HomeMy WebLinkAbout1858 TULE CT; 110; CBR2020-2043; PermitBuilding Permit Finaled
Residential Permit
Print Date: 02/17/2021
Job Address: 1858 TULE CT, # 110, CARLSBAD, CA 92011-5138
Permit Type: BLDG-Residential Work Class: Second Dwelling Unit
Parcel #: 2155040500 Track #:
Valuation: $93,486.67 Lot #:
Occupancy Group: Project #:
#of Dwelling Units: Plan #:
Bedrooms: Construction Type:
Bathrooms: Orig. Plan Check #:
Plan Check U:
(CitY of
Carlsbad
Permit No: CBR2020-2043
Status: Closed - Firialed
Applied: 08/27/2020
Issued: 10/23/2020
Finaled Close Out:
Inspector: PBurn
Final Inspection: 02/17/2021
Project Title:
Description: FRANCO: 492 SF ATTACHED ADDITION 1ST FLOOR ADU// 217 CONVERSION OF GARAGE TO LIVING FOR ADU
Applicant: Property Owner:
WRIGHT DESIGN OWNER ARCINIEGA JESSICA FRANCO
SAMUEL WRIGHT 1858 TULE CT
2911 STATE ST CARLSBAD, CA 92011-5138
CARLSBAD, CA
(760) 720-7631
FEE AMOUNT
BUILDING PERMIT FEE ($2000+) $600.92
BUILDING PLAN CHECK FEE (BLDG) $420.64
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL $43.00
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION $175.00
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL $52.00
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL $80.00
5B1473 GREEN BUILDING STATE STANDARDS FEE $4.00
STRONG MOTION-RESIDENTIAL $12.15
SWPPP INSPECTION FEE TIER 1 - Medium BLDG $246.00
SWPPP PLAN REVIEW FEE TIER 1 - MEDIUM . $55.00
Total Fees: $1,688.71 Total Payments To Date: $1,688.71 Balance Due: $0.00
Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction. You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that yourright to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-2700 1 760-602-8560 f I www.carIsbadca.go
(City of
Carlsbad
Q
RESIDENTIAL
BUILDING PERMIT
APPLICATION
B-I
Plan Check /-aR 202C4
Est. Value -
PC Deposit -
,Date -2 --2o2TE
iobAddress '1i GL..r' Suit II ° -•APN: ..as
CT/Project #4 _Lot _Year Built:
Fire Sprinklers: 0 YES 9rNO Air Conditioning: YES 0 NO Electrical Panel Upgrade: 0 YES 0 NO
BRIEF DESCRIPTION OF WORK:
e.cwy is 1 &.I1r 1 'i oi (Jd.K.AQ.jE. -r o "• . U. L
Dvrl 0 ,00
Addition/New:• 4' 's-' Living SF,________ Deck SF, Patio SF, Garage SF -
Is this to create an Accessory Dwelling Unit? ØY ON New Fireplace? 0 qfN, if yes how many?
SF of affected area. Is the area a conversion or change of use
OSolar: KW, Modules, Mounted: ORoofOGround, Tilt:O vON, RMA:OY ON,
Battery:OY ON, Panel Upgrade: OY ON
El Reroof:
O Plumbing/Mechanical/Electrical Only: ... . . .
kOther:, . 1
This permit is to be issued In the name of the Property Owner as Owner-Builder, licensed contractor or Authorized Agent of the,
owner or contractor. The person listed as the Applicant below will be the main point of contact throughout the permit process.
PROPERTY OWNER APPLICANT 0 PROPERTY OWNERS AUTHORIZED AGENT APPLICANT
8In, M L • c I I. .4. W C. C5 M2mP 'A NA L.,L t2. I L 0 Iii&
'TuL
City: CuJI4I State:d ip:'hII
Phone:
DPool/Spa: SF Additional Gas or Electrical Feafures?
DESIGN PROFESSIONAL APPLICANT 0
Name:
Address:
City: State: Zip:__________
Phone:
Email:
Architect State License:
VM.F%I '! V 141 U L.L... .X M .41 L., C..
CONTRACTOR OF RECORD APPLICANT lJ
Name: -Custom Improvement Contracting
-
Address: 2869 Levante St
City: Carlsbad State:..__Zlp: 92009
Phone: 760-613-9405
Email:__Edcicone@mac.com .
State License/class:Bi Bus. License: BLRE1241439
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Bulldingcarisbadca.aov
REV. 08120
IDENTIFY WHO WILL PERFORM THE WORK BY COMPLETING (OPTION A) OR (OPTION B) BELOW:
(OPTION A): LICENSED CONTRACTOR DECLARATION:
I hereby affirm under penalty of perjury that lam licensed under provisions of Chapter 9 (commencing with Section 7000)01 Division 3
of the Business and Professions Code, and my license is infuliforce and effect. I also affirm under penalty of perjury one of the
following declarations:
Di have and will maintain a certificate of consent to self-Insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. Policy No.______________________________________________________________________________________________
Di have and will maintain workers compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: insuranceCompany Name:
Policy No. Expiration It
Certificate of Exemption: I certify that In the performance of the work for which this permit Is issued, i shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
Interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit Is issued (Sec. 3097 (i) Civil Code).
Lender's Name: NA Lender's Address:
CONTRACTOR PRINT/SIGN: Edgar E Cicone Hi 4'L
DATE: 10-21-20
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that lam exempt from Contractor's License Law for the following reason:
Dl, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure Is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work
himself or through his own employees, provided that such improvements are not Intended or offered for sale. If, however, the building or improvement is sold within
one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
Dl, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
Di am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
El "Owner Builder acknowledgement and verification form" has been filled out, signed and attached to this application. Proof of Identification attached.
El Owners "Authorized Agent Form" has been filled out, signed and attached to this application giving the agent authority to obtain the permit on the owner's behalf. Proof of Identification attached.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed
contractors.! understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application Is submitted or at the following Web site: http://www.leglnfo.ca.govfcolaw.hrmL
OWNER PRINT/SIGN: DATE:_____________
APPLICANT CERTIFICATION: SIGNATURE REQUIRED AT THE TIME OF SUBMITTAL
_yjjyjjrnature belojçjji that: am
owner or contractor's behalf. I certify that! have read the application and state that the above Information Is correct and that the Information on the plans Is accurate.! agree to comply with all City ordinances and State laws relating to building construction.
I hereby authorize representative of the City of Carlsbadto enter upon the above mentioned prope,4rfolspectJon purpose& I ALSOAGREE TO SAVE, INDEMMFYANOkEEPHARMLESS THE CI7YOF CARLSBAOAGAINSTALL LIABILITIES, JUDGMENTS, COSTSAND EXPENSES WHICH MAYINANY WAYACCRUE AGAJNSTSAID QTYIN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OS :An A permit is requlredforexcavations over5'O' deep and
demolition or construction of structures over 3 stories In height.
APPLICANT PRINT/SIGN:#SA WLiciw r( jI DATE:"'
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760.602-2719 F: 760-602-8558 Email: Buildlnecarisbpdca.gov
2 REV. 08120
Permit Type: BLDG-Residential Application Date: 08/27/2020 Owner: OWNER ARCINIEGA JESSICA FRANCO
Work Class: Second Dwelling Unit Issue Date: 10/23/2020 Subdivision: CARLSBAD TCT#72-34 UNIT#01
Status: Closed - Finaled Expiration Date: 07/19/2021 Address: 1858 TULE CT, #110 ,..
IVR Number: 28316 CARLSBAD, CA 92011-5138
Scheduled Actuai Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-Plumbing Final February 17, 2021: Yes
No building deficiencies.
1. New attached, single-story, accessory
dwelling unit (ADU), one bedroom dwelling
unit, per structural and architectural plans
and detail specifications-scope of
work-approved.
BLDG-Mechanical Final February 17, 2021: Yes
No building deficiencies.
1. New attached, single-story, accessory
dwelling unit (ADU), one bedroom dwelling
unit, per structural-and architectural plans
and detail specifications-scope of
work-approved.
BLDG-Structural Final February 17, 2021: Yes
Nobuilding deficiencies.
1. New attached, single-story, accessory
dwelling unit (ADU), one bedroom dwelling
unit, per structural and architectural plans
and detail specifications-scope of
work-approved.
BLDG-Electrical Final February 17, 2021: Yes
No building deficiencies.
1. New attached, single-story, accessory,
• dwelling unit (ADU), one bedroom dwelling
unit, per structural and architectural plans
-
• and detail specifications-scope of
work-approved.
Wednesday, February 17, 2021 • • • Page 6 of 6
Permit Type: BLDG-Residential Application Date: 08/27/2020 Owner: OWNER ARCINIEGA JESSICA FRANCO
Work Class: Second Dwelling Unit Issue Date: 10/23/2020 Subdivision: CARLSBAD TCT#72-34UN1T#01
Status: Closed - Finaled Expiration Date: 07/19/2021 Address: 1858 TULE CT, # 110
CARLSBAD, CA 92011-5138
IVR Number: 28316
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Paul Burnette Video inspection 01/15/2021
01120/2021 01/20/2021 BLDG-27 Shower 148680-2021 Passed Paul Burnette Complete
Pan/Tubs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
NOTES Created By TEXT Created Date
Paul Burnette Video inspection 01/20/2021
02/0912021 02/09/2021 BLDG-Final Inspection 150133-2021 Failed Paul Burnette Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final No
BLDG-Electrical Final No
02/17/2021 02117/2021 BLDG-Final Inspection 150653-2021 Passed Tony Alvarado Complete
Wednesday, February 17, 2021 Page 50f 6
Permit Type: BLDG-Residential Application Date: 08/27/2020 Owner: OWNER ARCINIEGA JESSICA FRANCO
Work Class: Second Dwelling Unit Issue Date: 10/23/2020 Subdivision: CARLSBAD TCT#72-34 UNIT#01
Status: . Closed - Finaled Expiration Date: 07/19/2021 Address: 1858 TULE CT, # 110
IVR Number: 28316 CARLSBAD, CA 92011-5138
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
BLDG-34 Rough Electrical January 13, 2021: (partial pass).. Yes
Rough combination inspection - required
anchor bolt, located at exterior wall bottom
sill plate, within 12 inches from new bottom
plate bottom/sill plate break.
Nail plate required at kitchen sink, 2'inch
vent line, at top plate area.
Attic venting required, located
at/between kitchen above attic and
bedroom/bathroom attic, contractor did not
provide communication/air-flow space
between new attic areas.
Strap at exterior top plate, exterior wall
location, next to front door area, diagonal
wall meets perpendicular wall requires 'S"
strap connection.
Kitchen window missing, will be installed
January 14, 2021, per contractor
representative, moist-stop flashing and lath
paper is ran-wild for a future window
installation.
BLDG-44 January 13, 2021: (partial pass). Yes
Rough-Ducts-Dampers 1. Rough combination inspection - required
anchor bolt, located at exterior wall bottom
sill plate, within 12 inches from new bottom
plate bottom/sill plate break.
Nail plate required at kitchen sink, 2"inch
vent line, at top plate area.
Attic venting requi?ed, located
at/between kitchen above attic and
bedroom/bathroom attic, contractor did not
provide communication/air-flow space
between new attic areas.
Strap at exterior top plate, exterior wall
location, next to front door area, diagonal
wall meets perpendicular wall requires '5"
strap connection.
Kitchen window missing, will be installed
January 14, 2021, per contractor
representative, moist-stop flashing and lath
paper is ran-wild for a future window
installation.
01/15/2021 . 01/15/2021 BLDG-16 Insulation 148427.2021 Passed Tony Alvarado Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency January 14,2021: (virtual inspection). Yes
Virtual inspection for exterior wall.
insulation.
insulation certificate verified, scope of
insulation work-approved.
BLDG-17 Interior . 148496.2021 Passed Paul Burnette Complete
Lath/Drywall
Wednesday, February 17, 2021 . Page 4 of 6
Permit Type: BLDG-Residential Application Date: 08/27/2020 Owner: OWNER ARCINIEGA JESSICA FRANCO
Work Class: Second Dwelling Unit Issue Date: 10/23/2020 Subdivision: CARLSBAD TCT#72-34 UNlT#01
Status: Closed - Finaled . Expiration Date: 07/19/2021 Address: 1858 TULE CT, #110
IVR Number: 28316 CARLSBAD, CA 92011-5138
Scheduled Actual Inspection Type . . Inspection No. Inspection Primary Inspector Reinspection . Inspection
Date Start Date . Status
Checklist Item COMMENTS Passed
BLDG-Building Deficiency January 13, 2021: (partial pass). Yes
Rough combination inspection - required
anchor bolt, located at exterior wall bottom
sill plate, within 12 inches from new bottom
plate bottom/sill plate break.
Nail plate required at kitchen sink, 2inch
vent line, at top plate area.
Attic venting required, located
at/between kitchen above attic and
bedroom/bathroom attic, contractor did not
provide communication/air-flow space
between new attic areas.
Strap at exterior top plate, exterior wall
location, next to front door area, diagonal
wall meets perpendicular wall requires "S"
strap connection.
Kitchen window missing, will be installed
January 14, 2021, per contractor
representative, moist-stop flashing and lath
paper is ran-wild for a future window
installation.
BLDG-24 Rough-Topout January 13. 2021: (partial pass). . Yes
Rougkcombination inspection - required
anchor bolt, located at exterior wall bottom
sill plate, within 12 inches from new bottom
plate bottom/sill plate break.
