Print Date: 05/27/2021 Permit No: FPC2016-0041
Job Address: 2501 GATEWAY RD, CARLSBAD, CA 92009 Status: Closed - Finaled
Permit Type: FIRE-Construction Commercial Work Class: Underground Fire
Parcel U:
Valuation: $0.00
Occupancy Group:
#of Dwelling Units:
Bedrooms:
Bathrooms:
Track U:
Lot U:
Project U:
Plan U:
Construction Type:
Orig. Plan Check U:
Plan Check U:
Applied: 12/20/2016
Issued: 05/09/2017
Finaled Close Out: 04/03/2019
Inspector:
Final Inspection:
Project Title:
Description: VIASAT BRESSI RANCH CAMPUS - UNDERGROUND (LG) PHASE 1
FPContractor:
WEST-TECH CONTRACTING INC
568 N TULIP ST
ESCONDIDO, CA 92025-2533
(760) 233-2570
FEE AMOUNT
FIRE Expedited Plan Review Per Hour - Office Hours - $132.00
FIRE Expedited Plan Review Per Hour - Office Hours $132.00
FIRE Expedited Plan Review Per Hour - Office Hours $132.00
FIRE Underground Piping with 5+ Hyds/Risers $996.00
Total Fees: $1,392.00 Total Payments To Date: $1,128.00 Balance Due: $264.00
Fire Department 0 Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-4665 1 760-602-8561 f I www.carlsbadca.gov
VJASAT PHASE 1 PROJECT
PRIVATE FIRE PROTECTION
SYSTEM ANALYSIS
CITY OF CARLSBAD
Revised March 13, 2017
E1=
Prepared by:
Dexter Wilson Engineering, Inc.
2234 Faraday Avenue
Carlsbad, CA 92008
760-438-4422
_#I I 3-i)
Job No. 574-006
1'
E DEXTER WILSON ENGINEERING. INC. ...
DEXTER S. WILSON, P.E.
I ANDREW M. OVEN, P.E.
STEPHEN M. NIELSEN, P.E.
NATALIE J. FRASCHETTI. P.E.
Ii
March 13, 2017 574-006
Pasco Laret Suiter & Associates
535 North Highway 101, Suite A
I Solana Beach, CA 92075
Attention: Dan Loss, P.E., Project Manager
I Subjects Private Fire Protection System Analysis for the ViaSat - Phase 1 Project in
the City of Carlsbad
I
Introduction.
I This report is an update of the November 18, 2016 study for the onsite private fire
protection system for the ViaSat Phase 1 project. Based on comments received from the
City of Carlsbad Fire Department, this report revision includes calculation of available fire
hydrant flow with 20 psi residual at each of the four fire hydrants expected to provide I service to the ViaSat Phase 1 project. No other changes have been made in this report
revision. The analyses provided in the November 18, 2016 report are included in this
1 revised document and the conclusions and recommendations are the same for both reports.
I This report will address two aspects of the water supply system for the ViaSat Phase 1
project. These are:
ft 1., Sizing of the fire protection system service laterals, detector check backflow
preventers, and onsite private fire protection water system to ensure that the onsite
I
2234 FARADAY AVENUE • CARLSBAD, CA 92008 • (760) 438-4422 • FAX (760) 438-0173
I
Dan Loss, P.E.
I March 13, 2017
- private fire hydrants can deliver the necessary fire hydrant flow at greater than 20
psi residual pressure.
2. Sizing of the four fire sprinkler service laterals serving the proposed buildings
comprising the ViaSat Phase 1 building project. The fire sprinkler laterals will be
connected to the private onsite fire protection system piping outlined in Item 1
above.
The ViaSat Phase 1 building project is located in the central portion of the City of Carlsbad.
I The project is in the southeast corner of the intersection of El Camino Real and Gateway
Road. The project site extends south and east to include a small amount of frontage along
1' Town Garden Road.
Two fire protection system laterals for the ViaSat Phase 1 building project will be connected
J to the existing 12" 550 Pressure Zone public water system piping in Gateway Road. A third
fire protection system lateral will be connected to the existing 12" 550 Pressure Zone water
line in Town Garden Road.
I Private Fire Protection System Sizing
I An onsite private fire protection system is being designed for the ViaSat Phase 1 building
project in order to provide fire flow service to the two onsite private fire hydrants. This
I
system is designed to deliver the required fire hydrant flow to the two onsite fire hydrants
as well as supply the building fire sprinkler systems. For fire hydrant flow, minimum
residual pressure in the onsite system must be greater than 20 psi.
IN' J ii iv ant. Fl rReu hi ment. The required fire hydrant flow for the ViaSat Phase I
I building project is based on the building square footage and type of construction. Table 1
summarizes the building sizes and types of construction and determines the fire hydrant
flow requirements based on the 2016 fire Code. The fire flow requirement for the ViaSat
I) Phase 1 building project is calculated to be 50 percent of the Fire Code flow based on the
allowable reduction for having fire sprinkler systems in each building. The largest fire
hydrant flow needed for the site is 3,125 gpm.
DEXTER WILSON ENGINEERING, INC. PAGE 2
.1
Dan Loss, P.E.
March 13, 2017
I
TABLE 1
VLASAT PHASE 1 BUILDING PROJECT
FIRE HYDRANT FLOW REQUIREMENTS
Builchn Building Area, Construction Fire Flow
Requirement,
Fire Flow with
Sprinkler Square Feet Type gpm, System., gpm'
12 1 126,837 IT-A 5,250 2,625
13 89,010 Il-13 6,250 3,125
Café & Cont. Room 33,371 Il-B 3,750 1,875
P1 209,524 I-B 5,000 2,500
1. Based on 50% reduction of total fire flow reauirement.
I
Available ilythaulic GLade Line The available hydraulic grade line for the 550
Pressure Zone supplying the ViaSat Phase 1 building project is set at 550 feet HGL at the ' intersection of Palomar Airport Road and El Camino Real. At this intersection an existing
pressures reducing station regulates the 700 Pressure Zone in Palomar Airport Road down
to the 550 Pressure Zone in El Camino Real.
Additional data which provides available pressure in the public water system adjacent to
the ViaSat Phase 1 project are two fire flow analyses prepared by the City of Carlsbad.
These Water Availability Forms identify a flow and pressure at a given existing fire
hydrant on the existing public water system. These two fire flow analyses are provided in I Appendix A. How these are used in the hydraulic analysis for the ViaSat Phase 1 site will
be discussed later in this report.
Fitting. and.. .Vlve...Losses.,. To simulate minor losses through pipe fittings and valves,
equivalent lengths of piping were added to the straight pipe lengths and included in the
hydraulic model. Appendix B provides the equivalent length reference table utilized for the
determination of minor losses within the computer modeling analysis. Minor losses for the
fire sprinkler system piping include accounting for the PIV and FDC risers.
.Backflów.Assernblv Losses. The pressure losses through the reduced pressure principle I detector check assembly devices were modeled as minor losses using a "k" value large
enough to result in the expected pressure loss through these devices. Appendix B presents
I a candidate reduced pressure principle detector check assembly backflow preventer device.
The manufacturer's literature includes charts which show pressure loss through the
DEXTER WILSON ENGINEERING, INC. PAGE 3
I
Dan Loss, P.E.
March 13, 2017
backflow preventer as a function of flow. These charts were used to approximate the
pressure losses which were reflected in the computer modeling and show up as minor losses
calculated in feet.
I Fire Pthtection. System Analysis. Appendix C presents the computer modeling results
for the onsite private fire protection system serving the onsite fire hydrants. Exhibit A at
I the back of this report shows the Node and Pipe Diagram for the onsite private fire
protection system.
I The first two hydraulic runs presented in Appendix C are to check the hydraulic computer
model created for the ViaSat Phase 1 analysis against the data presented in the City of
I Carlsbad's Water Availability Form. The results correlate well. The most current City
Water Availability Form, dated October 25, 2016, indicates a residual pressure of 84 psi for
a flow of 7,425 gpm at the second existing hydrant east of El Camino Real on Gateway
1 Road. In Exhibit A at the back of this report, this existing hydrant is identified as Node 58.
The computer model results in Appendix C indicate a residual pressure of 84.7 psi for a flow
of 7,425 gpm.
The second data point from the City Water Availability Form is for an existing fire hydrant
on Campbell Place north of Gateway Road. This data, dated August 21, 2015, indicates a
residual pressure of 78 psi for a flow of 5,250 gpm. In Exhibit A at the back of this report,
this existing hydrant is identified as Node 70. The computer model results in Appendix C
indicate a residual pressure of 75.3 psi for a flow of 5,250 gpm.
Thus, the computer model prepared for the ViaSat Phase 1 analysis closely corresponds to
the Water Availability Form data provided by the City of Carlsbad.
Next, the fire flow requirement for the ViaSat Phase 1 building project of 3,125 gpm was
modeled at two adjacent fire hydrant locations within the project site. The total fire flow
was divided between two fire hydrants with a flow of 1,625 gpm at one hydrant and a flow
of 1,500 gpm at the adjacent fire hydrant. Minimum residual pressure at either of the
onsite fire hydrants under the fire flow scenario is 69 psi, well above the minimum
requirement of 20 psi residual.
DEXTER WILSON ENGINEERING, INC. PAGE 4
I
I
ii
I
I
I
I
I
1
I
I,
$
I
I
I
I
Dan Loss, P.E.
M.ari 13, .20......................................................................................................... ....
Finally, we analyzed a 3,125 gpm fire flow at the existing public water system fire hydrant
on Town Garden Road fronting the ViaSat Phase 1 Building P1. The residual pressure
under this fire flow analysis as shown in the computer model output in Appendix C is 108
psi.
Under each of the fire hydrant flow scenarios, the fire flow requirement is met with greater
than 20 psi residual pressure at all locations within and around the proposed project.
The onsite private fire protection system is recommended to be connected to the existing 12"
public water, main in Gateway Road at two locations as shown in Exhibit A. Each
connection includes an 8" fire service lateral and an 8" reduced pressure principle detector
check assembly in accordance with City of Carlsbad and the Carlsbad Fire Department
backflow prevention requirements. An 8" onsite private fire protection system pipe loops
between the two fire service laterals from Gateway Road.
Available-Fire Flow. at 20 PST,Residual.t Fire flow available at each of the four fire
hydrants serving the ViaSat Phase 1 project was extrapolated to 20 psi residual. Table 2
below shows the theoretical available fire flow at each fire hydrant when flowing
individually. Appendix D presents the computer model calculation results:
TABLE 2
AVAILABLE FIRE FLOW AT EACH FIRE HYDRANT -
Residual Pressure Fire Flow Node Number Hydrant Type at Fire Hydrant, Capability, gpm psi
Node 122 Private Onsite I 4,000 20.6
DEXTER WILSON ENGINEERING, INC.. PAGE 5
I
I Dan Loss,
March 13, 2017
The available fire flow at each fire hydrant is qualified as theoretical because the calculated
flows cannot be extracted from a single fire hydrant. It is more correct to describe the
I' extrapolated flows at 20 psi residual to be indicative of what the water distribution system
can deliver to a certain area with the residual pressure in the water system of 20 psi.
I
Fite Sprinkler Servi "ice Laterals to the ViaSat Phase 1 Build rngs
The second portion of the ViaSat Phase 1 building project private fire system analysis is to
I determine the required sizes fort the individual fire sprinkler service laterals to each of the
four buildings in the ViaSat Phase 1 building project. The individual fire service laterals
I are to be connected to the private onsite fire protection system piping. Each fire sprinkler
lateral will be installed with a PIV and FDC in accordance with the City of Carlsbad Fire
Department requirements.
At the time of the preparation of this report, the design of the fire sprinkler systems for the
I ViaSat Phase 1 buildings had not commenced yet. Thus, this report will make a
conservative estimate of the expected fire sprinkler flow and provide preliminary results
which will need to be, confirmed by the fire sprinkler systems designer.
Similar ViaSat buildings recently constructed elsewhere in Carlsbad had fire sprinkler flow
, requirements ranging from 400 to 700 gpm. For the ViaSat Phase 1 building project, we
will estimate a fire sprinkler flow requirement of 800 gpm and prepare our calculations and
lateral size recommendations accordingly.
Appendix E presents the results of the computer modeling for the fire sprinkler system
laterals. Table 3 summarizes the results of the analyses. Six-inch laterals are
recommended for all the ViaSat Phase 1 buildings at this time. When fire sprinkler system
design flows for the buildings are established, a review of the fire sprinkler lateral sizing
may be conducted if the laterals have not yet been constructed.
DEXTER WILSON ENGINEERING, INC. '" ''' PAGE 6
I
Dan Loss, P.E.
March 13,..2017 ............., ....... ..., .............,, .............................. ..........,
TABLE 3
FIRE SPRINKLER SYSTEM LATERAL DATA
Residual
BuiIdin Fin Sprinkler Lateral Size, Base of Riser - - Pressure at I' Ii ''pin
-
i n
-
Elevation, ft W. R. psi
P1 800 6 294.0 88
Node 347
12 Tv 800 6 310.0 78
Node 125 . -
13 800 6 313.0 85
Node 137
Corif& Café 800 6 311.0 81
Conclusion
Eight-inch onsite private fire protection system piping connected to the existing 12" public
water main in Gateway Road at two locations is recommended for the ViaSat Phase 1
building project fire protection system. The proposed system layout and pipe sizing is
shown in Exhibit A at the back of this report.
Fire sprinkler service laterals are recommended to be 6-inch diameter based on an expected
maximum fire sprinkler flow at any one building of 800 gpm. Once the fire sprinkler
requirements are established for the ViaSat Phase 1 buildings, a review of the fire sprinkler
lateral sizes can be conducted by the fire sprinkler system designer.
Available fire flow at the two proposed onsite private fire hydrants is at least 4,000 gpm at
a residual pressure of 20 psi. For the two existing public fire hydrants connected to existing
12" public water mains in Gateway Road and Town Center Road, the available fire flow at
20 psi exceeds 13,700 gpm.
DEXTERWILSON ENGINEERING, INC. .... PAGE 7
I
I Dan Loss,
March 13, 2017 ..., .,, .................. .. .
