Loading...
HomeMy WebLinkAbout1858 TULE CT; 110; CBR2020-2043; Recycle(City of Carlsbad RESIDENTIAL GREEN BUILDING CODE STANDARDS MANDATORY MEASURES CERTIFICATION CHECKLIST B-51 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov This form, signed and completed, and all receipts for the recycled materials shall be submitted to the Building Inspector prior to Final Inspection. Site Development Mandatory 4.106.2 A plan is developed and implemented to manage storm water drainage during construction. (X) 4.106.3 The site shall be planned and developed to keep surface water away from buildings. (X) Construction plans shall indicate how site grading or a drainage system will manage all surface water flows. Energy Efficiency 4.201.1 Low-rise residential buildings shall meet or exceed the minimum standard design required by (x) the California Energy Standards. Water Efficiency and Conservation Indoor Water Use 4.303.1 Indoor water use shall be reduced by at least 20 percent using one of the following methods: (X) Water saving fixtures or flow restrictors shall be used. 7/01/2011 A 20 percent reduction in baseline water use shall be demonstrated. 4.303.2 When using the calculation method specified in Section 4.303.1, multiple showerheads shall not (X) exceed maximum flow rates. 7/01/2011 4.303.3 Plumbing fixtures (water closets and urinals) and fittings (faucets and shower heads) shall (X) comply with specified performance requirements. 7/01/2011 Outdoor Water Use 4.304.1 Automatic irrigation systems controllers installed at the time of final inspection shall be weather- (X) based. Enhanced Durability and Reduced Maintenance 4.406.1 Joints and openings. Annular spaces around pipes, electric cables, conduits or other openings in plates at exterior walls shall be protected against the passage of rodents by closing such openings (x) with cement mortar, concrete masonry or similar method acceptable to the enforcing agency. Construction Waste Management Plan 4.408.1 A minimum of 65 percent of the construction waste generated at the site is diverted to recycle or (X) salvage. Recycled material receipts from approved recyclers must be attached to this form. 4.408.2 Where a local jurisdiction does not have a construction and demolition waste management (X) ordinance, construction waste management plan, per form B-59, shall be submitted for approval to the enforcing agency. Building Maintenance and Operation 4.410.1 An operation and maintenance manual shall be provided to the building occupant or owner. (X) Environmental Quality Fireplaces 4.503.1 Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed woodstove or pellet stove shall comply with US EPA Phase II emission limits where applicable. (x) Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances. c70— 204 IS 519 -kt-E '*. .4+110 B-51 Page 1 of 2 Rev. 5/17 Pollutant Control 4.504.1 Duct openings and other related air distribution component openings shall be covered (X) during construction. 4.504.2.1 Adhesive, sealants and caulks shall be compliant with VOC and other toxic compound (X) limits. (X) 4.504.2.2 Paints, stains and other coatings shall be compliant with VOC limits. (X) 4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MIR limits for ROC and other toxic compounds. (X) 4.504.2.4 Documentation shall be provided to verify that compliant VOC limit finish materials, have been used. (X) 4.504.3 Carpet and carpet systems shall be compliant with VOC limits. 4.504.4 50 percent of floor area receiving resilient flooring shall comply with VOC-emission limits (X) defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or be certified under the Resilient Floor Covering Institute (RFCI) FloorScore program. (x) 4.504.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood used in interior finish systems shall comply with low formaldehyde emission standards. Interior Moisture Control 4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations. (X) 4.505.3 Moisture content of building materials used in wall and floor framing is checked before (X) enclosure. Indoor Air Quality and Exhaust 4.506.1 Exhaust fans which terminate outside the building are provided in every bathroom. (X) Environmental Comfort 4.507.1 Whole house exhaust fans shall have insulated louvers or covers which close when the (X) fan is off. Covers or louvers shall have a minimum insulation value of R-4.2. 