Nail plate required at kitchen sink, 2"inch
vent line, at top plate area.
Attic venting required, located
at/between kitchen above attic and
bedroom/bathroom attic, contractor did not
provide communication/air-flow space
between new attic areas.
Strap at,exterior top plate, exterior wall
location, next to front door area, diagonal
wall meets perpendicular wall requires "S'
strap connection.
Kitchen window missing, will be installed
January 14, 2021, per contractor
representative, moist-stop flashing and lath
paper is ran-wild for a future window
installation.
Wednesday, February 17, 2021 .
.
Page 3 of 6
Permit Type: BLDG-Residential Application Date: 08/27/2020 Owner: OWNER ARCINIEGA JESSICA FRANCO
Work Class: Second Dwelling Unit Issue Date: 10/23/2020 Subdivision: CARLSBAD TCT#72-34 UNIT#01
Status: Closed - Finaled Expiration Date: 07/19/2021 Address: 1858 TULE CT, #110
CARLSBAD, CA 92011-5138
IVR Number: 28316
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS . Passed
BLDG-Building Deficiency January 13. 2021: (partial pass). Yes
Rough combination inspection - required
anchor bolt, located at exterior wall bottom
sill plate, within 12 inches from new bottom
plate bottom/sill plate break.
Nail plate required at kitchen sink, 2"inch
vent line, at top plate area.
Attic venting required, located
at/between kitchen above attic and
bedroom/bathroom attic, contractor did not
provide communication/air-flow space
between new attic areas.
Strap at exterior top plate, exterior wall
location, next to front door area, diagonal
wall meets perpendicular wall requires "5"
strap connection.
Kitchen window missing, will be installed
January 14, 2021, per contractor
representative, moist-stop flashing and lath
paper is ran-wild for a future window
installation.
BLDG-84 Rough 148195-2021 Partial Pass Tony Alvarado Reinspection Incomplete
Combo(14,24,34,44)
Wednesday, February 17, 2021 Page 2 of 6
City of
Building Permit Inspection History Finaled Carlsbad
Permit Type: BLDG-Residential Application Date: 08/27/2020 Owner: OWNER ARCINIEGA JESSICA FRANCO
Work Class: Second Dwelling Unit Issue Date: 10/23/2020 Subdivision: CARLSBAD TCT#72-34 UNIT#01
Status: Closed - Finaled Expiration Date: 07/19/2021 Address: 1858 TULE CT, #110
IVR Number: 28316 CARLSBAD, CA 92011-5138
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
1012812020 1012812020 BLDG-SW-Pre-Con 142202.2020 Passed Paul Burnette Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
11/18/2020 11118/2020 BLDG-21 144061.2020 Passed Paul Burnette Complete
UndergroundlUnderflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
1112012020 11120/2020 BLDG-11 144360.2020 Passed Paul Burnette Complete
FoundationlFtglPlers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
1210412020 12/0412020 BLDG-15 RooflReRoof 145446.2020 Passed Paul Burnette Complete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
1211612020 1211612020 BLDG-84 Rough 146379.2020 Failed Paul Burnette Reinspection Incomplete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-14 No
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout No
BLDG-34 Rough Electrical No
BLDG-44 No
Rough-Ducts-Dampers
01111/2021 0111 112021 BLDG-I3 Shear 148043.2021 Passed Chris Renfro Complete
Panels/HD (ok to wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Shear nail only. Special inspection report Yes
collected. Need exterior wrapped and
exterior last nailed off prior to rough combo
inspection.
0111312021 0111312021 BLDGI8 Exterior I48353-2021 Partial Pass Tony Alvarado Reinspection Incomplete
Lath/Drywall
Wednesday, February 17, 2021 Page I of 6
Carlsbad cbR-2020-2043
9/18/2020
(city of
Carlsbad
SPECIAL INSPECTION
AGREEMENT
B-45
PflyeIopment. Services
Building Division
1635 Faraday Avinue
760.602-2719
www.carisbadça.gov
In accoreanco with Chapter 1701 the California Building Códèthe following must be completed when work bOlflg.porfonned
requiresepecial Inspectiort, structural observation and construction material testing.
Project/Perm i M,.z0LQ1-0A:6fOiec1Address: b Tt4 C.Ill. 1'
THIS SECTION MUST BE COMPLETED BY THE PROPERTY OWNERIAUThORIZEO AGENT Please check if you are Owner-Builder
0. (If you checked as owner-builder you-must also complete Sectlon.B.of this agrekment.)
Name: (etoaseprint) -as II 14 ILl .J 4 T
(Fti -
Mailing Address:_a1 LI_S 'T/__I L'$1' Ii. E. I.
Email- w r tj oLq. v e t.OA ___JeltP
lam: aProperty Owner Property Owner's Agent of Record UArchitect of Record DEngineer of Record
State of California Registration Numbet Expiration Date:_________________
AGREEMENT: I, the undersign d. declare under penalty of perjury under.the laws of the State of California, that I have read, understand acknowledge an promise to mply with the City, of Carlsbad requirements for special inspections structural observatiOns,-construction- terlaistesti nd'&i' e fabrication of building coMpBnents, as prescribed in the statement of. special inspeclions noted the approv lans and. uired by the California Building Code.
Signatura:_ Date:
CONTRACTOR'S STATEMENT OF RESP NSIBILITY (07 CBC, Ch 17, Section 17013).7hls'sectlon must be completed by the
contractor builderl owner-builder.
Contractor's Company Name: Custom Improvement Contracting Please check ttyouom Ownor-0u2dei ci
Name: (Please push) Edgar Edward Ciconc III
IRIS) (Nil .
Mailing Address: 2869 Levante St Carlsbad Ca 92009
Email: Edcicone@mac.com Plume- 760-613-9405
State of California Contractor's LiCense Number: BI-829778 Expiration DátO: 12-31-21
I acknowledge and, am aware, of special requirements contained In the statement of special inspections noted on
the approved plans:
I acknowledge that control will be exercised to obtain conformance With the construction documents approved by the
building official;
I will have in-place procedures for exercising control,withln our (the contractor's) organization, for the method and
frequency of reporting and the distribution of the reports; and
I certify that I will have a qualified persàn within our (the contractor's) organization to exercise such. control. twill brovlde a final rpnortllptfpr in nnmnlianntvwish iRfl ,#Mn 4?.flA 4 5
____________Date: 10-2,1-20
545 . . Page lofi RECEIVE) ReV.08111
OCT r16 2020
CITY OF CARLSBAD
BUILDING DIVISION
George Postulka Inspection Services
P0 Box 503 RECORD
c -IOP
Poway, CA 92074 City 0j Carlsbad
(858) 354-9918 SPECIAL INSPECTION REPORT 3o is 10
Project: /r ry 1
Address: / gç F19 1 7L
City: (ir/c h/
Permit Number cO 13/f 2-2) 2 -2 nq3 Plan File Number__________________
TYPE OF OBSERVATIONS:
Reinforcing SteelReinforced Concrete Structural Masonry Field Welding
Epoxy X Prestressed Concrete Shop Welding ____ Bolting ___ Fireproofing____
Number of Samples: ____ Type:
Materials/DesignMix/Psi: 4 3O7 ó? Iv,
Se-I,f3 FR 2c F xv h-Z2.
Date: /Z2O
REPORT
2
i W S c
WORK INSPECTE,P5ONFORMS WITH APPROVED PLANS AND SPECIFICATIONS UNLESS OTHERWISE NOTED
tvy? VO.51c'Jki z TIME IN: /1.'oo TIME OUT:
Inspector (Print) Certification #
ZZZ55~--
Inspector's Signature
va
A4)IoriZed Job Site Contact Signature
General Contractor: f4 t3,, /I'ii.i
Address:
City:
Phone;
EsG!l
A SAFEbuiIt Company
DATE: 10/16/2020 0 APPLICANT
0 JURIS.
JURISDICTION: Carlsbad
PLAN CHECK #.: cbR-2020-2043 SET: II
PROJECT ADDRESS: 1858 Tule Court
PROJECT NAME: Garage Conversion and Addition to SFD for ADU Addition
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
LI The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
LII The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to
EsGil staff did not advise the applicant that the plan check has been completed.
EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (bLL Email:
Mail Telephone Fax In Person
REMARKS: Applicant to complete City forms B-5- and B-55 at City.
By: Richard Moreno. Phone: 858-345-6435 Enclosures:
EsGil
10/8/2020
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
David Thomas
Engineering, A.P.C.
Structural Engineering Services
Structural Calculations
(ADU) RECEIVED
AUG 272020
CITY OF CARLSBAD
BUILDING DIVISION
Project
Franco Residence / 20171
1858 Tule Court
Carlsbad, California 92011
Prepared For
Sam Wright
Wright Design
2911 State Street
Carlsbad, California 92008
8-17-20
Mailing: 3525 Del Mar Heights Road, #331, San Diego, California 92130
Physical: 12625 High Bluff Drive, Suite 106, San Diego, California 92130
Office Phone (858) 2013072 Cell Phone: (858) 336-9902
Website: www.dtengsd.com Email: daviddtengsd.com
CcA2OLO2d O
L "P
Job Franco ADU 20171
Calculated by DT Date 8-17-20
David Thomas Engineering
TABLE OF CONTENTS
PAGE
1. PROJECT SCOPE / DESIGN CRITERIA..........................................................2
2. DESIGN LOADS ...........................................................................................
3. VERTICAL ANALYSIS:
HORIZONTAL MEMBER DESIGN (BEAMS, HEADERS, JOISTS, ETC.)
VERTICAL MEMBER DESIGN (COLUMNS, STUDS, ETC.)
4. LATERAL ANALYSIS:
SEISMIC/WIND LOADING ANALYSIS & LATERAL DISTRIBUTION............-
LATERAL LOAD-RESISTING DESIGN: - SHEARWALL DESIGN ..............................................................
CANTILEVERED STEEL COLUMN ELEMENTS.............................
STEEL MOMENT FRAMES ......................................................
IV ......................................................
5. FOUNDATION DESIGN: 10 CONTINUOUS & SPREAD FOOTINGS .................................................
RETAINING WALLS ..........................................................................
CONCRETE GRADE BEAMS................................................................
DEEPENED CONCRETE PIERS/CAISSONS ..........................................
E ..........................................
6. SCHEDULES:
SHEARWALL SCHEDULE....................................................................11
HOLD DOWN SCHEDULE ...................................................................
SPREAD FOOTING SCHEDULE ........................................................13
1 of 13
Job Franco ADU 20171
Calculated by DT Date
David Thomas Engineering
PROJECT SCOPE
Provide vertical and lateral load calculations for a proposed ADU addition at an existing single family residence
at 1858 Tule Court, Carlsbad, California 92011. Residence to be constructed utilizing primarily wood-frame
construction. Roof framing to consist of a combination of conventional stick-frame and pre-fabricated roof
trusses (by other) and the foundation system to consist of a conventional slab-on-grade with deepened
perimeter footings. A soils report was not provided fOr this project. Therefore, the foundation design will be
based on the minimum soil bearing capacity as specified in the current version of the Governing Code - 2019
California Building Code. David Thomas Engineering makes no representations concerning the suitability of the
soils and/or minimum soil values allowed by the CBC.
These calculations have been prepared for the exclusive use of Maria Franco and her design consultants
for the specific site listed above. Should modifications be made to the project subsequent to the preparation
of these calculations, David Thomas Engineering should be notified to review the modifications with respect
to the recommendations/conclusions provided herein, to determine if any additional calculations and/or
recommendations are necessary. Our professional services have been performed, our findings obtained,
and our recommendations prepared in accordance with generally accepted engineering principles and
practices.
DESIGN CRITERIA SUMMARY
GOVERNING CODE: 2019 C.B.C.
CONCRETE: fc = 2500 PSI (MIN.), NO SPECIAL INSPECTION REQ'D, (U.N.O.)
MASONRY: ASTM C90, fm = 1500 PSI, SPECIAL INSPECTION REQ'D, (U.N.O.)
REINFORCING STEEL: ASTM A615, Fy =60 KSI FOR #4 AND LARGER (U.N.O.)
STRUCTURAL STEEL: ASTM A992, Fy =50 KSI (ALL 'W SHAPES, ONLY)
ASTM A36, Fy =36 KSI (STRUCTURAL PLATES, ANGLES, CHANNELS)
ASTM A500, GRADE B, Fy =46 KSI (STRUCTURAL TUBES-HSS)
ASTM A53, GRADE B, Fy =35 KSI (STRUCTURAL PIPES)
SAWN LUMBER: DOUG FIR LARCH, ALLOWABLE UNIT STRESSES PER 2018 NDS.
E.W.P.: BOISE-CASCADE: BCI-JOIST (ICC-ESR-1 336), VERSA-LAM (ICC-ESR-1 040)
GLULAMS: DOUGLAS FIR OR DOUGLAS FIR/HEM
GRADE 24F-V4 (SIMPLE SPANS) GRADE 24F-V8 (CANTILEVERS)
SOIL: EXISTING NATURAL SOIL VALUES PER CBC TABLE 1806.2 (1,500 PSF)
2 of 13
L "P
Job Franco ADU 20171
Calculated by DT Date
David Thomas Engineering
DESIGN LOADS
CASEI
MATERIAL: Shingle
ROOF SLOPE: 5:12
DEAD LOAD:
ROOFING MATERIAL ............................................................................10.0 PSF
SHEATHING..................................................................................................1.5
RAFTERS/C.J. (or) TRUSSES .........................................................................4.0
INSULATION....................................................................................................1.5
DRYWALL........................................................................................................2.5
OTHER (ELEC., MECH., MISC.) ......................................................................0.5
TOTAL DEAD LOAD: 20.0 PSF
LIVE LOAD: 20.0PSF
TOTAL LOAD: 40.0 PSF
EXTERIOR WALL FINISH: Stucco/Sidin
STUDS..............................................................................................................1.0 PSF
DRYWALL.......................................................................................................2.5
INSULATION....................................................................................................1.5
EXTERIORFINISH ......................................................................................10.0
OTHER................................................................................................................1.0
TOTAL LOAD: 16.0 PSF
INTERIOR WALL
STUDS.........................................................................................................1.0 PSF
DRYWALL....................................................................................................5.0
OTHER.............................................................................................................1.0
TOTAL LOAD: 7.0 PSF
3 of 13
q E\
Job Franco ADU 20171
Calculated by DT Date
David Thomas Engineering
LATERAL DESIGN (Sheet 1)
Wind Design
MethodUsed =Main Wind-Force Resisting System (MWFRS) - Envelope Method - Part 2
Maximum Building Height (z) = feet
Design Wind Speed = 90 mph (per ASCE-7, Figure 26.5-1A)
_20
Exposure Category = C (per ASCE-7, 6.5.6.3)
Importance Factor (I) = 1.00 (per ASCE-7, Table 1.5-2)
K"t = 1.00 (per ASCE-7, 26.8.2)
1.29 (per ASCE-7, Figure 28.5-1)
Ps30 = 17.80_psf (per ASCE-7, Figure 28.5-1)
0.6 x Ps =1_13.781psf Ps = Ax Kt x Ps30 (per ASCE-7, 28.5.3, Equation 28.5-1)
(reduced for ASD load combos)
Adjust Factor ATable
Mean Roof Exposure
Height (ft) B C D
15 1.00 1.21 1.47
20 1.00 1.29 1.55
25 1.00 1.35 1.61
30 1.00 1.40 1.66
35 1.05 1.45 1.70
40 1.09 1.49 1.74
45 1.12 1.53 1.78
50 1.16 1.56 1.81
55 1.19 1.59 1.84
60 1.22 1.62 1.87
SeismicDesign
Methodused = Equivalent Lateral Force Procedure
Occupancy Category = 2 (per ASCE-7, Table 1-1) (Residential = 2.0)
R = 6.5 (per ASCE-7, Table 12.2-1) (Wood Shearwalls = 6.5)
I = 1.00 (per ASCE-7, Table 11.5-1) (Residential = 1.0)
Site Class = D (per ASCE-7, 11.4.2) (Assume SiteClass = D" w/o Soils Report)
Ss = 0.993 g (0.2 sec) Fa = 1.200 5DS = 0.794 g
S,= 0.361 g (1 sec) F = 11.500 SD1 = 0.361 g
Seismic Design Category (SDS) = D (Use the worst case seismic design category) Seismic Design Category (SD 1) = D
T.= 0.189 sec CthnX (per ASCE-7, Equation 12.8-7)
Cs = 0.122 505/(R/I) (per ASCE-7, Equation 12.8-2)
C5m = 0.294 SD1/Ta(R/I (per ASCE-7, Equation 12.8-3)
C5mjn = 0.010 C5min > 0.01 or 0.551/(R/I) (per ASCE-7, Eq. 12.8-5 / 12.8-6)
C5a_0.122
P= 1.3 Assumed Factor of Safety
V = 0.113 _W, (Csact*p)*Wx/1.4 (ASD) X 11 1.20 = 10.136IWx
4 of 13
ZDTE~
David Thomas Engineering
Job Franca ADU 20171
Calculated by DT Date
LATERAL DESIGN (Sheet 2)
BUILDING WEIGHTS
Total Installed Roof Weight = 20psf
Total Installed Deck Weight = _25_psf ROOF
Total Installed Interior Wall Weight = 7 psf
Total Installed Exterior Wall Weight = 16 psf
Commercial Partition Loads? = N Y or N
ROOF LOADS
Diaphragm Area Roof= 3500 sq. ft.
Exterior Wall Length = 300 ft.
Interior Wall Length = 300 ft.
Minimum Diaphragm Dimension N-S = 28 ft.
TOTAL BUILDING DEAD LOAD, WT. =97,600.00 LBS.
Cs(adjusted) = 0.136
BASE SHEAR, V = 13,291.45 LBS.
LATERAL LOAD DISTRIBUTION
Story Area (A) 3500 sq. ft.
Story Unit Shear (v,) 3.80 psf
WIND VS. SEISMIC COMPARISON
Wind Pressure (F) = 13.78 psf
Story Linear Forces = ROOF
NORTH-SOUTH Wind = 13.78 psf x
NORTH-SOUTH Seismic = 3.80 psf x
EAST-WEST Wind = 13.78 psf x
EAST-WEST Seismic = 3.80 psf x
Roof Project. Height = 3ft
Plate Height = 8ft
* Alternate Ext. Wall =1 Ipsf
Deck= sq. ft.
Alt.= ft.
E-W=I 261ft.
TOTAL= 97600 LBS.
See Lateral Design Loads Spreadsheet
See Lateral Design Loads Spreadsheet
7ft. 96p1f SEISMIC GOVERNS I 28 ft. : 106 pif
7ft : 96p1f SEISMIC GOVERNS 26 ft. : 99 plf
Job_ Franco ADU 20171 -
E. Calculated by DT Date
David Thomas Engineering
Shearwall Design
Story Shearwalls Direction Unit Lateral Load, v = 3a0 psf
Griciline ç 9'li_) ( )
2 2. t Lbs
sq. ft. Tributary Area (This Level):
,o Lateral Load (This Level):
Lateral Load (Level Above): Lbs
Total Load (All Levels), F = 2o Z.2 Lbs
Total Shearwall(s) Length, L = 4,0 ft.
Unit Wall Shear, v = FXIL =5705r pif
Shearwall Type: (}
Overturning: Panel Design Width = ft. OR Okay by Inspection
Uplift (9°5)(2) 4.°43 Lbs
Holdown Anchor Type: ' 14 bt4
Gridllne (ii/)Ii') sq. ft Tributary Area (This Level):
ILDo Lbs Lateral Load (This Level):
Lateral Load (Level Above): - Lbs
Total Load (All Levels). F = TIP IP Lbs
Total Shearwall(s) Length, L = c,o ft.
Unit Wall Shear, v = FX/L = 32. plf
Shearwall Type:
9
Overturning: Panel Design Width = ft. OR Okay by Inspection
Uplift= ( IMP Lbs
Holdown Anchor Type: RI "fDti4i'
Gridline / \
Tributary Area (This Level): (212)1-i)-I-(_Z7./)(I 5) 2 01 sq. ft
Lateral Load (This Level): I P,7 Lbs
Lateral Load (Level Above): - Lbs
Total Load (All Levels), F= 1 Lbs
Total Shearwall(s) Length, L = (7 c) j2)i ft.
Unit Wall Shear, v = FXIL = i7-4 plf
Shearwall Type:
Overturning: Panel Design dth = ft. OR _____ Okay by Inspection
Uplift = (#244) C
Wi
Il L3 Lbs
Holdown Anchor Type: E "14-1> 'j4
6 of 13
job _Franco ADll 20171
D E . Calculated by DT Date
David Thomas Engineering
Shearwall Design
Story Shearwalls M Direction Unit Lateral Load, v 3.Bo psf
Gridline
(-12) Tributary Area (This Level): sq. ft.
Lateral Load (This Level): (j27 Lbs
Lateral Load (Level Above): - Lbs
Total Load (All Levels), Fx 6 7-1 Lbs
Total Shearwall(s) Length, L = I 2 0 ft.
Unit Wall Shear, v = FX/L = 53 plf
Shearwall Type: <a)
Overturning: Design Width = ft. OR Okay by Inspection
Uplift= Lbs
Holdown Anchor Type: EEl "l4D '.ia'
Gridliné
sq.ft. Tributary Area (This Level):
Lbs
Lateral Load (This Level): Lbs
Lateral Load (Level Above):
Total Load (All Levels), F = Lbs
Total Shearwall(s) Length, L =
Unit Will Shear, v = FX/L pif
Shearwall Type: 3
Overturning: Panel Design Width = ft. OR ______ Okay by Inspection
Uplift = Lbs
Holdown Anchor Type: D
Gridline.
Tributary Area (This Level): ___________________________________________ _______________________________________________________________ sq.ft.
Lateral Load (This Level): Lbs
Lateral Load (Level Above); Lbs
Total Load (All Levels), F = Lbs
Total Shearwall(s) Length, L
Unit Wall Shear, v = FXIL = pif
Shearwall Type:
Overturning: Panel Design Width = ft. OR Okay by Inspection
Uplift = . Lbs
Holdown Anchor Type: 0
.
7 of 13
Job _FrancoADU 20171
D E Calculated by DT Date
David Thomas Engineering
Shearwall Design
Story Shearwalls Direction Unit Lateral Load, v = ' & ° psf
A Gridline (ic[,_.) 1i) UP5 Tributary Area (This Level): sq. ft.
Lateral Load (This Level): Lbs
Lateral Load (Level Above): Lbs
Total Load (All Levels), F = (02-7 Lbs
Total Shearwall(s) Length, L
Unit Wall Shear, v = FXIL = pif
Shearwall Type: (j
Overturning: Panel Design Width = ft. OR Okay by Inspection
Uplift = (i o) () .57 Lbs
Holdown Anchor Type: •[j 11 I40z. rq
Gridline
Tributary Area (This Level)-'-('&-i (fl.-) 42.. sq. ft.
Lateral Load (This Level): I C, p Lbs
Lateral Load (Level Above): Lbs
Total Load (All Levels), F = 11#a Lbs
Total Shearwall(s) Length, L = ft.
Unit Wall Shear, v = FX/L = plf
Shearwall Type: ()
Overturning: Panel Design Width = ft. OR Okay by Inspection
Uplift = (*) I 0 Lbs
Holdown Anchor Type: E1 114 b r.jj.'1
Gridline C.
Tributary Area (This Level): ('7-) (vi.1+' (22/ (4o) sq. ft.
Lateral Load (This Level): 4 9 Lbs
Lateral Load (Level Above): Lbs
Total Load (All Levels), F = 2, Lbs
Total Shearwall(s) Length, L = ft.
Unit Wall Shear, v = FX/L p11
Shearwall Type: ()
Overturning: Panel Design Width = ft. OR ______ Okay by Inspection
Uplift = t's. ol) ( Lbs
Holdown Anchor Type: E1
8 of 13
Job Franco ADU 20171 -
D E Calculated by DT Date__________
David Thomas Engineering
Shearwall Design
I 'i(
Story Shearwalls Direction Unit Lateral Loads v = 3 20 psf
Gridline
Tributary Area (This Level): (7417,+ Q,) (4t) _7C'O sq. ft.
I Lateral Load (This Level): Sit Lbs
Lateral Load (Level Above): - Lbs
Total Load (All Levels), Fx = Se139 6 Lbs
Total Shearwall(s) Length, L = U
Unit Wall Shear, v = FX/L = 2.&3 plf
Shearwall Type:
9
Overturning: Panel Design Width = ft. OR Okay by Inspection
Uplift= l-(1) >) Lbs
Holdown Anchor Type: El H
Gridline
Lbs
Lbs
Lbs
Tributary Area (This Level): sq.ft.
Lateral Load (This Level):
Lateral Load (Level Above):
Total Load (All Levels), F =
Total Shearwall(s) Length, L = ft.
Unit Wall Shear, v = FJL = p11
Shearwall Type: I}
Overturning: Panel Design Width = ________ ft. OR _Okay by Inspection
Uplift = Lbs
Holdown Anchor Type:
Gridline
Tributary Area (This Level): sq. ft.
. Lbs Lateral Load (This Level):
Lbs Lateral Load (Level Above):
Total Load (All Levels), F = Lbs
Total Shearwall(s) Length, L = ft.
Unit Wall Shear, v = FXIL = plf
Shearwall Type: KIJ
Overturning: Panel Design Width = ft. OR ______ Okay by Inspection
Uplift = Lbs
Holdown Anchor Type: El
9 of 13
Job Franco ADU 20171
Calculated by DT Date
David Thomas Engineering
CONTINUOUS FOOTING DESIGN
ALLOWABLE APPLIED LOADS
AIIowble Soil Bearing Pressure (ASBP) = 1.500 psf (Per Design Criteria)
Existing Continuous Footing (CF-1)
Cont. Footing Width = 1.0 ft. mm . Cont. Footing Depth = 1.0 ft. mm .
Allowable Line Load = ASBP x Footing Width = 1.000 plf (assume 1,000 psf at existing)
Maximum Line Load (Gridline _L) = 500 plf
Allowable Point Load = ASBP x Footing Width x 2 x Footing Depth = 2.000 lbs.
USE: 12"WIDE X 12"DEEP CONT. FOOTING
New Continuous Footing (CF-1)
Cont. Footing Width = 1.0 ft. mm . Cont. Footing Depth= 1.0 ft. mm .
