Owner: laair 1sr Contractor: 1 $se'p& p1-r*L..(
Job Address: ?" 1 'L"?' Jr Phone Number: 30 '&fl-
Estimated Cost of Project: $ bg _ DPO
Type of Project: []New Construction lTodel or 1.1. O<esidential D Commercial 0 Demolition
(check all that apply) 0 Other
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 50% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 50% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables I & 2 below)
0 Construction waste shall not exceed 2 lbs. per Sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area X 2 lbs. = lbs. of allowable waste.
i'plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table I - Estimated Waste (To be filled out prior to permit issuance - refer to example on Page 2.)
MATERIALS lbs. of waste to betaken to
LANDFILL
lbs. of waste to be
RE-USED or RECYCLED Waste Hauling Company or Re-Use Method
Asphalt/ Concrete 46000 165
Brick! Masonry 4P _________
Cardboard fQO
Drywall q7 -0— / L/Q
Landscape Debris
Lumber! Wood 70 # g4 -.. ( Lr-g't 10076
Metals ioa° L.I5
Mixed Waste
Trash / Garbage
Other:
TOTAL lbs:
Estimated Percentage to be Re-Used or Recycled %
that the information orovi rein, to the best of my knowledge, is true and correct.
sftmrs L;11. P4 Sr.
Date
OfflcIl Use Only
0 Plan Approved 0 Plan Denied 0 Project Valuation Approved
Reviewed / Approved by:___________________________________________
Page lof 2
Table 2 -Actual Waste (To be completed after construction.)
MATERIALS lbs. of waste taken to
LANDFILL
lbs. of waste
RE-USED or RECYCLED
Waste Hauling Company or Re-Use Method
(complete only if different than Table 1)
Asphalt/ Concrete
Brick/ Masonry
Cardboard -
Drywall - - -
Landscape Debris ..--*
Lumber/ Wood
Metals . .. -.
Mixed Waste
Trash/Garbage
Other:
TOTAL lbs.:
Actual Percentage Re-Used or Recycled %
Official Use Only
050% Goal Achieved 050% Goal Not Achieved []Alternative Compliance Achieved Penalty Paid $
Reviewed / Approved
EXAM PLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be token to
LANDFILL
lbs. of waste to be
RE-USED or RECYCLED Waste Hauling Company or Re-Use Method
Asphalt / Concrete 0 2000 AC Ftoi uttvLzi Co.
Brick/Masonry too 450 WM / t-ttsea rLcl. ovt.-sfte
Cardboard 0 150 A.a t6i L-tUvizi Co.
Drywall 0 50 ARC. FNkUv6Cj Co.
Landscape Debris o - 120 MutL&.ied E Re-vseQ( Ov-ste
Lumber/Wood 5013 0 wolste Meti.te
Metals 300 200 -. - WM ,AC -&Lig
Mixed Waste 1500 0 . - WM
Trash / Garbage 300 0 WM
Other: Pool. 4vvtfte 0 900 RSeG cis crushed Some ov-sfte
TOTAL lbs.: 200 -3270
Percentage to be Re-Used or Recycled 59 %
Formula: - -
Total Re-used or Recycled X 100 = % Re-Used or Recycled
(Total Combined Waste)
3870 X 100 = 59% Re-Used or Recycled
(2700+ 3870)
Since 59% exceeds the minimum requirement of 50%, this plan complies.
Page 2 of 2
March 15th, 2017
To: Jonathan West
Building Inspector, City of Carlsbad
Re: Building Permit # C131 53492
Jonathan,
In regards to the Waste Management Plan B-59, I was not aware of
this in detail before my project started. I did have a GC, Joe Natale,
that I worked with on some of my project, but unfortunately because of
some miscommunication, I was not aware of all the rules of disposing
of waste from the remodel.
I will say, that I did recycle 100% of all the cardboard, water bottles,
soda cans etc. myself, and about 50% of the clean lumber I took to a
friends house in Chino Hills, who heats his home/shop with wood.
The rest of the old lumber with nails, drywall etc attached to it, was put
in the dumpster and taken to the transfer station, along with the old
drywall, insulation, some metal and the concrete from the old front
porch area. I put all my old appliances back in the house when the
project was completed.
I hope this explains the how and where of my project's trash.
Please call me if you have any questions.
Regards,
Jim Webb
307-733-7418
WASTE MANAGEMENT
wume
INVOICE Page 1 of 2
Customer ID: 17-70489-63004
Customer Name: JOSEPH NATALE CONSTRUCTION
Service Period: ROLL OFF SERVICE
Invoice Date: 01/01/2017
Invoice Number: 4608090-0274-0
fiow To contact-vs T our Payment Due Tour 1C11I•1,r-
Visit wm.com Due Upon Receipt 1. $734.24
Tosettyoriepo8nupfoperlesa -
statemeitma,ageurauit. view holiday
Iffiu1peyTnertof1he invoiced waft 6 rat recved
! - iiw (rntrtt terms, you may be ded a
I I .. nrJntWy te drge of 2.5% of de urpa anwt,
witharirimnycIsieof$5,a-s.idite how
Customer Service: I%EJB IcIe law t4-..
(800) 596-7444 conb See Reverse for Important Messages c:
Previous Balance
185.26
+ L Payments
0.00
Adjustments +
0.00
+ Current Charges
548.98
— Total Due
— 734.24
Details for Service Location: CustomerID: 17-70489-63004
Joseph Natale Construction, 2713 Vancouver St, Carlsbad CA 92010-1367
Description ' Date ' Ticket Quantity ' Amount
Container usage charge daily 12/08/16 M33092 1.00 36.96
Through 12/08/2016 . 0.00
Ticket Total 36.96
40 Yd demolition 12/08/16 806812 1.00 217.20
Disposal per ton 6.53 294.82
Ticket Total 512.02
Total Current Charges 548.98
—<--.--.------'--- ---------------------PleasedetacIrend send the lower po,tion with poyment -- - (no cash or staples) - -
YURZ. WASTE MANAGEMENT
WASTE MANAGEMENT
P0 BOX 43530
PHOENIX. AZ 85080
(800) 596-7444
800) 76-61 FAX
Mffl
ow
0274000177048963004046080900000005489800000073424 7
010538501 AT 0.396 AUTO T837392084-7O331S.001.PO55CO-11 10274090 IuuII,1IIIuullIuuiuuuIIillIIlIiuhihiI 1lIlih1 bIIIll
IilIuuuiluIIhhlhIhIIhIlllilhihhllhhI9IIhhhIIlIhIlPIImfuhIa COAST WASTE MANAGEMENT
JOSEPH NATALE CONSTRUCTION P0 BOX 541065 N esl
615 CRESCENT LN LOS ANGELES CA 90054-1065 9 UI
VISTA CA 92084-7033 It)
THINK GREEN Pthitedon I.,
S rvtQd flaW.
Invoice[--;; jtnvokeNurnber11 L
Customer I 71
__________________ — 17-70469-63004
Payment Terms Total Due Amount Paid
Due Upon Receipt $734.24
(city of
Carlsbad
RESIDENTIAL GREEN
BUILDING CODE
STANDARDS MANDATORY
MEASURES
CERTIFICATION
CHECKLIST
8-51
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
This form, signed and completed, and all receipts for the, recycled materials shall be
submitted to the Building Inspector prior to Final Inspection.
Site Development Mandatory
4.106.2 A plan is developed and implemented to manage storm water drainage during construction. (x)
4.106.3 The site shall be planned and developed to keep surface water away from buildings. (X)
Construction plans shall indicate how site grading or a drainage system will manage all surface water
flows.
Energy Efficiency
4.201.1 Low-rise residential buildings shall meet or exceed the minimum standard design required by (x)
the California Energy Standards.
Water Efficiency and Conservation
Indoor Water Use
4.303.1 Indoor water use shall be reduced by at least 20 percent using one of the following methods: (X)
Water saving fixtures or flow restrictors shall be used. 7/01/2011
A 20 percent reduction in baseline water use shall be demonstrated.
4.303.2 When using the calculation method specified in Section 4.303.1, multiple showerheads shall not (X)
exceed maximum flow rates. 7/01/2011
4.303.3 Plumbing fixtures (water closets and urinals) and fittings (faucets and shower heads) shall (X)
comply with specified performance requirements. 7/01/2011
Outdoor Water Use
4.304.1 Automatic irrigation systems controllers installed at the time of final inspection shall be weather- (X)
based.
Enhanced Durability and Reduced Maintenance
4.406.1 Joints and openings. Annular spaces around pipes, electric cables, conduits or other openings
in plates at exterior walls shall be protected against the passage of rodents by closing such openings (X)
with cement mortar, concrete masonry or similar method acceptable to the enforcing agency.
Construction Waste Management Plan
4.408.1 A minimum of 50 percent of the construction waste generated at the site is diverted to recycle or (X)
salvage. Recycled material receipts from approved recyclers must be attached to this form.
4.408.2 Where a local jurisdiction does not have a construction and demolition waste management (X)
ordinance, construction waste management plan, per form B-59, shall be submitted for approval to the
enforcing agency.
Building Maintenance and Operation
4.410.1 An operation and maintenance manual shall be provided to the building occupant or owner. (x)
Environmental Quality
Fireplaces
4.503.1 Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed
woodstove or pellet stove shall comply with US EPA Phase II emission limits where applicable. (X)
Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances.
B-51 Page 1 of 2 Rev. 11/15
Pollutant Control
4.504.1 Duct openings and other related air distribution component openings shall be covered (x)
during construction.
4.504.2.1 Adhesive, sealants and caulks shall be compliant with VOC and other toxic compound (X)
limits. (X)
4.504.2.2 Paints, stains and other coatings shall be compliant with VOC limits. (x)
4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MIR limits for
ROC and other toxic compounds. (X)
4.504.2.4 Documentation shall be provided to verify that compliant VOC limit finish materials
have been used. (X)
4.504.3 Carpet and carpet systems shall be compliant with VOC limits.
4.504.4 50 percent of floor area receiving resilient flooring shall comply with VOC-emission limits (x)
defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or
be certified under the Resilient Floor Covering Institute (RFCI) FloorScore program. (X)
4.504.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood used in interior
finish systems shall comply with low formaldehyde emission standards.
Interior Moisture Control
4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations. (x)
4.505.3 Moisture content of building materials used in wall and floor framing is checked before (x)
enclosure.
Indoor Air Quality and Exhaust
4.506.1 Exhaust fans which terminate outside the building are provided in every bathroom. (x)
Environmental Comfort
4.507.1 Whole house exhaust fans shall have insulated louvers or covers which close when the (x)
fan is off. Covers or louvers shall have a minimum insulation value of R-4.2.
4.507.2 Duct systems are sized, designed, and equipment is selected using the following
methods: (x)
Establish heat loss and heat gain values according to ACCA Manual J or equivalent.
Size duct systems according to ACCA 29-D (Manual D) or equivalent
Select ACCA (Manual equivalent. _heating _and _cooling _equipment _according _to _36-S_ _S)_or
Installer and Special Inspector Qualifications
702.1 HVAC system installers are trained and certified in the proper installation of HVAC (x)
systems.
702.2 Special inspectors employed by the owner must be qualified and able to demonstrate (x)
competence in the discipline they are inspecting.
I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items
listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2013
California Green Building Standards. All receipts for recycled materials have been attached to this form.
Project Address: .1)13 L,/4,JC4ccskf £T Check Number:
Print Name: 1JeiT4 Signed:
License Number: Date: It 1 7
B-51 Page 2of2 Rev. 11115