
118.5
12.26.9 7.4
120.8 121.7
PL PL PL
NG
1873
SW
127119121 99 79
1873
Test
No.
Laboratory Maximum Density (pcf)
1873
638
68
SIDEWALK-WEST OF BLDG
1873
62 63
70
638
SW
6966
SW SW
Wet Density (pcf)
65
5710 Ruffin Road, San Diego, CA 92123 Test Type:SUBGRADE
7/1/20
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
117.0
121.0
64
Test Date
6/29/20
117.0
SUMMARY OF FIELD DENSITY TESTS
648
626724 705
NG
638
1873
648
604642 731 719
PL PL
NG
638 638
61
62
638
PARKING LOT SG-EAST OF BLDG-MIDDLE AREA
PARKING LOT SG-EAST OF BLDG-MIDDLE AREA
1898
70
NG
1873
NG
67 6864
PL
599
6/29/20
61
7/1/20
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
Corrected Maximum Density (pcf)
Optimum Moisture (%)
PASS
Specified Relative Compaction (%)
PASS PASS PASS PASS PASS PASSPASS PASSPass/Fail
Retest on (if applicable)
PASSTEST RESULTSSoil Type Number
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
127.6 121.1
63
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
65
69
66
67
6/29/20
6/29/20
Coarse Fraction (%)
Test Of
PARKING LOT SG-EAST OF BLDG-SOUTH AREA
PARKING LOT SG-EAST OF BLDG-SOUTH AREA
121.5
PARKING LOT SG-WEST OF BLDG-PERMEABLE PARKING AREA
SIDEWALK-NORTH OF BLDG-PAVER AREA
SIDEWALK-NORTH OF BLDG
122.5
Finer Fraction (%)
648
128.0
NG
638
1898
NG
1898
126.7
108425008_FDT_SUBGRADE_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
115.4
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
114.7 116.7115.4
118.0118.0
98
118.0
99
118.0 118.0
125.0 120.8 120.0
114
118.0
109.4 108.7
118.0
151 116
NG
631
NG
87156
Sand in Cone + Hole (lbs) / (DC)
1898
7/17/20
Test No.
614
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
Test
Of
Block
No.
SW
SW
ST
ST
TJW
TJW
MAE
MAE
Initials
95
10.0
Test Location
SIDEWALK-WEST OF BLDG
SIDEWALK-WEST OF BLDG
Elev. or
Depth (ft)
122.5
122.0
95
93
3
SW
95
97
3
10.0 10.0
118.0
98
118.0
115.2
10.7
Coarse Fraction (lbs)
127.5
Percent Moisture
3
Coarse/Finer Fraction in Max (%)
110.0
110.0
111.0
ST7/16/20
7/16/20
7/16/20 ST
MAE
MOISTURE
JMS
JMS
MAE
MAE
MAE
ST
ST
ST
10.3 7.3
97
118.0
92
112.4
3
95 95
3
98
10.0
9595
3
95
3333
95 95
10.0 10.0 10.0 10.0 10.0 10.0
9595
7.2
114.2
7.5 6.9 7.0
111.9
5.87.1 7.5
117.6 116.2
ST ST ST
NG
1750
ST
99110113 114 113
1750
Test
No.
Laboratory Maximum Density (pcf)
1898
648
78
PARKING LOT FOR CARTERS FEED STORE RETEST FOR # 78
1750
72 73
80
678
ST
7976
ST ST
Wet Density (pcf)
75
5710 Ruffin Road, San Diego, CA 92123 Test Type:SUBGRADE
7/16/20
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
112.0
111.0
74
Test Date
7/1/20
112.2
SUMMARY OF FIELD DENSITY TESTS
605
4211783 1738
NG
678
1750
678
4231803 2016 2020
SW ST
NG
678 678
71
72
648
CONCRETE APPROACH TO CARTERS FEED STORE
CONCRETE APPROACH TO CARTERS FEED STORE
1903
80
NG
1750
NG
77 7874
ST
1799
7/1/20
71
7/17/20
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
Corrected Maximum Density (pcf)
Optimum Moisture (%)
PASS
Specified Relative Compaction (%)
PASS PASS PASS FAIL FAIL PASSPASS PASSPass/Fail
Retest on (if applicable)
PASS
79 80TEST RESULTSSoil Type Number
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
126.5 123.8
73
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
75
79
76
77
7/16/20
7/16/20
Coarse Fraction (%)
Test Of
PARKING LOT FOR CARTERS FEED STORE
PARKING LOT FOR CARTERS FEED STORE
111.0
PARKING LOT FOR CARTERS FEED STORE
PARKING LOT FOR CARTERS FEED STORE
PARKING LOT FOR CARTERS FEED STORE RETEST FOR # 77
111.0
Finer Fraction (%)
605
122.1
NG
678
1750
NG
1903
122.2
108425008_FDT_SUBGRADE_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
86
87
85
88
1907
82 83
90
908986 87 8884
Test
No.