Allowable Line Load = ASBP x Footing Width = 1.500 plf
Maximum Line Load (Gridline _çj = 500 plf
Allowable Point Load = ASBP x Footing Width x 2 x Footing Depth = 3.000 lbs.
USE: 12"WIDE X 12"DEEP CONT. FOOTING
SPREAD FOOTING DESIGN
P-I Spread Footing: Allowable Point Load = ASBP x Footing Width x Footing Width = 6,000 lbs.
USE: 24" SQUARE X 12" DEEP CONT. FOOTING wl (2) - #4 BARS (EA. WAY @ BOTTOM)
P-2 Spread Footing: Allowable Point Load = ASBP x Footing Width x Footing Width = 9.750 lbs..
USE: 30" SQUARE X 12" DEEP CONT. FOOTING wl (3) - #4 BARS (EA. WAY @ BOTTOM)
P-3 Spread Footing: Allowable Point Load = ASBP x Footing Width x Footing Width = 13,500 lbs.
USE: 36" SQUARE X 12" DEEP CONT. FOOTING WI (4) - #4 BARS (EA. WAY @ BOTTOM)
P-4 Spread Footing: Allowable Point Load = ASBP x Footing Width x Footing Width = 18.375 lbs.
USE: 42" SQUARE X 12" DEEP CONT. FOOTING wl (5) - #4 BARS (EA. WAY @ BOTTOM)
P-5 Spread Footing: Allowable Point Load = ASBP x Footing Width x Footing Width = 24,000 lbs.
USE: 48" SQUARE XA 2" DEEP CONT. FOOTING w/ (6) - #4 BARS (EA. WAY @ BOTTOM)
10 of 13
Job Franco ADU 20171 Calculated by DI Date David Thomas Engineering _JI I I I oioio 0
I I J I -Ix -Ix Ix - I
coI <zi I I LU I
1uIujIujIaj
~H C6 lLU C6IU) 'Lu-
I)I)I
1 JOIOJO o 0 olo
IL
U) in Ifl
I
U) U) mIcnII Iin I I
I-k) < < <I<I-I_iI--i
±
00
¼)¼)) Un tn )
od ' o
—..'<
0
) ¼) tfl < ® x K x x
t_ U) U) U)U)
In z o
U)
o UJ.) S
_J u.I'n 0 0 0 0 Q
LLI IL
= = = = = = = CM CM CM CM CM CM CM -1 —1 --
4Xx %ç zz
Ed La
=41 CC) CM =CN CM
LU
tn tn
I = = ) U) U)
0000
CM CC) CC) U) T U) -
.1
q
0
RS III _I 32 o_
'nx Ci
u
au x
-
IT RI In 16 id le -o )u tn
- 0uj mx LUUJ j.
-
tn
0
II
:cI.•5
Iu
.1- x
-
tu LLI OM id z
010NIQUIii tn Of D._
Q_
xQ LU NJ
Hi 'g U)
LU
16
-1:3 El"
-Wpw<~
ZZ
— c0
2 VL in
xi
omX
=
(C)
U
tu
0 113
Job Franco ADU 20171
Calculated by _
DI Date
David Thomas Engineering
HQL==QN SCIHEULE
MARK HOLD-PON DEVIOE VALUE
JA 4x POST v/ "M5TG40" FLR-TO-FL.R H.D. 3,OS0 LBS.
4x POST / "M5TG52" FLR-TO-FLR H.D. 4,20 LBS.
EIIJ 4x POST vi/ "MSTG' FLR-TO-FLR H.D. 5,80 LBS.
4x POST v/ 'M5TG4SB3" FLR-TO-FLR H.D. 37(15 LBS.
FEI 4x POST v./ "MSTGB3° FLR-TO-FLR H.D. 4,505 LBS.
4x POST v'I "HUT HOLD-POV1N
ON SSTBI A.B. (5/So A.B.) 3,015 LBS.
4x POST v'I "HU4" HOLD-OkN
ON 55TB20 A.B. (S/S"O A.B.) 4,5'5 LBS.
4x POST v/ "HUS" HOLD-IO4N
ON S51624 A.B. (5/b "o A.B.) 5,45 LBS.
6x POST v/ "HUS" HOLD-POVlN
ON 55TB2S A.B. (1/S's A.B.) 1,510 LBS.
x POST v/ "HUIl" HOLI7-I0'MN
ON SB Ix3O A.B. (1 110 A.B.)
GT,335 LBS.
x POST v4/ "HUI4" HOLD-POkMN
ON SB Ix3O A.B. (I "O A.B.)
14,445 LBS.
--------------------
---------------------
NOTES:
I. HOLD DOVN ANCHORS MUST BE TIED IN PLACE PRIOR TO FOUNDATION INSPECTION.
DEEPEN FOOTIN&S TO PROVIDE 3" MIN. CONCRETE COVER VHERE HOLD-D0YN
ANCHORS ARE LONGER THAN THE FOOTING DEPTH.
USE (RJ) OPTION ON STHD HOLD-DOI'MNS FOR RAISED V100D SUS-FLOOR CONDITION.
MSTC HOLD-D0k4NS MAY USE I6d SINKERS OR 10d COMMON NAILS.
MSTCC, HOLD-DOVINS TO BE CENTERED BETI.MEEN UPPER 4 LO1ER FLOORS. MAXIMUM
CLEAR SPAN IS". NAILS NOT REQUIRED IN CLEAR SPAN (RIM BOARD) AREA.
of 13
Job Franco ADU 20171
Calculated by DT
_ Date
David Thomas Engineering
5FIREAD FOOTI NO SGHEDULE
51'ES1DOL SPREAD FOOTIN6 DIMEN51ON5 REINF.
(f'c. _2,50.0_PSI MIN. _0 KSI) _fy
<6> 24" SO. x .." DEEP SPREAD FOQTIN
vi/ (2)-*4 EARS (EAGH 'MAY)
<9> 30" SO. x i" DEEP SPREAD F00TIN
W (3)-*4 EARS (EAGH frMA'r')
36" SO. x 1?.." DEEP SPREAD F00TIN
W (4)-#4 BARS (EAGH frMA'r')
&42" SO. x ia" DEEP SPREAD FOOTIN&
v'1/ (5)-*4 BARS (EAGH It1A'i')
45" SO. x 18" DEEP SPREAD FO0TIN
i/ (6)44 BARS (EAGH V1A'r')
13 of 13
_______ COMPONENT DESIGN DRAWINGS & DETAILS
om
Simpson Strong-Tie
Company, Inc.
5956W. Las Positas Blvd.
Pleasanton, CA 94588
(800) 999-5099
www.strongtie.com
Aloha Lumber and Truss, Inc.
Franco ADU
11/17/2020,2:56 PM
118149
Notes:
The component design drawings referenced below have been prepared based on design criteria and requirements set forth in the
Construction Documents, as communicated by the Component Manufacturer.
The engineer's signature on these drawings indicates professional engineering responsibility solely for the individual components
to be able to resist the design loads indicated, utilizing all the design parameter and materials indicated or referenced on each
individual design.
It is the Building Designer's responsibility to review the component design drawings to insure compatibility with the Building design,
Refer to all notes on the individual component design drawings.
7 Component Design Drawing(s):
1-Al: SID 866094 3-A2a: SID 866096 5-B2: SID 868098 7-84: SID 866100
2-A2: SID 866095 4-BI: SID 866097 6-B3: SID 866099
Component SolutionslM Important Information & General Notes
General Notes
Each Truss Design Drawing (MD) provided with this sheet has been
prepared in conformance with ANSI/TPI 1. Refer to ANSI/TPI I Chapter 2 for the
responsibilities of all parties involved, which include but are not limited to the
responsibilities listed on this sheet, and for the definitions of all capitalized
terms referenced in this document.
TDDs should not be assumed to be to scale.
The Contractor and Building Designer shall review and approve the
Truss Submittal Package.
The suitability and use of the component depicted on the TDD for any
particular building design is the responsibility of the Building Designer.
The Building Designer is responsible for the anchorage of the truss at all
bearing locations as required to resist uplift, gravity and lateral loads, and for all
Truss-to-Structural Element connections except Truss-to-Truss connections.
The Building Designer shall ensure that the supporting structure can
accommodate the vertical and/or horizontal truss deflections.
Unless specifically stated otherwise, each Design assumes trusses will
be adequately protected from the environment and will not be used in
corrosive environments unless protected using an approved method. This
includes not being used in locations where the sustained temperature is
greater than 150"F.
Trusses are designed to carry loads within their plane. Any out-of-
plane loads must be resisted by the Permanent Building Stability Bracing.
Design dead loads must account for all materials, including self-weight.
The TDD notes will indicate the min. pitch above which the dead loads are
automatically increased for pitch effects.
Trusses installed with roof slopes less than 0.25/12 may experience
(but are not designed for) ponding. The Building Designer must ensure that
adequate drainage is provided to prevent ponding.
Camber is a non-structural consideration and is the responsibility of truss
fabricator.
Handling, Installing, Restraint & Bracing
The Contractor Is responsible for the proper handling, erection, restraint
and bracing of the Trusses. In lieu of job-specific details, refer to BCSI.
ANSI/TPI 1 stipulates that for trusses spanning 60' or greater, the
Owner shall contract with any Registered Design Professional for the design
and inspection of the temporary and permanent truss restraint and bracing.
Simpson Strong-Tie is not responsible for providing these services.
Trusses require permanent lateral restraint to be applied to chords and
certain web members (when Indicated) at the locations or intervals indicated on
the TDD. Web restraints are to be located at mid points, or third points of the
member and chord purtins are not to exceed the spacing specified by the TDD.
Chords shown without bracing indicated are assumed to be continuously
braced by sheathing or drywall. Permanent lateral restraint shall be
accomplished in accordance with: standard industry lateral restraint/bracing
details in BCSI.B3 or BCSI-87, supplemental bracing details referenced on the
TDD, or as specified in a project-specific truss permanent bracing plan provided
by the Building Designer.
Additional building stability permanent bracing shall be installed as
specified in the Construction Documents.
S. Special end wall bracing design considerations may be required if a flat
gable end frame is used with adjacent trusses that have sloped bottom
chords (see BCSI-133).
Do not cut, drill, trim, or otherwise alter truss members or plates without
prior written approval of an engineer, unless specifically noted on the TDD.
Piggyback assemblies shall be braced as per BCSI-B3 unless otherwise
specified in the Construction Documents.
For floor trusses, when specified, Strongbacking shall be installed per
BCSI-137 unless otherwise specified in the Construction Documents.
Symbols and Nomenclature
5x7 Plate size; the first digit is the plate width (perp. to the slots)
and the second digit is the plate length (parallel to the slots).
5x7-18 -18, -18S5, or -18S6 following the plate size indicates different
18 gauge plate types.
These symbols following the plate size indicate the direction of
II = the plate length (and tooth slots) for square and nearly square
plates.
10-344 Dimensions are shown in feet-inches-sixteenths (for this
example, the dimension is 10'-3 14/16").
i Joints are numbered left to right, first along the top chord and
2' then along the bottom chord. Mid-panel splice joint numbers
are not shown on the drawing. Members are identified using
their end joint numbers (e.g., TC 2-3).
. When this symbol is shown, permanent lateral restraint is
. required. Lateral restraint may be applied to either edge of the
member. See Note 3 under Handling, Installing, Restraint &
Bracing for more information.
r Bearing supports (wall, beam, etc.), locations at which the
truss is required to have full bearing. Minimum required
bearing width for the given reactions are reported on the TDD.
. Required bearing widths are based on the truss material and
indicated PSI of the support material. The Building Designer is r- responsible for verifying that the capacity of the support
material exceeds the indicated PSI, and for all other bearing
design considerations.
Truss-to-Truss or Truss-to-Structural Element connection,
which require a hanger or other structural connection (e.g.,
.Ii toe-nail) that has adequate capacity to resist the maximum
reactions specified in the Reaction Summary. Structural
connection type is not limited by type shown on TDD. Toe-
nails may be used where hanger type shown where allowed by
detail or other connection design information. Design of the
Structural Element and the connection of the Truss to a
Structural Element is by others.
Note: These symbols are for graphical interpretation only; they are not
intended to give any indication of the geometry requirements of the
actual item that is represented.
Materials and Fabrication
Design assumes truss is manufactured in accordance with the
TDD and the quality criteria in ANSI/TPI I Chapter 3, unless more
restrictive criteria are part of the contract specifications.
Unless specifically stated, lumber shall not exceed 19%
moisture content at time of fabrication or in service.
Design is not applicable for use with fire retardant, preservative
treated or green lumber unless specifically stated on the TDD.
Plate type, size, orientation and location indicated are based on
the specified design parameters. Larger plate sizes may be
substituted in accordance with ANSI/TPI, Section 3.6.3. Plates shall
be embedded within ANSI/TPI I tolerances on both faces of the truss
at each joint, unless noted otherwise.
Truss plates shall be centered on the joint unless otherwise
specified.
Referenced Standards
ANSI!TPI 1: National Design Standard for Metal Plate Connected Wood
Truss Construction, a Truss Plate Institute publication (www.tpinst.org).
SCSI: Guide to Good Practice for Handling, Installing, Restraining &
Bracing Metal Plate Connected Wood Trusses, a joint publication of the
Truss Plate Institute (www.tpinst.org ) and the Structural Building
Components Association (www.sbcindustry.com ).