4.507.2 Duct systems are sized, designed, and equipment is selected using the following methods: (X) Establish heat loss and heat gain values according to ACCA Manual J or equivalent. Size duct systems according to ACCA 29-D (Manual D) or equivalent Select heating and cooling equipment according to ACCA 36-S (Manual S) or equivalent. Installer and Special Inspector Qualifications 702.1 HVAC system installers are trained and certified in the proper installation of HVAC (x) systems. 702.2 Special inspectors employed by the owner must be qualified and able to demonstrate (X) competence in the discipline they are inspecting. I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016 California Green Building Standards. All receipts for recycled materials have been attached to this form. Project Address: TQ j Plan Ck Number: C6 P,_ Print Name: (\9 C 0 Signed: License Number: _78Date: B-51 Page 2 of 2 Rev. 5/17 (City of Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday. Avenue 760-602-2719 www.carlsbadca.gov Many of the materials generated from your project can be recycled. You are required to list materials that will be reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing this form, please contact.Waste Management at (760) 929r9400, a certified C&D recycler, or the Carlsbad Building Division at (760) 602-2700. Please note: Unless you are self-hauling. Waste Management or approved haulers must be used for all construction projects within the City of Carlsbad. PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued without a completed Construction Waste Management Plan. Permit No. %/" f&., Project Address_____ Applicant Name Last Applicant Address - 9 )-0 1016roject Title 2k ••..• First 'a Owner Contractor Architect Other 000 Phone (7(,G t1'3 1'( OS E-mail Address J d (0 '\( "a c . C 0 kil Applicant Mailing Address ,V (if different than project address) Project Type Residential Commercial Public Building (check all that apply): U E1 Brief Description (o,. iiJ I m Project Size ' I77 Estimated Cost Of Project $_(5_5._OOL square footage) Please check the appropriate box: 17 I plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction. 19 I plan on self-hauling to a certified recycling. facility and will provide all receipts after construction. IIThis is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE MANAGEMENT. Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only, from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. % . -177 Print Name Ed CT C_% AD . Signature 4 Date ' Page 1of4 Rev. 11/12/18 city of CONSTRUCTION WASTE Development Services Building Division MANAGEMENT PLAN 1635 Faraday Avenue Carlsbad B-59 760-602-2719 www.carlsbadca.gov Section 4408.1 and Section 5.408.1 of the 2M California Green Building Standards requires at least 65% of non-hazardous construction debris is recycled and/or salvaged for reuse. With the submitting of your application for a Building Permit or permit issuance, you must have completed a Construction Waste Management Plan (CWMP) demonstrating how you will recycle a minimum of 65% of the construction waste generated from your project. NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to collect all receipts from the facilities that recycle t _heiiL materials AND all pr-qiec ,t waste/landfill disposal receipts. When working with the City's franchised hauler, Waste Mangrnt, one cumulativ$Oj_ct receipt is acceptable. However, it is the Applicant's responsibility to confirm that the bins are cchlected for MID Recycling. ..... ç.