81
82
83
85
Test
Of
118.0
119.0
6.0
10.010.0
3
118.0
PASS
Wet Density (pcf)
Laboratory Maximum Density (pcf)
699
Percent Moisture
124.2 119.5
9.2
Sand in Cone + Hole (lbs) / (DC)1208
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
112.384
Test Date
7/28/20
7/30/20
7/30/20
S LANE OF RW ENTRY FROM RANCHO SANTA FE
S LANE OF RW ENTRY FROM RANCHO SANTA FE
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
113.3
ADF
JMS
JMS
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:SUBGRADE
1950
NG
605
1907
NG
605
82
ST
1796
159 88
124.0
10.0
3
95
10.9
Coarse Fraction (%)
Finer Fraction (%)
140
Sand + Bottle Before (lbs) / (DS)
89
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
95
Soil Type Number
96
118.0
113.6
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTS112.8
5.5
Initials Test Location
NORTH LANE OF ROADWAY ENTRY FROM RANCHO SANTA FE RD, UNDER PAVEMENT
NORTH LANE OF ROADWAY ENTRY FROM RANCHO SANTA FE RD, UNDER PAVEMENT
Elev. or
Depth (ft)
113.3
112.3
ADF
Block
No.
ST
ST
MOISTURE
81
1796
699Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
ST
ST
118.0
112.7
10.0
33
96
PASS
95
9695
PASS
7/28/20
Test Of ST ST ST
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
1199 1927
Coarse Fraction (lbs)
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
95
Dry Density (pcf)
Relative Compaction (%)
112.0
108425008_FDT_SUBGRADE_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
5710 Ruffin Road, San Diego, CA 92123 Test Type:AGGREGATE BASE
127.4 122.0131.2
EAST BOUND ON PRIVATE ROAD @ STATION 10+30
ACCESS RD, ROUNDABOUT
122.3
ACCESS RD, EAST OF GATE
ACCESS RD, WEST OF GATE
PKG SPACES, EAST END OF LOT
JMS
JMS
JMS
3/30/20
Finer Fraction (%)
Sand in Cone (lbs) / (MC)
AB3/30/20
AB
AB
AB
JCG
JCG
JCG
JCG
Test
No.
1
2
3
5
9
6
7
4
JMS
Sand + Bottle After (lbs) / (MS)
122.3
123.5
5/27/20
5/27/20 122.3
122.3
AB
AB
NG
AB
Test No.
