HomeMy WebLinkAbout2386 VIA PELICANO; ; CBR2017-0930; Permit(btyof
Carlsbad
Residehfial Permit '1
Print Date: 06/22/2018 Permit No: CBR2017-0930
Job Address: 2386 Via Pelicano
Permit Type: BLDG-Residential Work Class: Alteration Status: Closed - Finaled
Parcel No: 2155712800 Lot 1*: Applied: 05/03/2017
Valuation: $15,437.28 Reference #: Issued: 07/06/2017
Occupancy Group: Construction Type: Permit
Finaled:
U Dwelling Units: Bathrooms: Inspector: TFraz
Bedrooms: Orig. Plan Check U: Final
Plan Check U: Inspection: 6/22/2018 4:08:43PM
Project Title:
Description: BLUHM: 232 REMODEL TO CONVERT LOFT TO BEDROOM // RAISE ROOF TO EXISTING PEAK
Applicant: Owner:
JAN WILCOX CHRISTOPHER T BLUHM
1093 Yorkshire P1 -
DAN VILLE, CA 94506
BUILDING PERMIT. FEE $2000+ $168.18
BUILDING PLAN CHECK FEE (BLDG) $117.73
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL . $41.00
5B1473 BUILDING STANDARDS FEE $1.00
STRONG MOTION-RESIDENTIAL $2.01
Total Fees: $329.92 Total Payments To $329.92 Balance Due: $0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Secion
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad, CA 92008-7314 1 760-602-2700 1760-602-8560 f I www.carlsbadca.gov
I
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: i:i PLANNING 0 ENGINEERING 0 BUILDING t:i FIRE [—]HEALTH tj HAZMATIAPCD
cT
Building Permit Application
City of 1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax: 760-602-8558 Iir1sbad. email: buiIdingcarlsbadca.gov
www.carlsbadca.gov
Plan Check No. O21-3O
Est. Value 1 , Plan Ck. Deposit
Date - -ISWPPP I
JOB ADDRESS 23 B(. i ç) SUITE#/SPACE#/UNIT# PN
IA 21 -.7J - 2-D -
CT/PROJECT U I LOT U
tt
I PHASE U • J#OFUNITS IUBEDROOMS
I
U BATHROOMS I TENANT BUSINESS NAME I CONSTR. TYPE
I
DCC. GROUP
DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) CON 'Jccr LOF1 t0 2.32.
ç cj Vwo o t
5F-
2-52—'51
EXISTING USE I PROPOSED USE 'Sf9) I GARAGE (SF) PATIOS (SF) I DECKS (SF) I FIREPLACE
YES D# NOEl
I AIR CONDITIONING
YESENOE
I FIRE SPRINKLERS
YESDNOE
APPLICANT NAME L °dnary Contact
PROPERTY OWNER NAME
-
ADDRESS
7750 -StT'
ADDRESS 2B( 'I1P UC$.u.O
CITY STATE ZI CITY STATE ZIPP
PI1ON
19 I ________________________
PHONE FAX
EMAIL , A*4 @ * t4 G-7—
EMAIL
cse '?foO.
DESIGN PROFESSIONAL c4}LL CONTRACTOR BUS NAME ff-j Cbt..Lt
ADDRESS cr. ADDRESS
CITY STATE ZIP - CITY STATE ZIP
~- tos c 12o78
PHONE Ix
- - . .
PHONE
- 310
FAX
EMAIL E-Luoc. c • co ti
EMAIL
STATE LIC. H STATE LIC.# CLASS CITY BUS. LIC.11
I
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to Its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law {Ctiapter 9, commending with Section 7000 of Division 3 of the
Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a
civil nenaltv of not more than five hundred dollars 1550011.
Workers' Compensation Declaration: I hereby affimi under penalty of perjury one of the following declarations: . . .
[1 I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensa n in urance rrier and policy
number are: Insurance Co. C=L) C. Co .Policy No. C) b,. '_.) 0 ( O4 Expiration Date ./ -
This section need not be completed if the permit is for one hundred dollars ($100) or less.
[]Certificate of Exemption: I certify that in the performance of the wo for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California. WARNING: Failure to secure workers' corn P —Coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
addition to the cost of compensation, damage vi or in Section 3706 of the Labor code, interest and attorney's fees.