DSB-89 Recommended Design Specification for Temporary Bracing of
Metal Plate Connected Wood Trusses, a Truss Plate Institute publication
(www.tpinst.org).
NDS: National Design Specification for Wood Construction published by
American Forest & Paper Association and American Wood Council.
ESR-2762 Simpson Strong-Tie® AS Truss Plates are covered under
ESR-2762 published by the International Code Council Evaluation Service
(www.icc-es.org ).
TD-GEN-0003A 5/2019
Franco ADU Qty: I Truss: Al
Customer: - SID: 0000866094
liD: 118149
Date: 11118/20
Truss Mir. Contact: SL Page: 1 of
12-0-104 5-7-14 5-0-2 5-0-2 5-7-14 .2-0-10 ,
' ' 5-7-14 10-8-0 15-8-2 21-4-0 1 2 3 4 5 6 7
4x6
'.0 5x8pm WPM
Do Not Notch Do Not Notch
'6 r
4-1 3x4pm=
'I'
4-1
z
'3x6p 3x6pm
Typical plate: 1.50
7-3-0 6-9-1 7-3-15
7-3-0 14-0-1 21-4-0 1 8 9 10 11 12 13 14 15 7
1. 21-4-0
Code/Design: CBC-2019/TPI-2014 Snow Load Specs ---------- -Wind Load Spec Additional Design Checks ------
PEELive Dead Our Factors ASCE7-16 Ground Snow(Po) - N/A ASCE7-16 Wind Speed(V) - 115 mph 10 paf Non-Concurrent BCLL: Yea TC 20.0 20.0 Live Wind Snow Risk Cat: IT Terrain Cat: C Risk Cat: TI Exposure Cat: C 20 paZ BC Limited Storage: Yes BC 0.0 10.0 L.1.25 1.60 N/A Roof Exposure: Sheltered Bldg Dims: L - 38.0 ft B - 34.0 ft 200 lb BC Accessible Ceiling: Yes
Total 50.0 Pit 1.25 1.60 N/A Thermal Condition: All Othera(l.0) )t.R.H(h) - 15.0 ft tczt - 1.0 300 lb TC Maintenance Load: Yes Spacing: 2-00-00 o.c. Plies: 1 Unobstructed Slippery Roof: No Bldg Enclosure: Enclosed 2000 lb TC Safe Load: No Repetitive Member increase: Yes Low-Slope itininums(Pfmin): No Wind Dilpsf): TC - 12.0 BC - 6.0 Unbalanced TCLL: Yes Occur. Lumber: Yes Wet Service: 210 Unbalanced Snow Loads: No End Vertical Exposed: L Yes R Yes Tab Tolerance: 20% Creep (Kcr) 2.0 Rein Surcharge: No Ice Dam Chic: No Wind Uplift Reporting: ASCE7 MFRS
Oil Soffit Load: 2.0 paZ CSC End Zone: 3-04-13
Material Summary Reaction Summary Deflection Summary TC 2x4 DFL 82 Reaction Sununary(Lbs) TrusoSpan Limit Actual(in) Location BC 2x4 DFL 82 Jnt --X-Loc- React -Up- --Width- -Reqd -Mat PSI Vert LL L/360 L/9991 0.00) 15- 7 Webs 2x4 DFL 82 1 08-07 723 0 21-04-00 Vert DL L/180 L/999( 0.00) 15- 7
Other 2x4 DPI. 82 8 2-10-15 137 168 21-04-00 Vert CR L/240 L/999( 0.00) 15- 7
10 7-03-15 573 0 21-04-00 Hors LL 0.751n I 0.01) tJt 7
Member Forces Summary 13 14-01-00 569 0 21-04-00 Herz CR 1.251n 1 0.02) liSt 7
. .81cm... Ten Comp .CSI. 15 18-05-01 137 168 21-04-00 01mg CR 2L/240 2L1599(-0.09) 1- 1
TC ON- 1 121 0 0.68 7 20-07-09 722 0 21-04-00 ohng CR 2L/240 2L/599(-0.09) 7-7
1- 2 50 16 0.17 Reactions not shown: down < 400 and up < 150
2 35 287 0.21 ---- Reaction Summary (piE) Vert CR and Hors CR are the vertical and
3 65 237 0.41 5nt5flt React -Up- --Width horizontal deflections due to live load
4 187 96 0.48 1- 7 10 0 21-04-00 (reduced) plus the creep component of deflection
s 185 99 0.48 Max Non: - -81 / +81 at Joint 1 due to dead load, computed as Defl,,,LL +
6 51 231 0.41 (Her - 1) x Defl_DL in accordance with
7 50 16 0.17 Loads Summary 1.NSI/TPI 1.
6- 7 40 281 0.21 7-OH 121 0 0.68 This truss has been designed for the effects of an unbalanced top chord Bracing Data Summary BC 1- 8 207 32 0.44 live load occurring at 110-08-001 using a 1.00 Pull and 0.00 Reduced lead -----------Bracing Data ------------ 7-15 202 16 0.44 factor. Chordal continuous except where Shown 8 9 207 32 0.12 See Loadcase Report for loading combinations and additional details. Web Bracing -- None 9-10 207 32 0.05 Dead Loads may be slope adjusted: 2 12.0/12 10-11 146 2 0.03 Tooth-Holding reduction factors applied:Green Lumber Plate Offsets (X,Y: 11-12 146 2 0.04 (None unless indicated below) 12-13 146 2 0.04
13-14 202 16 0.05 Notes .lntl (-08-00, -02-04), .int3 (-00-04,00-03),
14-15 202 16 0.12 Gable webs are attached with mm. 1x3 20 ga.plates. The max.rake overhang ,int5(00-04,00-05), Jnt7(07-13,-02-03),
Web 3-10 117 402 0.06 - 1/2 the truss spacing. If this truss is exposed to wind loads Sntlolo,-00-14), 5nt4(0,Ol-06)
4-10 26 325 0.15 perpendicular to the plane of the truss, it must be braced according to a
4-13 25 321 0.16 standard detail matching the wind criteria shown, or according to the
5-13 116 400 0.06 Construction Documents and/or SCSI - 83.
Designed for green lumber that will be seasoned by time of installation.
Plates designed for Cq at 0.80 and Rotational Tolerance of 10.0 degrees
Plates located at TC pitch breaks meet the prescriptive minimum size
requirement to transfer unblocked diaphragm loads across those joints.
A "pm' next to the size indicates that the has been plate plate user
modified: see Plate Offsets for any special positioning requirements.
The top chord may be notched 1.5' deep x 3.5" wide at 24" o.c. max. for
outlookers. Do not notch in the heel, areas marked or anywhere there is a /DAvIDNOflRlS.\ single chord member. Do not cut the connector plates.
Attach stacked chords with 2x4 20 ga. plates, u.n.o. LY LL
11/18/2020:
NOTICE A copy of this design shall be furnished to the erection centimeter. The design of this Individual truss Is based on design criteria and requirements suppled by - - Component Solutions
the Truss Manufacturer and relies upon the accuracy and completeness of the information set forth by the Building Designer. A seal on this drawing Indicates tilkil$f'1'I Truss Studio V
acceptance of professional engineering responsibility solely for the tress component design shown. See the cover page and the 'Important Information & General :_________________ Notes' page for additional Information. All connector plates shall be manufactured by Simpson Strong.11e Company, Inc In accordance with ESR-2782. All connector
2020.1.0.136
__- Helpdesk: 1-866-252-8606
plates are 20 gauge, unless the specified plate size Is followed by a '48` which indicates an 18 gauge plate. or'S# 18', which Indicates a high tension 18 gauge plate. CSHoIplistrongtie.com
Engorwg, 2e190kel_ceg
Material Summary
IC 2x4 DPI 12
BC 2x4 DPI. 82
Webs 2x4 DPI 62
Member Forces Summary
.Mem... Ten Comp .CSI.
IC OH- 1 121 0 0.68
2 123 1932 0.43
3 140 1688 0.51
4 140 1686 0.51
5 123 1932 0.43
5-011 121 0 068
BC 1- 6 1707 0 .7 0.
7 1707 10 0.57
7 1161 0 0.54
Web 2- 6 116 391 0.06
3- 6 553 13 0.09
7 553 13 0.09
7 115 391 0.06
Franco ADU - Franco ADU Qty 3 - Truss: A2
Customer: - SID: 0000866095
liD: 118149
Date: 11/17/20 Truss Mfr. Contact: SL Page: 1 of I
2-0-10 5-7-14 5-0-2 5-0-2 5-7-14 2-0-10
5-7-14 10-8-0 15-8-2 21-4-0 1 2 3 4 5
06
4-1
7-3-15 6-8-3 . 7-3-15 I I I 7-3-15 14-0-1 21-4-0 1 6 7 S.
21-4-0
Code/Design: CBC-2019/TPI-2014 PS! Live Dead Our Factors
IC 20.0 20.0 Live Wind Snow
SC 0.0 10.0 Lum 1.25 1.60 N/A
Total 50.0 pit 1.25 1.60 N/A
Spacing: 2-00-00 0.0. Plies: I
Repetitive Member Increase: Yes
Green Lumber: Yes Wet Service: No
Tab Tolerance: 20% Creep (Her) - 2.0 OH Soffit toed: 2.0 paf
Snow Load Specs----------
ASCE7-16 Ground Snow(Pg) N/A
Risk Cat: XI Terrain Cat: C
Roof Exposure: Sheltered
Thermal Condition: All Otbers(1.0)
Unobstructed Slippery Roof: No
Low-Slope Minimums(Pfmin): No
Unbalanced Snow Loads: No
Rain Surcharge: No Ice Dam Chk: No
Wind Load Specs--r -------
ASCE7-16 Wind Speed (V) - ItS mph
Risk Cat: II Exposure Cat: C
Bldg Dims: I - 38.0 ft B - 34.0 ft
M.R.H(h) 15.0 ft Kzt - 1.0 Bldg Enclosure: Enclosed
Wind DL(psf): IC - 12.0 BC - 6.0
End Vertical Exposed: I - Yes P. - Yes Wind Uplift Reporting: ASCE7 MWPRS
CSC End Zone: 3-04-13
Additional Design Chocks------
10 psf Non-Concurrent BCLL: Yes
20 paf BC Limited Storage: Yes
200 lb BC Accessible Ceiling: Yes
300 lb IC Maintenance Load: Yes
2000 lb IC Safe Load: No Unbalanced TCLL: lee
Reaction Summary
Reaction Summary(Lbs) ----------------
Jnt --X-Loc- React -Up- --Width- -Reqd -Mat PSI
1 02-12 1248 0 05-08 01-05 DPI 625
5 21-01-04 1248 0 05-08 01-05 DPI 625
Max ltoriz - -76 / +76 at Joint 1
Loads Summary
This truss has been designed for the effects of an unbalanced top chord
live load occurring at (10-08-00) using a 1.00 Full and 0.00 Reduced lead
factor.
See Loadcase Report for loading combinations and additional details.
Dead Loads may be slope adjusted: > 12.0/12 Tooth-Holding reduction factors applied:Green Lumber
Notes
Designed for green lumber that will be seasoned by time of installation.
Plates designed for Cq at 0.80 and Rotational Tolerance of 10.0 degrees
Plates located at IC pitch breaks meet the prescriptive minimum size
requirement to transfer unblocked diaphragm loads across those joints.
Deflection Summary
TrussSpan Limit Actual(in) Location
Vert LL L/360 L/999(-0.08) 6- 7
'fort DL 1/180 L/999(-0.13) 6- 7 Vert CR 1/240 L/999(-0.21) 6- 7
Hors IL 0.75in I 0.02) @Jt 5
Hors CR 1.25in ( 0.09) lIlt 5
01mg CR 21/240 21/599(-0.09) 1- 1
Ohng CR 2L/240 2L/599(-0.09) 5- 5
Vent CR and Nor: CR are the vertical and
horizontal deflections due to live load
plus the creep component of deflection
due to dead load, computed as DeflLL +
(Kcr - 1) x Def1DL in accordance with
ANSI/TPI 1.
Bracing Data Summary
Bracing Data ------------
Chords; continuous except where shown
Web Bracing -- None
Plate offsets (X, Y):
(None unless indicated below)
,lntl(0.00-02), JntS(0,00-02).
Jnt6(0.-01-00)
NOTICE A copy of this design shall be furnished to the erection contractor. The design of this individual buss is based on design clitoris and requirements supplied by -_______________ Component Solutions I
the Truss Manufacturer and relies upon the accuracy and completeness of the Information set forth by the Building Designer.A seal on this drawing indicates tilk!il 2i]I, Truss Studio V I
acceptance of professional engineering responsibility solely for the truss component design shown. See the cover page and the'Important InformatIon 8 General 2020.1.0.136 I I Notear page for additional Informaijon. All connector plates shall be manufactured by Simpson Stzong.fle Company. Inc in accordance With ESR-2762. Al) Connector Helpdesk: 1-866-252-8606 plates are 20 gauge, unless the specified plate size is followed by a '-18* which Indicates an 18 gauge plate, or*SO 18, which indicates s high tension 18 gauge plate. 1 CSflelp8otxongtie.com I
Material Summary
IC 2x4 DPI 62 SC 2x4 DPI 62
Webs 2x4 DFL 62
Member Forces Summary
.Mern... Ten Comp .CSI.
IC OH- 1 121 0 0.69
2 149 1959 0.43
3 165 1714 0.51
4 192 1763 0.49
5 181 2016 0.48
BC 1- 6 1732 44 0.57
7 1795 82 0.61
7 1189 0 0.53
Web 2- 6 117 393 0.06
3- 6 549 6 0.09
7 604 46 0.10
7 142 117 0.06
France ADU -France ADU Qty: 4 Truss: Aft
Customer: - SID: 0000866096
TiD: 118149
Date: 11117/20
Truss Mfr. Contact: SL Page: 1 of I
5-7-14 5-0-2 5-0-2 5-7-14
5-7-14 10-8-0 15-8-2 21-4-0
1 2 3 4 5
4x6
4-1
7-3-15 6-8-3 7-3-15
7-3-15 14-0-1 21-4-0
1. 21-4-0
Code/Design: CBC-2019/TPI-201.4
5SF Live Deed Dur Factors
IC 20.0 20.0 Live Wind Snow
SC 0.0 10.0 turn 1.25 1.60 N/A
Total. 50.0 Pit 1.25 1.60 N/A
Spacing: 2-00-00 o.e. Plies: 1
Repetitive Member Increase: Yes
Green Lumber: Yes Wet Service: No
Tab Tolerance: 20% Creep (Ken) - 2.0 OH Soffit Load: 2.0 psf
Snow Load Specs----------
ASCE7-16 Ground Snew(Pg) N/A
Risk Cat: II Terrain Cat: C
Roof Exposure: Sheltered
Thermal Condition: All Others (1.0)
Unobstructed Slippery Roof: No
Low-Slope Minimums (Pisrin): No
Unbalanced Snow Loads: 110
Rain Surcharge: No Ice Dam Chk: No
Wind Load Specs----------ASCE7-16 Wind Specd(V) - 115 mph
Risk Cat: II Exposure Cat: C
Bldg Dims: L - 38.0 ft B - 34.0 ft
M.R.H(h) - 15.0 ft Kzt 1.0
Bldg Enclosure: Enclosed
Wind DL(psf): IC -12.0 BC 6.0
End Vertical Exposed: L Yes P. - Yes
Wind Uplift Reporting: ASCE7 I4WFR5
C&C End Zone: 3-04-13
Additional Design Chock-------
10 psf Non-Concurrent BCLL: Yes
20 psf BC Limited Storage: Yes
200 lb BC Accessible Ceiling: Yes
300 lb TC Maintenance Load: Yes
2000 lb TC Safe Load: No
Unbalanced TCLL: Yes
Reaction Summary Deflection Summary
Reaction Susirnary(Lbs)---------------- TrussSpan Limit Actual(in) Location
Jnt --X-Loc- React -Up- --Width- -Reqd -Mat PSI Vent IL 1/360 L/999(-0.07) 6- 7
1 02-12 1260 0 05-08 01-06 DFL 625 Vert DL 1/160 L/999(-0.12) 6- 7
5 21-01-04 1055 0 05-08 01-02 OF!. 625 Vert CR L/240 L/999(-0.18) 6- 7
Max Horiz - -62 / +92 at Joint 1 Harz IL 0.75in I 0.02) 9Jt 5
Hors CR 1.251n I 0.05) 82!. 5
Loads Summary Ohng CR 2L/240 21/599(-0.09) 1- 1
This truss has been designed for the effects of an unbalanced top chord Vert CR and Harz CR are the vertical and
live load occurring at (10-08-00) using a 1.00 Full and 0.00 Reduced load horizontal deflections due to live load
factor, plus the creep component of deflection
due to dead load, computed as Def 1 LI + See Loadcase Report for loading combinations and additional details. (Ect - 1) x Defl_DL in accordance with Dead Loads may be slope adjusted: > 12.0/12 ANSX/TPl 1. Tooth-Holding reduction factors applied:Green Lumber
Bracing Data Summary Notes -----------Bracing Data ------------Designed for green lumber that will be seasoned by time of installation. Chords; continuous except where shown
Plates designed for Cq at 0.80 and Rotational. Tolerance of 10.0 degrees Web Bracing -- None Plates located at TC pitch breaks meet the prescriptive minimum size
requirement to transfer unblocked diaphragm loads across those joints. Plate onsets(x,Y):
(None unless indicated below)
.lntl(0, 00-02), Jnt5 (0,00-02), Jnt6(0,-01-00)
I
NOTICE Acopy of this design shall be furnished to the erection contractor. The design of this Individual buss is based on design criteria and requirements supplied by 'P°"" amusema I
the Truss Manufacturer and relies upon the accuracy and completeness of the Information set forth by the Building Oesigner.A seal on this drawing indicates t21Wd!1t!I Trues Studio V
acceptance of professional engineering responsibility solely for the truss component design shown. See the cover page and the 'Important Information & General 2020.1.0.136
Notes' page for additional Information. All connector plates ths0 be manufactured by Simpson Strung-Tie Company, Inc in accordance with ESR-2762.All connector 1-866-252-8606 I
plates are 20 gauge, unless [he specified plate size Is followed by a '.18' which indicates an 18 gauge plate, or '86 18. which Indicates a high tension 18 gauge plate. csflelpllstrengtio .com
Franco ADU - - Qty: I Truss: BI
Customer: - SID: 0000869599
TID: 118382
Date: 11124/20
Truss Mfr. Contact: SL Page: 1 of I
2-0-7 4-8-7 5-7-5 6-0-12 2-6-7
4-8-7 10-3-12 ' 16-4-8 .
1 2 3 4 5
40
3x6 3x6 -5.9/12
5.9/12
4x8p1T II Do Not Notch
1111
'I 4-6
3x6pm 3x4= 3x4--
Typical plate: 1.5x4
Do Not Notch
4x8pm
8-0-10 3-9-9
8-0-10 12-6-15 16-4-8 1. 6 7 8 9 10 11 12
1. 16-4-8
Code/Design: CBC-2019/TPI-2014
PS! Live Dead Our Factors
TC 20.0 20.0 Live Wind Snow
BC 0.0 .10.0 Lure 1.25 1.60 N/A
Total 50.0 Pit 1.25 1.60 N/A
Spacing: 2-00-00 o.c. Plies: 1
Repetitive Member Increase: Yes
Green Lumber: Yes Wet Service: No
Feb Tolerance: 20% Creep (Kcr) 2.0
OR Soffit Load: 2.0 psf
Snow Load Specs----------
ASCE7-16 Ground Snow(Pg) - N/A
Risk Cat: II Terrain Cat: C
Roof Exposure: Sheltered
Thermal Condition: All Others (1.0)
Unobstructed Slippery Roof: No
Low-Slope Minimums(Pfmin): No
Unbalanced Snow Loads: No
Rain Surcharge: No Ice Dam Chk: No
Wind Load Specs----------
ASCZ7-16 Wind Specd(V) - 115 mph
Risk Cat: II Exposure Cat: C
Bldg Dims: L - 38.0 ft B - 34.0 ft
M.R.H(h) 15.0 ft Kzt - 1.0
Bldg Enclosure: Enclosed
Wind DL(psf): TC - 12.0 BC - 6.0
End Vertical Exposed: L Yes R - Yes
Wind Uplift Reporting: ASCE7 NWFRS
CSC End Zone: 3-04-13
Additional Design Checks------
10 paf Non-Concurrent BC!.!.: Yes
20 psI BC Limited Storage: Yes
200 lb BC Accessible Ceiling: Yes
300 lb TC Maintenance Load: Yea
2000 lb TC Safe Load: No
Unbalanced TCLL: Yes
Material Summary
TC 2x4 OF!. 62
2x4 0!!. 813 4-5
BC 2x4 OF!. 62
Webs 2x4 DFL #2
Other 2x4 OF!. 62
2x4 DFL #113
Member Forces Summary
.91cm... Ten Comp .CSI.
TC OH- 1 137 0 0.66
1- 2 57 18 0.20
1- 2 50 418 0.23
2- 3 77 364 0.48
3- 4 189 100 0.58
4- 5 186 194 0.96
5-OH 160 0 0.85
BC 1- 6 317 62 0.44
7 317 62 0.11
8 317 62 0.08
5- 9 93 38 0.04
9-10 93 38 0.03
10-11 0 27 0.03
11-12 0 27 0.02
12-OH 0 0 0.00
Web 3- 8 150 441 0.12
4- 5 53 413 0.19
4-10 76 351 0.16
5-10 160 185 0.05
5-12 118 515 0.06
Reaction Summary
Reaction Sumusary(Lbs)----------------
Jnt --X-Loc- React -Up- --Width- -Reqd -Mat PSI
1 07-01 698 0 16-04-08
8 8-00-10 520 0 16-04-08 10 12-06-15 439 41 16-04-08
12 16-02-12 533 0 16-04-08
Reactions not Shown: down < 400 and up < 150 Reaction Summary (plf) ----- Jnt-Jnt React -Up- --Width-
1- 12 10 0 16-04-08 (reduced)
Max Horiz -86 / +127 at Joint 1
Loads Summary
This truss has been designed for the effects of an unbalanced top chord
live load occurring at (10-03-12) using a 1.00 Full and 0.00 Reduced load factor.
See Loadcase Report for loading combinations and additional details.
Dead Loads may be slope adjusted: > 12.0/12 Tooth-Holding reduction factors applied:Green Lumber
Notes
Gable webs are attached with rein. 1x3 20 ga.plates. The max.rake overhang
- 1/2 the truss spacing. If this truss is exposed to wind loads
perpendicular to the plane of the truss, it must be braced according to a
standard detail matching the wind criteria shown, or according to the
Construction Documents and/or SCSI - B3.
Designed for green lumber that will be seasoned by time of installation.
Plates designed for Cq at 0.80 and Rotational Tolerance of 10.0 degrees
Plates located at TC pitch breaks meet the prescriptive minimum size
requirement to transfer unblocked diaphragm loads across those joints.
A 'ps' next to the plate size indicates that the plate has been user
modified; see Plate Offsets for any special positioning requirements.
The top chord may be notched 1.5' deep a 3.5' wide at 24" o.c. max. for
outlookors. Do not notch in the heel areas marked or anywhere there is a
single chord member. Do not cut the connector plates.
Attach stacked chords with 2x4 20 ga. plates. u.n.o.
Deflection Summary
TrussSpan Limit Actual(in) Location
Vert LL L/360 1.1999) 0.00) 1- 6
Vert DL L/180 L/999( 0.00) 1- 6
Vert CR L/240 L/999( 0.01) 1- 6
llorz 1.!. 0.75in 1 0.02) @Jt 1
Horz CR 1.25in ( 0.02) @Jt 1 01mg CR 2L/240 2L1599(-0.09) 1- 1
Ohng CR 2L/240 2L/349(-0.19) 5- 5
Vert CR and Nor: CR are the vertical and
horizontal deflections due to live load
plus the creep component of deflection
due to dead load, computed as Defl_LL +
(Kcr - 1) x Del 1DL in accordance with
ANSI/TPI 1.
Bracing Data Summary
Bracing Data ------------
Chords; continuous except where shown
Web Bracing -- None
Plate offsets (X, '6'):
(None unless indicated below)
Intl (-07-05. -02-09), Jnt2 (-03-04, -01-10).
Jnt3 (-00-09,00-05) • 3nt5 (-01-00.00-08).
Jnt4 (0,01-07)
I
NOTICE A copy of this design shall be furnished to the erection contractor. The design of this Individual buss Is based on design criteria and requirements supplied by ..Component 601,j0me
the Truss Manufacturer and relies upon the accuracy and completeness of the Information set forth by the Building Deslgner.A seal on this drawing indicates l. TZUSS Studio V
acceptance of professional engineering responsibility solely for the truss component design shown. See the cover page and the "Important Information & General , 2020.1.0.136 I
Notes' page for additional Information. All connector plates shall be manufactured by Simpson Strong-lie Company, Inc In accordance with ESR-2782. All connector Nelpdeak: 1-866-252-a606 I
plates are 20 gauge, unless the specified plate size Is followed bye'-I8' which indicates an 18 gauge plate, or 'SI) 18', which Indicates a high tension 18 gauge plate. . CSHolp@stzongtio.com
France ADU - France ADU Qty: I Truss: 82
Customer: - SID: 0000869597
TID: 118381
Date: 11/23/20
Truss Mfr. Contact: SL Page: 1 oil
2-0-7 5-4-15 4-10-13 4-0-6 4-0-6 2-6-7
5-4-15 l 10-3-12 14-4-2 18-4-8 1 2 3 4 5
3x5
-5.9/12
5.9/12
4x4 4x4
4x4=
U41-
1x44X83X4N
4-6
5-4-15 4-10-13 4-0-6 3-11-7 0
5-4-15 ' 10-3-1
-15
2 14-4-2 ' 18-3-9
6 7 8 18-4-8
9
18-4-8
Code/Design: CBC-2019/TPI-2014
PSP Live Dead Our Factors
TC 20.0 20.0 Live Wind Snow
BC 0.0 10.0 turn 1.25 1.60 N/A
Total. 50.0 Pit 1.25 1.60 N/A
Spacing: 2-00-00 o.c. Plies: I
Repetitive Member Increase: Yes
Green Lumber: Yes Wet Service: No
Fab Tolerance: 20% Creep (Ncr) - 2.0
ON Soffit Load: 2.0 paf
Snow Load Specs ----------
ASCE7-16 Ground Snow(P(j) N/A
Risk Cat: 11 Terrain Cat: C
Roof Exposure: Sheltered
Thermal Condition: All Others 11.0)
Unobstructed Slippery Roof: No
Low-Slope Minimums(Ptmin): No
Unbalanced Snow Loads: No
Rain Surcharge: No Ice Dam Chk: No
Wind Load Specs----------
ASCE7-16 Wind Speed(V) - 115 mph Risk Cat: II Exposure Cat: C
Bldg Dims L - 38.0 ft B - 340 ft
M.R.H(h) - 15.0 ft Kzt - 1.0
Bldg Enclosure: Enclosed
Wind DL(psf): TC - 12.0 BC - 6.0
End Vertical Exposed: L - Yes N - Yes
Wind Uplift Reporting: ASCE7 MWFRS
CSC End Zone: 3-04-13
Additional Design Check-------
10 paf Non-Concurrent SCLL: Yes
20 psf BC Limited Storage: Yes
200 lb BC Accessible Ceiling: Yes
300 lb TC Maintenance Load: Yes
2000 lb TC Safe Load: No
Unbalanced TCLL: Yea
Material Summary
TC 2x4 DFL #2
2x4 DFL #15 3-5
BC 2x4 DFL 82
Webs 2x4 DPI 82
Member Forces Summary
.14cm... Ten Comp .CSI.
TC OH- 1 137 0 0.68
1- 2 82 1400 0.36
2 3 121 923 0.44
3- 4 124 898 0.26
4- 5 89 983 0.83 5-OH 160 0 0.85
BC 1- 6 1171 0 0.45
7 1171 0 0.40
8 791. 0 0.30
9 0 12 0.23
9-OH 0 0 0.00
'Web 2- 6 224 0 0.04
2- 7 83 525 0.24
3- 7 421 14 0.07
4- 7 64 190 0.07
4- 8 40 173 0.03
5- 8 830 0 0.14
5- 9 178 1106 0.11
Reaction Summary
Reaction Summary(Lbs) ----------------
Jnt --X-Loc- React -Up- --Width- -Reqd -Mat PSI
1 02-12 1099 0 05-08 01-03 DFL 625
9 18-02-12 1143 0 07-06 01-04 DFL 625
Max Horiz -95 / +107 at Joint 1
Loads Summary
This truss has been designed for the effects of an unbalanced lop chord
live Load occurring at (10-03-121 using a 1.00 Full and 0.00 Reduced load
factor.
See Loadcase Report for loading combinations and additional details.
Dead Loads may be slope adjusted: > 12.0/12
Tooth-Holding reduction factors applied:Green Lumber
Notes
Designed for green lumber that will be seasoned by time of installation
Plates designed for Cq at 0.80 and Rotational. Tolerance of 10.0 degrees
Plates located at TC pitch breaks meet the prescriptive minimum size
requirement to transfer unblocked diaphragm loads across those joints.
Deflection Summary
TrusaSpan Limit Actual(in) Location
Vert LL L/360 1/999(-0.03) 6- 7
'Fart DI. 1/180 1/999(-0.06) 6- 7
Vert CR L/240 L/999(-0.09) 6- 7
Hors IL 0.75in I 0.01) lIlt 9
Horn CR 1.251n ( 0.02) 113t 9
Ohng CR 21/240 21/599(-0.09) 1- 1
Ohng CR 2L/240 2L/349(-0.19) 5- 5
Vert CR and Nor: CR are the vertical and
horizontal deflections due to live load
plus the creep component of deflection
due to dead load, computed as Defl,LL +
(Kct - 1) x Def1.,DL in accordance with
ANSI/TPI I.
Bracing Data Summary Bracing Date ------------
Chords; continuous except where shown
Web Bracing -- None
Plate offsets X, Y):
(None unless indicated below)
NOTICE A copy of this design shall be furnished to the erection contractor. The design of this Individual truss Is based on design criteria and requirements supplied by
the Truss Manufacturer and relies upon the accuracy and completeness of the Information set forth by the Building Designar.A east on this drawing Indicates
acceptance of professional engineering responsibility solely for the truss component design shown. Sea the cover page and the important Information & General Notes' page for additional Information. All connector plates shall be manufactured by Simpson Strong.Ite Company, Inc In accordance with ESR.2782. All connector plates are 20 gauge, unless the specified plate an Is followed by a •-18 which indicates an 18 gauge plate, or 18'. which Indicates a high tension 18 gauge plate.
-M
I
Component Solution. True. Studio V
M
_2020.
1
.0.
1
36
Belpdeak: 1-866-252-8606
CSHolp@stz,onatio.com
France ADU -France ADU Qty: I Truss: 03
Customer: - SID: 0000869596
lID: 118381
Date: 11123/20
Truss Mfr. Contact: SL Page: 1 of I
2-0-7 5-4-15 4-10-13 4-10-13 5-1-15
.,
2-67
5-4-15 10-3-12 15-2-9 20-4-8 4.
1 2
3x5
4-6
X
5-4-15 4-10-
7 8
13 4-10-13 5-1-0
5-4-15 10-3-12 6 15-2-9 20-3-9 20-4-8
5
20-4-8
Code/Design: CBC-2019/TPI-2014
P57' Live Dead Dur Factors
TC 20.0 20.0 Live Wind Snow
BC 0.0 .10.0 Lum 1.25 1.60 N/A
Total 50.0 Pit 1.25 1.60 N/A
Spacing: 2-00-00 o.c. Plies: I Repetitive Member Increase: Yes
Green Lumber: Yes Wet Service: No
Tab Tolerance: 20% Creep (Kcr) 2.0
Oil Soffit Load: 2.0 paZ
Snow Load Specs ----------
ASCE7-16 Ground Snow(Pg) - N/A
Risk Cat: II Terrain Cat: C
Roof Exposure: Sheltered
Thermal Condition: All Others (1.0)
Unobstructed Slippery Roof: No
Low-Slope t4inimums(Ptmin): No
Unbalanced Snow Loads: No
Rain Surcharge: No Ice Dam Chk: No
Wind Load Specs----------
ASCE7-16 Wind Speed (V) - 115 mph
Risk Cat: XI Exposure Cat: C
Bldg Dims: L - 38.0 ft B - 34.0 ft
M.R.11(h) = 25.0 ft Ret 1.0
Bldg Enclosure: Enclosed
Wind DL(psf): TC - 12.0 BC - 6.0
End Vertical Exposed: L - Yes K Yes
Wind Uplift Reporting: ASCE7 MWFRS
CSC End Cone: 3-04-13
Additional Design Checks------
10 psf Non-Concurrent BCLL: Yes
20 paZ BC Limited Storage: Yes
200 lb BC Accessible Ceiling: Yes
300 lb TC Maintenance Load: Yes 2000 lb TC Safe Load: No
Unbalanced TCLL: Yes
Material Summary
TC 2x4 DFL 02
2x4 DEL ha 3-5
BC 2x4 DEL 62
Webs 2x4 DEL 12
Wedge 2x4 DEL *2
Member Forces Summary
.Me-i Ten Comp .CSI.
CC ON- 1 137 0 0.68
2 84 1574 0.38
3 124 1119 0.46
4 124 1113 0.38
5 87 1421 0.44
5-0Il 157 0 0.77
BC 1- 6 1325 0 0.47
8 1178 0 0.67
7 1325 0 0.41
8 1178 0 0.43
Web 2- 6 214 0 0.03
2- 7 82 506 0.24
3-7 538 9 0.09
4- 7 71 386 0.38
4- 8 166 34 0.03
Reaction Summary
Reaction Sununary(Lbs)----------------
Jnt --X-Loc- React -Up- --Width- -Reqd -Mat PSI
1 02-12 1185 0 05-08 01-04 DEL 625
5 19-11-14 1258 0 07-06 01-05 DEL 625
Max None -100 / +95 at Joint 1
Loads Summary
This trues has been designed for the effects of an unbalanced top chord
live load occurring at (10-03-121 using a 1.00 Full and 0.00 Reduced load
factor.
See Loadcase Report for loading combinations and additional details.
Dead Loads may be slope adjusted: > 12.0/12
Tooth-Holding reduction factors applied:Green Lumber
Notes
Designed for green lumber that will be seasoned by time of installation.
Plates designed for Cq at 0.80 and Rotational Tolerance of 10.0 degrees
Plates located at IC pitch breaks meet the prescriptive minimum size
requirement to transfer unblocked diaphragm loads across those joints.
Deflection Summary
TrussSpan Limit Actual(in) Location
Vert IL L/360 L/999(-0.06) 7- 8
Vert DL I/laO L/999(-0.09) 7- 8
Vert CR 1/240 L/999(-0.14) 7- B
Herz LL 0.75in I 0.03) 0Jt 5 Herz CR 1.25in I 0.07) 63t S
Ohng CR 2L/240 21./599(-0.09) 1- 1
Ohng CR 2L/240 21/391(-0.16) 5- 5
Vert CR and Morl CR are the vertical and
horizontal deflections due to live load
plus the creep component of deflection
due to dead load, computed as Oefl_LL +
(Kcr - 1) x Defl_DL in accordance with
ANSI/TPI 1.
Bracing Data Summary
Bracing Data ------------
Chords; continuous except where shown
Web Bracing -- None
Plate offsets (X, Y):
(None unless indicated below)
Jnt7 (0, -00-08), Jnt5 (-03-10, 01-00)
I
NOTICE A copy of this design shall be furnished to the erection contractor. The design of this individual buss is based on design criteria and requirements supplied by - Component SO1UOIIa
the Truss Manufacturer and relies upon the accuracy and completeness of the Information set faith by the Building Oeslgner.A seal on this drawing Indicates t1I!iII]1 Truce Studio V I
acceptance of professional engineering responsibility solely for the truss component design shown. See the cover page and the 'Important Information S General .12020.1.0.136
.com
I I Notes' page for additional information. All connector plates shall be manufactured by Simpson Stmng.fl Helpdesk: 1-866-252-8606 e Company. Inc in accordance with ESR-2762. All connector Ia.)15JJj• plates are 20 gauge, unless the specified plate size is followed by a .18 which indicates an 18 gauge plate, or $(t 18'. which indicates a high tension 18 gauge plate.
4-6
I
3x5
France ADU - France ADU Qty: 2 Truss: 84
Customer: - SID: 0000869598
TiD: 118381
Date: 11123/20
Truss Mfr. Contact: SL Page: 1 of I
2-0-7 5-4-15 4-10-13 4-10-13 5-4-15 2-0-7
5-4-15 ' 10-3-12 15-2-9 20-7-8 1 2 3 4 5
5-4-15 4-10-13 5-4-15
5-4-15 10-3-12 15-2-9 20-7-8 1 6 7 8 5
1. 20-7-8
Code/Design: CBC-2019/TPI-2014
PSE Live Dead Our rectors
TC 20.0 20.0 Live Wind Snow
BC 0.0 10.0 bum 1.25 1.60 N/A
Total 50.0 Pit 1.25 1.60 N/A
Spacing: 2-00-00 o.c. Plies: I
Repetitive Member Increase: Yes
Green Lumber: Yea Wet Service: No
Tab Tolerance: 20% Creep (Ncr) 2.0
ON Soffit Load: 2.0 paf
Snow Load Specs ----------
ASCE7-16 Ground Snow(Pg) - N/A
Risk Cat: 11 Terrain Cat: C
Roof Exposure: Sheltered
Thermal Condition: All Othets(l.0)
Unobstructed Slippery Roof: No
Low-Slope Minimums(Pfmin): No
Unbalanced Snow bade: No
Rain Surcharge: No Ice Dam Chic: No
Wind Load Specs----------
ASCE7-16 Wind Speed(V) - 115 mph
Risk Cat: II Exposure Cat: C
Bldg Dims: 1. - 38.0 ft B - 34.0 ft
N.R.lt(h) 15.0 ft Kzt 1.0
Bldg Enclosure: Enclosed
Wind DL(psf): TC - 12.0 BC - 6.0
End Vertical Exposed: I = Yes P. Yes
Wind Uplift Reporting: ASCEI MWFRS
CSC End Zone: 3-04-13
Additional Design Check-------
10 psf Non-Concurrent BCLL: Yes
20 psf BC Limited Storage: Yes
200 lb BC Accessible Ceiling: Yes
300 lb TC Maintenance Load: Yes
2000 lb TC Safe Load: No
Unbalanced TCLL: Yes
Material Summary
TC 2x4 DTL 62
BC 2x4 DEL 62
Webs 2x4 DEL 12
Member Forces Summary
.Mem... Ten Comp .CSI.
TC OH- 1 137 0 0.68
2 96 1634 0.39
3 128 1177 0.47
4 128 1177 0.47
5 96 1634 0.39
S-OH 137 0 0.68
BC 1- 6 1379 0 0.48
8 1379 0 0.48
7 1379 0 0.42
8 1379 0 0.42
Web 2- 6 215 0 0.04
7 82 506 0.24
7 586 13 0.10
7 81 508 0.24
4-8 215 0 0.04
Reaction Summary
Reaction Sunonary(Lbe)----------------
Jnt --X-Loc- React -Up- --Width- -Reqd -Mat PSI
1 02-12 1213 0 05-08 01-05 DEL 625
5 20-04-12 1213 0 05-08 01-05 DEL 625
Max Horiz -98 / +98 at. Joint 1
Loads Summary
This trues has been designed for the effects of an unbalanced top chord
live Load occurring at (10-03-12) using a 1.00 Full and 0.00 Reduced load
factor.
See Loadcase Report for loading combinations and additional details.
Dead Loads may be slope adjusted: > 12.0/12
Tooth-Holding reduction factors apptied:Green Lumber
Notes
Designed for green lumber that will be seasoned by time of installation
Plates designed for Cq at 0.80 and Rotational Tolerance of 10.0 degrees
Plates located at TC pitch breaks meet the prescriptive minimum size
requirement to transfer unblocked diaphragm loads across those joints.
Deflection Summary
TrussSpan Limit Actual(in) Location
Vest LI. L/360 1/999(-0.05) 7- 6
Vert DL 1/180 1/999(-0.08) 7- 8
Vest CR 1/240 L/999(-0.13) 7- 8
Hors IL 0.75in 1 0.02) ltjt S
Hors CR 1.25in I 0.05) 83t 5
Ohng CR 21/240 2L/598(-0.09) 1- 1
Ohng CR 2L/240 2L/599(-0.09) 5- 5
Vest CR and Nor: CR are the vertical and
horizontal deflections due to live load
plus the creep component of deflection
due to dead load, computed as flefl_LI. +
(Ncr - 1) a Defl_DL in accordance with
ANSI/TPI 1.
Bracing Data Summary
Bracing Data ------------
Chords; continuous except where shown
Web Bracing -- None
Plate offsets (X, Y):
(None unless indicated below)
.int7(0,-00-08)
DAVID NORRIS
NOTICE A copy of this design shall be furnished to the erection centimeter. The design of this Individual truss Is based on design criteria and requirements supplied by
the Truss Manufacturer and relies upon the accuracy and completeness or the Information eel forth by the Building Designer. A east on this drawing Indicates
acceptance of professional engineering responslblity solely for the buss component design shown. Sea the cover page and the 'Important Information & General
Notes' page for additional Information. Alt connector plates shall be manufactured by Simpson Strong-Ile Company, Inc In accordance with ESR.2782. All connector
plates are 20 gauge, unless the specified plate size Is followed by a-1r which indicates an 16 gauge plate, or 'SI 18W. which Indicates a high tension 18 gauge plate.
Component Solutions
Truss Studio V
2020.1.0.136
Helpdeak: 1-866-252-8606
CSHQID@Btzonatio.com
16-4-8
Bi DL#3000
CP
00
M. CONV.BY
OTHERS
I —-—-.n
13-6-8
--
r.J iS
\
_____
THIS IS A TRUSS PLACEMENT DIAGRAM ONLY
-
z
0. oro to
Franco ADU
REVISION:
II124l2O IRLEN: I.AtdlLRyout
DATE:
AXE: is :::::: 1I bqPd
________________________ ______ ___________ LUBE .8iTRU5S•
I
_TT1!a 0
schoold
arid returnedthe city prior
I
a completed school fee farm -
r Project a -
Permit # CaR20?O.2043
Project Address: 2858 rULE CT 110 _ -
Assesso?s Parci,j #: 2155040500
Project Applicant OWNER ARCPNIEGA JESSICA FRANCO
(Owner Name) .
Residential Square Foot:
Now/Additions.
Second Dwelling Unit:
Commercial Square Feet;
New/Additions; -- - - -
City Certification: City of Carisbad BUiIdIfl&DMSIOfl Date: 10/20/2020
Ceififieadon of Applicant/Owners. The person executing this declaration(Ownef) certifies I toy lsppLufliyj
under penalty of perjury that (1) the information provided above is correct and true to the
best Of the wn. lrnowledge. and that the Owner will file an amended certification of - Vista Unified School District pai,ment and pay the additional fee It Owner requests an increase in the number f I 1234 Arcadia Drive citing units or square footage after the budding permit Is Issued or If the initial Vista CA 92083 efemsnation of units or square footage Is found to be incorrect. and that (2) the Owner Is 1w Owner/deeefoper of the above described project(s), or that the person executing this I Phone: (760) 726-2170 x2222
ctaration is authorized to sign on behalf at the Owner.
SCHOOL DISTRICT SCHOOL FEE CERTIFICATION
(To be completed by the school district(s))
THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS
FOR THE PROJECT HAVE BEEN OR WILL BE SATISFIED.
underaigned, being duly authorized by the applicable School District, certifle, that the developer, bullde writer has satisfied the obligation for school facilities. This is to certify that the applicant listed on page sid all amount, or completed other applicable school mitigation determined by the School District. T nay lasas building permit, for dug project.
ittjre of Authorized School District Offlctal:(. ç (/il i c.a t, . 1 -. •. -. -
Bete 2>
f: tof2s,
carlabed Unti .d School District
622561 Camino Real
Carlsbad CA 92009
Phone. (760) 331 -5000
U Encinitas Union School District
101 South Rancho Santa Fe Rd
Encinitas, CA 92024
Phone: (760) 944-4300 )(1 166
San DI.guito Union HS. District
684 Requeza Dr.
Encinitas, CA 92024
Phone: (760) 753-6491 Ext 5514
(By Appt. Only)
[J San Marcos Unified Sets. Oletric 255 Pico Ave Ste. 100
San Marcos, CA 92069
Phone: (760) 290-2649
Contact: Katherine Marcella
BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE
Erosion Control - Control UPS Tracking Tracking Nonni Water Waste Management and Materials
limps Sediment BMPS Management BMPa Pollution Control BMPe
0
n 5-...
0 5
.5 E 5 — 5 .m E. S
0
.
to
BestManagementPractice
10 C
....
(BMP) Description . - cl,
.5oç5C
a° — ., o — ç
1
2
1
ASQADesig1stion— ,..cc on V. u, a r.Co 9 C4 r Co '1 ' '7 'IIn C? 010
Grading/Soil Disturbance
Trenching/Excavation - - - - X - N - - - - - - - - - - - - - - N - - - - -
Stockpiling
Drilling/BorIng
Concrete/AhattSawcuttlng
Concrete flatwaric
Paving
Canduit/Pipelnstotlatlon - - - - - -
Stucco/Mortar Work a - - - - - - - - - - - - - - a -
Waste Disposal ____......
Staging/Lay Down Area - - - - - - -
Equipment Maintenance and Fueling - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - - - - -
Hazardous Substance Use/Storage ------ - - Dewatering
--
--
-
Site Access Across Dirt
Other(Iist): - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Instructions: i. check the ban to the left of all applicable construction activity (first column) expected to acorir during construction.
located along the top of the BMP Table Is a list of BMP'a with it's corresponding California Starmwoter Quality Association (CASQA) designation number. Choose one
or more BMPS you intend to use during construction from the list. Check the boo where the chosen activity row intersects with the BMP column.
Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project.
PROJECT INFORMATION
Site Address: 1858 Tule Ct, Carlsbad, CA 92011
Assessor's Parcel Number 215-504-05
Emergency Contact:
Name: Ed Ciconc
24 Hour Phone: 760-613-9405
Construction Threat to Storm Water Quality
(Check Box)
0 MEDIUM El LOW
Page 1 of 1 REV 11/17
STORM WATER COMPLIANCE FORM
TIER I CONSTRUCTION SWPPP (Ric2o. 2-pL13
STORM WATER POLLUTION PREVENTION NOTES
ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE
AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION
OF EROSION AND SEDIMENT CONTROL 8MPs WHEN RAIN
IS EMINENT.
THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION
CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION
OF THE CITY INSPECTOR AFTER EACH RUN—OFF PRODUCING
RAINFALL
THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION
CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY
INSPECTOR DUE TO INCOMPLETE GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE.
ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE
AT THE END OF EACH WORKING DAY WHEN THE FIVE (5)
DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PECENT
(40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER
EACH RAINFALL
ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM
AGGREGATE.
ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER
PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST
BE INSTALLED AND MAINTAINED.
THE CITY INSPECTOR SHALL HAVE THE AUTHORITY TO ALTER
THIS PLAN DURING OR BEFORE CONSTRUCTION AS NEEDED
TO ENSURE COMPLIANCE WITH CITY STORM WATER QUALITY
REGULATIONS.
OWNERS CERTIFICATE:
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT
BEST MANAGEMENT PRACTICES (BMPS) DURING CONS1RUCT1ON
ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO AVOID
THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO
AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION
RELATED POLLUTANTS; AND (2) ADHERE TO. AND AT ALL TIMES,
COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP
THROUGHOUT THE DURATION OF THE CONSTRUCTION AC11V111ES
UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED
BY ThE CITY OF CARLSBAD.
Ed Cicone
OWNER(S)IOWNER))ENT NAME (PRINT)
10-22-20
OWNER(SOWER'S AGENT NAME (SIGNA1URE) DATE
E-29
(City of
Carlsbad
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Building Division
1635 Faraday Avenue
(760) 602-2719
www.carlsbadca.gov
PURPOSE
This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance
requirements apply to their projects. The completed checklist must be included in the building permit application. It may be
necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate
full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach
to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as
specified by the ordinances.
NOTE: The following-type of permits-are n'otrequiredto fiH form outthiS fo
,I. ..
+ Patio J + Decks I + PME (w/o panel upgrade) j • Pool
4 If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
an explanation must be provided to the satisfaction of the Building Official.
4 Details on CAP ordinance requirements are available on the city's website.
4 A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be
completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webDaQe and
download the latest form.
Application Information
Project Name/Building
Permit No.:
A BP No.:
Property Address/APN:
f LE.... C. r C. b. 2-1 S . £ •
Applicant Name/Co.: 14 ii.1C J .i r 1p ILc' I '".J W
Applicant Address: 2.. iI c ri L. c r IT E_ A I. . a Azp, Co AU 00
Contact Phone: 1 i Contact Email:. 4 g , W ?
1L6 4i - U.'E s.._.... —
Contact information of person completing this checklist (if different than above):
Name: Contact Phone:
Company
name/address: Contact Email:
Applicant Signature: _ ___________________ Date: t 2.0
B-50 Page 1 of 6 Revised 06118
City of Carlsbad Climate Action Plan Consistency Checklist
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. For alterations and additions to existing buildings, ttach Building Permit Valuation worksheet.
Building Permit Valuation (BPV) prom worksheet: $
Con*uon Type Complete Section(s) I Notes.
A high-rise residential building is 4 or more stones, including a
JJ Residential Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use
0 New construction IB 2Bon 2A,
4A 3B 4A
, Additions and alterations:
BPV < $60,000
T BPV k $60,000
Electrical service pam
0 BPV ~! $200,000
D Nonresidential
N/A N/A All residential additions and alterations
4:A ) 4A 1-2 family dwellings and townhouses with attached garages only
*Mftj4my dwellings only where interior finishes are removed
IA, 4A* IB, 4A* and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbina sYstems are orocosed
0 New construction IB, 2B, 3B, 4B and 5
Alterations:
BPV ~t $200,000 or additions k 1,000 lB 5
square feet
BPV k $1,000,000 1B, 2B, 5 Building alterations of k 75% existing gross floor area
a- 2,000 sq. ft. new roof addition 2B, 5 1 also applies if BPV 2: $200,000
CAP Ordinance Compliance
Checklist Item
Check the appropriate boxes, explain all not applicable and exception items, and pruvide siporthg calniations and doanentation as necessay.
1. Energy Efficiency
Please refer to Carlsbad Municipal Code (CMC) sections 18.21.155 and 18.30.190, and the California Green Building Standards Code (CALGieen) for more information when completing this section.
A. JZI Residential addition or alteration? $60,000 building permit valuation. D N/A_________________________ See CMC section 18.30.190. o Exception: Home energy score k 7
(attach certification)
Year Built Single-family Requirements Multifamily Requirements
Before 1978 Select one: Duct sealing 0 Attic insulation 0 Cool roof 0 Attic insulation
1978 and later Select one: Lighting package 0 Water heating Package
D Between 1978 and 1991 Select one:
0 Duct sealing DAttic insulation 13 Cool roof
fl.1 1992 and later Select one:
0 Lighting package PrWater heating package
B. 0 Nonresidential* new construction or alterations? $200,000 building permit valuation,
or additions 1,000 square feet 0 N/A__________________________
Updated 8/15/2019 2
City of Carlsbad Climate Action Plan Consistency Checklist
.4.Elecfrlc,VehicIeChargInq'.
A Z Residential New construction and major alterations*
Please refer to Carlsbad Ordinance CIVIC section 18.21.140 when completing this section.
DOne and two-family residential dwelling or townhouse with attached garage:
GOne EVSE Ready parking space required 0 Exception:______________________________
DMulti-family residential: 0 Exception:______________________________
Total Parking Spaces
Proposed
EVSE Spaces
Capable Ready Installed Total
Calculations: Total EVSE spaces =10 x Total parking (rounded up to nearest whole number)
EVSE Installed = Total EVSE Spaces x.50 (rounded up to nearest whole number)
EVSE other= Total EVSE spaces - EVSE Installed
(EVSE other may be Capable, 'Ready" or installed?')
'Major alterations are: (1) Ibr one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation ~ $60,000
or include an electilcal service panel upgrade; (2) for muItibmy dwellings (three units or more without attached garages), alterations have a building permit
valuation 2! $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing
systems are proposed.
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
0 0-9 1 1 0 10.25 2
0 26-50 4 2
51-75 6 3 o 76-100 9 5
101-150 12 6 p 151-200 17 9 JJ 201 and over 10 percent of total 50 percent of Required EV Spaces