5/28/20
Test Of AB
WET DENSITY & ROCK CONTENTTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)
606
NG
1812
602
2415
173
1723
123
Pass/Fail PASS
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)
127.7 125.9
Tare (lbs)
Soil + Rock + Tare (lbs)
PASS PASS PASS PASS
Wet Density (pcf)
602602662
648
602
Laboratory Maximum Density (pcf)
Dry Density (pcf)
Percent Moisture
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
784
AB
5/27/20
Project Street Address:
Jurisdiction:
662
8
10
186 168
Permit No.:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
113.5
1917
PARKING LOT AREA NORTH WEST OF GATE
1917
23
AB
116.6
116.6
Test Date
3/30/20
3/30/20
3/30/20
1824
10
NG
1812 1812 1812
9
EAST BOUND ON PRIVATE ROAD @ STATION 11+95
EAST BOUND ON PRIVATE ROAD @ STATION 10+15
SUMMARY OF FIELD DENSITY TESTS
1
5/27/20
STANDARD& TEST COUNTS189
Sand in Cone + Hole (lbs) / (DC)
1917
TLT
1172 1028
NG
662
1917
NG
662
5
185 187 130 130
NG
1917
NGNG
6
AB AB
2401
122
2326 2546
662
127.9125.2128.8 125.5
13.2
5
98 96
117.0 117.0117.0 117.0
15.0
115.2 113.0114.8
117.0
55
15.0
97
15.0 15.0 15.0
95 95
PASSPASSPASS
9.3 9.2 8.8
115.7
15.0
12.4
117.0
13.413.7
Coarse Fraction (lbs)
130.0
96 99
PASS
Retest on (if applicable)
Coarse Fraction (%)
MOISTURE
98
117.0
114.3
Corrected Maximum Density (pcf)
Soil Type Number
112.1
15.0
13.9
5
9595
Test Location
EAST BOUND ON PRIVATE ROAD @ STATION 10+10 (FIRST LIFT)
EAST BOUND ON PRIVATE ROAD @ STATION 11+30
Elev. or
Depth (ft)
117.0
114.4
AB AB
95
15.0
96
95
112.0
117.0
5
95
100
55
NG
17211642
Sand + Bottle Before (lbs) / (DS)
AB AB AB
NG
Initials
JCG
Test
Of
Block
No.
AB
AB
AB
95
113.1
97
117.0
15.0
117.0
98
15.0
95
5
95
5
116.7
13.9 8.7
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
112.1
PASS
Relative Compaction (%)TEST RESULTS5
108425008_FDT_AGGREGATE BASE_1 Field Density Test Sheet 2013 v 3.0
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
114.8
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
115.0 115.4108.8
117.0117.0
93
117.0
99
117.0 117.0
133.3 130.4 125.5
202
117.0
113.6 113.8
117.0
160 178
NG
1694
NG
147177
Sand in Cone + Hole (lbs) / (DC)
1824
7/1/20
Test No.
1702
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
Test
Of
Block
No.
AB
AB
AB
AB
TLT
TLT
TLT
TLT
Initials
95
15.0
Test Location
ACCESS RD WEST SIDE OF GATE
ACCESS RD SOUTH SIDE OF ROUNDABOUT
Elev. or
Depth (ft)
122.2
116.6
95
97
5
AB
95
98
14
5
15.0 15.0
117.0
97
117.0
113.1
13.6
Coarse Fraction (lbs)
128.5
Percent Moisture
5
Coarse/Finer Fraction in Max (%)
120.0
118.1
120.5
AB5/28/20
5/28/20
6/22/20 AB
TLT
MOISTURE
TJW
TJW
TLT
TJW
TJW
AB
AB
AB
12.0 14.2
97
117.0
97
115.8
5
95 95
5
98
15.0
9595
5
95
5555
95 95
15.0 15.0 15.0 15.0 15.0 15.0
9599
13.2
113.5
11.3 10.6 12.4
110.9
14.215.5 12.6
126.4 125.9
AB AB AB
NG
1824
AB
147144170 170 161
1876
Test
No.
Laboratory Maximum Density (pcf)
1824
606
18
PARKING LOT-EAST OF BLDG-NORTH SECTION
1824
12 13
20
606
AB
1916
AB AB
Wet Density (pcf)
15
5710 Ruffin Road, San Diego, CA 92123 Test Type:AGGREGATE BASE
6/30/20
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
118.0
121.0
14
Test Date
5/28/20
118.0
SUMMARY OF FIELD DENSITY TESTS
661
14201215 959
NG
606
1824
661
9451177 1608 1478
AB AB
NG
606 645
11
12
606
ACCESS RD SOUTH WEST SIDE OF ROUNDABOUT
ACCESS RD SOUTH WEST SIDE OF ROUNDABOUT
1898
20
NG
1824
NG
17 1814
AB
1634
5/28/20
11
6/30/20
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
Corrected Maximum Density (pcf)
Optimum Moisture (%)
PASS
Specified Relative Compaction (%)
PASS PASS PASS PASS PASS PASSPASS PASSPass/Fail
Retest on (if applicable)
FAILTEST RESULTSSoil Type Number
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
128.8 124.2
13
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
15
19
16
17
5/28/20
5/28/20
Coarse Fraction (%)
Test Of
ACCESS RD EAST OF GATE
ACCESS RD NORTH EAST OF ROUNDABOUT
121.0
1ST REMEDIAL AREA-NORTH SECTION (1ST 8" LIFT)
2ND REMEDIAL AREA-NORTH SECTION
1ST/2ND REMEDIAL AREA-NORTH SECTION
121.0
Finer Fraction (%)
648
131.1
NG
606
2321
NG
2321
127.6
108425008_FDT_AGGREGATE BASE_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
26
27
PARKING LOT-EAST OF BLDG-MIDDLE SECTION
25
7/1/20
693
NG
28
SOUTH LANE OF ROADWAY AT RANCHO SANTA FE RD
1898
22 23
30
30
AB
NG NG
1898
2926
AB AB
NG
27 2824
NG
AB AB
Test
No.