Thank you for the opportunity to provide private fire protections system sizing analysis
services for this project. Please feel free to contact us to discuss further any aspect of the
1 information presented in this fire protection service analysis for the ViaSat Phase 1
building project.
Dexter: 'i1sii Engineering, Inc.
Andrew Oven, P.E.
AO:sm
Attachments
I
I
.1
I
I
U DEXTER WILSON 4GINEERING, INC..-.... PAGE 8
I
[1
I
APPENDIX A
I
I FIRE FLOW ANALYSES FROM CITY OF CARLSBAD
WATER AVAILABILITY FORMS
I
I
I
I
1
I
I
I
I
CARLSBAD FIRE DEPARTMENT
Fire Prevention Division
1635 Faraday Avenue - Carlsbad, CA 92008
760.602.4665
WATER AVAILABILITY FORM
SECTION A: TO BE COMPLETED BY CUSTOMER
PROJECT NAME: Viasat SR#:
PROJECT ADDRESS:
(Assigned upon plan submittal)
CITY: Carlsbad
PHONE: ( 858 ) 259-8212 x122 (Dan Loss at PLSA) FAX NUMBER: ( 858 ) 259-4812
I Largest Building (ft.2): Sprinkled? Construction Type:
SECTION B: TO BE COMPLETED BY LOCAL WATER COMPANY. CUSTOMER TO PROVIDE RESULTS TO CFD.
Water Purveyor: City of Carlsbad
Location of test (reference map required): southwest corner of El Camino and Gateway
TEST INFORMATION IS VALID FOR 6 MONTHS FROM DATE PERFORMED
Flow Test Results
Static pressure: 105 PSI Hydrant Number (if applicable): H20164
Elevation of test 308 est. Feet Date/Time of Test1
Corrspondirig Flow GP
Total Flow: 7,425 GPM Residual Pressure 84 PSI
Atpeak demand, this water system is capable of providing a fire flow discharge of 20 psi greater than 8,000 gpm, yet
exceeds the maximum 15 fps limitation. Therefore, the maximum allowable fire flow for this site is 7,425 gpm.
1Test to be performed as close as possible to the time the most conservative flows and pressures are expected.
Note: If the water availability information was obtained in a manner other than a flow test (i.e. computer
modeling), fill out the information above as applicable and check here: x
Name: JenniferR.Mael,P.E. Eng. Lic. No. (if applicable): C69606
Signature
Title/Or gLP_jectManager Date: 10/25/2016
I
I
I
Viasat Fire Flow'Analysis
JUNCTION (MOTYPE)
Active
° Domain
TANK (MOTYPE)
Active Tank
Domain Tank
T Domain 12 sir
EM-1 7", Active Reservoir
INJ u
:
-41 PIPE (MOTYPE)
10.
12
17 12 P' Domain Pipe
L1EL ' Active Check Valve Ll
\\'
U12
Li Domain Check Valve E
PUMP ( OTYPE)
U
12 U H . Active
U - DATE'J RD 12
.?Domain
5 . . . .
c VALVE (MOTYPE)
H20164 . . UDIS1OERYF : " Activ
'' Domain
U .
8" hydrants
lei—lNHtE1ONAV U
Si . . . . 13
.oIl
tran Road-
'- 12 12 12"
TOWtGflRDLN RD U
ANNO2
H , El
I I .
ANN03
z • : - II Lj
. U 8' U
ARUNDEL AV- PARCELS NORTH
El I fli,
Prepared By: Jennifer R. Mael, P.E. - MCS Date: Wednesday, October 26, 2016
I r-°
CARLSBAD FIRE DEPARTMENT
Fire Prevention Division
1635 Faraday Avenue - Carlsbad, CA 92008
760.602.4665
WATER AVAILABILITY FORM
SECTION A: TO BE COMPLETED BY CUSTOMER
I PROJECT NAME: Viasat 11 SR#:
(Assigned upon plan submittal)
PROJECT ADDRESS: CITY: Carlsbad
Li PHONE: ( 619 ) 572-1407 (Paramount Fire Systems, Inc.) FAX NUMBER: (619) 749-9404
1 Largest Building (ft. 2): Sprinkled? Construction Type:
SECTION B: TO BE COMPLETED BY LOCAL WATER COMPANY. CUSTOMER TO PROVIDE RESULTS TO CFD.
Water Purveyor: City of Carlsbad
Location of test (reference map required): North of GatewayRoad between El Camino Real and Campbell Place
TEST INFORMATION IS VALID FOR 6 MONTHS FROM DATE PERFORMED
Flow Test Results
Static pressure: 100 PSI Hydrant Number (if applicable): H20884
Elevation of test: 319 Feet Date/Time of Test':
Pitot Tube Reading: PSI Corresponding Flow: GPM
Total Flow: 5,250 GPM Residual Pressure 78 PSI
At peak demand , this water system is capable of providing a fire flow discharge @ 20 psi of no4es& more
Rhan 10,950 GPM, but exceeds maximum velocities of 15 fps. The maximum flow available at 15 fps is 5,250 gpm.
'Test to be performed as close as possible to the time the most conservative flows and pressures are expected.
Note: If the water availability information was obtained in a manner other than a flow test (i.e. computer
modeling), fill out the information above as applicable and check here:
_fluetuatiens_knewn_te_exist_at_ the the _Test, _the _Site _of _Flew _automatic_fire_sprinkler_system Based _en_water_ system
should _be_ _based _en_an_anticipated_ _static_pressure_of_(PSI),_a_low_static_pressure designed high
of_(PSI),_ and _a_low_residual_pressure_of_(PSI)_ with _a_residual_ flew _of _GPM.
i
I
I
[I
I
I
El
I
I
i
i
I
Name: Jennifer R. Mael, P.E.
Signature
aP'ectMa!nager Title/Org
Eng. Lic. No. (if applicable): C69606
Date: 08/21/2015
I
Viasat 11 Fire Analysis
VALVE (MOTYPE)
? Active
' Domain
/ Inactive
hydrants
tran Road
ANNO2
Prepared By: Date: 8/21/2015 10:40:40 AM
I
I
APPENDIX B
I
I CALCULATION OF
MINOR LOSSES FOR FITTINGS AND VALVES
AND
I CANDIDATE BACKFLOW PREVENTER ASSEMBLY
I
1
I
I
1 1,
I
I
I
I
1
I
ViaSat Phase 1 in Carlsbad 11/15/2016
574-006
Pipe No. Gate Valve,
Open Check Valve Standard tee,
Branch
Standard tee,
Through
90° Elbow,
std
S
45° Elbow Length
(ft) Pipe Size, in
Equiva'ent Length
of Additional Pipe
Elements
Total Length
(ft)
Pipe No.
221 1 1 2 30 8 90.5 120.5 221
224(Bkflw) 20 8 0 20 224(Bkfiw)
227 2 1 35 8 52 87 227
230 1 1 25 8 58 83 230
233 1 1 2 2 300 8 80.5 380.5 233
236 1 1 4 2 450 6 120.3 570.3 236
239 1 1 1 120 8 62.5 182.5 239
242 2 105 8 28 133 242
245 1 1 1 4 1 310 6 123.9 433.9 245
248 2 3 3 300 8 121 421 248
251 1 1 4 90 6 116.5 206.5 251
254(Bkflw) 20 8 0 20 254(Bkflw)
257 1 1 2 30 8 90.5 120.5 257
333 1 1 2 60 6 71.5 131.5 333
336(Bkflw) . 20 6 0 20 336(Bkfiw)
339 4 50 6 68 118 339
\\artic\docs\574-006\2016-11-10 Pvt Onsite Fire System Minor Loss Equivalent Length Calcs / Equivalent Length
5000C1V
.:
ES-A-5000C1V
n
L
I
1
Series 500001V Reduced Pressure Detector Assemblies are used in health
hazard applications and are designed exclusively for use in accordance with
water utility authority containment requirements. It is mandatory to prevent the
reverse flow of fire protection system substances, i.e., glycerin wetting agents,
stagnant water and water of non-potable quality from being pumped or
siphoned into the potable water line. The Series 5000C1V is ideal for fire
protection systems to detect leaks or unauthorized use of water.
Modular check design concept facilitates maintenance and assembly access.
All sizes are standardly equipped with AWWA epoxy coated, UL/FM listed OSY
resilient seated gate valves, CFM (cubic feet per minute) or GPM (gallon per,
minute) meter and ball type test cocks. A pressure differential relief valve is
located in a zone between the check valves.
Specifications
A Reduced Pressure Detector Assembly shall be installed on fire protection
systems when connected to a public water supply. Degree of hazard present is
determined by the local authority having jurisdiction. The unit shall be a
complete assembly including UL listed OSY shutoff valves with FM approval.
Including an auxiliary line consisting of an approved backflow preventer and
water meter. The assembly shall meet the requirements of AWWA C511-92; UL
Classified File No. EX3185; CSA B64 and USC Manual 8th. Edition. Assembly
shall be an Ames Company Series 5000C1V.
I
I
I
I
I
I
Features
Body construction fused epoxy
coated cast iron
Replaceable bronze seats
Maximum flow at low pressure
drop
Compact for economy combined
with performance
Design simplicity for easy
maintenance
Furnished with a CFM or GPM %
x 3/4"(16 x 19mm) recordall meter
Model 25, bronze
No special tools required
I 554
Job Name .. ....Contractor .. ....
Job Location
Engineer. . P.O. No....___________________________________. __________________
Approval
Ames product specifications In U.S. customary units and metric are approximate and are provided for reference only. For precise measurements, please contact Ames Technical Service. Ames r85815e3 the
right to change or modify product design, construction, specifications, or materials without prior notice and without incurring any obligation to make such changes and modifications on Ames products pre-
viously or subsequently sold. www.amesfirewater.com
I
i
I
Dimensions - Weight
-----4I
--Fi ---------- -Li --- -----
E'-------- ----F--
-.L(5000WV LG) .
A (50OOlV0SY) I
Materials
Epoxy coated cast iron body, bronze seat and disc holder;
stainless steel trim and durable, tight-seating rubber check
valve discs.
All sizes furnished with bronze body ball valve test cocks.
Furnished with outside stem and yoke (OSY) gate valves
ULJFM listed. Series 5000CIV bypass line unit consists of an
approved Reduced Pressure Zone Assembly and CFM or
GPM 5/a x (16 x 19mm) water meter.
Available Models
Suffix:
LG - less gates
OSY - UL/FM outside stem and yoke resilient seated
gate valves
3/4' Bypass Line Meter:
CFM - cubic feet per minute meter
GPM - gallons per minute meter
LM - less meter
Pressure - Temperature
Temperature Range: 33'F - 140'F (0.5'C - 60t)
Maximum Working Pressure: 175p5i (12.1 bar)
Standards
AWWA C511-92; CSA B64
USC Manual for Cross-connection Control, 8th Edition
Approvals
FM <13> G (gus AppfoVad
1047
IMPORTANT INQUIRE WITH GOVERNINGAUTHORITIES
FOR LOCAL INSTALLATION REQUIREMENTS
NOTE: Piping for 3" 5000C1V will start from #1 gate valve
and connect at #2 check valve.
I
I
I
I
I
I
1
I Note: The installation of a drain line is recommended. When
installing a drain line, an air gap is necessary.
ZE [IllbIll1I'R!.1 V15K11
in.
(DNI
mm in.
A
mm
C(0S1)
in. mm
0
In. mm
01
in. mm
E, El
in. nini
F, F1
in. mm
G
ik mm in.
L
mm in,
II
mm
T
in. mm
Ti
in. mm lbs. kgs.
2½. 65 42½ 1070 163A 416 51/4 133 41/4 114 12 305 8 203 .7 178 26½ 664 14 356 9 229 75/h 194 230 104
3 80 42½. 1070 .18%. .479 5¼ 133 41/4 114 12 .305 B 203 7 178 26¼. 664 14 356. 9 229 7% 194 .230 104
4 100 55½ 1400 2231 578 6 152 57A 149 17 432 9 229 9½ 241 7 940 15 381 13% 346 1131 299 470 213
6 1501 66 1664 301A 765 1 6 152 6 152 1 2031 527 10½ 267 14½ 368 45 1130 16 406 13% 346 I 11V, 299 :798. 382
8 200 781h 1994 13734 959 9Y, 248 8% 219 .26 .660111% 292 1.181h, 470 1 55¼ 1403 1 17 432 18½ 470 1163A 4161:1456 660
10 250 931A 2378 1 4531 1162 93/i 248 81A 219. 32 813 1 13 330 1 21½ 546 1 67½ 1715 1 18 457. 181/2 470 1 16% 416 12230 1012
I
I
I
I
I
I
I
I
I
izzm
LIF1' IIi I.E 2 ,
I. I u______
I I______
I
• v______
I
U Capacity
As compiled from documented Foundation for Cross-Connection Control and Hydraulic Research at the University of
Southern California lab tests.
'Typical maximum flow rate (7.5 feet/sec.) (including shutoffs)
0 20 40 60 80 100 120 140 160 180 200 220 240 gpm 0 30 60 go 120 150 180 210 240 270 300 330 360 gpm
P 0 76 152 228 304 380 456 532 608 684 760 936 912 1pm AP 0 114 228 342 456 570 684 798 912 1028 1140 1254 13681pm
6 7.5 10 15 fps 5 7.5 10 15 fps
1.8 2.3 3.0 4.6 mps 1.5 2.3 3.0 4.6 mps
Flow Rate Flow Rote
4" (100mm)
kPa psi
207 30
172 25
0 138 20 km 103 15
69 10
35 5
00
0 50 100 150 200 250 300 350 400 450 500 550 600 gpm
AP 0 190 380 50 760 950 1140 1330 1520 1710 1900 2D9D 2280 1pm
5 7.5 10 15 fps
1.5 2.3 3.0 4.6 mps
Flow Rate
6" (150mm)
kPa psi *
i;1 00, L1-1•1
0 200 400 600 800 1000 1200 1400 1600 gpm
AP 0 700 1520 2280 3040 3800 4560 5320 6080 1pm
5 7.5 10 15 tps
1.5 2.3 3.0 4.6 mps
Flow Rate
8" (200mm) 10" (250mm)
kPa psi
207
172 25
21 38 20
3103 15
69 10
35
4 4
0 200 400 600 800 1000 1200 1400 1600 18002000 gpm
AP 0 760 1520 2280 3040 3800 4560 5320 6080 6840 7600 1pm
5 7.5 10 15 fps
1.5 2.3 3.0 4.6 mps
Flow Rate
kPa psi
207 30
172 25
0138 20
103 15
69 10 00--
35 5
00
0 256 500 750 1000 1250 1500 1750 2000 2250 2590 2750 3000 gpm
P 0 950 1900 2859 3800 4750 5700 6650 7600 6550 5500 10400 11400 1pm
6 7,5 10 fps
1.8 2.3 3.0 mps
Flow Rate
I
I
APPENDIX C
I
I COMPUTER MODEL ANALYSES
FOR FIRE HYDRANT FLOW REQUIREMENT
I
I NODE AND PIPE DIAGRAM REFERENCE:
I Exhibit A in the back of the report.
I CONDITIONS MODELED:
I 1. Computer Model Check: Fire flow of 7,425 gpm at Node 58.
I 2. Computer Model Check: Fire flow of 5,250 gpm at Node 70.
I 3. Fire flow of 3,125 gpm split between Nodes 122 and 128.
4. Fire flow of 3,125 gpm split between Nodes 122 and 128.
I 5. Fire flow of 3,125 gpm at Node 79.
I
I
I
I
I
I
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
I Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
I FLOWRATE IS EXPRESSED IN GPM AND PRESSURE IN PSIG
I
A SUMMARY OF THE ORIGINAL DATA FOLLOWS
PIPE NO. NODE NOS. LENGTH DIAMETER ROUGHNESS MINOR LOSS K FIXED GRADE
(FEET) (INCHES)
0 49 950.0 24.0 120.0 .00 550.00
I ii
14 49 52 135.0 12.0 120.0 .00
17 52 55 100.0 12.0 120.0 .00
20 55 58 210.0 12.0 120.0 .00
23 58 61 220.0 12.0 120.0 .00 I 26 61 64 100.0 12.0 120.0 .00
29 64 67 315.0 12.0 120.0 .00
32 67 70 400.0 12.0 120.0 .00
I 35 67 73 410.0 12.0 120.0 .00
38 73 76 740.0 12.0 120.0 .00
41 77 76 480.0 12.0 120.0 .00
42 79 77 60.0 12.0 120.0 .00
I 44 82 79 550.0 12.0 120.0 .00
47 85 82 840.0 12.0 120.0 .00
50 49 85 1150.0 24.0 120.0 .00
221 55 110 121.0 8.0 120.0 .00 I 224 110 113 20.0 8.0 120.0 16.00
THERE IS A CHECK VALVE IN LINE NUMBER224
227 113 116 87.0 8.0 120.0 .00
I 230 116 119 83.0 8.0 120.0 .00
233 119 122 381.0 8.0 120.0 .00
236 116 125 529.0 4.0 120.0 .00
I
239
242
119
128
128
131
183.0
133.0
8.0
8.0
120.0
120.0
.00
.00
245 131 134 391.0 4.0 120.0 .00
248 143 131 421.0 8.0 120.0 .00
251 143 137 166.0 4.0 120.0 .00
I 254 140 143 20.0 8.0 120.0 31.00
THERE IS A CHECK VALVE IN LINE NUMBER254
257 61 140 121.0 8.0 120.0 .00
333 77 341 107.0 4.0 120.0 .00 I 336 341 344 20.0 4.0 120.0 4.00
339 344 347 94.0 4.0 120.0 .00
JUNCTION NUMBER DEMAND ELEVATION CONNECTING PIPES
49 .00 298.00 11 14 50
52 .00 299.00 14 17
I 55 .00 299.00 17 20 221
58 .00 302.00 20 23
61 .00 308.00 23 26 257
64 .00 309.00 26 29 I 67 .00 317.00 29 32 35
70 .00 319.00 32
73 .00 327.00 35 38
I 76 .00 304.00 38 41
77 .00 290.00 41 42 333
79 .00 287.00 42 44
Page lof 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
82 .00 274.00 44 47
85 .00 305.00 47 50
110 .00 302.00 221 224
113 .00 302.00 224 227
116 .00 306.00 227 230 236
119 .00 307.00 230 233 239
122 .00 309.00 233
125 1.00 310.00 236
128 .00 307.00 239 242
131 .00 307.00 242 245 248
134 1.00 311.00 245
137 1.00 313.00 251
140 .00 309.00 254 257
143 .00 309.00 248 251 254
341 .00 290.00 333 336
344 .00 290.00 336 339
347 .00 294.00 339
OUTPUT SELECTION: ALL RESULTS ARE OUTPUT EACH PERIOD
3 VALUES ARE OUTPUT FOR MAXIMUM AND MINIMUM PRESSURES
THIS SYSTEM HAS 31 PIPES WITH 29 JUNCTIONS , 2 LOOPS AND 1 FGNS
A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE
JUNCTION NUMBER DEMAND
61 7425.00
THE RESULTS ARE OBTAINED AFTER 4 TRIALS WITH AN ACCURACY = .00087
ViaSat Phase 1 Site on Gateway Road in Carlsbad File: 574006FF
Check Fire Flow Test Results for 10-25-2016
7425 gpm at 84 psi residual
PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
11 0 49 7428.00 3.92 .00 .00 5.27 4.12
14 49 52 5284.53 8.67 .00 .00 14.99 64.20
17 52 55 5284.53 6.42 .00 .00 14.99 64.20
20 55 58 5281.53 13.47 .00 .00 14.98 64.13
23 58 61 5281.53 14.11 .00 .00 14.98 64.13
26 61 64 -2143.47 -1.21 .00 .00 -6.08 -12.07
29 64 67 -2143.47 -3.80 .00 .00 -6.08 -12.07
32 67 70 .00 .00 .00 .00 .00 .00
35 67 73 -2143.47 -4.95 .00 .00 -6.08 -12.07
38 73 76 -2143.47 -8.93 .00 .00 -6.08 -12.07
Page 2 of 12
I
I
ViaSat Phase 1 Building Project in the City
Private Fire Protection System Analysis
of Carlsbad November 18, 2016
Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
I 41 77 76 2143.47 5.79 .00 .00 6.08 12.07
42 79 77 2143.47 .72 .00 .00 6.08 12.07
82 79 2143.47 6.64 .00 .00 6.08 12.07
P
44
47 85 82 2143.47 10.14 .00 .00 6.08 12.07
50 49 85 2143.47 .47 .00 .00 1.52 .41
221 55 110 3.00 .00 .00 .00 .02 .00
I 224 110 113 3.00 .00 .00 .00 .02 .00
227 113 116 3.00 .00 .00 .00 .02 .00
230 116 119 2.00 .00 .00 .00 .01 .00
233 119 122 .00 .00 .00 .00 .00 .00 !
236 116 125 1.00 .00 .00 .00 .03 .00
239 119 128 2.00 .00 .00 .00 .01 .00
242 128 131 2.00 .00 .00 .00 .01 .00
245 131 134 1.00 .00 .00 .00 .03 .00
I 248 143 131 -1.00 .00 .00 .00 -.01 .00
- 251 143 137 1.00 .00 .00 .00 .03 .00
THE CHECK VALVE IN LINE NUMBER 254 IS CLOSED
257 61 140 .00 .00 .00 .00 .00 .00
I 333 77 341 .00 .00 .00 .00 .00 .00
1 336 341 344 .00 .00 .00 .00 .00 .00
344 347 .00 .00 .00 .00 .00 .00
P
339
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
I
49
52
.00
.00
546.08
537.42
298.00
299.00
107.50
103.31
55 .00 531.00 299.00 100.53
58 .00 517.53 302.00 93.40
1 61 7425.00 503.42 308.00 84.68
64 .00 504.63 309.00 84.77
67 .00 508.43 317.00 82.95
70 .00 508.43 319.00 82.09
73 .00 513.38 327.00 80.76
I 76 .00 522.31 304.00 94.60
77 .00 528.10 290.00 103.18
79 .00 528.83 287.00 104.79
I 82 .00 535.47 274.00 113.30
85 .00 545.61 305.00 104.26
110 .00 531.00 302.00 99.23
113 .00 531.00 302.00 99.23
I 116 .00 531.00 306.00 97.50
119 .00 531.00 307.00 97.06
122 .00 531.00 309.00 96.20
125 1.00 530.99 310.00 95.76
I 128 .00 531.00 307.00 97.06
131 .00 531.00 307.00 97.06
134 1.00 530.99 311.00 95.33
I 137 1.00 530.99 313.00 94.46
140 .00 503.42 309.00 84.25
143 .00 531.00 309.00 96.20
341 .00 528.10 290.00 103.18
I 344 .00 528.10 290.00 103.18
347 .00 528.10 294.00 101.45
I Page 3 of 12
I
'
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
MAXIMUM PRESSURES
82 .00 535.47 274.00 113.30
49 .00 546.08 298.00 107.50 I 79 .00 528.83 287.00 104.79
MINIMUM PRESSURES
I 73 .00 513.38 327.00 80.76
70 .00 508.43 319.00 82.09
67 .00 508.43 317.00 82.95
I THE NET SYSTEM DEMAND = 7428.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
I
PIPE NUMBER FLOWRATE
11 7428.00
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 7428.00
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = .00
A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE
JUNCTION NUMBER DEMAND
70 5250.00
THE RESULTS ARE OBTAINED AFTER 3 TRIALS WITH AN ACCURACY = .00011
ViaSat Phase 1 Site on Gateway Road in Carlsbad
Check Fire Flow Test Results for 8-21-2015
5250 gpm at 78 psi residual
PIPE NO. NODE NOS
I ll 0 49
14 49 52
17 52 55
20 55 58
J 23 58 61
26 61 64
29 64 67
32 67 70 I 35 67 73
38 73 76
41 77 76
I
I
FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
5253.00 2.06 .00 .00 3.73 2.17
3359.55 3.75 .00 .00 9.53 27.74
3359.55 2.77 .00 .00 9.53 27.74
3356.55 5.82 .00 .00 9.52 27.70
3356.55 6.09 .00 .00 9.52 27.70
3356.55 2.77 .00 .00 9.52 27.70
3356.55 8.73 .00 .00 9.52 27.70
5250.00 25.37 .00 .00 14.89 63.42
-1893.45 -3.93 .00 .00 -5.37 -9.59
-1893.45 -7.10 .00 .00 -5.37 -9.59
1893.45 4.60 .00 .00 5.37 9.59
Page 4 of 12
I
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
I Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
42 79 77 1893.45 .58 .00 .00 5.37 9.59
44 82 79 1893.45 5.28 .00 .00 5.37 9.59
47 85 82 1893.45 8.06 .00 .00 5.37 9.59 I 50 49 85 1893.45 .38 .00 .00 1.34 .33
221 55 110 3.00 .00 .00 .00 .02 .00
224 110 113 3.00 .00 .00 .00 .02 .00
227 113 116 3.00 .00 .00 .00 .02 .00 I 230 116 119 2.00 .00 .00 .00 .01 .00
233 119 122 .00 .00 .00 .00 .00 .00
236 116 125 1.00 .00 .00 .00 .03 .00
239 119 128 2.00 .00 .00 .00 .01 .00 I 242 128 131 2.00 .00 .00 .00 .01 .00
245 131 134 1.00 .00 .00 .00 .03 .00
248 143 131 -1.00 .00 .00 .00 -.01 .00 I 251 143 137 1.00 .00 .00 .00 .03 .00
THE CHECK VALVE IN LINE NUMBER 254 IS CLOSED
_ 257 61 140 .00 .00 .00 .00 .00 .00
333 77 341 .00 .00 .00 .00 .00 .00
336 341 344 .00 .00 .00 .00 .00 .00
339 344 347 .00 .00 .00 .00 .00 .00
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
49 .00 547.94 298.00 108.31
I 52 .00 544.19 299.00 106.25
55 .00 541.42 299.00 105.05
58 .00 535.60 302.00 101.23
61 .00 529.51 308.00 95.99 I 64 .00 526.74 309.00 94.35
67 .00 518.01 317.00 87.11
70 5250.00 492.64 319.00 75.25
73 .00 521.95 327.00 84.48 I 76 .00 529.04 304.00 97.52
77 .00 533.65 290.00 105.58
79 .00 534.23 287.00 107.13 I 82 .00 539.50 274.00 115.05
85 .00 547.56 305.00 105.11
110 .00 541.42 302.00 103.75
113
116
.00
.00
541.42
541.42
302.00
306.00
103.75
102.01
119 .00 541.42 307.00 101.58
122 .00 541.42 309.00 100.71
125 1.00 541.42 310.00 100.28 I 128 .00 541.42 307.00 101.58
131 .00 541.42 307.00 101.58
134 1.00 541.42 311.00 99.85
137 1.00 541.42 313.00 98.98 I' 140 .00 529.51 309.00 95.55
143 .00 541.42 309.00 100.71
341 .00 533.65 290.00 105.58
344 .00 533.65 290.00 105.58
347 .00 533.65 294.00 103.85
Page 5 of 12
I
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
MAXIMUM PRESSURES
82 .00 539.50 274.00 115.05
49 .00 547.94 298.00 108.31
79 .00 534.23 287.00 107.13
MINIMUM PRESSURES
70 5250.00 492.64 319.00 75.25
73 .00 521.95 327.00 84.48
67 .00 518.01 317.00 87.11
THE NET SYSTEM DEMAND = 5253.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
11 5253.00
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 5253.00
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = .00
A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE
JUNCTION NUMBER DEMAND
122 1625.00
128 1500.00
THE RESULTS ARE OBTAINED AFTER 5 TRIALS WITH AN ACCURACY = .00146
ViaSat Phase 1 Site on Gateway Road in Carlsbad
3125 gpm Fire Flow Split Between Nodes 122 and 128 Onsite
1625 gpm at Node 122 and 1500 gpm at Node 128
PIPE NO. NODE NOS
11 0 49
14 49 52
17 52 55
20 55 58
23 58 61
26 61 64
29 64 67
32 67 70
35 67 73
38 73 76
41 77 76
42 79 77
FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
3128.00 .79 .00 .00 2.22 .83
2503.09 2.17 .00 .00 7.10 16.09
2503.09 1.61 .00 .00 7.10 16.09
651.05 .28 .00 .00 1.85 1.33
651.05 .29 .00 .00 1.85 1.33
-624.91 -.12 .00 .00 -1.77 -1.23
-624.91 -.39 .00 .00 -1.77 -1.23
.00 .00 .00 .00 .00 .00
-624.91 -.50 .00 .00 -1.77 -1.23
-624.91 -.91 .00 .00 -1.77 -1.23
624.91 .59 .00 .00 1.77 1.23
624.91 .07 .00 .00 1.77 1.23
Page 6 of 12
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
44 82 79 624.91 .68 .00 :00 1.77 1.23
47 85 82 624.91 1.03 .00 .00 1.77 1.23
50 49 85 624.91 .05 .00 .00 .44 .04
221 55 110 1852.04 8.03 .00 .00 11.82 66.34
224 110 113 1852.04 1.33 .00 34.71 11.82 66.34
227 113 116 1852.04 5.77 .00 .00 11.82 66.34
230 116 119 1851.04 5.50 .00 .00 11.81 66.27
233 119 122 1625.00 19.84 .00 .00 10.37 52.07
236 116 125 1.00 .00 .00 .00 .03 .00
239 119 128 226.04 .25 .00 .00 1.44 1.35
242 128 131 -1273.96 -4.41 .00 .00 -8.13 -33.18
245 131 134 1.00 .00 .00 .00 .03 .00
248 143 131 1274.96 13.99 .00 .00 8.14 33.22
251 143 137 1.00 .00 .00 .00 .03 .00
254 140 143 1275.96 .67 .00 31.92 8.14 33.27
257 61 140 1275.96 4.03 .00 .00 8.14 33.27
333 77 341 .00 .00 .00 .00 .00 .00
336 341 344 .00 .00 .00 .00 .00 .00
339 344 347 .00 .00 .00 .00 .00 .00
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
49 .00 549.21 298.00 108.86
52 .00 547.04 299.00 107.48
55 .00 545.43 299.00 106.79
58 .00 545.15 302.00 105.37
61 .00 544.86 308.00 102.64
64 .00 544.98 309.00 102.26
67 .00 545.37 317.00 98.96
70 .00 545.37 319.00 98.09 -
73 .00 545.87 327.00 94.85
76 .00 546.79 304.00 105.21
77 .00 547.38 290.00 111.53
79 .00 547.45 287.00 112.86
82 .00 548.13 274.00 118.79
85 .00 549.16 305.00 105.80
110 .00 537.40 302.00 102.01
113 .00 501.37 302.00 86.39
116 .00 495.60 306.00 82.16
119 .00 490.09 307.00 79.34
122 1625.00 470.26 309.00 69.88
125 1.00 495.59 310.00 80.42
128 1500.00 489.85 307.00 79.23
131 .00 494.26 307.00 81.15
134 1.00 494.26 311.00 79.41
137 1.00 508.25 313.00 84.61
140 .00 540.83 309.00 100.46
143 .00 508.25 309.00 86.34
341 .00 547.38 290.00 111.53
344 .00 547.38 290.00 111.53
347 .00 547.38 294.00 109.80
I Page 7 of 12
I
[1
I
I
I
a
I
I
I
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
MAXIMUM PRESSURES
82 .00 548.13 274.00 118.79
79 .00 547.45 287.00 112.86
77 .00 547.38 290.00 111.53
MINIMUM PRESSURES
122 1625.00 47026 309.00 69.88
128 1500.00 489.85 307.00 79.23
119 .00 490.09 307.00 79.34
THE NET SYSTEM DEMAND = 3128.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
11 3128.00
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 3128.00
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = .00
A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE
JUNCTION NUMBER DEMAND
122 1500.00
128 1625.00
THE RESULTS ARE OBTAINED AFTER 2 TRIALS WITH AN ACCURACY = .00016
ViaSat Phase 1 Site on Gateway Road in Carlsbad
3125 gpm Fire Flow Split Between Nodes 128 and 122 Onsite
1500 gpm at Node 122 and 1625 gpm at Node 128
FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
3128.00 .79 .00 .00 2.22 .83
2502.89 2.17 .00 .00 7.10 16.09
2502.89 1.61 .00 .00 7.10 16.09
652.98 .28 .00 .00 1.85 1.34
652.98 .29 .00 .00 1.85 1.34
-625.11 -.12 .00 .00 -1.77 -1.23
-625.11 -.39 .00 .00 -1.77 -1.23
.00 .00 .00 .00 .00 .00
-625.11 -.51 .00 .00 -1.77 -1.23
-625.11 -.91 .00 .00 -1.77 -1.23
625.11 .59 .00 .00 1.77 1.23
625.11 .07 .00 .00 1.77 1.23
Page 8 of 12
I
PIPE NO. NODE NOS
11 0 49
14 49 52
17 52 55
20 55 58
23 58 61
26 61 64
29 64 67
32 67 70
35 67 73
38 73 76
41 77 76
42 79 77
n L
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016 I Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
I 44 82 79 625.11 .68 .00 .00 1.77 1.23
47 85 82 625.11 1.03 .00 .00 1.77 1.23
50 49 85 625.11 .05 .00 .00 .44 .04 I 221 55 110 1849.91 8.01 .00 .00 11.81 66.20
224 110 113 1849.91 1.32 .00 34.63 11.81 66.20
227 113 116 1849.91 5.76 .00 .00 11.81 66.20
230 116 119 1848.91 5.49 .00 .00 11.80 66.13 I 233 119 122 1500.00 17.10 .00 .00 9.57 44.89
236 116 125 1.00 .00 .00 .00 .03 .00
239 119 128 348.91 .55 .00 .00 2.23 3.01
,I 242 128 131 -1276.09 -4.43 .00 .00 -8.14 -33.28
245 131 134 1.00 .00 .00 .00 .03 .00
248 143 131 1277.09 14.03 .00 .00 8.15 33.33
I 251
254
143
140
137
143
1.00
1278.09
.00
.67
.00
.00
.00
32.03
.03
8.16
.00
33.38
257 61 140 1278.09 4.04 .00 .00 8.16 33.38
333 77 341 .00 .00 .00 .00 .00 .00
336 341 344 .00 .00 .00 .00 .00 .00
339 344 347 .00 .00 .00 .00 .00 .00
I JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
49 .00 549.21 298.00 108.86
I' 52 .00 547.04 299.00 107.48
55 .00 545.43 299.00 106.79
58 .00 545.15 302.00 105.36
61 .00 544.86 308.00 102.64
,I 64 .00 544.98 309.00 102.26
67 .00 545.37 317.00 98.96
70 .00 545.37 319.00 98.09
73 .00 545.87 327.00 94.84 I 76 .00 546.78 304.00 105.21
77 .00 547.38 290.00 111.53
79 .00 547.45 287.00 112.86
82 .00 548.13 274.00 118.79
85 .00 549.16 305.00 105.80
110 .00 537.42 302.00 102.02
113 .00 501.47 302.00 86.44
I 116 .00 495.71 306.00 82.21
119 .00 490.22 307.00 79.39
122 1500.00 473.11 309.00 71.12
125 1.00 495.71 310.00 80.47
I 128 1625.00 489.67 307.00 79.16
131 .00 494.09 307.00 81.07
1.34 1.00 494.09 311.00 79.34
137 1.00 508.12 313.00 84.55 I' 140 .00 540.82 309.00 100.45
143 .00 508.12 309.00 86.29
341 .00 547.38 290.00 111.53
I 344 .00 547.38 290.00 111.53
- 347 .00 547.38 294.00 109.80
I Page 9 of 12
I
3128.00 .79 .00 .00 2.22 .83
1289.17 .64 .00 .00 3.66 4.71
1289.17 .47 .00 .00 3.66 4.71
1286.17 .98 .00 .00 3.65 4.69
1286.17 1.03 .00 .00 3.65 4.69
1286.17 .47 .00 .00 3.65 4.69
1286.17 1.48 .00 .00 3.65 4.69
.00 .00 .00 .00 .00 .00
1286.17 1.92 .00 .00 3.65 4.69
1286.17 3.47 .00 .00 3.65 4.69
-1286.17 -2.25 .00 .00 -3.65 -4.69
-1286.17 -.28 .00 .00 -3.65 -4.69
1838.83 5.00 .00 .00 5.22 9.09
Page 10 of 12
11 0 49
14 49 52
17 52 55
20 55 58
23 58 61
26 61 64
29 64 67
32 67 70
35 67 73
38 73 76
41 77 76
42 79 77
44 82 79
11
I
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
MAXIMUM PRESSURES
82 .00 548.13 274.00 118.79
79 .00 547.45 287.00 112.86
77 .00 547.38 290.00 111.53
MINIMUM PRESSURES
122 1500.00 473.11 309.00 71.12
128 1625.00 489.67 307.00 79.16
134 1.00 494.09 311.00 79.34
THE NET SYSTEM DEMAND = 3128.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
11 3128.00
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 3128.00
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = .00
A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE
JUNCTION NUMBER DEMAND
79 3125.00
THE RESULTS ARE OBTAINED AFTER 4 TRIALS WITH AN ACCURACY = .00001
ViaSat Phase 1 Site on Gateway Road in Carlsbad
3125 gpm Fire Flow on Town Garden Road for southwestern building
PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
I
I
I
I
I
I
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
47 85 82 1838.83 7.63 .00 .00 5.22 9.09
50 49 85 1838.83 .36 .00 .00 1.30 .31
221 55 110 3.00 .00 .00 .00 .02 .00
224 110 113 3.00 .00 .00 .00 .02 .00
227 113 116 3.00 .00 .00 .00 .02 .00
230 116 119 2.00 .00 .00 .00 .01 .00
233 119 122 .00 .00 .00 .00 .00 .00
236 116 125 1.00 .00 .00 .00 .03 .00
239 119 128 2.00 .00 .00 .00 .01 .00
242 128 131 2.00 .00 .00 .00 .01 .00
245 131 134 1.00 .00 .00 .00 .03 .00
248 143 131 -1.00 .00 .00 .00 -.01 .00
251 143 137 1.00 .00 .00 .00 .03 .00
THE CHECK VALVE IN LINE NUMBER 254 IS CLOSED
257 61 140 .00 .00 .00 .00 .00 .00
333 77 341 .00 .00 .00 .00 .00 .00
336 341 344 .00 .00 .00 .00 .00 .00
339 344 347 .00 .00 .00 .00 .00 .00
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
49 .00 549.21 298.00 108.86
52 .00 548.57 299.00 108.15
55 .00 548.10 299.00 107.95
58 .00 547.12 302.00 106.22
61 .00 546.09 308.00 103.17
64 .00 545.62 309.00 102.54
67 .00 544.14 317.00 98.43
70 .00 544.14 319.00 97.56
73 .00 542.22 327.00 93.26
76 .00 538.75 304.00 101.73
77 .00 536.50 290.00 106.82
79 3125.00 536.22 287.00 108.00
82 .00 541.22 274.00 115.80
85 .00 548.85 305.00 105.67
110 .00 548.10 302.00 106.65
113 .00 548.10 302.00 106.64
116 .00 548.10 306.00 104.91
119 .00 548.10 307.00 104.48
122 .00 548.10 309.00 103.61
125 1.00 548.10 310.00 103.18
128 .00 548.10 307.00 104.48
131 .00 548.10 307.00 104.48
134 1.00 548.10 311.00 102.74
137 1.00 548.10 313.00 101.88
140 .00 546.09 309.00 102.74
143 .00 548.10 309.00 103.61
341 .00 536.50 290.00 106.82
344 .00 536.50 290.00 106.82
347 .00 536.50 294.00 105.08
I Page 11 of 12
I
I
I
I
1
I
I
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
MAXIMUM PRESSURES
82 .00 541.22 274.00 115.80
49 .00 549.21 298.00 108.86
52 .00 548.57 299.00 108.15
MINIMUM PRESSURES
73 .00 542.22 327.00 93.26
70 .00 544.14 319.00 97.56
67 .00. 544.14 317.00 98.43
THE NET SYSTEM DEMAND = 3128.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
11 3128.00
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 3128.00
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = .00
Page 12 of 12
APPENDIX D
COMPUTER MODEL CALCULATIONS FOR
AVAILABLE FIRE FLOW AT 20 PSI RESIDUAL
AT EXISTING
AND
PROPOSED FIRE HYDRANTS
NODE AND PIPE DIAGRAM REFERENCE:
Exhibit A in the back of the report.
CONDITIONS MODELED:
Available Fire Flow at Node 122.
Available Fire Flow at Node 128.,
Available Fire Flow at Node 61.
Available Fire Flow at Node 79.
I
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017
i Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
- Onsite Private Fire Protection System for Onsite Fire Hydrants
I Available Fire Flow at Node 122 with 2-'0'--v s--i Residual
I FLOWRATE IS EXPRESSED IN GPM AND PRESSURE IN PSIG
A SUMMARY OF THE ORIGINAL DATA FOLLOWS '
PIPE NO. NODE NOS. LENGTH DIAMETER ROUGHNESS MINOR LOSS K FIXED GRADE
(FEET) (INCHES)
122 0 5.0 8.0 120.0 .00 355.20
I
i
U 0 49 950.0 24.0 120.0 .00 550.00
14 49 52 135.0 12.0 120.0 .00
17 52 55 100.0 12.0 120.0 .00
20 55 58 210.0 12.0 120.0 .00 I 23 58 61 220.0 12.0 120.0 .00
26 61 64 100.0 12.0 120.0 .00
29 64 67 315.0 12.0 120.0 .00
32 67 70 400.0 12.0 120.0 .00 I 35 67 73 410.0 12.0 120.0 .00
38 73 76 740.0 12.0 120.0 .00
41 77 76 480.0 12.0 120.0 .00
I 42 79 77 60.0 12.0 120.0 .00
44 82 79 550.0 12.0 120.0 .00
47 85 82 840.0 12.0 120.0 .00
50 49 85 1150.0 24.0 120.0 .00
I 221 55 110 121.0 8.0 120.0 .00
224 HO 113 20.0 8.0 120.0 10.00
THERE IS A CHECK VALVE IN LINE NUMBER224
227 113 116 87.0 8.0 120.0 .00 I 230 116 119 83.0 8.0 120.0 .00
233 119 122 381.0 8.0 120.0 .00
236 116 125 529.0 4.0 120.0 .00
I 239 119 128 183.0 8.0 120.0 .00
242 128 131 133.0 8.0 120.0 .00
245 131 134 391.0 4.0 120.0 .00
I 248
251
143
143
131
137
421.0
166.0
8.0
4.0
120.0
120.0
.00
.00
254 140 143 20.0 8.0 120.0 20.00
THERE IS A CHECK VALVE IN LINE NUMBER254
25761 140 121.0 8.0 120.0 .00
1 333 77 341 107.0 4.0 120.0 .00
336 341 344 20.0 4.0 120.0 4.00
339 344 347 94.0 4.0 120.0 .00
I
JUNCTION NUMBER DEMAND ELEVATION CONNECTING PIPES
49 .00 298.00 ii 14 50
I 52 .00 299.00 14 17
55 .00 299.00 17 20 221
58 .00 302.00 20 23
61 .00 308.00 23 26 257
I 64 .00 309.00 26 29
67 .00 317.00 29 32 35
70 .00 319.00 32
I Page 1 o 4
1
I
ViaSat Phase 1 Building Project in the City of Carlsbad
I Private Fire Protection System Analysis
March 10, 2017
Dexter Wilson Eng., Inc.
574-006
I
Onsite Private Fire Protection System for Onsite Fire Hydrants
wit 20'p§i Re sdaj
73 .00 327.00 35 38 I 76 .00 304.00 38 41
77 .00 290.00 41 42 333
79 .00 287.00 42 44
I 82 .0.0 274.00 44 47
85 .00 305.00 47 50
110 .00 302.00 221 224
113 .00 302.00 224 227
I 116 .00 306.00 227 230 236
119 .00 307.00 230 233 239
122 .00 309.00 1 233
125 1.00 310.00 236 I 128 .00 307.00 239 242
131 .00 307.00 242 245 248
134 1.00 311.00 245
I 137 1.00 313.00 251
140 .00 309.00 254 257
143 .00 309.00 248 251 254
341 .00 290.00 333 336
I 344 .00 290.00 336 339
347 .00 294.00 339
OUTPUT SELECTION: ALL RESULTS ARE OUTPUT EACH PERIOD
3 VALUES ARE OUTPUT FOR MAXIMUM AND MINIMUM PRESSURES
U THIS SYSTEM HAS 32 PIPES WITH 29 JUNCTIONS , 2 LOOPS AND 2 FGNS
(
I THE RESULTS ARE OBTAINED AFTER 5 TRIALS WITH AN ACCURACY = .00041
ViaSat Phase 1 Site on Gateway Road in Carlsbad File: 574006F1
I Private Fire Protection System Analysis
Fire Flow at Node 122 with 20 psi residual
PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
0 49 4094.79 1.30 .00 .00 2.90 1.37
I
ll
14 49 52 3284.54 3.59 .00 .00 .9.32 26.61
17 52 55 3284.54 2.66 .00 .00 9.32 26.61
20 55 58 774.06 .38 .00 .00 2.20 1.83
23 58 61 774.06 .40 .00 .00 2.20 1.83
I 26 61 64 -810.25 -.20 .00 .00 -2.30 -1.99
29 64 67 -810.25 -.63 .00 .00 -2.30 -1.99
32 67 70 .00 .00 .00 .00 .00 .00
35 67 73 -810.25 -.82 .00 .00 -2.30 -1.99 I 38 73 76 -810.25 -1.47 .00 .00 -2.30 -1.99
41 77 76 810.25 .96 .00 .00 2.30 1.99
I Page 2 of 4
1
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
- Onsite Private Fire Protection System for Onsite Fire Hydrants
Available Fire Flow at Node 122 with 20 psi Residual
42 79 77 810.25 .12 .00 .00 2.30 1.99
44 82 79 810.25 1.10 .00 .00 2.30 1.99
47 85 82 810.25 1.67 .00 .00 2.30 1.99
50 49 85 810.25 .08 .00 .00 .57 .07
221 55 110 2510.49 14.10 .00 .00 16.02 116.53
224 110 113 2510.49 2.33 .00 39.86 16.02 116.53
227 113 116 2510.49 10.14 .00 .00 16.02 116.53
230 116 119 2509.49 9.66 .00 .00 16.02 116.44
233 119 122 4091.79 109.71 .00 .00 26.12 287.96
236 116 125 1.00 .00 .00 .00 . .03 .00
239 119 128 -1582.30 -9.07 .00 .00 -10.10 -49.56
242 128 131 -1582.30 -6.59 .00 .00 -10.10 -49.56
245 131 134 1.00 .00 .00 .00 .03 .00
248 143 131 1583.30 20.89 .00 .00 10.11 49.62
251 143 137 1.00 .00 .00 .00 .03 .00
254 140 143 1584:30 .99 .00 31.75 10.11 49.68
257 61 140 1584.30 6.01 .00 .00 10.11 49.68
333 77 341 .00 .00 .00 .00 .00 .00
336 341 344 .00 .00 .00 .00 .00 .00
339 344 347 .00 .00 .00 .00 .00 .00
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
49 .00 548.70 298.00 108.64
52 .00 545.11 299.00 106.65
55 .00 542.45 299.00 105.49
58 .00 542.06 302.00 104.03
61 .00 541.66 308.00 101.25
64 .00 541.86 309.00 100.91
67 .00 542.49 317.00 97.71
70 .00 542.49 319.00 96.84
73 .00 543.30 327.00 93.73
76 .00 544.78 304.00 104.34
77 .00 545.73 290.00 110.82
79 .00 545.85 287.00 112.17
82 .00 546.95 274.00 118.28
85 .00 548.62 305.00 105.57
110 .00 528.35 302.00 98.08
113 . .00 486.16 302.00 79.80
116 .00 476.02 306.00 73.67
119 .00 466.35 307.00 69.05
00 356.,j oqThn
125 1.00 476.02 310.00 71.94
128 .00 475.42 307.00 72.98
131 .00 482.02 307.00 75.84
134 1.00 482.01 311.00 74.11
137 1.00 502.91 313.00 82.29
140 .00 535.65 309.00 98.21
143 .00 502.91 309.00 84.03
341 .00 545.73 290.00 110.82
344 .00 545.73 290.00 110.82
347 .00 545.73 294.00 109.08
Page 3 of 4
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
MAXIMUM PRESSURES
82 .00 546.95 274.00 118.28
79 .00 545.85 287.00 112.17
77 .00 545.73 290.00 110.82
MINIMUM PRESSURES
122 .00 356.64 309.00 20.64
119 .00 466.35 307.00 69.05
125 1.00 476.02 310.00 71.94
THE NET SYSTEM DEMAND = 3.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
1 -4091.7:
11 4094.79
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 4094.79
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = -4091.79
I
1 Page 4 of 4
1
I
I
I
I
L]
I
I
I
I
I
I
I
I
I
I
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017 I Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
I
Onsite Private Fire Protection System for Onsite Fire Hydrants
Available Fire Flow at 'N'-,ode 128 wi t" h, 20 psi Residual
FLOWRATE IS EXPRESSED IN GPM AND PRESSURE IN PSIG
SUMMARY OF THE ORIGINAL DATA FOLLOWS
I
A
PIPE NO. NODE NOS. LENGTH DIAMETER ROUGHNESS MINOR LOSS K FIXED GRADE
(FEET) (INCHES)
l
2
11
128
0
0
49
5.0
950.0
8.0
24.0
120.0
120.0
.00
.00
353.20
550.00
14 49 52 135.0 12.0 120.0 .00
17 52 55 100.0 12.0 120.0 .00
20 55 58 210.0 12.0 120.0 .00 I 23 58 61 220.0 12.0 120.0 .00
26 61 64 100.0 12.0 120.0 .00
29 64 67 315.0 12.0 120.0 .00
32 67 70 400.0 12.0 120.0 .00 1 .
35 67 73 410.0 12.0 120.0 .00
38 73 76 740.0 12.0 120.0 .00
41 77 76 480.0 12.0 120.0 .00
I 42 79 77 60.0 12.0 120.0 .00
44 82 79 550.0 12.0 120.0 .00
47 85 82 840.0 12.0 120.0 .00
49 85 1150.0 24.0 120.0 .00
I
SO
221 55 110 121.0 8.0 120.0 .00
224 110 113 20.0 8.0 120.0 9.00
THERE IS A CHECK VALVE IN LINE NUMBER224
227 113 116 87.0 8.0 120.0 .00 I 230 116 119 83.0 8.0 120.0 .00
233 119 122 381.0 8.0 120.0 .00
236 116 125 529.0 4.0 120.0 .00
I 239 119 128 183.0 8.0 120.0 .00
242 128 131 133.0 8.0 120.0 .00
245 131 134 391.0 4.0 120.0 .00
I 248
251
143
143
131
137
421.0
166.0
8.0
4.0
120.0
120.0
.00
.00
254 140 143 20.0 8.0 120.0 10.00
THERE IS A CHECK VALVE IN LINE NUMBER254
257 61 140 121.0 8.0 120.0 .00
I 333 77 341 107.0 4.0 120.0 .00
336 341 344 20.0 4.0 120.0 4.00
339 344 347 94.0 4.0 120.0 .00
I JUNCTION NUMBER DEMAND ELEVATION CONNECTING PIPES
49 .00 298.00 11 14 50
I 52 .00 299.00 14 17
55 .00 299.00 17 20 221
58 .00 302.00 20 23
61 .00 308.00 23 26 257
I 64 .00 309.00 26 29
67 .00 317.00 29 32 35
70 .00 319.00 32
I Page 1of4
[1
1
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017
I Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
I Available Fire Flow at Node 1 with 20 psi Residual
73 .00 327.00 35 38 I 76 .00 304.00 38 41
77 .00 290.00 41 42 333
79 .00 287.00 42 44
I 82 .00 274.00 44 47
85 .00 305.00 47 50
110 .00 302.00 221 224
I
113
116
.00
.00
302.00
306.00
224
227
227
230 236
119 .00 307.00 230 233 239
122 .00 309.00 233
125 1.00 310.00 236 I 128 .00 307.00 2 239 242
131 .00 307.00 242 245 248
134 1.00 311.00 245
137 1.00 313.00 251 I 140 .00 309.00 254 257
143 .00 309.00 248 251 254
341 .00 290.00 333 336
I 344 .00 290.00 336 339
347 .00 294.00 339
' OUTPUT SELECTION: ALL RESULTS ARE OUTPUT EACH PERIOD
3 VALUES ARE OUTPUT FOR MAXIMUM AND MINIMUM PRESSURES
THIS SYSTEM HAS 32 PIPES WITH 29 JUNCTIONS , 2 LOOPS AND 2 FGNS
I
THE RESULTS ARE OBTAINED AFTER 5 TRIALS WITH AN ACCURACY = .00060
I
ViaSat Phase 1 Site on Gateway Road in Carlsbad File: 574006F2
I Private Fire Protection System Analysis
Fire Flow at Node 128 with 20 psi residual
' PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY EL/bOO
2 128 0 651950 3 1 0 0 00 -41.6:1::: 6 8 23i
11 0 49 6522.50 3.08 .00 .00 4.63 3.24
14 49 52 5182.22 8.36 .00 .00 14.70 61.91 I 17 52 55 5182.22 6.19 .00 .00 14.70 61.91
20 55 58 1686.94 1.63 .00 .00 4.79 7.75
23 58 61 1686.94 1.70 .00 .00 4.79 7.75
26 61 64 -1340.29 -.51 .00 .00 -3.80 -5.06 I 29 64 67 -1340.29 -1.59 .00 .00 -3.80 -5.06
32 67 70 .00 .00 .00 .00 .00 .00
I Page 2 of 4
1
LI
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017
I Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
Availablw at Node 128 with 2QpRj4
35 67 73 -1340.29 -2.07 .00 .00 -3.80 -5.06
38 73 76 -1340.29 -3.74 .00 .00 -3.80 -5.06
41 77 76 1340.29 2.43 .00 .00 3.80 5.06
42 79 77 1340.29 .30 .00 .00 3.80 5.06
44 82 79 1340.29 2.78 .00 .00 3.80 5.06
47 85 82 1340.29 4.25 .00 .00 3.80 5.06
50 49 85 1340.29 .20 .00 .00 .95 .17
221 55 110 3495.28 26.02 .00 .00 22.31 215.08
224 110 113 3495.28 4.30 .00 69.54 22.31 215.08
227 113 116 3495.28 18.71 .00 .00 22.31 215.08
230 116 119 3494.28 17.84 .00 .00 22.30 214.97
233 119 122 .00 .00 .00 .00 .00 .00
236 116 125 1.00 .00 .00 .00 .03 .00
239 119 128 3494.28 39.34 .00 .00 22.30 214.97
242 128 131 -3025.23 -21.89 .00 .00 -19.31 -164.60
245 131 134 1.00 .00 .00 .00 .03 .00
248 143 131 3026.23 69.34 .00 .00 19.31 164.70
251 143 137 1.00 .00 .00 .00 .03 .00
254 140 143 3027.23 3.30 .00 57.96 19.32 164.80
257 61 140 3027.23 19.94 .00 .00 19.32 164.80
333 77 341 .00 .00 .00 .00 .00 .00
336 341 344 .00 .00 .00 .00 .00 .00
339 344 347 .00 .00 .00 .00 .00 .00
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
49 .00 546.92 298.00 107.87
52 .00 538.56 299.00 103.81
55 .00 532.37 299.00 101.13
58 .00 530.74 302.00 99.12
61 .00 529.04 308.00 95.78
64 .00 529.55 309.00 95.57
67 .00 531.14 317.00 92.79
70 .00 531.14 319.00 91.93
73 .00 533.21 327.00 89.36
76 .00 536.96 304.00 100.95
77 .00 539.39 290.00 108.07
79 .00 539.69 287.00 109.50
82 .00 542.47 274.00 116.34
85 .00 546.72 305.00 104.75
110 .00 506.35 302.00 88.55
113 .00 432.50 302.00 56.55
116 .00 413.79 306.00 46.71
119 .00 395.95 307.00 38.55
122 .00 395.95 309.00 37.68
125 1.00 413.79 310.00 44.98
: 21
131 .00 378.50 307.00 30.98
134 1.00 378.50 311.00 29.25
137 1.00 447.84 313.00 58.43
140 .00 509.10 309.00 86.71
143 .00 447.84 309.00 60.17
I Page 3 of 4
I
I
I
I
I
I
I
I
1
I
r~
I
I
I
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
Tivailable Fire Flow at Node 128 with 20,p_§i Residual
341 .00 539.39 290.00 108.07
344 .00 539.39 290.00 108.07
347 .00 539.39 294.00 106.33
MAXIMUM PRESSURES
82 .00 542.47 274.00 116.34
79 .00 539.69 287.00 109.50
77 .00 539.39 290.00 108.07
MINIMUM PRESSURES
128 .00 356.61 307.00 21.50
134 1.00 378.50 311.00 29.25
131 .00 378.50 307.00 30.98
THE NET SYSTEM DEMAND = 3.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
2 -6519.5
11 6522.50
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 6522.50
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = -6519.50
I
1
I
I
I
Page 4 of 4
I
I
I
I
I
I
I
I
I
I
I
P
Li
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
Available Fire Flow at Node 61 with 20 psi RèsiduaI
FLOWRATE IS EXPRESSED IN GPM AND PRESSURE IN PSIG
SUMMARY OF THE ORIGINAL DATA FOLLOWS
I
A
PIPE NO. NODE NOS. LENGTH DIAMETER ROUGHNESS MINOR LOSS K FIXED GRADE
(FEET) (INCHES)
I
3
11
61
0
0
49
5.0
950.0
12.0
24.0
120.0
120.0
.00
.00
354.20
550.00
14 49 52 135.0 12.0 120.0 .00
17 52 55 100.0 12.0 120.0 .00
20 55 58 210.0 12.0 120.0 .00
I 23 58 61 220.0 12.0 120.0 .00
26 61 64 100.0 12.0 120.0 .00
29 64 67 315.0 12.0 120.0 .00
32 67 70 400.0 12.0 120.0 .00 I 35 67 73 410.0 12.0 120.0 .00
38 73 76 740.0 12.0 120.0 .00
41 77 76 480.0 12.0 120.0 .00
I 42 79 77 60.0 12.0 120.0 .00
44 82 79 550.0 12.0 120.0 .00
47 85 82 840.0 12.0 120.0 .00
50 49 85 1150.0 24.0 120.0 .00
I 221 55 110 121.0 8.0 120.0 .00
224 110 113 20.0 8.0 120.0 16.00
THERE IS A CHECK VALVE IN LINE NUMBER224
227 113 116 87.0 8.0 120.0 .00 I 230 116 119 83.0 8.0 120.0 .00
233 119 122 381.0 8.0 120.0 .00
236 116 125 529.0 4.0 120.0 .00
I 239 119 128 183.0 8.0 120.0 .00
242 128 131 133.0 8.0 120.0 .00
245 131 134 391.0 4.0 120.0 .00
I
248
251
143
143
131
137
421.0
166.0
8.0
4.0
120.0
120.0
.00
.00
254 140 143 20.0 8.0 120.0 31.00
THERE IS A CHECK VALVE IN LINE NUMBER254
257 61 140 121.0 8.0 120.0 .00
I 333 77 341 107.0 4.0 120.0 .00
336 341 344 20.0 4.0 120.0 4.00
339 344 347 94.0 4.0 120.0 .00
I
JUNCTION NUMBER DEMAND ELEVATION CONNECTING PIPES
49 .00 298.00 11 14 50
I 52 .00 299.00 14 17
55 .00 299.00 17 20 221
58 .00 302.00 20 23
61 .00 308.00 3 23 26 257
I 64 .00 309.00 26 29
67 .00 317.00 29 32 35
70 .00 319.00 32
I Page 1 of 4
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad . March 10, 2017
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
I
Onsite Private Fire Protection System for Onsite Fire Hydrants
AvailablFire Flow at Node 61 with psi "'R d.ua
73 . .00 327.00 35 38 I 76 .00 304.00 38 41.
77 .00 290.00 41 42 333
79 .00 287.00 42 44
I 82 .00 274.00 44 47
85 .00 305.00 47 50
110 .00 302.00 221 224
I
113
116
.00
.00
302.00
306.00
224
227
227
230 236
119 .00 307.00 230 233 239
122 .00 309.00 233
125 1.00 310.00 236
I 128 .00 307.00 239 242
131 .00 307.00 242 245 248
134 1.00 311.00 245
137 1.00 313.00 251 I 140 .00 309.00 254 257
143 .00 309.00 248 251 254
341 .00 290.00 333 336
I 344 .00 290.00 336 339
347 .00 294.00 339
I OUTPUT SELECTION: ALL RESULTS ARE OUTPUT EACH PERIOD
3 VALUES ARE OUTPUT FOR MAXIMUM AND MINIMUM PRESSURES
THIS SYSTEM HAS 32 PIPES WITH 29 JUNCTIONS , 2 LOOPS AND 2 FGNS
I THE RESULTS ARE OBTAINED AFTER 5 TRIALS WITH AN ACCURACY = .00210
I
ViaSat Phase 1 Site on Gateway Road in Carlsbad File: 574006F3
Private Fire Protection System Analysis
Fire Flow at Node 61 with 20 psi residual
I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
.978 I,] - I I Ti7 TTi9P..
0 49 16014.98 16.26 .00 .00 11.36 17.11
I
ll
14 49 52 11392.98 35.95 .00 .00 32.32 266.32
17 52 55 11392.98 26.63 .00 .00 32.32 266.32
20 55 58 11389.98 55.90 .00 .00 32.31 266.19
23 58 61 11389.98 58.56 .00 .00 32.31 266.19
I 26 61 64 -4622.00 -5.01 .00 .00 -13.11 -50.09
29 64 67 -4622.00 -15.78 .00 .00 -13.11 -50.09
32 67 70 .00 .00 .00 .00 .00 .00
35 67 73 -4622.00 -20.54 .00 .00 -13.11 -50.09
I 38 73 76 -4622.00 -37.07 .00 .00 -13.11 -50.09
41 77 76 4622.00 24.04 .00 .00 13.11 50.09
I] Page 2 of 4
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
vai1ab1e Fie Flow at Node 61 with 20 psi Residual
42 79 77 4622.00 3.01 .00 .00 13.11 50.09
I 44 82 79 4622.00 27.55 .00 .00 13.11 50.09
47 85 82 4622.00 42.08 .00 .00 13.11 50.09
50 49 85 4622.00 1.97 .00 .00 3.28 1.71
I 221 55 110 3.00 .00 .00 .00 .02 .00
224 110 113 3.00 .00 .00 .00 .02 .00
227 113 116 3.00 .00 .00 .00 .02 .00
230 116 119 2.00 .00 .00 .00
I 233 119 122 .00 .00 .00 .00 .00 .00
236 116 125 1.00 .00 .00 .00 .03 .00
239 119 128 2.00 .00 .00 .00 .01 .00
242 128 131 2.00 .00 .00 .00 .01 .00
I 245 131 134 1.00 .00 .00 .00 .03 .00
248 143 131 -1.00 .00 .00 .00 -.01 .00
251 143 137 1.00 .00 .00 .00 .03 .00
THE CHECK VALVE IN LINE NUMBER 254 IS CLOSED I 257 61 140 .00 .00 .00 .00 .00 .00
333 77 341 .00 .00 .00 .00 .00 .00
336 341 344 .00 .00 .00 .00 .00 .00
I 344 347 .00 .00 .00 .00 .00 .00
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
I 49 .00 533.74 298.00 102.16
52 .00 497.79 299.00 86.14
55 .00 471.16 299.00 74.60
58 .00 415.26 302.00 49.08
I 356.70 308.00 2110
64 .00 361.71 309.00 22.84
67 .00 377.49 317.00 26.21
.00 377.49 319.00 25.35 P 70
73 .00 398.03 327.00 30.78
76 .00 435.10 304.00 56.81
77 .00 459.14 290.00 73.29
I
.
79 .00 462.15 287.00 75.90
82 .00 489.70 274.00 93.47
85 .00 531.77 305.00 98.27
110 .00 471.16 302.00 73.30
P 113 .00 471.16 302.00 73.30
116 .00 471.16 306.00 71.57
119 .00 471.16 307.00 71.14
.00 471.16 309.00 70.27 P 122
125 1.00 471.16 310.00 69.84
128 .00 471.16 307.00 71.14
131 .00 471.16 307.00 71.14
P 134 1.00 471.16 311.00 69.40
137 1.00 471.16 313.00 68.54
140 .00 356.70 309.00 20.67
143 .00 471.16 309.00 70.27
P 341 .00 459.14 290.00 73.29
344 .00 459.14 290.00 73.29
347 .00 459.14 294.00 71.56
I Page 3 of 4
P
I
I
I
I
I
I
I
U,
I
I
I
I
I
I
I
I
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
vailable Fire Flow at Node 61 with 20 psi Residua
MAXIMUM PRESSURES
49 .00 533.74 298.00 102.16
85 .00 531.77 305.00 98.27
82 .00 489.70 274.00 93.47
MINIMUM PRESSURES
140 .00 356.70 309.00 20.67
61 .00 356.70 308.00 21.10
64 .00 361.71 309.00 22.84
THE NET SYSTEM DEMAND = 3.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
-16011. 98
11 16014.98
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 16014.98
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = -16011.98
Page 4 of 4
F]
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017 I Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
- Onsite Private Fire Protection System for Onsite Fire Hydrants
Available Fire Flow at Node 79 with 20 psi Residual
FLOWRATE IS EXPRESSED IN GPM AND PRESSURE IN PSIG
A SUMMARY OF THE ORIGINAL DATA FOLLOWS
PIPE NO. NODE NOS. LENGTH DIAMETER ROUGHNESS MINOR LOSS K FIXED GRADE
(FEET) (INCHES)
4 79 0 5.0 12.0 120.0 .00 333.20 J 11 0 49 950.0 24.0 120.0 .00 550.00
14 49 52 135.0 12.0 120.0 .00
17 52 55 100.0 12.0 120.0 .00
20 55 58 210.0 12.0 120.0 .00 I 23 58 61 220.0 12.0 120.0 .00
26 61 64 100.0 12.0 120.0 .00
29 64 67 315.0 12.0 120.0 .00
32 67 70 400.0 12.0 120.0 .00 I 35 67 73 410.0 12.0 120.0 .00
38 73 76 740.0 12.0 120.0 .00
41 77 76 480.0 12.0 120.0 .00
42 79 77 60.0 12.0 120.0 .00
44 82 79 550.0 12.0 120.0 .00
47 85 82 840.0 12.0 120.0 .00
49 85 1150.0 24.0 120.0 .00 I 50
221 55 110 121.0 8.0 120.0 .00
224 110 113 20.0 8.0 120.0 16.00
THERE IS A CHECK VALVE IN LINE NUMBER224
' 227 113 116 87.0 8.0 120.0 .00
230 116 119 83.0 8.0 120.0 .00
233 119 122 381.0 8.0 120.0 .00
236 116 125 529.0 4.0 120.0 .00
239 119 128 183.0 8.0 120.0 .00
4 242 128 131 133.0 8.0 120.0 .00
- 245 131 134 391.0 4.0 120.0 .00
248 143 131 421.0 8.0 120.0 .00
251 143 137 166.0 4.0 120.0 .00
254 140 143 20.0 8.0 120.0 31.00
THERE IS A CHECK VALVE IN LINE NUMBER254
257 61 140 121.0 8.0 120.0 .00
I 333 77 341 107.0 4.0 120.0 .00
336 341 344 20.0 4.0 120.0 4.00
339 344 347 94.0 4.0 120.0 .00
I
JUNCTION NUMBER DEMAND ELEVATION CONNECTING PIPES
49 .00 298.00 11 14 50 R 52 .00 299.00 14 17
55 .00 299.00 17 20 221
58 .00 302.00 20 23 ' 61 .00 308.00 23 26 257
64 .00 309.00 26 29
67 .00 317.00 29 32 35
70 .00 319.00 32
I Page 1 of 4
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017 I Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574006
Onsite Private Fire Protection System for Onsite Fire Hydrants
lable Fire Fl, W1,tKS Pjiqe.
73 .00 327.00 35 38 I 76 .00 304.00 38 41
77 .00 290.00 41 42 333
79 .00 287.00 4 42 44
82 .00 274.00 44 47
85 .00 305.00 47 50
110 .00 302.00 221 224
113 .00 302.00 224 227
I 116 .00 306.00 227 230 236
119 .00 307.00 230 233 239
122 .00 309.00 233 * 125 1.00 310.00 236
128 .00 307.00 239 242
- 131 .00 307.00 242 245 248
134 1.00 311.00 245
137 1.00 313.00 251 I 140 .00 309.00 254 257
143 .00 309.00 248 251 254 * 341 .00 290.00 333 336
344 .00 290.00 336 339
347 .00 294.00 339
OUTPUT SELECTION: ALL RESULTS ARE OUTPUT EACH PERIOD
3 VALUES ARE OUTPUT FOR MAXIMUM AND MINIMUM PRESSURES
THIS SYSTEM HAS 32 PIPES WITH 29 JUNCTIONS , 2 LOOPS AND 2 FGNS
THE RESULTS ARE OBTAINED AFTER 5 TRIALS WITH AN ACCURACY = .00018
ViaSat Phase 1 Site on Gateway Road in Carlsbad File: 574006F4
Private Fire Protection System Analysis
Fire Flow at Node 79 with 20 psi residual
I PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
i3774Th4 378
I
ll
14
0
49
49
52
13777.94
5672.93
12.30
9.88
.00
.00
.00
.00
9.77
16.09
12.95
73.21
17 52 55 5672.93 7.32 .00 .00 16.09 73.21
20 55 58 5669.93 15.36 .00 .00 16.08 73.14
23 58 61 5669.93 16.09 .00 .00 16.08 73.14
26 61 64 5669.93 7.31 .00 .00 16.08 73.14
29 64 67 5669.93 23.04 .00 .00 16.08 73.14
32 67 70 .00 .00 .00 .00 .00 .00 ' 35 67 73 5669.93 29.99 .00 .00 16.08 73.14
38 73 76 5669.93 54.12 .00 .00 16.08 73.14
41 77 76 -5669.93 -35.11 .00 .00 -16.08 -73.14
I Page 2 of 4
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017
I Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
vaiaiIFi€ F10 at Noth 79 ith .O p ,i Residual
42 79 77 -5669.93 -4.39 .00 .00 -16.08 -73.14
44 82 79 8105.00 77.96 .00, .00 22.99 141.75
47 85 82 8105.00 119.07 .00 .00 22.99 141.75
50 49 85 8105.00 5.57 .00 .00 5.75 4.85
221 .55 110 3.00 . .00 .00 .00 .02 .00
224 110 113 3.00 .00 .00 .00 .02 .00
227 113 116 3.00 .00 .00 .00 .02 .00
230 116 119 2.00 .00 .00 .00 .01 .00
233 119 122 .00 .00 .00 .00 .00 .00
236 116 125 1.00 .00 .00 .00 .03 .00
239 119 128 2.00 .00 .00 .00. .01 .00
242 128 131 2.00 .00 .00 .00 .01 .00
245 131 134 1.00 .00 .00 .00 .03 .00
248 143 131 -1.00 .00 .00 .00 -.01 .00
251 143 137 1.00 .00 .00 .00 .03 .00
THE CHECK VALVE IN LINE NUMBER 254 IS CLOSED
257 61 140 .00 .00 .00 .00 .00 .00
333 77 341 .00 .00 .00 .00 .00 .00
336 341 344 .00 .00 .00 .00 .00 .00
339 344 347 .00 .00 .00 .00 .00 .00
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
49 .00 537.70 298.00 103.87
52 . .00 527.81 299.00 99.15
55 .00 520.49 299.00 95.98
58 .00 505.14 302.00 88.03
61 .00 489.05 308.00 78.45
64 .00 481.73 309.00 74.85
67 .00 458.69 317.00 61.40
70 .00 458.69 319.00 60.53
73 .00 428.71 327.00 44.07
76 .00 374.59 304.00 30.59
77 . .00 339.48 290.00 21.44
82 .00 413.05 274.00 60.26
85 .00 532.12 305.00 98.42
110 .00 520.49 302.00 94.68
113 .00 520.49 302.00 94.68
116 .00 520.49 306.00 92.95
119 .00 520.49 307.00 92.51
122 .00 520.49 309.00 91.65
125 1.00 520.49 310.00 91.21
128 .00 520.49 307.00 92.51
131 .00 520.49 307.00 92.51
134 1.00 520.49 311.00 90.78
137 1.00 520.49 313.00 89.91
140 .00 489.05 309.00 78.02
143 .00 520.49 309.00 91.65
341 .00 339.48 290.00 21.44
344 .00 339.48 290.00 21.44
347 .00 339.48 294.00 19.71
Page 3 of 4
ViaSat Phase 1 Building Project in the City of Carlsbad March 10, 2017
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Private Fire Protection System for Onsite Fire Hydrants
Tivailable Fire Flow at Node 79 ,with 20 vsi Residual
MAXIMUM PRESSURES
49 .00 537.70 298.00 103.87
52 .00 527.81 299.00 99.15
85 .00 532.12 305.00 98.42
MINIMUM PRESSURES
347 .00 339.48 294.00 19.71
79 .00 335.09 287.00 20.84
77 .00 339.48 290.00 21.44
THE NET SYSTEM DEMAND = 3.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
.941
11 13777.94
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 13777.94
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = -13774.94
Page 4 of 4
I
I
'1
I
I
I
I
I
I
I
I
I
I
I
APPENDIX E
COMPUTER MODEL CALCULATIONS FOR
FIRE SPRINKLER FLOW
NODE AND PIPE DIAGRAM REFERENCE:
Exhibit A in the back of the report.
CONDITIONS MODELED:
Fire sprinkler flow of 800 gpm at Bldg. P1 Node 347.
Fire sprinkler flow of 800 gpm at Bldg. 12 Node 125.
Fire sprinkler flow of 800 gpm at Bldg. 13 Node 137.
Fire sprinkler flow of 800 gpm at Conf. & Café Node 134.
MINOR LOSS K FIXED GRADE
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
238.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
238.00
.00
.00
27.00
.00
550.00
I
ViaSat Phase 1 Building Project in the City of Carlsbad 1 Private Fire Protection System Analysis
Onsite Fire Sprinkler System Laterals Analysis
FLOWRATE IS EXPRESSED IN GPM AND PRESSURE IN PSIG
A SUMMARY OF THE ORIGINAL DATA FOLLOWS
November 18, 2016
Dexter Wilson Eng., Inc.
574-006
PIPE NO. NODE NOS. LENGTH DIAMETER ROUGHNESS
(FEET) (INCHES)
11 0 49 950.0 24.0 120.0
14 49 52 135.0 12.0 120.0
17 52 55 100.0 12.0 120.0
20 55 58 210.0 12.0 120.0
23 58 61 220.0 12.0 120.0
26 61 64 100.0 12.0 120.0
29 64 67 315.0 12.0 120.0
32 67 70 400.0 12.0 '120.0
35 67 73 410.0 12.0 120.0
38 73 76 740.0 12.0 120.0
41 77 76 480.0 12.0 120.0
42 79 77 60.0 12.0 120.0
44 82 79 550.0 12.0 120.0
47 85 82 840.0 12.0 120.0
50 49 85 1150.0 24.0 120.0
221 55 110 121.0 8.0 120.0
224 110 113 20.0 8.0 120.0
THERE IS A CHECK VALVE IN LINE NUMBER224
227 113 116 87.0 8.0 120.0
230 116 119 83.0 8.0 120.0
233 119 122 381.0 8.0 120.0
236 116 125 571.0 6.0 120.0
239 119 128 183.0 8.0 120.0
242 128 131 133.0 8.0 120.0
245 131 134 434.0 6.0 120.0
248 143 131 421.0 8.0 120.0
251 143 137 207.0 6.0 120.0
254 140 143 20.0 8.0 120.0
THERE IS A CHECK VALVE IN LINE NUMBER254
257 61 140 121.0 8.0 120.0
333 77 341 132.0 6.0 120.0
336 341 344 20.0 6.0 120.0
339 344 347 118.0 6.0 120.0
[1
1
I
I,
I
JUNCTION NUMBER DEMAND ELEVATION CONNECTING PIPES
49 .00 298.00 11 14 50
52 .00 299.00 14 17
55 .00 299.00 17 20 221
58 .00 302.00 20 23
61 .00 308.00 23 26 257
64 .00 309.00 26 29
67 .00 317.00 29 32 35
70 .00 319.00 32
73 .00 327.00 35 38
76 .00 304.00 38 41
77 .00 290.00 41 42 333
79 .00 287.00 42 44
I Page 1 of 10
1
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Fire Sprinkler System Laterals Analysis
82 .00 274.00 44 47
85 .00 305.00 47 50
110 .00 302.00 221 224
113 .00 302.00 224 227
116 .00 306.00 227 230 236
119 .00 307.00 230 233 239
122 .00 309.00 233
125 1.00 310.00 236
128 .00 307.00 239 242
131 .00 307.00 242 245 248
134 1.00 311.00 245
137 1.00 313.00 251
140 .00 309.00 254 257
143 .00 309.00 248 251 254
341 .00 290.00 333 336
344 .00 290.00 336 339
347 .00 294.00 339
OUTPUT SELECTION: ALL RESULTS ARE OUTPUT EACH PERIOD
3 VALUES ARE OUTPUT FOR MAXIMUM AND MINIMUM PRESSURES
THIS SYSTEM HAS 31 PIPES WITH 29 JUNCTIONS , 2 LOOPS AND 1 FGNS
A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE
JUNCTION NUMBER DEMAND
347 800.00
THE RESULTS ARE OBTAINED AFTER 6 TRIALS WITH AN ACCURACY = .00005
ViaSat Phase 1 Site on Gateway Road in Carlsbad File: 574006FS
Fire Sprinkler Flow To Building P1
800 gpm at Node 347
FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
803.00 .06 .00 .00 .57 .07
338.76 .05 .00 .00 .96 .40
338.76 .04 .00 .00 .96 .40
335.76 .08 .00 .00 .95 .39
335.76 .09 .00 .00 .95 .39
335.76 .04 .00 .00 .95 .39
335.76 .12 .00 .00 .95 .39
.00 .00 .00 .00 .00 .00
335.76 .16 .00 .00 .95 .39
Page 2 of 10
I
I
1
I
I
I
I
I
I
I
I
I
I
I'
I
I
I
I
I
PIPE NO. NODE NOS
11 0 49
14 49 52
17 52 55
20 55 58
23 58 61
26 61 64
29 64 67
32 67 70
35 67 73
38 73 76 335.76 .29 .00
41 77 76 -335.76 -.19 .00
42 79 77 464.24 .04 .00
44 82 79 464.24 .39 .00
47 85 82 464.24 .60 .00
50 49 85 464.24 .03 .00
221 55 110 3.00 .00 .00
224 110 113 3.00 .00 .00
227 113 116 3.00 .00 .00
230 116 119 2.00 .00 .00
233 119 122 .00 .00 .00
236 116 125 1.00 .00 .00
239 119 128 2.00 .00 .00
242 128 131 2.00 .00 .00
245 131 134 1.00 .00 .00
248 143 131 -1.00 .00 .00
251 143 137 1.00 .00 .00
THE CHECK VALVE IN LINE NUMBER 254 IS CLOSED
257 61 140 .00 .00 .00
333 77 341 800.00 7.51 .00
336 341 344 800.00 1.14 .00
339 344 347 800.00 6.71 .00
.00 .95 .39
.00 -.95 -.39
.00 1.32 .71
.00 1.32 .71
.00 1.32 .71
.00 .33 .02
.00 .02 .00
.00 .02 .00
.00 .02 .00
.00 .01 .00
.00 .00 .00
.00 .01 .00
.00 .01 .00
.00 .01 .00
.00 .01 .00
.00 -.01 .00
.00 .01 .00
.00 .00
9.08 56.89
9.08 56.89
9.08 56.89
I
I
I
I .00
.00
34.54
.00
I
ViaSat Phase 1 Building Project in the City of Carlsbad
1 Private Fire Protection System Analysis
Onsite Fire Sprinkler System Laterals Analysis
November 18, 2016
Dexter Wilson Eng., Inc.
574-006
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
49 .00 549.94 298.00 109.17
52 .00 549.88 299.00 108.72
55 .00 549.84 299.00 108.70
58 .00 549.76 302.00 107.36
61 .00 549.68 308.00 104.73
64 .00 549.64 309.00 104.28
67 .00 549.51 317.00 100.76
70 .00 549.51 319.00 99.89
73 .00 549.35 327.00 96.35
76 .00 549.07 304.00 106.20
77 .00 548.88 290.00 112.18
79 .00 548.92 287.00 113.50
82 .00 549.31 274.00 '119.30
85 .00 549.91 305.00 106.13
110 .00 549.84 302.00 107.40
113 .00 549.84 302.00 107.40
116 .00 549.84 306.00 105.66
119 .00 549.84 307.00 105.23
122 .00 549.84 309.00 104.36
125 1.00 549.84 310.00 103.93
128 .00 549.84 307.00 105.23
131 .00 549.84 307.00 105.23
134 1.00 549.84 311.00 103.50
137 1.00 549.84 313.00 102.63
140 .00 549.68 309.00 104.29
143 .00 549.84 309.00 104.36
341 .00 541.37 290.00 108.93
344 .00 505.69 290.00 93.47
347 800.00 498.98 294.00 88.82
I Page 3 of 10
I
1
I
I
1
1
I
I
'I
U..
I
I
I
I
I
I
I
I
1
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Fire Sprinkler System Laterals Analysis
MAXIMUM PRESSURES
82 .00 549.31 274.00 119.30
79 .00 548.92 287.00 113.50
77 .00 548.88 290.00 112.18
MINIMUM PRESSURES
347 800.00 498.98 294.00 88.82
344 .00 505.69 290.00 93.47
73 .00 549.35 327.00 96.35
THE NET SYSTEM DEMAND = 803.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
11 803.00
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 803.00
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = .00
A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE
JUNCTION NUMBER DEMAND
125 800.00
THE RESULTS ARE OBTAINED AFTER 5 TRIALS WITH AN ACCURACY = .00002
I
I
I
I
I
I
1
PIPE NO. NODE NOS
11 0 49
14 49 52
17 52 55
20 55 58
23 58 61
26 61 64
29 64 67
32 67 70
35 67 73
38 73 76
41 77 76
42 79 77
ViaSat Phase 1 Site on Gateway Road in Carlsbad
Fire Sprinkler Flow To Building 12
800 gpm at Node 125
FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY, HL/1000
802.00 .06 .00 .00 .57 .07
635.23 .17 .00 .00 1.80 1.27
635.23 .13 .00 .00 1.80 1.27
223.13 .04 .00 .00 .63 .18
223.13 .04 .00 .00 .63 .18
-166.77 -.01 .00 .00 -.47 -.11
-166.77 -.03 .00 .00 -.47 -.11
.00 .00 .00 .00 .00 .00
-166.77 -.04 .00 .00 -.47 -.11
-166.77 -.08 .00 .00 -.47 -.11
166.77 .05 .00 .00 .47 .11
166.77 .01 .00 .00 .47 .11
Page 4 of 10
ViaSat Phase 1 Building Project in the City of Carlsbad
Private Fire Protection System Analysis
Onsite Fire Sprinkler System Laterals Analysis
November 18, 2016
Dexter Wilson Eng., Inc.
574-006
44 82 79 166.77 .06 .00 .00 .47 .11
47 85 82 166.77 .09 .00 .00 .47 .11
50 49 85 166.77 .00 .00 .00 .12 .00
221 55 110 412.10 .50 .00 .00 2.63 4.10
224 110 113 412.10 .08 .00 25.56 2.63 4.10
227 113 116 412.10 .36 .00 .00 2.63 4.10
230 116 119 -387.90 -.30 .00 .00 -2.48 -3.67
233 119 122 .00 .00 .00 .00 .00 .00
236 116 125 800.00 32.49 .00 .00 9.08 56.89
239 119 128 -387.90 -.67 .00 .00 -2.48 -3.67
242 128 131 -387.90 -.49 .00 .00 -2.48 -3.67
245 131 134 1.00 .00 .00 .00 .01 .00
248 143 131 388.90 1.55 .00 .00 2.48 3.69
251 143 137 1.00 .00 .00 .00 .01 .00
254 140 143 389.90 .07 .00 22.88 2.49 3.70
257 61 140 389.90 .45 .00 .00 2.49 3.70
333 77 341 .00 .00 .00 .00 .00 .00
336 341 344 .00 .00 .00 .00 .00 .00
339 344 347 .00 .00 .00 .00 .00 .00
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
49 .00 549.94 298.00 109.17
52 .00 549.77 299.00 108.66
55 .00 549.64 299.00 108.61
58 .00 549.60 302.00 107.29
61 .00 549.56 308.00 104.68
64 .00 549.57 309.00 104.25
67 .00 549.60 317.00 100.80
70 .00 549.60 319.00 99.93
73 .00 549.65 327.00 96.48
76 .00 549.73 304.00 106.48
77 .00 549.78 290.00 112.57
79 .00 549.78 287.00 113.87
82 .00 549.84 274.00 119.53
85 .00 549.93 305.00 106.14
110 .00 549.14 302.00 107.09
113 .00 523.50 302.00 95.98
116 .00 523.14 306.00 94.09
119 .00 523.44 307.00 93.79
122 .00 523.44 309.00 92.93
125 800.00 490.65 310.00 78.28
128 .00 524.12 307.00 94.08
131 .00 524.60 307.00 94.29
134 1.00 524.60 311.00 92.56
137 1.00 526.15 313.00 92.37
140 .00 549.11 .309.00 104.05
143 .00 526.15 309.00 94.10
341 .00 549.78 290.00 112.57
344 .00 549.78 290.00 112.57
347 .00 549.78 294.00 110.84
Page 5 of 10
I
I
I
I
I
I
I
I
I
I
L
I
I
U
I
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad 1 Private Fire Protection System Analysis
Onsite Fire Sprinkler System Laterals Analysis
1 MAXIMUM PRESSURES
82 .00 549.84 274.00
79 .00 549.78 287.00
I 77 .00 549.78 290.00
MINIMUM PRESSURES
November 18, 2016
Dexter Wilson Eng., Inc.
574-006
119.53
113.87
112.57
125 800.00 490.65 310.00 78.28
137 1.00 526.15 313.00 92.37
134 1.00 524.60 311.00 92.56
THE NET SYSTEM DEMAND = 802.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
11 802.00
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 802.00
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = .00
A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE
JUNCTION NUMBER DEMAND
137 800.00
THE RESULTS ARE OBTAINED AFTER 3 TRIALS WITH AN ACCURACY = .00011
ViaSat Phase 1 Site on Gateway Road in Carlsbad
Fire Sprinkler Flow To Building 13
800 gpm at Node 137
PIPE NO. NODE NOS
11 0 49
14 49 52
17 52 55
20 55 58
23 58 61
26 61 64
29 64 67
32 67 70
35 67 73
38 73 76
41 77 76
42 79 77
FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
802.00 .06 .00 .00 .57 .07
632.38 .17 .00 .00 1.79 1.26
632.38 .13 .00 .00 1.79 1.26
244.42 .05 .00 .00 .69 .22
244.42 .05 .00 .00 .69 .22,
-169.62 -.01 .00 .00 -.48 -.11
-169.62 -.03 .00 .00 -.48 -.11
.00 .00 .00 .00 .00 .00
-169.62 -.05 .00 .00 -.48 -.11
-169.62 -.08 .00 .00 -.48 -.11
169.62 .05 .00 .00 .48 .11
169.62 .01 .00 .00 .48 .11
Page 6 of 10
I
11
Page 7 of 10
ViaSat Phase 1 Building Project in the City of Carlsbad
Private Fire Protection System Analysis
Onsite Fire Sprinkler System Laterals Analysis
November 18, 2016
Dexter Wilson Eng., Inc.
574-006
44 82 79 169.62 .06 .00 .00 .48 .11
47 85 82 169.62 .09 .00 .00 .48 .11
50 49 85 169.62 .00 .00 .00 .12 .00
221 55 110 387.97 .44 .00 .00 2.48 3.67
224 110 113 387.97 .07 .00 22.66 2.48 3.67
227 113 116 387.97 .32 .00 .00 2.48 3.67
230 116 119 386.97 .30 .00 .00 2.47 3.65
233 119 122 .00 .00 .00 .00 .00 .00
236 116 125 1.00 .00 .00 .00 .01 .00
239 119 128 386.97 .67 .00 .00 2.47 3.65
242 128 131 386.97 .49 .00 .00 2.47 3.65
245 131 134 1.00 .00 .00 .00 .01 .00
248 143 131 -385.97 -1.53 .00 .00 -2.46 -3.63
251 143 137 800.00 11.78 .00 .00 9.08 56.89
254 140 143 414.03 .08 .00 25.80 2.64 4.14
257 61 140 414.03 .50 .00 .00 2.64 4.14
333 77 341 .00 .00 .00 .00 .00 .00
336 341 344 .00 .00 .00 .00 .00 .00
339 344 347 .00 .00 .00 .00 .00 .00
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
49 .00 549.94 298.00 109.17
52 .00 549.77 299.00 108.67
55 .00 549.64 299.00 108.61
58 .00 549.60 302.00 107.29
61 .00 549.55 308.00 104.67
64 .00 549.56 309.00 104.24
67 .00 549.59 317.00 100.79
70 .00 549.59 319.00 99.92
73 .00 549.64 327.00 96.48
76 .00 549.72 304.00 106.48
77 .00 549.77 290.00 112.57
79 .00 549.78 287.00 113.87
82 .00 549.84 274.00 119.53
85 .00 549.93 305.00 106.14
110 .00 549.20 302.00 107.12
113 .00 526.47 302.00 97.27
116 .00 526.15 306.00 95.40
119 .00 525.84 307.00 94.83
122 .00 525.84 309.00 93.97
125 1.00 526.15 310.00 93.66
128 .00 525.18 307.00 94.54
131 .00 524.69 307.00 94.33
134 1.00 524.69 311.00 92.60
137 800.00 511.38 313.00 85.97
140 .00 549.05 309.00 104.02
143 .00 523.16 309.00 92.80
341 .00 549.77 290.00 112.57
344 .00 549.77 290.00 112.57
347 .00 549.77 294.00 110.83
I
I
1
I
I
I
I
I
I
I
I
[I
I
I
1
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Fire Sprinkler System Laterals Analysis
MAXIMUM PRESSURES
82 .00 549.84 274.00 119.53
79 .00 549.78 287.00 113.87
77 .00 549.77 290.00 112.57
MINIMUM PRESSURES
137 800.00 511.38 313.00 85.97
134 1.00 524.69 311.00 92.60
143 .00 523.16 309.00 92.80
THE NET SYSTEM DEMAND = 802.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
11 802.00
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 802.00
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = .00
A SUMMARY OF CONDITIONS SPECIFIED FOR THE NEXT SIMULATION FOLLOWS
THE FOLLOWING SPECIFIC DEMAND CHANGES ARE MADE
JUNCTION NUMBER DEMAND
134 800.00
THE RESULTS ARE OBTAINED AFTER 3 TRIALS WITH AN ACCURACY = .00002
ViaSat Phase 1 Site on Gateway Road in Carlsbad
Fire Sprinkler Flow To Conf & Cafe Building
800 gpm at Node 134
PIPE NO. NODE NOS
11 0 49
14 49 52
17 52 55
20 55 58
23 58 61
26 61 64
29 64 67
32 67 70
35 67 73
38 73 76
41 77 76
42 79 77
44 82 79
FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL/1000
802.00 .06 .00 .00 .57 .07
633.86 .17 .00 .00 1.80 1.26
633.86 .13 .00 .00 1.80 1.26
233.50 .04 .00 .00 .66 .20
233.50 .04 .00 .00 .66 .20
-168.14 -.01 .00 .00 -.48 -.11
-168.14 -.03 .00 .00 -.48 -.11
.00 .00 .00 .00 .00 .00
-168.14 -.04 .00 .00 -.48 -.11
-168.14 -.08 .00 .00 -.48 -.11
168.14 .05 .00 .00 .48 .11
168.14 .01 .00 .00 .48 .11
168.14 .06 .00 .00 .48 .11
Page 8 of 10
I
I
Page 9 of 10
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Fire Sprinkler System Laterals Analysis
47 85 82 168.14 .09 .00 .00 .48 .11
50 49 85 168.14 .00 .00 .00 .12 .00
221 55 110 400.36 .47 .00 .00 2.56 3.89
224 110 113 400.36 .08 .00 24.13 2.56 3.89
227 113 116 400.36 .34 .00 .00 2.56 3.89
230 116 119 399.36 .32 .00 .00 2.55 3.87
233 119 122 .00 .00 .00 .00 .00 .00
236 116 125 1.00 .00 .00 .00 .01 .00
239 119 128 399.36 .71 .00 .00 2.55 3.87
242 128 131 399.36 .51 .00 .00 2.55 3.87
245 131 134 800.00 24.69 .00 .00 9.08 56.89
248 143 131 400.64 1.64 .00 .00 2.56 3.89
251 143 137 1.00 .00 .00 .00 .01 .00
254 140 143 401.64 .08 .00 24.28 2.56 3.91
257 61 140 401.64 .47 .00 .00 2.56 3.91
333 77 341 .00 .00 .00 .00 .00 .00
336 341 344 .00 .00 .00 .00 .00 .00
339 344 347 .00 .00 .00 .00 .00 .00
JUNCTION NUMBER DEMAND GRADE LINE ELEVATION PRESSURE
49 .00 549.94 298.00 109.17
52 .00 549.77 299.00 108.67
55 .00 549.64 299.00 108.61
58 .00 549.60 302.00 107.29
61 .00 549.55 308.00 104.67
64 .00 549.56 309.00 104.24
67 .00 549.60 317.00 100.79
70 .00 549.60 319.00 99.93
73 .00 549.64 327.00 96.48
76 .00 549.72 304.00 106.48
77 .00 549.78 290.00 112.57
79 .00 549.78 287.00 113.87
82 .00 549.84 274.00 119.53
85 .00 549.93 305.00 106.14
110 .00 549.17 302.00 107.11
113 .00 524.96 302.00 96.62
116 .00 524.63 306.00 94.74
119 .00 524.30 307.00 94.17
122 .00 524.30 309.00 93.30
125 1.00 524.63 310.00 93.00
128 .00 523.60 307.00 93.86
131 .00 523.08 307.00 93.64
134 800.00 498.39 311.00 81.20
137 1.00 524.72 313.00 91.75
140 .00 549.08 309.00 104.03
143 .00 524.72 309.00 93.48
341 .00 549.78 290.00 112.57
344 .00 549.78 290.00 112.57
347 .00 549.78 294.00 110.84
I
I
I
I
I
I
I
1
I
I
1
I
I
1
I
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
I
I
ViaSat Phase 1 Building Project in the City of Carlsbad November 18, 2016
Private Fire Protection System Analysis Dexter Wilson Eng., Inc.
574-006
Onsite Fire Sprinkler System Laterals Analysis
MAXIMUM PRESSURES
82 .00 549.84 274.00 119.53
79 .00 549.78 287.00 113.87
77 .00 549.78 290.00 112.57
MINIMUM PRESSURES
134 800.00 498.39 311.00 81.20
137 1.00 524.72 313.00 91.75
125 1.00 524.63 310.00 93.00
THE NET SYSTEM DEMAND = 802.00
SUMMARY OF INFLOWS(+) AND OUTFLOWS(-) FROM FIXED GRADE NODES
PIPE NUMBER FLOWRATE
11 802.00
THE NET FLOW INTO THE SYSTEM FROM FIXED GRADE NODES = 802.00
THE NET FLOW OUT OF THE SYSTEM INTO FIXED GRADE NODES = .00
Page 10 of 10
Li
PROPERTY LINE
BUILDING 12
FF=3O7.5O
wo
DETAIL A'
SEE LOWER LEFT
143
ct 58
BUILDING 13
BUILDING P1
FF=290.80
PROPERTY LINE
LEG=
PROPOSED BOUNDARY
EXISTING PUBLIC WATER
PRIVATE FIRE PROTECTION SYSTEM
PRIVATE FIRE SPRINKLER LATERAL
FIRE SERVICE DETECTOR CHECK BACKFLOW
EXISTING FIRE HYDRANT
PROPOSED FIRE HYDRANT
COMPUTER. MODEL NODE NUMBER
- COMPUTER PIPE NUMBER
6" BACKFLOW
EX. 1 2"
1(/ 'F
SCALE: 1" 100'
0 100
FEET
DEXTER WILSON ENGINEERING, INC.
CONSULTING ENGINEERS
(760) 436-4422
EXHIBIT A
PRIVATE FIRE
PROTECTION SYSTEM
VIASAT - PHASE 1
- ~/ ~_ I c wt- t7 QG 1
Uom N Wc
4 /4 /ri
Al—
ICE -1
13
-
/ FF=31050 /
\FIRE FLOW DEMAND TABLE
r
//2 I
12 //
\ \
I FF=307.50
Ul
11 270.9M
LEGEND
40# via
CITY OF CARLSaAD FMDffWTrMENT
APMOWD _!
I / / PASCO LARET FIRE ACCESS PLAN
H & ASSOCIATES
ph 858 STS82 [2 855 5TH 4812 pH8]HHHH1lgHHHH SHEET - S S
\/1c1 iice I hc'vii P31 Lock
4/41(7
Io. 11
To
-
—1A III
ATEWAY I FF=3O --
-
To
- \ \ F!RE FLOW DEMAND TABLE'
(= /
- \ .
-
/
TS
Lid
-
LEGEND
PR H—T
cc
/
VIASAT PHASE I
FIRE SERVICE PLAN PASCO LARET
jj 61 & ASSOCIATES