..CONTRACTORSIG []AGENT DATE 14) 7/1 7
I hereby affirm that lam exempt from Contractor's License Law for the following reason:
[] I, as owner of the properly or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply loan owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. It, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
[J I, as owner of the properly, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply loan owner of
properly who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractors License Law).
[] I am exempt under Section _____________Business and Professions Code for this reason: J I personally plan to provide the major labor and materials for construction of the proposed property improvement DYes [:]No
I (have I have not) signed an application for a building permit for the proposed work.
I have contracted with the following person (firm) to provide the proposed construction (include name address/phone! contractors' license number):
I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name! address! phone contractors' license number):
I will provide some of the work, butt have contracted (hired) the following persons to provide the work indicated (include name! address! phone / type of work):
..PROPERTY OWNER SIGNATURE DAGENT DATE
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? 0 Yes 0 No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 Yes 0 No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 Yes 0 No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
L
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name . Lender's Address
QA?
I certhy that l have read th application and state that the above information is conmof and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to buitdingconstnrthon.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA An OSHA pesrriit is required for excavations over 50' deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become nut and void tithe building or work authorized by such permit is not commenced within
180 days from the date of such permit or f the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced bra period of 180 days (Section 106.4.4 Uniform Building Code).
.APPLICANT'S SIGNATURE _.-4-:--- DATE 14/ 17 J 7
Fir
Permit Type: BLDG-Residential Application Date: 05/03/2017 Owner: CHRISTOPHER BLUHM
Work Class: Alteration Issue Date: 07/06/2017 Subdivision: CARLSBAD TCT#8441
Status: Closed - Finaled Expiration Date: 10/22/2018 Address: 2386 Via Pelicano
Carlsbad, CA 92009-6620
IVR Number: 3474
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date
04/20/2018 04120/2018 BLDG-84 Rough 055515-2018 Passed Paul Bumette Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
04/24/2018 0412412018 BLDG-17 Interior 055882.2018 Passed Paul Burnette Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06/22/2018 06/22/2018 BLDG-Final 061829-2018 Passed Tim Frazee Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
I
June 22, 2018 Page 2 of 2
Permit Type: BLDG-Residential Application Date: 05/03/2017 Owner: CHRISTOPHER BLUHM
Work Class: Alteration Issue Date: 07/06/2017 Subdivision: CARLSBAD TCT#84-41
Status: Closed - Finaled Expiration Date: 10/22/2018 Address: 2386 Via Pelicano
Carlsbad, CA 92009-6620
IVR Number: 3474
Scheduled Actual
Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
04/20/2018 BLDG-16 Insulation 055817-2018 Passed Paul Burnette Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-18 Exterior 056107.2018 Passed Paul Burnette Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
11/0912017 11/09/2017 BLDG-11 040053.2017 Failed Paul Bumette Reinspection Complete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
11/14/2017 11/14/2017 BLDG-11 040401-2017 Passed Paul Burnette Complete
FoundationlFtglPier
S (Reber)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency S Yes
BLDG-12 Steel/Bond 040376.2017 Passed Paul Burnette Complete
Beam
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
03/07/2018 03/07/2018 BLDG-IS 050906-2018 Passed Paul Burnette Complete
Roof/ReRoof (Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
04/10/2018 04/10/2018 BLDG-13 Shear 054573-2018 Passed Paul Burnette Complete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
04/18/2018 04/18/2018 BLDG-84 Rough 055326.2018 Failed Paul Burnette Reinspection Complete
Combo(I4,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-14 No
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout S No
BLDG-34 Rough Electrical No
BLDG-44 No
Rough-Ducts-Dampers
June 22, 2018 Page 1 0f2
SO CAL INSPECTIONS, INC.
3483 Sierra Ave • Norco, CA 92860 AWS/CWI- ICBO/ICC
Phone (951) 203-9701 ALL CITIES & JURISDICTIONS
Fax (626) 917-8739 INSPECTION & MATERIAL TESTING
REGISTERED INSPECTOR'S DAILY REPORT
1
Job Number Date
111/10/17
TYPE OF
INSPECTION
REQUIRED
LI Reinforced Concrete LI Structural Steel Assembly LI Quality Control
LI Post Tensioned Concrete LI Fireproofing LI Epoxy Anchors
LI Structural Masonry LI Asphalt [1 Other
Job Address City
2386 Via Pelicano Carlsbad, CA
Job Name
Room Addition
Permit Number
BL1706070035
Issued By
City Of Carlsbad
Type of structure
Single Family Home
Architect
C.R. Carney
Material Description (type, grade, source)
Simpson XP Epoxy
Engineer
Contractor
Rolcom
Inspectors Name
Charles F. Ramsey III
Subcontractor
INSPECTION SUMMARY - LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS,
REMARKS, ETC. INCLUDES INFORMATION ABOUT AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED,
NUMBER, TYPE AND IDENTIFICATION NUMBERS OF SAMPLES TAKEN. STRUCTURAL CONNECTIONS (WELD
MADE H.T. BOLTS TORQUED) CHECKED, ETC.
Epoxy Anchors:
Observed placement of #5 rebar dowels for new pad footing per detail on sheet 6 of
Plans. #5 bars were installed with 6" embedment into concrete. Simpson XP
(ICC ERS# 2508) epoxy was used. (4) footings total. (6) bars total
(1) 5/8" all thread rods for new ABU were installed in footings. Bolts were installed with
12" embedment into concrete.
RFI pending for remaining holddowns poured in place bolts in underpinned footing vs epoxy
bolts per detail on sheet SD1. There was not enough concrete footing to achieve
Proper embedment for epoxy bolts.
SAMPLES
CONCRETE MORTAR I GROUT BLOCK PRISMS DENSITY
PAGE 1 OF TIME IN I TIME OUT REG. HOURS I OT 1.5X OT 2X
1 10:00 1 I 4 I I
CERTIFICATION OF COMPLIANCE: To the best of my knowledge, all of the reported work,
unless otherwise noted, is in conformance with the approved plans, specifications, and
applicable sections of the governing building laws.
LACO 01911
of Special Inspector
All inspections based on a minimum of 4 hours. Over 4 hours = 8 hours minimum.
Any inspections extending past noon will be charged as an 8 hour minimum.
APPROVED
BY:
EsGil Corporation
In tPartners/iip wit/i government for Bui(iing Safety
DATE: May 25, 2017
JURISDICTION: Carlsbad
PLAN CHECK NO.: CBR2017-0930
LI APPLICANT
JURIS.
1LI PLAN REVIEWER
0 FILE
SET: II
ELI
PROJECT ADDRESS: 2386 Via Pelicano
PROJECT NAME: Bluhm SFR Addition.
LI The plans transmitted herewith have been corrected where necessary and substantially comply
withthe jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
I1 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at EsGil
Corporation until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
LII The applicant's copy of the check list has been sent to:
EsGil Corporation staff did not advise the applicant that the plan check has been completed.
EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: ' (by..&) Email: QA
Mail Telephone Fax In Person
REMARKS: Set 2 was submitted as slip sheets to set I. Person responsibl 6r&pIreparation
to add included sheets to the set of plans held at the city to make a compl mset of
plans.
By: Rich Moreno for D.A. Enclosures:
EsGil Corporation
EIGA EIEJEMB El PC May 22, 2017
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
EsGil Corporation
In Partnership with Government for Building Safety
DATE: 05/12/2017
JURISDICTION: Carlsbad
PLAN CHECK NO.: CBR2017-0930 SET: I
PROJECT ADDRESS: 2386 Via Pelicano
PROJECT NAME: Bluhm SFR Addition.
LI APPLICANT
, JURIS.
"U PLAN REVIEWER
U FILE
Lii The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
Ellil The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at EsGil
Corporation until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
Jan.wilcox
EsGil Corporation staff did not advise the applicant that the plan check has been completed.
EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Jan Wilcox Telephone #: (619)668-9157
Date contacted: (by: ) Email: janwilcoxdesign.net
TeIepho Fax inPe rson
By: Dwight Ashman Enclosures:
EsGil Corporation
El GA [1 EJ [1 MB El PC 05/04/2017
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax(858)560-1576
Carlsbad CBR2017-0930
05/12/2017
PLAN REVIEW CORRECTION LIST
SINGLE FAMILY DWELLINGS AND DUPLEXES
PLAN CHECK NO.: CBR2017-0930 JURISDICTION: Carlsbad
PROJECT ADDRESS: 2386 Via Pelicano
FLOOR AREA: 232 s.f. STORIES: 2
HEIGHT: NC
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION: 05/03/2017
DATE INITIAL PLAN REVIEW
COMPLETED: 05/12/2017
FOREWORD (PLEASE READ):
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 05/04/2017
PLAN REVIEWER: Dwight Ashman
This plan review is limited to the technical requirements contained in the California version of
the International Residential Code, International Building Code, Uniform Plumbing Code,
Uniform Mechanical Code, National Electrical Code and state laws regulating energy
conservation, noise attenuation and access for the disabled. This plan review is based on
regulations enforced by the Building Department. You may have other corrections based on
laws and ordinance by the Planning Department, Engineering Department, Fire Department or
other departments. Clearance from those departments may be required prior to the issuance of
a building permit.
Present California law mandates that construction comply with the 2016 edition of the California
Code of Regulations (Title 24), which adopts the following model codes: 2015 IRC, 2015 IBC,
2015 UPC, 2015 UMC and 2014 NEC.
The above regulations apply, regardless of the code editions adopted by ordinance.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2015 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
Carlsbad CBR20 17-0930
05/12/2017
. PLANS
Please make all corrections, as requested in the correction list. Submit FOUR new
complete sets of plans for commercial/industrial projects (THREE sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted
in one of two ways:
Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
Bring TWO corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
2. All sheets of plans must be signed by the person responsible for their
preparation. (California Business and Professions Code).
. FIRE PROTECTION
In existing buildings, when alterations, repairs or additions requiring a permit
occur (or when one or more sleeping rooms are added), the dwelling unit shall
be provided with smoke alarms located as required for new dwellings; the
smoke alarms shall be interconnected and hard wired. Exception: Smoke alarms
in existing areas need not be interconnected and hard wired where the
alterations or repairs do not result in the removal of interior wall or ceiling finishes
exposing the structure, unless there is an attic, crawl space, or basement
available which could provide access for hard wiring and interconnection without
the removal of interior finishes. Section R314.8.1. Please show the location of
all smoke alarms.
Inside each bedroom.
Outside each separate sleeping area in the immediate vicinity of the
bedrooms.
On each story, including basements.
Such smoke alarm locations shall comply with the following:
They shall be not less than 3' from the door opening of a bathroom.
They shall be at least 20' from a cooking appliance.
They shall be at least 3' from supply registers of heating/cooling
systems.
They shall be at least 3' from the tip of the blade of a ceiling-
mounted fan.
Carlsbad CBR20 17-0930
05/12/2017
4. When alterations, repairs or additions are proposed for dwelling units within
which fuel-burning appliances are installed (and in dwelling units having attached
garages), the dwelling unit shall be provided with carbon monoxide alarms
located as required for new dwellings; the carbon monoxide alarms shall be
interconnected and hard wired. Exception: Carbon monoxide alarms in existing
areas need not be interconnected and hard wired where the alterations or repairs
do not result in the removal of interior wall or ceiling finishes exposing the
structure, unless there is an attic, crawl space, or basement available which
could provide access for hard wiring and interconnection without the removal of
interior finishes. Section R315.2. Please show the location of all CO alarms.
Outside each separate sleeping area in the immediate vicinity of the
bedrooms.
On each story, including basements.
. GENERAL RESIDENTIAL REQUIREMENTS
5. Sleeping rooms shall have a window or exterior door for emergency escape.
Section R310.
a) Windows must have an openable area of at least 5.7 square feet, with the
minimum openable width 20" and the minimum openable height 24".
Please address egress at the new bedroom; the large pane in the 71047
appears to be fixed, and a 3040 SH does not provide adequate egress area.
EXITS, STAIRWAYS, AND RAILINGS
6. Provide stairway and landing details for the new stairs. Section R311.7.
Maximum rise is 7-3/4" and minimum run is 10", measured from the
nosing projection. Where there is no nosing, the minimum run is 11"
Minimum headroom is 6'-8".
7. Handrails (Section R311.7.8):
Shall be provided on at least one side of each stairway with four or more
risers.
Handrails and extensions shall be 34" to 38" above nosing of treads and
be continuous.
The handgrip portion of all handrails shall be not less than 1 1/4 inches nor
more than 2 inches in cross-sectional dimension. See Section R311.7.8.3
for alternatives.
Handrails projecting from walls shall have at least 1 -½ inches between
the wall and the handrail.
Ends of handrails shall be returned or shall have rounded terminations or
bends.
Carlsbad CBR20 17-0930
05/12/2017
. ROOFS/DECKS/BALCONIES
8. Specify on the plans the following information for the roof materials, per Section
R106.1.1:
Manufacturer's name and product name/number.
ICC approval number, or equal.
Specify roof slope on the plans.
Show the required ventilation for attics (or enclosed rafter spaces formed where
ceilings are applied directly to the underside of roof rafters). The minimum vent
area is 1/150 of attic area (or 1/300 of attic area if at least 40% (but not more
than 50%) of the required vent is located no more than 3' below the ridge). Show
on the plans the area required and area provided. Section R806.2.
Note on the plans: "Attic ventilation openings shall be covered with
corrosion-resistant metal mesh with 1/16" minimum to 1/4" maximum openings.
Section R806.1.
Show location of attic access with a minimum size of 22"x30", unless the
maximum vertical headroom height in the attic is less than 30". Access must be
provided to each separated attic area (if over 30 sq. ft.), shall be located in a
hallway or other readily accessible location and 30" headroom clearance is
required above the opening. Section R807.1.
STRUCTURAL
Details A, B, C, D are referenced to sheet 4, but they appear on sheet 6. See
sheet 6 & 7 detail references.
Provide stud size and spacing for new walls.
Carlsbad CBR20 17-0930
05/12/2017
. ELECTRICAL
15. Include on the plans the following specifications for electrical devices installed in
dwellings: CEC Article 210 & 406
Tamper resistant receptacles for all locations described in 210.52 (i.e., all
receptacles in a dwelling).
Weather resistant type for receptacles installed in damp or wet locations
(outside).
Arc-fault protection for all outlets (not just receptacles) located in rooms
described in NEC 210.12(A): Kitchens, laundry areas, family, living,
bedrooms, dining, halls, etc.
GFCI protected outlets for locations described in NEC 210.8(A): Laundry
areas, kitchen dishwashers, kitchens, garages, bathrooms, outdoors,
within 6' of a sink, etc.
. PLUMBING
16. For additions or improvements to a residence built before 1994, note on the
plans that existing "noncompliant" fixtures (toilets that use more than 1.6 gallons
of water per flush, urinals that use more than one gallon of water per flush,
showerheads that have a flow capacity of more than 2.5 gallons of water per
minute, and interior faucets that emit more than 2.2 gallons of water per minute)
shall be replaced. Certification of compliance shall be given to the building
inspector prior to final permit approval. California SB407.
. RESIDENTIAL GREEN BUILDING STANDARDS
The California Building Standards Commission has adopted the Green Building
Standards Code and must be enforced by the local building official. The following
mandatory requirements for residential construction must be included on your plans.
CGC Section 101.3. The Standards apply to newly constructed residential buildings,
along with additions/alterations that increase the building's conditioned area, volume
or size. CGC Section 301.1.1. Provide a sheet on the plans labeled "Green
Building Code Requirements" and include the following notes as applicable.
17. Recycling. Note on the plans that a minimum of 65% of construction waste is to
be recycled. CGC Section 4.408.1.
18. Recycling. Note on the plans that the contractor shall submit a Construction
Waste Management Plan, per CGC Section 4.408.2.
19. Operation and maintenance manual. Note on the plans that the builder is to
provide an operation manual (containing information for maintaining appliances,
etc.) for the owner at the time of final inspection. CGC Section 4.410.1.
Carlsbad CBR20 17-0930
05/12/2017
Pollutant control. Note on the plans that during construction, ends of duct
openings are to be sealed, and mechanical equipment is to be covered. CGC
Section 4.504.1.
Pollutant control. Note on the plans that VOC's must comply with the
limitations listed in Section 4.504.3 and Tables 4.504.1, 4.504.2, 4.504.3 and
4.504.5 for: Adhesives, Paints and Coatings, Carpet and Composition Wood
Products. CGC Section 4.504.2.
Interior moisture control. Note on the plans that the moisture content of wood
shall not exceed 19% before it is enclosed in construction. The moisture content
needs to be certified by one of 3 methods specified. Building materials with
visible signs of water damage should not be used in construction. The moisture
content must be determined by the contractor by one of the methods listed in
CGC Section 4.505.3.
Note on the plans that prior to final inspection the licensed contractor, architect
or engineer in responsible charge of the overall construction must provide to the
building department official written verification that all applicable provisions
from the Green Building Standards Code have been implemented as part of the
construction. CGC 102.3.
. ENERGY CONSERVATION
Residential Energy Lighting Requirements: ES 150.0(k)
All installed luminaires shall be high-efficacy in accordance with ES TABLE
150.0-A. Light sources that are not marked "JA8-2016-E" shall not be installed in
enclosed luminaires. ES 150.0(k)
In bathrooms, garages, laundry rooms, and utility rooms at least one luminaire
shall be controlled by a vacancy sensor.
Dimmers or vacancy sensors shall control all LED style luminaires. Two
exceptions: Fixtures installed in hallways or (closets under 70 square feet).
Recessed can light fixtures shall be IC listed, air-tight labeled, and not be
equipped with a standard medium base screw shell lamp holder. ES 150.0(k)
SFD outdoor lighting fixtures that are attached to a building are required to be
high efficacy, be manually on/off switch controlled, and have both motion sensor
and photocell control. See ES 150.0(k) 3 for additional control options.
Carlsbad CBR20 17-0930
05/12/2017
. MISCELLANEOUS
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes No U
31. The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Dwight Ashman at
EsGil Corporation. Thank you.
Carlsbad CBR2017-0930
05/12/2017
[DO NOT PAY - THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: CBR2017-0930
PREPARED BY: Dwight Ashman DATE: 05/12/2017
BUILDING ADDRESS: 2386 Via Pelicano
BUILDING OCCUPANCY:
BUILDING
PORTION
AREA
(Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Addition 232 City Est 15,437
Air Conditioning
Fire Sprinklers
TOTAL VALUE 15,437
Jurisdiction Code 1GB I By Ordinance
Bldg. Permit Fee by Ordinance V
Plan Check Fee by Ordinance I v
Type of Review: Complete Review 0 Structural Only
I7 $167.811
I $109.081
E] Repetitive Fee
,,, Repeats
O Other
Hourly
EsGil Fee
Hr. @ *
Comments In addition to the above fee, an additional fee of $43 is due (0 5hour@
$86/hr.) for the CaiGreen -review.
Sheet 1 of 1
macvalue.doc +
1ILCO
Gifffs ad
DETERMINATION OF
PROJECT'S SWPPP
TIER LEVEL AND CONSTRUCTION
THREAT LEVEL
E-32
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
I'm applying for: 0 Grading Permit D&Building Permit 0 Right-of-way permit 0 Other
Project Name: t1. Project ID: DWG #ICB#
Address:2.?,9C..cAti APN ?-Or _-_511._2Disturbed Area: OIAc
Section 1: Determination of Project's SWPPP Tier Level SWPPP
(CheckapplicablecriteriaandcirclethecorrespondingSWPPPTierLevel,thengotosection2) Tier Level
Exempt - NoThreatProiect AssessmentCriteria
My project is in a category of permit types exempt from City Construction SWPPP requirements. Provided
no significant grading proposed, pursuant to Tablel, section 3.2.2 of Storm Water Standards, the
following permits .aeexe.mp•t••from SWPPP requ..m.....
.
Exempt
> Electrical > Patio Mobile Home > Plumbing > Spa (Factory-Made)
' Fire Sprinkler Mechanical > Re Roofing Sign > Roof Mounted Solar Array
tier 3- Significant Threat Assessment Criteria - (See Construction General Permit (CGP) Section I.B)*
U My project includes construction or demolition activity that results in a land disturbance of equal to or
greater than one acre including but not limited to clearing, grading, grubbing or excavation; or,
U My project includes construction activity that results in land disturbance of less than one acre but the
construction activity is part of a larger common plan of development or the sale of one or more acres
of disturbed land surface or,
U My Project is associated with construction activity related to residential, commercial, or industrial Tier 3
development on lands currently used for agriculture; or
U My project is associated with construction activity associated with Linear Underground/overhead
Projects (LUP) including but not limited to those activities necessary for installation of underground
and overhead linear facilities (e.g. conduits, substructures, pipelines, towers, poles, cables, wire,
towers, poles, cables, wires, connectors, switching, regulating and transforming equipment and
associated ancillary facilities) and include but not limited to underground utility mark out, potholing,
concrete and asphalt cutting and removal, trenching, excavation, boring and drilling, access road,
tower footings/foundation, pavement repair or replacement, stockpile/borrow locations.
U Other per CGP
Tier2-ModerateThreatAssessmentCriteria: My project does not meet any of the Significant Threat
Assessment Criteria described above and meets one or more of the following criteria:
U Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the
Carlsbad Municipal Code); or,
U Project will result in 2,500 square feet or more of soils disturbance including any associated
construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance
areas and project meets one or more of the additional following criteria: . Tier 2
located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or,
disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or
disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or
watercourse; and/or
construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1
through Apr. 30).
Tier1-LowThreat AssessmentCriteria
My project does not meet any of the Significant or Moderate Threat criteria above, is not an exempt
permit type per above and the project meets one or more of the following criteria: Tier 1 results in some soil disturbance; and/or
includes outdoor construction activities (such as roof framing, saw cutting, equipment washing,
material _stockpiling, _vehicle _fueling, _waste _stockpiling)
* Items listed are excerpt from CGP. CGP governs criteria for triggers for Tier 3 SWPPP. Developer/owner shall confirm coverage
under the current CGP and any amendments, revisions and reissuance thereof.
E-32 Page 1 of 2 Rev. 2/16/16
SWPPP Section 2: Determination of Project's Construction Threat Level
Tier (Check applicable criteria under the Tier Level as determined in section 1, circle Construction
Level the corresponding Construction Threat Level, then complete the Threat Level
signature block below)
Exempt - Not Applicable -
77
empt
Tier 3 - High Construction Threat Assessment Criteria: My Prolect meets one or more of the
following:
U Project site is 50 acres or more and grading will occur during the rainy season
U Project site is located within the Buena Vista or Agua Hedionda Lagoon watershed,
inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly
to an ESA High
. U Soil at site is moderately to highly erosive (defined as having a predominance of soils
Tier 3 with USDA-NRCS Erosion factors kf greater than or equal to 0.4)
U Site slope is 5 to 1 or steeper
U Construction is initiated during the rainy season or will extend into the rainy season (Oct.
1 -April 30).
U Owner/contractor received a Storm Water Notice of Violation within past two years
Tier 3 -'Medium Construction Threat Assessment Criteria Medium U All projects not meeting Tier 3 High Construction Threat Assessment Criteria
Tier 2 - High Construction Threat Assessment Criteria: My Proiect meets one or more of
the following:
U Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or
within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an
ESA
U Soil at site is moderately to highly erosive (defined as having a predominance of soils High
with USDA-NRCS Erosion factors k, greater than or equal to 0.4)
Tier 2 U Site slope is 5 to 1 or steeper
U Construction is initiated during the rainy season or will extend into the rainy season (Oct.
1-Apr.30).
U Owner/contractor received a Storm Water Notice of Violation within past two years
U Site results in 10,000 sq. ft. or more of soil disturbance
Tier 2 - Medium Construction Threat Assessment Criteria 1 i Medium U My project does not meet Tier 2 High Threat Assessment Criteria listed above
Tier 1 - Medium Construction Threat Assessment Criteria: My Proiect meets one or more
of the following:.
U Owner/contractor received a Storm Water Notice of Violation within past two years
U Site results in 500 sq. ft. or more of soil disturbance Medium
Tier I U Construction will be initiated during the rainy season or will extend into the rainy season
(Oct.1-April 30)
Tier 1 - Low Construction Threat Assessment Criteria Low U My project does not meet Tier 1 Medium Threat Assessment Criteria listed above
I certify to the best of my knowledge that the above statements are true and correct. I will prepare and submit an appropriate tier level SWPPP as determined above
prepared in accordance with the City SWPPP Manual. I understand and acknowledge that I must adhere to and comply with the storm water best management
practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards at all times during construction activities for the permit type(s) checked above.
The City Engineer/Building Official may authorize minor variances from the Construction Threat Assessment Criteria in special circumstances where it can be shown
that a lesser or higher SWPPP Tier Level is warranted.
Owner/Owner's Authorized Agent Name: Title:
Owner/Owner's Authorized Agent Signature: Date:
City Concurrence:
(For City Use Only)
Yes No
By:
Date:
Project ID:
E-32 Page 2 of 2 Rev. 2/16/16