21
22
23
25
7/1/20
118.7
118.2
AB7/1/20
TJW
TJW
7/1/20 117.3
116.6TJW
Test
Of
7/1/20
117.0
1898 18981898 1898
648648
11.9
130.4 129.8
1034
127.5 127.5
12.2
15.015.0
5
117.0
PASS PASS PASS PASS
Wet Density (pcf)
Laboratory Maximum Density (pcf)
128.6 128.9
13.2
95
648
Percent Moisture
129.0 130.1
12.3
Sand in Cone + Hole (lbs) / (DC)1008
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
118.224
Test Date
7/1/20
7/1/20
7/1/20
PARKING LOT-EAST OF BLDG-MIDDLE SECTION
PARKING LOT-EAST OF BLDG-MIDDLE SECTION
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
118.5
TJW
TJW
TJW
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:AGGREGATE BASE
AB
NG
966
NG
648
1898
NG
648
184 168
AB
975 1031
1800
135
648648648
9211006 996
185 162 179
1898
122183 175
128.5
15.0
5
95
15.0
9595
655
13.1
Coarse Fraction (%)
Finer Fraction (%)
174
PASS
12.2
AB
AB
Sand + Bottle Before (lbs) / (DS)
7/31/20
29
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
95
Soil Type Number
98
117.0
114.4
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTS116.2
12.2
135.4
Initials Test Location
PARKING LOT-EAST OF BLDG-NORTH SECTION
PARKING LOT-EAST OF BLDG-NORTH SECTION
Elev. or
Depth (ft)
120.5
120.2
TJW
Block
No.
AB
AB
114.7
11.3
114.6
12.8MOISTURE
112.4
21
1898
648Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
AB
AB
AB
117.0
PARKING LOT-EAST OF BLDG-MIDDLE SECTION
116.2
PARKING LOT-EAST OF BLDG-MIDDLE SECTION
PARKING LOT-EAST OF BLDG-SOUTH SECTION
PARKING LOT-EAST OF BLDG-SOUTH SECTION
116.0
15.0
55 5
95
99 98
PASS
95
9998
PASS
7/1/20
Test Of AB AB AB
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
996 970
AB
AB
Coarse Fraction (lbs)
ADF
TJW
TJW
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
95
Dry Density (pcf)
Relative Compaction (%)
114.1
8.1
97
5
PASSPASS
117.0
114.9 113.9
117.0 117.0117.0
99
15.0
98
114.0 125.3
127.0
95
5
117.0
97
95
98
15.0 15.0 9.015.0
108425008_FDT_AGGREGATE BASE_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
36
37
35
38
32 33
40
403936 37 3834
Test
No.
31
32
33
35
Test
Of
10.5
15.09.0
6
117.0
Wet Density (pcf)
Laboratory Maximum Density (pcf)
693
Percent Moisture
134.8 123.6
9.8
Sand in Cone + Hole (lbs) / (DC)920
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
34
Test Date
7/31/20
8/3/20 NORTH LANE OF ROADWAY AT RANCHO SANTA FE RD
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
114.8
ADF
JVT
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:AGGREGATE BASE
NG
1800
147 136
135.3
9.0
Coarse Fraction (%)
Finer Fraction (%)
157
Sand + Bottle Before (lbs) / (DS)
39
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
95
Soil Type Number
97
127.0
123.2
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTSInitials Test Location
SOUTH LANE OF ROADWAY AT RANCHO SANTA FE RD
CARTER FEED PARKING LOT ENTRANCE
Elev. or
Depth (ft)
114.8
112.8
ADF
Block
No.
AB
AB
MOISTURE
31
1800
693Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
AB
127.0
111.9
9.0
6 5
PASS
95
9697
PASS
7/31/20
Test Of AB AB AB
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
932 707
Coarse Fraction (lbs)
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
95
Dry Density (pcf)
Relative Compaction (%)
123.7
108425008_FDT_AGGREGATE BASE_1 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
PASS
Relative Compaction (%)TEST RESULTS101
95
96
147.1 145.6
97
95
102
95
102
Initials
JCG
Test
Of
Block
No.
AC
AC
AC
95
98
102 102
NG
548537
Sand + Bottle Before (lbs) / (DS)
AC AC AC
NG
95
96
95
147.1
101
Test Location
EAST BOUND ON PRIVATE ROAD @ STATION 10+05
EAST BOUND ON PRIVATE ROAD @ STATION 10+40
Elev. or
Depth (ft)
116.8
116.8
AC AC
101
9595
MOISTURE
96
147.1
Corrected Maximum Density (pcf)
Soil Type Number
Coarse Fraction (lbs)
141.3
96 97
PASS
Retest on (if applicable)
Coarse Fraction (%)
147.1
PASSPASSPASS
98
95 95
101
97 98
145.6 145.6145.6 145.6147.1
101 102
142.2141.9141.2 141.9
97
547 544
660
5
100 118 90 96
NG
1931
NGNG
6
AC AC
549536 522
NG
660
1931
NG
660
1962
9
EAST BOUND ON PRIVATE ROAD @ STATION 11+25
EAST BOUND ON PRIVATE ROAD @ STATION 11+90
SUMMARY OF FIELD DENSITY TESTS
1
5/29/20
STANDARD& TEST COUNTS121
Sand in Cone + Hole (lbs) / (DC)
1931
TJW
Permit No.:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
115.8
1931
WEST OF GATE-CIRCLE AREA (BASE COURSE)
1931
23
AC
117.8
114.8
Test Date
3/30/20
3/30/20
3/30/20
1962
10
NG
1962 1962
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
784
AC
5/29/20
Project Street Address:
Jurisdiction:
660
8
10
106 95
PASS PASS PASS PASS
Wet Density (pcf)
695695660
539
695
Laboratory Maximum Density (pcf)
Dry Density (pcf)
Percent Moisture
Pass/Fail PASS
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)
140.6 141.6
Tare (lbs)
Soil + Rock + Tare (lbs)
695
NG
1962
695
548
92
546
106
TJW
Sand + Bottle After (lbs) / (MS)
123.8
118.4
5/29/20
5/29/20 122.4
120.3
AC
AC
NG
AC
Test No.
5/29/20
Test Of AC
WET DENSITY & ROCK CONTENTTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)
Test
No.
1
2
3
5
9
6
7
4 3/30/20
Finer Fraction (%)
Sand in Cone (lbs) / (MC)
AC3/30/20
AC
AC
AC
JCG
JCG
JCG
JCG
EAST BOUND ON PRIVATE ROAD @ STATION 10+15
EAST OF GATE-PARKING AREA (BASE COURSE)
117.0
EAST OF GATE-ROAD (BASE COURSE)
EAST OF GATE-ROAD (BASE COURSE)
WEST OF GATE-CIRCLE AREA (BASE COURSE)
TJW
TJW
TJW
142.1 142.4143.3
5710 Ruffin Road, San Diego, CA 92123 Test Type:ASPHALT CONCRETE
108425008_FDT_ASPHALT CONCRETE_35-37 Field Density Test Sheet 2013 v 3.0
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
140.3 140.2
NG
644
1894
NG
1894
EAST PARKING LOT-NORTH SECTION (BASE COURSE)
EAST PARKING LOT-NORTH SECTION (BASE COURSE)
118.6
EAST PARKING LOT-MIDDLE SECTION (BASE COURSE)
EAST PARKING LOT-MIDDLE SECTION (BASE COURSE)
EAST PARKING LOT-MIDDLE SECTION (BASE COURSE)
118.2
Finer Fraction (%)
644
13
WET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
15
19
16
17
7/2/20
7/2/20
Coarse Fraction (%)
Test Of
Relative Compaction (%)
Dry Density (pcf)
Soil + Rock + Tare (lbs)
141.2 140.5
PASS PASS PASS PASS PASS PASSPASS PASSPass/Fail
Retest on (if applicable)
PASSTEST RESULTSSoil Type Number
Corrected Maximum Density (pcf)
Optimum Moisture (%)
PASS
Specified Relative Compaction (%)
11
12
695
EAST PARKING LOT-NORTH SECTION (BASE COURSE)
EAST PARKING LOT-NORTH SECTION (BASE COURSE)
1894
20
NG
1894
NG
17 1814
AC
461
5/29/20
11
7/2/20
STANDARD& TEST COUNTSTest Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG
SUMMARY OF FIELD DENSITY TESTS
644
461459 455
NG
644
1894
644
462454 462 455
AC AC
NG
644 644
5710 Ruffin Road, San Diego, CA 92123 Test Type:ASPHALT CONCRETE
7/2/20
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
121.2
119.1
14
Test Date
5/29/20
120.9
Test
No.
