HomeMy WebLinkAboutDWG 507-1A; CDP 13-20; WALLACE RESIDENCE; 01-04'
GRADING NOTES
(IN ADDITION TO TH[ R[QUIR[M[NTS OF CHAPTER 15. 16 or TH[
CAFILSBAD MUNICIPAL COD[.)
1. THIS PLAN SUP[RS[D[S ALL OTHER PLANS PR[VIOUSL Y APPROVED BY TH[ Cl fY
OF CARLSBAD REGARDING GRADING SHOWN ON THIS SET OF PLANS.
2. APPROVAL OF THIS PLAN DOES NOT L[SS[N OR WAIVE ANY PORTION OF Tl-IE
CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY
STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HE.REON AS THEY MAY
PERTAIN TO THIS PROJECT. THE ENGINEE.R IN RESPONSIBLE CHARGE SHAU.
R[VISE THESE PLANS WHEN NON-CONFORMANCE IS DISCOVERED.
3. CITY APPROVAL OF PLANS DOES NOT RELl[V[ THE D[V[LOP[R OR ENGINEER-OF-
WOFIK FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS
DISCOVE.RED DURING CONSTRUCTION. ALL PLAN liEVISIONS SHALL B[ PFIOMPTL Y
SUBMITT[O TO TH[ CITY [NGIN[[R roR APPROVAL.
4. A RIGHT-OF-WAY P[RMIT FROM TH[ CITY [NG/NEER WILL B[ R[QUIREO roR ANY
WORK IN TH[ PUBLIC RIGHT or WAY. PRIOR TO PERMIT ISSUANCE, A
CERTlr/CA TE OF INSURANCE AS WELL AS ADDITIONAL INSURW ENDORS[M[NT MUST BE
FILED NAMING TH[ CITY OF CARLSBAD AS AN ADDITIONAL INSURED ON THE
PERMITTEE'S POLICY IN TH[ MINIMUM AMOUNT OF $1,000,000.00 FOR EACH
OCCURRANCE OF LIABILITY. TH[ INSURANCE COMPANY WRITING THE POLICY MUST
HA\/[ A RA TING OF "A--" OR BETTER AND A SIZE CATFGORY OF CLASS VII
OR BETTER AS ESTABLISHED BY "BFSTS" KFY RA TING GUIDE.
5. NO WORK SHALL B[ COMMENCED UNTIL ALL PERMITS HAVE B[[N OBTAINED FROM
TH[ CITY ANO OTHER APPROPRIATE AGENCIES.
6. APPROVAL OF TH[S[ PLANS BY TH[ CITY [NGINE[R DO[S NOT AUTHORIZE ANY
WORK OR GRADING TO BE P[RFORM[D UNTIL Tl-IE PROPERTY OWNER'S PE.RMISSION
HAS BEEN OBTAINED AND A VALID GRADING PERMIT HAS BEEN /SSU[O
7. NO REVISIONS WILL BE MADE TO T/-1[5[ PLANS WITHOUT THE WRITTEN APPROVAL
OF TH[ CITY £NGIN[£R, NOTED WITHIN TH[ R[\/IS/ON BLOCK, ON Tl-I[
APPRO/JRIATE SHEET OF TH[ PLANS AND TH[ TITLE Sl-/[ET.
8. ORIGINAL DRAWINGS SHALL BECOME TH[ PROP[RTY OF THt. CITY UPON B[ING
SIGNED BY TH[ CITY ENGIN[[R.
9. /HE ORIGINAL DRAWING SHALL B[ REVISED ro REFLECT AS-·BUILT CONDITIONS
BY TH[ ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OF THE WORK BY TH[
CITY.
10. ACCESS FOR FIRE AND OTH[R [M[RGENCY VEHICLES SHALL BE MAINTAINED TO
THE PROJECT 5/ff AT ALL TIMES DURING CONSTRUCTION.
11. WHER[ TRENCHES ARE WITHIN CITY [ASUAENTS, A SOILS REPORT COMPRISED
OF: (A) SUMMARY SHEU; (B) LABOR A TORY WORK SH[[TS AND (C) COMPACFION
CURVES, SHALL B[ SUBMITTED BY A PROF£SS/ONAL [NGIN[[R OF TH[ STAT£ OF
CALIFORNIA, PR/NC/PALLY DOING BUSINESS IN THE Fl[LO OF APPU[O SOILS
MECHANICS. TH[ SOILS REPORT WILL B[ SUBMITTED TO TH[ CITY ENGINEERING
INSPECTOR WITHIN TWO WORKING DAYS OF TH[ COMPLE f/ON OF FIELD TESTS.
12. A SOILS COMPACTION REPORT ANO COMPLIANCE V[RIFICA TION REGARDING
ADHERENCE TO RECOMMENDATIONS OUTLIN[D IN TH[ SOILS REPORT IS REQU/,RED
PRIOR TO nl[ ISSUANCE OF A BUILDING PERMIT. ALL CONTROLLED GRADING
SHALL BE DON[ UND[R TH[ 0/R[CTION OF A PROFESSIONAL [NGIN[[R OF TH[
STA TE or CALIFORNIA PR/NC/PALLY DO/NC BUSINESS IN TH[ Fl[LO OF APPL/[D
SOILS MECHANICS. ALL FILL OR FUTURE FILL AREAS SHALL BE CONSTRUCTED IN
ACCORDANCE WITH TH[ CITY OF CARLSBAD STANDARD SPECIF/CATIONS AND n IE
[AR TH WORK SPECIF/CATIONS " A TTAUl[D TO TH[ PRELIMINARY SOILS
INV[STIGA TION DAILY Fl[LD COMPACTION REPORTS WILL BE SUBMITTED TO TH[
PROJECT INSPECTOR.
13. A PR[CONSTRUCTION M[[TING SHALL__B[ HUD AT THE SITE PRIOR TO /HE
BEGINNING OF WORK ANO SHAii RF ATTFNDFO RY All REPRFSFNTA TIVFS
RESPONSIBLE FOR CONSTRUCTION, INSPECTION, SUPERVISION, ![STING AND AU O (HER
ASPECTS OF TH[ WORK. THE CONTRACTOR SHALL R[OU[ST A PRE.CONSTRUCTION
MEETING BY CALLING TH[ INSPECTION LIN[ AT (!60) 438-389/ AT LEAST FNE.(5)
WORKING DAYS PRIOR TO STARTING CONSlRUCl/ON. Tl-IE CONTRACTOR WILL TH[N BE
CONTACTED BY THE PROJECT INSPECTOR TO COORDINATE A DA TE AND TIME FOR THE.
PRECONSTRUCTION MEETING. APPROVED DRAWINGS MUST BE. AVAILABLE Pk/0,7 TO
SCHEDULING TH[ GRADING PERMIT WILL 8[ PROVIDED BY THE PROJECT INSPECTOR
AT /HE MEETING.
14. ALL INSPECTION RFOU[STS Ont[R THAN FOR PR[CONSTRUCTION M[[TING WILL BE.
MAO[ RY CAI! ING TR[ fNGINFFRING )4-HOUR IN5PFCTION RFOI/FST ! INF AT
(760) 438-3891, INSP[CTION REQUEST MUST B[ R[C[IV[O PRIOR TO 2:00 P.M.
ON THF DAY B[FOR[ TH[ INSP[CTION IS N[[D[O. INSPECTIONS WILL B[ MAO[
TH[ N[XT WORK DAY UNLESS YOU R[QU[ST OTH[RWIS[. REQUESTS MADE AFffR
2: 00 P.M WILL B[ SCH[DUL[D FOR TWO FULL WORK DAYS LATER.
15. THE OWNER AND/OR APPLICANT THROUGf/ TH[ D[VELOP[R AND/OR CONmACTOR
5/-IALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAfTTY D[I//C[S, INCLUDING
SHORING, AND SHALL B[ SOL[L Y R[SPONSIBL[ FOR CONFORMING TO ALL LOCAL,
STAT£ ANO FEDERAL SAFETY AND H[ALTH STANOAROS, LAWS AND R[GUL~ TIONS.
16. TH[ CONlRACTOR Sf/ALL CONFORM TO LABOR COD[ SECTION 6705 BY SUBMITTING
A DETAIL PLAN ro TH[ CITY ENGINEER AND/OR CONCERNED AGENCY SHOWING
THE DE.SIGN OF SHORING, BRACING SLOPING OF/ OTH[R PROVISIONS TO B[ MADE
OF WORKER PROTECTION FROM TH[ HAZARD OF CAVING GROUND DURING TH[
[XCAVA l/ON OF SUCH TRENCH OR TR[NCl/[S OR DURING TH[ PIP[ INSTALLATION
TH[R[IN. THIS PLAN MUST B[ PRE.PARED FOR ALL TR[NUl[S FIVE. F[[T (5') OR
MORE IN D[PTH AND APPROVED BY THE CITY E.NGINEER AND/OR CONC[RNE.O
AGENCY PRIOR TO [XCAVA TION. IF Tf/E PLAN VARIES FROM THF SHORING SYSTEM
STANDARDS [STABI ISH[D BY TH[ CONSTRUCTION SAFETY ORDERS . TITLE 8
CALIFORNIA ADMINISTRA TIV[ COO[ TH[ PLAN SHA! I BE PR[PAR[D BY A
REGIST[R[D [NGIN[ER AT TH[ CONTRACTORS [XP[NSF A COPY OF THE OSHA
EXCAVATION PERMIT MUST B[ SUBMITTED TO TH[ INSPECTOR PRIOR TO
EXCAVATION.
17. NO BLASTING SHALL BE PERFORMED UNTIL A VALID BLASTING P[RMIT HAS BEcN
OBTAINED FROM TH[ CITY or CARLSBAD. SUBMIT APPL/CATION FOR BLASTING
P[RM/T WELL IN ADVANCE OF TH£ SCHEDULING OF BLASTING OPERA T/ONS.
78. Ir ANY ARCHAEOLOGICAL RESOURCES ARE 0/SCOV[R[O WITI//N ANY WORK AR[A
DURING CONSTRUCTION, OPERATIONS WILL C[ASE IMMEDIA T[I Y AND T/-1[
PERM/TT[[ WILL NOTIFY TH[ CITY [NGIN[[R. OP[RA TIONS WILL NOT RESTART
UNTIL TH[ PERM/TT[[ HAS RECUl/[O WRITTEN AUT/-IORITY FROM THE CITY
[NG/NEER TO DO SO.