• ' Ti ') This project shall generate the least amount of waste possible y:anning andgdering crefully, following all proper storage and handling procedurito reduce broken and damaged materials, and rduPnd1m%7;tdriats whenever possible. Waste Management Services can provide 2611off binsone or coxnmrngled c truiiorrdebris and one for trash. The I I p \# _ t; .6 commingled construction roll-off bin will betaken to aCertmed Mixed C&D Processing Fatility to sort the material and !N37 Ccreate receii(~)to rate rojctbanet a 65% diversion ra' j 1 Applicants with a goal of recycling greater than 65% of the projec tôtaI4'ase should work with, the City's exclusive franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll-off bins for particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible. 4 Contractors 1su,eontractors hauling their own waste as part of their 'scope oi'work(e g, construction clean up companièset.)SHALLN9T be e'xelbdd from'o p'o'vide weight and waste diversion receipts from a Certtfiecl S*jrc Separated Recycling Facility. For a current list of Certifed.Recycling Facilities go to hp://www.sandiego.g/nvonmental-services/recycling/cd/index.shtml. S. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. Part 1- Before the Project Begins Y Prior to issuance of a Building Permit, Applicant must submit PART 1 of the Construction Waste Management Plan (CWMP) Table. a. Submit completed and signed form to City with Building Permit application. Part 2- During and After the Project Prior to receiving inspection for final sign off of the Building Permit or Certificate.of Occupancy, Applicant must submit the fully completed and approved PART 2 of the Construction Waste Management Plan (CWMP) Table. a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where materials were taken. Complete the Debris Recycling.Repo(t(DR) as your project progresses. Recycling/diversion goals are M(at a minimum) 1 \ 5%'oftJie waste generated by 'dur piject' D c. Return completed form to: City of Carlsbad Buildirg Division - 1635 Faraday Ave, Carlsbad, CA 95008 or your inspector prior to requesting final inspection. Rev. 11/12/18 PART 2- Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final building approval. -' DEBRIS RECYCLING REPORT (ACTUAL): AcpQwle,dgemfl , I the Stt ?ai in certify under,laws of provided and with this form pertains to construction and demolition debris generatdonly 'thprojt'ist1)n PART 1, that I have qy ofj\çtnformation1 and that the informati true and of my knowledge and beef. Permit No. co t. 70O ?O45 Print Name 9_(' C. Address S3 ,_('_C2f_Date Use this Final Log below to track loads of materials as they leave the job site. ©©SAVE RECEIPTS©© Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. AdditionalProjectLogpagesare available if necessary.UseCity Conversion Table to convert volume to tons. A B C Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility Reused or Recycled Disposed in (Name, Address, Phone) Salvaged y Landfljj.J Example: Palomar Transfer Station, 5960 El 01/05/2018 Concrete (broken) 5 tons Camino Real _ —(760)603-0153 O(fWOJ AAA ©TOTAI. • 1 .0 6,7 <5 _____L{_= Diversion Rate Achieved Total of columns A + B Total of columns A + B + C &VERSION Contractor/Owner Signature Date )-' (.7 ". 3. Attach the fol1 jtiotd'entation to this Report: • Return completed form and documentation to: Original recycling weight tickets, landfill weight tickets City of Carlsbad Original donin recipt,with photos and/or itemized descriptions Building bivisidn(lst Floor) Any other reIea)it1mf9rmtidnsupport Recycling Report 1635 FaradáyAienue Carlsbad, CA 92008 Page 3of4 Rev. 11112118 PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will (cont'd) not be issued without a completed Construction Waste Management Plan. I1IIs]Wi Permit No. d3 -O0 OLf3Project Title ErAA CO ADU Project Address (0 e7a ry (e C_'( APN Applicant Name Q cr, rQ Phone (7çp) C( 3 -' Cf 05 Lost First — . . '- '. r ,- t IU*l[•]Is CoThS1etethefoliowing table with estimated wastetonnage too gererateçI byour project. ,Thlip isyodrtp1antfor construction waste management.Cháhges can)e flaae on t Ee.fiic!al re cycIe report. Goal: the diversion rate shall be 65% by weightsóf debris. A B C Material Type Estimated Place a (/) check Place a (") check next Place a (1) check next Waste Quantity next to items to be to items to be to items to be (tons) reused or salvaged recycled disposed at landfill Complete this line of the table only if only using WASTE MANAGEMENT roll-off bins. Mixed C&D Debris Asphalt & Concrete Brick / Masonry / Tile Mixed Inert Debris Cabinets, Doors, Fixtures, Windows(circle all that apply) Carpet ., - . . . .. - Carpet Padding/Foam. . Cardboard. Ceiling Tile (acoustic) r • 1! - — I Drywall (used, new, scrap) I . .'s( Vi Landscape Debris (brush, trees, stumps, etc.) No dirt. Unpainted Wood & Pallets Roofing Materials <' 'j Scrap Metal _______________________ Stucco \ 1 • C . Other ' TOTAL iiir.ir - j•- \ ) -• •. . _To meet 65% Diversion Requirement (estimate) • 5' x 0.65 = . 