Laboratory Maximum Density (pcf)
1962
695
18
EAST PARKING LOT-MIDDLE SECTION (BASE COURSE)
1894
12 13
20
644
AC
1916
AC AC
Wet Density (pcf)
15
AC AC AC
NG
1894
AC
9999114 103 94
1894
140.2 141.1
95
9595
103
95
103103 103103
95 95
9595
103
95 95
103
95
147.5
96
120.5
119.3
118.2
AC7/2/20
7/2/20
7/2/20 AC
TJW
MOISTURE
TJW
TJW
TJW
TJW
TJW
AC
AC
AC
97
145.6
Coarse Fraction (lbs)
141.4
Percent Moisture
102
Coarse/Finer Fraction in Max (%)
95
97
102
145.6
95
Test Location
WEST OF GATE-CIRCLE AREA (BASE COURSE)
WEST OF GATE-ENTRANCE ROAD (BASE COURSE)
Elev. or
Depth (ft)
117.9
116.3
95
95
103
AC
Test
Of
Block
No.
AC
AC
AC
AC
TJW
TJW
TJW
TJW
Initials
100
Sand in Cone + Hole (lbs) / (DC)
1962
7/2/20
Test No.
552
Sand + Bottle Before (lbs) / (DS)
Sand + Bottle After (lbs) / (MS)
104 112
NG
554
NG
90111
147.5147.5
141.1 140.2 140.5
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
147.5147.5
95
147.5
96
147.5 147.5
108425008_FDT_ASPHALT CONCRETE_35-37 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
95
104
146.8
96
95
96
PASSPASS
147.3146.8 146.8147.5
9595
147.3
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
95
Dry Density (pcf)
Relative Compaction (%)95
104
7/2/20
Test Of AC AC AC
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
460 464
AC
AC
Coarse Fraction (lbs)
JVT
JVT
ADF
103 103 103
95
96 96
PASS
95
9595
PASS
AC
AC
AC
147.5
SOUTH LANES OF ROADWAY AT RANCHO SANTA FE RD
114.9
SOUTH LANES OF ROADWAY AT RANCHO SANTA FE RD
CARTER FEED PARKING LOT ENTRANCE
NORTH LANE OF ROADWAY AT RANCHO SANTE FE RD
MOISTURE
113.1
21
1894
644Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
Initials Test Location
EAST PARKING LOT-MIDDLE SECTION (BASE COURSE)
EAST PARKING LOT-MIDDLE SECTION (BASE COURSE)
Elev. or
Depth (ft)
117.1
118.0
TJW
Block
No.
AC
AC
139.5
AC
AC
Sand + Bottle Before (lbs) / (DS)
8/3/20
29
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
95
Soil Type Number
96
147.5
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTSCoarse Fraction (%)
Finer Fraction (%)
100
PASS
141.3
103
95 9595
105105104
1894
9798 100
AC
NG
456
NG
644
1894
NG
644
96 2121
AC
455 10789
2164
693693644
11395526 533
96 111 108
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:ASPHALT CONCRETE
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
116.924
Test Date
7/2/20
7/2/20
7/2/20
EAST PARKING LOT-SOUTH SECTION (BASE COURSE)
EAST PARKING LOT-SOUTH SECTION (BASE COURSE)
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
118.1
TJW
TJW
TJW
644
Percent Moisture
140.4 139.8
Sand in Cone + Hole (lbs) / (DC)454
PASS PASS PASS PASS
Wet Density (pcf)
Laboratory Maximum Density (pcf)
139.4 139.6
95
103
147.5
141.6 141.2
509
147.5
1800 18001894
693
141.0 141.2
2824
NG
AC AC
Test
No.
21
22
23
25
7/31/20
116.0
112.9
AC7/2/20
ADF
TJW
7/31/20 114.9
113.1ADF
Test
Of
8/3/20
26
27
EAST PARKING LOT-SOUTH SECTION (BASE COURSE)
25
7/31/20
NG
28
CARTER FEED PARKING LOT ENTRANCE
1894
22 23
30
30
AC
NG NG
1800
2926
AC AC
NG
27
108425008_FDT_ASPHALT CONCRETE_35-37 Field Density Test Sheet 2013 v 2.9
I
Tested material does does NOT meet the requirements of the approved project documents.
The material was was NOT sampled and tested as required by the approved project documents.
97
146.4 146.4146.4
NOTE: Tests results shown bold italicized have been corrected per ASTM D 4718 Section 4.2 for oversize rock content.
95
Dry Density (pcf)
Relative Compaction (%)95
106
8/4/20
Test Of AC AC AC
Test Type (SC/SC(SR) = Sand Cone, NG = Nuclear Gauge)NG NG
11239 10991
AC
Coarse Fraction (lbs)
JVT
106 106 106
95
96 97
PASS
95
9997
PASS
AC
AC
AC
146.4
CENTER OF ROUNDABOUT
NORTH LANE OF DRIVEWAY OF OFF RANCHO SANTA FE RD.
MOISTURE
31
5404
1098Sand + Bottle After (lbs) / (MS)
Test No.STANDARD& TEST COUNTSWET DENSITY & ROCK CONTENTTare (lbs)
Sand in Cone (lbs) / (MC)
Soil + Rock + Tare (lbs)
Initials Test Location
EAST PARKING LOT-NORTH SECTION
EAST PARKING LOT-MIDDLE SECTION
Elev. or
Depth (ft)
117.5
118.0
JVT
Block
No.
AC
AC
Sand + Bottle Before (lbs) / (DS)
39
PASS
Retest on (if applicable)
Corrected Maximum Density (pcf)
95
Soil Type Number
96
146.4
Pass/Fail
Specified Relative Compaction (%)
Coarse/Finer Fraction in Max (%)
Optimum Moisture (%)TEST RESULTSCoarse Fraction (%)
Finer Fraction (%)
2030
140.7
106
9595
106
5404
2026 1931
11212
NG
1098
5404
NG
1098
1921
AC
11205
10841084
11266
2017 2145 1953
SUMMARY OF FIELD DENSITY TESTS
5710 Ruffin Road, San Diego, CA 92123 Test Type:ASPHALT CONCRETE
Project Name:OPERATIONS FACILITY REMODEL & ADDITION Project No:108425008
114.534
Test Date
8/4/20
8/4/20
8/4/20
EAST PARKING LOT-SOUTH OF GATE ENTRANCE
SOUTHERN LANE OF DRIVEWAY OF OFF RANCHO SANTA FE RD.
Permit No.:
Project Street Address:
Jurisdiction:OMWD Plan File No.:
1966 OLIVENHAIN ROAD, ENCINITAS, CA 92024
117.3
JVT
JVT
JVT
1098
Percent Moisture
142.0 144.8
Sand in Cone + Hole (lbs) / (DC)11309
PASS PASS PASS PASS
Wet Density (pcf)
Laboratory Maximum Density (pcf)
139.3
95
106
146.4
141.7
11379
146.4
54115411
1084
139.9 142.1
3834
NG
AC AC
Test
No.
31
32
33
35 117.0
116.3
AC8/5/20
JVT
JVT
8/5/20 113.3
Test
Of
36
37
DRIVEWAY TO SOUTHWEST PARKING LOT; WEST OF GATE ENTRANCE
35
8/5/20
38
5404
32 33
40
40
AC
NG
5411
3936
NG
37
108425008_FDT_ASPHALT CONCRETE_35-37 Field Density Test Sheet 2013 v 2.9