19. ALL OPERATIONS CONDUCTED ON THE SIT[ OR ADJACENT fH[R[TO, INCLUDING
WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR OPERATION OF TRUCKS,
EARTHMOVING EQUIPMENT, CONSTRUCTION EQUIPMENT ANO ANY OTHEI/ ASSOC/A TED
GRADING [OUIPM[NT SHALL B[ LIMIT[D ro TH[ PERIOD BEJWE[N 7:00 A.M AND
6:00 P.M. EAC/-1 DAY, MONDAY THRO FRIDAY ANO NO EARTHMOVING OR G,RADING
OPERATIONS SHALL B[ CONDUCTED ON W[[KENDS OR /-IOLIDA YS. ( A LIST or Cl TY
HOLIDAYS IS AVAILABLE AT TH[ [NGIN[[RING D[PA,RTM[NT COUNTER)
20. ALL OFF-SIT[ HAUL ROUTE.S SHA! L Bf SUBMITTED BY THE CONTRACTOR TO TH[
CITY ENGINEER FOR APPROVAi TWO FULL WORKING DAYS PRIO/i TO BEGINNING OF
WORK.
21. IMPORT MA ff RIAL SHALL B[ OBTAINED FROM, AND WASTE MA ![RIAL SI !AL.I. 8£
D[POSITED AT, A SIT[ APPROVED BY TH[ CITY [NGIN[[R. THF CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY DEBRIS 011 DAMAGE OCCURRING ALONG Tl-IE HAUL
ROUTES OR ADJACENT STR[ETS AS A RESULT OF TH[ GRADING OPERATION.
22. BRUSH S/-IALL BE R[MOV[D ONLY WITHIN ff/[ A.R[A TO B[ GRADED NO TREES AR[
F0 B[ R[MOV[D UNLESS SPECIF/CALLY NOTED ON TH[ PLAN.
23. ALL AR[AS SHALL BE GRADED TO DRAIN. GRADING RESULTING IN THE PONDING OF
WATER IS NOT PERMITTED. ALL EARTHEN SWALES ANO DITCHES SI-IALL /-/AV[ A
MINIMUM ONE PERCENT SLOPE.
24. TH[SE PLANS ARC SUBJ[CT TO A SIGNED AND APPROVED SWPPP AND/UR SET OF
[ROS/ON CONTROL PLANS. EROSION CONTFIOL SHALL BE AS SHOWN ANO AS APP,ROVED
BY Tl-IE CITY ENGINEER Oil AS DIRECTED BY THE PROJ[CT INSPECTOR.
25. ALL SLOP[S SHALL B[ TRIMMED TO A FINISH GRADE TO PRODUCE A UNIFORM
SU,RFAC[ AND CROSS SECTION. Tl-IE SIT[ SHALL BE LEfT IN A N[A T AND
ORDERLY CONDITION ALL STONES, ROOTS OR OTH[R DEBRIS SHALL BE REMOVED
ANO DISPOSED OF AT A SIT£ APPROVED OF BY TH[ CITY [NGIN[[R.
26. ALL SLOPES SHALL BE /RR/GA TED, STABIUZ[D, PLANTED AND/OR HYOROS[[OED
WITHIN TEN (10) DAYS OF TH[ TIM[ WHEN [ACH SLOP[ IS BROUGHT TO GRAD[
AS SHOWN ON TH[ APPROl/£0 GRADING Pi.A~
27. LANDSCAPING SHALL 8[ ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED
BY TH[ CITY OF CARLSBAD LANDSCAPE. MANUAL, Tl-/[ LANDSCAPING PLANS FOR
THIS PROJECT, DRAWING NO.----~, AND/OR AS DIRECTED BY THE CITY
[NG/NEER OR PLANNING DIRECTOR.
T1700 0. PROJECT FILES D/2605 WALLACE/GP SH r1 .OWG
ROT: o·oo·oo" 0.0000,0.0000
11/15/2017
28. TH[ OWNER/APPLICANT SHALL INSURE THAT ALL CONTRACfORS SHALL COOFIU/NATE
Tl/[ WORK OF THESE GRADING PLANS WIT!-! !HAT S,YOWN ON BOT/I THt. LANOSCAPF
AND IRRIGATION PLANS ANO Tl-IF IMPROV[MFNT PL.ANS AS R[QUIRFO /COR THIS
WORK IN ACCORDANCE WI TH T.1-/E LANDSCAPE MANUAL TIMI: R[QUIREMEN IS
29. WHERE AN EXISTING PIPF UN[ IS TO B[ ABANOONFD AS A R[SUL T OF TH[
GRAD/NC OP[RA TION, IT SHALL B[ R[MOV[O VI/THIN TWENTY FEET OF BUILDING
OR sm[ET AREAS ANO R[PLAC[O WITH PROP[RL y COMPACT[D SOILS. IN OTHER
AR[AS TH[ PIP[ WILL B[ PLUGG[U WIT/ I CONCf/[T[ OR ,R[MOl/£0 AS APPROVED BY
Tf/E CITY [NG/N[[R.
JO. FHE CONTRACFOR SHALL 1/UllrY TH[ LOCA !ION OF ALL EXISTING FACILITl[S
( ABOVE. GROUND ANO UNU[R GROUND) WITHIN THE PROJ[CI SITE SUFrlCIENTL Y.
AHEAD OF GRADING TO P[RMIT THt.· ,?[VISION or iH[ GRAU/NG Pl.ANS IF IT IS
FOUND Tf/A T THE ACTUAL LOCA iiONS ARE IN CONFUCT WITH ii-IE PROPOSED
WORK.
)1. TH[ CONTRACTOR S/-IALL NOTIFY AfF[CTEU UTILITY COMP1\Nl[S (St.E BELOW) AT
LEAST 2 FULL WORK/NC DAYS PRIOR TO STARTING GRADING NEAR THUii
FACILITl[S AND SHALL COORDINATt. THE WO/iK WITH ~ COMPANY R[PI/CS[NTATIV[
UNDERGROUND SERI/IC[ ALE.RT (DIG ALE.RI) Iii/
SDG&[ (800)411-7343
AT&T (619)237 2787
SPECTRUM CABLE. (800)227-2600
COX COMMUNICATIONS (619)252-1122
CITY OF CARLSBAD(STRffTS & STORM DRAIN) (760)434-2980
Cl TY OF CARLSBAO(SEW£R, WA T[R & R[CI AIMCO WA T£R) (760)4.38-?722
32. P[RMIT COMPLIM/C[ R[QU/R[M[NTS:
A. FOR CONTROLL[O GRADING · · TH[ APl'LICAN r HIRES A CIVIi ENG/Nfffl,
SOILS [NGIN[ER, AND/OR GEOLOGIST ro GIi/[ T[CHNICAL AUi/iC[,
OBSERVE AND CONTROi. THE WORK IN PROGR[SS /15 16.120 A.8/
CAR/_SBAD MUNICIPAL CODE.
B. PRIOR TO COMP/ET/ON OF GRADING WORK -Tf![ FOLLOWING
REPORTS MUST BESUBMITT£D ~ THE. CITY E.NGINEE.R VIA Till.
PROJ[CT INSP[CTOR Pl'R SECTION IS. 16.120 OF Tl 1£ CARISBAD
MUNICIPAL COD[:
(1) FINAL ,R[PORT 8Y SUP[RVIS/NG G.1/AOING [NCIN[[R STA TING ALi'
GRADING IS COMP/ET[. AIL EROSION CONTROL, S/_OPJ: Pl.ANT/NC
ANO /RR/GA TION AR[ IN STAL/ED IN CONcORMANC[ WIT/ I CITY
CODE ANO TH[ APPROV[D PLANS (OBTAIN S/i/APL[ Of COMPUANC[
LETTER FROM CITY fNCINE£R!NC DEPARTMENT)
(?) AS-!3U/L T GRADING PLAN
(3) RE.PORT FROM Tl-/,C SO/IS [NGIN[[R, WIIICH INC/.UO[S
R[COMME.ND[D SOIL GEARING CAPACITIES, A STA !CME.NT AS TO
TH[ EXPANSIVE. QU~LITY OF THt SOIL, AND SUMMAR/f_S OF
Fl[LD AND /_ABORA TORY TCSTS. TH[ REPORT SHALL ALSO
INCLUDE A STkfEM£NT BY THf_-SOILS [NG/NEER THA r THE
CR ADI NG WAS DON[ IN ACCORDANCE WI TH THc R[QU/1/EMEN TS ANO
RECOMM[NDA TIONS OUTL/N[D IN TH[ PRELIMINARY SOILS RE.POTIT
ANO AN y SUPPU)AEN rs THERETO.
( 1) REPO/i T WI Ill AS-B!JIL T GEOIOGIC Pl AN, II R[QU/1/ED BY T/.JF
CITY.
(5) PERMANENT SfRUCTURiJ. BMP INSTALLATION CE_RTIFICATE.
(6) P[RMITTE.D WAI.L fu/AI. INSPCCTION RFPO/IT
33. UNLESS A GR,iDING PERMIT FOR Tl/IS PRO,J[CT IS ISSUED WITHIN ON/. (1)
YEAR AFTER T/-1[ CITY FNGINEER'S APPROVAL, Tll[SE Pl.ANS MAY B[ R[QU'RED
TO BE R[SUBMI r rw FOi/ nANCHtCK. PLANCI ![CK rE.ES WILL BE. R[QUIREU FO,R
ANY SUC/1 RE.CHECK.
3•1·. IN ACCORDANCE WIT/-/ TH[ CITY STORM WA TfR STANDARDS, ALL STORM DRAIN INLETS
CONSTRUCTED BY THIS PLAN SHALL INCL/JOE "STE.NC/LS" Bf /1UUED TO PROHIBIT
WASTEWATER OISCHARG[ DOWNSTREAM. STENCILS S/-IALL B[ AUD[O TU Tl I[
SATISFACTION or TH[ CITY ENGINFLR.
"DECLARATION OF RESPONSIBLE CHARGE"
I H[R[BY DECLARE Tl/AT I AM THE [NG!NcER OF WORK roR THIS PROJFCT, /HA I I
HAVE EXERCISED RESPONSIBLE CHARGE OV[R /HE DtSIGN Of THF PROJEC I AS O[F!NED
IN SECTION 6 703 OF Tf/[ BUSINESS AND PROFESSIONS COO[, AND THI\ r TH[ DESIGN IS
CONSISTENT WITH CURRENT STANDARDS.
I UNDERSTAND THAT THE Ch't.CK OF PROJt-CT ORAW!NGS ANO SPFCIF!CA TIONS BY THE
CITY OF CARLSBAD DOES NO! R[Ut. VE ML, AS ENCIN[[R 01 WOIIK, OF MY
R[SPONSIBILITl[S FOR PROJ[CT DESIGN.
Fl,,M: STAFNG/NF[RING INC
ADDRESS.· PO BOX 2636
CITY, STA TE: YIST A CA ~2085-2.fjJfi___
TEL[l"/-IONE· 760 1/58 8057
Br: LEONARD SCI-IA TZMANN
(NAM[ OF [NGIN[[R)
R.C.C. NO.: ,J=2~16~1 ______ _
R[GISTRA TION [XP!,RA TION DA ff: ~12~--~--~l/_-~2~0~78~---
SO!LS ENGINEER'S CERTIFICATE -~·---
/, MAMAOOU SAL/OU DIALLO , A R[GISTERt.D (CIVIL/
G[OTECHNICAL) ENGINEER OR TH[ s !A IE or CALIFDRNIA, PR/NC/RAU y UOINC
BUSINESS IN TH[ Fl[LO OF APPLIED SOILS MECIIANICS, 1-/[REBY CERTIFY THAT
A SAMPLING ANO ST/JOY OF THE SOIL CONDITIONS PREI/ALFNT 'NITHIN THIS
SIT[ WAS MADE BY ME OR UNDER MY DIRECTION BF TWEEN fH[ DA TFS OF
NOVEMBER )2, 2012 ANO U[C[M!J£R 2, 20_1:;j_ TV/0
COPIES OF TH[ SOILS REPORT COM,"'ILED FROM THIS ST/JOY, WITH MY
RECOMMENDATIONS, /-/AS B[[N SUBMIT !ED TO TH[ OFFIC[ OF TH[ Cl TY
U/G!NEER.
SIGN[IJ:
G.£./P.E NO.: 7704 I .540Zl___
DA TF:
LICENSE [XP/1/ATION DATE: 12-31-2017~-----_
OWNER'S CERTIFICATE
I ( W[ ) 1-/[REBY CERTIFY T/-!A T A REGISTERt.D SU/LS cNG!NEt,h/ OR
GEOLOGIST /-/AS B[[N Ori WILi. Bf Fl[TAINJ:O TO SIJPtRVISE 01/[R-AI./
GRADING ACTIVITY AND ltOVISE ON Tl-It. COMPACTION AND STABILITY UF-
Tl-'/S SITE. IF /HIS PROJECT/DEVELOPMENT IS SUBJECI TO A STJ, IE-
REGULA TED SVIPPP, I (VIE) ALSO AGR[E A 0/JAL/Fft.D S'IIPPP PRACTITIONEH
(OSP) HAS BEEN OR WILL BE RETA!NtU TO SUPEHV/S[ IMPLLM[NTA TION Of
Th[ SWPPP IN ACCOIIOANCC WITH ii-IE CA/II-ORN/A CONSTRUCTION ORO[R ,~NU
MUNICIPAL PERMIT, L_A TFST VFRSION.
CHR/'5T/Nc.· WALLACE DATc
SOURCE OF TOPOGRAPHY
TOPOGRAPHY SHOWN ON THESE PLANS WAS GENERA TED BY FIELD
SURV[Y METHODS ·FROM INFORMATION GA THER[O ON f3-c.-"2~5,__--"7""0,_,13'"-. ___ _
BY BARGER [NGIN~F[~R=ll"!G~----·--···
TOPOGRAPHY SHOVIN HEREON CONFORMS TO NATIONAL MAP
ACC~RACY STANDARDS.
PROJECT LOCATION
THIS ,0 ROJ[CT IS LOCA T£0 W//HIN ASSESSORS PARCtL NUMtJCll(S)
206-262-40
TH[ CALIFORNIA COORDINA T[ INDEX OF THIS PRO,J[CT IS:
N 360 _. E 16 71
EROSION. CONTROL NOTES
1. IN CASE [M[RGb\JCY VORK IS REQUIR[O, CONTACT CHRIST/NF WALi ACE AT
760-845-3230 (PHON[ NUMBER)
2. EQUIPMENT AND WORkERS UJR [M[RGE.NCY WORK SHALL 8[ MADE AVAILABLE AT ALL
TIMES DURING THE. RANY SEASON. AU NECFSSARY MA ![RIALS SHA!./. BE STOCKP!L[D ON
:i!TE AT CONVENIENT !OCATIONS W FACILITATE RAPID CONSTRUCT/ON OF TEMPORARY
DEVICES VIHEN RAIN 15 E.MINJ:NT.
3. FOR PROJf_CTS CO\/UtO HY ST kit_ SWPPP /WDIU, IN ACCORDANCE WITH TH[ CONSTRUCTION
4.
5.
6.
ORDER ISSUED BY Tl-If CALIFORNIA REGIONAL WA ffR QUALITY CONTROL GOARD, Tl-/[
QUALIFIED SWPPP PlACTIT/ON[R (OSP) SI/AIL UPDA T£ ANO MAINTAIN TH[ WA T[R
POLLUTION CONTROL (WPC) PLAN TO AOUi/[SS UPDA TEO SITE CONDITIONS OF THE PROJ[CT.
THE UPDA !LO WPC PL4N AND UPUAT[D SWPPP SHALL EJL KEPT AT TH[ PROJECT SIT[ AND
MADE A 1/AILABLE TO iH[ CITY INSPECTOR. ADDITIONAL CONSTRUCTION BMP'S BEYOND THE
ORIGINAL APPROVEU SWPPP SHALL BE PROVIDED TO AOOr/ESS SITE CONDI f/ONS NOT
ANTIC/PA ffD. THE. QSF SHALi. REPORT t!MP DEFICl[NCIES TO THE. CITY INSPECIDR. THc
QSP Sf/ALL OBTAIN APPROVAL FROM THF QUALIFIED SWPPP DEi/ELOPER ANO Tf/[ CITY
INSPf.C /OR REGARD/NC ANY SIGNIFICANT CHANC[S TO GMP DEPLOYMENT.
THC CONTI/ACTOR SHJLL RESTORE ALL [ROS/ON CONTROL 0[1//CES ro WO/i.KING 0.~0£R
ID THE SA TISFAC/iON OF Tl/[ CITY [NGINEFR AFTf_R [ACH RUN-OFF PRODUCING RAINFALL.
Tl/£ CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL ME.ASURE.S AS MAY BE
REQUIRED BY THE °,/TY [NGIN[E.R OU[ TO UNCOMPIETED CRADINC OPERATIONS OR
UNFOR[S[EN CIRCUMS ,~NCES WHICH MAY ARISE.
TH[ CONTRACTOR Sl/~LL GE R[SPONSIBL[ ,IND SHALL TAKE NECESSARY PRECAUTIONS TO
PREVENT PUBLIC TR,SPASS ONTO Al':EAS WHERE IMPOUNOf_D WA T[RS CREA ff A
HAZARDOUS CONDIT/Of'
7. ALL [ROS/ON CONT/iOL MEASURES PRO\/IU[O PEJi THE APPROVED SWPPP AND/OR
EROSION CONTROL PUN SHALL BE INCORPO!IA ffD fl FREON.
8 GRAO[D AREAS AROU!''D Iii[ PROJECT PER/MEIER Musr DRAIN ~WAY FROM THc fAC[ OF
SI.OPE AT Tl-IE CONCLUSION OF EACH WORKING DAY.
9. ALL REMOVABLE PliOTECTIV[ UcVICES SI !OWN S!IALL BE IN PL~CE AT /HE ENO OF EAC/-1
WORKING DAY WHEN TH[ FIVE. (5) DAY RAIN !'ROBABIL/TY FORECAST [XCE.E.OS FIFTY
i0ERCENT (50%) SILT JNO OTIIFR D[BRIS S/-/ALL B[ R[M0\/[0 AFTER EACH RAINFAU
10. ALL GRAVEL BAGS SHILL BE BURLAP TYP[ WfiH 3/4 INCH MINIMUM AGGREGRA 7-C· ~~
11. SI !OULO GERM/NATION OF HYORUSEFD[D SL.OPES FAIL TO PROVIDE EFF[CTII/[ COV[RAC[
OF GRADLD SI.OPCS (JO% covt.-RACE) PR/OT/ TO NOVEMUER 15, fl-/[ SLOP[S SHALL ,SF.
STABIL/lLD BY PUNCH STRAW INSTA/_LED IN ACCORDANCE WITH S[CTION .35.02.5 OF I/IE
E.ROS/ON AND SEDIM[NT CONTROL HANDBOOK OF THE D[,OARTMENT OF CONS[RVA T/ON,
STAT[ OF CALlrORNIA.
TEMPORARY EROSION CONTROL
PLANTING AND IRRIG/\ TION
ALL P[RMANt.N r ANU TEMPORAIIY [ROS/ON CON rROL PLANTING AND IR/i/GA TION SHALL BE
INSTALLED AND M,\/NTAINEO AS R[QUIR[D IN SECTION 212 OF TH[ STANDARD
SPECIF/CA T!ONS AND cff FOLLOWING:
A. 1-IYDROS[EOING SHAU 8£ APl'LIEO TO:
1 A!.L SLOPES Tl/A I ARC GliADW 6: 1 (HOR/10NiAL TO Vt.HTIC~L) OR SIEEP[R ,~HEN
lH[Y AHE:
a. /////[[ F[[T OR MOR[ IN /-IUGHT AND AOJAC[NT !O A
PU!JL/C WAL/_ OR STR[[T.
b. AU_ SLOFfS 4 FE[T OR MO,R[ lN 1-IE!Gh'T.
2. AREAS CRAD[D FLA TT[R THAN 6: 1 WI l[N ANY OP Tfl[ FDLLOWING CONU! FIONS
EXIST:
a. NOT SC/-IEDUL[D FOIi IMPROV[MENTS(CONS fRUCl!ON 0,~ GENERAL
LANOSCAF!NG) WIT/-1/N 60 DAYS OF f/OUCH Gf/AOINC.
b. ID[N liFl[C BY THc PARKS AND RECREATION DIRECTOR AS II/CHI Y
I/IS/BL[ TO TH[ PUBLIC.
c. HAVE AN'. SPcDAI. CONDITION IDENTIFl[O BY THE CITY ENC1NF[R
THAT WARRANTS IMMEOIA IE TRE_XfM[Ni.
B. 1/YDROS[EIJED AR[AS ,HAU Be IF/RIGA/ED IN ACCURO/,NCc WITH TH[ FOLLOWING
CRITERIA:
1 ALL SLOP[:, FHA I AR[ GRADED 5: ! UR STcH-'cR ANU I/IA T /,r/[:
o. THREE TC c/G/-IT FITT IN HEIGi-iT SHALL 8£ IRRIGATED BY HAND
WATERING FROM 0/JICK COUP!ERS/HOSE BIBS OR A CONV[N TIONA/
SYSTEM CF LOW PRtDPITA liON S/-'R/NKLE.R HEADS PROVIDING 100%
COVERAGE.
b. GR[AT[R !}/AN 8 Far !N /-/[IC/IT 51-/ALL /][ WA TF.R[D BY A
CON VEN IDN1\L SYS/EM Of. LOW PRECIPIIA TION Sl"R/NKLt.H H[AUS
Pf/OVID/NC 100% COV[RACE.
?, AREAS SLOP[[' LESS Tl/AN 6: I S/JAU_ B[ /RR/GA TED AS APP,ROV[O BY Tl-I[ CITY
CNGINffR, Pli/JR TO HYOROSE[U/NG, THC: DEVE.LOP[R SI/ALL SUGM/l A PROPOSED
SCHEME TO PPOVIOF IRRICA TION /0 THE CITY [NGIN[[R. THE PROPOSAL SHALL [)[
SPECIFIC REGPRDING Tl-IF NUMBERS, TYPES AND COSTS OF TH[ E.IIM[NTS OF THF
THE PROPOSE[' SYSTEM
3. /,Rf/lGA TION SHALL MAINTAIN fH[ MO/STU/it. LEl/[L OF Tl-IE SOIL A I T,/-1[ OPTIMUM
IEV[L FOR TIE GROWTI I OF Tl/[ HYDROSEEDED G,,OWT/1
C. HYDROSE[DING MIX SH,L/_ CONSIST OF ALL OF THt FOI_LOWING:
1 SEED MIX SHAL!_ CONSIST OF NO LESS Tl /AN:
a. 20 lbs. PER ACR[ OF ROS[ CLO\/[R
b. 20 lbs. PiR ACR[ OF 10RRO FE.SCUE.
c. 3 lbs. PE, ACRF OF c SCHOOL CIA CAL/FORN1CA
d 4 lbs. P[o ACRE OF 1\Cll/1/_[A MILLEFO/.IA
e. 3 lbs. f-J[(,, ACRE ur-AL YSSUM (CARPF r or SNOW)
f, 1 /2 lb. ?FR ACRF OF 0/MORPHOLCCA
g ITEMS c,d,e, ANU f OF THIS SUBSECTION MAY BF OMITT[O ON
LOCATIONS WHUIE THE AR[A BEING I IYDROS[[O[D IS NOT VIS/BL[
FROM [ITl-[R A PUGL/C STR[t.T OR R[S!D[Nr!AL STRUCTURES.
h. IT[M u ,)F /HIS SUBSECTION MUST B[ INOCULATED WITH A
NITROGt.N ax/NC BACT[RIA AND APPL!t.D DRY ffTH[R BY DRILLING
OR BROAOCAS f/NG OU"ORC HYDROS[[OING.
,. ML 5[[0 11,i fffllALS SHALL BE TRANSPORTFD TO Tl![ JOGSIT[ IN
UNOPENED CONTA!NtRS WIT/I TH[ C1\LWO!,NIA O[PARIM[NT OF
FOOD AN[ AGmCULTURF. CFRTIFICA TION TAC A TT~CH[O TU, OR
PRINffD 011 SAID CONTAINCRS.
J. NON-PHY{,)-TOXIC WETTING ACt.NTS MAY /Jc ADUED TO IH[
HYDROS[[[ $!_URRY AT TH[ DISCR[TION or iH[ CONJRACTOR.
2 TYl-'E_ 1 MULCH APPLIED AT rHE RA TE 01 NO LcSS Ti/AN 2000 lbs PFR ACRc.
TYPc 6 MlLC/1 (STRAW) MAY BE SUBSTITUTED, ALL 0,7 PART, FO,fl
HYDRAULICALLY APPLIED FIBcR Ml, F[RIM. WHEN STRf,W IS UScD !T MUST [3[
ANCHORED TO TIit S!OPE. GY M[C/-IANICALL Y PUNCHING NO LE.SS TH/1N 50% OF
TH[ STRAW INTO THt. SOIL.
3. F[RTILIZ[R CONSISTING OF AMMONIUM PHOSPIIA T£ SIJLc/1 TE, 16-20-0, //IT/I lo%
SULPHUR AI/P/./cD AT /HF RA iE Or 500 lbs. PER ACR[
U. ~//[AS TO B[ HYUROSE,0£0 SI-IALL [][ Pl/[PARED PR/011 TO HYUROSETUINC tJY:
1. RO!JGHENING T/-c SURFACE TO BE PI_ANTE.D BY ANY OR A COMB/NATION OF:
a. TRACK WA_K/NG SLOPES STF[P[R THAN 6: 1
b. I/Al/ROW/NC AR[AS 6: 1 OR FLA TTUI THAI Ali[ SUfFICl[NlL Y
/CRIABL£.
C. Fl/RP/NG AP LAS n /AT WILL NU r BR[AK UP USING ITEMS (] OR b
ABOVE
2 CONDITIONING Tl[ SOILS SO THAT IT IS SUITABLE FDR !-'LANT/NC HY
o. ADJUSTING THE SURFACE. SOIL MO/SfUR[ TO PROV/DC A DAMP
BUT NOT SATURA TFD SEFD BFD.
b. Tl/[ AUD/TUN OF SOIL AMENDMENTS, F'/1 ADJUSTMENT, IFAC/1/NG
COi/ER/NC SALIN[ SOI/ S /0 PROVIDED VIABLE COND/ilONS FO,R
CROWT/-1
C 1/YUf/OSEfDED Arl[A'.i S,JAL/_ BE MAIN/A/NEU TO Pf/01/10[ A VIGOROUS GROWTH UNTIi. TH[
TH[ PROJECT IS P[RMAIIFNTL Y I ANDSCAPEO OR, fOR ARU,S WHEH[ HYO!iOSffD!NG 1'.i Tl!£
TH[ F'[RMANCNT LAN[SCAr!NG, UN f/L 1/-1£ PROJECT IS COMPIFTFD AND AU BONDS
1/ELEASEU.
F. ALL SLOPES SHALL H.WE IRRICA TION INSTALLED AND BE SIABIL/lt.D, PLANTED AND/011
HYDROS£ED£D WITHIN TEN (10) DAYS OF TH[ TIM[ ilf./EN EACH Si.OP[ IS DROUG/IT TO GRAD[
AS SHOWN ON TH[ A!-'P,IOV[D GRADING PLANS. AN APPROVED cROS/ON CON lROI. 1/ROOUC r
(RECP) SHALL 8£ IN STALED PER EC-· 7 IF THIS REOU!RfJv![NT CANNOT BC MET. v'UT[,
[XC[LS/0.9 OR STRAW B1ANKFT IS UNACC[/JTA!JL[.
G. S/-/OULD GERM/NATION ff HYUROS[ED FAIi TO PROV/Of [!FIC!FNl COl/[RAG[ (NO LFSS !H11N
70%) PR/OF/ TO OCTOE[R 1, THE SLOPES SHALL BE STABILIZ[D BY AN APPROVED R[CP.
JUTE, [XCE.LSIOR ANO scRAW BLANKET IS UNACCEPTABLE.
H. LANDSCAPING SHALL BE ACCOMPUS/-l[D ON ALL SLOPES AND PADS AS ,R[QU/1/LD BY Tl IE
CITY LANDSCAPE MANUA', TH[ LANOSCAP[ Pl.ANS FOR THIS PRO,J[CT OR AS Dmt·CT[D BY
TIIE CHY f.NGIN[[R OF/ ,;/ TY PL ANN FR.
VICINITY MAP WORK TO BE DONE
THE GRADING WORK SHALL CONSIST OF TH[ CONSTRUCTION OF ALL CUTS AND FILLS,
CITY OF OCEANSIDE
HIGHWAY
R[M[D/AL GRADING, ORA/NAG[ F AC/LI Tl[S, [ROS/ON CONTROL F AC/LI Tl[S, AND
PLANTING OF P[RMAN[NT LANDSCAPING AND PR[PARA TION OF AS-·BUILT GRADING PLANS,
AS-BUILT GEOLOGIC MAPS ANO F/[POf/TS, ALL AS SHO'M~ OR R[QUIR[O ON THIS S[T
OF PLANS AND TH[ CITY STANDARDS, SPECIF/CATIONS, R[QUIR[M[NTS, RE.SOLUTIONS
AND ORDINANCES Cl TED ON THESE PLANS.
Tl-I[ GRADING WOFIK SHALL BC P[RFORM[D IN ACCORDANCE WITH /HE FOLLOWING
DOCUMENTS, CURRENT AT TH[ TIME OF CONSTRUCTION, AS DIRECT£[ BY THE CITY
NOT TO
SCALE [NG/NEER.
SIT[ '
PACIFIC:
OCEAN
LOCATION MAP
INDEX OF SHEETS --···
/. GRADING T!TL[ SH[[T
2. GRADING PLAN
4.
Tl[R 2 SWPPP IJTL[ SHE[T
SWPPP
LEGAL DESCRIPTION
PARCEL 2 OF PM 15570, IN THE CITY CF CARLSBAD,
COUN rY OF SAN Df[GO, STA ff or CALIFORNIA
PROJECT ADDRESS
3935 SYME DPfVE
CA.RLSBAD, CA, 92009
OWNEH/DEVELOPER
NAM[: CHRISTINE WALLACE & DAVID FAEER
A/JUR[SS: 511 PIN[ A VE.NU[
CARLSBAD, CA 92008
PHONE NO: 760-845-3230
REFERENCE DRAWINGS
EARTHWORK QUANTITIES
CUT: __ -~/J~O_CY
FILL: 110 CY
IMPOFIT: __ ----'O"-CY
[XPORI' __ O_ CY
R[ME.DIAL:--80 CY
BENCH M/\RK
D£SCf?!PT!ON: 2.5" UISC iN NOl?T!-f CUiW rAC[
LUCA TION: CAR!.SBAD VILLAGF ORIV£, NORTH SDF CURB, 0.1 MILE
WEST OF 11/GI-II_ANU DRIVE
,R[CORD[O:. C.~s=·l=B_-~12=2~-----
aEVA TION: 121.190
--------
UNUM: _ NGl/0 29
1, CARLSBAD MUNICIPAL COO[
2. CITY OF CARLSBAD E.NCINE[R/NG STANDARDS
3. THIS S[T OF PLANS
4. R[SOLU TION NO. N/A DA T[O,_-".NL/C'-A __
5. TH[ STANDARD SPECIF/CATIONS f-OR PUBLIC WORKS CONSTRUCTION (GR,[N
BOOK).
6. SOILS REPORT AND RE.COMMENDATIONS BY (65T COUNTY SOIL CONSUL 7A l]!)N ANO
AND FNCIN[[RING INC. DATED 12-2-2015.
1. TH[ SAN DIEGO REGIONAL STANDARD DRAWINGS AND AS MAY BE MOD/F/[D BY
TH[ CITY OF CARLSGAD STANDARDS.
8. CALIFORNIA COASTAL COMMISSION DEVELOPM[NT P[RMIT CONDITIONS
DA T[D ___ -------------
9. [NVIFIONM[NTA/. APPROVAL DOCUMENTS OAT[O _1~~/~A _____ _
10. STORM WATER POLLU f/ON PRE\/[NTION PLAN PR[PAR[D
BY STA ENCIN[ERING INC. DAT[D 10-16-2017
WO/ONO. N/A -~----------
11. STOFl,\,i WATER QUA/.ITY MANAGEMENT PLAN PREPA~ED
BY NIA DATED N1A
12. CALIFORNIA STORM WATER QUALITY ASSOC/A TION BMP CONSTI\UCTION /-IANOBOOK ANO
CAL !RANS CONSTRUCTION SITE BMP MANUAL ..
DESCRIPTION
EXISTING CONTOUR
[X/STING SPOT EL[l/A TION
PROPOSED CON TOUR
PROPOS[D SPOT ELEVATION
CARTHEN SWALE
FILL SLOPE
LEGEND
DWG,NO. SYMBOL
;•; w,,s, ,, __
i,'.;:'j J
150
E{l.J
------r I [I 'f
-11 C ---tt-F CUT/FILL. LINE
DAYLIGHT LINE
CONCRETE. SURFACE.
7r--11
l ~. 'J
PLAN PREPARED BY:
ST A ENGINEERING, INCORPORATED
PO BOX 2636 2530 3/4 FOOTHILL DR!VE
VIS rA, CA. 92085-2636 (760) 758-8057 FAX: 758-8059
SURVEYING, CIVIi. & TRAFFIC ENGINEERING
-:L,_~~-~--~~
LEONARD SCHATZMANN(PE C321-61, [XP DATE 12/31/2018
11/16/201/
DATE
STRUCTURAL (POST-CONSTRUCTION) BMP TABLE
STORM WA T£R R[OUIR[M[NTS THAT APPLY: [X[MPT FROM HYDROMOOIFICA TION?
QUANTITY
B STANDARD STORMWA TE.R R[QUIR[M[NTS
PRIORITY PROJ[CT R[OUIR[M[NTS
□ Y[S (SE.[ SWMP FOR DOCUM[NTATION) LJ NO
TYPE DESCRIPTION OWNERSHIP
TOTAL I.OT AliEA = 12. 724 S.F.
TOTAL D!STURBE.O AREA = ~1~1 =J=OO~S=.F~·----
(TI-IIS AR[A INCLUDES BUT IS NOT LIMIIED TO
OFF-·SITE WORK INCLUDING PU/3L/C IMPROV[M[NTS
AND TEMPORA!iY DISTURBANCE SUCH AS VE/-1/CL[
AND [QUIPM[NT STAGING A,7EAS, CONSTRUCTION
WORKER FOOT TRAFFIC, SOIL/GRAVEL PILES, UTILITY
TRENCHES, BACKrlLL CUTS AND SLOP[ K[YWA YS)
TOTAL REPLACED IMP[RI/IOUS AR[A = ~2=39~--
TOTAL PROPOS[D IMPERVIOUS AR[A -~4=9~19~_
MAINTENANCE
AGREEMENT SHEET NO. MAINTENANCE
FREQUENCY
11 A S B LJ I L T 11
~-~
RCF 32161 EXP 12/31/2018
_1Q/31/20Is
DATE
I----+--+------~· ------1--+---f----+---I I SH1EET I CITY OF CARLS B J\.D ~4-ETS
ENGINEERING DEPARTMEN·r ~
L__. -----·--------------~ ---~,----f------j----+-----j ~===-'================~
' GRADING PLANS FOR:
-+------+----+-----! WALLACE RESIDENCE
~---1----l -------~-----------+-----C----J---+---J 3935 SYME DRIVE
GR 2017-0051 TITLE SHFFT ~---+----+-----------------~ -+---+---+----C---_, ;c==============================;
APPROVED a,..,~ JASml );fif~J;T L------·--------------------+---+----+----+----!
----l---f--~/'1\~p_..,,,.,,..,,_-fr i~.§ ;,.-lb<, A,J»&,, Jtt
J -l----+----1----+-----l DA ff INITIAl.
---------
ENGINEER OF WOF~K REVISION DESCRIPTION
DATE INITIAL
OTHER APPROVAL
DATE INITIAL
CITY APPROVAL
CITY ENGINEER" RCE 63912 EXPIRFS 9/30/18 '□ATE
OWN BY: LFS
CHKD BY: LFS
RVWO BY: LFS
PROJECT NO. I DRAWING NO.
CDP 13-20 507-1A
•
...
0 ...
,i:,.
□ jJ
~
2
(j)
2
C s:
Ol m
jJ
0
jJ
~
2
(j)
2
C s
Cll m Jl
Cl I
2
(j)
2 C s:
OJ m
jJ
□ jJ
i ~
(i) 2
YI (j)
0 ..,. 2
' C: .... s: )> to m jJ
w
" (D
z
C
36.00'
f n .. h , 'l~:>/
I
• I
.I
\ ~ I U7 = I
I
I
I
I
,, A"
N 28°40'13" W Hi21.46'
BUILDl~G I.INC:
-149
I
63.33'
STACKABLE WALL,
3' HEIGHT, 2.5'
EXPOSED MAX
u.I_ -II F
; -'---148 -
B
10 5 0 10 20 30
I""" 1~~-L~~~
PLOTT ABLE EASEMENTS:
A. 5' WIDE PUBLIC UTILITY EASEMENT TO CITY OF CARLSBAD RECORDED 3-2/-1986 AS
FILE NO. 86-118023 OF D.R.
B. 7.5' WIDE EASEMENT FOR INGRESS, EGRESS /\ND INCIDENTAL PURPOSES TO l~ARG/\RET
WALLACE Rfa.NNEY RECORDED 7-01-1944 IN BOOK 1685, PAGE 497 OF D.R.
C. 5' WIDE S.D.C&E. EASEMENT RECORDED 6-03-1942 11~ BOOK 1352 PAGE 109 OF O.R.
UNPLOTTABLE EASEMENTS:
1. NONE OF THE ROADS OR STREETS DELINEATED ON MAP 1681 ARE WITH!N THE BOU~DARY
OF THE SUBJECT PROPERT~
2. 10' WIDE EASEMENT FOR ROAD PURPOSES TO CITY OF CARLSBAD, Rc:CORDf:D 6-2)-1982
AS FILE NO. 82-191870 OF O.R., IS FOR THE WIDENING OF TAMARACK AVENUE WHICH IS
NOT WITHIN NOR DOES IT ABUT II-IE SUBJECT PROPERTY.
PLAN PREPARED BY:
STA ENGINEERING, INCORPORATED
QtESSiO,t;
o Schot< ~< P.O. BOX 2636 2530 3/4 FOOTHILL DRIVE
VISTA, CA. 92085-2636 (760) 758-8057 FAX: 758-8059
SURVEYING, CIVIL & TRAFFIC ENGINEERING
T1700 0: PROJECT FILES D/2605 WALLACE/GP SHT2.DWG ROT: 61°19'47" 0.0000,0.0000
11/17/2017
DATE
11/15/2017
-?; ~ o Cl
0. C.32101 ; Z
CIVIL
OF CA\_\
re '"' Co
N 28°40'13" W 105.56' C01~C CURB
DEEPEN ;\SkREOUIRED
ABBREVIATIONS
FF -FINISH Fl OOR 'I 1::\/A 110~1 cs -CRAWL SPACE ELE\/ATON
PAD -PAD ELEVATION
TC -TOP OF CURB
Fl. FLOWLl:~E
HP HIGH POl•~T
TP IOP OF PA\/Hi'.ENT
ASPH ASPciAL T
CONC -CONCRETI::
PROJECT ~!OTES.
1. GRADING TO BF PcJ! CITY OF C/\f1LSG/\D DWC GS 15.
2. CARRY SURF /\CE 1NATER TO ~,EARfST STREET.
3. SWALE SLOPE 10 BE I% MIN.
4. F"l:~!SH SURFACE SI_OPE 'O RE 1% MIN.
5. ROOF DOWN SPOU IS TO BE IJISS'PA TED AND
DISCHARGED l~ITO I A.NDSCAPEQ AkFAS.
6. MINl~IIZC l<'~PFRVIOUS SUkFACfS WI !f:RE c[ASl8L[
7. PROGRESSION OF WORK TO BFCIN WITH DIGGING OU I /
SOIL UNDER /\ND AROU~D PROPOSED STRUCTUR" TIC
/\I_LOW CONSTRUCTION oc STE\11 WALL, Tl !lN
F'REPA,~ATION OF PAD UNO[~ GARAGE A,~D THEN
BACKF!I_L AC1\INST STEM W/\LL AND FINISH GRADING
AS SHOW~! ON THIS PIAN.
/
/
N
(D
a,
"'
·w
' 0
U)
0
" tO
z
I ;
20.98'
' a,
0 0
n U)
" "1
0 " 0J II
Ji, o:;
I
f
·o
" "' II _J
3" P;\/C WALL
.. DRAIN
w
w
,:\ ~o
,._L1l "-",'
0
" tO
z
3'.YME
DRIVE
-150-
' ' ' ' I 1----------
FF 151.50
FNISH GRADE
---
' -
-165-
I-
LL w
__J
s:
0
__J
w
[I]
w
-150-
w c.n
• ' 7 w
.l z
__J
: ~ .....
--: : : \_ EXISTING ~LOCK WALL
----\ EXISIIN; GROUND
I
I-u
<(
2
-145-
0
l.p·····R·······O·······F·····l·L···· .. E.··.·•·.·.·S .... ·.C .. '.··.A.-.. · .. L. Esl···'.:i·'······ HORIZ: 1" = 4' '
VERT: 1" = t \
10
-155-
I-
I
Cl
et::
w > 0
[I]
<(
s: w w c.n
w z
__J
I
1-u
<(
> -145-
50
BENCH MARK
O[SCR!Pl/UN
FF 151.5(
~ ~ <(""''
3c
0
0 ~
CD
I·~
X
'-W
20
MEf AU FLASHING
PER BUILDING Pl.ANS
----1----
L_J ..
60
SECTION
....-=' ' --
CONC FTG TO BE IN
CO~PETEN ( u,;01s fURBEb''
SO!L, PER SOILS REPORT
30
EXISTING GRouno
70
,, A,, ,, A,,
--145-
40 50
--155-
-150-
-145-
80
11 A S B U 11_ T 11
~~c/~ 10;31;201s
RCE 32161 EXP 12/31/20_1il_ DATE
!.OCf, T!ON: _________________ _
li[CORO[D: _________________ _ ,/,sit't
[L[VA TION. DA TUM: NCVO 29 ,-DATE
-~' ---1'----+---+---J [_SH2EET I CITY OF CARLSBAD [SH4EETS I
,-;==:=::=:_'::==:=E::::N::::G:::::I N~E:::::.E::::R::::I N::::G:::::::::D::::E=P::::;AR::::;T::::;~:='E::::N::::;' T==:'....':::==~
GRAD ING PLANS FOR:
o-----t-----,-------~-· ----·--·----+------+---+---+-----+
l----+------+-----------·----~ +---
D/\TE INIT!AI_ DATE INITIAL
E:NGl.\iE:ER OF WORK REViSl·)N DESCRIPTION OTHER APPROVAL
DAT[ INITIAL
CITY APPROl/r-\L
WALLACE RESIDENCE
3935 SYME DRIVE
GR 2017-0051
APPROVED: /U ll:iJ:' JASO~
CITY ENGINEE,~ / RCE 63912 EXPIRES 9 30 18
-DW:'i DY: LFS
CH:<D BY: LFS
RVWO BY: Lf·s coPR 0 J1E3~20 1 so1'~G1A
---
'
N
0 ...
"'
□ I
2
Ci)
2
C: s:
Cl m ll
□ ll
i
2
(jJ
2
C s:
Cl m ll
□ ll ~
2 Gl
2
C: s:
to m
ll
□ ll
0~ :ii -Cl 2
Ul Gl
0 2 -,I C ' ... s: :t> tJJ m
ll
---·--------------------------------
STORM WATER POLLUTION PREVENTION NOTES
TIER 2 CITY STORM WATER POLLUTION PREVENTION PLAN (TIER 2 SWPPP)
SW CITY OF OCEANSIDE
HIGHWAY 78 GENERAL SIT[ MANAGEMENT REQUIREMENTS
TH[ FOLLOWING GENERAL SIT[ MANAGEMENT R[OU!R[M[NTS SHALL 8[ ADHERED TO
THROUGHOUT TH[ DURATION or TH[ CONSTRUCTION WORK (YEAR ROUND}.
I. IN CASE [M[RG[NCY WORK IS R[QU!R[O, CONTACT· CHRISTIN[ WALLACE
FROM: OWNER AT (TEL NO.) 760-845-.52.50
2. O[VIC[S SHOWN ON CITY APPROVED PLANS SHALL NOT 8[ MOVED OR MOO/Fl[D
WITHOUT TH[ APPROVAL or TH[ [NG!N[[R/NG INSPECTOR.
3. TH[ CONTRACTOR SHALL R[STOR[ ALL [ROS/ON CONTROL D[VIC[S TO WORKING ORDER
TO TH[ SATISFACTION or TH[ CITY [NGIN[[R AFTER [ACH RUN-arr PRODUCING RAINFALL.
4. TH[ CONTRACTOR SHALL INSTALL ADDITIONAL [ROS/ON CONTROL MEASURES AS MAY 8[
REQUIRED BY TH[ CITY [NG!N[[R OU[ TO UNCOMPLETED GRADING OPERATIONS OR UNFORS[EN
CIRCUMSTANCES WHICH MAY ARISE
5. TH[ CONTRACTOR SHALL 8[ R[SPONS!BL[ AND SHALL TAKE NECESSARY PRECAUTIONS
TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE !MPOUNO[O WATERS CREATE A HAZARDOUS
CONDITION.
6. GRADING AREAS AROUND TH[ PROJECT PERIMETER MUST DRAIN AWAY FROM TH[ FACE
or SLOP[ AT TH[ CONCLUSION or [ACH WORKING DAY.
1. ALL REMOVABLE PROTECTIVE O[V/C[S SHALL 8[ IN PLACE AT TH[ END or [ACH WORKING
DAY WHEN FIVE (5) DAY RAIN PROBABILITY FORECAST [XC[[DS FORTY P[RC[NT (40%}. SILT
ANO OTHER DEBRIS SHALL 8[ REMOVED AFTER EACH RAINFALL.
8 ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM AGGREGATE.
9. ALL EXPOSED DISTURBED AREAS MUST HAVE [ROS/ON PROTECTION BMPs PROPERLY
INSTALLED. THIS INCLUDES ALL BUILDING PADS, UNFINISHED ROADS, ANO SLOPES.
10. ADEQUATE P[RIM[T[R PROTECTION BMPs MUST BE INSTALLED AND MAINTAINED ANO
WILL 8£ UPGRADED, IF NECESSARY, TO PROVIDE SUFFICIENT PROTECTION FROM RUNOFF
DURING RAIN [VENTS.
11. AD[QUA TE SEDIMENT CONTROL BMPs MUST 8[ INSTALLED ANO MAINTAINED.
12. AO[QUAT[ BMPs TO CONTROL OFFS/TE SEDIMENT TRACKING MUST 8[ INSTALLED AND
MAINTAINED.
/J. A MINIMUM or 125% or TH[ MATERIAL N[[D[O TOO INSTALL STANDBY BMPs TO
PROTECT TH[ EXPOSED AREAS FROM EROSION ANO PREVENT SEDIMENT DISCHARGES,
MUST BE STORED ONS/T[. AREAS ALREADY PROTECTED FROM EROSION USING PHYSICAL
STABILIZATION OR ESTABLISHED VEGETATION STAB/LIZA TION BMPs ARE NOT CONSIDERED
TO 8[ "[XPOS[D" FOR PURPOSES or THIS R[QUIR[M[NT
14. TH[ OWN[R/D[V[LOPER/CDNTRACTOR MUST FOLLOW "W[A TH[R TRIGGERED" ACTION
PLAN AND 8[ ABLE TO DEPLOY STANDBY BMPs TO PROTECT TH[ [XPOS[O PORTIONS OF
TH[ SIT[ WITHIN 48 HOURS or A PR[O!CT[O STORM [V[NT (A PREDICTED STORM [VENT
IS O[FIN[O AS A 40% CHANCE or RAIN WITHIN A 5-0AY NATIONAL W[ATH[R S[RVIC[
FORECAST}. ON REQUEST, TH[ OWNER/D[VELOP[R/CONTRACTOR MUST PROVIDE PROOF
or THIS CAPABILITY.
15. DEPLOYMENT OF PHYSICAL OR V[G[TA TION [ROS/ON CONTROL BMPs MUST COMMENCE
AS SOON AS SLOPES AR[ COMPL[T[O. TH[ OWNER/DEVELOPER/CONTRACTOR MAY NOT RELY
ON TH[ ABILITY TO DEPLOY STANDBY BMP MATERIALS TO PREVENT EROSION OF SLOPES THAT
HA V[ B[[N COMPLETED.
16. TH[ AREA THAT CAN BE CLEARED, GRADED, AND LEFT EXPOSED AT ONE TIME IS
LIMITED TO TH[ AMOUNT OF ACREAGE THAT THE CONTRACTOR CAN AD[QUA TEL Y PROTECT
PRIOR TO A PREDICTED RAIN [V[NT. FOR LARGER SITES, GRADING SHOULD 8[ PHASED.
IT MAY 8[ NECESSARY TO DEPLOY EROS/ON AND SEDIMENT CONTROL BMPs IN AREAS THAT
AR[ NOT COMPLETED, BUT AR[ NOT ACT!VEL Y BDNG WORKED BEFORE ADDITIONAL GRADING
IS ALLOWED TO PROCEED, AT TH[ DISCR[TION or TH[ CITY INSPECTOR.
11. ALL DISTURBED AREAS THAT ARE NOT COMPLETED AND/OR NOT BDNG ACTIVELY GRADED
MUST BE FULLY PROTECTED FROM EROSION IF L[FT FOR 74 OR MORE DAYS. THE ABILITY
TO INSTALL BMP MATERIALS IN A PROMPT MANNER IS l1f1I SUFFICIENT. BMPs N[[D TO 8[
INSTALLED IN TH[S[ AREAS.
18. BMPs MUST 8[ STOCKPILED AT VARIOUS LOCATION THROUGHOUT THE PROJECT SIT[
THROUGHOUT TH[ Y[AR. WHENEVER THERE IS A 40% CHANCE OR GR[A T[R OF A RAIN
WITHIN A THR[[ (J) DAY FORECAST, TH[ INSPECTOR WILL VERIFY THAT BMPs AR[
ADEQUATELY STOCKPILED. BMPs MUST 8[ STOCKPILED AND READY FOR DEPLOYMENT WHEN
TH[R[ IS 50% CHANCE or RAIN WITHIN A 48 HOUR FORECAST. FAILURE TO COMPLY WITH
THIS R[OUIR[M[NT COULD RESULT IN TH[ ISSUANCE OF A STOP WORK NOTICE OR OTHER
ENFORCEMENT ACTION.
19. ALL TREATMENT AND EROSION CONTROL BMPs MUST 8£ INSP[CT[D W[[KL Y AND
PRIOR TO A FOR[CAST[D RAIN [V[NT or GREATER THAN 50%, AND AFT[R A RAIN [V[NT.
IN ADDITION, TREATMENT CONTROL BMPs MUST 8£ SERVICED AS NEEDED THROUGHOUT
TH[ YEAR.
20. IF SELECTED BMP FAILS DURING A RAIN [VENT, IT MUST 8[ REPAIRED OR IMPROVED
OR REPLACED WITH AN ACCEPTABLE ALTERNATE AS SOON AS IT IS SAFE TO DO SO. TH[
FAILURE or A BMP IND!CAT[S IT WAS NOT AD[QUA T[ FOR TH[ CIRCUMSTANCES IN WHICH
IT WAS USED. REPAIRS AND REPLACEMENT MUST TH[R[FOR[ PUT A MOR[ ROBUST BMP
MEASURE IN PLAC[.
27. ALL CONSTRUCTION [MPLOY[[S MUST B[ TRAINED ON TH[ IMPORTANCE OF STORM
WATER POLLUTION PREVENTION AND BMP MAINTENANCE
WEATHER TRIGGERED ACTION PLAN
TH[ DEVELOPER SHALL DEPLOY STANDBY BEST MANAG[M[NT PRACTICE MEASURES TO
COMPLETELY PROTECT TH[ EXPOSED PORTIONS or TH[ SIT[ WITHIN 48 HOURS OF A
PREDICTED STORM [VENT ( A PR[D!CT[D STORM [V[NT IS DEFINED AS A FORECAST[D, 40%
CHANG[ or RAIN BY TH[ NA T!ONAL WEA TH[R S[RVIC[}, IN ADDITION TO BMPs !MPL[M[NT[D
Y[AR-ROUND INCLUDING P[R/M[T[R CONTROL, WIND [ROS/ON CONTROL, TRACKING,
NON-STORM WA T[R CONTROL, WAST[ MANAGEMENT, AND MATERIALS POLLUTION CONTROL
TH[ NATIONAL WEATHER SERVICE FORECAST SHALL 8[ MONITORED AND USED BY
TH[ DEVELOPER ON A DAILY BASIS. IF PR[C!PITATION IS PREDICTED (40% CHANCE or
RAIN}, THEN THE NECESSARY WATER POLLUTION CONTROL PRACTICES SHALL 8[ DEPLOYED
WITHIN 48 HOURS AND PRIOR TO TH[ ONSET OF TH[ PRECIPITATION.
TH[ D[PLOYM[NT or TH[ BMPS SHALL INCLUDE BUT NOT 8[ LIMITED TO GRAVEL BAGS AND
SILT FENCES. A MINIMUM or 725% or TH[ MATERIAL N[[D[D TO INSTALL STANDBY BEST
MANAGEMENT PRACTICES MEASURES TO PROTECT TH[ EXPOSED AREAS FORM EROSION ANO
PREVENT SEDIMENT DISCHARGES MUST BE STORED ON-SIT[. AREAS THAT HAVE ALREADY
BEEN PROTECTED FROM [ROS/ON USING PHYSICAL STABIUZA TION OR ESTABLISHED
VEGETATION STAB/LIZA TION BMPS AS DETERMINED BY THE CITY OF CARLSBAD AR[ NOT
CONS!D[R[D TO B[ "EXPOSED" FOR TH[ PURPOSES or "W[ATH[R TR/GG[R[D ACTION PLAN''.
AN ADE OU A TE SOURCE OF [QU!PMEN T AND WORKERS SHALL BE AVAILABLE FOR
DEPLOYMENT OF ''w[ATH[R TRIGGERED BMPS''.
Tl 700 0: PROJECT FILES D/2605 WALLACE/T2 TITLE.DWG
ROT: oo·oo'oo" 0.0000,0.0000
11/15/2017
EROSION CONTROL HYDROS[[D!NG PLANTING AND !RR/GA TION
/. ALL PERMANENT AND TEMPORARY EROSION CONTROL PLANTING AND IRRIGATION SHALL
BE INSTALLED AND MAINTAINED AS REQUIRED IN SECTION 272 OF TH[ STANDARD
SPECIF/CATIONS AND THE FOLLOWING:
A H YDROS[[DING SHALL BE APPLIED TO:
I ALL SLOPES THAT AR[ GRADED 6: I (HORIZONTAL TO VERTICAL) OR
STEEPER WHEN THEY ARE:
a, THR[[ F[[T OR MOR[ IN HDGHT AND ADJACENT TO PUBLIC
WALL OR STR[[T.
b. ALL SLOPES 4 FEET OR MOR[ IN HDGHT
2 AR[AS GRADED FLA TT[R THAN 6: I WH[N ANY or TH[
FOLLOWING CONDITIONS EXIST.·
o. NOT SCHEDULED FOR IMPROVEMENTS (CONSTRUCTION OR
G[N[RAL LANDSCAPING) WITHIN 60 DAYS or ROUGH GRADING.
b. !D[NTIF/£0 BY THE PARKS ANO RECREATION DIRECTOR AS
HIGHLY VISIBLE TO TH[ PUBLIC.
c. HAVE ANY SPECIAL CONDITION !D[NTIFl[D BY TH[ CITY
ENGINEER THAT WARRANTS !MM[D!AT[ TREATMENT
B HYDROS[[D!NG AREAS SHALL BE IRRIGATED IN ACCORDANCE WITH THE
FOLLOWING CRITERIA:
7 ALL SLOPES THAT AR[ GRADED 6: I OR STEEPER AND THAT AR[:
a. THR[[ TO [!GHT FEET IN H[IGHT SHALL 8[ IRRIGATED BY HAND
WA T[R/NG FROM QUICK COUPLERS/HOS[ BIBS OR A
CONVENTIONAL SYSTEM OF LOW PR[CIP!TA T!ON SPRINKLER
HEADS PROVIDING 100% COVERAGE.
b. GREATER THAN 8 FEET IN H£/GHT SHALL 8[ WA T[R[O BY A
CONVENTIONAL SYSTEM OF LOW PRECIPITATION SPRINKLER H[ADS
PROVIDING 100% COVERAGE.
2 AREAS SLOPED LESS THAN 6: I SHALL 8[ !RR/GA TED AS APPROVED BY
TH[ CITY [NG/NEER, PRIOR TO HYDROS[[D!NG. TH[ DEVELOPER SHALL
SUBMIT A PROPOSED SCHEME TO PROVIDE !RR/GA T!ON TO TH[ CITY
ENGIN[[R. TH[ PROPOSAL SHALL BE SPECIFIC REGARDING TH[
NUMBERS, TYP[. AND COSTS or TH[ [L[M[NTS or TH[ PROPOSED SYSTEM
3 !RR/GA TION SHALL MAINTAIN TH[ MOISTURE LEVEL OF TH[ SOIL AT TH[
OPTIMUM L[V[L FOR TH[ GRADING or TH[ HYDROS[[D[D GROWTH.
C HYDROS[[DING MIX SHALL CONSIST or ALL or TH[ FOLLOWING:
I S[[D MIX SHALL CONSIST OF NO LESS THAN:
a. 20 lbs. P[R ACR[ or ROS[ CLOVER
b. 20 lbs P[R ACR[ or ZORRO F[SCU[
c. Jibs PER ACRE OF [ SCHOOL CIA CALIFORNICA
d. 4 lbs P[R ACRE OF ACH!LL[A MILL[FOUA
e. Jibs PER ACRE OF AL YSSUM (CARPET OF SNOW}
f. 1/2 lb. P[R ACRE IF DIMORPHOL[CA
g. ITEMS C, d, e, AND I or THIS SUBSECTION MA y B[ OMITTED ON
VIS/BL[ FROM £/TH:R A PUBLIC STREET OR RESIDENTIAL
STRUCTURES.
h. ITEM a OF THIS SUBSECTION MUST 8[ INOCULATED WITH A
NITROGEN FIXING BACTERIA ANO APPLIED DRY [!TH[R BY
DRILLING OR BROADCAS!NG BEFORE HYDROS[[DING.
1. ALL S[[D MATERIALS SHALL 8[ TRANSPORTED TO TH[ JOBS/TE
IN UNOPENED CONTAINERS WITH THE CALIFORNIA DEPARTMENT
or FOOD AND AGRICULTURE CERTIFICATION TAG ATTACHED TO,
OR PRINTED ON SAID CONTAINERS.
j NON-PHYTO-TOXIC WETTING AGENTS MAY BE ADDED TO TH[
HYDROS[[D SLURRY AT TH[ D!SCR[T!ON or TH[ CONTRACTOR.
2 TYP[ I MULCH APPLIED AT TH[ RAT[ or NO L[SS HAN 2000 lbs PER
ACR[. TYP[ 6 MULCH (STRAW} MAY B[ SUBSTITUTED, WH[N STRAW IS USED,
IT MUST 8[ ANCHORED TO TH[ SLOP[ BY M[CHANICALL Y PUNCHING NO LESS
THAN 50% IF THE STRAW INTO THE SOIL
3 F[RTILIZ[R CONSISTING or AMMONIUM PHOSPHA T[ SULFATE. 16-20-0
WITH 15% SULPHUR APPLIED AT THE RAT[ OF 500 lbs. PER ACRE.
D AR[AS TO 8£ HYDROSEED[D SHALL 8£ PREPARED PRIOR TO HYDROS[[D!NG:
I ROUGHENING TH[ SURFACE TO 8£ PLANTED BY ANY OR A
COMB/NA T!ON OF:
a. TRACK WALKING SLOPES ST[[P[R THAN 6: I.
b. HARROWING AREAS 6: I OR FLATTER THAT AR[ SUFFIC![NTL Y
FRIABLE.
2 AR[AS GRADED FLATTER THAN 6: I WHEN ANY or TH[ FOLLOWING
CONDI T!ONS [XIS T-
o. ADJUSTING THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP
Bl T NOT SA TUR A TED S[[D 8£D.
b. TH[ ADDITION or SOIL AM[NDM[NTS, PH ADJUSTMENT, L[ACH!NG
CO V[R!NG SALIN[ SOILS TO PRO VID[D VIABLE CONDITIONS FOR
GROWTH.
[ HYDROS[[DING AREAS SHALL B[ MAINTAINED TO PROVIDE A VIGOROUS GROWTH
UNTIL TH[ PROJECT IS P[RMANENTL Y LANDSCAPED OR, FOR AREAS WHERE
HYDROS[[D!NG IS THE PERMANENT LANDSCAPING, UNTIL TH[ PROJECT IS
COMPLETED AND ALL BONDS R[L[AS[D
2. ALL SLOPES SHALL HA VE IRRIGATION INSTALLED ANO B[ STABILIZED, PLANTED
AND/OR HYDROS[[D[O WITHIN T[N (10} DAYS or TH[ TIM[ WH[N EACH SLOP[ IS BROUGHT
TO GRADE AS SHOWN ON TH[ APPROVED GRADING PLANS.
J. SHOULD GERMINATION OF HYDROS[[D[D SLOPES FAIL TO PROVIDE [FFIC/[NT
COVERAGE OF GRADING SLOPES (90% COVERAGE) PRIOR TO OCTOBER /, TH[ SLOPES SHALL
BE STABILIZED BY AN APPROPRIATE EROSION CONTROL MATTING MATERIAL APPROVED BY
TH[ PUBLIC WORKS INSPECTOR.
4. LANDSCAPING SHALL B[ ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED BY
TH[ CITY OF CARLSBAD LANDSCAPE MANUAL, TH[ LANDSCAPING PLANS FOR THIS PROJECT
OR AS DIR[CT[D BY TH[ CITY [NG!N[[R or PLANNING DIRECTOR.
5. TH[ OWNER/APPL/CANT SHALL ENSURE THAT ALL CONTRACTORS SHALL
COORDINATE TH[ WORK or THIS CONSTRUCTION SWPPP SHOWN ON ANY GRADING
PLANS, LANDSCAPE AND IRRIGATION PLANS, AND IMPROVEMENT PLANS AS
REQUIRED FOR THIS PROJECT WORK.
Jii SITE
f ~--NOTTO ~ SCALE
LOCATION MAP
BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE
Erosion Control Sediment Control BMPs Tracking Non-Storm Water Waste Management and Materials
BMPs Control BMPs Management BMPs Pollution Control BMPs
" -" " ls -.2 E " " " O> 0 "' " "' " "' " u u " .s .g, E " E .2 0 " " .2 .s,. 0
0 2 "° "° "' ' "' -::,, " "' O> ' 21 ~ "-" C' O> ~ 0 " "' ·E .Sc "' "' "' §i 0-0 o~ O> Ocj Q "' .s " "' " ' Le "' " Best Management Practice' "' "" .s C, 0., & 0 ' "" ~
" O>
en "'" "' >Cc 0 "" "' ~ "" 0 .s .c .s E 0 .s u' u "' " "' ~ " "' ::,, 0 "' "' .'.! "' (fJ en "' O> 0., O> (BMP) Description ---f :.::; ::::,. "' "' 0 " " " C, ::, "' ~ QJ 0 "' -0 '6 0 " " '0 1;~ " "' 0"' " " 0 0 "' ~ " ' v " C, 0., (fJ ·-O> c:i :;:; u 13 0 0 O> "' ~ O> "' ::,, C, O> C, " "' °' E 0 ~~ ;!; 0 01:;:; "' 0"' :g ~
Qi .s "' " 0 ,1' .§ .0, " -" c§ E ;,:; ·-~ 'I.... :.w :0 ~ .s ·-O> Q 0 "' "' ::S .s "' ' "'" ·-"' :-:::::--0 Q 0 .~ § '0 "' -" v,~ R v ~ ' -.Q ' .q 0 <D v ·s: Qi 0 "'' v
(l_J -~ 0 0 '0 Q -"' "' "' 0 "'u " 0 0 o en -0 .c "' -o 0 ~ " "' ~ 0' 0 ~ "' .c ee ' "° 0 0 -' 2o ~ ct OQ 0 ~o 0 -0
Q Le :t: "' LcQ Uj V) V) u Cc "' VJ> V) V) Q V) ~ V) °' QO Q ::,, (fJ ::,, iii
CASQA Designation ~ " -C) ") " oO -"' ") "' ... oO O; --,,., ... "' <o " oO -"' -I I I I I I I I I I I I I I I I I I I I I I I
u Ci u u c., c., bi bi bi bi bi bi bi bi ~ ~ (fJ (fJ (fJ (fJ i i i Construction Activity Le Le Le Le Le Le < < < <
X Grading/Soil Disturbance X X X X X X
X Trenching/[ xca vat ion X X X X X
Stockpilinq
Drill inn IBorinq
X Concrete/Asphalt Sowcutting X X X X X X
X Concrete Fla/work X X X X X
X Paving X X X X
Conduit/Pipe lnslo/loUon
Stucco/Mor/or Work
X Waste Disposal X X X X X
5/oqinq/Lay Down Area
[auioment Maintenance and Fuelino
Hazardous Substance Use/Storooe
Dewoterin_q
X Site Access Across Dirt X X X X X
Other (/isl):
Instructions:
I. Check /he box lo the left of all opp/icoble construction activity (first column) expected to occur during construction.
2. Located along /he top of the BMP Tobie is a fist of BMP's with it's corresponding California Stormwoter Quality Association (CASQA) designation number. Choose one
or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column.
3. Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project.
LEGEND
DESCRIPTION SYMBOL
"' " C,
" 2 -" "' " ~ -"' :g E "' ' -,0 "" Q 0 O> "° t,O =":::c is 6 QO (fJ c., V) ::,,
... "' I I
i i
X
X
X
X
X
X
[C-9, EARTH DIKES & DRAINAGE SWALES
SE -1, SILT FENCE OWNER'S CERTIFICATION·
"' "' ~-" "' "' " E 0"'
"' O> :s 0
"' Q O 0 :t: ::,,
CD
I
i
~
"' o~
,0 ~
"'E -"' "' en b o
cc " O 0 Ll ::,;
oO
I i
X
X
SE-6, GRAVEL BAG = I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT
BEST MANAGEMENT PRACTICES (BMPs} DURING CONSTRUCT/ON ACTIVITIES
~ "' ~
iS
"--"' " ~"' c,.; E '"' o en :';::'.O
cc " O 0
(fJ ::,;
°' I
i
X
X
X
X
X
X
SE-7, STREET SWEEPING & VACUUMING TO TH[ MAXIMUM [XT[NT PRACTICABLE TO AVOID TH[ MOB/LIZA T!ON or
POL LU TAN TS SUCH AS S[D!M[N T AND TO A VOID TH[ [XPOSUR[ or STORM
WATER TO CONSTRUCTION RELATED POLLUTANTS; ANO (2) ADHERE TO, AND
PACIFIC
OCEAN
TR-I, STABILIZED CONSTRUCTION ENTRANCE
WM-5., SOLID WASTE MANAGEMENT
WM-8, CONCRETE WASTE MANAGEMENT
imlllllllllllllllll~
C2J
lcwAI
AT ALL TIMES, COMPLY WITH THIS CITY APPROVED T![R 2 CONSTRUCTION SWPPP
THROUGHOUT TH[ DURATION or TH[ CONSTRUCTION ACT!VIT![S UNTIL TH[
CONSTRUCT/ON WORK IS COMPLETE AND SIGNED arr BY TH[ CITY OF CARLSBAD.
CJV11Jrm o ~)o OQ0,r,Q_ l \/ I J ( 1 J
CHRISTIN[ WALLACE -OWNER DAT[
WM-9, SANITARY/SEPTIC WASTE MANAGEMENT
DAVID FABER -OWNER OAT[
CITY OF VISTA
A GA
\)'-cosr
CITY OF ENCINITAS
VICINITY MAP
APN: 206-262-40
SITE ADDRESS:
3935 SYME DRIVE
CARLSBAD, CA 92009
CITY OF
SAN MARCOS
AREA OF DISTURBANCE
AR[A or DISTURBANCE 11,300 s.r.
(THIS AREA INCLUDES BUT IS NOT LIMITED TO
OFF-SITE WORK INCLUDING PUBLIC IMPROVEMENTS
AND TEMPORARY DISTURBANCE SUCH AS VEHICLE
AND EQUIPMENT STAGING AREAS, CONSTRUCTION
WORKER roo T TRAFFIC, SOIL/GR A V[L PILES, u TIU TY
TRENCHES, BACKFILL CUTS AND SLOP[ KEYWA YS}
CONSTRUCTION THREAT:
CONSTRUCTION THR[A T TO STORM WA T[R QUALITY (CHECK BOX}:
□ HIGH 181 MEDIUM
OWNER/APPLICANT:
NAME.
ADDRESS:
CHRISTIN[ WALLACE & DAVID FABER
511 PINE STREET
CARLSBAD, CA 92009
TELEPHONE NO.: 760-845-.52.50
EMERGENCY CONTACT:
NAM[:
ADDRESS:
CHRISTIN[ WALLACE
511 PIN[ STREET
CARLSBAD, CA 92009
TELEPHONE NO: 760-845-3230
1 sH3EET I ClTY Or' CARLSB~\D I SHEETS I
,-----------------------::::~~;::::---, ENGINEERING DEPARTMENT 4
CITY STORM WATER POJU!TION PRF:V~NTION Pl.AN (SWPPP)
TIER2
NAME OF PREPARER: LEONARD SCHATZMANN
' QUALIFICATION OF PREPARER:_O~S~D~, ~R~CE~-----
10 Schot<
0 '?
0
ADDRESS: PO BOX 2636
VISTA, CA 92085-2636
NO. C32161 ';
PROJECT NAME: WALLACE RESIDENCE
PHONE NO.: 760-758-8057
CIVIL TITLE SHEET GR 2017-0051
~~~ LENARD SCHA TZMN
PROJECT ID
CDP 13-20
DRAWING NO.
507-1A
I
'
SE-I
SILT FENCE
w
' 0 --" "' z
' ,,
"
L
I
~
r,v~
I
I
/ I
==j
\
\
'
I
I
~ ✓-t<'/1 ---~"---
·,~
/~·
EC-9
EARTH DIKE &
DRAINAGE SWALE
B :;,
'
l ''
10 5 0 10 20 30
PLOTTABLE EASEMENTS:
A. 5' WIDE PUBLIC UTILITY EASEMENT TO CITY OF CARLSBAD RECORDED 3-27-1986 AS
FILE NO. 86-118023 OF O.R,
B, 7,5' WIDE EASEMENT FOR INGRESS, EGRESS AND INCIDENTAL PURPOSES TO MARGARET
WALLACE RANNEY RECORDED 7-01-1944 IN BOOK 1685, PAGE 497 OF O,R,
C. 5' WIDE S.D,G&E. EASEMENT RECORDED 6-03-1942 IN BOOK 1352 PAGE 109 OF OR,
UNPLOTTABLE EASEMENTS:
L NONE OF THE ROADS OR STREETS DELINEATED ON MAP 1681 ARE WITHIN THE BOUNDARY
OF THE SUBJECT PROPERTY,
2. 10' WIDE EASEMENT FOR ROAD PURPOSES TO CITY OF CARLSBAD, RECORDED 6-22-1982
AS FILE NO, 82-191870 OF O.R., IS FOR THE WIDENING OF TAMARACK AVENUE WHICH IS
NOT WITHIN NOR DOES IT ABUT THE SUBJECT PROPERTY,
PLAN PREPARED BY:
STA ENGINEERING, INCORPORATED
P,O. BOX 2636 2530 3/4 FOOTHILL DRIVE
VISTA, CA, 92085-2636 (760) 758-8057 FAX: 758-8059
SURVEYING, CIVIL & TRAFFIC ENGINEERING
Tl 700 0: PROJECT FILES D/2605 WALLACE T2 SHT2,DWG
ROT: 61'19'47" 0.0000,0,0000
11/15/2017
N 28'40'13" W 105,56'
, I
I •
I
I
I
_J /
1490 (
FF ,14B"""2 ,?7 ,IQ WM-5
. d' PI' CONCRETE
WASHOUT AREA
I
I
<c s u
~I .__ ____ --:__-~-\~~-]-
SE-I _,:-,
SILT FENCE
I
I
SE-6
GRAVEL BAGS TO
BE IN PLACE DURING
PREDICTED RAIN
/
/
N
"' m r---
0 en
0 " "' z
I
'
""" ,,_. "
"o"" "-• _, --, •
EC-9
; EARTH DRAINAGE
. SWALE
WM-5
.. · -. WM-9 . '•"·
SANITARY,/SEPTIC WASTE
MANAGEMENT, RQRTA-POTTIE )';ef<f,r
w
STABILIZED CONSTRUCTION
; ENTRANCE
in
.),JR£ET SWEEPING & , w
ACUUMING AS;NEEDED ,, , ,
CT) -ooo -en .,,. "' ' N r<) LO . .,,. ~ II II
II 0:: _J
<l
'::.,.,O L~.'.<"5--,,,
" -"' ,•.Z
3'.)YM E
I
DRIVE
,""• ,,,
, I SE'-7 I
\")· '
STREET SWEEPING &
VACUUMING AS NEEDED
GRAVEL BAGS W/
TRAFFIC CONE
SILT FENCE, STAPLE
TO WOOD STAKE,
30" MIN HEIGHT ~:
EXCAVATE 4" X 4"
TRENCH , LAY SILT
FENCE ALONG EDGE
OF TRENCH AND
COMPACT BACKFILL
SILT FENCE NOTE:
SILT FENCE SHALL BE INSPECTED
PRIOR TO FORECAST OF RAIN TO
INSURE FENCE IS IN FUNCTIONAL
CONDITION AND AFTER RAIN. ANY
SILT SHALL BE REMOVED NEXT
WORK DAY AFTER END OF RAIN.
WOOD STAKE
NATURAL GROUND
SILT FENCE DETAIL
~ CITY OF CARLSBAD I SHEETS I ,--------------------:::::;~:;;;:::---7 L±_j ENGINEERING DEPARTMENT 4
NAME OF PREPARER: LEONARD SCHATZMANN
QUALIFICATION OF PREPARER:~O=S=D,~R~C=E-----~
ADDRESS: PO BOX 2636
VISTA, CA 92085-2636
PHONE NO.: 760-758-8057
C32161
R.C.E./C£RT. NO.
CITY STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
TIER2
NO. C32161
12-31-2018
UC. EXP. DATE
PROJECT NAME: WALLACE RESIDENCE
GR 2017~0051
I PROJECT IDCDP 13-20 //7'2-Zd/2
DATE
TITLE SHEET