725 tons Total Estimated Waste from above Minimum Required Diversion Contractor/Owner Signature _'_Date 2 (7.. c.\ Page 2 of 4 Rev. 11/12/18 VJ 0 Conversion Table for Common ConstrUction Waste This document is informational only. It is here to help you convert truckload quantities to tons, if necessary.. - Column A , Column B Column C Category Material Volume Ton/Unit Tons Mixed Debris Cbnstructioñ . cy x 0.18 = Demolition cy x 1.19 . = Asphalt/Concrete Asphalt (broken) . cy x 0.70 = Concrete (broken) cy x 1.20 = Concrete (solid slab) cy X 1.30. = Brick/Masonry/Tile Brick (broken) cy x 0.70 = Brick (whole, palletized) cy x 1.51 = Masonry brick (broken) cy IX . 0.60 = Tile . sq ft x 0.00175 = Building Materials (cabinets, doors, windows, etc.) cy . x 0.15 Cardboard (flat) . . . cy x 0.05 = Carpet By square foot . sq ft x 0.0005 = By cubic yard cy X . 0.30 = Carpet Padding/Foam . sq ft X 0.000125 = Ceiling Tiles Whole (palletized). cy X .0.0003 = - Loose . cy. X 0.09 = Drywall (new or used) 1/2" (by squarefdot) sq ft X 0.0008 = (by square foot) sq ft X 0.0105 = Demo/used (by Cu. yd.) cy X 0.25 = Landscape Debris (brush, trees, etc.) . cy X 0.15 = Asphalt Composition . Shingles, asphalt Shingle cy x 0.22 = Unpainted Wood/Pallets By board foot bd ft x 0.001375 = • Bycubic yard cy x 0.15 = Trash/Garbage .. . cy X 0.18 = • S. Other (estimated weight) cy X estimate = ____________________ cy X estimate = cy X estimate = cy X estimate = Total all = :Page 4of4 S Rev. 11/12/18 MOODY' S '1 AT1ON M000YS 433-6691 u OCEANSIDE BLVD SALL, CA 92003 760-631-0342 CASH SALE NAME REF#: 00000049 CiYCFORIGN E,, : 0? • 1tTh2C 15:09:48 .iOE LOCATION -. E 08458D BY ELAVON ITHAILE. Chip ........... LOAD CUNY $175.00 I 1 1 2 SIJRCRGE $7.00 $182.00 1- PROVED DATE )ENCE TIME e~~ LOADS L- ,AOr :03io10 ... !0iU8000 Si F AM< YOU I iFF - jti U) d&JV ')MER r '1j ç )(Itt I ..... OTHER CHARGES $ TOTAL 7c '-• TRUCK # S is not responsIb'e for damage to this being loaded or unloaded in PALOMAR TRANSFER 5960 EL CANINO REAL CARLSBAD, CA 92008 (7 60) 603-0153 000999 - CASH AND CHECK CUSTOMER ADDRESS carlsbad, CA 92008 Contract: RESI - GATE Yr. 2 GROSS 15,000 Scale In TARE 12,140 Tare Out NET 2,860 Tracking Qty: 0.00 Qty Unit Description 1.43 TN MSW Origin: CARLSBAD 54 Ticket fl: 2182217 Weighmaster: reyesma3 In: December 18, 2020 Out: December 18, 2020 Vehicle: A56864 Ref: BOL: INBOUND CASH Rate Extension Tax $79.09 $113.10 $0.00 12:08 pm 12:08 pm Total $113.10 "PAtMrRAMS1ER Sm 5960 El. CAMIM) REAL CARLSBAD, CA 92008 12/18/2020 12:09:12 CREDIT 111D 'flSA SALE Card XXXXXXXXXX2391 Chip Card: VISA DEBIT AID: A0000000031010 SEQ: 26 Bath #: 1409 INVOICE 27 Approval Code: 100094 Envy Method: Chip Read Issuer c $0.00 ë OUNT $l13.1 CUSTOMER 0)PY Total Paid Change EDIT CARD-SCALE Signature: ., c- PALOMAR TRANSFER 5960 EL CANINO REAL CARLSBAD, CA 92008 (7 60) 603-0153 000999 - CASH AND CHECK CUSTOMER ADDRESS carlsbad, CA 92008 Contract: RESI - GATE Yr. 2 GROSS 14,120 Scale In TARE 12,140 Tare Out NET 1,980 Tracking Qty: 0.00 Qty Unit Description 0.99 TN MSW Origin: CARLSBAD 54 Ticket #: 2199648 Weighmaster: hernabr In: January 31, 2021 9:10 am Out: January 31, 2021 9:10 am Vehicle: A56864 Ref: BOL: INBOUND CASH Rate Extension Tax Total $79.09 $78.30 $0.00 $78.30 100% tOAR TRAISFER SIA 596011 CAMItIU REAL CARLSBAD, CA 9008 09:11:36 CREDIT CARD VISA SALE Card # XXXXXXXXXXXX2391 Chip Card: VISA DEBIT AID: A0000000031010 SEQ#: 19 Batch "44: 85 INVOICE 19 Approval Code: 191818 Enbi Method: Chip Read Mode: Issuer Tax Amount: $0.00 SALE AMOUNT $78.30 CUSTOMER COPY Total $78.30 Paid $78.30 Change $0.00 EDIT CARD-SCALE V Signature: