Loading...
HomeMy WebLinkAboutDWG 446-6L; CT 05-16; VLC (OAKS 3.4 & 3.5); 01-22LANDSCAPE ARCH TECTURAL FLANS FOR: V LLAGES OF LA COST A T HE OAKS A~EA 3.4 / 3.5 5ENERAL CONDITIONS SHORT FORM PROTI:C.TION OF LIFE AND PROf'ERiY I. C.OntrC1G.tor shall protect all construction and landscaping from damGl9C' and, Hhen required, provide guards or covering. ~ damage shall be repaired or rcpl=od at the C-ontrC1G.tor's exponse. C.OntrC1G.tors on tho Job shall c~ the folloHlng Insurance, (a) Hark.or's C.ompensatlon, (b) Publlc C.omprohenslve Seneral Llablllty, and (c) Property Damage. In an emergency threatening the safety of lire, Hork or adjoining property, tho C-ontrC1G.tor Is hereby Instructed to act at his discretion to prevent such loss or lnj~ and shall maintain the folloHlng minimum llablllty Insurance coverage during tho contract period. COVERAeE Bodlly Injury, S250,000 per lndlvldual, per Occurrence Property Damage, SIOOPOO per Occurrence, aggregate C.liY OF C.ARLSBAD c5RADINc5 NOTI:5 I. PRIOR TO THE START OF c5RADINc5, THE APPLIC.ANT OR APPLIC.ANT'5 Ac5ENT SHALL OBTAIN C.liY APPROVAL OF A CONSTRIJC.TION SC.HEDULE AND/OR EXHIBIT OUTLININc5 THE TIMINc5 OF THE SLOPE PLANTINc5 AND IRRlc5ATION. THE SC.HEDULE SHALL SHOW TIMINc5 OF C.ONSTRIJC.TION OF FREE5TANDINc5, RETAININc5 AND C.RIB WALLS IMMEDIATI:LY AFTI:R ROUc5H c5RADINc5 AS EAc.H LOC.ATION 15 Ac.HIEVED. IRRlc5ATION AND PLANTINc5 SHALL TAKE PLAc.E AS c5RADINc5 PROc5RESSE5. 2. INSTALLATION OF IRRlc5ATION A5 SHOWN ON THE APPROVED PLANS SHALL COMMENc.E WITHIN 10 DAYS OF THE TIME WHEN EAc.H SLOPE 15 BROI.Jc5HT TO c5RADE AS SHOWN ON THE APPROVED c5RADINc5 PLANS. 3. PLANTINc5 AND IRRlc5ATION FOR THE SLOPE AREAS SHALL 6E COMPLETI:LY INSTALLED, A5 SHOWN ON THE APPROVED PLANS, WITHIN 30 DAYS AFTI:R THE IRRlc5ATION INSTALLATION FIRST COMMENC,E5. 2. The C.Ontractor shall cause to be named as additional Insured In such c.ontractor's Publlc Llablllty, C.Ontractor's Protective Llablllty and Automoblle Llablllty Insurance pollcles tho folloHlng, (a) MorroH Development (b) c51flesple. Moody. Patterson, '1404 Senesee Avenue, Suite 140, La Jolla, C.A '120:51-1:5:5<!. -- 3. c.ontractor shall not cause this policy to be canceled or permit It to lapse, and tho Insurance pollcy shall Include a clause to the effect that tho pollcy shall not, at any time during tho construction period, be canceled or reduced, restricted or llmltod untll fifteen (15) da!:15 after al addltlonal Insureds have received Hrltten notice as evidenced by returned receipts of registered or certlrled letters. 4. The C.Ontractor agrees to hold the OHner and Landscape Architect harmless Prom any claims arising out of his operations of any of his sub contractors, material supplles, or agents. 5 . All local, municipal and state laHs, rules and regulations govemlng or relating to any portion of this Hork are hereby Incorporated Into and made a part of those specifications and their provisions shall be carried out by tho contractor. b . The contractor shall verify the locations of all existing utllltles, structures, and services before commencing Hork. The locations of utllltles, structures and services shoHn In these plans are approximate only. ~ discrepancies bel:Heen these plans and actual field conditions shall be reported to the oHner or landscape architect. 1 . The contractor shall protect all existing utllltles and features to remain on, and adjacent to, tho project site during construction. C.ontractor shall repair, at his oHn expense, all damage resulting from his operations or negllgence. 8 . The contractor shall obtain the pertinent engineering and/or architectural plans before beginning Hork. <!. Permits for any construction depicted In these plans shall be obtained by the contractor. 10. C.Ontractor shall have a valld contractors llcense required for the particular Hork being done. c.ontractor shall not alloH tho llcense(s) to lapse during tho contract period. DEC-LARATION OF RE5PON51E'II f C.HAR<?f • I HEREBY DEC.LARE THAT I AM THE LANDSC,APE ARCHITECT OF WORK FOR THIS PROJEC.T, THAT I HAVE EXERc.lSED RESPONSIBLE C.HARc5E OVER THE DESlc5N OF THIS PROJEC.T A5 DEFINED IN SEC.TION b103 OF THE !3U51NESS AND PROFESSIONS CODE AND THAT THE DE51c5N IS CONSl5TI:NT WITH C,URRENT STANDARDS. I UNDERSTAND THAT THE C.HEC.K OF PROJEC.T DRAWINc55 AND 5PEC.IFIC.ATION5 BY THE C.liY OF C.ARLSBAD AND THE SAN DIEc50 C.OUNiY DEPARTMENT OF ENVIRONMENTAL HEAL TH 15 CONFINED TO A REVIEW ONLY AND DOES NOT RELIEVE ME, AS LANDSCAPE ARCHITfC,T OF WORK, OF MY RESPONSIBILITIES FOR PROJEC.T DE51c5N. THESE PLANS HAVE BEEN PREPARED IN 5UB5TANTIAL CONFORMANC-E WITH THE APPROVED LANDsc.APE CONc.EPT PLAN, WATI:R CONSERVATION PLAN, STORM WATI:R POLLUTION NTION PLAN, FIRE PROTI:C.TION PLAN, AND ALL CONDITIONS OF APPRO'li'l"'f-/ LATI:D TO LAND5c.APINc5. BY, -I-;_~~~:;:;:;;-----------DATI: J -l'2-0-={-- DY FIRM NAME AND ADDRESS, GILi f<;,PIE MOODY PATTERSON, INC.. <1404 eENE5EE .\VE,. 5TE. 140 LA ,JOLLA, C.A <!20;51-15,-, PHONE NO,, (.!>St>) 55t>-e,m REGISTRATION NO,: C.A ;:5e,27 DEVELOPER'S NAME: .._,.. DEVD.0PIIENT 110JWRIGIITPU<:£. #100 lB.. 7.,_:129--2701 DATE PL.AN PREPARED: 11-29-D6 BY: GMP FAX: (e,se,) 55f>-<!lf>f> EXPIRATION DATE: 10-0"1 APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTING AREAS. <.> -... • CA\.\ KEY !VfAP I "= :200 '-0" © 1~16ATION l"LAN5 [!] l"LANTIN6 l"LAN5 PROJECT SITE ill, • • till, iii .. .. -.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 LANDSCAPE ARCHITECTURE & PLANNING -lfO. 14711 ....... - DRAWN lR APPROVllD .... 1ST SUBIOT'l'AL 02-0U-07 2ND SUBIIITl'AL 3-13-07 3RD SUBIO'ITAL 4--30-07 4-TB SUBMITTAL 7-02-07 IIYLAR SUBIOTl'AL 7-10-07 10B NO. 05-038 DATll 04-30-07 SC.illll AS SHOWN '""''"""' NU / C.liY OF CARLSBAD NOTI:5 INSPEC.TION PROCEDURES, I. Inspection of the project shall be performed by tho Landscape Architect of tho Hork, or his designated agent. Refer to tho specifications for the schedule of required Inspections and required submlttals. 2. FolloHlng tho completion of Hork, tho Landscape Architect of tho Hork HIii certify that tho Installation has been completed by submitting tho "Final Landscape c.ertlflcatlon Form". A request for a flnal landscape Inspection by the city must also be made by calling the Inspection Request Line. "Final Landscape c.ertlflcatlon Form" Fax to, 1b0-<!44-1:,<!43 Landscape Inspection Request Phone Line, 1b0-602-4b02 3. All Irrigation backfloi-i preventers shall be tested by a certified tester and results rTNJSt be given to the city and the C-arlsbad M.Jnlclpal Water District. Pipe betHeen the meter and ckfloH preventer shall be "schedule K hard C.Opper". Approved contract backfloH testers be found on the C.Jty Heb site at HHH,c.l.c;;grl&bad,c,g.11&/pdfc::loc;;.html?pld=;:540 4 . l"lll"""r service (point of connection) Installation for landscape shall be In place as required e Hlth planting timing specified In Section V . ell I l~X SI 11!!:T: TITJ..I! SHl!l!T HOLD HARMLESS AND INDEMNIFICATION CLAUSE CONTRAc.TOR Ac5REES THAT HE SHALL AS5LIME SOLE RESPONSIBILITY FOR JOB 51Tc CONDITIONS D\JRINc5 THE c.ouR5E OF CONSTRIJC.TION OF THIS PROJEC.T, INc.LUDINc5 5AFEiY OF ALL PERSONS AND PROPERiY; THAT THIS REGUIREMENT SHALL APPLY CONTINIJOU5L Y AND NOT 6E LIMITI:D TO NORMAL WORKINc5 HOUR5, AND THAT THE CONTRAc.TOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER, THE C.liY/c.ouNiY OF Loe.AL ..JJRl5DIC.TION, AND THE LANDsc.APE ARc.HITI:C.T HARMLESS FROM ANY AND ALL LIABILliY REAL OR ALLE5ED, IN CONNECTION WITH THE PERFORMANC,E OF WORK ON THIS PROJEC.T, EXC.EPTINc5 FOR LIABILliY ARl51Nc5 FROM THE SOLE NEc5L15ENc.E OF THE OWNER, THE C.liY/C.OUNiY OF LOC.AL ..JJRl5DIC.TION, OR THE LANDsc.APE ARc.HITI:C.T. SHl!l!T NO.: I.. T-01 (I) IRRl'5,ATION PJ..ANS J..1-01 TH,IW J..1-04 (.::2-5) J..1-05 (6) IRRl'5,ATION J..1!'5,l!NC, IRRl'5,ATION CAJ..CUJ..ATIONS IRRl'5,ATION 01!TAIJ..S, 4 NOTl!S IRRl'5,ATION SPl!Cl!"'ICATIONS PJ..ANTIN'5, i-J..ANS J..1-06 (i) 1..1-0; TH!IW 1..1-0"'1 (e-,o> J..1-10 TH,IW J..1-1::Z (11-1~) J..P-01 TH,IW J..i--04 (14-li) J..P-05 (le) PJ..ANTIN'5, l..1!'5,l!NC, 01!TAIJ..S PJ..ANTIN'5, NOTl!S PJ..ANTIN'5, SPl!Cl!"'ICATIONS R!!CYCJ..1!0 ~ATl!R USI! MAi- J..P-06 (l"'I) J..P-Oi TH!IW 1..,--oe (.::20-.::21) J..H-0 I (::Z::Z) e,,1,1.lf'OIIINIA !ffAff! L.>.H "'~ Ya.I -T G""-W .All!! >'a.I Die. _,-G<l0I!! ec;1iat ~ !ITA"!e ,_T ~VA,._., ellll•DH9, T1IIDIGHtNe, DISSMAl!I, DtTc.tttN&t, CIIUWN9 ~.1\INLINe, 5GIU,..,._,, GH!IU! 0.-.-.a!~-.~. JIIO.K)"TION 0199tNe, ~ DteelNe t'I.IHIINl!t, l'DIGe l"OltT Olll Ntf ~ ...... Y. ClUlt _,. l'Olt ,,_Ne HI.I. NOT 111! V/l<LJD l41M0I/I" A Die,..__,-TIGl<l!T N.l4!IBl ND NOTIP'IGATlON 114AT ne M•IIK.Ollrr HA& l!l!l!N GOf4ll.rl!!C1. ,_ 1!1 AU10 A l<M)AY HNl:><:>H ~TION ..-~) IN l+tlGH Ya.I -T GOf4ILrT1! Tle ~ D:1919F"t9. P 'l"'GIIJ rlU.. trl!!B:> ADDfT10NAL Tl4!! l!!ll!'T"otiD ne: M DA'I"'&. IT ts "f~ I l'CiTWIBILrrr' TO flleGALL 0.. ,..__,-_ Die ,..__,-TOLL-l"N!I! -1!11-600-271-2600. nAS-BUILT" ~1 CITY OF CARLSBAD II SHEETS I L...!_J. PLAt.tllNG DEPARTIENT . 22 .---------.,,.....,......-----.,,.....--------.--'--....------.----------------......---,----r---r--~ TITLE SI I FOR, 1.. T-01 Sll/LDER DATE Vlt t OFU. COSTA 11EOA'<S-~.4 ~~ TillE: I APPrt":t l Lx -E;.t t=:fr RECEIVED BY: 1-M -01 -DATE PLANNING DWN BY: I PROJECT NO. I DRAWING NO. DATE INITIAL DATE INITIAL DATE INITIAL CHKD BY: ENGINEER Of" ~ REVISION DESCRIPTION DlHER APPROVAL CITY APPROVAL RVWD BY: C.T 05-16 446-bL IN§5£CTOR DATE 0 -----__:::::::::"."'.""-'~ 5 ",!4 ~ I 51 'CD 8 L_1~ 88.• ~\2Dfi I II lfil II~ .:,, ~ ,,. 1t,,,. lT-2 ; ~ . II . ,, .• r'":~~~~ ' ~ / APPROVED FOR PLANTING AND IRRIGATION ONLY, INC-LUDING PREC-15E LOC-ATION OF PLANTING AREAS. \\ \ (.> .. -. ... :I " ' \\I> SCA ,t.ood,i, II'" 2'' \ II 9 9 -9 -11s;i 1 I I L____ 11 2 I 1 5 s s I 3/4 3 s 4 NOTE: IRRIGATION HAINLINE AND APPURTENANC.ES LOC.ATIONS ARE DIAGRAMMATIC.. ALL IRRIGATION EQUIPMENT SHALL BE INSTALLED V'IITHIN THE LIMIT OF V'IORK, 18" OFF ANY HARDSCAPE AND V'IITH PLANTING AREAS. ANY PAR~Y IMPROVEMENTS IN PUBLIC. RIGHT-OF-~Y REQUIRES AN ENC.ROAC.HMENT PERMIT FROM THE C.ITY. NOTE, IRRIGATION EQUIPMENT SHOV'IN OUTSIDE OF HAINTENANC.E RESPONSIBILITY AREAS FOR C.LARITY ONLY. ALL EQUIPMENT SHALL BE INSTALLED V'IITHIN THE LIMIT OF V'IORK LINES. VERIFY ALL LAYOUT IN FIELD V'IITH OV'INER'S AUTHORIZED REPRESENTATIVE. NOTE: ALL HEADS ARE TO BE ADJUSTED TO PREVENT OVER.SPRAY ONTO BUILDINGS, ~LLS, FENC.ES AND HAR.DSC.APE. ALL ADJUSTI"1ENTS SHALL ASSURE GOOD SYSTEM COVERAGE AND DISTRIBUTION EFFICIENC.Y V'IHILE KEEPING ~TER V'IITHIN THE LANDSCAPED PLANTED AREAS. NOTE: C.ONTRAC.TOR SHALL ADJUST ALL HEADS AS REQUIRED TO AC.COMMODATE ANY VERTICAL OBSTRUC.TIONS THAT HAY OCCUR, INCLUDING BUT NOT LIMITED TO LIGHT POLES, FIRE HYDRANTS, FENC.ES, ETC.. VERIFY ALL HEAD LAYOUT V'IITH OV'INER'S AUTHORIZED REPRESENTATIVE PRIOR TO C.OHMENC.ING V'IORK. NOTE, /:lli/J-j'/1-1•' l I ' 5_ T~l14 _Jl/4 _ I ffi #r'~S~5 -rr:r'------=ilfil- CONTRAC.TOR SHALL PROVIDE SLEEVING FOR ALL FU71JRE PAVED AREAS INC.LUDING FU71JRE DRIVE~YS, ROAD~YS, AS V'IELL AS ALL C.URRENT PAVED AREAS, PATHS, ETC.. VERIFY ALL SLEEVE LOCATIONS IN FIELD V'IITH OV'INER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING V'IORK. I ,~~;I 1. I 7~1/lcil _JJ/_~ / e"c,,-, .""i'-, /" e•·m ~'=i e ll 10, "-r-"'""/ e e m--=:t--;;;;a,~~E--• 1,-I/ .-' ' =-- 2· I www.gmplandarch.com 4125 Sorrento Valley Blvd. Suite D San Diego California 92121 Tel 858 558 8977 Fax 858 558 9188 F 12 4 - II /fil II II II 2 69 I' 5/ e, 5/ e, 1"3/ B ., ,/ e, 5/ e, I , II 1 6 8 I 3/ I e! 1, • e 9 9 /4 9 4 9 8 I " e, e, ,, NOTE, ALL RCV'S AND QC.V'S SHALL BE INSTALLED OFFSET FROM MAINLINE AND ISOLATED V'IITH A BALL VALVE. ALL RC.V'S SHOV'IN V'IITHIN 15 FEET OF EAC.H OTHER SHALL BE INSTALLED ON A COMMON MANIFOLD. KEY MAP --------r----------::--:-=---=-:-~~-------,-----,--..-----u-· ___ 6_0 __ 1_5 __ o_sc:._A_1..ea..,.._eo:1·:· _=_ T_5:c:,:•:6""TO~~~~~~ .. "'-o--l w c1rrLAN~I~ D~!~k~BAD _DRA_WN ______ --'J-"'-R "AS-BUILT" GUEST BUILDER IRRIGATION PLAN APPROVED MM 1ST SUBMITTAL 02-09-07 MYLAR SUBMITTAL 7-10-07 AS-BUILT 1ST 01-07-13 AS-BUILT SIGNED 07-24-13 JOB NO. 05-038 DATE 04-30-07 SCALE AS SHOWN MARC MOODY TITI.E: PRINCIPAL 6£1/=5T EJ()/LJ:)ER VILLA6ES OF LA COSTA 5 -8.4 !3.5 Ll-01 t-------R;:;;E=;C,:;:E"'IV;,:,E"D'B;:::Y;:-: ------1------l----l---------------1----1-----+---1---1 · <c.:.l 1 q:--~vr '1-vt-~" ~--1----t----------------+----+--+---11--1 /A-P_P_R_o_v_rn_J_4-_~7...+1---=,1--"-'=~➔_,__1.__ I DA TE INlllAL DATE INlllAL INSPECTOR DATE ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL OA TE INlllAL CITY APPROVAL PLANNING DATE . DWN BY: I CHKD BY; __ _ RVWD BY: _ PROJECT NO. C.T 05-16 I DRAWING NO. 446-6L NOTE, IRRIGATION MAINLINE AND APPURTENANCES LOCATIONS ARE DIAGRAMMATIC.. ALL IRRIGATION EQUIPMENT SHALL SE INSTALLED j,'ljlTHIN THE LIMIT OF j,'ljORK, le" OFF ANY HARDSC.APE AND j,'ljlTH PLANTING. AREAS. ANY PARKJ,'ljAY IMPROVEMENTS IN PUBLIC. RlcSHT-OF-j,'ljAY REQUIRES AN ENC.ROAC.HMENT PERMIT FROM THE C.ITY. NOTE, IRRlcSATION EQUIPMENT SHOj,'ljN OUTSIDE OF MAINTENANC.E RESPONSISILITY AREAS FOR C.LARITY ONLY. ALL EQUIPMENT SHALL SE INSTALLED j,'ljlTHIN THE LIMIT OF l"lORK LINES. VERIFY ALL LAYOUT IN FIELD j,'ljlTH Oj,'ljNER'S AUTHORIZED REPRESENT ATIYE. NOTE: ALL HEADS ARE TO SE ADJUSTED TO PREVENT OYERSPRAY ONTO SUILDINGS, j,'ljALLS, FENC.ES AND HARDSC.APE. ALL ADJUSTMENTS SHALL ASSURE GOOD SYSTEM COVERAGE AND DISTRISUTION EFFIC.IENC.Y j,'ljHILE KEEPING j,'ljATER J/'.IITHIN THE LANDSCAPED PLANTED AREAS. NOTE, C.ONTRAC.TOR SHALL ADJUST ALL HEADS AS REQUIRED TO AC.C.OMMODATE ANY YER.TIC.AL OSSTRUC.TIONS THAT MAY OC.C.UR, INC.LUDING SUT NOT LIMITED I TO LIGHT POLES, FIRE HYDRANTS, FENC.ES, ETC.. VERIFY ALL HEAD LAYOUT V'IITH OJ/'.INER'S AUTHORIZED REPRE5ENTATIYE PRIOR TO C.OMMENC.ING j,'ljORK. , NOTE, C.ONTRAC.TOR SHALL PROVIDE SLEEVING FOR ALL FUTURE PAYED AREAS INC.LUDING FUTURE DRIYEJ,'ljAYS, ROADJ,'ljAYS, AS V'IELL AS ALL C.URRENT PAYED AREAS, PATHS, ETC.. VERIFY ALL SLEEVE LOC.ATIONS IN FIELD V'IITH OV'INER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING V'IORK. 111 I/ ~ NOTE, ALL RC.Y'S AND QC.Y'S SHALL SE INSTALLED OFFSET FROM MAINLINE AND ISOLATED V'IITH A SALL VALVE. ALL RC.V'S SHOV'IN V'IITHIN 15 FEET OF EAC.H OTHER SHALL SE INSTALLED ON A C.OMMON MANIFOLD. )_,' ~-\, ,:rj,•· <J. q'i'i,"'G </',~ II"- APPROVED FOR PLANTING AND IRRIGATION ONLY, INC,LUDING PREC,15E LOC,ATION OF PLANTING AREAS. ,!' <,(> ,I' I TT-5 TT-6 I "112 15'121 ~-SEE NEIGHBORHOOD 9.9 WNTROLLER AREA "55" FOR PARKY'IAY , \.,. ~ HCP OPEN SPACE 3. 7 ACRES CONTROLLER 'TT', REFER TO NOTE 'AA" AT LEF 1 ·(j rr/ t:::: /c f \ 1 __J. KEY NOTE A, FOG "€14" TO BE A I½" POTABLE i"lATER METER l'ilTI-1 A 2' SERVIC.E LATERAL. BACKFLOl'i SIZE, I½" BACKFLOl'i ENCLOSURE, V.I.T. SBBc.-90CR MASTER VALVE SIZE, I½" FLOl'i SENSOR SIZE, I½" STATIC i"lATER PRE55LIRE: 10€1 PSI DESIGN i"lA TER PRESSURE, "14 PSI BOOST REG!lJIRED, NO MAXIMLIM DEMAND, 40GFM SET POC REGlJLA TOR @ "l"I PSI ESTIMATED AREA SERVED, 21,000 SQ. FT. EST. ANNUAL i"lATER USE, lh1 ACRE FT. PER YEAR MAl"lA, lh0 ACRE FT. PER YEAR ROAD STATION, 10+10 i"lATER SOURCE INFO 12-1-0€1 FROM DAVID OBTAINED, BLALOC.K @ HUNSAKER (858-558-4500) THE CONTRAC.TOR SHALL VERIFY LOCATION AND i"lATER PRESSURE BY DIRECT MEASUREMENT IN THE FIELD. IF EXISTING PRESSURE IS NOT AS STATED ON THE PLANS THE CONTRACTOR SHALL NOTIFY TI-IE Ol'iNERS' REPRESENTATIVE BEFORE PURGHASE OF EQUIPMENT AND BEGINNING INSTALLATION. PURCHASE OF EG!lJIFMENT AND ANY INSTALLATIONS l'iHEN EXISTING STATIC. PRE551JRE IS BELOl'i THAT STATED ABOVE SHALL BE THE SOLE RESPONSIBILITY OF THE C.ONTRAC.TOR. NOTEM, CONTROLLER 'TT" SHALL BE A RAIN MASTER/ HYDRO-SC.APE C.ONTROLLER ASSEMBLY, MODELII, HSl-6P-DX9o/HSDX-R.F/HSEV-RADIO-F/HSEV-ANT-FD/HSEV -GND/HSRSE-DX/HSFS-150 FINAL LOCATION OF CONTROLLER, ELECTRIC.AL SERVIC-E, AND APPIJRENT ANC.ES SHALL BE OUTSIDE ANY PUBLIC. R.O.l"l. OR EASEMENT AND CONFIRMED l'ilTH OMR'S REPRESENTATIVE PRIOR TO C.OMMENc.lNG l'lORK. r / ~--------------~ CITY OF CARLSBAD ~ ~ PLANNING DEPARTMENT ~ www.gmplandarch.com 4125 Sorrento Valley Blvd. Suite D San Diego California 92121 Tel 858 558 8977 Fax 858 558 9188 -=---------------....,,...------------,----,---,----------------,---,---,---,----1 DRAWN ~R .. AS-BUILT" APPROVED MM /J 1ST SUBMITTAL 02-09-07 MARC MOODY /11,-, ~- MYLAR SUBMITTAL 'l'-10-0'l' ~ AS-BUILT 1ST 01-07-13 i...::Tl:TI.:E:,:::P::RIN::::C::IP:::AL::::=:::;;:;;;;~:;;:;:::======-L--!--L--------------'---!--L--i-~ AS-BUILT SIGNED O'l'-24-13 RECEIVED BY: JOB NO. 05-038 DATE 04-30-07 SCALE AS SHOWN INSPECTOR DATE DA TE INITIAL ENGINEER OF' WORK REVISION DESCRIPTION DA TE INITIAL DA TE INITIAL OlHER APPROVAL CITY APPROVAL GUEST BUILDER IRRIGA TI□N PLAN 6iJEST 8()/LOER VILLA6ES OF LA C:OSTA 11-IE OAKS -9.4 9.5 PLANNING OWN BY: __ _ CHKD BY; __ RVWD BY: PROJECT NO. CT 05-16 Ll-02 DATE DRAWING NO. 446-bL l NOTE: IRRIGATION MAINLINE AND APPURTENANCES LOCATIONS ARE DIAGRAMMATIC. ALL IRRle:,ATION EQUIPMENT SHALL 6E INSTALLED JIIIITHIN THE LIMIT OF JIIIORK, le" OFF ANY HARDSC.APE AND JIIIITH PLANTING AREAS. ANY PARKJ,"IIAY IMPROVEMENTS IN PUBLIC. RIGHT-OF-J,"IIAY REQUIRES AN ENCROACHMENT PERMIT FROM THE C.ITY. NOTE, IRRIGATION EQUIPMENT SHOl-"IN OUTSIDE OF MAINTENANCE RESPONSIBILITY AREAS FOR CLARITY ONLY. ALL EQUIPMENT SHALL BE INSTALLED JIIIITHIN THE LIMIT OF Jl'lORK LINES. VERIFY ALL LAYOUT IN FIELD JIIIITH OJIIINER'S AUTHOR.I ZED REPRESENTATIVE. NOTE, ALL HEADS ARE TO 6E ADJUSTED TO PREVENT OVERSPRAY ONTO BUILDINGS, J,"IIALLS, FENC.ES AND HARDSC.APE. ALL ADJUSTMENTS SHALL ASSURE GOOD SYSTEM COVERAGE AND DISTRIBUTION EFFICIENCY i-"IHILE KEEPING J,"IIATER JIIIITHIN THE LANDSCAPED PLANTED AREAS. NOTE: C.ONTRAC.TOR SHALL ADJUST ALL HEADS AS REQUIRED TO ACCOMMODATE ANY VERTICAL O6STRUC.TIONS THAT MAY OCC.UR, INCLUDING BUT NOT LIMITED TO LIGHT POLES, FIRE HYDRANTS, FENCES, ETC.. VERIFY ALL HEAD LAYOUT JIIIITH OJIIINER'S AUTHORIZED REPRESENTATIVE PRIOR TO COMMENCING JIIIORK. NOTE: C.ONTRAC.TOR SHALL PROVIDE SLEEVING FOR ALL FUTURE PAVED AREAS INCLUDING FUTURE DRIVEJ,"IIAYS, ROADJ,"IIAYS, AS JIIIELL. AS AL.I.. CURRENT PAVED AREAS, PATHS, ETC.. VERIFY AL.I.. SLEEVE LOCATIONS IN FIELD Ji'IITH OJIIINER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING JIIIORK. NOTE: ALL RC.Y'S AND QC.Y'S SHALL. 6E INSTALL.ED OFFSET FROM MAINLINE AND ISOLATED JIIIITH A BALL. VALVE. ALL RC.V'S SHOJIIIN JIIIITHIN 15 FEET OF EAC.H OTHER SHALL BE INSTALLED ON A COMMON MANIFOLD. I I el 7 0D I PLAN 4-8 PAD=5J7.6 Fr=5JB.27 (m) ----- CID PLAN 3/\ PAD=538. I FT=5JB.77 (FR) .., 0 osc ood APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTING AREAS. <.> .. 1 .::; :I ,. PPROJ a T BOUNDARY I 10- --= e,t,' I I' 5+00 I (2, .. ,· --- a www.gmplandarch.com 4125 Sorrento Valley Blvd. Suite D San Diego California 92121 Tel 858 558 8977 Fax 858 558 9188 K / 0~ ~~ ~ 0 t-~ V eGALf!:, 111 c ao1 KEY MAP NOTE A, POC. "61" TO BE A I½' POTABLE i"lATER METER l'llTI-1 A 2' SERVIC.E LATERAL. BAC.KFLOl'l SIZE, I½" BAC.KFLOl'l ENC.LOS\JRE: V.I.T. SBBc.-;\OC,R MASTER VALVE SIZE: I½' FLOl'l SENSOR SIZE: I½' STATIC. i"lATER PRE55URE, "14 PSI DE5I6N i"lATER PRESSURE: 11 PSI BOOST REQUIRED: NO MAXIMUM DEMAND: 4IGPM SET POC. REGULATOR@ 11 PSI ESTIMATED AREA SERVED, 2;1,lf>O SG!. FT. EST. ANNUAL i"lATER USE: 1.82 AC.RE FT. PER YEAR MAl"lA, 1.16 AC.RE FT. PER YEAR ROAD STATION: 20+50 l'lATER SOURc.E INFO 12-1-06 FROM DAVID OBTAINED: BLALOC.K@ HUNSAKER (858-558-4500) TI-IE C.ONTRAC.TOR SHALL VERIFY LOC.ATION AND l'lATER PRESSURE 6Y DIREC.T MEASIJREMENT IN TI-IE FIELD. IF EXl5TIN6 PRESSURE 15 NOT AS STATED ON THE PLANS TI-IE C.ONTRAC.TOR SHALL NOTIFY TI-IE Ol'lNERS' REPRESENTATIVE BEFORE PIJRC.HASE OF EG!UIPMENT AND BE6INNIN6 INSTALLATION. PURc.HASE OF EQUIPMENT AND ANY INSTALLATIONS l'lHEN EXl5TIN6 STATIC. PRESSURE 15 BELOVi THAT STATED ABOVE SHALL BE THE SOLE RESPONSIBILITY OF THE C.ONTRAC.TOR. NOTE 6, C.ONTROLLER "W" SHALL BE A RAIN MASTER/ HYDRO-SC.APE C.ONTROLLER A55EM6L Y, MODEL#, HSI-BP-DX;l6/HSDX-RF/HSEV-RADIO-F/HSEV-ANT-FD/HSEV -GND/HSRSE-DX/HSFS-150 FINAL LOCATION OF C.ONTROLLER, ELEC.TRIC.AL SERVIC.E, AND APPIJRENT ANC.ES SHALL BE OUTSIDE ANY PIJBLIC. R.O.l'i. OR EASEMENT AND C.ONFIRMED l'llTH Ol'lNER'S REPRESENTATIVE PRIOR TO C.OMMENC.IN6 ViORK. ~ CITY OF CARLSBAD ~2 L±_j PLANNING DEPARTMENT ~ DRAWN JR ,---------,,,.,, A""'S,---,:B:-:-U:-:-:IL-:T:;:-.,-------~----.--.--------------.-----.--.----,---1 GUEST BUILDER IRRIGA TI□N PLAN 1ST SUBMITTAL 02-09-07 MA.RC MOODY ~ ' DATE MYLAR SUBMITTAL 7-10-07 APPROVED MM ~ AS-BUILT 1ST 01-07-13 i-::TI.:.::1lE~:_::P::RI::NC::I:::PAL:::::::=~~~~~;:=======-1-----------t--!--------------+----i--!----l----l AS-BUILT SIGNED 07-24-13 RECEIVED BY: 6/JEST 81./ILOER VILLA6ES OF LA C:::OSTA THE OAl<S -8.4 8.5 r--t---+-----------+--+---+---+----t I APPROVED ,~J, I q: ~\lo¾ _PLANNING JOB NO. 05-038 DA.TB 04-30-07 DA TE INITIAL SCALE AS SHOWN INSPECTOR DATE ENGINEER OF WORK DA TE INITIAL DA TE INITIAL REVISION DESCRIPTION DTiiER APPROVAL CITY APPROVAL DWN BY: __ _ CHKD BY: __ RVWD BY: PROJECT NO. CT 05-16 LI-OS 1---z.q_ ,~ DATE DRAWING NO. 446-bL NOTE: IRRIGATION MAINLINE AND APFUR.TENANC.ES LOC.ATIONS ARE DIAGRAMMATIC.. ALL IRRIGATION EQUIPMENT SHALL SE IN5TALLED HITHIN THE LIMIT OF HOR.K, 18" OFF ANY HAR.DSC.APE AND HITH PLANTING AREAS. ANY PAR.KHAY IMPROYEMENT5 IN PUBLIC. R.IISHT-OF-HAY R.EQUIR.E5 AN ENC.R.OAC.HMENT PER.Ml T FROM THE C.ITY. NOTE: IRRIGATION EQUIPMENT 5HOHN OUTSIDE OF MAINTENANC.E R.ESPONSISILITY AREAS FOR C.LARITY ONLY. ALL EQUIPMENT SHALL SE INSTALLED HITHIN THE LIMIT OF HOR.K LINES. VERIFY ALL LAYOUT IN FIELD HITH OHNER'S AUTHORIZED REPRESENTATIVE. NOTE, ALL HEADS ARE TO SE ADJUSTED TO PREVENT OVER5PR.AY ONTO SUILDING5, HALL5, FENC.E5 AND HARD5C.APE. ALL ADJU5TfvfENT5 SHALL ASSURE GOOD SYSTEM GOYER.AGE AND DISTRIBUTION EFFIC.IENC.Y HHILE KEEPING HATER HITHIN THE LANDSCAPED PLANTED AREAS. NOTE: C.ONTRAC.TOR 5HALL ADJU5T ALL HEADS AS REQUIRED TO ACC.OMMODATE ANY VERTICAL OBSTR.UC.TIONS THAT MAY OC.C.UR, INC.LUDINIS SUT NOT LIMITED TO LIGHT POLES, FIRE HYDRANTS, FENC.ES, ETC.. VERIFY ALL HEAD LAYOUT HITH OHNER'5 AUTI-!ORIZED REPR.E5ENTATIVE PRIOR TO C.OMMENC.ING HOR.K. NOTE: C.ONTRAC.TOR SHALL PROVIDE SLEEVING FOR ALL FUTURE PAYED AREAS INC.LUDINIS FUTURE DRIVEHAY5, ROADHAYS, A5 HELL AS ALL C.URR.ENT PAVED AREAS, PATHS, ETC.. VERIFY ALL SLEEVE LOC.ATIONS IN FIELD HITH OHNER.'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING, Y'IORK. _J ~:_tt,±g • ~ -=--- APPROVED FOR PLANTING AND IRRIGATION ONLY, INC,LUDING PREC,15E LOC,ATION OF PLANTING AREAS. I'/ • ' \1 L.IMIT OF ~O~K_/ www.gmplandarch.com 4125 Sorrento Valley Blvd. Suite D San Diego California 92121 Tel 858 558 8977 Fax 858 558 9188 II~ II "==- ' DRAWN JR APPROVED MM 1ST SUBMITTAL 02-09-07 MYLAR SUBMITTAL 7-10-07 AS-BUILT 1ST 01-07-13 AS-BUILT SIGNED 07.-24-13 JOB NO. 05-038 DATE 04-30-07 SCALE AS SHOWN 1 SEE NEl6HOORHOOD 3.3 PLANS FOR PARKr'IAY CONTROLLER AREA 'i"ll"l' IWIE I· . -----=~ "AS-BUILT" r 1k-1b MARC MOODY ' 11ATE TilLE: PRINCIPAL RECEIVED BY: J¾..dl [r:~l~-o-lt 1-V''t,1") DATE INlllAL ENGINEER OF WORK INSPECTOR DATE -------·------------ KEY II eo eo 60 "10 SCAL.E!!, 111 = ec:,1 1 s5ET I CITY OF CARLSBAD LEJ PLAf.l\JING DEPARTMENT 2 GUEST BUILDER IRRIGA TI□N PLAN 61JEST EJ()/LJ:)ER Ll-04 VILLA6E5 OF LA C:::OSTA OAK.5-8.4 8.5 APPROVED ,~.:/) /• Vi.►~ PLANNING DATE DWN BY: PROJECT NO. I DRAWING NO. DATE INlllAL DATE INlllAL CHKD BY: REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: GT 05-16 446-oL SYMBOL G V H F <D Ell 0 <D ~ ® @ @ @ CT! ® ® @ ® @ @ @ @ @ @ @ 81@ ® @ ® © @ €1 @ @© @ §@ @) €3 @ s @@ €) @~ @ @@ @ e@ @ ©@ Sl'MBOL 11!1 NO SYMBOL 8 e ~ NO S'!'MeOL NO S'!'MeOL IRRIGATION MATERIAL LEGEND MANIJFAc:.T. MODEL NO. I DESGRIPTION 6PM PSI RADIUS DETAIL RAIN BIRD RAIN BIRD RAIN BIRD RAIN BIRD RAIN BIRD RAIN BIRD RAIN BIRD HUN1cR HJNTER HUNTER HJNTER HUNTER HJNTER HJNTER HJNTER HJNTER HUNTER lf>OO-SAM-PRS--5 POP-IJP lf>OO-SAM-PRS-U& POP-LJP 1800-SAM-Pl'.S-UIO POP-I.JP lf>OO-SAM-Pl'.S-Ul2 POP-IJP 1800-SAM-Pl'.S-U15 POP-I.JP lf>OO-SAM--PRS-15LST/56T POP-UP Sc;H.&o NIPPLE l'IITH 1402 PRESSUFe COMPEN5ATIN6 TRIC.KLL PATTERN eueeLER, EAc:,H SYMBOL REPRESBITS THO SUBBLERS PER TREE PGJ-.15/1.5/5.0 SHRU6 HEAD PeJ-1.0/2.0/4.0 SHRU6 HEAD P5H-ADV/56V-4.0/6.0/'l.0 SHRU6 HEAD P5H-ADV/56V-5.0/1.0/IO.O SHRUB HEAD P5H-ADV/56V-6.0/'I.O/II.O ROTOR HEAD l-20-ADV/56V-.5/I.0/2.0 SR ROTOR HEAD l-20-ADV/56V-.15/l.5/3.0 SR ROTOR HEAD l-20-ADV/56V-I.0/2.0/4.0 ROTOR HEAD 1-20-ADV/'!Jt,V-IS/3.0/6.0 ROTOR HEAD l-20-ADV/56V-2.0/4.0/8.0 ROTOR HEAD .10, .13, .20 .2.6, .35, .52, 1.05 .5", .52, .1'1, 1.51 .65, .a1, 1.5, 2.6 .'13, 1.23, 1.es, 3.10 .61, 1.21 1.54 .15, 1.5, 3.0 1.0, 2.0, 4.0 1.4, 2.4, 4.5 1.a, s.o, 6.o 2.4, 4.5, a.o .45, .'10, 1.1 ha, 1.5, 2.1 1.0, I.&, 3.1 1.4, 2.4, 4.Gf l.b, 3.1, 6.0 30 5 FT A 50 &FT A 30 10 FT A 30 12 FT A 30 15 FT A 30 5xl5 FT A 5x30 FT 50 3 FT A 40 20 FT A 40 25 FT A 40 30FT A 40 35 FT A 40 40FT A 40 20FT A 40 25 FT A 40 50FT A 40 35FT A 40 40FT A HUNTE:R POP-IJPS SHALL BE USEC) IN THE Rl5HT-oF-+'!AY AND i'llEREVER l'IITHIN 10' OF ANY HARJ:?5C.APE, 11JRF OR 0..-ILR Al'U=A 1+ER1: I WESTRIAN TRAFFIC. MAY oc:;aJR 6,C, RAIN BIRD MANJFAc:.T. P.O.C.. Nie= HJNTER HJNTER NIA 1'111.KINS HJNTER HINTER INSTALL ALL SHRU6 HEADS ON 12' POP-IJPS AND ALL lVRF HEADS ON 6" POP-IJPS. l"IHEN RADIUS OF SPRINKLER !EADS, REGUIRED FOR PROPER c.oYERA5E, IS LESS THAN RADIUS SHOl'IN ON LESEND, THE c:;ONTRAC,TOR SHALL EGUIP HEAD l'IITH A RAIN BIRD 'Pc;S" PRESelJRE c;oMPENSATINe sc;RLCN FOR. Fl.OH AND ltADIUS ~L-51:LEC,T sc;l'Q:EN ON PC,S NOZZLE sc;RLCN SELcc;TION c;HART, PROVIDW 6'!' MANIJFAC,11JFQ:R, FOi'. A~IATE RADIUS. l"IHEN INSTALLINe SPl'.INKLER HEADS USINe NOZZLES THAT "-EGUIRE ARc; PATTERNS OTHER THAN THE STANDARD ARc; PATTERNS /'360', leD', 1:20', '10', ETC.) THE c;oNTRAc;TOR SHALL USE VARIABLE ARc; OR ADJJSTABLE NOZZLES. RADIUS OF ADJJSTABLE NOZZI.Ef, SCI LC,Tl;D TO MATc;H SITE c;oNDITIONS. NOTE, PRcc;IPITATION RATES ARE IN INc.l-lES PER. HOUR (IN/HJ BASED ON TRIANGIA..AR Sf'Ac:.INe, 50!5 DIAMETI:R OF THl'WW, c;oLLCc;TLD IN ZEfW l'IIND c;oNDITIONS. IRRIGATION MATERIAL LEGEND (PRIVATE LOTS) MODEL NO. I DLSG.RIPTION c:.oNNEC,T DOHETREAM OF THE EXISTING 3/4" DOMESTIC. HEIER, VERIFY SIZE, LOG,ATION, AND PRESSURE IN FIELD, l'IJTH Ol'H;R'S AI.ITHORIZED REPRESENTATIVE PRIOR TO GOMMENC,IN6 Y'IOFlK MODEL N.JM6ER T-5&0-66 BRONZE 6ALL VALVE, LINE SIZE, THREADW THO-Plcc;c 60DY'. HUNTE"-PC-,ooo<I MODULAR, INDOOR MOUNT IRRl6ATION c;ONTROLL.ER SIZE AS REGIJIRED, INSTALL l'IITHIN 6ARAISE, VERIFY Ac:,i1JAL LOG,ATION IN FIELD l'IITH OHNE~ .ALITHORIZED FIEPRESENTATIVE. MINl-c;LIK RAIN SO,!SOR, MOUNT TO EAVE OF EILD6. AND Wll'.E TO CONTl'.OLLEk PER MANJFAC,T\.IRER INSTRIJG,TION5. VERIFY Ac:.ilJAL LOG,ATION IN FIELD l'IITH OHNERS AI.ITHORIZED REf'RESENTATIVE. 120 VOLT ELEc.TRIC.AL PO~ PROVIDED 6'!' ELEc.TRIC.IAN, VERIFY Ac:,i1JAL LOG,ATION IN FIELD 500--HLR SERJLS PRESelJRE tEDUC.IN6 VALVE WITH 10 TO 125 PSI Sf'RINe RAN6E, SIZE AND PRl3SIJRE 5ETTIH6 AS NOTED. ASV-101-CC. ANTI-SIPHON REMOTE c.ONTROL VALVE, WHEN HEADS ARE L.Oi'ER THAN Rc;V P6V-IOIA-CC. AN6LE VALVE FOR USE l+£N IRRl6ATION HEADS ARE Hl5HER THAN RGV IN (;ON.lJNc.TION l'IITH HUNTER ATM05f'HEl'I.IC. VAC-WM 6RLAKER. INSTALL AV6-IOO ATMOSPHLR.IC. VAC-WM 6RLAKER PER MANJF. REc.OMMENDATIONS, 6' A60VE Hl5HLST OUTLET, SIZE AS SHOI-N. AS APPROVW PVC. PIPE 3/4" -11/2" C.L. 200 AS LATERAL LINES 12" BELOW 6RADL AS APPROVW PVC. PIPE 11/4" Sc;H. 40 AS MAINLINES I&" BEi.OH 61'.ADL AS APPROVW PVC. PIPE Sc;H_ 40 AS 5LEEVIN6, Tl'IIC.E THE DIAME I Ek OF PIPE OR WIRE 6IJNDLE C.ARRIW PLAc:.L BEL.OH ALL PAVINe, HARJ:?5C.APE, ETC.., AND AS DIRCc.TLD 6Y Ol+IER'S AUTHORIZED REPRESENTATIVE. AS APPROVW •1a-xx Al'l6 MUI. Tl-STRAND IRRl6ATION (;ONTROL WIRE, DIRCc.T BURIAL, U.L. APPROVED, PER c;oDC. NUMBER OF MULTI-WIRE STRANDS SHALL BE AT LEAST THREE MORE THAN NJMBER OF VALVE STATIONS SHOl'IN PER PRIVATE LOT. SPEARS DS-500 PRE-Fil.LED WIRE c;oNNEc.TORS, USE ON ALL HIRE C.ONNEC.TIONS DETAIL D,E G K NIA M s TP,V DD DD EE E>PD.EE SYMBOL ® ~ (.y) ® r!I El NO SYMBOL NO 5YMEIOL NOT SHOWN NOT SHOWN NO SYMBOL NO SYMEIOL IRRIGATION MATERIAL LEGEND (POTABLE WATER) MANIJFAc:.T. MODEL NO. I DCsc:;1'.IPTION P.O.C.. POTABLE IRRl6ATION l'IATER MLTEk (SEE NOTES FOR DLSleNATION AND SIZES). VERIFY Ac:,ilJAL LOCATION, SIZE, AND l'IATEk PRL5SURf; IN THE FIELD PRIOR TO c.oMMENc.lNe Y'IOFlK AND l"URc.HASINe LGIUIPMENT. l'IILKINS '115XL VSRSOOHLR SERIES, 6Ac:.KFLOH PRl:VENTION A55EM6L Y WI MODEL 'YeP' l'\1'L STRAINER. ALL PIPIH6 BETWEEN r IC, .:R AND 6Ac:.KFLOH DLVIC.E SHALL BE 'K' WI I LR OR RED 6RASS. RAIN 61RD ~-D SERIES 6RASS MASTER c.oNTROL VALVE. MASTER VALVE SHALL BE INSTALLED IN A 'J.JM60' SIZED VALVE eox WITH LOc.KINe ISRELN c.oVLR AND 'Mc.V' HEAT BRANDED ON C.OVER. DATA INDAJeT IR-220 PVC. Fl.OH SENSOR, HIRE TO c;oNTROLLLR. USIN5 P1111D C.A6LE IN I" C.ONDUIT, INSTALL PER MANIJFAC,ilJRER'S AND UNTITLD 6REEN TEc;H OF LA6UNA HILLS, C.A (eoo-421-oTT'I) Rf:c.OMMENDATIONS. MULTIPLE FLOW 5LNSOR5 REGllJIRL SEPARATE (;ONDlJIT RIJNS. Nie= MODEL NIJI-EER T-SeD-66 6RONZE 6ALL VALVE, LINE SIZE, THl'U=ADCD THO-PICC.E 60DY'. VALVE eox WITH 6REEN LID, HEAT eRAND LID WITH "BV'. RAIN 61RD 441.C. GUlc.K COUPLER VALVE, INSTALLED IN 10" ~ VALVE eox HITH l.Oc.KIN6 6REEN c.oVLR AND 'GC,V' HEAT 6RANDED ON C.OVEk. INSTALL Gc.V ON A 11/2" 5i1J6--0IJT OFF MAINLINE. EAc:,H Gc.V SHALL BL ISOLATED FROM THE MAINLINE 6Y A 11/2" 6ALL VALVE AND INSTALLED AT 200' O.C.. PER C.IT'!' REGUIREMENT5. DETAIL NIA 0 N J R L RAIN 61RD PESB C.P-PRS-D SERIES PLASTIC. PRL5SURf; REGULATIN5 CONTROL VALVE, SIZE AS SH01"1N, INSTALL ONE VALVE PER p STD. RCc.T. VALVE eox l'IITH l.Oc.KIH6 6RLEN c.oVLR AND 'Rc.V' HEAT BRANDED ON =vcR. VALVES SHALL BE INSTALLED IN MANIFOLDS ISOLATW FROM THE MAINLINE BY' A BALL VALVE. SIZE 6ALL VALVE PER THE L>.~L!::>T RGV IN THE MANIFOLD. RAIN MASTER/ IRRl6ATION c.oNTROLLER IN STAINI E5S STEEL ENC-L.05URE, SEE NOTES FOR MODEL AND STATION (;OIJNT. c;oNTROLLER F H'fDRO-S(;APE SHALL HAVE A DLSleNATW RCc.TAN61JLAR PULL eox INSTALLW A1 PEDESTAL BASE. c.ONTAC,T H'fDRO-S(;APE TO C.OORDINATE PIJRC,HASE AND INSTALLATION. HUNTE"- NIA 1'111.KINS RAIN SENSOR, H'l'DR0-5c;APE HILL MOUNT TO CNc.L05URE AND HIRE TO c.oNTROLLER. 120 VOLT CLEc.TRIC.AL PO~ PROVIDED 6Y ELEc.TRIC.IAN, VERIFY Ac:,ilJAL l.Oc.ATION IN FIELD 5oo-HLR SERIES PRESelJRE REDIJC,IN5 VALVE l'IITH 10 TO 125 PSI Sf'RINe RAN5E, SIZE AND PRL5SURE 5LTTIN5 AS NOTED. F NIA NIA AS APPROVW PULL eoxcs FOR. WIRE SPL.IC.LS SHALL BE LOG,ATLD APPROXIMATELY 500' o.c.. AND AT THE ENDS OF ALL SLEEVES H UNDER PAVINe. PULL eoxcs SHALL 6E 10' ~ WITH L.oc.KIN5 LID AS APPROVED PVC. SOLVENT i'ELD LATERAL PIPE l'IITH Sc;H.40 FITTIN65, ¾"-ii!," Sc;H. 40, 2"-21!,' C.LASS 200, DEPTH A5 PER DETAIL. AS APPROVED PVC. PIPE MAINLINES, DEi IH AS PER DETAIL,~" e SMALi.Ek SHALL BE SOLVENT HELD Sc;H.40 WITH Sc;H.40 SOLVENT l'IELD FITTIN65, 2'--3" SHALL BE SOLVENT l'ELD C.L. 515 WITH Sc;H.aD SOLVENT HELD FITTINeS, ~"-3" FITTIN65 SHALL BE THRUST BLOc.KW, 4" AND I.ARISER s,HALl BE C.L. 200 6A5KET JOINT l'IITH L.EEMc.0 DUc.TILE IRON FITTIN65 AND JOINT RESTRAINT. AS APPROVED PVC. PIPE AS SLEEVIN5, Tl'IIC.L THE Dl ... r-11:IEk c:)F PIPE OR l'IIRL BlMDLE CARRIED PLAc.E ea.ow ALL PAVIH6, HARDsc;APE, ETC.., AND AS DIRLc.TLD BY' '""-.F("::; AUTHORIZED ~ATIVE. SLEEVE5 UNDER ROADS SHALL BE Sc;H. &O PVC., AND ALL 5!..EEVE5 UNDER PAVINIS(NoN-ROAD) SHALL ec Sc;H. 40 PVC.. 5!..EEVE5 UNDER 6ROl'I DITc;HLS SHALL BE ENC-ASED IN CONC,RCTE A MINIMUM OF 6" THICK ON ALL SIDES OF PIPE. EXTEND ALL 5LEEVE5 12" MINIMUM PAST HARD5c.APE wees. MAl'.K HARDsc;APE ~ WITH '15' IN 2" Hl5H L.LTTEkS FOR. l.Oc.ATION(S.) EXTEND ALL PIPE I&" PAST 5LEEVE PRIOR TO ANY FITTINeS. AS APPROVW IRRl15ATION c.oNTROL HIRE SHALL BE •14UF Al""5 DIRCc.T BURIAL (U.L. APPROVED), c;oLOR c;oDC WIRE PER c.ONTROLLEk, A MINIMUM OF -n-«EE SEPARATE Sf'ARE PILOT l'lll'U:S TO THE END OF EAc:,H MAINLINE. IIIOUTE Sf'ARE WIRES INTO EAc;H VALVE MANIFOLD LOG,ATION, BUNDLE AND TAPE ALL HIRE AND INSTALL ADJAC.ENT TO MAINLINE LEAVE SPAI'!: WIFU: ENDS IN THE LAST VALVE MANIFOLD eox ON THE MAINLINE. IRRl6ATION COMMON HIRE SHALL BE •12UF Al'l6 DIRCc.T BURIAL tu.I.. APPROVED). VALc;oN DS-500 PRE-FILLED Wll'.E (;ONNE:c.TORS, USE ON ALL l'IIRE c;oNNEc.TIONS IN VALVE OR PULL eoxcs ONLY 5000 SERIES ADV, USEC) ON ALL SPRINl<I..EkS l'IITH LOH HEAD DRAINAeE IJNCCNTROLLABLE BY FAc:.TORY' INTE6RAL SF'RINKLEk HEAD c;Hcc;K VALVE. 6R-4 ~ REGULATIN5 VALVE TO BE INSTALLED ON ALL LATERAL LINE(; ~IIEkE .sF'R.INKIJ:R HEADS ARE L.oc.ATLD AT AN ELEVATION MORE THAN 50' LOl'ER THAN THE FfGV. 51:T ~ TO c;oNTROL PRESelJRE DUE TO THIS ELEVATION c;HANeE, 51.ze PER LATERAL LINE SERVINe SYSTEM. INSTALL IN A 10' ROUND VALVE eox BEi.OH SRADe. (;ONTRAC,TOR TO LOG,ATE AU. SUc.t-1 PRV'S IN THE FIELD AND 5HOH L0c.ATION5 ON REC,ORD Dl'.AHINISS. MANJFAc:.ilJRED Sc;H.40 o-RINe Sl'IINIS JOINTS. FOR)!," Sf'RA'!' !-EADS USE T532-212, FOR¾" TURF ROTORS USE T132-212, FOR I' SPORr ROTORS USE 15132-412, FOR I" GIJlc.K c.ouF'LER VALVES USE 151325-212 l'IITH MALE 6RASS 5TA61LIZLR LL60lol, FOR. ¾" GIJlc.K c.oLIPLLR. VALVES USE 61i32T-212 l'IITH MALE eRA5S STABILIZER LL60H. VALVE 60.XCS, SIZE PER LGIUlf"t,ENT L.E6END, WITH T-c.ovER LIDS AND C.APTIVE 601.T AND LOG,-KIT. FOR ROUND DRIP EMITTlaRS USE MODEL 510, 1' cc;oNO SHALL 6E MODEL 10ll>, 10' ~ SHALL BE MODEL '110, 12' STANDARD RCc.T. SHALL BE MODEL 141"1, 12" .JJMeO RCc.T. SHALL eE MODEL 12:20, 5lJf'ER. .JJMe0 SHALL 6E MODEL 1324, AND 5UF'ER .JJM60 XL SHALL BE MODEL 1130. VALVE 60.XCS SHALL HAVE 61.AC,K HDPE 60DY' AND 6RLEN LIDS IN lVRF, eLAc.K LIDS IN SHRUB BEDS, AND TAN LIDS IN ROCK M.JLc.H. FOR. USE IN NON-VEHICoULAR TRAFFIC. Sli1JATION5 ONL '!'. DO NOT INSTALL IN CONC,RLTE OR ASPHALT. ~-C.ONTROLLER I 5TATION # ITI]QJ-GPM ~--VALVE 51ZE DD DD 15PD,EL 6 NIA NIA NIA NIA I PRIVATE LOT C.ALL OIJT! @~TION• ~ 60 "!O -----------, -------r------;;-:--:,:-:,::-:::-,,:,;;----------r--.--.-------------sc:;.-AJ..--,~._-1'_'-_=-_eo-_~,~r---.--~ W CITILA~l~G □~~~k~BAD "AS-BUil T'' GUEST BUILDER IRRIGATION LEGEND ~ 2 APPROVED FOR PLANTING AND IRRIGATION ONLY, INC.LUDING PREC.15E LOC.ATION OF PLANTING AREAS. www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 LANDSCAPE ARCHITECTURE & PLANNING DRAWN PM. JII APPROVED -1 ST SUBMITTAL 02-09-07 2ND SUBMITTAL 3-13-07 3lID SUBl41TI'AL 4-30-07 l!TI.E: 4TH SUBMITTAL 7-02-07 MYLAR SUBMITl'AL 7-10-07 JOB NO. 05-038 DATE 04-30-07 SCALE AS SHOWN DAlE RECEIVED BY: INSPECTOR DAlE SI.EST BIJILOER Viii ~ OF LA COSTA THE OAKS -!!S.41 !!S.5 Ll-05 I APPRofif:.f~ / lr-~'"°it -,.,s.c,1 ~=====~====;================================1=====t====1=====t===j . P_L_A_N_N~IN=G'-'+=,l~-~--==---1------DATE I DRAWING NO. _ 44b-6L DA 1E INllll\L ENGINEER OF WORK REVISION DESCRIPTION DA 1E INllll\L DAlE INllll\L OlHER APPROVAL CllY APPROVAL OWN BY: __ _ CHK□ BY: __ _ RVWO BY: PROJECT NO. C.T 05-16 ~ ~ I ~ (' POC -PRESSURE CAI.CS PROJECT 05-038 LA COST A OAKS 3.4 -3.5 POC#/RCV# 64 TT-2 POC WATER TYPE POTABLE WATER RCVDEMAND 28 GPM HYDRAULIC GRADE LINE 750 FEET METER ELEVATION 506 FEET PRESSURE AVAILABLE AT POC SET POC PSI REGULATOR@ DESIGN PRESSURE # GPM SIZE LENGTH PSI SERVICE LINE 28.00 2" 35.00 0.87 METER 28.00 1.5" BACKFLOW DEVICE W/ STRAINER 28.00 1.5" FLOW SENSOR 28.00 1.511 MASTER CONTROL VALVE 28.00 1.5" MAINLINE (2" CLASS 315) 28.00 2" 359.00 0.66 ISOLATION VALVES 5 VM = LINE 0.70 RCVSINGLE STATION 28.00 1.511 CLASS 200 (10% OF PSI REQ'D) VM 5.39 SUBTOTAL + 10% FOR FITTINGS TOTAL LOSSES SPRINKLER OPERATING PRESSURE 30 PSI ELEVATION OF SPRINKLER HEAD(S) ON 526 FEET ZONE: -8.66 PS/LOSS SUM PRESSURE REQUIRED SURPLUS 42% SET RCV PRESSURE REGULATOR..@_ -soOST REQUIRED: MIN. SUCTION PRESSURE: 0 NONE NPSHr: 0 •contractor to verify PSI at Meter is: 105.7 TDH REQUIRED: 0 POC -PRESSURE CAI.CS PROJECT 05-038 LA COST A OAKS 3.4 -3.5 POC'#/RCV# 66 W-3 POC WATER TYPE POT ABLE WATER RCVDEMAND 26 GPM HYDRAULIC GRADE LINE 750 FEET METER ELEVATION 534 FEET PRESSURE AVAILABLE AT POC SET POC PSI REGULATOR@ DESIGN PRESSURE # GPM SIZE LENGTH PSI SERVICE LINE 26.00 2" 35.00 0.76 METER 26.00 1.5" BACKFLOWDEVICE WI STRAINER 26.00 1.511 FLOW SENSOR 26.00 1.5" MASTER CONTROL VALVE 26.00 1.5" MAINLINE (2" CLASS 315) 26.00 2" 445.00 0.57 ISOLATION VALVES 4 VM = LINE 0.70 RCV SINGLE STATION 26.00 1.5" CL 200 LATERALS {10% OF PSI REQ'D) VM 4.88 SUBTOTAL + 10% FOR FITTINGS TOTAL LOSSES SPRINKLER OPERATING PRESSURE 30 PSI ELEVATION OF SPRINKLER HEAD(S) ON 539 FEET ZONE: -2.165 PSI LOSS SUM PRESSURE REQUIRED SURPLUS 35% SET RCV PRESSURE REGULATOR@ ""BOOST REQUIRED: MIN. SUCTION PRESSURE: 0 NONE NPSHr: 0 •contractor to verify PSI at Meter is: 93.5 TDH REQUIRED: 0 106 PSI 90 PSI 85 PSI LOSS 0.30 PSI 1.60 PSI 15.00 PSI 0.50 PSI 2.78 PSI 2.37 PSI 3.50 PSI 3.00 PSI 3.66 PSI 32.71 PSI 3.27 PSI 35.99 PSI 30.00 PSI 8.66 PSI 74.65 PSI 31.01 PSI 48.59 PSI BOOST IN PSI= 0 PSI 94 PSI 69 PSI 69 PSI LOSS 0.27 PSI 1.40 PSI 15.00 PSI 0.50 PSI 2.66 PSI 2.54 PSI 2.80 PSI 3.72 PSI 4.88 PSI 33.76 PSI 3.38 PSI 37.14 PSI 30.00 PSI 2.17 PSI 69.30 PSI 24.22 PSI 44.14 PSI BOOST HI/ PSI= 0 PSI RUN-TIME CALC 05-038 LA COSTA OAKS 3.4-3.5 METER '64' / CONTROLLER 'TT' T= 60 x INTERVAL x PEAK Eto x KC POTABLE WATER PRx IE TIME= MIN 1.4 WATER 5 DAYS/WEEK 0.137 INTERVAL PEAK Bo KC 0.80 TURF (WUCOLS HIGH 0.7--0.9) 0.50 SHRUB (WUCOLS LOW 0.1-0.3, MOD 0.4-0.6) 0.45 SLOPE (WUCOLS VERY LOW 0.1) PR IE 0.70 TREE 1.85 SPRAY 0.50 ROTOR 0.30 DRIP 3.00 BUBBLER 0.60 SPRAY 0.85 ROTOR 0.90 DRIP 0.85 BUBBLER SHRUB ROTORS T = SHRUB ROTORS SLOPE T = TURF ROTORS T = TURF SPRAYS T = SHRUB SPRAYS T = SHRUB DRIP TREE BUBBLER$ T= T= 14 X 2 MIN/STA 12 X 0 MIN/STA 22 X 0 MIN/STA 8 X 17 MIN/STA 5 X 7 MIN/STA 21 X 0 MIN/STA 3 X 6 MIN/STA total number of stations: 32 RUN-TIME CALC STATIONS = STATIONS = STATIONS = STATIONS = STATIONS = STATIONS = STATIONS = TOTAL OVERHEAD ZONES: DRIP ZONES: 27 0 0 141 36 0 19 223 3.72 41.35% 3.41 032 MINUTES MINUTES MINUTES MINUTES MINUTES MINUTES MINUTES MINUTES HOURS OF9HR HOURS HOURS 05-038 LA COSTA OAKS 3.4 -3.5 T= 60 x INTERVAL x PEAK Eta x KC METER '66' / CONTROLLER 'W' POTABLE WATER PRx IE TIME= MIN INTERVAL 1.4 WATER 5 DAYS/WEEK PEAK Eto 0.137 KC 0.80 TURF 0.50 SHRUB 0.45 SLOPE 0.70 TREE PR 1.85 SPRAY 0.50 ROTOR 0.30 DRIP IE SHRUB ROTORS 3.00 BUBBLER 0.60 SPRAY 0.85 ROTOR 0.90 DRIP 0.85 BUBBLER T= SHRUB ROTORS SLOPE T= TURF ROTORS T= TURF SPRAYS T= SHRUB SPRAYS T= SHRUB DRIP T= TREE BUBBLERS T= 14 MIN/STA 12 MIN/STA 22 MIN/STA 8 MIN/STA 5 MIN/STA 21 MIN/STA 3 MIN/STA (WUCOLS HIGH 0.7--0.9) (WUCOLS LOW 0.1--0.3, MOD 0.4--0.6) (WUCOLS VERY LOW 0.1) X 0 STATIONS = 0 X 0 STATIONS = 0 X 0 STATIONS = 0 X 13 STATIONS = 108 X 7 STATIONS = 36 X 0 STATIONS = 0 X 5 STATIONS = 16 TOTAL 160 2.66 total number of stations: 25 29.61% OVERHEAD ZONES: 2.40 DRIP ZONES· 026 MINUTES MINUTES MINUTES MINUTES MINUTES MINUTES MINUTES MINUTES HOURS OF9HR HOURS HOURS 05-038 LA COSTA OAKS 3.4 -3.5 POTABLE WATER METER '64' I CONTROLLER 'TT' ESTIMATED WATER USE EWU (GPO) = ETO x PF x HA x .62 IE ETo = 0.137 AVG DAILY Eta 50 per year PF = 0.5 SHRUBS & GROUND COVER (SPRAY&ROTOR) 0.8 TURF (SPRAY & ROIDR) 0.5 SHRUBS (POINT SOURCE & DRIPLINE) HA = 0.62 = IE = ZONE TYPE: SHRUB ROTORS TURF ROTORS SHRUB SPRAYS TURF SPRAYS SHRUB DRIP TREE BUBBLER TOTAL SQ. FEET: ACRE: SEE BELOW FOR SQUARE FOOTAGE CONVERSION FACTOR OF UNITS TO GPO 0.85 ROTORS 0.6 SPRAYS 0.9 0.85 DRIP BUBBLERS AREA (SQ.FT) 2,000 0 3,871 10,359 0 72 16,302 0.37 EWU= 99.92 (Ela x 0.5 X HA X .62)/.85 EWU= 0.00 (Eta X 0.8 X HA X .62)/.85 EWU= 273.97 (Eta X 0.5 X HA X .62)/.60 EWU= 1,173.07 (Etc x 0.8 X HA X .62)/.60 EWU= 0.00 (Eta X 0.5 X HA X .62)/.90 EWU= 4.32 (Etc X 0.5 X HA x .62)/ 85 EWU= 'EWU based on watering 5days perl/1£/ek, 52 l/1£/eks per year, wlh no effective rainfall. 1551.28 GPD 403,334 GPY" MAWA=Eto x 0.8 x AREA x 0.62 DAILY MAWA: 1,108 404,290 GPY YEARLY MAWA: GPO GPO GPO GPO GPO GPO 1.24 AC. FT/yr 53918.10 CU.FT/yr 1.24 AC FT. 05-038 LA COSTA OAKS 3.4 -3.5 METER '66' I CONTROLLER 'VV' POTABLE WATER ESTIMATED WATER USE EWU (GPO)= ETO x PF x HA x .62 IE ETo = 0.137 AVG. DAILY Eto 50 per year PF = 0.5 SHRUBS & GROUND COVER (SPRAY&ROTOR) 0.8 TURF (SPRAY & ROIDR) 0.5 SHRUBS (POINT SOURCE & DRIPLINE) HA = SEE BELOW FOR SQUARE FOOTAGE 0.62 = CONVERSION FACTOR OF UNITS TO GPO IE = 0.85 ROTORS ZONE TYPE: SHRUB ROTORS TURF ROTORS SHRUB SPRAYS TURF SPRAYS SHRUB DRIP TREE BUBBLER TOTAL SQ. FEET: ACRE: 0.6 SPRAYS 0.9 0.85 DRIP BUBBLERS AREA (SQ.FT.) 0 0 4,613 8,824 0 39 13,476 0.31 EWU= 0.00 (Ela x 0.5 x HA X .62)/.85 EWU= 000 (Eta XO 8 x HA X .62)/.85 EWU= 326.49 (Ela x 0.5 X HA x .62)/.60 EWU= 999.25 (Ela x 0.8 x HA X .62)/.60 EWU= 0.00 (Ela x 0.5 x HA X .62)/.90 EWU= 2.34 (Eta x 0.5 X HA X 62)/.85 EWU= *EWU based on watering 5days per v.eak, 52 l/1£/ek s per yea~ wth no effective rainfa/1. 1328.08 GPO 345,300 GPY" MAWA=Etox 0.8 x AREA x 0.62 DAILY MAWA: 916 GPO GPO GPO GPO GPO GPD 1.06 AC. FT/yr 46160.03 CU.FT/yr YEARLYMAWA: 334.205 1.03 GPY AC. FT. www.gmplandarch.com DRAWN PII 1111 r--------,.::-A,-,:S,-,B"'"u""1L"""T:::-.-------,---.--.-----------------.-----,--..-----.-----1 9404 Genesee Avenue APPROVED -Suite 140 La Jolla 1ST SUBIIITTAL 02-09-07 DAlE California 92037-1353 2ND SUBMITTAL 3-13-07 Tel 858 558 8977 3RD SUBlOTTAL 4-30-07 TITLE: Fax 858 558 9188 4TH SUBlDTl"AL 7-02-07 RECEIVED BY: fsi!ITll CITY OF CARLSBAD11~EE~1 L..lJ . PLMt-J I NG DEPARTt.ENT . 22 GUEST BUILDER IRRIGATION CALCULATIONS 61.JEST Bl/IL.DER VILLASES OF LA c::;;osrA THE OAKS -a4 ~.5 APPROVED FOR PLANTINS AND IRRISATION ONLY, INC.LUDING-PREC.ISE LOCATION OF PLANTINS AREAS. LANDSCAPE MYIAB SUBMl"ITAL 7-10-07 t----+--+-----------+------l--+--+----11 APP7~~ I 4r-~.,pt "1-1~-" "1 1-----t--+----------------+----t--+----I-----I ~-P~L~A;=NN~l;;:~::::;.;==::,;:=~~~~~==;-~DA::::TE:::::::::===: ARCHITECTURE JOB NO. Oli--038 DATE 04-30-07 C~\.\ a PLANNING SCALE AS SHOWN INSPECTOR DAlE DWN BY: ~JM~-PROJECT NO. I DRAWING NO. ~~ :~~~e-h.i_ C:.T 05-lb _ 446-bL DA 1E INITIAL ENGINEER Of WORK REVISION DESCRIPTION DA lE INITIAL DA lE INITIAL OlHER APPROVAL CllY APPROVAL ROTOR HEAD, SEE LE6END FOR !:>1"1:GIFIC.ATION --~ -------INSTALL fi!NQ.ER +EAD FUJ5H Hill Flll!iH ~ Ill "MU' NE/6 1-----SPRA,.. HEAi?, SEE LE6END FOR Sf'Ec.lFIC.ATION 12' -----INSTALL !:f'RIMQ.ER +EAD 1/2' -I -NJlNf. FINISH 6RADE IN 5IR8 :I Ill I 111--~=~=~- =1 11 I ' TRIPLE SWINS JOINT =1 I . AeeEMBL ,.., ~" LA,, MINIMJM lrSGll-40 PVC, Si6KT rel; Flmlle LATal',I. x 5PRIIIQ.fR IN..ET SIZE LATal',I. LOE. !!EE 5PEc.lFlc.A110N5 FOil iY1'E All0 DEP1l" 'FQ!Pfl? =· INSTALL -NKL.ER HEADS 6" FROM PAVIHe EDeE IN i$ROUND (;OVER N£6,S. INSTALL Sl"l'.INKL.ER HEADS 4" FROM PAVIHe EDeE IN 1IJRF Ne/6. INSTALL -NKL.ER HEADS PI..IJl,e. AOJJST SPRA'T'S OR NOZZLE: Sll'U:AM TO (;OVER LA1'1:15GAPE ~ HITHOI/T OVERSf'RA'( ONTO PAVIN5, FENc.ES, HAl.1..5 OR BUILDIN55. DO NOT USE SIPE INLET ON HEADS HITH IN1E6~ c.H:c.K VAL VE. ALL THREADa:> c.oNNEc.TIONS TO HAVE TEFLON TAPE OR PASTE. @:~~:~~ SPRINKLER ~ 9lffL Y LINE TO HOUSE-----. MAINLINE TO IRRIGATION S'T'5TEM TEE FlmNS INSTAI I Eil "Y PUM3ER [ VALVE eox OF eaoH 6RADEI BALL VALVE. PER LJ:eEN:) L---sc.H. ~PVC.OR """55 UNION ll'll'tlGATION MAINLINE, PER I..E6END. '------MALE ADAPTER Tl'P. ~ 5IJll'PL Y LINE FROM METER--' .__ _______ PRl=SSIR: 1'E61JJ..ATOR, l'ER Lfi6E!'I:). NOTE, ALL THREADED c.ONNECTION5 TO HAVE TfFLON TAPE OR PAS1E. POINT OF CONNECTION (PRIVATE LOTS) SC.ALE, N.T.S. MOUNT ENCL05UIIE AS FER MAN.f','1,GTIJRER'S REc.Ol+ENPATION 0 0 4&" NOTE, CONmOLLER, SEE I..E6END FOR 5f'EG.IFIC,ATION. 120 VOLT POIIER 5UPPLY IN J-eGX. 6Y OTtER5 RIGID ELECTRIC.AL CONDUIT TO RAIN SENSOR (IF SPEC,IFIEOJ IN RIISID COM:)UIT LOH VOLT"6E HIRE IN RISID PVC. c.oNDUIT PVC. ElcGTRIC.AL ...UI TO EXTERIOR ElUILDINIS HALLTHRGlUISHJ-BOX BUILDING l'I..OOR 6Y OTtER5 INSTALL ENCLOSIJRE AS INDIC.ATEil PER PLAN * MANJF1•.c:n,!~ER'S RECOMMEM:)ATION. ROUTE HIRES AND SLEEVE THRDUISH HALL TO FU:CTAH5ULAR PULL BOX AND TRANSITION TO DIREc.T 8URY HIRE. (D ~~~-;1ouNT coNTROLLER APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PREC.15E LOC.ATION OF PLANTING AREAS. !>SCA ,aood □r---------~ ADAPTER SPRA,.., see LE6END 12' MIN. - =~IIEII ~~ NOTE, FOR 5f'EG.IFIC.ATION --------sc.H ~PVC.NIPPLE, 11'IO REGIUIRED LENISTH AS REQUIRED --------SPRING lYPE ANTI-DRAIN VALVE J .. ~"'!11:ll!!~!' -~2'------1, ---FINISHl:D eRADE :::~~ ----IK>IS~ SOIL ffillffiIIi =111':=II= ~--TRIPLE SHIN6 JOINT ASeEMeL.,.. ---sc.H 40 PVC. So<SKT TEE FITTIN6 LATERAL x -NKL.ER INLET SIZE INSTALL SPRINKLER HEADS 1.2' FROM feNC,fS HALLS OR ElUILDIN65. DO NOT INSTALL SPRINKLER HEAD HITHIN 10 FT OF PAVINIS, CUR6S OR 11JRF E06ES. INSTALL SPRINKLER HEADS PI.JJl-e. AD.JJST SPRA,.. TO (;OVER LANDSGAf'f ~ l'IITHOI/T ~y ONTO PAVING, FENCES, HALLS OR BUILDIN55. ALL THl'EADED CONNEc.TIONS TO HAVE TfFLON TAPE OR PASTE. @ ~~~~ HEAD ON RISER NOTE, GOHm.OLLER--~"ffi~-..~ STAINLESS STEEL------11 1---AAIN 5EHSOR INSIDE A VANDAL RESISTANT ENCLOSI.R FFIONTENm'f IEMA3Fl ENCLOSl-"E POIER 3i'IITc.H AND--iil:..!11 61'1 l'ECEPTACLE PVC. CONDUIT FOR ELECTll:IC. 51:RVlc.E l'ER NEc. c.oDE iJ.• PVC. c.oHDUIT FOR--~ FLOH SEN50RIMV HIRES ~--TERMINAL STRIP FOR c.ONTROL HIRE5 t;iti=:~f"9'~,_~tf1~0RMLD:: ALUMINUM PAD '-V.I.T. s~x GLIICl<:f'AD ~ MOUNTIN6 PAD ~;;;~:.._-1Y.,,.• COMMJNICATION CAEILE PVC. CONDUIT (IF REG) '--3' c.olffllOl. HIRE PVC. c.oNOIJIT '------%•x 0 1 c.iOI I Ck ~ ROD HITH 16 SAfe 6IIOIRC 1,11"1: ANO C.LA>-P PROVIDE REc.TANSILAR PULL 60X FOR LOH VOLTAISE CONTROL HIRE SPL.lc.ES AT 6A5E OF c.ollTROLLER. ® ::.1;;,:_T AL CONTROLLER-FRONT ENTRY L RHIEL TI1"E NOTE, c.oNc.ENTRIC. REDUCER FITTING FINl5H 6RADE IN 1IJRF NEAS ~-PLASTIC,. RE(;TANISl.LAA VALVE BOX HITH BOLT~ COVER, USE STAINLE55 BOLT, NIT, NC HASIIER. BOX TO SE PLACED AT RIGHT AN6LE TO HARDSc.APE EDSE. !EAT l!IRAIC) 'FS' ONTO LID. ~-FL.OH SENSOR. 5EE LE6alD FOR SPECIFIC.ATION ------(4/ E!Rlc.K SIJPPORT5 '------3/4' ROc.K, 2 c.u61C. FEET '--------LANDSCAPE FABRIC. NO FITTIN65 IOx PIPE OD. UPSTREAM OF SENSOR, NO FlmN65 5x PIPE OD. DOHNSTREAM OF SENSOR INSTALL FLOH SENSOR l'ER THE MANIJF,'1,G~'S RECOMI-ENDATION5, ~ HI~ THRGlU6H CONDUIT TO IRRIGATION ~ USE 45 c,f;c,flEE ELLS TO ACHIEVE MAINLINE 01:PTH ON THE DOHNSTREAM SIDE OF THE FLOH SENSOR. www.gmplandarch.com DRAWN 9404 Genesee Avenue APPROVED Suite 140 La Jolla 1ST SUBMITTAL California 92037-1353 2ND SUIDOTTAL Tel 858 558 8977 9:RD SUBlOTl'AL Fax 858 558 9188 4TH SUBKITTAL PM ff! -02-09-07 3-13-07 4-30-07 7-02-0'7 LANDSCAPE MYLAR SUBMrlTAL 7-10-07 ARCHITECTURE .JOB NO. 05-038 DATE 04-90-07 & PLANNING SCA.LE AS SHOWN /T'~~~-------SI IRU6 SPRINKLER IEAD, SEE L.E6END FOR Sf'Ec.lFIC.ATION ~::}-------SECURE RISER TO STAKE HITH STAINLESS STEEL "FUNc.H-1.0K' Cl..AI-P, THO REGIUIRED 1.2' MIN. rJ1~-------SHRIJS RISERASSEl'BLY, see 1;1 I..E6END FOR 51"1:CIFIC.ATION ~;It+-------RE6AR STAKE, 114 X '6' LENISTH -------SPRIN6 TYPE ANTI-DRAIN VALVE ,,------SCH~ PVC. NIPPLE, LEN6Tl-l AS ~IRED FINISl-£D 5RADE l.l.lrr;ill;------l.t,IDIS~ SOIL .,,---5c.H 40 PVC. THREADED c.olJPL.IN5 ~-TRIPLE SHINIS JOINT ASSEMBL,.. NOTE, ALL ll!READED c.oNNEc.TIONS TO HAVE TEFLON TAPE OR PASTE. INSTALL !!l'llllNl<U!R ~ l'I..Ul-e. AD.JJST !!l'lllAY TO COVl!lt LAND!CAl'e Hf!!A HITHOI/T OVERSPRAY ONTO PAVIN6, FENCeS, HALLS OR BUILDIN55. ON FU:CYCLEO HATER S'T'STEMS USE • RISER MARKER'. © ~~:~~ HEAD ON RISER ~----LOl,I VOLTAISE l,IIRES, 3 MAXIMUM OUTl!!l'l C..A5f: OF CONNl!c..TOR STRIP AND -n-HST I-IIRES FOR ~ C.ONNEc..TION NOTE, IN9f'ECT, TEST, AND VERIF'f PROPER 5'1'5TEM CONIEC,TIOll eEFORE IIU:kl lull INTO SEALANT C.ARTRIDISE. DO NOT RESIISE SEALANT C.ARTRID\5ES. ~----EAVE OF 6UILDIN6 ~--PLASTIC. TIE Dot-ti STRAP ~--RAIN 5ENSClR.5EE 1..E6END FOR SPEc.S. ~---MOUNTINIS eRAc.l(ET _, ______________ HIRE TO IRRIGATION CONTROU..fR ■------------------~ HIRE HITH C.Ael..E TIE EIRACKET, 3' O.C.. MIN. 6RONZE BALL VALVE--~ ALL PIPIN6 ABOVE -~-,7 ~TOBE FINISH SRADE-------....... 1,----TO HOUSE l'IATER SUFPL,.. '\__~ f'll:6ULA TOR (BY C, nf_R.,) 1----!=ROM l'IATER l-1ETcR AT STREET V"',,~ / '~-----PRESaJRE RE5ULATOR ~v= (BY LAND5CAPE CONTRACT01'.) NOTE, ALL THREADED CONIEC,TIONS TO HAVE TEFLON TAPE OR PASl:E. POINT OF CONNECTION (PRIVATE LOTS) SC.ALE, N.T.S. FINl!llED 6RADE IN 11-"F AW=AS ------10' FIOUND PLASTIC, VALVE 60X HITH eoL. T DOHN COVER, USE STAINLESS eoL. T, NIT, AND l'IASHER. HEAT !!RAND 'PB' ONTO LID. ,----24' HIRE El<PANSION LOOP ('NP/. -----Flll!iH 6RADE IN!iHIUIHIEH, ....,.,,.,.....,.,., ___ HATER PROOF HIRE GOIN;C.TORS .:::::==~!----'f"\IC. ELECTRIC.AL 91 lil (IF INSTALLEO IN c.oN:llJITJ ----------LAHD5",lft:F-G -----=--------;l/4' ROCK, I GIEIG FT. +--6c-,",------,j<-® ~~~~;?-PULL BOX NOTE, ..-------FlllSH ~ IN "MU' l«fld ---1'1.MTIG RaN, VALVE eox Hlil+ BOLT DOM! GO\IER. U5E 5TMUS6 BOLT NIT Nf:J IWilER !EAT BRAND 'GCN' ONTO LID. ~=~---BR.1155NIPPLE, MOt.Ji£D IN PI..AGE .,,,---('I) IRGK ...-1s :..---LASc.o SCH. 40 TRIPLE SHINIS JOINT AS5e Ell Y HITH MALE eRAS5 STA61LIZER ELflOi'l J-->--MAIILIIE, 5EE !HC&. l------'114x '6' Rl:BM 5TN:ES, ~ of ;.v ---------~l'-G '----------5/'1' ROa, I all!C, FT. ALL ~ c-oNIEc.TIONS TO HAVE TEFLON TAPE OR PASTE. GLllc.K COUPLER VALVE l(E'( MJST Si'IIVEL FREEL,, l"l£N ltl5El"'•ED INTO LUIS TRAC.I<. CITY OF CARLSBAD WI ---------=-----=----------.----.----,,----------------~---.-----~---1 "AS-BUILT" PLAIINING DEPARTMENT DAlE 1111£: RECEIVED BY: INSPECTOR DAlE GUEST BUILDER IRRIGATION DETAILS 6!E5T Bl/II.DER VILLA6ES OF LA COSTA 11-IE OAl<S -~.4 / ~.5 Ll-01 1----+--+------------+--+--1----1----1 I APP~~~ { ct-bLoft 7-IS-.i "1 I i-----;---i----------------+----;r---t---+---t ~-P~LA~NN~l~N:::G:::;.:;:==;--;==~:::;::~~~=~~D:::ATE=::::::;::~· DWN BY: ~J=M__ PROJECT NO. I DRAWING NO. ~~ :~: ~PM~_ e, T 05-16 . 446-6L DA 1E INITIAL ENGINEER Of 'MlRK REVISION DESCRIPTION DA 1E INITIAL DA 1E INITIAL OTHER APPROVAL CllY APPROVAL -------FINISH 5RADE IN TURF A~ -----PLASTIC, ROIMD VALVE eox Hllll 60LT DOIi+! c;OIIER, USE STAINI.ES6 eoLT, NJT, AND~ eox TO 6f Pl.AGED It>' FROM HARDSC,Af'E cD61:. HEAT 6RAND "PRV" OIITO LID. ~-~ RE5ULAT°" see L.E6eND FOl't Sl"EC,IFICATIOII -FINISHLSRADE INSl«IJBAREAS 1-'-:;r-PVC SCH t>O T.O.E. Nlf'l"LE, !5' MIN., 2 REG!. PVC SCH 40 SLIP c.olJPL.INiS, 2 REG!. ~JtME~ ~WR (4) BRICK 5Ul"F'ORTS /4" ~ 2 CU61C FT. '---------LANDSC,Al"E FABRIC '-----------~NIPPLE (n'P). '------------eRASS UNION '-----------------FVC MAINLINI:: ~ P.O.C. NO'IE, USE -45 DEiSF'fE el.1.S TO ACHIEVE MAIM:..INE DEPlll FROM SUPPL 'I' SIDE OF Tl£ PRESGi 'l'1: RE5ULA TOI'( ASSCM6I. 'I'. ALL TIRADfD (;Olle;TIONS TO Hol\VE lB'I.ON TAPE OR PAS1E. ~---l"INl!lH ~ IN 11,!l!F NfEA5 ~-PLASTIG REGTAHSULAR VALVE eox HITH BOLT DOJ,f,I COVER, USE 5TAINLE5S BOLT, MIT, AND i'IA5leR. eox TO 6f PLACED AT Rl6KT ANl5LE TO HAl'l:DSC,,l,PE EDeE. teAT BRAlt:) "SV" OIITO LID. BALL V >L VE, SEE L.B5END FOl't !ll"EC,IFICATION • .. 1 .. ·1~ ll I~ -FINl51£D SRADE IN 5HRJ,B AREAS -4' MIN. ~ c.n..i;;;;;~~~~-!l~i'--=:2"_-:_-=_-=_-=:MAINLINE, DEPlll AS PER SPECS. FVC MALE ADAPTER (l OF 2) -----~ SRADE -eRI\S6 I.NION Ba.OH 15RADE -SCH.t>o UNION 1----(4) BRICK SUPf'ORT:3 ---NJOVE ElRADE -eRI\S6 NIPPLE \ \ BELOH ElRADE -SCH.t>o NIPPLE \ ~----!5/4" ~ 2 ClelG FT. NOTE, ~. -----LAND5CAPE FABRIC eox TO 6f INSTALLED AS TO AU.OH FOl't PFIOPER OPERATION OF BAU. VALVE HNl,I.E. INSTALL AT Rl6HT AN6LE TO HARD!l(;Af'E EDGE, INSTALL V>LVE ~ IN eox. INSTALL VALVE eox EXTENSIONS AS REGUIRED TO AGHIEVE Pl'<DI Ek VALVE INSTALLATION AT MAINLINE DEPTH. ALL THREADED GOIIEG-TIONS TO HAVE TEFLON TAPE OR PASTE. @~~;T_s:ALVE (PRIVATE LOTS) WR PVC. SCH.t>o THREADED '10"~ ATi'I05PHERIC.VAGU.HBl'f,',J,3:R-fi_l THO PVC ELL!! AS KEaJIRED (TYPJ. --.. t PVC LATERAL LINE TO AVB l!IURI~ AS 5HOil'IN ON PLANS 51.0PE -----.. MIN. 6' AeoVE Hl61EST OUTLET FINISH SRADE ---~ AIISLE VALVE, SEE ' ESat:1 FOR SPECS DRl-!lPLICE -----CONNECTIONS MIN.6'NJOVE FINISHSRADE NOTE, 11 1I1 111 1I1 1111 11..,-., I I I I I I I I I I I I I I I I I I I IT ~1~::_1 1-1 -.:J I 1==1 I 1==1 I 1==1 I I= -- PVC LATERAL LINE 0 l£AD5 CLA~LINE OAVB SHNi5 CHECK VALVE ALL TI«EADED COHHEGTIOH!l TO HAVE TEFLON TAPE OR PASTE. PVC SCH. 40 5><T FITTINGS (TYP J @~~:,~~-VALVE/ AVB PLACEMENT APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PREC,ISE LOC,ATION OF PLANTING AREAS. ------,.-INISH tSRADE IN TURF~ ,-------Pl..Af:JTIC, REC.TANeULAR VALVE SOX HITH SOLT DOI+! C,OVER, USE 5TAINLE55 SOLT, NUT, AND HASHER. BOX TO ee PLACED AT RISHT ANSLE TO HARDSCAl"E ED6e. HEAT~ ''MV' ONTO LID. MASTER CONTROL VALVE, SEE LEISEND F""'-SPEC,, :£:::::=:!='"-------f'INISH BRADE IN 5HRUEI AREAS 24" HIRE LOoP VALVE ID TA65 e, SCH &o FEMALE ADAl"TEI'(, (I OF 2) '-------rYC MAINLIJ.E TO R.0H SENSOR, PIPE PER SPEc.5. :IQ~~----(4) BRICK SUl"PORTS '-------BFtA:95 UNION '-------BRASS Nll"l"LE (TI'l"J. '--------LANDsc;Al"E FABRIC ~--------:,/4" ROc.K, 2 c.ue1c FT. '---------------PVC, MAINLINE PIPE~ BACKFLOH -SPEC,5. NOTE, USE -45 DEiSREE ELLS TO ACHIEVE MAINLINE DEPlll FROM SUPPL 'I' SIDE OF 'THE MASTER VALVE ASS&el.'I'. ALL nftADED c:;oNt;C,TIONS TO HAVE TEFLON TAPE OR PASTE. r---FINISH SRADE IN TIR' AREAS ~-PLASTIC RECTiAHSULAR VALVE eox Hill! BOLT DOIi+! GOVER, USE 5TAINLE5S BOLT, Mir, AND J/'L'51 ER eox TO eE PLACED AT RIGHT AN6LE TO HMD5CAl"E EDeE. teAT BRAND "SV" OIITO LID. PVC BAU. VALVE, see I.E6END FOR !ll"EC,IFIGATION -FINISH SRADE IN SIIRIJB AREAS --MAINLINE, DEPlll AS PER !ll"EC,5. ~~~~jJl:i::::,:::::_ __ DIJAL UNION CONIEC,TIONS AS PNtT OF 5ALL VALVE, THkEADED IF !ll"EC,IFIED IN L.B5END ~~~~~---(4) EIRICK SUF'!"ORT!l "-----!5/4' ROCK, 2 ClelC FT. ~-----LAND!lCAPE FABRIC BOX TO BE INSTALLED TO AL.LOH FOR PROPER OPERATION OF BALL VALVE HANDLE. INSTALL AT Rl6HT AN6LE TO HARP!lCAPE EDGE. INSTALL VAi.VE eox EXTENSIONS AS REGIUIRED TO ACHIEVE PROPER VAi.VE INSTALLATION AT MAINLINE DEPlll. ALL nftADED GOIIEG-TloNS SHALL HAVE TEFLON TAf'E OR PASTE. TOP OF SLOPE--, TOE OF SLOPE NOTES, C, '--LATERAL LllE('TYP) ~A1M09PHERIC. ¥AC.WM eREAKER LA 'TERAL LINE(TI'I"):==,/ AVB •e,• SHALL 6f INSTALLED 6' AeoVE Hl61EST OUTLET AND PEk CODE. l'IIHERE HEADS ARE L01ER THAii FiC,V USE ANTI-SIPHON "B' TT'PE VALVE. l'H;RE HEADS ARE AeoVE RCV USE ANl5LE "A" T'l'l"E VALVE AND AVB 'C'. l+IEN HEADS ARE AeoVE RCV USE Si'jlNe Gl£GK VALVES "D". V RESIDENTIAL RC.V AT TOE OF SLOPE SC.ALE, N.T .5. www.gmplandarch.com DRAWN 9404 Genesee Avenue APPROVED Suite 140 La Jolla 1ST SUBMITI'AL California 92037-1353 2ND SUBlllTl'AL Tel 858 558 8977 3RD SUBMITTAL Fax 858 558 9188 ,TB SUBlOTTAL PM lliil -02-09-07 3-13-07 •-so-07 7-02-07 LANDSCAPE MYLAR SUlDIITl"AL 7-10-07 ARCHITECTURE J'OB NO. 05-008 DATE 04-30-07 & PLANNING SCALE AS SHOWN NOTES, LE5END 6 I. REDUGED ~,<LSURE PRJNc,IPLE BAGKFLOH PREVENTER, PER I..E6END 2. HYE STI'AIIER (IF Sl"EC,IFIED) !5. Bl'AS5 NIPPLES a..EN6TH AS REGJ 4. FINISH SRADE. 5. sc;H.t>O FVG FEMALE ADAPTER. 6. PVC l'RES5URE SUPPL'!' LINE, Sf!: ~ll"ICATlote. i. 12"xl2"><12' COHc,- THRIJ&T E!I OGKS t!>. BRAse T><T ELL, LINE SIZE di. WFFLk SxT ELL, LIi£ SIZE 10. TT'PE 'K1 GOI I □4. TlJBINS FROM i'IATER METER. II. V.I.T. STl'IONSeOX GP-,oef" GIUICK PAD, IF ~ l!l ~ll"IED, SET 2" AeoVE 6RADE 12. FILL llASe OF GIUICKPAD Hill! ¾' ROCK TO TOF OF BASE OF UNIT 1!5. STAINI.ES6 STEEL ENGLOSURE (IF 5PECIFIED) 14. ~ REel.lLATOR (IF 5PECIFIED) 15. eRI\S6 UNION I. INSTALLATION M.IST COlf'ORM TO LOCAL C,ODES 2. c.oN~TOR MJST ~DE BACKPLOH CERTIFICATION. !5. ALL ~ CONNECTION!! TO HAVE TEFLON TAPE OR PASTE. 4. ALL eRAS5 OR wi I ER .JEL.Ol'I ~ SHALL HAVE Al+IA G20CI APPROVED PIPE TAPE. 5. INSTALL PER C""' STAND~ DHG. H-20. ELECTRIC. ANTI-SIPHON 7 CONTROL VAi.VE MIN. 6' AeoVE Hl61£5T OllTLET 111111; 11 PVC SCH. t>O NIPPLE ---I I.EN6lll AS REG. 0 OF 2) PVC LA11::R/J,J,. LINEPIPIN6 NOTE, HA TEFIPROOF HIRE GONNECTORS (2 T'l'P J .._____ /'°' HIRE LOOP /FINl!lHSRADE -111~m;:1111r=11111tt;-'1 ---.-1 12' MINIMN I FVC~MAIN ALL THREADED CONNECTIONS TO HAVE TEFLON TAPE OR PASTE. TOP OF 51..0PE --, '--LATERAL LllE('TYP) ~ SHINE; C4-IEG,K VALVE / /REMOTE CONTROL VALVE ~'-?i::-'-?y' MAINLINE---.,_ TOE OF SLOPE NOTE!!, -HEADS ARE AeoVE RCV, USE SHINe CHECK VALVES ·cv· ~ LATERALS CONNECT TO RCV. INSTALL IN XI &,-.TE 6' V/J,J,.VE eox ALL THREADED CONNECTIONS TO HAVE TEFLON TAPE OR PASTE. FINISH ""ADf IN 11JRF AffEA5 n PLASTIC ~TANaJLAR VALVE eox l'IITH BOLT DOi'IH COVER, USE 5TAINI.ES6 eoLT, NUT, AND~ eox TO BE PLACED AT RIGHT AN6LE TO HARDSC,Al"E cD61:. HEAT BRAfl:l 'RCV" AND ~ STATION • ONTO LID. FINISHSRADE IN 5HRIJ5 AffEA5 LJi--~•~ +Elt----24" HIRE LOOP LA'TERAL ---7 SCH. &o PVC --FEMALE ADH'. ;=.=~!;---VALVE ID TM :...Ji:(;lf,jP,~W, -t11----SCH. &o PVC~ ELL OR TEE '---f'::::i-,JI,---G0Nm0L V />J..VE, SEE 1.J:61:N:) FOR SFEc;S ~--~~ rt~~ ('T'T'P). SCH. &o UNION---~ ::.1--(4) BRICK 9il'PORT5 a ,---1~6ATION MAINLINE OR MANIFOLD SUB-MAIN ~-----'14' AOCK ~VEL 2 CUSIC FEET '--------LANDSGAF'EFAIRG NOTE, ALL THREADED CONNECTIONS TO HAVE TEFLON TAf'E OR PASTE. IF MAINLINE OR MANIFOLD ~IN 15 AT Vl>J..VE DEPTH, TEE INTO VALVE HITH SCH.t>o NIPPLE, l.Bl5TH AS REGIUIRED. ATMOSPHERIC, VAGWM BREAKER--, WR RESISTANT SCH. t>O NIPPLE, I.EN6TH AS REG!. MIN.b'lve Hl61£5T OllTLET 11111 1111111111 PVC SCH. e,o NIPPLE,-_, LENelll AS REG. 0 OF 2) FVG LATERAL LINE PIPINS FROM RCV NOTE, ~-WR RESISTANT SCH. t>O THREADED '10 /FIN15HSRADE 1111~1111 I 111~1111= 12" MINIMUM V. PVC LA11::R/J,J,. LINE PIPINiS TO HEADS 5><TPVC5CH.40 FITTINGS (TYP). ALL THREADED GONNECTloNS 5HALL HAVE TEFLON TAPE OR PASTE. TOE OF 51..0PE ---, NOTES, .________ !!PRINE; GHEc.K VALVE ,,------LATERAL LINE /TYPJ '-......__MAINLINE IIIERE HEADS AKE 6fLOH RCV Lee SPklNIS Gl£GK VALVES AT LATERAl..5. ALL Tl«EADED CONleGTION!l TO HAVE TEFLON TAPE OR PASTE. ~1 CITY OF CARLSBADIISHEE~I L...:!_j _ PLANNING DEPARTMENT _ 22 ,-----------::"~A-=s-=8".',U~IL"=T=::',.--------,-t--_ -_ -_ -_ "T-t--_ -_-_--rt--_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_ -r+ -_ -_ -_ -_ -r+ -_ -_ -_ --r+--_ -_ -_ -_ ..,.+ -_ -_ -_ --1-1 GUEST BUILDER IRRIGATI□N DETAILS DA1E TITLE: RECEIVED BY: INSPECTOR DAlE 61.EST BIJ/J.DER. Ll-08 VILLA6ES OF LA COSTA TfE OAKS -!J.4 !J.5 i----i-----t-------------+---+--+--+----11 =-AP-c:-PRc"::):t.'-::~:--D_=-t{--'(""1--:f.;;...• -=f::(=-1=-o=·rlt.__ ___ I• 1~·~1 t-----+--+---------------+----+--+----+---1. PLANNING DATE t-s==-+7.;;;;-;,-t---------------+---::cc=-+==cc--l--c-c=-+=---I DWN BY: ..,.JM.,___ DA1E INITIAL DA1E INITIAL DAlE INITIAL CHKD BY: ~P~M __ ENGINEER OF \\ORK REVISION DESCRIPTION OlHER APPROVAL CllY APPROVAL RVWD BY: PRO..ECT NO. GT 05-16 I DRAWING NO. . 44b-6L Fl---------1RR1eATION MAINLINE INSTALLED 1.e,• I I OFF HARDSc;APE l:Ol5E 1---------------HAADSC,APE a,eE 1-------GIIJIGK GOIA"LER V/>J..VE ON SWINe JOINT IN ROIH:i V/>J..VE BOX r++-------SCH. &o PVC, TB:, W MAINLIIE X MANIFOLD SIZE -t-------SCH. &o PVC, UNION 11:>r~-----BALL TI'PE ISOLATION V/>J..VE. IF 5f'f:C,lf'll:D 1-------SCH. &o PVC, TEE, SxSxS i<=•r-----6ALL TI'PE ISOLATION V/>J..VE, IF 5f'EC.IFIED ' :--l~t====== sc.H. e,o PVC, UNION l IRRleATION $LB-MAINLINE, SIZE PER 12' T'i'I". LI\RBEST V/>J..VE >1.---,J.1;;:;:::::;;;::;;-----MINIMJM 12' SEPARATION eET1aEl:N ALL V/>J.. VE BOXES '----l'IEMOTE ~L V/>J..VE ~---SCH. &o PVC, L.NION ,.---LATERAL LINE TO Sf'RJNIQ.ERS NOTI:, ALL TIRADfD GON!t:C,TIONS TO HAVE TEFLON TAl'E OR PASTE NOTE, IF MANIFOLP 51.e-MAIN 15 AT V/>J..VE DU IH, 1EE INTO V/>J..VE 1'11TH 5"H.OO NIPPLE, LUt5TH AS REGUIRED. ~A, ., +#"" -r <ff' 41 DH RH A C,C, COMMJNIC,ATION C,Aet.E PULL eox DH RH A 'RLV +STATION# Rf!MOle! ~ V/>J..VE DH RH A MV MASTER~ V/>J..VE DH RH A FS FL.OW 51:NSOR DH RH A &I 6ALL V//>L. VE DH '°" A Fl F□'UILIZER lk.EC,TOR DH RH A Bl:', B,06!Q:r SmAINER DH RH A MS MOISTIJRE SENSOR DH RH A P5 PULL BOX DH RH A GiGV GIIJIGK GOUPLER V/>J..VE DH RH A FV FUJSH V/>J.. VE DH RH A SLV ~~ DH l'U>II A BO MAINLIIE el.OW OUT DH RH A DV DRAIN V//>L.VE DH l'U>II A AAV AIR/VAGWM RELIEF DH l'U>II A DF DISK FILTER DH RH A PRV f'RES6Ule ~-V/>J..VE C,ONTAC,T -eATION GOIISILTANT FOi'. Nff DEVIGE NOT LISTED. @::~~-~ BOX IDENTIFIGATION APPROVED FOR PLANTIN5 AND IRRl5ATION ONLY, INC,LUDIN5 PRECISE LOCATION OF PLANTIN5 AREAS. 1------------HARl:)SC,APE l:Ol5E •-------INSTALL MAINLINE I.&' OFF OF HARl:)SC,APE ED6E /~-----5"H.OO TEE, MAINLINE" I½" 5>c5KS ■---BALL T'fPE ISOLATION V//>L.VE --------SCH. &o PVC, UNION ---GIIJIGK GOUPLER SC,H.00 TRIPl.f !:w'IIN5 JOINT A55E! IBl.. Y HITH DOISLE 0-RINe SEAL •---GIIJIGK c:.ol.l"LER V/>J..VE IN A NOTE, ROUolD V/>J..VE BOX, SEE LE6END FOi'. Sl"EC,5. ALL THREADED GONNEC,TloNS TO HAVE TEFLON TAPE OR PAS11a. QGV TO eE INSTALLED IN PLAHTIN6 HlE,t,S 1+81 POSSIBLE. @~~~~-~ QCV INSTALLATION DIMENSION 5' ORLESS 3' TO 5 1/2' 6'ANDLAReER A 6 C BACKFILL SHO.A..D eE PLACED IN 6" LAYER& AND TAl'l'ED I~" 12' 6' 24' X 6' '6' X 6' www.gmplandarch.com DRAWN PM ,1111 9404 Genesee Avenue APPROVED -Suite 140 La Jolla 1 ST SUBMJTTAL 02-09-07 California 92037-1353 2ND SUBMITTAL 3-13-07 Tel 858 558 8977 3RD SUBllITI'AL 4-50-07 Fax 858 558 9188 -<TH SUBMJTTAL 7-02-07 LANDSCAPE IIYLAR SUBKITI'AL 7-10-07 ARCHITECTURE JOB NO. 05-038 DATE 04-30-07 & PLANNING SCALE AS SHOWN GIUIGK GOUF'LIN6 V/>J..VE BOX (Tl'p)---, 0 0 0 NOTES, Rce,T AN5U..AR V/>J.. VE BOX tr(P) ----, 0 0 0 0 I. VALVE BO.>CES SHALL Bf LAel:LED DY HOT IRON eFIMIDIN!; OR ,t,UIMIII.IM MPHIILT Ell\5laD Nlo\lfRFROOF iDAINT. 2. GONl1'IOL VALVf:5 !!HALL Bf INST1"Ll.f:t> TO AI..I.Ol'I ~ • .'r' .---OF VALVE BOJCES. ,. I.DCIITc VALVE I.S5E11!1.ll:5 IN !IH'ILB Ol'l ~ ~ HIIV61"lleN l'O!lemLE. 4. I.DCIITION OF VALVE ·•cn<e"t.a:s SHALL Bf STMED FOR N"PflDVAL B'I'" ~ ARGlt"TEGT PRIOR TO IN5TIU.ATION. 5. a!llffll V>LVE eo,e; CNElt VALVE t :en 'elL TO Fl>GILITATc ,>a;e;c MC> MAI-. 6. SET VAJ.VE BOJCES AT mJAL EI.El(ATIONS HITH TOPS AT FINISH l!IRAC>I! IN n-"P' Alll!A5 Ol'l !I' H!JO,/E !'INl!lH~ IN-COl/eRNfEN>. .,_ Vl'J..VE eoxe !!HALL l!E !!el" l"N' .. 11 !'I TO !!ACH ~ANI, I □-""Ola.LAA TO ED6E OF AReA. &. C>O NOT on vRM OR GOLl..llf'5E V>LVE eox B'I'" ™ SOIL GOMPAC,TIN!; ARClUID IIOX. 1. ON ~Ya.ED 51'5-rEte 1'J..L VALVE BOXEIS MCI GUGK ~IN!; Vl'J..Vf!:5 SHALL 1!E GLEML Y GOLDIIED Nlf'I.E. DIMENSION-VEHICLE A 6'0"-LE95 56' 6'AND~ @" DIMENSION-VEHICLE A 3' °"' l.J=95 1.e,11 :5' TO 5 1/:2" 2411 6' O!lf. LARSER :56' B C, 1&11 1:2' I&' 12' B C, I&' 12' I&' 1:2' I&" 1:2' D 6" 6" D 6' 6' 6' BAGKFILL SHoUU:> eE PLAGED IN 6" LAYER& AND TAMPED EE SLEEVE INSTALLATION, POTABLE SCALE, N.T.5. NOTE, 'RGV ll'lRl6ATION C-ON-,,;cot.. VALVE A=l GV 0 0 1~6ATION c-oNTROL VAL VE I. RcC,T. V/>J..VE BOX i'ITH I.OGKABLE COVER. 2. 2' LAeELINe !'ER 5PEC,IFIC,ATIONS ,. ~~l!'MalT DESI.SIIATION 4. V/>J..VE IDENT!Flc-ATION 5. ROUND V/>J..VE BOX i'IITH L.oc.KAel.E COVER ALL V/>J..VE eox ~ SHALL eE ~ IN C,OLOR ON REC,YGU:D l'IATER SYSTl:MS. @~~~~ BOX LABELING ..--------,,--------------..----r---,----------------,,-----.-----..--~--1 "AS-BUILT" UQJ CIT!_AN~I~ D~Pi~BAD ~ DA1E llllE: RECEIVED BY: INSPECTOR DA1E GUEST BUILDER IRRIGATION DETAILS 6(F5T SIJILDER VIL.LA6ES OF LA COSTA THE OAKS -5.4 5-' Ll-0<=! 1-----t--+-----------+--t---+--+---1 I APPtl:X., { lT-E:ll--0::ft •· ICj.c-z I l---+--1---------------+---f---l---+---I ~-P~L~AN~N~IN;=G::,,=:::::::,;:::::=~~~~=:::;-;:~D~ATE~~::::;:· OWN BY: -.I.I~-PROJECT NO. DRAWING NO. DA TE INlllAL ENGINEER OF WORK .REVISION DESCRIPTION DATE INITIAL OlHER APPROVAL DA 1E INlllAL 2~ ~~:~P=IA-C..T 05-16 446-6L CITY APPROVAL IRRIGATION 5PEC.IFIC.ATION5 SECTION 02811 LANDSCAPE IRRIGATION PART I -GENERAL 1.01 Sl,.t,IMARY A. IT IS THE INTENT OF THE SPEGIFIGATIONS AND DRAV1ING5 THAT THE FINISHED SYSTEM IS GOMPI.E11: IN EVl:R'I' RE5F'EGT AND SHALL BE READY FOR Ol"ERATION SATISFACTORY TO THE OHER. 6. THE l'IORK SHALL INGUJDE ALL MATERIALS, LABOR, SERVIGES, TRANSPORTATION, AND EGIJIPMBIT l£GESSAR'I' TO PERFORM THE l'IORK AS INDIGAW ON THE DRAt-llN6S, IN THESE SPEGIFIGATION, AND AS NEGESSARY TO C01'f'LETE TtE CONTIV,C.T. 1.02 GONS"IRJCTION DRAHING5 A. DIE TO 1l-lE SC.ALE OF TIE DRAl'11NGS, IT IS NOT POSSIBLE TO ltl:>IGAif ALL OFF5ETS, flmNGS, 51..EEVE5, ETG. rt!IGH MAY BE REGUIREO. TI-iE CONm'GTOR SHALL GAREFLLLY INVESTl6Aif TtE STRUG11JRAL AND FIN15HED CONDITIONS AFFEGTINe ALL OF HIS 1't:1RK AND PLAN HIS l'k,RK ACGOROIN51.. Y, FURNISHINe SUCH FITTING5, ETG. AS MAY 6E Rl:GVIREO TO 1-EcT SLIGH GONDITIONS. DRAlallNGS ARI: ISENERALLY DIAl5RAl+IATIG AND INDICATIVE OF THE l'IORK TO 6E INSTALLED. THE l'IORK SHALL 6E INSTALLED IN SUCH A MANNER AS TO AVOID CONFLICTS 6ETrEEN IRRIGATION SYSTEMS, PLANTINe, AND ARGHlifGMAL. FEAllJRES. B. ALL l'IORK GALLED FOR ON THE DRAl'IINGS 6Y NOTES OR DETAILS SHALL BE FURNISHED AND INSTALLED hC,ICR OR NOT SPEGIFIGALL Y MENTIOIED IN THE SPEGIFIGATIONS. l'i£N AN ITEM 15 SHOl'tl ON THE PLANS BJT NOT SHOH'< ON THE SPEGIFIGATIONS OR VIGE VERSA, IT SHALL El[ DEEl•CD TO BE AS 51-tOi-N ON BOTI-1. TliE LANDSGAPE Al'GtilifGT SHALL HAVE FINAL AIJTHORITY FOR GLARIFIGATION. G. TIE GONTIV,C.TOR SHALL NOT ~LLRJLL Y INSTALL 1l-lE IRRleA.TION SYSTEM AS~ ON TIE DIU,t,IINGS KEN IT IS OBVIOUS IN THE FIELD THAT oe5TRIJGTIONS, SRADE vn I El<EN,,,ES OR DISGl'EPANGIES IN HeA DIMENSIONS EXIST THAT Ml6Ht NOT HAVE BEEN GONS.DU4W IN~-SUCH oe5TRUGTIONS OR~ SHOl.lD BE~ TO THE ATifNTION OF 1l-E LAIC:lSGAPE MGHITECT AS SOON AS DEifGifD. IN TI-£ EVENT THIS NOTIFIGATION IS NOT F'ERFORI-CD, 1l-E IRRIGATION GONTRAC,TOR SHALL ASSLM: RJLL RESPONSIBILITY FOR ANY Rl:VISION 1£GESSARY. I.OS GVALITY ~ A. PROVIDE AT LEAST ot,C ENGLISH SPEAKINe PERSON rt!O SHALL BE ~ AT ALL TIMES DIJRIN6 EXEGIJTION OF TI!IS PORTION OF TI-£ l'IORK AND rt!O SHALL BE TI-IOROIJ6H..Y FAMILIAR )'IITH 1l-E TYPE OF MATERIALS BEINe INSTALLED AND THE MANJFAG'IU'U:R'S REGOMMENDED 1-ETHODS OF INSTALLATION AND rt!O SHALL DIREGT ALL l'k,RK PERFOFM:D Ul«R THIS SEGTION. B. MANJFAG'!U'U:R'S Dlt,!EGTIONS AND DETAILED ~lt55 SHAU 6E FOLLOl'£D IN ALL GAf!E:S il'II-IERE nc MANJFAGTIJRER OF ARTIGLE5 U5ED IN TiilS GONTRI\GT A.RNISH Dlt,!EGTIONS GOVER!Ne POINTS NOT SHOi't, IN THE DR,6,1,llNBS AND SPEGIFIGATIONS. G. ALL LOCAL, M.tllGIPAL AND STAif L.ArlS, ~ AND RE6ULATIONS ~ING OR Rl:LATINe TO ANY PORTION OF THIS l'IORK NiX. IU<Wi INGORPORAifD INTO AND MADE A PART OF 11-ESf SPEGIFIGATIONS, AND THEIR PROVISIONS SHALL BE CARRIED OIJT 6Y THE GONTRI\GTOR. AIIYTHINe CONTAINED IN 11-ESf SPEGIFIGATIONS SHALL NOT BE GONSTl'U:D TO GON'LIGT l'IITH AN'!' OF Tl-£ N:C1E "'1JLf5 AND l'EOO.ATIONS OF TtE SAl'C. ~ H£N THESE SPEGIFIGATIONS AND DRAll'IN65 GALL FOR OR DESGRIBE MATERIALS, l'IORKMANSHIP, OR GONSTIWGTION OF A BEi IER GVALITY, Hl61£R STANDARD, OR LAR6ER SIZE THAN IS REGIJIREO 6Y THE />BO,/E RU.ES AND RESULATIONS, 1l-E PROVISIONS OF THESE SPEGIFIGATIONS AND ~NGS SHALL TAKE PRECEDENGE. D. ALL MATERIALS SUPPLIED FOR THIS PROJECT SHALL Bf 1&-1 AND FRfE FROM ANY DEfEG.TS. ALL DEfEG.TIVE MATERIALS SHALL BE REPL.ACED 11+1:DIAifLY AT NO ADDITIONAL COST TO Oi-11£R.. E. THE GONTTUGTOR SHALL S£G'-'<E 1l-E ~ LIGENSES AND F'ElitMITS INGUOINe PA'T'11:NTS OF GHAR6ES AND FEES, GIVE REGIJIRl:D NOTIGES TO RJBLIG AIJTliORITIES, VERIFY PERMITS SEGlRD OR ARRAN6EI-EliTS MADE 6Y OTHERS AFFEGTINe THE l'ICJRK OF THIS SEGTION. 1.04 aeMITTALS A. MATERIALS LIST, I. AFTER Ai'1MD OF GONTRAGT AN:; BEFORc ANY IRRIGATION SYSTEM MATERIALS ARE DELIVERED TO THE .JOB SITE, aeMIT TO THE OHER A GOMPLETE LIST OF ALL IRRIGATION SYSTEMS, MATERIALS, OR~ f'ROPOSED TO BE FIIINISIED AND INSTALLED AS PART OF THIS GONTRAGT. 2. $HOH MANFAGTIJRER'S NA1-E AND GATALOO 101BER FOR EACH lifM, FIIINISH GOMPLETE GATAl..00 GUTS AND ifGHNIGAL DATA, F\IINISH THE MAMJFAGTURER'S RECOMMENDATIONS AS TO THE 1'£'TffOD OF INSTALLATION. :5. NO 9.eSTITIJTIONS ~LL 8E ALLOt-ED l'IITHOIJT PRIOR l«ITTEN AGGEPTANGE 6Y THE LANDSGAPE Al'GtilifGT OR ott-ER'S AIJTl-lORIZEO k£I kDEHTATIVE. 4. MANFAGTIJRER'S rlARAAHTIES SHALL NOT 15..IEVE TIE GONTRAGTOR OF HIS LIAEIILITY I.NDER THE ISUARANTEE. SLIGH l'IARJWtTIES SHALL ON-Y 5UPPLEMENT THE ISUARANTEE. B. SIE6Tl1VTIONS, IF TI-iE IRRIGATION GONTRAGTOR ~SHES TO 51JB&Tl1\ITE /Wr' EGIJIPl'ENT OR MATERIALS FOR THOSE EGUPl'ENT OR MATERIALS LISTED ON 1l-E IRRIGATION DRAl'IING5 AND SPEGIFIGATIONS HE MAY DO SO 6Y PROVIDIN6 THE FOU.Ol'ilNG II-FORMATION TO TIE LANDSGAPE ARGHITEGT OR ott-ER'S AUTHORIZEO ,.JJ 1<1...£HTATIVE AND GITY INSPEGTOR FOR l'ff'fltNAL. I. PROVIDE A J«ITTEN STATEMENT INDIGATING TIE REASON FOR MAKIN6 THE SIE6Tl1UTION. 2. PROVIDE GATAL06 GUT ::..a:s, TcGHNIGAL DATA, AND PERFORMANGE INFORMATION FOR EACH 51.eSTIT\ITI: lifM. :5. PROVIDE IN l«ITTN6 THE DIFFERl:NGE IN INSTALLED PRICE IF TI£ lifM IS AGGEPW. 1.05 EXISTING CONDITIONS A. THE CONTRACTOR SHALL VERIFY AND Bf FAMILIAR l'IITH THE LOGATIONS, SIZE AND DETAIL OF POINTS OF GONNEGTION PROVIDED l'6 THE SOI.RGE OF l'IATER, ELEGTRIGAL SUPPLY, AND ANY 1ELB'HONE LINE GONNEGTION TO THE IRRIGATION SYSTEM. ---- B. IRRIGATION DESIGN 15 BASED ON THE AVAILA61.E STATIC l'!AifR PRESSURE 5HOll+I ON THE DRAl'IINGS. CONTRACTOR SHALL VERIFY STATIG l'IATER ON THE PRO.EGT PRIOR TO THE START OF GONSTRIJGTION. SHOULD A DISGREPANGY EXIST, NOTIFY THE LANDSGAPE ARGHITECT AND OHo!ER'S AUTHORIZED REPRESENTATIVE PRIOR TO BE61NNINe GONSTRIJGTION. G. PRIOR TO GUTTING INTO THE SOIL, THE GONTRAGTOR SHALL LOGATE ALL GABLES, GONDUITS, 5El'ER SEPTIG TANKS, AND OTHER UTILITIES AS ME COMMONLY ENGOlJNTERED LNDER6ROIW AND HE SHALL TAKE PROPER PRECAUTIONS NOT TO DAMAGE OR DISTURB SUCH IMf'ROVEl,CNTS. IF A GONFLIGT EXISTS BETI-1:61 THE SLIGH Oll6TACLES AND THE f'ROPOSED Jl'lORK, THE GONTTUGTOR SHALL PROMPTLY NOTIFY THE LANDSGAFE MGHlifGT AND Ol'INER rt!O HILL ARRANGE FOR RELOGATIONS. TI-£ GONTRAGTOR l'IILL PROCEED IN THE SAME MANNER IF A ROCK LAYER OR AN'!' OTHER SLIGH CONDITIONS ME ~- APPROVED FOR PLANTING AND IRRIGATION ONLY, INC.LUDING PREC.ISE LOCATION OF PLANTING AREAS. -.... * D. THE CONTRACTOR SHALL F'!WifGT ALL EXISTING UTILITIES AND FEAl\R:5 TO REMAIN ON AND ADJAGENT TO 1l-E PROJEGT Slif DURING GONSTRIJGTION. CONTRACTOR SHALL REPAIR, AT HIS Ol'IN GOST, ALL DAMA6E RESIJLTIN6 FROM HIS Ol"ERATIONS OR NE61.IGENGE. E. THE IRRIGATION GONTRAGTOR SHALL GOORDINAif ~TH THE 6EM:RAL CONTRACTOR FOR INSTALLATION OF REGIJIREJ:) SLEEVING AS 5HOttl ON THE PLANS. 1.06 IN5PEGTIONS A. THE GONTRI\GTOR SHALL PERMIT THE LANDSGAPE ARG+llifGT, oi-tER.'S ,6UIHORIZED REPRESENTATIVE AND GITY IN5PEGTOR TO VISIT AND INSPEGT AT ALL TIMES ANY PART OF THE l'IORK AND SHALL PROVIDE SAFE AGGE&S FOR SUCH VISITS. 6. •• Ehl /HE SPEGIFIGATIONS REGIJIRE l'IORK TO BE ifSifD BY THE CONTRACTOR. IT SHALL NOT BE GOVERcD OVER UNTIL AGGEPTED 6Y THE LANDSGAPE ARGl!lifGT, OHER'S AUTHORIZED REPRESENrATIVE, AND/OR eoVERNINe AGENCIES. THE GONTTUGTOR SHALL BE 50LEL Y RESPONSIBLE FOR NOTIFYINe 1l-E LANDSGAPE ARG+llifGT, 01-iNER, AND OOVERNINe ASENCIES, A MINIM,'M OF 4tl> HOURS IN ADVNIGE, l+CRE AND Hfil TI£ ~ IS READY FOR ifSTIN6. SHOll.D ANY l-lOl<K BE COVERED l'IITHOUT ifSTING OR AGGEPTANGE, IT SHALL Bf, IF Sv W, vNCOVERED AT THE GONTRAGTOR'S E,<PLloE. G. INSPEGTIONS ~LL BE Rl:GVIRl:D FOR TtE FOL.l.OWIN6 AT A MINIMJl<1, I. SYSifM LAYOIJT 2. FRE5SURE TEST OF IRRIGATION MAIN LINE /FOUR HOIA'6 AT 125 PSI OR 120!li OF STATIC l'!AifR PRESSURE, rt!IGH EVER IS GREA11:RI /'ff'fltNAL REGUIRl:D BY GITY INSPECTOR. :5. GOVERA6E TEST OF IRRIGATION SYSTEM (N'f"'N:HAL PL:1111 & B'I' GIT'( D15FEGTOR,I. 4. FINAL INSPEGTION PRIOR TO START OF MAINifNANGE PERIOD 5. FINAL AGGEPTANGE D. SITE OBSERVATIONS AND ifSTINe l'IILL NOT GOl+ENGE l'IITHOUT THE R£GORD ~NG5 AS PREPARED 6Y THE IRRl6ATION GONTTUGTOR. t,lEGORD DAAl'IINGS MJST GOMPLETE AND IP TO DAif FOR EACH Slif VISIT. E. Y<ORK l+IIGH FAILS TESTINe AND 15 NOT~ l'IILL BE RETESTED. HOURL.l' RATES AND L,Gf;JtoES OF 1l-lE LAIC:lSGAPE ARGl!lifGT, otff:R'S AUTHORIZE., RU kLSEN,ATIVE, AND OOVERNINe A6ENGIES FOR REINSFEGTION OR RETESTINe HILL 8E PAID 6Y THE IRRIGATION GONTRAGTOR AT NO ADDITIONAL &BJ: TO Oll'N:R. IUT STORAGE AND HANDLINe A. USE ALL ..cAN5 NEGESSARY TO PROifGT IRRleA.TIOII SYSifM MATERIALS BEFORE, DURINe, AND AFTER INSTALLATION Ate:> TO PROifGT THE INSTALLATION Y<ORK AND MAifRIALS OF ALL onER TRADES. IN THE EVENT OF DAMAGE, ll+CDIAifLY MAl(l: ALL REPAIFIS AND REf'I.AGE1'ENT5 NEGESSARY TO TI£ AGGEPTANGE OF TI£ LANDSGAPE ARGl!lifGT AND OHER AND AT NO ADDITIONAL COST TO THE OHER. B. EXERC,ISE GARI: IN HANDLING, LOADIN6, l.tll.OADIN6, AND STORING PLASTIC PIPE AND FITTINGS Ul«R GOVER UNTIL READY TO INSTALL. TRANSPORT PLASTIG PIPE ONLY ON A VEHICLE l'IITH A BED LON6 ENOUGH TO ALLOl'I TtE PIPE TO LAY FLAT TO AVOID UNDlE BENDINe AND GONGENTRAifD EXTERNAL LOAD. 1.0& GLEAIU" AND DISPOSAL A. DISPOSE OF l'IASTE, TRA5H, AND DEeRl5 IN AGGORDANGE HITH APPI.IGABLE LAHS AND ORDINANCES AND AS PRESGRIBED 6Y AUTHORITIES HAVIN6 -UtlSOIGTION. BUR"\" NO SUCH l'IASif MATERIAL AND DEBRIS ON THE Slif. i:IUl"NING OF TRASH AND DEBl'IS )'IILL NOT BE PERMITifD. THE GONTRAGTOR SHALL REMOVE AND DISPOSE OF RlllBISH AND DEBRIS 6ENEl<AifD Bl' HIS l'IORK AND l'IORKMEN AT FREGIIENT INTERVALS OR H£N ORDERED TO DO SO BT' THE OHER'S AUTHORIZED Ra'RESENTATIVE. B. AT THE TII-C OF COMPLETION 1l-E ENTIRI: Slif HILL flE GLEAREO OF TOOLS, EGVIPMENT, Rl.eBISH AND DEBRIS l'IHIGH SHALL flE DISP06ED OF OFF-slif IN A LEeA.L DISPOSAL AREA I .oot 1lJRNOVER ITEMS A. RECORD DAAl'IINGS, I. REGORD AGGIJR.Aifl Y ON OHE 5ET OF CONTRAGT DRAl'IIN65 ALL GHAN6ES IN THE "40RK GONSTIWTING DEPAR11JRE5 FROM THE ORIGINAL GONTRAGT DAAl'IINGS. 2. TI£ CHANGES AND DIMENSIONS SHALL BE RcCORDED IN A LEGIBLE AND l'IORKMANLIKE MANIER TO 1lE SATISf'AGTION OF THE Oi'N:R. PRIOR TO FINAL INSPEGTION OF l'IORK, SUBMIT REGORD DRAt-lJNeS TO THE LANDSGAPE ARGHITEGT OR Ol<ffR'S AIJTHORIZED ALI l<LSEllrATIVE. :5. DIMENSIONS ~O F'EFtMANENT POINTS C.. ALI Ek□iCE SLIGH AS BUILDINGS, SIDEi'IAI.KS, CURBS, ETG. SHALL Bf SHOl+I. DATA ON RECORD ~NeS SHALL BE REGORDED ON A DAY TO DAY BASIS AS THE PRO..EGT IS BEING INSTALLED. ALL LETTERINe ON DRAl'IIN65 SHALL 8E MINIM.M 1/& INCi-i IN SIZE. 4. SHOl'I LOGATIONS AND DEPTHS OF TIE FOLLOl'IIN6 ITEMS, A POINT OF GOIIILG-TION (IMGLLOINe l'IATER r£,El<S, dAGKFLOl'I PREVENTERS, MASTER GONTROL VALVES, ETGJ B. ROVT"ING OF SPRIN<l.ER ~ LINES (DIMENSIONS SHOl'tl AT A MAXIM.M OF 100 FEET ALON6 ROUTING) G. 6Aif VALVES D. AUTOMATIIG <nRf:'Ml•U~if"" GONT1'0L VALVES AND ISOLATION BALL VALVES E. GVIGK GOUPLINe VALVES AND ISOLATION BALL VALVES F. ROVT"ING OF GOlfflWL l'lll'ES 6. IRRIGATION GONT1WLLERS H. kLLAifD EGIJIPI-LNT (AS MAl' BE DIRECifD) 5. MAINTAIN RECORD ~NGS ON 51if AT ALL TII-LS. UPON COMPLETION OF Jl'lORK, TRANSFER ALL AS-BUILT INFORMATION AND DII-CNSIONS TO R.Ef'RODUGl6LE 9EPIA PRINTS. 6. AS-BUILT PLANS FOR ALL f'RO..EGTS (BONDED AND NON-BON:)ED, RELIC. AND PRIVATE) ARE REGIJIRED TO BE aeMITTED. st.eMITTAL FO AS-BUILT PLANS SHALL llE AS REGI.IIRl:D 6Y 1lE EM61NEERIN6 AND PLANNIN6 DEPAR1M:NTS. THE FINAL PLANS SHOULD Bf PREPARED 6Y THE LANDSGAPE ARGl!lifGT FROM DIIENSIONS PROVIDED 6Y THE GONTRI\GTOR. FINAL AS-BUILT PLANS SHALL 8E DRAFTED Gl.£ARL Y TO THE SATISFACTION OF THE GITY, AND 8E SLeMITTED TO THE GITY AS SIGNED M'r'LAR5 TO BE l<EPT AT TI£ GITY l'IITH THE ORIGINAL SIGNED M'r'LARS. B. GO~LLER CHARTS, I. R£GORD ~NGS HJST BE N'f"FICNED 6Y LANDSGAPE MGHlifGT AND/OR OHER'S AUTHORIZED kLPkLSENTATIVE Bfl ORI: CHARTS ARE PREPARED. 2. PROVIDE ONE CONTROLLER CHART FOR EACH AUTOMATIC GONTROLLER CHART SHALL SHOH THE AREA COVERED 6Y TI£ PARTICULAR GONTROUER. 5. THE CHART 15 TO flE A kLDUGED GOP'( OF THE AG,TIJAL 'RECORD' DRAl'IING. IN 1lE EVENT 1lE ~ SEGI.ENGE IS NOT LEGIBLE l'IHEN THE ~Ne IS REOUGEP, IT SHALL BE ENl.AR6ED TO A READABLE SIZE. 4. rt!EN GOMPI.ETED AND APPROVED, THE CHART SHALL Bf HERl<LTIGALL Y Sf.6.1 ED Pcn£EN 1WO PIEGES OF PLASTIC, EACH PIEGE BEING A MINIM.M 20 MILS IN THICKNESS. G. OPERATION AND MAINifNANC,E MANUALS, I. TH::> INDIVIDUALLY BOIN:) COPIES OF OPERATION AND MAINifNANGE MAMJALS SHALL BE DELIVERED TO 1lE LANDSCAPE ARGHITEGT OR oi-tER'S AUTHORIZE., REFRESE.k,ATIVE AT LEAST 10 GALENDAR DAYS PRIOR TO FINAL IN!lf'fGTION. THE MANUALS SHALL DESGRlflE THE MAifRIAL INSTALLED AND THE PROPER Ol"ERATION OF THE SYSTEM. 2. EACH GOMPI.ETE,-BOIK1"1' MAit/AL SHALL INCLUDE 1l-E FOLLOWING INFORMATION, A INDEX $.E, STATING GONTRAGTOR'S ADDRES6 AND TELEPHONE 11.MeER, DURATION OF iSUARANifE PERIOD, LIST OF EGIJIPMENT INGLUDINe NA1'L5 AIO ADDRES::D OF Loe.AL MAIIFAGTIJRER REI l<ESE,4TATIVES. B. OPERATINe AND MAINTENANGE INSTRIJGTIONS FOR ALL EGIJIPMENT. G. 5f'ME PARTS LISTS AND RELATED MANUFAGTIJRER INFORMATION FOR ALL EGVIPMENT. D. EGIJIPI-ENT, I. SUPPL l' AS A PART OF THIS GONTRAGT THE FOJ.1.01'11Ne ITEMS, A. TH::> (2) l«ENGHES FOR DISASSEMBLY AND AD.JJSn-ENT OF EACH TYPE OF SPRlltc:LER HEAD USEV IN TI£ IRRleA.TION SYSifM. B. THREE :30-INGH SPRINKLER KEYS FOR MANUAL OPERATION OF CONTROL. VALVES. G. TH::> KEYS FOR EACH AUTOMATIC GONTROLLER D. FIVE GVIGK GOUl"LER KEYS ~TH A BRONZE HOSE THREAD '10 DEGREE Sl'IIVEL ATTAGtM:NT AND FIVE COUPLER LID KEYS. E. FIVE VALVE BOX GOVER KEY OR l'RENGH. F. ONE 5-FOOT TEE~ FOR OPERATING 6Aif VALVES :5 INCHES OR LAR6ER (IF U!iED). 6. SIX EXTRA SPRINKLER HEADS OF EACH SIZE AND TYPE PER IRRIGATION P.O.C,. 2. THE />BO,/E EGVIPl'<LNT SHALL llE 11JRNED OVER TO OH£R'S AUTHORIZED t-U.I k.t.SENTATIVE AT THE FINAL INSPEGTION. 1.10 GOMPLETION A. AT THE TIM: OF THE PRE-MAINTENANGE PERIOD INSPEGTION, TtE LANDSGAPE ARGHlifGT, OHER'S AIJTHORIZEt, ALI k£.l:;l., ATIVE, AND OOVERNINe AGENGIES ~LL IH5PEGT TI£ 1'10RK, AND IF NOT AC<.,EPIED, HILL f'l'ff'AflltE A LIST OF ITEMS TO BE GOMPLETED 6Y THE GONTRAGTOR. AT THE TIM: OF THE POST-MAINTENANGE PERIOD OR FINAL INSPEGTION Tl-£ l'k,RK HILL BE REINSFEGifD AND FINAL AGGEPTANGE HILL 8E IN l«ITING BT' 1l-E LNIDSGAPE MCl!lifGT, OHER'S AUTHORIZED RU kE!.A.MTATIVE, AND ISOVERNIN6 ASENCIES. B. THE Ol't£R'S AIJTHORl.za, Rel AE.S&, ATIVE SHALL HAVE FINAL AUTHORITY ON ALL PORTIONS OF THE Y<ORK. G. AFifR 1lE SYSTEM HAS BEEN COMPLETED, THE GONTTUGTOR SHALL INSTIWGT Ol'IER'S AIITHORIZED kLPl<ESElt,ATIVE IN THE OPERATION AND MAINTENANGE OF 11-E IRRIGATION SYSifM AND SHALL F\RIIISH A GOMPI.E11: SET OF Ol'l:RATINe AND MAINifNANGE INS11'11JC,TIONS. D. Aftf SETTLINe OF TRENGHE5 rt!IGH MAY OGGIA'!. DUIIQN6 TtE ONE-YEAR PERIOD FOlU)J,IING AGGEPTANGE SHALL 8E REPAIR.Et) TO THE oi-tER'S SATl5FAGTION 6Y TtE GONTTUGTOR l'IITHOUT ANY ADDITIONAL EXFEld: TO THE OhN:R REPAIRS SHALL INGl..l.OE TI£ GOMPLETE Rl:STORATION OF ALL DAMAGE TO PLANTIN6, PAVING OR OTlB. IMl"l'i1.0V!:M:TS OF ANY Kll-0 AS A k£5ULT OF THE l'IORK. I.I I GUARANTEE A THE ENTIRE 5PRJNKLER SYSTEM, INGLIJDING ALL l'IORK Dot,£ UNDER THIS GONTRAGT, SHALL BE UNCO!t:)ITIONALLY iSUMANTEED AGAINST ALL DEFEGTS AND FALI.T OF MATER.AL AND ~ANSHIP, INGI..IDIN6 SETTLING OF BAGI< FIELD ARcAS BfLOl'I GRADE, FOR A PERIOD OF ONE M YEAR FOLLOHtN6 THE FILIN6 OF TI£ NOTICE OF GOi'f'l.ETION. SHOLl.D ANY PROBLEM )'IITH THE IRRIGATION SYSTEM Bf DISGOVERED ~THIN THE ISUARANifE PERIOD, IT SHALL Elf GORkLGTED BY THE GONTRAGTOR AT NO ADDITIONAL E/4 LU: TO OHel HITHIN TEN 00) GALENDAR DAYS OF REGEIPT OF l«ITTEN NOTIGJ: FROM Ol'tLR.. rt!EN THE NAT!ft OF THE REPAIRS AS DE I ERMINED 6Y THE OJ/tER GONSTl1\ITE AN 8'E t6BIGY (I.E. BROl<J:N ~ LINE) THE OHel MAY~ TO MAKE REPAIRS AT TtE CONTRAGTOR'S U4 OU:. Aftf AND ALL DAMAGES TO EXISTING 11ff0v□<LNT RESULTING ElllER l'ROM FAUL TY MAiERIALS OR ~P. OR FROM THE NEGE&-.RY REPAIRS TO GORkLGT SN£, SHALL BE REPAIRED TO 11-E SATISFACTION OF 1lE ~ 6Y TIE GONTRAGTOR, ALL AT NO ADDITIONAL GOST TO Tl-IE Ol<INER. B. ISUARANifE SHALL 8E SUBMITTED ON..,GONTRAG,_., TORS Ol'IN LETifRHEAD AS FOLLOHS, iSUARANifE FOR SPRINKLER IRR!eA.TION SYSTEM laL rCREfr, iSUARANTEE THAT THE 5PRINKLER IRRIGATION SYSifM 1aL HAVE RJRNl5HED AND INSTALLED 15 FRfE FROM DEFEGTS IN MATERIALS AND l'IORKMANSHIP, AND THE l'IORK HAS BEEN GCM"!..EifD IN AGGORDANGE l'IITH THE DRAHtlt55 AND SPEGIFIGATIONS, ORDINARY l'eAR AND ifAR AND I.MJSUAL AllU5E, OP 1£61 EGT EXGEPl1:D. laL ."6REE TO REPAIR OR kEPl.AGE Aftf DEFEGTIVE MATERIAL ~Ne 11-E PERIOD OF ONE YEAR FROM DA if OF FILINe OF THE NOTIGE OF GOMPLETION AND ALSO TO REPAIR OR kLPLAGE ANY DAMAGE k£5ULTIN6 FROM THE REPAIRINe OR REPLAGINe OF SUCH DEFEGTS AT NO ADDITIONAL GOST TO THE Ol'tlER. 1aL SHALL MAKE SUCH REPAIFIS OR REPI..AGEl4:NTS HITI!IN 10 GAL□<)AR DAYS FOl.1.0HING l«ITTEN NOTIFIGATION 6Y 1lE Ol+ER.. IN THE EVENT OF OI.R FAIUJkL TO MAKE SUCH REPAIFIS OR REPL.AG□-LNTS ~THIN THE Tll'L SPEGIFIU, AFTER kLGEIPT OF l«ITTEN NOTIGE FROM Oi'N:R, laL AUTHORIZE THE OlffR TO PROCEED TO HAVE SAID REPAIRS OR Rcf'LAGEMENTS MADE AT OUR UI □lSE AND laL l'ILL PAY THE COSTS AND GHAR6E5 nEkLFORE UPON DEMAND. PRO..EGT NAME, PRfl f'C.T LOGATION, GONTRAGTOR NAME, ADDl<l.!h, m.EPHONE, Sl611LD, DAif, PART II -MATERIALS 2.ol ~ USE ONLY NEl"I MATERIALS OF THE MAIIFAG11JRER, SIZE AND TYPE SHOl'IN. ON THE ~NGS AND SPEGIFIGATIONS. MATERIALS OR EGIJIPl'<LNT INSTALLED OR FURNISHED THAT DO NOT MEET LANDSGAPE ARCHlifGT'S, °""'8:R'S, OR GOVERNINe "'6ENGIES STANDARDS l'IILL 8E RE..EGTED AND SHALL BE k£MOVED FROM THE Slif AT NO EXl'EN5E TO THE OIAINER 2.02 PIPE A. ~ 5UPPL Y LINE FROM POINT OF GONNEGTION THtwU6H BAGKFLOl'I PREVENTION UNIT SHALL BE TYPE I< "HARD' GOFI ER PIPE OR 6RA5S NIPPLES 11..ENelH l'6 REGUIRED). ~ CITY OF CARLSBAD www.gmplandarch.com DRAWN PM 1111: L....!..!_j PLANIIING DEPARTMENT ..---------=-.A-S_B_U_IL-T""'•-------..------,--.----------------,----r---.------.----1 GUEST BUILDER IRRIGA Tl□N SPECIFICATIONS 9404 Genesee Avenue APPROVED Suite 140 La Jolla 1ST SUBMITI'AL California 92037-1353 2ND SUBKITTAL Tel 858 558 8977 3:RD SUBlDTl"AL Fax 858 558 9188 4TH SUBYITl"AL -02-09-07 3-13-07 4-30-07 TITLE, 7-02-07 DATE RECEIVED BY: 6'EST EJIJILOER VILLA6ES OF LA COSTA THE OAKS -5.415.5 Ll-10 LANDSCAPE lfYIAR SUBIOTTAL 7-10-07 t-----t---+-------------------I APP7f~ I er-f:llc,,t---r. ,~.Q., I _PLANNING ' DATE . ~D~WN~~BY~:::: ..,::;JJIM~~~~,===P~R~O::J::::EC~T;::::N0:::::.=:::::;1;::D~R::::A:::Wl:::N::G=NO= . ARCHITECTURE .JOB NO. 05-D38 DATE 04-50-07 & PLANNING SCA.LE AS SHOWN INSPECTOR DATE ~~ ~~; ~P~M--I C.T 05-16 . 446-6L DA lE INITIAL ENGINEER OF 'MIRK REVISION DESCRIPTION DA lE INITIAL DA TE INITIAL OlHER APPROVAL CITY APPROVAL IRRIGATION SPECIFICATIONS (CONT'D) PART II -MATERIALS B. PRESSURE 5U"PL Y Lllt:5 2 INGHE5 IN DIAMETER AND UP TO 2.5 INGHE5 IN DIAME"TER DOl'tlSTREAM OF BAGl<FLOl'I PREVENTION UNIT SHALL BE GLA56 315 50LVENT l'i:I.D PVG. PIPINl5 SHALL G0NF0RM TO ASTM D:2241. G. PRESSURE 5U"PL Y Lllt:5 3 INGHES IN DIAME!cR AND UP TO fJ INGHE5 IN DIAMl:Tl:R Dot'NSTREAM OF 5AGl<FI..Ol'I PREVENTION UNIT SHALL BE GLA56 200 iSASl<cT JOINT PVG. PIPINl5 SHALL GONFORM TO ASTM D.2241. D. PRESSURE Sl.ff'L Y LIIES I.S INGl-£5 IN DIAMETER AND SMALLER OF THE BAGKFLON PRE\/ENTION UNIT SHALL BE 5GHEDULE 40 SOLVENT Jlt:1D l''VCt~IN6 TO ASTM Dl1a5. E. NON-PRESSURE LINES .15 INGl-£5 IN DIAMl:Tl:R AND lAR6ER DOJl+ISlli!EAM OF THE !<EMOTE GON'llWI. VALVE SHALL BE 5GH. 40 PVG. F. REGYGLED (REGLAII-ED) l'IATI:R PVG PIPE TO BE GOLOR-GOD!:D PURPLE IN GO~ MARKED ON Tl'lO SIDES HITH RECLAIMED l'IATI:R INl,RNIN6 STA1EH:NT5 'GAI/TION-REGYGLED ~IMED) "1AlcR'. REC.LAIi-ED l'IATI:R PIPIN15 HJ5T BE AGGEPTED BY LOGAL REGLAll'ED l'IATER 60VERNIN6 A6ENGIE5. REGYGLED NATER PIPE SHALL BE lJ5ED ONL'T' ON REG'T'GLED S'T'5TEM. NON-PRESSURE PIPING SHALL GONFORM TO ASTM Dl1a5. 15. ALL SPEGIALIZl;D PIPINIS SHALL BE A5 INDIGATED ON THE ~NiS LEi5END Ok DETAILS. 2.0:5 MET AL PIF'f AND FITTINl55 A. BRASS PIF'f SHALL BE a5 PERGENT FIED BRASS, ANSI, IPS STANDARD 1:25 POUNDS, 5GHEDIA.E 40 5GREl'ED PIPE. B. BRASS FITTIN65 SHALL BE MEDll,t;f BRASS, 5GREH:D I:25-POIMD GLA56. G. GOFI Ek l'IF'f SHALL BE 'HARD' T'T'F'f I< Ok A5 NOTED ON THE DRAl'IINIS LE6END Ok DETAILS. 204 PLASTIG PIF'f AND FITTINl56 A. PIF'f SHALL BE MARKED GONTIMJCUSL Y l'IITH MANJFAGlURER'S NAH:, NOMINAL PIF'f SIZE, 5GIEDULE Ok GLASS, PVG T'T'F'f AND iSRADE, NATIONAL SANITATION FOIKlATION ~AL. GOMMERGIAL STANDARI¼ DESIGNATION, AND DATE OF EXmlJSION. B. ALL PLASTIG PIPE SHALL BE EXTIUlED OF AN IMPROVED PVG Vl~IN PIF'f GOl'POUND IN ~ANGE )'jJTH ASTM D:224I Ok A5TMDna4. G. ALL PVG FITTINl55 SHALL BE STANDARD H:liSHT S(;f-EDIU: 40 AND SHALL BE IN.EGTION MOLDED OF AN IMPRO\/ED VIR6IN PVG FITTINIS GOMPOUND. SLIP PVC, FITTINISS SHALL BE THE 'PEEP SOGKET" eAAGt:ETED T'T'F'f. THREADED PLASTIG FITTINISS SHALL BE IN.EGTION MOLDED. ALL TEES AND a.LS SHALL BE SIDE \SATED. ALL FITTINl55 SHALL GOlfOkM TO ASTM D:2-466. D. ALL 1'lRADED NIPPLES SHALL BE STANDARD H:liSHT 5GIEDULE aG HITH MOLDED TIRADS AND SHALL GONFORM TO ASTM Dl1a5. E. ALL SOLVENT GEt-ENTINiS OF PLASTIC, PIF'f AND FITTINISS SHALL BE A Tl'IO-STEP PROGE9S, USINIS PRIMER AND SOLVENT c&l:NT APPLIED PER THE MANJFAGlURER'S REGOl+ENDATIONS. GEl-£NT SHALL BE OF A FUJID GONSISTENG'T', NOT iSEL-LIKE Ok ROPY'. 50LVENT GEMENTIN6 SHALL BE IN GONFOkMANGE il'IITH ASTM D:2564 AND ASTM D:ias5. F. J+el GONNEGTION 15 PLASTIC, TO METAL, FEMALE ADAPTERS SHALL BE HAND TIISHTENED, PLUS ONE lUkN l'IITH A STRAP l'RENGH. JOINT GOMPOl.tV SHALL BE NON-LEAD BASE TEFLON PASTE, TAPE, Ok EGUAL. 2.05 BAGKFL01'1 ~TION UNIT5 A. THE ~ PREVENTION I.NIT SHALL BE OF 1lE MANIFAG11JRER. SIZE, AND T'T'F'f INDICATED ON THE QRA)'jlNiSS. 6. THE ~ PREVENTION I.NIT SHALL BE INSTALLED IN AGGORDANCE rl!TH THE F!EGIUIFQ:MENTS SET FORTH BY LOGAL GODE5. C.. THE BAGl<FLOl'I PREVENTION A55EMBL Y SHALL GONSIST OF BRASS PIPINIS, I.NIONS AND FITTINiSS. 206 VALVES A. iSA TE VAL YES, I. \SATE VALVES SHALL BE OF 1lE MAIU'AGll-"ER, SIZE, AND T'T'F'f INDIGATED ON THE ~Ne.;. 2. ISATE V>t.VES SHALL BE GONS'IRIJGTED OF A 6IWNZE BODY, BONNET' AND DISG, AND A MAI I EAfll.E IRON HANDriEEL. \SATE VALVES SHALL HAVE THREADED GONNEGTIONS. 3. ALL iSA'IE VALVES SHALL HAVE A MINI~ il'IORKINIS l'kE5SUkE OF NOT LE55 THAN 150 PSI AND SHALL CONFORM TO AJ+IA STANDARDS. 6. BALL VALVES, I. BALL VALVES 5HALL BE OF THE MANJFAG11JRER, SIZE, AND T'T'F'f INDIGATED ON THE DRAHINiSS. 2. BALL VALVES SHALL BE GONSTRUGTED OF A BRONZE BODY, 5TAINLE55 S'IEEL BALL AND STEM, MALLEABLE IRON tw0LE. BALL VALVES SHALL HAVE 'l1ftADED CONIEGTIONS. 3. ALL BALL VALVES SHALL HAVE A MINI~ il'IORKINIS PkE56URE OF NOT U:56 THAN 150 PSI AND SHALL GONFOkM TO AJ+IA STANDARDS. G. GVIGK GOll"l.ER VALVES, I. GIJIGK GOll"l.ER VALVES SHALL BE OF 1lE MANJFAG11JRER, SIZE, AND T'T'F'f INDICATED ON THE DRAl'IINl56. 2. GI.IIGK COUPLER VALVE& SHALL BE BAA55 l'IITH A NALL THIGKN:55 iSUARANTEED TO i"IITHSTAND NORMAL il'IORKINIS PkE55URE OF 150 PSI j,jiTiiOIJT LEAl<A6E. VALVE& SHALL HAVE FEMALE 1lRAD5 OPENINIS AT BASE, HITH TWO-PIEGE 60D'T'. VALVES TO BE OF'fRATEDONL 'T' HITH A GOUPLER KE'!', DESliSIED FOR THAT PURPOSE. COUPLER KE'!' IS liW<,..D ,NTO VALVE AND A POSITIVE, HATI:RTIISHT GONNEGTION SHALL BE MADE B!..,ittN 11-iE GOUPLER KE'!' AND VALVE. HINISE GOVER SHALL 6E THE LOGKINIS T'T'F'f GONSm.JGTED OF BAA55 j,jiTH A RLE!BER-LIKE VIN'T'L GOVER. 3. VIN'l'L GIJIGK GOLIPLER GOVER FOR REC.LAIi-ED )'jf,,lcR GVIGK GOUPLER VALVE5 TO BE FIJRPLE IN GOLOk j,jlTH 1lE l'IORDS 'l'IARNINe-REG'T'GLED (REGLAll'ED) l'IA 11:R-DO NOT DRINK PERMANENTL 'T' MARKED ON LID FOR Rfe'T'GLED S'T'STEM. D. AUTOMATIC, GONTfWL VALVE&, I. AUTOMATIG GOllTROL VAL\/f3 SHALL BE OF THE MAMJFAGTURER, SIZE, AND T'T'F'f lt-VICATED ON THE DRA)'jlNiSS. 2. AUTOMATIG GONTkOL VALVES SHALL BE ELEGTRIGALLY OPERATED. E. ANTI-DRAIN VALVES, I. ANTI-DRAIN VALVE& SHALL 6E OF THE MANJFAGTUkER, SIZE, AND T'T'F'f INDIGATED ON THE DRA)'jlNiSS. 2. ANTI-DRAIN VALVES SHALL HAVE l&-e, 5TAINLE55 S'IEEL 5PRINISS AND VALVE STEHS l'IITH ElJNA-N SEALS. 3. ANTI-DRAIN VALVE5 l'IILL HAVE THREADED GONtEGTIONS THE SIZE OF THE RISER OR PIF'f THE'!' ARE TO BE INSTALLED ONTO, OR THE NEXT' AVAILABLE SIZE. NO SLIP GONNEGTION ANTI-DRAIN VALVE& ARE ALLOH:D. 2.01 VALVE 60XE5 A. VALVE 60XE5 SHALL 6E FA6RIC,ATED FROM A DlRA6LE, l'IEATHER-RESISTANT PLASTIC MATERIAL RESISTANT TO 9UNLIISHT AND GI-EMIGAL ACTION OF SOILS. 6. THE VALVE 60X GOVER SHALL 6E GREEN IN GOl.Ok AND 5EGIJRa) lrtlTH 60LT5. G. THE GOVER AND 60X SHALL BE GAPABLE OF SUSTAINING A LOAD OF 1,500 POUNDS. D. VALVE 60X EXTENSIONS SHALL BE BY THE 5A1'E MAtlFAGilJRER A5 TIE VALVE 60X. E. AUTOMATIG GONTkOL AND MAS'IER VALVE 60XE5 SHALL BE 16'Xll'Xl2' REGTAN61.JLAR SIZE. VALVE 60X GOVERS SHALL BE 'HEAT BRANDED' IN 2" Ht6H LEI il:k:, l'IITH EITHER "RGV' l'IITH THE VALVE IDENTIFIGATION llJMBER5 Ok 'MGV'. F. SPEGIALIT'T' 'JJ-160' 60XE5 MAY BE INDICATED ON DRA)'jlNiSS AND SHALL BE 25'Xl5'X12' REGTAN61.JLAR SIZE. 15. BALL VALVE, iSA'IE VALVE, AND GVIGK COUPLER VALVE 60XE5 SHALL BE GIRGUL.Ak 10' SIZE. VALVE 60X GOVER5 SHALL BE "HEAT BRANDED' IN 2' HliSH L.Ei iEkS nlTH EITHER '6V", 'iSV'', Ok 'GIGV". H. V 1-t.VE 60X GOVER FOR kEGLAIMED 5'1"5TEM5 5HALL 6E FIJRPLE IN GOLOR AND PERMAl£NTL Y MARKED l'IITH TI-IE JlliOkD5 "l'IARNINIS F!EC'T'GLED (REGLAIMED) )'jf,,lcR -00 NOT DRINK' FOR REC,'T'GLED IRRIGATION SYSTEM. 2.0t; IRRIGATION GON'llWI.LER A GONTIWLLER SHALL BE OF THE MANWAGTURER, SIZE AND T'T'F'f INDIGATED ON THE DRAHINISS. 6. THE GONTROLLER ENGL051R: SHALL BE OF 1lE MAtlFAGTUkER, SIZE AND T'T'F'f INDIGATED ON THE DRAl'IIN65. THE ENGLOSURE SHALL ALSO ENGl05E THE GONTIWLLER ELEGTRIGAL H:l'l:R. C. THE GONTROLLER SHALL 6E OF THE MANJFAGTURER, SIZE AND T'T'F'f REGVIRED BY ]Yf'E 1111:if'AU]Y tm. 2.0'I ELEGTRIGAL A ALL ELEGTRIGAL EGVIPM:NT SHALL BE NEMA T'T'F'f 3, l'IATERPROOFED FOR EXlERIOR INSTALLATIONS. B. ALL ELEGTRIGAL HQRK SHALL GONFOkM TO LOGAL GODE5 AND ORDINANGE5. 2.10 I.OH VOLTAISE GONTkOL j,jiRJNiS A. REl'IOTE GONTIWL HIRE SHALL BE DIRECT-BURIAL A)'jl5-IJf' T'T'F'f, SIZE A5 INDIGATED ON THE ~NISS, AND IN NO C,ASE SMALLER THAN 14 6AUISE. 6. GOtfEGTIONS SHALL BE EITHER EPOX'T'-5EALED PACKET T'T'F'f Ok f'EN'.1-Tl'IE GONNEGTORS. G. COMMON ra1eS SHALL BE J/'Hl'IE IN COL.Ok, AND IN NO GASE 5MALLER THAN 12 15,',UiSE, GONTkOL lrtlkE5 SHALL BE RED (1"IHERE Tl'40 Ok MORE GONTIWLLER5 ARE USED, THE GONTROL )'j!RE5 SHALL BE A DIFFERENT GOLOk FOR EAGH GON'IROLLER. THESE GOLORS SHALL BE NOTED ON THE "REGOkD DRA)'jlNiSS' PLANS LOGATED ON GONTkOLLER DOOR). D. l5RDIJIC) )'j!RE5 SHALL BE i5kEEN IN GOLOR, AND IN NO GASE 5MALLER THAN 6 iSAUiSE. E. PROVIDE A 24, LOHi5 EXPANSION LOOF FOR ALL DIREGTIONAL GHANl5E5 IN GONTROL )'j!RE R.OUTINIS. 2.11 IRRIISATIOH HEADS A SPRINKLER IEAD5 SHALL BE OF Tl£ MANJFAG11JRER SIZE, T'T'PE, l'IITH RADIUS OF THROl'I, OPERATINIS PkES5UkE, AND Dl5GHARISE RA'IE INDIGATED ON 1lE DRAl'IINiSS. 6. POF-uP IEAD5 AND ~ISER IEAD5 SHALL BE USED A5 INDIGATED ON THE DRAl'IINiSS. G. IRRliSATION IEAD5 FOR REG'T'Gl.ED S'T'STEM SHALL HAVE FIJRPLE kEGYGLED (REGLAII-EDJ "1AlcR l'IARNINIS GOVER. PART Ill -EXEC,UTION 3.01 SllE GONDITIONS A. INSPECTIONS, I. PRIOR TO ALL HQRK OF THIS SEGTION, GAREFULL'T' INSPEGT M INSTALLED HOkK OF ALL OTHER TRADES AND VERIF'T' THAT ALL SUGH HOkK IS GOMPI.ETl: TO THE POINT N-1:RE THIS INSTALLATION MA'T' PROFERL'T' GOMMENGE 2. VERIF'T' THAT IRRl6ATION SYSTEM MAY BE INSTALLED IN STRICT ACGORDANGE HITH ALL PERTIIENT GODE5 AND REISULATIONS, THE OkliSINAL Df5I6N, THE REFERENGED STANDARDS, AND THE MANJFACTURER'S ~ATIONS. B. Dl5GREPANGIE5, I. IN M EVENT OF DISGREPANGY, IMMEDIA'IEL'T' NOTIF'T' 1lE LANDSGAPE ARGHl'IEGT Ok OJlffR.'5 AI.ITllORIZED ,<£J 14...laWTATIVE. 2. 00 NOT PROa:ED rl!TH INSTALLATION IN AREAS OF DISGREPANGY ""1TIL ALL DISGREFANGIES HAVE BEEN RESOLVED. C,, 15RADES, I. BEFORE STAATINIS HORI<, C,AREFLU'T' GHEGK ALL i5kADE5 TO DEIE.kM,rc THAT l'IORK MA'T' SAFELY PkOGEED KEEPINiS )'jJTHfN THE SPEGIFIED MATI:RIAL DEPTHS l'IITH kESPECT TO FINISH 6RADE. ' 2. FINAL 6RADES SHALL BE Au,EPIED t:!'T' THE ENISINEER BEFORE il'IOkK ON THIS SEGTION HILL BE ALL.Ot£D TO BEISIN. 0. FIELD i'EASl.liEMENT5, I. MAKE ALL li:GESSARY ~ IN M FIELD TO ENSURE PREGISE FIT OF llEMS IN ACGORDANGE )'j!TH THE OkliSINAL DESl6N. ~TOR SHALL GOORDINA'IE THE INSTALLATION OF ALL IRRIISATION MA'IERIALS HITH ALL 011-IER i'tlRl<. 2. ALL SCALED D1MEN510N5 ARE APPROXIMA'IE. Tl-£ ~TOR SHALL Gt£GK AND VERIF'T' ALL SIZE DIMENSIONS PRIOR TO PROa:EDINiS rl!TH ~ 1.NDER THIS SEGTION. 3. El<ERGISE EXiREI-IE GARE IN EXGAVATINIS AND il'IORKINIS IEAA EXISTINIS IITILITIES. GONTRAGTOR SHALL BE RESPONSIBLE FOR OAMAiSES TO IJTILITIE5 l'IHlGH ARE GAUSED BY HIS OPERATIONS !f6I EGT. E. DIMRAMMATIG IN'IENT, 1lE DRAl-llN65l+t:IIU:ARE E56EHTIALL Y DIA6RAl+IATIG. THE SIZE AND LOGATION OF EGVIPMENT AND FIX'l1JRE5 ARE OkAH11 TO SGALE ltEJe P0951BLE. PROVIDE OFFSE.:S IN PIPINIS GHANi5ES IN EGVIPMENT LOGATIONS A5 IEGE55AAY TO G0NF0RM il'IITH 5m.JG11RE5 AND TO AVOID 06Sm.JGTION5 Ok GONFI..IGT5 )'j!TH 011-IER HOkK AT NO ADDITIONAL EJ<i £16£ TO ortER. F. LA'T'OUT, I. PRIOR TO INSTALLATION, THE GONTRAGTOR SHALL STAKE OUT ALL PRESSURE SUPPLY LIIES, ROUTING AND LOGATION OF SPRINKLER IEADS, V>t.VES, BAGm..Ol'I FRE\IEHTcR, AND AUTOMATIG GONTROLLER. 2. LA'T'OUT IRRIISATION SYSTEM AND MAKE MINOR AD.JJST1'ENT5 REGIJIRW DIE TO DIFFERENGES BEii£EN Ji'IE AND DRAj,jjN155_ HERE FIP1Ni5 15 SHCH, ON DRAj,jjNiSS I.NDER PAVED fl,N;,45, Bl/T Rl,IININIS PAQ&I I El AND ADJACENT TO PLAKTED Ne/>6, INSTALL Tl-£ PIPINIS IN THE PLANlED Hf£A5. 15. l'IA'IER SUPPL 'T' GONNEGTIONS TO, Ok THE INSTALLATION OF, THE l'IATER SUPPLY SHALL BE AT THE LOGATIONS SHCH, ON THE DkN'INl95. MINOR GHANSE5 GAIJSED BY AG'TlJAL Sl'IE GONDITIONS SHALL BE MADE AT NO ADDITIONAL t:)(fbeE TO ortER. H. ELEGTRIGAL SERYIGE, I. GOHl£GTIONS TO THE ELEGTRIGAL SUPPL'!' SHALL BE AT 1lE LOGATIONS SHOHN ON THE DRA)'jINi56. MINOR GHANi5ES GAUSED BY Sl'IE GONDITIONS SHALL BE MADE AT NO ADDITIONAL EXPENSE TO ortER. 2. GOHT1'AGTOR SHALL MAKE 120 VOLT GOHl£GTION TO THE IRRIISATION ~-ELEGTRIC,AL POH:R 50iA'GE TO GONTROLLER LOGATIONS SHALL BE PRO\/'IDED BY OTHERS. A. EXGAVATIONS SHALL BE 5TRAIISHT l'IITH VERTIGAL 5IDE5, EVEN i5kADE, AND 9UPPORT PIF'f GONTIIIJOIJSLY ON BOTTOM OF 'll'ENCH. 'flllEHCHINiS EXC,AVATION SHALL rOLLOH LAYOUT INDIGATED ON DRAHINiSS TO THE DEPTHS BELOl'I FINISIED '5RADE AND A5 NOTED. N-1:RE LINES OGGLR l"'1DER PAVED N1EA, 1lE5E DIMENSIONS SHALL 6E GONSIDEf!faD BEL.OH SUBiSR,6,DE, B. PROVIDE MINIHJM GOVER OF I& INGHES ON ~ SUPPL 'T' LINES 2 1/2 INGIES AND 5MALLER. PROVIDE MINI~ GOVER OF 24 INGHES ON PkE56URE SUPPLY LIIES 3 INGtES, AND 36 INGHES OF GOVER ON PkE55URE 5UPPL 'T' LINES 4 INGHANDI.AAGER G. PROVIDE MINIHJM COi/ER. OF l?J INGHES FOR GONmoL )'j!Rf:5_ D. PROVIDE MINIHJM GOVER OF 12 INGHES FOR~ Lllt:5. E. PIPES INST>t.LED IN A GOl+ION ~ SHALL HAVE A 4 INGH MINIHJM SPACJ: et::.w,i PIPE5. F. PRO\/'IDE 5AIV BAGKFILL A MINIHJM OF 4 INGIES OVER AND 1.NDER ALL MAINLl!E PIPINIS. 3,03 6AGKFILLINl5 A. 6AGKFILL MA'IERIAL ON ALL LINE& 5HALL BE 1lE SAME A5 ADJAGENT SOIL FREE OF DEBRIS LITTER, AND RQGKS OVER 1/2 INGH IN DIA1'ETEll. ' B. 6AGKFILL SHALL BE TAMPED IN 4-INGH LA'T'ERS LWER THE PIF'f AND UNIFORM. 'T' ON BOTH SIDES FOR TI-E FLU j,jJDTH OF THE lRENC,H AND THE RJLL l.EHiSTH OF THE P1F'f. BAGKFILL MAlERIALS SHALL BE Sl.ff'IGIENTLY DAI-PTO PERMIT THOROU6H GOl-l'AGTION, FREE OF VOIDS. BAGl<FILL SHALL BE GOMPAGTED TO DRY DENSIT'T' EGIIJAL TO ADJAGENT UNDIS-ruRl:lED SOIL AND SHALL GOtFORM TO ADJAGEMT iSkADES. G. R.OODINIS IN LIBJ OF TAI-PINIS IS NOT ALLOl'£D. D. UNDER NO ~TANGE5 SHALL TRUGK lff:EL5 BE USED TO GOMPAGT BAGKFU. E. PROVIDE SAND BAGKFILL A MINI~ OF 6 INGHES OVER AND Ui'VER ALL PIPINIS UNDER PAVED AREA5. DRAWN PK la ~ CITY OF CARLSBAD ------------~ ---------r----------;;-;-;::--;;-;--;;-;-:;:;;--------T""--r---.-----------------.---,---~--~--J ~ PLA~ ING DEPARTMENT "AS-BUILT" APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTING AREAS. .. -... • \ll>SCA "'°od ... I www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 LANDSCAPE ARCHITECTURE & PLANNING .APPROVED w 1 ST SUBMI'ITAL 02-09-07 2ND SUBIOTTAL 3-13-07 3BD SUBKITTAL 4-30-07 TITLE: -4:TH SUBMITTAL 7-02-07 MYLAR SUBllITI'AL 7-10-07 JOB NO. 05-038 DATE 04-30-07 SCALE AS SHOWN DATE RECEIVED BY: INSPECTOR DATE GUEST BUILDER IRRIGATION SPECIFICATIONS 6/EST EJIJILOER VI/ I ASES OF LA COSTA 11E OAKS -!!1.4 I !!1.5 LI-II 1------,--+----------+-____.j----l---l---.l I APPtt( 4:-~(OQj}-...,_ ,q,£111 l--;;--;-a;=-1c-=c;;-;c-+----------------+----le----L---L--..J ::;-P~LA~N~Nl~N=G:;ii:=Sr==~~~~~==m~D~ATE~~~- DATE INITIAL DATE INITIAL DATE INITIAL I DWN BY: PROJECT NO. DRAWING NO. ENGINEER OF 'MIRK REVISION DESCRIPTION OlHER APPROVAL CITY APPROVAL ~~ ~~; 2P~Mc.__ C.T 05-16 446-bL IRRIGATION SPECIFICATIONS (CONT'D) 3.o4 PIPING A PIPl115 INDER EXISTlll5 PAVEMENT MAY BE INSTALLED BY' JACKING, BORING, OR HY'D1'W.ILIC DRIVING. NO HYDRAIA..IC DRIVING IS PERMITTED UNDER ASPHALT PAVEMENT. 6. CUTTING OR eREAKIN6 OF EXISTING PAVEMENT IS NOT PERMITTED. C. CARERJU.Y INSPECT .ALL PIF'l: AND FITTIN65 81..FOl<L 11-IST.ALLATION, REMOVING DIRT, SCALE, MRS REAMIN6. INST.ALL PIF'l: l'IITH .ALL MARKIN65 IP FOR VISUAL INSf'EGTION AND VERIFIC.ATION. D. REMOVE .ALL DENTED AND DAMMED PIF'l: 5ECTIONS. E. ALL LINES SHALL HAVE A MINIM-"" Cl.EAAANCE OF 6 INc.f-ES FROM EACH OTHER AND 12 !Ne.HES ~ LINES OF OTiiER TRADES. F. PAAALLEL Lite SH.ALL NOT BE INSTALLED DIREGTL 'I' OVER EACH OT1£R 6. IN SOLVENT IE.DING, USE ONLY THE SPEc.lFIED PRll'£:R AND SOLVENT CEMENT AND MAKE .ALL JOINTS IN STRICT ACCORDANCE l'IITH THE MANUFAG~'S RECOMMENDED MElHODS INc.l.lDING HIPING ALL EXc.E9S SOLVENT FROM EACH IE.D . .AlLOl'l SOLVENT 1E.DS AT LEAST 15 H1NJTES SETIJP TIMI: BEFORE MOVlll5 OR HANDLING AND 24 HOURS CURING TIME BEFORE flLLING. H. PVC. PIPE SHALL BE INSTALLED IN A MANIER HHlc.H HILL PROVIDE FOR EXPANSION C.ONTRAC,TION AS RECOl+ENDED BY' Tl-IE PIF'l: MAN.JFAC,~. I. CENTERLOAD .ALL PLASTIC. PIF'l: PRIOR TO PRE55lft TESTING. J. ALL THREADED PLASTIC-To-PLASTIC CONNEC.TIONS SHALL BE A5SEMBI..ED USING TEFLON TAI"!: OR TEFLON PASTE. K. FOR PLASTIC-TO-METAL c.oNIECTIONS, HORK THE METAL c.oNIECTIONS FIRST. USE A NON-HARDENIN6 PIPE DOPE AN ALL THREADED PLASTIC-To-+£TAL COIIECTION5, EXc.EFT 11IERE NOTED O"lleHISE. ALL PLASTIC-To-METAL cott!ECTIONS SHALL BE MADE HITH PLASTIC FEMALE ADAF,ERS. L. .ALL c.olf£CTIONS Bt,IW, PVC LA~ Lite SHALL BE MADE USIN6 Sc.H. 40 PVC FlmN65 HITH CUHFl<GSI.JN ADAPIERS. ALL c.olf£CTIONS 6ETIEEN DRl~lte TO BE MADE USIN6 GOt II AS&,V>'I FlmN6S OF MAIU'Ac.~ OF THE DRIPF'l:RLINE. USE NO PIF'l: DOPE, TEFLON TAI"!:, PRIMER OR SOLVENT CEMENT ON cot-lPRE:S:SION FITTIN66. 3.o5 CONTROI..LER A. Tl£ EXAc.T LOCATION OF Tl£ CONTROLLER SHALL BE APPROVED BY' 11-f: LANDSCAPE ARGHITEc.T OR Ol<'tER'S i'UTHORIZED REI AL.A.NTATIVE LA.I Ol<L INSTALLATION. TtE B.ECTRICAL 5ERVICE SHALL BE c.oORDINATED HITH THIS LOCATION. 6. THE IRRl6ATION c.oNTRAC,TOR SHALL BE RE!if'ONSl6LE FOR THE FINAL ELEGlRIGAL HOOK UP TO IRl'.16ATION c.ot-l'fflOI.LER C.. THE IRRl6ATION S'l'STEM SHALL BE~ TO OPERATE DIRIN6 Tl£ PERIODS OF MINIMAL USE OF Tl£ DESIISN AAJ:A D. INSTALL c.ONTl'WLLER ENc.J...OEIJRE AS RECOl+ENDED BY' 11-E MANJl'Ac.1\JRER 3.o6 C.ONiML HIRIN6 A. LOH VOLTAEif ~ HIF!.1115 SHALL OCGUP'I' THE SAME TRENc.H AND SH.ALL BE INSTALLED .ALON6 THE SAME ROIJTE AS THE PF1.ES5URE SUPPLY LINES i'f£NEVER POSSl6LE. 6. 11IERE MORE THAN OIE Hite IS PLAc.ED IN A Tl'elC.H, THE HJRIN6 SHALL BE TAPED ,vGL,HB< IN A BUNDLE AT INTERVALS OF 10 FEET. eut,t)lE SHALL BE~ TO THE MAINLINE HITH TAI"!: AT INTERVALS OF 20 FEET. C. ALL CONNECTIONS SHALL BE OF AN~ T'l'Fl: AND SHALL oc.CUR IN A VALVE BOX. PROVIDE AN I& INc.H SERVICE LOOP AT E.ACH CONNECTION. D. AN EXPANSION LOOP OF 12 INCHES SHALL LA. Pl'OVIDEP AT EACH l'tlF1.E CONNECTION AND/OR DIRECTIONAL CHANISE, AND ONE OF 24 INc.1-ES SHALL BE PROVIDED AT EAc.H REMOTE c:.oN'l1WL VALVE. E. A c.ONTINJOUS RI.ti OF HIRE SHALL BE USED BETJ,EEN A~ AND EACH REHOTE c.ONTROL VALVE. Ul'l:)!:R NO CIF!.CIJMSTANCES SHALL 5PLICES BE USED HITHOllT PRIOR APPROVAL. 301 VALVES A AUTOMATIC. c.ONTROL VALVES, 6ALL VALVES, 6ATE VALVES, Al'O GlJICK COlA"LER VALVES SHALL BE INSTALLED IN THE APPROXIMATE LOCATIONS INDICATED ON Tl£ DRAHIN65. 6. VALVE SHALL BE INSTALLED IN 51 Re Af'V6 i'fEIEVER POSSl6LE. C. INSTALL ALL VALVES AS INDIC.ATED IN Tl£ DETAIL DRAHIN6S. D. V/>J..VES TO BE INSTALLED IN VALVE BOXES SHALL BE INSTALLED OM: VALVE PER BOX. E. REM01c CONTROL VALVES AND GlJICK c.aJPI..ER VALVES SHALL BE ISOLATED~ THE MAIN.INE BY' A 6ALL VALVE SIZED PER THE L.ARBE5T U.V. IN THE MANIFOLD OR I 1/:2 INc.H FOR Gt:,.V.'S. 3.o& VALVE BOXES A VALVE BOXES SHALL BE INSTALLED IN SHRLe AREAS l'IHENEVER POSSl6LE. e. EACH VALVE BOX SHALL BE INSTALLED OH A FOIH:)ATION OF 3/4 INCH 6R-<\VEL BAc.KFILL, 2 CU61C FEET MINl1'1JM. VALVE BOXES SHALL BE INSTAI I B? "'1111-i 11-f:IR TOPS 1/:2 INc.H A60VE THE SURFACE OF ~IN6 FINISH 6RADE IN LAHN AREAS AND 3 !Ne.HES ABOVE FINISH 6RADE IN i5ROUl-v COVER M£AS. 3.0<I 6ACKFILOIH PREVENTERS A INSTALL 6Ac.KFI.Ol'I f'REVENTEFI. l-NIT AS ll<llCATED IN THE DETAIL DAAHJN6S. 6. INSTALL BACKFLOH AS6EM3LIES AT LOGATIONS APPROVED IN THE FIB.D AND AT HEl6HT REGVIRED BY' LOGAL CODES. C.. INSTALL l'l'l'E STRAINERS AND PRES6URE RE5ULATOR5 ON THE 6Ac.KFLOl'I A5eifM6L Y. D. IF 6AC,KFI.Ol,ll P1'EVENTER IS INSTALLED ADJACEKT TO A 8UILDIN6, KbU, OR OTIER 06STRIJCTION. INSTALL i.tlllT 50 THAT THE TEST COC.KS ARE FAc.lN6 OIIT1'IARD AHAY FROM THE OBSTRUCTION. E. INSTALL 6Ac.KFLOH ENc.LOSUF!.E AS REc.0MMENDED BY' THE MANIJFAc.T\JRER APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTING AREAS. Cl\.\ 3JO 5PR.I~ HEADS A SPRINKLER HEADS SHALL BE INSTALLED AS ll'OICATED ON THE ORAl'IIN6S. 6. SPACING OF HEADS SHALL NOT EXCEED MAXIM.M INDICATED ON 11-f: DAAHIN66. C. RISER NIPPLES SHALL BE OF THE SAME SIZE AS THE RISER OF'l:NIN6 IN THE SPRI~ BOD'!'. D. POP-1,f' SPRINKLER !EADS SHALL NOT 6E INSTALLED USIN6 SIDE OlJTLET OF'l:NIN6S. E. RISER NIPPLES ON REC.YCLED ~TER SYSTEMS SHALL BE IDENTIFIED HJTH ADHESIVE VIN'l'L MARKERS BELOl'I SPRI~ HEAD AND A MINIM-"" OF 10 INCHES A60VE FINISH GRADE. 3.11 MISCELLANEOUS EGlJIPMEliT A INSTALL ALL A55EIELIE5 SF'EC,IFIED t-ae:IN AC,C,ORDIN6 TO THE RESPCCTIVE DETAIL DAAl'IIN6S OR SPEc.lFIC.ATIONS, USING BEST STANDARD PF!Ac.TICES. 6. GlJIC.K COUPLER VALVES SHALL BE SET APPROXIMATELY 12 !Ne.HES~ rW.KS, aRlS, HEADER. BOARDS, OR PAVED AREAS I IIERE Af'F'U(;A61..E. C.. UNLESS DESIISNED AS AN INTl:ISRAL PART OF THE IRRl6ATION IEAD, ANTI-DRAIN VALVES HILL BE INSTALLED IJVER EVER'!' HEAD. THE ANTI-DRAIN VALVE HILL BE 11-f: SAME DIAl"ETER AS THE RISER AND 6E INTEISRAI. TO THE RISER ASSeeLY. D. INSTALL RAIN 5EN50R AS INDICATED ON THE DRAHIN65 AND AS~ BY' THE MANJFAClUREF!.. 3.12 FLUSHIN6 11-E S'l'STEM A PRIOR TO INSTALLATION OF SPRINKLER NOZZI ES, THE VALVES SHALL 6C OPDED AND A RJLL HEAD OF l'iATER USED TO FLUSH OUT 11-E LINES AND RISERS. 6. SPRINKLER NOZZLES SHALL BE INSTALLED AFTER FLIJSHIN6 ll£ S'l'STEM HAS 6EEN COMPLETED. 3.13 ADJUSTIN6 THE 5'1'5TEM A CONTRACTOR SHALL ADJUST VALVES, ALIISN HEADS, AND c.HECK c.oVERA6E OF EAc.H 5'1'STEM PRIOR TO c.oVERA6E TEST. B. IF IT IS DEll:f<Mll£D BY' THE L.AND5CAPE AAGHITEc.T OR OYN:R'5 i'UTHORIZED REPRESENTATIVE THAT ADDITIONAL ADJUSTMENTS OR NOZZLE CHAN5ES l'IILL 6E REGIJIRED TO PROVIDE PROPER CO\IER.,t6f, ALL 1£.c.ESGAA'I' c.HAN5ES OR ADJUSTMEMTS SHALL 6E MADE PRIOR TO AN'!' PLANTIN6. C.. THE ENTIRE S'l'STEM SHALL BE OPERA TING PROPERLY ElEFORE AN'!' PLANTIN6 OPERATIONS COMI-ENCE. D. AUTOMATIC CONTROL VN.VES Ne TO BE ADJUSTED SO THAT THE SPRINKLER HEADS Of'EIV'.TE AT 11-E PRE9SURE REeoMMEN:,ED BY' TIE MANJFAc.llJRER. 3.14 lc5TIN6 AND 065fRVATION A DO NOT ALI.Ol'I OR. GAUGE AN'!' OF THE HORK OF THIS 5ECTION TO BE c.oVEF1.ED IP OR ENa.OSED UNTIL IT HAS BEEN 065ERVED, TESTED AND ACCEPTED BY' 11-E LANDSc.AF'E ARc.HITEc.T, ~ AND OO\IEF1.NIN6 A6ENCIES. 6. THE c.oNTRAc.TOR SHALL BE SOLELY RESPONSl6LE FOR NOTIFYING THE LANDSCAF'l: ARc.HITEc.T, ~ AND 60VERNIN6 AEifNCIES, A MINIH.M OF 4" HOURS IN ADV/WI., It f:Rf. ,'ID HHEN THE HORK IS 1'EAD'I' FOR TESTIN6. C. l+EN 1lE SPRIMCLER S'l'STEM IS c.oMPLETED, lHE c.ONTRAc.TOR SHALL PERFORM A c.oVERA6E TEST OF EAc.H SYSTEM IN ITS ENTl!'iiET'( TO DEIEl<HINE IF TI-IE l'iATER COVERA6f FOR Tl£ PLANTED AREAS IS c.oMPI..ETE AND ADEGlJATE IN 11£ PRESENa: OF THE LANDSCAPE AAGHITEc.T. D. THE CONTRAC,TOR. SHALL FUilNISH ALL MATERIALS AND FB<l °'°'1 ALL HOFi.K REGVIF!.ED TO CORl'IIEGT AN'!' INADEGlUAC,IES OF CO\IEAA6E OLE TO DEVIATIONS FROM 1lE PLANS, OR H£RE THE SYSreM HAS LA.EN l'IILLRll'I' INSTALLED AS INDICATED ON THE DRANINGS lff:N IT IS OBVIOIJ5LY INADEGVATE, HITHOIJT llRINGtll6 THIS TO THE ATTEKTION OF THE LAND5CAPE ARGHITEc.T. THIS TEST SHALL BE ACt..EPIED BY' THE LAND5CAPE ARGHITEc.T AND ACCOMPl..15HB:1 OCI Ol<L STAF!.TIN6 AN'!' PLANTIN6. E. RNAL INSPECTION NILL NOT COl+ENCE HITHOllT RECORD DRAHIN66 AS PREPARB? BY' THE IRR16ATION c.ONTRAc.TOR. 3.15 MAINTENANc.E DIRIN6 THE MAINTENANCE Fl:RIOD Tl£ CONTRAc.TOR SHALL ADJUST AND MAINTAIN THE IRRIGATION SYSTEM IN A FU.LY OPERATIONAL CON:)ITION PROVIDIN6 c.ot-PI.ETE IRRl6ATION co--/FRN!E. TO ALL INTENDED PLANTIN66. 3.16 COMPLETION CLEANIN6 C-L.EAN-UP SHALL BE MADE AS EAc.H PORTION OF THE HORK F'ROORE55ES. REFUSE AND EXCES6 DIRT SHALL BE REMOVED FROM THE SITE, ALL K'J..KS AND PAVIN6 SHALL BE BROOMEP, AND AN'!' DAMABE 5U5TAINED ON THE HORK OF O'llt:RS SHALL BE REPAIRED TO ORl61NAL CON:)ITIONS. END OF 5EC.TION GENERAL GMP IRRIGATION NOTES I. ALL LOCAL MlA-IIC.IPAL AND STATE LAl"6, RULES AND REl!5ULATIONS 60VEF!.NIN6 OR RELATING TO ANY PORTION OF TIHIS l't:iRK ARE , El<EO f INCORPORATED INTO AND MADE A PART OF Tl-ESE SPEGIFICATIONS AND THEIR PROVISIONS SHALL BE C.ARRIED OUT 6'I' THE CONTRAC.TOR. IN C.ASE OF C.ONFLICT a.acct, TIHE SPEGIFICATIONS, DRAJ,1111165, AND/OR c.oDE, THE MORE 5TF!.IN6ENT REG!UlREMENT SHALL PREVAIL. 2. THE CON"IRACTOR SHALL Vl;RIF'I' THE L.Oc.ATIONS OF ALL EXISTING UTILITIES, SfflJc.TIJRE5 AND SERVIC.E5 BEFORE COMMENc.lNG Jr.lORK. THE LOC.ATIONS OF UTILITIES, STRIJG.TIJRES AND SERVICES 5HOl/fll IN TIHE5E PLANS ARE APPROXIMATE ONLY. ANY DISC.REPANG,IES BETH:EN THESE PLANS AND Ac.TIJAL FIELD GONDITIONS SHALL BE REPORTED TO THE Ol<ff:R'S REPF!.E5ENTATIVE. :3. THE c.oNTIVIC,TOR SHALL OBTAIN THE PERTINENT EN51NEER.ING OR ARGHITECTIJRAL PLANS BEFORE BE61NNIN6 l't:iRK. 4. THE C.ONTRAC.TOR SHALL OBTAIN ALL NEC.ESSARY PERMITS REGlUIRED TO PEF!.F~ TIHE Jr.10RK INDIC.ATED HEREIN BEFORE Bl:GINNIN6 Jr.lORK. 5. THE MAINLINE AND SLEEVING IS DIA6RAMMATIC. ALL PIPIN6 IS FOR DE51c$N C.LARIFICATION ONL y AND SHALL BE INSTALLED Y'IITHIN LIMIT OF Jr.lORK SOUNDARJES AND IN SHRU6 PLANTING ~ ~ P05516LE. AVOID ANY CONFLICTS BETl<EEN THE SFl'.INKLER SYSTEM, PLANTING AND ARGHITECTIJRAL FEATURES. 6. IRRl6ATION EGUIPMENT AS SHOHN IS DIMRAMMATIC.. INSTALL ALL TIHE IRRl5ATION REMOTE CONTROL VALVES, GIJICK COUPLERS, MASTER VALVES, FLOW SENSORS, BAGKFL.01'15, AIR/V.AGUUM DEVlc.ES, BALL VALVES, AND ANGILLAR'I" EGUIPMENT, IN SHRlJB PLANTING AffE.AS HHEN FEASla.E OR AS APPROVED 6'I' uiiCR.5 ~TATIVE AND THE L.AND5c.APE IRRl5ATION DE516NER. i. DO NOT HILLFUU.Y INSTALL ANY EGIJIPMENT AS SHOHN ON THE PLAN5 HHEN IT 15 OBVIOUS IN TIHE FIELD TIHAT UNKNOH-1 C.ONDITIONS EXIST THAT I-ERE NOT EVID!;NT AT THE TIME TI-E5E PLANS l'ERE PREPARED. ANY suc.H c.oNDITIONS SHALL BE eROUl5HT TO THE ATTENTION OF TIHE Ol+ER'S REPRESENTATIVE: PRIOR TO ANY ~ OR THE IRRl6ATION GONTRAG-TOR SHALL ASSUME ALL RESPONSIBILIT'I' FOR ANY FIELD c:.HAN6ES DEEMED NEc.E55AR'I" 6'I' THE OHER. e,, INSTALL ALL EGUIPMENT AS 5HOHII IN THE DETAILS AND Sf'Ec.lFIC.ATIONS. c.oNTIVIC,TOR SHALL BE 1'E:3f'ONSl6LE TO COMPLY Y'IITH L.Oc.AL CIT'I', COUNTY' AND STATE F!.EGUIREMENTS FOR BOTH EGUIPMENT AND INSTALLATION. "I. Ac.TIJAL LOCATION FOR THE INSTALLATION OF THE 6AGKFLOW PREVEN1tR, REc.YCLED C.R09S C.ON!Cc.TION TEST VALVE, PUMP STATION AND THE AUTOMATIC CONTROLLER IS TO Bl: CIEIEkMINED IN THE FIELD 6'I' THE OY'INER'S AUTHORIZED REPRESENTATIVE. 10. GONTRAc.TOR IS TO PROVIDE THREE (3) ADDITIONAL PILOT Y'IIRE5 AND ONE (I) COMMON l'IIRE TO THE 8"' OF THE MAINLINE RUN IN 1""0 DIRECTIONS FROM THE c.oN'TF1.0LLER THE ADDITIONAL HIRE SHALL BE l::)(,EIOED Iv', MAKIN6 A COIL TO FIT INSIDE A REc.TAN6ULAR PULL BOX LABEL TIHE LID OF THE PULL BOX 'SH'. II. ALL PIPE UNDER PAVED AAEAS, HARDSCAF'E, OR AS DIREc.TED BY 0~ ~TATIVE TO BE INSTALLED IN 5LEEVIN6, THIC-E THE DIAl"IEIER OF PIPE OR HIRE BUNDLE C.ARRIED. ALL 2' AND 3' SLEEVING SHALL BE PVCl:.220 Sc:.H. 40, TYPE I, 6RADE 2 MATERIAL ~ING TO ASTIM STANDARD D-li&S-4. ALL 4' AND LARISER SLEEVING SHALL BE PVC.1220 C.LA55 200 5Dl!C21, TYPE I, eRADE 2 MATERIAL CONFORM1N6 TO ASTIM 5TAlt:>A"D D-2241. SLEEVES LINDER BIWl'I DITCHES SHALL BE ENCASED IN c.oNc.RETE A MINIMUM OF 6' THICK ON ALL SIDES OF PIPE. SLEEVES TO EXTEND AT LEAST 12" PAST THE ED6E OF PAVIN6. 12. ALL GIJICK COUPLER VALVES TO BE INSTALLED IN SHRUB OR~ GOVER AREAS 1+1ERE POSSIBLE. ALL GUICK COl-"'L.EF1. VALVES TO BE INSTALLED AS SHOHN ON THE INSTALLATION DETAILS. INSTALL ALL GIUICK COUPLER VALVES l'IITHIN I&" OF HARDSc.APE. 1:3. ALL HEADS ARE TO BE INSTALLED l'IITIH TIHE NOZZLE, SC.REEN AND ARCS 5HOHN ON THE PLANS. ALL HEADS ARE TO BE ADJJSTED TO f'IIQ:VENT OVERSPRAY ONTO 6UILDINiSS, l'IAI..LS, FENCES AND HARDSc.APE. TIHIS INc.LlDES, l9UT NOT LIMITED TO, ADJJ5TMENT OF DIFFUSER PIN OR ADJJSTMENT SC.R&I, REPLACEMENT OF~ COMPENSATING SCREENS, REPL.AGEMENT OF NOZZLES Y'IITH MORE Af'f'l'OPRIATE RADIUS UNITS AND THE REPLAGEMENT OF NOZZLES l'IITH ADJJSTABLE ARC-~ITS. H-11.N VERTICAL oe6fflJc.TION5 (f'Rof'S, STREET Ll6HT5, ,REES, ETC) 111.,LI<i U:::.... Y'IITH THE SPRAY PAI ,Ekh OF THE 5PRINKL.E1'. HEl,D5 PREVENTING PROPER COVERAGE, THE ll'IRl6ATION CONTR.AGTOI'. SHALL Fla.D ADJJST THE SPRINKLER S"'(STEM BY' IN5TALLIN6 A GIUARTER CIRC-LE OR HALF CIRC-LE SPRINKLER HEAD ON EACH SIDE OF THE oe6ffl.lC,TION 50 AS TO PROVIDE PROPER COVERME. ALL ADJ.JSTMENTS SHALL 6E MADE AT NO ADDITIONAL C.OST TO THE Oi'IINER. 14. THE IRR15ATION c.oNTRAGTOR SHALL ADJJST THE PRE55URE REGULATOR ON EAGH ELEGTRlc. CONTROL VALVE 50 TIHAT THE SPRli+::LER l£AD FAR,HESr AND Hll5HEST IN ELEVATION FROM rm FiiE5Pi:CTIVE CONTROL VALVE OPERATES HTIHIN THE OPERATIN6 PFtESSURE SHOl<+I ON THE IRRl5ATION LE6END. NOT TO EXGEED FIVE (5) PSI ~ THE 51VEN OPERATIN6 PRE5SIJRE FROM THE SPEc.lFIED PRE55URE LOCATED ON THE IRRl6ATION LE6END. 15. THE IRRl6ATION SYSTEM DESlc$N 15 BASED ON THE MINIMA-I OPERATIN6 ~ AND THE MAXli"LIM FLOl'l DEMAND 5HOl+I ON THE IRRIGATION DRAl'IIN65 AT EACH POINT OF CONIEc.TION. THE IRR15ATION CONTRAC,TOR SHALL VERIF'I' i'IATER PRESSURE VIA DIREc.T FIELD ~ PRIOR TO CONSTRIJG.TION. REPORT ANY Ool I B<l,lit,c BE:ltti. rHE i'IATER PRE5SIJRE INDICATED ON THE DRAHIN65 AN:> THE AGlUAL PRE5SIJRE READIN6 AT THE IRR16ATION POINT OF COl+EGTION TO THE OilltlER'S AUTHORIZED ~ATIVE. IN TIHE EVENT PRESSURE DIFFERENCES ARE NOT REFOR1t:D PRIOR TO START OF c.oNSTF1.1Jc.TION. TIHE IRRl6ATION CON1'RAG.TOR SHALL ASSUME FLU. RE5PON51BILIT'I' FOR ANY REVISIONS, AND C.OSTS ASSOc.lATED HITIH SAID REVISIONS. lb. SHOULD FIELD c.oNDITIONS REG!UlRE PIPE INSTALLATION on EK THAN THAT 5H01+1 ON PLANS, THE C.ONTRAC.TOR SHALL LIMIT EXCE55 FLOl'I AND SIZE ALL PIPE NOT TO EXCEED A VELOCIT'I' OF 5 FE;ET PER SECOND /19"5) IN PVC. PIPE AND CAST IRON PIPE. FLOY'I THROOOH ANGIL.LARY' EGUIFM:NT, STEEL AND COFFER i-'IPE SHALL NOT EXCEED A VELOc.lT'I' OF 1 J!z FPS. ALL ADJJSTMENTS SHALL 6E MADE AT NO ADDITIONAL C.OST TO THE OHNER. 11. ELEGTF!.ICAL POHER SOIJRC,L FOR THE IF!Rl6ATION C.ONi'ROLLER AND/OR BOOSTER PUMP SHALL BE PROVIDED UNDER THE ELEGTF!.ICAL SEc.TION OF TIHE 5PLc.lFICATION5. IT SHALL BE THE RESPONSIBILIT'I' OF TIHE IRRl6ATION CONTAACTOR TO COORDINATE ELEGTF!.IC.AL SERVIC.E l'IITIH THE 6LNERAL c.oNTRAGTOR AND SHALL MAKE THE FINAL CONNEc.TION FROM THE ELEGTF!.ICAL SOURCE TO THE C,ON"l"ROLLEk AND/OR BOOSTER PUMP. It>. CHEc.K VALVES SHALL 6E USED TO PREVENT ALL LOI'! HEAD DAAINA5L. l"I. THE FINAL IRRl5ATION AS-BUILT PLANS l'IILL BE REGUIRED TO 6E REVl&IED AND APPROVED 6'I' THE C.IT'I' AND FINAL MYLARS HLL BE REGIJIRED TO BE A~ AND Sl6NED 6'I' THE C.IT'I' PRIOR TO THE PLANNIN5 OEPARTLMENT 51c$NING THE PERMIT CARD. DRAWN PM ,1111 ~ CITY OF CARLSBAD ----------------------.----------;;~:--;::;-;:::--,;:;;---------r---r----.----------------.---,----,----.----1~ PLANNING DEPARTMENT "AS-BUILT" www.gmplandarch.com 9404 Genesee Avenue APPROVED -Suite 140 La Jolla 1ST SUBMITTAL 02-09-07 California 92037-1353 2ND SUBMITTAL 3-13-07 Tel 858 558 8977 3RD SUBMlTl'AL -4-30-07 TITLE, Fax 858 558 9188 4TH SUBMITTAL 7-02-07 LANDSCAPE HYLAR SUBMITI'AL 7-10-07 ARCHITECTURE JOB NO. 05-03B DA.TE 04-30-07 & PLANNING SCA.LE A.S SHOWN DAlE RECEIVED BY: INSPECTOR DA.lE GUEST BUILDER IRRIGATI□N SPECIFICATIONS se;r SIJILDER VIL.LASES OF LA COSTA "nE OAKS -5.415.5 Ll-12 l----+--+----------+----1---1---1-----11 APPRfJr..2(_ / er-t&tt...oit _PLANNING ,.,'3-0:::z I DATE DA 1E INillAL DA 1E INITIAL ENGINEER OF v«lRK REVISION DESCRIPTION OTHER APPROVAL DAlE INillAL CITY APPROVAL DWN BY: _.J.,_M __ CHKD BY: .,P:.o,M'--- RVWD BY: PROJECT NO. CT 05-16 I DRAWING NO. 446-6L ALL SLOPES S''-...,._----,,-,±,-¼-.,,,--t,\;=f-<,t- ANI:> UNDEFt FAGI N5 l"'UeLIG 1111.ALKS SHAJ..1.. ~Gl=IVE STR.,6J,',1 MAiTIN5 1"'1!:Ft E~SION GONmOI.. SHEETS 6"1" HUNSA~ ASSOCIATES (i'Y'P). JL 0 ,_ - ., ,,·!+-I ''LJ!tl 1~ .. -I jH, Iii I l ' I ' \ 'H r:I i l ;,(r ' ;, !/ 1.1,ifg,: lfrrJl_ ·H ./1 ti ~ --J ~it#-m.;;;::-H . l i l ' I I ' 1,-tic-JI /'1 I // (I ·..:t '! J,,/( ,, ~ _,1_'.I ,, '-~ '" I "": U! i I . -. ilf ' !:t : !Al'r-...c i1, I I ;· - l l K" ® n·-, ! 479.!:,; I APPROVED FOR PLANT'i, G AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTING AREAS. CA\.\ ,55 [1 __ ._J_~_o bCJ 49 [58 rt-J/1--' le I I, I ! ; rf; 1 !i) f !.' i ' i ii . ! IU r. --J..J n i ' --.j ' I vi C) ,I Lj. 06 !' J !: I . ' ,ir/i---ii1'iL' --~,-~:.-i., @ 70i·/ JI I bl ' /' ; ui----r k1 i J,q I 1 ,, i . !11 -.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 LANDSCAPE ARCHITECTURE & PLANNING I An1 ·/ I 70 1 • r 61 j 486.9 DRAWN APPROVED 1 ST SUBMI'ITAL 2ND SUBIDTI'AL 311D SUBMl'ITAL 4TH SUBMITTAL JR MK 02-09-07 3-13-07 4-30-07 7-02-07 KYLAR SUBMITTAL ?-10-07 JOS NO. 05-03B DATE 04-30-07 SCALE AS SHOWN ,-ppe. «r'I". !!"l"M. 14 0 <I() E9 10 0 220 25 51 IIU!l6 ciTY. SYM. 62 ◊ 14 0 131 @ ""' ® "' © 4' © 32' ® ,,, ® l60 © 263 ® It, e IOI e ARElllTll5 Ull:00 'MARINA' -STANDARD ~A PANIC..U.TA ~mo5 EXC,fl "ilJS Pllt/5 CANARIEN515 Pllt/5 c.,l,N.A,RIEN515 TIQ5TANIA CO!f'ERTA MAVE. AT11:MJATA 'lltNA' ARElllTll5 Ull:00 -H.l Tl 5Ta-t GEAIIOTIIJ5 '.U.IA F1£1.P5' Gl511.15 X l'LIV'IJlel5 IOO'OFIA WAR.IA MT'Of'OIQI PAGIFIGUM R05HAAJNJ5 'l1J5(;AN BLIE' SALVIA MIGROl'lffi.LA 'HOT LIPS' im:1«11.1'1 F1'IJTIGAN5 lo£5TRIN51A FRI/T1G05A GEAN011iJS ISRl!il.5 HORIZONl'Al.15 LANTANA HONTEVICEM515 'Sl'RfADIN6 5IM5ET' <i9MMC?N NAM!! 50!..DBRAIN TREE IIEl'I ZEALAND ~51MA5 TREE c;,t,NAAT' 151..AND PINE c;,t,NAAT' 151..AND PINE BLIE FOX TAIL NSAVE. 5~m!: HIIDLILAG ROGKR05E REDHOTFOt<;ER MT'~ 'TU5CAN BUE R05&IAAY' HOT LIPS SALVIA aeH~ WAST R05E1'fAAY C,MM:LWF4.1.i& 51'RflOIN6 9M!£r I.ANT~ 517"" 24' eox 24" eox 24• eox 24' eox "6' eox 24• eox 51%!! 56AL 56AL I 6AL 56AL I 6AL I 6AL SISAL 16AL 56AL 56AL 5 6AL 16AL MV.Sf? sr.ze -------------------------------'==--QTY. S"l"M. II~ 0 14K.!11111161A 11111915 ~~ I 6AL • 30" o.c,. I 6AL • 42' O.C. 124 212 ffi PEIH.:ETUM 51:TAaUM ~· @ 5TIPA ffltll561MA FOUNTAIN 6AA56 i'EXIGAN l'EA'TlER ~ ~;:;1 ~TIHL~ I 6AL, I&' o.c. Vltes 51%!! 2& rv-.ANo PAAll£HOGIS6LIS 'IRIGUSPIDATA BOSTON IVY 15 6AL., IOO!II •itd0Nf5 eo,vl1 zr---------------------:e.rir.m..--- dri'Y. iYM. NOTE, ALL 9Uft NfVe 9HAU.. I!! P'I..J,N'l!!P l'f1lf ~ l"MVH"OLIL!of MN!~· l'l!llt l"LAIITIN6 : ::no. ALL 51 t 1"1!5 lwl,l,LL llll!CeM! ~ MATTINS N, l'l!llt ST,'tc,......, I OI' Tit: «;nY OI' ,._,... 551\P l:!IIOSION c;oNl'RQL i'EA!!IJI ES. S'IMl!I MAT 5HALL BE USED IN l'I..IGE OI' COlll!R ~- ~ ~-., ~ MT'Of'OIQI l'AAVIFOUl.!'1 ,., '.,,-.,,..,-, ..... -..... . :::::::::: 'HARA.THON 111:1 1URF/50D .......•.• ......•.. HYERID FrSaE NOTE, L CONTM(;TOR 5IW.L CONT'Ac;T 'Ill! LNAC:,'1"1! .'IRGHl'!ET l'RIOlt TO WINIIN5 ~ l'IOIIC; 50 'l!IAT Tit:~ ~1?,c;T «;AN llleRl'I Tit: ~T IITILIT'I" LDGATION5 ,'tc, ~ l"LAN5 oliCGIA/INIIL'T' TO I'll.I. 'T' SGI 11!1!11 ALL IITILIT& l"RDM ViEl'I. 2. Mtf '1Rfl: HlfflN 1lE ~ G()RIER CL.fAR 2'ote 5HAll. BE !lf>' eox Hnl A HNli,u.f &' CL.fAR ec:.EEI FINISH l5R,tDE AND Tl£ 1Rfl: GNIOP'(. 3. Al.1 a I 5 .,· NlJ 111:lER l',i,c;&N6 l'IEILI«; l'IAUG SHALL ~ 5~ MATTIN& l'l!llt '°9ION ~ uC.5 d'f HJl!WC!!llt >!9Xl1'Tm. 4. ALL ~ 5HALL IIEl4AIN CUT511:1!: OI' 111! c:,1,1. TIW5 5l6lf1' DISTANIZ ~ 5. ALL 1M5 !IW.L I!! LDGA'l!D A HNIMA-I OI' 5' l"RDM l"AVINl5 NCI 1' l'ltOM Kl.9 NO 5D'l!R Ute.~ eHALL II! I.DGA'IBI A MINIM."4 OI' 10' l"RDM 5-neT LleHl'S. 5-neT '\NIS eHALL BE l"l..,tiGI![) TO ;,er «;IT'!" Cl' CM! eem ST1'!1!T Ttlll!!I! STANPNU,S. II SG.AL~, I" c: 501 60 "'10 ----------,",-A_S_B_U_IL_T"..,,....-------~---,--.,.....--------------.,.....---,--.,.....----.-----1 DATE TITLE: [jrJ CITY OF CARLSBAD f'LAl',t,jlNG DEPARTMENT GUEST BUILDER PLANTING PLAN 6/EST BIJILOER. VIL.LA6ES OFLA ~TA 'nE OAKS -5.4 / 5.5 LP-01 RECEIVED BY: t---+----+-----------+----+---+--+------1 I APPlf:e { C::r:-E:L,ft '1. l'i•D"1 . PLANNING DA TE ;:;D~WN~~B;:Y:== -_=_ =_ =_::;-;::::==P:;R:;O::.E;:C:;T:::=N:::::0.=:::::;1~D:;R::A=Wl::::N=G::=N~O. REVISION DESCRIPTION DA TE INITIAL DATE INITIAL INSPECTOR DATE 2~ :~\--C.T 05-16 _ 446-bL DA TE INITIAL ENGINEER OF WORK DlHER APPROVAL CITY APPROVAL 5EE NEIGHBORHOOD S.S -----._--...,1. IMPROVEMENT PLANS / I I • \ • ,? ll ,s?' ., .// (\~., {~ -..,.-s; ,, ' .. ' ' . . ✓ / / / ' rw._, c:i.;r /. '£~/I rxif:l I ,<'W/1 / /"'./ I :-., ,f I /1 ::;;;~...;:;;~.,..,.-:c:;:;::'OV'-!..:L=-1.::::e"---------------------=s,e:.1=m=---, dri'Y. S'T'M. ',, NOTE, ,l,IJ. lll.Dl'I! NeM eHALL 11: l'LNffl!P l'lml M'l'Ol'OIQII l"NMl"OLIUM MAH ~• l'l:R l'LAIITI~ ' C5111C'. ,l,IJ. SI. I C5 eHALL Wl!IV! 5TIIW'I MATT1N5 N, l'l:R &TNIPMD I Clf" M c;IT'I' Clf" c;MLSBto l!l'OSION ~ IE•.S~. S1'RAl'I MAT 5IIAI.L Ile ueet:I IN l'LAGe Cf'~ c:IIOI". ~ ...,_,_., ~ MY'OF'OR.IH PARVlrOLiLt'I ,.. •""""'" FLATS• I&' Ot:.. ••••••••• ......... ......... ......... ........... l'IAAA'lliON 111::· TIR','SOI:> H'r'BltlP FeGI.E 50D NOTE, I. ~~ 91+11L1. c.o!ITi'GT M ~ ~~T l"RIOlt TO Bf61NNIN5 I.ANPS(;Af'I:: ~ 50 THAT M l.,l,Nl;SG,Al'I:: ~T c;,t,N ~Cl'I M ~T ln'ILnY LOc;ATIONS NIP ie.'ISE P'LANS -""OIU)INISL'I' TO fl.I.I. 'I'~ ALL UTILml:5 l'ROM VICl't 2. ~ ~ HnHIN Tit: C""1.5BAI:) CORl£R CLfAR ZONES 5HALL BE 36' BOX 1'11TH A MINli'U'I ti GI.EAR E£IWfEN FINISH ~ AIO Tit: ~ CNIOP'('. ,. ,l,IJ. 5LOl'E5 5' NIP UNPER ~ACIN& f'l.el..lc; l'W.KS SHAU. ~IVE 5TIIW'I MATT1N6 l'l:R l!ROSION CON'l1'0I. SIC,: l5'l" KJN5Al<l!R A5&0CIA'll!S. 4. ,l,IJ. Ties SHAU. Rl!MAIM Olll'5IC'I: Cf' M c;ALmANS Sl&Kl' PISTANa: c;oMJ~ 5. ,l,IJ. ~ eHALL II: t.oCA'leP A MINIM.!-t Clf" 5' !'ROM l'AVIN6 NIP 1' !'ROM l'IA'l!R NIP 5De LIE. TteS 5HAL.1. 11: t.oCA"ll!P A MINIMUM Clf" IO' !'ROM 5~ Lletfl'!. 5~ TteS SHALL eE PVaD TO !eT c;IT'I' Clf" SC c:NII seto Sl"Al!l!T 'INi!: STANPAIIPS. ,----------------~ \.t-•I) AJ•t 1 AFFKOYED FOR. FLANfiNe1 /~ +o:'~~ AND IRRl5ATION ONLY, : i If lfi.,.,v,~. ~; INCLUDIN5 PRECISE LOCATION OF PLANTIN5 AREAS. / ,' "• //"'", ! ' 1,,\, 1'.l~ 1/ / / , • I 529.2 ·······-"-·· . !(_ 0 /~/ Cw• ~h ~ .:3 t.C) ---------.. -----, www.gmplandarch.com DRAWN JR 9404 Genesee Avenue APPROVED MM Suite 140 La Jolla 1ST SUBMITTAL 02-00-0? California 92037-1353 2ND SUBMITl'AL 3-13-0? Tel 858 558 8977 SBD SUBlOTTAL 4--30-07 Fax 858 558 9188 4TH SUBMITl'A.1. 7-02-07 LANDSCAPE MYl.&R SUBMITTAL 7-10-0? ARCHITECTURE JOB NO. o~-oae DATE 04-30-07 & PLANNING SCALE AS SHOWN ·~ TITLE! • /"f 1 / t , - 1 f< , i ~j. L, 7() C: -1 ' ' i,.,,' ' =~··'·· 68 ,;::-.._ ~ ,, / i -.....:: I ~ P, /'• '7 ·•.• ~ /l j ,._ ; JL.U.J ! { l~· ·, "/ -1"' ~ ! /" i -°;<~ i 73 . ,., J "· -,;{ ' 0 / ., ' '> ✓• '·, ,,,.-~ ' ALL SLOPES 6' ANI::I UNI:el f"ACIN6 FUBLIC J/IIALKS SHALL llteCEIVE STRAIIII MATTIN6 !"'ER ~SION CON""'°L SI IEE : S B'T' HUNSAKER ASSOCIATI!:S (T"!'P). l'"LANTI~ I ZIIL'NC) 14 0 ARlllJTIJS IJBl0 1'1M!NA' -5TAl'OARD 40 Et) ~A l'ANIGU.ATA 10 0 ~ fXCa.5115 :22 0 PIii.iS CAIIARlfNSIS PIIIJSCANARlfNSIS 25 (~' .__..,1 TRISTAIIA COlf"BUA . . 62 p /'6AVE ATTEIIJATA '111:NA' 1-4 0 N9ITIJ5 LIEllCI -Kl.Tl STEM 1,i ® CEANOTH!S 'J.I.IA PIEi.PS' '4'I ® CIS11J5 X f'\fflRl.lS 3& © KNIPOFIAWARIA 43 @ M\"Of"OIU,f PACIFIGUM ~ ® FIOSMAAIIIJS 'l1JSCAN BUE' ~ 0 !W.VIA HGROl'lffl..l.A 'HOT LIPS' l60 0 ~ ~ 26:5 ® IESTRIN61A l'RIT1G05A I& @ CEAN01lll5 EiRl5alS HORIZONTALIS /,.<' -~ .;A ,, IOI @) l.ANTANA MONIEIIIDENSIS 'SPRE>OIIIS Sltl5ET' "" «TY. . 11'1 © MM.!! b,A 11116fNS 124 EB PEltll5E11l'I 51:TAGEUM ~ 212 ® STIPA 1cNA56IMA ~;~;I c;MeX 'IIJMLIG(JIJ\ VINES 2& MANI PARTl£NOG,1SfiUS TRIGIJ5PIDATA 60LDENRAIN TREE Jo&l ZfALAN:) CI-RISTMAS TREE CNWtf 191.Alt:) PIii:: CNWtf 191.Alt:) PIii:: ~!!BAN:BOX BUE FOX TAIL "6AVE 1'11LP LILAC F10CKR05E RB)HOTl'Ol'B1. MY'Of'CIRIH 11J5GAN BUE ~ HOT LIPS !W.VIA BUSH~ COAST R05EHARY' GARte..uZ.LLILR 5PREAPlll5 5IM5ET LANTANA ~eRJel!, f'G11M'AIN 5RA5S 1-EXJCAN FEATIER !SAA$ BERKEI.E'!'SEOOE BOSTON IVT' 24'BOX 24'60X 24' BOX 2-4' BOX 36' BOX 2-4' BOX Sim 56AL 56AL I6AL 5 6AL 16AL 5 6AL 16AL 5 6AL 5 6AL 5 6AL I 6AL. II I 6AL. o ,O' Ot:.. I 6AL e -42' O.C. I 6AL. I 6AL, I&' Ot:.. SI%!: 15 6AL., IOO!II "AS~-B;:::U~IL:-,;T,;;-,------,-----.----,---D ________ =_~--.-•-l"_=~=-'_•~0---~-o_J~I ;;:;;;s~l;;;;;.C;;I;;:T:::';r~LA:;~:;;1;;rG~£~pf;;RR;::T~=kr=S=B=A=D=-.':l==2=I GUEST BUILDER PLANTING PLAN S,ff,T BUILDER LP-02 DATE VILLA6ES OF LA COSTA TIE OAKS -!J.4 / !J.5 RECEIVED BY: INSPECTOR DATE l---+----t------------l--.J.----1-----l.--1 I APP:t:&(¢:r. M..o::t± 7-1'[-O'J . PLANNING DATE ;:;D;;:WN;;;;:::;B~Y=: ~==-~=-= _:::;--;:::::==P=R=o=J=Ec=T=N=o=. =:::;-;=D=R=Aw=1N=G=N=o:::::_ ~~g :~:--GT 05-16 446-6L DATE INITIAL ENGINEER OF Y«>RK REVISION DESCRIPTION DATE INITIAL DATE INlllAL OTHER APPROVAL CITY APPROVAL IDLANTIN6LmeNJ, 14 0 40 E9 10 0 22 0 ~A PANICII.ATA ~IDEROS EXGEL!iUS Pll'U5 GANARIEN5!5 Pll'U5 GANARIEN5!5 25 ,-:;) 1'tl5TANIA cotf'E!i.TA 62 14 1,1 """ :;lb 43 32' ,,, l60 263 I& ◊ MAVE ATTENJATA 'WNA' 0 AABIITU5 IN:DO -H.L Tl STEM ® CEANOnll5 'JJLIA Plfi.PS' ® Gl51U5 X f'IJRPl.!l:B.l5 © KNIPOFIA WARIA @ MY'OPORIN PAGIFICIN ® R05MARINJ5 'llJ5CAH EUE' ® SAL VIA-MICROPHYL.L.A \IOT UPS' © Ttl.lCHRIJM FRI/TIGANS @ IESTRIN51A FRI/TIG05A e CEANOnll5 ISRISB.15 HORIZONTALIS IOI @) LANTANA MONT1:VlOEN515 'SFRE,t,DIN5 ~ s ( '. :7 . L- /'~· ·z, Q ,;/,I JJU. '··-···••s.~•·-.. ---~--\ 1 I c:.oMMON NAM!! SI%!! 24' BOX 60l.DEtRAIN TRfl: 24' BOX tel ZEAL.AN:) GIR51HA5 TRfl: 24' BOX CMWI:( ISl.AND Pli'E: CMWI:( ISl.AND Pli'E: BRISB,l,NEBOX BUE FOX TAIL MAVE S~'lffi lotU, LILAC; ROCl<R05E REDHOTPOl<ER MY'Ol"(Rl,f T1J5(;AN BUE FIOSEMARY HOT LIPS SAL VIA EIJSH ~ COAST R05EHAAI' 51'READIN5 SUH5ET LANTANA 24' BOX "6' BOX 24' BOX Ei12E 56AL 56AL I 6AL 56AL I 6AL I 6AL 56AL I 6AL 56AI. 5 6AI. 5 6AI. I 6AL .118CA.o APPROVED FOR PLANTING AND IRR15ATION ONLY, INCLUDIN5 PRECISE LOCATION OF PLANTING AREAS. Q -... ~Od.1' .. i CA\.\ t-~ V 1 8 r sJ-.7. 1 \ \ --¾. \ \ •,,;:/4 ,; /. ' I //> ~ /' /// ,-'\ 4. + ✓ <··~~/\' '\._ + + " ,. ,~--' "~~\~ ,I".><; ~ ~ + ~+ '.,~~--" i--s,/ ,J -'. t 'l ~f} ,,"':::::-'•t l' ~--,~---+--+ -E' 1 ~}/~ J'),. -~....,\ ' 1; + ,. < ~,5;,~J ✓~ ,, -1(._-+ -+ 1 : r?A:-,,r ,s;) }' \ ' --~ k.~··'¾1, .,_ , ~ Y ~ • !'k!~ , ~✓-.•v;.. k\ ~ .... , 'I" ,!,, -~ -~-v 1 '" I ')Q ·.,'( " ,.✓ • .! ' ' ·"·"'-. __ -1 l c_ ____ J A ~v i' -r'.' " ~, .... ; 11'1 124 21:2 Vltee @ K."-IIJ;IEL U.A Rl8!NI ffi l'EltllSfTUH SETAGB.M 'Cl.fRB.t,I' ® STIPA Tl::IU!:61MA CME)( 11M.LIC4.A OEER'5RASS FOIMrAtl 6AASS 1'£XICAN FEA 1l£R '5RAS5 BERl:a.c'T' 5ED6E 91%1! I 6AI. • 42" 0£,. 16AL I 6AL, I&' 0£,. SI%!! 2b MAM PARl1t:NOGl55U5 TRICUSPIDATA BOSTONt>lf 15 6AL. 100!!! SI%!! NOTt:, ALL a.Ill'! NeM etW!. !I! l'I.ANT!I) 1'1111 M'(~ l'ARVfl"OUUM MAN Glllll!K' 1'1111. PLAN1'INf 'CSll'IIC. ALL 91 l'1!! etW!. ~ S'IIIIAIII MATTIN& "6 1'1111. STNIDMD I f:11' M CM"I' f:11' CMI &ef\O l!lto.!ION ~ ~-5'IIIIAIII MAT 5IW.L el! USl!D IM !Va f:11' COlil!ll ~- ~ ~ M'l'OPOl'UI PARVIFOUUM MY'Ol"(Rl,f FLATS• I&' 0£, . ••••••••• •••••••••• •••••••••• 'MARAlHCN IE1 11JRf~ •••• •••••• lwlw'V Hl"BRIDFESGIE 500 ••••••••• NOTE, I. ~TClt SHALL ~AC.TM~ ~T 1"1'10. TO £!f6llilllN& ~ 1'11:iRK $0 lH,I\T Tie~ .wHtlCCT CAN~ Tie ~T IITIL11Y LOCATIONS ND e.'ISE 1'1.ANS ~INISL'I' TO P'IU'.' JG 8:11 !,LL IITILIT1e5 l'!IOM VJel!l 2. Ml'I' TREE IOIITl-flN Tl£, .... , 5B'D WRIER Cl.fAR ZOIE5 5HALL BE 56' eox !Olliff A MINli,,o,i &' CLEAR el i ►EN FINSH 6RADE ND Tl£ TREE CfioWJP'f. 9. ALL 51 t I e5 i,• AND IAClelt f'AGIN6 l'I.BLIC l'IAIJG SHALL IIICCl!IVI! S'IIIIAJII MATTIN& 1'!11. -0N ~ 51 CIS B'I" IU&til<l!ll ,•.eeoc:1ATl!!S. 4. ALL TRl!l!S SHALL lll!MAIN Q/TSIClE OF TIE CALTRANS SISIIT PISTANGE COMIIXIR. 5. ALL 'l1'IEE5 SHALL BE LOCATED A MINIM.M OF 5' f'IIIOM l'AVIN& AloD i' l'!IOM l'IATl!R AN, SEIIBl LINES. 'l1'IEE5 SHALL eE I.OCATB) A MINIMUM OF 10' !'ROM 51Rl!l!l' Ll6lff5. STN!ET Tllll5 SHALL BE f'l...laD TO i'EET CllY OF CARI SEIIIP 51Rl!l!l' Tia!! STAND~. II ecALm, =--, .. -= ec___;;;· 60 "lo ~1 CITY OF CARLSBAD IISH2EE2TSI ------------~ _________ ---------;;7-::::--;:~~.---------,----,---,-----------------,--~--"T"---,----I ~. PLAf\111 ING OCPARTI.ENT . ' "AS-BUILT" www.gmplandarch.com DRAWN JR 9404 Genesee Avenue APPROVED llll Suite 140 La Jolla 1ST SUBMITTAL 02-08-07 California 92037-1353 2ND SUBMITTAL 3-13-07 Tel 858 558 8977 3RD SUBl0'19l'AL 4-30-07 Fax 858 558 9188 -'TH SUBlll'ITAL 7-02-07 LANDSCAPE MYLAR SUBIO"lTAL 7-10-07 ARCHITECTURE JOB NO. Ofi-038 DATE 04-30-07 & PLANNING SCALE AS SHOWN DATE TITLE: RECEIVED BY: INSPECTOR DATE GUEST BUILDER PLANTING PLAN 61EST Si/IL.DER VILLASES OF LA COSTA THE OAKS -5.4 5.5 P-05 l----t--+-------------+---+--1----1-----11 APP~ 4r-i,ll~i\:: •·•1•0'7 r----r----;-----------------+---+---t---+---i ~-P~L~AN~N~IN:::G:::::==:;-;::=:::::~::::::::::::;:====;-;:::D::A:::TE=:=:::::::: DA TE INITIAL DA TE INITIAL DWN BY: ---PRO.ECT NO, I DRAWING NO. ~~ ~}--C.T 05-16 _ 446-bL DA TE INITIAL ENGINEER OF WRK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVl\l . I y_ It (.) ~ IL (.) 1--::r _J •• I 96 APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTING AREAS. s l)SC od u .. -:I ... • CA\.\ ~-SEE NEIGHBORHOOD 5.5 IMPROVEMENT FLANS I I I 88 I •--' 5L56. 7 I 536.9 r~ www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 LANDSCAPE ARCHITECTURE & PLANNING DRAWN APPROVED . ,./·:°~"""'-- " ~J!t ~ ,· I )>, I -I I (\ I I r z m U\ m m .. U\ r . m 1m 1--t ,r ! ---0 i I lo I Ul • j 51%1! ci'rr'. iYM. NOTE, ALL !iLCIPI! ,,,.,,,, !ilWJ. 1!11! l'VM!D 1'1'11! 1"l'Ol"aU4 l'MVll'Q.HJM MAH Gl'll!I(' l"9' ~ : mnr>. ALL SLOl'l!S !ilWJ. N!C:l!IVI! S'llW'I MATTIN6 /61"9' STNQIIIID I Of' M C,l1Y Of'~ se•o l!II06ION GOllntDI. K:l'S.lttS. SmN'I M.tiT SHH.I. £1! !RD IN !Va Of' c:ovnt '-"Df'. ~ ~-~ ~ MY'Of'ORl.t,I PAAVIFOLI~ ,., • .,,.-,,....,.., ••••••••• •••••••••• •:::::::::. ~TfiOIN Ill:' '11Jllf/!a:> HYBRIDFE5GIE SOD ....... .. . NOTE, I. ~TOIi! SIWJ. CClll'l'Ac.T nE J.Alll5GN'E AIIGHl115CT l'!IIIOIII TO EE&ltlllN5 lAND5C,APE l'ICRc: 50 'll!AT 111: LAN0SGN'E ARC,Htll5CT C,1111 REVIEN 111: !'ROBT UT1Ll1Y LOC,ATION5 ND~ l'LAN5 -'""RDINISI. 'I' TO Fl.l.L Y 5Gl&N ALL UT1LITIE5 F!IOM VIEl'I. 2. Mrf "TREE Hl'MN 111: CARl.5BAD CORNER CLEAR zote 5HAU. BE '6" BOX Hlll A MINIMJol &' CLEAR a:,.EBI Flll5H BRADE NC 111: "TREE C,NIOPf_ 3. ALL =I.I. I 5 .3' AIO IJtOSt l'I\C,IN6 FIB.IC w.u<S 5HAI.L ~'I!! S'llW'I MATTIN6 FER l!ROS!atl ~ SIL lb BY HNiAl<ER Ali&OGIA'l!b. 4. ALL TR!!S 5HAI.L Rl!MAIN OUTSIDe Of' M C.Al1111AN5 Sl611T DISTANc:e GOIIIRIDOR. 5. ALL TR!!S 5HAI.L EE LOC,AT!D A MlllloUo4 M" 5' ~ PAVIN5 NC "T' !'ROM MT!R MID 5!191. LIi&. TR!5 SHALL 1!11! LOC,AT!D A MINIIOI Of' 10' l'IIDM 5Tllt!!I' L16111'5. 5Tllt!!I' '1'111!!5 SHAU. 1!11! l'LAG!D TO~ C.11Y Of' C,,'lfll Sf\"1::! S'IN!!l!T '!Ill!! STANDARDS. JR n AS-BUil T" .... 1ST SUBMITTAL 02-011-07 DATE 2ND SUBIIITl'AL 3-13-07 3RD SUBllITTAL 4-30-07 TITLE: 4TH SUBMITTAL 7-02-07 RECEIVED BY: MYLAR SUJDO'ITAL 7-10-07 J'OB NO. 05-09B DATE INITIAL DATE 04-30-07 SCALE AS SHOWN INSPECTOR DATE ENGINEER Of WORK D KEY MA i-LANTIN6 ' ,ii, I BOTANIGAL NN C/GA ~!.!..L.EC ..,-,.__. --..!GOl!!:l= .. !!:ION.!!la!....!:!NAMl!C!!::!!!!o... __ ...,Sj!!l.e,lr--- Cin'Y . 14 0 E9 0 0 Mel/lU51.M:DO 1'1AAINA' -5TMDARD -40 IO 22 :25 (~' .....__,1 ~A PANla.1.ATA ~EXO'l'iilS l"1IIJ5 C,AAA,RIBISIS PIIIJ5 C,,t,NMIBISIS TRl5TAIIA GO!ftRl"A 5lll'UII 62 -$-161\Vf. ATTEIIJATA 'ICNA' 14 0 AAlll/lV5 IH:00 -MA. TI SlEH 131 @ C.EAN011115 '.IJLIA fie.PS' 3-4'1 @) Cl5TIJ5 X l'URl'\M.e 36 ® KIIIPOFIA WAAJA -4!5 32' 333 l60 @ MY'Of'OIU,t PACIFIGU-I @ ROSMARJNJ5 'TUSC,AN a.LE' €) SALVIA MIGROl'H'fl..LA \t7T LFS' 0 lBKJRIJM FRIJTICANS 263 @ ~TRINGIA FRIJTIC05A I& @ GEI.N01lll5 5Rl5Ell5 HCRIZDNTALIS IOI @) LANTANA MONTEVIDEN515 'SPREADIN6 ~• ,Slll,l,Sf 7 «TY. SYM . II'! 124 21:2 @ STIPA TEN/15511'111 VINES ~" ""A."'" PAD'T\FNt'Y.l~JC. 'TliPll"JJCiPlnATA •o eG.AL.I!!:, 111 = 901 DAlE INITIAi. DAlE "10 INITIAi. l50l.DEl«AIN 1REE lei ZEAI..ND G/«15™"51REE C,1'WII:( ISLAN7 PIN; C,1'WII:( ISLAN7 Pit£ BRJSBH£ BOX BL.LE FOX TAIL MAVf. HUD LILAC ROCKR.OSE REDHOTPOl<ER M'(Of'OIU,t TIJSCAl'I BLLE "°5EMAAY HOT LIPS SAL VIA aJSHEBMAlaR GOAST R05EMM'I" GARte..LJl<LLLR SPREADIN6 9M5ET l.ANTAAA ClEER~ FOLtlTAIN 6AAS6 HEXICJ,N Fl:Allf'R eR/\55 BERKa..EYSB:16£ Rne.Tt"&I I\H 24" BOX 24" BOX 24" BOX 24" BOX '6" BOX 24" BOX 5 '5AL 16"1. 5 6AI. 16"1. I '5AL 5 6AI. 16"1. 5 6AI. 5 '5AL 5 5AI. 16"1. SIZI! I 61\L o !lO' Ot:,. I 6AI. o 42" Ot:,. 161\L I 6Al., I&" Ot:,. 51%1! uill CITY OF CARLSBADIISHEE~I PLAI\III I NG DEPARTMENT 22 GUEST BUILDER PLANTING PLAN 61.EST BIJILOER P-04 VILLA6ES OF LA COSTA 11-E OAKS -5.4 5.5 I APP,S,~-I g::. E:J~-df PLANNING .,_ ,,.0"7 I DATE DWN BY: PROJECT NO. DRAWING NO. CHKD BY: REVISION DESCRIPTION DlHER APPROVAi. CITY APPROVAL RVWD BY: C,T 05-16 446-6L .~ ·.~ .. -. ~ ~ ~~~ 0~BALL @) e,~-1• ABOVE: FINISH~ @FINISH~ 0 FINISH eRADE AT SLOPE © 2 X ROOT 9ALL c:>IA. At-0 I X DEFT1-I @ 6ACK FILL MIX (SEE NOlc5) ...... MAXl,I G) FERTll.lZER (PER 5011.5 ~) @ SEE PAVINe DETAl!.5 @ TOP OF PAVIN6 @ 2" HIGH K",TERIN6 BASIN (IF leG'c:>) ® UNc:>ISl\JRSEc:> NATIVE SOil. @ STRAl'I MAT ~ION CONTROi. --7 0 CD 2" DIA. X 10' I.OD15iEF'Ol.E PINI= STAKE (2 REGl'c:>) ® RIGHT OF K",'r' © VIN'r'I... TREE TIE (2 REGl'c:>) 0 3'-0"MIN. ® SEE TREE F'I.ANTIN6 c:>ET All. @ 12"MIN. (vTREETRI..NK @ROOTBALL @&"MIN. @ f'REVAll.lNe HIND AXIS ® ~ TO ee !:!' l!IEHINc:> R.O.H. F'I.AN VIEH 1 ~ 0 2' ® PREPARED SOil. I!' ..---=m=~® PLANT TAeLET 6 0 FINISH 5Rt,c:>E ® l=GIJAl.(X)-eEI!: PLANT 5CfEDUU: FOR ON CENTER Sf'ACINe @ CONc;RETE MOH STRIP OR HARDSCAf'EIMF'FIO'IIEMENT A5 INDICATED ON PLAN G) CONCl'ETE CU"8 OR HARD!!CAl'I!! l~T AS INDICATED ON Pl.AN ® EGii 1,o,J.. 1/2(X) ,-J.ANTIN6 U!~ eoTANIC::.,S. NAMl!/C::.A I 1:9 Oft'f' /1:le!SC::.. 5~=-:-----------------------------CRT'I"'. tl'M, 14 0 40 EB 10 0 22 0 25 (~' '-/ e111111.ee c:IIT'I"'. S'T'M. 62 ◊ 14 © 131 ©> AAEllTU5 IH:00 'MARINA' -5TANDAAD KOEI.RaJTERIA PANIGUI.ATA METR.o51DEIWS EXGEL5U5 PIM.IS c.ANAAIENSl5 PIM.IS c;ANAAIENSl5 1Rl5TANIA c.oNFERTA />6AVE ATlcM)ATA 'NOIA' AAEllTU5 IH:00 -HA.Tl 5iEM c;EAN01HJS 'JJLIA F'1£1..1'5' N(;N NB'i ZEAL.AN:) c;HRIS1MA51REE c;NWt( ISLAIC PIN: c;NWt( ISLAN:) PIN: BR.156AI£ BOX BLUE FOX TAIL />6AVE 5TRAIW4<:ll'EE till.DLL>,c; 24' BOX 24'BOX 24'BOX 24"BOX :56' BOX 24' BOX SIZ!! A 5HRU6/T8EE PLANTING DETAIL NT5 6 TREE STAKING DETAIL NTS C, GROUNDC.OVER PLANTING DETAIL NTS ='4'I ® c;l511J5 X ~ ROCKR05E 56"1. 56"1. 16"1. SISAL 16"1. 16AL 56AL 16AL 56AL 56AL 56AL 16AL n -11 •------<@ II II II CD VINE: ATTACHED TO SURFACE HITH Cl.EAR EPOXY Vll'E TIES ® NJR~l!ll'i STAKES-TO BE FUaMOVED © EXISTIN6 SURFACE 0 CROll+l-1' ABOVE: FINISH '5!'tAc:>I: ® 4' Hlc!IH K",TERIN6 eASIN (IF REGIJIREc:>) @ PLANT TAel..e1'9 0) FINISH SR.~ @ 6ACl<:FILL MIX (SEE SPECS) @2~c:>IA. @ UIOISllJRBl;D NATIVE SOil. ® ROO'TBALL 1..-,!.~-~~-_,.l;::;,,2 MIN. 6' 6El.OH FINISHED FLOORe6L.c:>6. -- 1i'11 111~ 11 = I .... ·.· 11 "----I& 10 =111=111=111=111 TIT: D l @ l r ~ NOTE, VINES HM,IRSER'r' ESf'Al.lER STAKE TO BE MOVED AND ATTACHl!c:> TO ~ACE BY Cl.EAR EPOXY VINE TIES. VINE PLANTING DETAIL HTS 3 4. I i G) GONC,RETI; SIDI; HALK OR HARDSG,Af'E IMPROVEMENT AS INDIC.ATI=D ON PLAN @DEEPROOTl..624-2 ®SIJ66AADE 0 PLANTS PER PLAN ® CONGRETI; GURB OR HARD5c.Af'E l~T AS INDIC.ATI=D ON PLAN SUBMIT SAMPLE OF BIOBARRIER f;=-c::':=--:::::~::::;-:=-::::::;-';::;:;-::;::l:;-~~'--:=.:f.~ TO CITY c:::: = = = ~ ==i 2 INSPECTOR PLAN FOR APPROVAi. PRIOR TO if--+---< 4 IN5TA!.l.ATION ROOT BARRIER HTS APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTING AREAS. GRA55C-R.ETE PAVING DSC od CA\.\ I~ 2 11JRF l'llnt 1/2' TO 314' SOIL HAT 9 ~ PAV!He PER PLAN 4 6' l'IIDE GONC;RETI: Bi15E ti' DEEP- MC'!IOLITHIC, POIR 1'5NC:1 GLAS6 II B"'5E ROGK i"llnt ,or. ~SHMPS>H:)(HIX LNIF'ORK:( l'RIOR TO GOMl",C,TION/ 0srea. REIN'ORGINl5 PER MANF,C,TIR:RS ~TION5 0GOMP,C,Ta:1 5le-6AADE PER SOILS tal--URi 0~~PER l"Q~) 31'> © KNtl'0FIA W MIA RED HOT POKER 48 9 M'fOPOIU4 PACIFIQlo1 Ml'Ol'OIOI 323 ® R05MARINJS 'TU5GAN BLUE' 1IEGAN BLUE ROSEMARY ~ @ SALVIA~ 'HOT UPS' HOT LIPS SALVIA l60 0 lfUC.HRIUM mlrlc;AN5 EllSH 6ERMANDER 263 @ l"l:5TRIN51A FRl1T1C05A Wl6T ROSEMAR'f lb @ c.EANOTHJ5 6ftl!:B!S HORIZONTALIS GAR>EI..GAWLk IOI 0 I.ANTHIA HON1cVIDBl5l5 ~1115 51.NSEr' Sf'READIN5 5UN5ET LANTANA II.. @ ~IA 1U6ENS DEER 6/W!li!, I 6AL • 30' O.C,. I !SAL e 42' O.C.. 16AL 124 (B f'ENNl5EIIH SETAC,BJM 'aJFRB.tol' 212 @ 5TIPA raus61MA 1'E)(lc;AJ,I ffATI-ER EiAA55 ~ ; : ; I CMEX 1LMA.I~ BERl<El.E'( 5fD6E I 6AL, I&" OC.. VINl!s lalZ!! 26 ""4NI PARnBIOc;1951.15 TRlaJ9PIDATA BOSTON IV'f 15 6AL., loo.II SIZ!! NOTE, ALL SI.me ,11/V6 SHALL BE l"LAlffl!0 i'IITM M'fCIP'OIQt P'J«Vll"Ol.11.M MAH C~' 1"9' 1'1.AN1'1NI ; CS!IC. A1.L 51.0Pe!i SHALL ~ 5""""' MATTIN6 "6 l"l!lt STNDNPD I (If' TIil CITY' (If' t:MII eeAP ""°'510N CON1'IOI. I ~ L. STAAl'I MAT SHAU. El! IJ!il!Cl IN PLAG1! (If' co,"11, CIIIOI". ~ ~ M'fOPOIU4 PARVIFOL.IUM Ml'OPOIU'i FLATS e lb' OC.. •••••••••• ••••••••• ·::::::::: MARA 'THC)N. IIE' 1\WISO[) ll'r'BRIDFESa.E SOD .... ••.•.•·· NOTE, I. ~TOR SHALL cot/TACT Tie L.,l,ICISc;Al'I! ~T l'IIIOlt TO l!ll!6INffll& LNC5CAl'I! 1'1011( SO THAT TIE LANDSCAl'E ARGHl~T c;AN ~ TIE PRO.l!CT 1/Tll.lTY LO(".ATIONS ,i,,c, ~SE PLANS ~NISLY TO P\LL Y 9CP N ALL IITILITIIS l"l'OM Vll!K 2. ~ 1REE t'fflffN 11£ ~ 'iNO CoORIER av.R ZOIES SHALL BE 36' BOX Hnt A MINIMN &' av.R BETl,ft;N FINISH l5AAOE NCI 11£ mEE c;NIOPY. 3. AU. SI t I IS J' AND UNC8l P'ACIN6 l'la.lC l'IAIJ(S SHALL RCCe!V!! STAAl'I MATT1N6 ~ ~ COlfflllOL b1C,& r:ff ~ ,.eeOCIAT!S. 4. ALL '1'11115 5HALL ll91Alll OUT91DI! (1f' TIE CALTIWIS 516+1T PISTANt2 COMIDOR. 5. ALL TREES SHALL BE 1.0(",ATl!I) A MINIMJM OF 5' !'ROM PAVIN6 AND i• !'ROM 11'1,ti'!Bl N#Q 5E1 ER LIi&. TREES SHALL ef 1.0GATl!I) A Mlkff,U,;f (If' 10' !"ROM &Tl'e-r L.151f!'&. STlll!eT TieS SHALL 111! 1"LJIGl!D TO i,er c;ITT' Off ~ARI SB.,D STIIEET 'l1'!E STNCIMDS. ~ CITY OF CARLSBAD I SHEETS I -----------~ --------,--------::-:-::--=:-~:::---------,----,---,--------------.---~-~--~--I~ PLANNING DEPARTMENT 22 · "AS-BUILr www.gmplandarch.com DRAWN JR 9404 Genesee Avenue APPROVED llOI Suite 140 La Jolla 1ST SUBlOTTAL 02-09-07 California 92037-1353 2ND SUBIIITTAL 3-13-07 Tel 858 558 8977 3RD SUBMl'ITAL 4--80-07 Fax 858 558 9188 4TH SUBMITl'AL 7-02-07 LANDSCAPE llYLAR SUBlll'ITA.L 7-10-07 ARCHITECTURE JOB NO. 05-038 DATE 04-80-07 & PLANNING SCALE AS SHOWN DATE llllE: RECEIVED BY: INSPECTOR DATE GUEST BUILDER PLANTING LEGEND~ DETAILS 61.EST EJIJILOER LP-05 Vlt t A6ES OF LA COSTA THE OAKS -~.4 / ~.5 l----+--+----------+---+---.___---l------11 APP~".;i_/ l-J-E;)l,.:fr . PLANNING t-D;.;Ac.;TEc---j--;a;IN"'lll""AL-+---------------+-D-A-TE-+-IN_lll_AL-+-DA-TE-l-1-Nlll-AL--I DWN BY: --- l-----'-----1----'-----''--I CHKD BY: __ ENGINEER OF 'MJRK REVISION DESCRIPTION OlHER APPROVAL CllY APPROVAL RVWD BY: PROJECT NO. GT 05-16 , . ,,..o-z I DATE I DRAWING NO. 446-6L I PLANTING NOTE5: I. ALL ffl.!!eS JIIIITHIN A SP!i!Cl!!S SHALL HAVE! MATCHIN6 FORM. 2. ALL L.ANJ:>SGAl"EC> All!E:AS TO RECEIVE! AUTOMATEP IRi'l,l6ATION. S. ~ TO l"LANTIN6 5F'EGIFICATIONS l"OR SOIL l"Rl:F"ARATION, F'E!RTILIZATION, MULCHIN6, AND OTHe!ll. Ai::>C>ITIONAL l"L.ANTIN6 INPORMATION. 4. AU. l"LANT MATER I AL. SHAU. ee Al"'l"!ltOVE!C> i,y THE L.ANJ:>SGAl"E! AII\GHITE!C T F'i'tlOR TO INSTAL.L.ATION. 5. FINAL LOCATION OF AL.L. l"LANT MAi!:RIAL.S 51-!AL.L el! SUBJE!CT TO THE A~VAL. OF THE · • L.ANC>SC-Al"E! ~HITE!C T. 6. CONTRACTOFI. SHAL.L NOTIFY Ol'jNEf!l.'S AUTHOFl.1:Z:EC> ~TATIVI! @ HOURS F'i'tlOFI. -,_ TO COMMENCEMENT OF !NORK TO GOOFI.C>INATI! l"RO.J!!GT IN!Sl"!!GTION SCl-ll!l:)UL.!!$. SEE C>ETAILS AND Sl"ECIFICATIONS FOR STAKIN6 METHOC>, FL.ANT l"IT C>IMEN5I0NS AND eACKFILL l'<l!GlUIRE:MENTS. e. IF CONF'Lh~TS ARISE el!T~N Size OF A~ ANC> FL.ANS, CONTRACTO!I!. TO CONTACT L.ANC>SC-Al"E! ~HITECT FOR RESOL.IJTION. !"AIL.URE TO MAK!! SUGH CONFLICTS KNOi"4N TO THE LANC>SCAl"E! Al'.CHITE!CT l"IILL ~LT IN CONTRACTOR'S LIAelLITY TO RELOCATE THE MA TERIAL.S. "I. CONTRACTOFI. SHALL sueMIT PHOTOS OF AU.~ NOT AL.RE!AC>Y TAc!aee:t: 6Y L.ANDSCAl"E! ARCHITE!CT. l"HOTOS SHOUL.C> INCL.UC>!: A J"altSON FOR $CAL.I: f"U!llFOSES. AL.L. eox Tl'tEE!S 51-!AU. ee OF ®AL.IT'!' AS C>ETE!RMIN!!P eY THI! O~SGAFE ARGHITEGT. MATERIAL. l"OUNC> UNSIJITAal.E F'OFI. THE C>ESI.S.N OR Sl"ECIFICATION INTENT JIIIILL el! REJECTEC>. 10. IT IS THE CONTRAGTOFl.'S RE:Sl"ONSll:IILITY TO ~ISi-i FL.ANT MATeRIAL.S FREE OF l"!!STS OFI. FL.ANT PISl!!ASES. FRE-el!II.EC,TEP OFI. 'TA66e:t:' MATEl'.IAL. MUST !:IE INSFECTEC> l:N' THE CONTRAGTOI'. AMP CEf!I.TIFIEl:1 l"E!ST ANC> r:>ISEASE Fru!E. IT IS THE GONTRAGTOFl.'S 06Ll6ATION TO JIIIA~TY ALL FL.ANT MATERIAL.$ 1"E!)III; THE SFE!CIFIGATIONS. II. CONTRACTOR SHAU. 51: l'tES!"ONSIEILE! FOR MAKIN6 HIMSe!-1" l"AMILIA!lt l'llTH AU. ~~NP UTILITIES, Fll"E!LINe AND S"l'RUCTIJRES. CONTRACTOFI. SHAU. TAKE SOL.I! ~SFONSl5ILITY l"O!lt ANY GOST INCIJ1lffiEr:> C>IJ!: TO r:>AMA6E! OF SAIC> IJTILITl!!S. 12. CONTRACTOR SHAL.L. NOT JIIIILLF'ULLY ~ JIIIITH CONSTJIWC.TION AS r:>E!Sl6NEI:> l'+fEN IT IS oevIous THAT \JNKNOl'jN oes-muc.TIONS ANr:>/OR 611tAPE Pl~ES E!XIST THAT MAY NOT !-!AV!: eeeN KNOl'lN r;>IJRIN6 r:>1Sl6N. SUGH CONDITIONS SHAU. ee IMMEl:IIATE!LY 6!ltOU6HT TO THE ATTENTION OF THE L.ANC>SGAFE ARCHITEGT. THE! CONTRACTO!lt SHALL ASSUME F'\JLL RESl"ONSl61LITY l"Ol'I. ALL Nec.E!SSARY RE!VISIONS PUE TO l"AI~ TO 61VE! SUGH NOTIFICATION. IS. CONTRACTOR SHAU. 151:1 RESl"ONSleLE! l"O!lt ANY COO!ltr:>INATION JIIIIT!-1 SUl:IGONTRACTO!ltS AS RE:GIUIREl:1 TO Ac.CoMFLISH l"L.ANTIN6 Ol"ERATIONS. 14. CONfflAGTOI'. TO !ltECEIVE SITE ~ TO +0.10. GONTRACTOR SHALL oeTAIN LETTE!lt OF 6RAr:>E CERTIFICATION F'!ltOM OJIIINER F'i'tlOR TO l"!ltO.J!!GT E:aXEG\JTION. 15. FL.ANT MATERIAL. GIUANTITIE:;S ARE 61V!:N l"OR GONVE!NIENCE ONLY. FL.ANT SYMSOLS ANC> SFEGIFll!P 51"ACIN6 SHAU. TAKE:; l"RECEl:IE!NCfit CONTRAGTOR SHALL Yel'tlF'Y FL.ANT MATERIAL. ®ANTITIES l"'lim l"LAN. 16. A MINIMUM OF S" OF OR6ANIC MULCH SHAU. el! APr:>EC> IN NON-'TIJRF l"L.ANTIN6 AREAS l'llTH SLOl"ES LESS STEEi" THAN Sd TO COVE!lt THE SOIL S\J!ltFACE COMl"LETELY. l"I. TREE!S l"LANTEP JIIIITHIN 5' OF P\JeLIC Slr:>EJIIIALKS SHAL.L. !:IE INST_.,I I e, JIIIITH ROOT 6AR1'1,IERS Al"l"l'lOVE!r;> l:N' THE CITY. 5PECIFICATION5 FOR HYDROSEEDING I. I-IY'D~IN6 MIXTlJ1i<ES ANP RATES OF Al"PLICATION I-IY'D!ltOSEEC> MIX "A' AL. YSS\JM 'CARl"ET OF' 5N01"1' .S.AZANIA Rl.s.ENS 'l"IESTA Re,' ALYSS\JM 'ROYAL CAi'l.l'"ET' I-IY'D!ltOSEEC> MIX "6" ~HOL:z:IA CALll"ORNICA L.IJl"IN\JS A~ MIM\JL\JS l'"UNICE\JS POUNDS/Ac.RE 5 10 5 POUNDS/ACRE $ e, 5 MINIMUM% f"Lll=1.ITY /GERM. ",t,/e,o ",0/60 ",2,/f!;O MINIMUM SIS f"Lll=1.ITY /<SERM. qe,;e,o "10/60 qe,;e,o (ALL SEED AVAILAeLE THROUGH 1-!YDROPL.ANT, ATTN, ROe MC<SANN "160-144-1360 II. HYDROSEEDING SUSPENSION OR SLURRY COMPOSITION SREl:N JIIIOOD MULCH FERTILIZER (16-16-16) AZ-TAC BINDER ~ SULFATE OR IRON CHELATE Ill. Al"PLIG-ATION F!ltoe~S ANC> E®ll"MENT 2,2$0.0 L6/AC.. 400.0 Le/Ac.. 1$0.0 Le/AC,. :2.e, GALS/Ac.. A. eGIUIFMENT -HYC>RAULIC E®ll"M!!!NT \JSEC> FOR THE Al"PLICATION Of" TI-e l"E!!ltTILIZER, sec, ANP SJ.IJRRY OI" FREFARE!c> 1"IOOC> l"ULI" SHAU. eE OF THE "SIJl=etll. H'T'r:>RO-SEEr:>El'I."" TYFe AS APl"JII.OVE!C> BY Tl-e CITY OF CAl'I.LseAC> L.ANC>SG-Al"E! INSF'Ec.TOR. THIS l!®IFMENT SHAU. HAVE A eLJILT-IN A6ITATION SYSraM ANP Ol"ElltATIN.s. CAPACITY SUl"FIGIENT TO A61TATe, S\JSl"E!NC>, ANC> HOM06ENl!O\JSLY MIX A SLURRY CONTAININ$ NOT LESS THAN 40# OF l"IS!!l'I. MIJLCH l"L\JS A GOMBINEC> TOTAL OF' "I# FEf!I.TILIZl!!R SOLIDS FOR eAGH 100 &AL.LONS OF JIIIATEl'I.. THE SL.IJ!ltRY Pl5fflll!lUTION LINE$ SHALL eE L.AR61:1 ENOU6H TO l"'RE:Vl!NT STOl"l"A&e! ANP SHAU. el! EGIUIFFEl:1 l'llTH A SET 01" HYPRAULIC ~'!" NOULES JIIIHICH l'llLL l"1'0Vle>e A CONTIN\JOIJS NON-l"LUGTI.IATIN6 r:>1$C!-IA!lt6!!. THE SLURRY TANK SHALL HAVl!! A MINIMUM CAPACITY OF 1500 .S.ALLONS ANC> SHALL eE MO!h.TEP ON A TRAVELIN6 UNIT, EITHE!lt SE!LF-l"l!tOl"ELLEr:> 01'1. ~ BY A S!!fOAl'I.ATE UNIT, JIIIHICH JIIIILL l"I.ACE THE SL.IJRRY TANK SFRA'!" NOZZI ES ~ITHIN SUFl"IGIENT l"!ltOXIMITY TO THE AREAS TO eE SEEC>et:>. B. FREFAAATION -THE SJ.IJRRY FREFAl'lA.TION SHAU. TAKE PLAGe AT THE SITE OF' 1"IOll!.K ANP SHALL ee61N l:N' Ar:>C>IN6 l'lATER TO THE TANK J,ll!-IEN THE EN&INE IS AT HALF-THROTTLE. 1"11-!EN THE l'lATER LE!VE!L HAS ~ THE HEl.s.1-!T OF THE A61TATOR SHAFT, 600C, !lte-CIRCUL.ATION SHAU. BE ESTAeLISl-!Er;> ANP, AT THIS TIME, THI! ser;, SHALL ee APP!!t>. FE!ltTILl.zel'I.S SHALL THEN eE Ac,r,1!1,, l"OLL.OJ,lll!P BY JIIIOOC> F'\JLF MULG!-1. MULCH SHAL.L. ONLY eE Ai::>2'El:1 TO THE MIXTURE Al"TER THE see, ANP 1"11-!EN THE TANK IS AT L.EAST ONE-THl!lte> (113) FILL.EC> l'llTH JIIIATER. THE EN.s.lNE THROTTLE SHALL eE OFENEe> TO F'\JLL Sl"li:l\;I;) 1"11-!e!N THE TANK IS HALl"-FILLEC> JIIIIT!-1 JIIIATER ALL THE! 1"IOOC> l"\JLF MULCH SHALL ee ~ eY THE TIMe THE TANK IS TJIIIO-THIRClS (::Z/3) TO THRE!!!-l"OIJ!ltTHS (3/4) F'\JLL SF!ltAYIN.s. SHAL.L. COMMENGE IMMEl:IIATE!L y 1"11-!EN THE TANK IS F'\JLL. G. Al"FLICATION -THE! Ol"E!)lll;ATOR SHAU. Sl"AAY THE SL.OPES l'llTH A \JNIFORM, VISleLE! COAT BY \JSIN6 THE ~ COLOR OF THE l'lOOC> l"ULI" AS A 6UIC>e. THE! SLURJII.Y SHALL 61: Al"PLleC> IN A 5i'IEE!l"'IN.s. MOTION, IN AN ARCHEP STREAM SO AS TO FALL LIKE RAIN, AL.L.OJIIIIN.s. THE l'lOOC> i"le!!RS TO EIUILC> ON eAC!-1 OTHER UNTIL A ec,oc, COAT IS AG-HIEVEl:1, ANr:> THE MATERIAL IS 51"1'tEAi::> AT THE Rec.UIRl!C> RATI!: PeR ACRE. C>. AL.L. BA!IIE Sl"OTS SHALL ef! RCCEt'I .;e;, HITHIN NINETY ("10) e>AYS TO ne SATISFACTION 01" THE GITY OF CAl'I.LseAC> IN$!"1:C,TOR. . . e. F'i'tlOR TO THE ACCl!l"TANG-E OF' THE I-IY'D!ltOSEEC>l!P A~ eY THE GITY'S INSl"ECTOR, A GEf!I.TIFICATION REl"ORT MUST eE SUBMITTEC> 6Y A ~61STEREC> L.ANC>SG-AFE A~HITEGT, STATIN.s. THAT THE ~IN6 1"IAS CIONE AGCO!ltr:>I~ TO THE l"!ltO..Jec.T Sl"EGIFICATION AND THAT ITS 6ROl'lTH IS Ai::>eGIIJATeLY ESTAeLIS!-lee> TO FRE!VENT El'.o&ION. F. TI-E COVE!R CROI" (I.E. H.S. MIX "A" AND/OR H.S. MIX '6") SHAU. eE AFFLIEC> AT A !ltATE ANC> MANNER $Ui"i"ICIENT TO l"!ltOVIPE! "10% COVERA6E JIIIITHIN SO C>AYS. --------~ -------r------~=-=~::-:-------,---,----,------------,---.-----,--~--1~ CITU,i £p~~~N~BAD "AS-BUILT" APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTING Al<.EAS. ~1>SC4p ~oody :g .. -JI! .. -' :iii--.., -1< • www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 DRAWN JR APPROVED MM 1 ST StlBMl'ITAL 02-09-07 2ND SUBMITTAL 8-13-07 3RD SUBMITTAL 4-30-07 4TH SUBMITTAL 7-02-07 MYLAR StlBMI'ITAL 7-10-07 JOB NO. 05-03B DATE 04-30-07 SCALE AS SHOWN DAlE TITLE: RECEIVED BY: INSPECTOR DAJE AREA 3.4/3.5 -PLANTING N□TES 61/EST SI/II.DER VILJ..A6ES OF LA G:OSTA 71E OAKS -5.415.5 i-----t---;------------+--+------l--+---11 APP~fi ( Cf-~{. ;_,-ft- . PLANNING t-;-.DA..;:lE;=--J-;IN.,;lll;acA;;-L-t----------------t-:D-:cA==-+,1N=111:-:-A,-L +-~c-l----c----1 DWN BY: --- t---'"~--+-D_A_lE_._I_NI_TIA_L--f CHKD BY: __ _ ENGINEER OF WORK REVISION DESCRIPTION 01HER APPROVAL CITY APPROVAL RVWD BY: PROJECT NO. GT 05-16 1 ·\~-E>71 DATE . DRAWING NO. 446-6L \ / I ) ij l"'J.ANTIN6 AND MAI NTENANc:.E l.05COP'I! 1.01 Per,om, all plamlng and maimencmee "ork '"" indI=ted and ,opec.1,1ed, """'f'lete. 1.0.:Z 11,e Condltlone o, the Contraet and the 6eneral SpeGIPleatlone are a port oP tnl& Seetlon. 1.09 eoN"'!'RDJ.., 1he aeleetlon o, her-blelde&, appll=tlon rate&, and metl,oc,l,o are to be perPormed und•r th• eontrol and guldane• oP a state 0, C..IIPornla lle•need p••t eontrol advl-and applleator. 1.04 I.ASOl'tATOlll.'T' ANAL. 'T'SIS, 19rovlde laboratory •oil• analy.1• eonf'om,lng to th• ,0I10 .. 1ng, A. Teetlng to be perlom,•d i:,,t th• Soil and l"'lant J..al:>oratary, 41.:Z So. J..yon, Santa Ana, CA "l:Zil 1, (;14) ,,e e,999_ B. e..t,m;t the ,0110,.Ing &oil• earrplee to th• laboratory at th• eommeneement oP ..ork, I. Natrv. eolh Ten rep,....,,....tlve oample& oP native 5011 to be lanc:leeaped at loeatlonm""'n on plane l'llth thle eyml:>ol. l"erPom, t..o (.:z) Solle Te&te at •=l'I loeatlon. (one (I) at 9'"0Und level to 10" deep, and on• (I) at .:z4" -!!6" depl:l'IJ :z. Import eoll, one (I) repreeentatlve ll'"'"f'I• Por eael'I 100 elA!,ie ij<"'d• and/or aour-ca. C. ,.lac.. eael'I ...,,pl• In a sturc:l,t eontalnar, properly ldentlPled, l...,,.led, and d<::ited. Cl. Provide report oP reeulte to the Ol'lner, J..andecape Jl.rel'llteet, City inspeetor and e.enera I Contraetor. E. All teetlng ...-vie.es •licll I be paid ,or i:,,t the J..anc:lee~ eontraetor. .:Z.O 6ENERAL. CONCIITIONS .:Z.01 All ec.<1led dlm..,,.lone are "'F'f'r<>><lmote. Cheek and verlPy all alte dimensions and reeelv• O..ner'e repreeenta~lve'e approval prior to procoeedlng ,.;ti, .. ork under thle Secotion. .:Z.O.:Z Coordinate lnetallatlon oP al I plant material•, to avoid interPerenee .,;ti, other "'°""~tlon. .:Z.09 tc:eep the premlae• col-n and ,ree 0, exeeu ""'\ulpment, ffl<llWlale, .:,ind deklr-I• lncoldental to ..ork. .:Z.04 Proteet ..ork .:,ind ..ork 0, athera at all tlm-In perPorn,..,,..• 0, ,...,-k. .:Z.05 CarePully note all Plr,fet, gr....,. l:>ePor• c.ommenelng ..ork. ~•tor• Cll"!j Plnlah gradeel'la,ged dur-lrig eour-ee oP thla Nork to orlglr,ai or ln..Mled grade•. 9.0 ON-51"1'!! CBl:.C!<.'ATION 9.01 The Pollol'll"'3 alte vl•lte· •licll I lc>e made i:,,t O,,,r,er'• repr....,,tatlv•. The eo..tracot:orahall re"lue5t revl-In wltlng In advano::e oP the time •lte vl•lt la re"lulred. Adv.:,in,:;e notlf'ICOQtlon Par the belo .. 5lte Vl5lb &hc:111 be req,ired Q6 Pollo,.., A. i-re-Jok:> coon,erencoe, ; dc,ya, City lnapecotor to attend aleo B. P'lncil gr<:lde rev,_, 4e hourtt c. l"'lant materfQI rev,_, 4e hour& Cl. Plant lc,yout revle,., -46 hour-5 E. Soil preparation .:,ind planting operatlon6 (one (I) tree Nll:l'I eaeh type o, apecolPled •taking 111ic!II be Qpproved prior to plQni;lng tr-•J, -46 hour& I". l"'re-r'IIQlr,i;enc,ncoe, i dQ!je &. l"lnQI Q,o,:;eptancoe, i dc:lp 9.0::Z i, Co..traetor r""'\u••ta Q alte vlalt .:1nd the •It• I• not. Pound to m In an Q~I• coondltlon to hold the revl-, the hourly P-• oP the pere-onnel COQlled Par the &lte v"'lt et,QII be p<:!ld i:,,t the c;.,,,t, ac:.tor Qnd eliclll lc>e deducoted Prom hie contrac:.t prlcoe. 9.09 No 6lte vl&lta ei,c,11 eommeno::e ,..;t,t,out QII It.me noted In prev...,. ok:>eervQtlon report. either coompleted or remedied uni-• euch coompliancoe haa men """'lved i:,,t the ONner. Site Vl&lte tliclt are 6COl'leduled, k:,ul; the Cont;rc:,c.tor h""6 Palled to QCOC.On'pl"'h punel'lliet taek5 or pr~• ade""'tely Por dHirad lnapeGtlon6, shall maic. the Contrc:,c.tor reepone-ibl• Par relml>ur'elng the ~ Ar-el'lite<Ot at hie courrent hourly k:>llllng rQte plus traneportation co06te. No Purther lnapecotlone-shal I m!!IGh•duleduntll thl5 el'larg• h""" men paid Qnd reeerv.d i:,,t ~ Ar-el'llteet. 4.0 MATE:RIAJ..S 4.01 5l!Nl!RAJ.., Provide maWfQla oP k:>eat qJallty obt:alnc,ble, ..nlel'I =mply •trlcotly ,..,ti, dr<:!Nlnge, and apecolPl=tlone. 4.0.:Z STATl!!~T'S OP" CONl"lfltMATION, 5ulomlt at time oP delivery lnv<>lee atatementa o::ertlPylng "\Uantltlee i:,,t k:>ulk. ond/or ,..,gt,t, ,or all organlco <:1mendmenl;,o ar,d ,ert1llzere,. e..t,mJt .uppliera' ....-t1P1=tee oP eompll.:1nee .. 1th theae apeco1P1coatlone. ~m 6afflPI-may be tc:ikan i:,,t O..,.,.r'a repr••entatlv• Par analy•I•. 4.0S-ORS-ANIC AMeNCIMENT, Clerlved Prom "'°od or k:>c:rk., granular In ncofaur-e, atak:>IIU:ed l'lith nltrog•n and PortlPled l'lith mineral", and having the Pollo,.lng prc,pertle&, A. Organlco content;, Minimum "!Clli i:,,t ... ,ght. B. l"rilcol• Size, Minimum "1551> p<:!Hlng 4 me&h Kr-n Minimum eo'6 P"""l"9 ~ me6l'I au-een. c. Nltr<>gen eor,tent;, 0.9 k:>aud on dry ,..lght ,or r•dl~ood ea,..duat. O.illi l:>i:aeed on dl"\j ,..,gt,t ,or ,1r .........,.t. I.~ k:>=>■ ed on dl"\j ,..,gt,t Par Plr or pine k:>ar-k. NOT!, l"lrw •-dullt la not aecoeptak:>le. Cl. Mineralized, C.ISI total Iron. e. ea11n1ty, Ma><lmum coonducot1v1ty 9.5 mm/em at .:z, degr ... c. 4.04 l"l!!RTIJ..IZi,. AMC> ► .. ,C l~5, A. l"errlco eulPate, 1"•2 (504) 9 mlnlnvn :zolli l"e, aa metallle. B. e9y:>eum, C..lcolum 5ur,Qte, CA S04 H.:zO, .:ZClli CA 16!11 c.oml:>lned ..ulPur. C. Soll ..ulPur-, Mlnll'nlm "15!11 elemental eulPur. Cl. Commercolal l"ertlllzer, AmmonlUm &UIPQte :Zl-0-0 Ammonium r,Jtrate 94-0-0Ammonlum ph<l,ophclte 16-20-0 6-::ZO-.:ZO S..t Co., or ""'\llal, ,or ""'II p, eparatlon I.:Z-12-I.:Z S...t CG., or ""'\Ual, Par e-oll preparation 16-6--6 "9et Co., or •Clual, Par malnl:enancoe e. Agr1'orm .:zo-I0-s (:ZI ~am) planting tak:>lete. P'. 6n:>"-l"'""'er Plue, 5,9,1, 50lll humue, ~ .... 11 penetr-ant PH 4.5 -4.i. NOTE, Aei\JAJ.. AMli!NCIMENT5 TO !!c L>E,l!!liJc, .. e::> B'I" 5011.S IIU:i•OIII.T OBTAINl!:C) l"£llt s.ec:. TION 1.04 .-.eoYe. 4.05 P'J..ANT MA~IAJ..5, Quantity Qnd &lze oP pl<:lnt& ""6 &tated on the Plana Qnd Plant L"'t. No root bound fflaterlala allo-d. P'lante llhall be Preeh and vlgoroue, oP l'IQl"fflal gro,.ti,, and Pr-oP dl&eQl!lea, -•de, t,a,,mPul lnaecota, or their Jnwt egge and larvae. A. Pl<:1nta ehall c.omply "'Ith C..11'ornla state Clep<:riment oP Agrlcoulture'e regulation Par nur&el"\j lnepecotlon•, rul.,., and ratlnge. All plant& aliclll have a normal 1'1c11,1t o, gro.,t,t, .:,ind aliclll m aound, _ ___ _ __ healthy, VigorGUtl, and Pree oP lnaeet w .. tatlone-, plant di••=-•-· 5Unec.<1Id5, ,,. •• h al:>r-co5lon6 oP 1:1'1• k:>c:rk., exe•••lv• aklraalo,,., or other ok:>jeeotlonak:>I• diePlgur-emem;e,. Tr-tnmka alicl II be el:urdy Qnd ,...11 hQrdenad. All plant& eliclll liclve norffl<lllly -II-developed k,r-Qncol'I •yet.em. Qnd vlgoroue and Plklrou• root ,oyateme. l"f,ere coonl:alner-gr-c,Nn plana =>re ,r-om eeveral eouro::e6, the roota .,, n<>t P-•r than tl'IG (.:Z) plant& oP e<:ICOh epec:.I" or variety ,rom eac:.l'I eouro::e 1'1111 m ln5pec:.ted. In e-the sc,mp le plant& are Pound to be dePecotlve, the J..anc:lecoape Arc.hit.cot r-•rv-the right to r•J•cot the entire lot or lot.. oP plant& repreeented i:,,t dePecotlve eampl ... 1he l..andl!leap• Arcohltecot le the aole Judge Q6 to aecoeptak:>lllty. A",j plant. rendered un..ultak:>le Por planting l:>ec.au5e a, 1:1'111!1 lnepec:.tlon 1'1111 m eoneldered ""6 eampl•• and NIii k:>e pr..vlded at 1:1'1• eontraetor'e e,cpenN. c. l"'l<:1nta .. 111 l:>e """'J•cot to revleN Por acoeeptancoe or reJecot:lon at placoe 0, gro .. th an/or c,n pro J•co• &lte Q; any time k:>ePore or during progr..,s 0, "ork., Por elze, variety, eondltlorl, latent deP•cota, and lnJur-le&. "-mGV• reJecoted plants ,rom &rte ,.,,mediately .:1nd replaee ,.,ti, acoeeptak:>le plant■. Cl. At ""' time llhcoll tree& or plQnt ffl<OIWIQIII m pruned, trimmed or topped prior to delivel"\j, any alternation .,, they ehap• k:>e eonducoted Gnly "'Ith the appr..va I of and In the preeencoe o, the J..andeeape. E. i-rotecot al I plant• l'rom damaging eun and il'llnd. CIQfflage ffl<llY l:>e """""• ,or reJeetl<ln even aPter Initial acoeeptancoe. I". Sul:>etlt:ute& are not pem,ltt:ed uni••• epeco1'l=lly approved In ...rltlng. 4.06 5el!!CI MIX£$, A. sem:,, ,.. ,opecolPled, delivered to the Jok:> elte, unmixed In separate .-led eonta1ner11. E:ael'I coontalner mu.t t>ecr l:l'le Ned euppller'• ,...,,.1,. lndleatlng the eonf:alner ... 1ght, -d type, wd purity, and gem,lnat:lon pereentagee. All eontalnare ehal I be lak:>eled <:1C0<0ordlng to 111:c:,te and Pederal ••ed 1 ....... 5ompl•• may l:>e t..::,ur, Par teat:lng to eneur• tflat: t:he wd epeco1Plcoatle>rl5 have k:>een met. 4.ci iUIV' ANP ~eece A. Hydr'aulle 5-dlng I. Seed, l"'r..,t,, col.an, n•"' c:.r-op eeed, preml,ced i:,,t eupplier. 'l'la,,...n'• J..and&eap•re- Mi,c P'e6<0ue Blend" -Ml>< c:idvenl:ure, muatard, and arid ,e...uea "'hleh Qr• IOO!II pure and liclve a germination rate oP "ISSli. :Z. l'bod coelluloee Plber, l"lre-t quality coo,rmerelal grade. !5. !:loll etak:>lllzer, l!!eology Control• M-elnder. Spread at a rate GP eo Im. Per <>n• (I) =re. 4. ~rtlll.zer, li-I!5-5 urea ,ormaldehyde Plre-t Cflallt&,i eommercolal 9""=>d• 5. Clellver to the Arcol'lltecot, Cla<Oller'• guaranl:eed eiatement oP c:.ompo•ltlon and percoent oP purlt&,i o, wd ml>< looj dealer. 4.0~ STAt<INIS AMC:> SU'T'INIS MA~IAJ..5, A. Tilll!!I!! e>TA!Cl!5· .:Z" dJQmeter >< 10' long, I (one) plecoe eound tr-tad pine and unlPom, elze, pointed at one end. 51,ak.a Ql!I detall•d. B. Tll!5, Ri,lol:er, VlrlJI 'Clncol'I-TI•' -manuPaeturad k:>y V.I.T. 4.0"! ~ ~I~, 510-SAIIIUl!lt 15 &al. Tr••• -tl'IG (.:z) ,.,ti, ,...,... (4) ranala re"luired .:z4" 15o>< tr... -tl'IG (::Z) "'Ith PIVe ~ panel& req,i,lr-ed !!6" i,o,. tr--tl'IG (.:Z) "'Ith eeven (i) p<:!nel• req,lrad -46" eo,c tree& Qnd larger -per manuPac:.turer'e r-ec:.ommendc:tlon6 4.10 MJJ..CH, A. Clouic,le Srlnd All Bork i:,,t Blue l'-11:>toon l..andaeQf>e SUppllea (;14) 699 9666, or approved eq,al. =ut>mlt 6Qfflf)I• to City lnepecotor Por appr..val prlo1" to Jolo r.lte del!very. B. Mulcoh depth to be at: i. ... t 9" unleu noted other.,,_ on Clral'llnga. !5.0 IN!>TAJ..J..ATION ~ 5.01 P'lle 5"'-At)IN&/$0I .. I FCI ""-ATION A. 6ENE!tAJ.., Clo not. ....nc 5011 Nhen the m<>latur-e eontenl: la ..., ~ that e,c..-lVe .,.,,,pc:,c.tl<ln Nill ococour-, r,or ,.+-, It I&"° dry t,t,Qt duat .. 111 Parm or that eloda "'Ill not k:>reak. readil\j. ""'Pf'ly ,..... i, neceeecry to provide lde<:II m<>ll!lture eontent Par tilling and planting. l"'erPorm Pine 9'""""'lng In IIUCOh a "'<IIJ aa to antlc:.ipc:tte the Plnll!ll'I gr<:lde aPter the Jrwtc:,llatlon oP 11011 coondltlonel"l!I. ltemove or radlatrlloute •xc "" &011 k:>efore ""F'f'llc:.aUon o, e-oll amendmertte. Mc!lnk,in al I PION lln••• drQlncige .,...,..,, and pattema ae """"" on the pr-eeiee ~adlng plan provided i:,,t the pr-o Jecot colVII engineer. B. Olotaln coert1'1coat1Gn ,r-om pr-ojeeot: colvil er,g,_ tliclt ,rnal ~ad-to 1/10 ,.,ot have men e&tal:oliahed prior to c.ommenelng land6"'aplng op«"atJona. ,.,...vlde Por ~Ion oP all -ndmenta, eet:tllng, atco. Be rellp"""ible Par ,.t,c,plng all planting ar--indicoQted on ClrQNinga. C. 1he rr,,,igatkm "Y"tem shall k:>e Pully "'f'•rationcil, r•v'-'•d, and "'F'f'rOYed i:,,t lanc:leco~ arehlt...t: .:,ind c:.lty inepeetor prior to pl.:1nt:ing. Cl. ltll"'l"'IN&, flllp aoil Ir, non1lope --1 .... than 4d In t..o (.:z) oppoalng d1recot;.,,,.. to a minimum depth oP 6 lnc.1'1-to relieve compaction. I!!. P'INl5H, &r<:lde all pl.,nt;1ng --to allc,,. Por aoll amendment& and mulcoh ""6 apecolPled. l't!ere no grQdea <:1re ,ot,..,.r,, grade be-•><"'ting or Pl,ced coontrola (euch -.... ii..., coun,a, eateh l:>caine) .:1nd elevatlon1t 11r,cmn to provide a am<>otl'I and emlnual pl-.. ~ <:Ind level Q5 neeeeeQl"\j to obt:ain true and ev.,, eurlaee•. Maink,Jn all &Nale& on er,gIneer'a plan and gr<:lde to drain. I". "'°"'"'v• and dlepoa• oP roe.lea over 9--lncol'I diameter, c:.onetrvc:.tlon deklrle, Need&, etco. ,.,thin the llm"'6 oP the pra jeeot prior to applying 11011 c:mendmenta. 5.0.:Z 5011. l"llll!!l"'Al'-ATION A. 01LIANTITll!5, IJni,om,ly "'F'f'IY to •=h l,OOC ll<:fl"II"• Peet oP plQntlng area, NOTI!!, 11t!! P"OJ..I.Ol'jJNe, AMENCIMll!NT'S AIU! l"O"-SICICIIN& P'.JIV'OSES ONJ.. 'T'. ACi\JAJ.. Cllll-"'NTITIC5 ANC1 Ml~ 5HAJ..J.. Be t>E I e,c,.,JINeCI IN AC-c:O"-CIANee i'IITH 5011.$ FCI Ol'-T OBTAI~ !"!!It ITl!!M 1.04 .-.eave. Nltt-ogen-atct,lllzed or':l"""lco amendment, 6 C'T' Ammonium pt,o&pt,ate 6/20/20, 1!5 J..e ""Tlwltural VS'-,,, 100 J..B Soll eulfur: .:ZO J..e 6n, "'-1"'11111, 160 J..e Iron .ulPate, 6 ~ e. 1:1151""-IBUTION, Clll!ltril::>ute the organic:. c::wnendment and ,ert111.zer over the plQntlng are to Q unlPorm .:Z lncohea. !Oeeure approval Prom O.....,.,.'a repr-euntal:lve prior to ..orklng amendme11t. Appr..val "" I not m glV.,, IP thll!I pr-..-.:lunl '" nGt ueed. C. CUJ.. TIVATION, ~ Into aoll k:>y wltlVatl<ln, epcic:Ong or rot:otllllng to a depth oP at; i.a.t 6 lncohe&. l"lnl&h grad-to 9ffl<loth ,1n1et, bel""' adJaeenl; paving and wrk:>6. ~mGV• QII deklr-1& and •••••de Prom elte. Cl. BAC:.Kl"IJ..J.. MIX, 5toc:.kplle a llllfflc:.lent "luantlty oP "PP' .,..,ed e,oll Pound on 11lte, ,,__ oP .... c:1e and delc "'· ror mlldng ""6 loa<:k.!'111 materlala. SUpplen,ent on-alte eoll Nlth approved llllf'OI t .... 11, Q5 r""'\uir'ed. Ml>< amount; Par 10 coi.t>Ico yarc:le ,.. Poll.,..., 6 wk:>lc. ij<"'de on-&lte eoll 4 couk:>lc. ij<"'c:le or !Im"~ amendment .:zo pounc:le Perrlco &UIPate 20 pounc:le .:,in,monlum pho•pliclte lliO pound& '<Sr.,_,._,. P'IUII' 1/ee ure not to etc:,ln c:.oncorete ,..,th Perrle aur,ate. Cle.:1n1ng GP etalned eoncorete la reaponeblllty a, eontrac:.tor. 5.09-,cw ASA I El..:NT, Upon the c:.ompletlon oP 1:1'1• lrrlgatl<ln •y.tem and aPter QII e,cletlng l'leeda and gro"th liclve be.,, remGVed ,r-om the planting areQ, perlom, the Pollo,.lng-l'lead ak:>c:ttement pr"9'"am. l"later-all are,.. ,...,... (4) time. d<::illy Par t..enty-one (:ZIJ coon....ul.lve da,11!1 Qnd unl:JI -•d 5eec:le hav• 9-rmlncoted. C•co•• .....terlng Par tl'lr-(9) daye. Appl!:j a non-Nlecotlve herk:>lcolde ll"ound-l.lp) per manuPac:.turer'e recoommendc:ttlone to eradr=te the germinated ,._de. Alie,., her-1:>lelde to kill all -•c:le. l'alce or hoe oPP all dead .,.ec:1,t to a depth 0,? lnel'I l:>elo" 1:1'1• &urlaee c,P the 5011. IP peremlc:1I l'leede <>r gr-••"' 1otlll e,clet, .-. .... ter Pour (4) tlm" daily for Pour-teen (14) coe>neeeutlve da,11!1 until ne"' grol'lth appeara. ~ply a herk:>lcolde ,.,ti, a dye lndleator. "-m<>v• ..-de aPter her-1,Jcolde hae had au,PJc:.lent time t<> k.111. 5.04 l"'I-ANTIN6 A. l"ltEl"J.ANT A~AJ..5, Obtain approval <>P plQnt le>eatlone, planl:lng hol••• pre-ml,ced k:>aek.PIII, and plante. I. -n-... and &iTuloll •liclll nGt be pl<:1nted 1.11'11:II c:.onal:r-uetlon "ork In the area l'l<:11!1 men eompleted, Plncil gradeo, and 61'1al•• eetak:>liehed, -•d """'"1:ement pr..vlded, and the planting .:1reae properl!:j ~aded and prep.:1red. .:z. Stake plant Toeatlone or plaee ""F'F'roved "luantlt:lea 0, plante In coontalnel"l!I on locoatlone. Elecour-• approvQI b.Pore e,ccoavatlng pita, making rwcoeeeal"\j ad.JU11!:ment11 aa dlreeted. B. 5HRUBt i kl5a r'L..ANTI~, I. l!!><eavate pita l'llth 6"'ari,1ed vertleal •Ide• Qnd t:>ott:om, no 9'ffl<Olller l:l'lan the PGIIOl'llng elze&,Cilllc:lntlty, a) I gall<>n pla..ta -&" d•ep, l.:Z" In dlQffleter. Clepth oP rc,oti,,:ill and t..o (.:z) .rmea Nlc:lth. k:>) 9 gallon plante -12" deep, 24" In dfQmeter. Clepth o, roo""""II and t..o (.:Z) tlme5 Nic:lth. c.) 15 gallon plante -I&" deep, 90" In dfQmeter. Clepth oP rootk:>all and tl'IG (.:Z) time• Nic:lth. d) Bo,ced tr ... -i,eptn oP root:k:>al I and tNo (.:z) time& ,..,dl:l'I. 2. No treee •liclll be planted "ltl'lln :Z' oP a paved 11urlacoe (I.e., eoncorete paving, ari>, "'all) uni-• epecoi,1eally lndlcoated on plan• and only .. 1th the apecolPled root k:>arrler. 9. Container pl<:lntl!I ehall l:>e 1:>aek,11 led l'llth Qfflended eoil per e-oll• report rec.ommendc:ttlone . 4. l"'rilally rePIII hole to a height that Nl'len Q plant le plaeed the ere>M 16 ellghtly above the Plnl&l'I grade. Lia• Prlak:>le unamended •oil ,or al I k:>o,ced tr-•• apeelf'led k:>acok.1'11I ml,c Par all ol:l'ler eontalnar plant& and tamp to coo.,,paet. 5. Clepoelt Sro-l"ol'ler planting tablN per manufaeturer'• recoornmendc:ttlone In plant pita. 6. l"orm &hallo"' k:>a&ln around edge oP r....tr:ic,11 i:,,t depr•••lng aoll 11ll9htly mle>l'I Plnlllhed ~ade. l"orm k:>aeln rime. t<eep k:>aeln l'lltl'lln outer •dg•• oP rootk:>all. i. lndlvfduQlly hand l'lc:tter eaeh plant to eaturate rootk:>al I and adJ<¥-enl: 5011 Immediately aPter plc:lntlng. &. Ad)l6t for ut:tl-t and gr<:lde areaa around plant& to Plr,leh gr....i.. and dlapoae oP •><o::eH &011. "I. ln11tall "~ 6uarde" on all tr••• In l:url areae. 10. Remove nur-eery •take• <:1nd guy or at..::iu tr-• d-lgnated "Ith •take or •~e on l'linc::INQrd •Ide oP tr•• ae detailed. c. l!:Sl"AJ..let PJ..ANTINIS,, ~v• e&p<:!lier et..::iu 6Uf>POrt at time oP planting .. 1thout dam=>9• to plant <Olnd train e&p<:!ller to the adJac:.ent .... 11 or 6Uf'F'ort ... detailed. Cl. ~ INSTAJ..J..ATION, Plant ~oundco..vere In all dHi9"'"ted ar-• • I. Plant r-ooted eut:tinge, and divi11le>n• ,r-.,m flats lnl:o mol•t ec,11 and In neat, 1otralght re>"'6 Qt "'fN<'"led Interval•. .:Z. Smooth ec,11 ct>out plante and leave ar-In n-t and elean coondltlon. Retain •light clepreukm <round e<:ICOh pl<:1nt. Clo not ~ the corONn oP the plant. 9. Hand Nater ~oundeover pl<rie at leaet t..lcoe a l'leek., =rePul ly and lndlvlducllly .. 1th ele>N 50Pt etream 0, ..at.er, to .,,...,... that e-oll la ••t:tled <round root., k:>ut ming c:.arePul not to .....i, aoll oPP oP pl<:lnte. Not more th.:1n one-h=>IP hour el,cil I elapae Prom the t:Jme Cll"!j ~oundco..ver I• planted unl:11 It I• ....tered. P'orm Q lic!IP ""f'-llke arr.:1ngement Por al I plQnl;,o on •lopea. Clo not QII°"' plant& to dry m mPore ..nlle ming pl<:lnted. 4. Apply pr.emergent het'l,ielde SIJ!tl"J..AN-'15 per manuPaeturer'a rec.ommend<::itJC>na to groundeover" --only, aPter all planting f'lc,a been c.ompleted. l"GIIO"' manuPc:,c.tur-er'e lnatruetlona. 1he l'IOrlc. &hall m Lll'lder-1:1'1• direcotlon oP a regl•tered pe5t eontrol advieor. e. ~• et> ~ I. A,ter •oll pr-~atlon, -tal:oll.twnent 0, Plncil gr<:lde6 .:,ind .,.ed eontrol, the &ur-,ac:.e t..<> (.:z) lncohea oP eoll el,cill be l......,,.d by MrrON or r-otc,1:lller and Ploated level and Irrigated Jllllt prior to plant;rng. .:z. ,.,.ep<Olratl<ln, ,,.,. slurry preparatlGn et,QII t..::,g plaee at 1:1'1• elte .., .. .,ri. and &hall k:>egln k:>y adding .....ter to the tank ..nen l:l'le engine 111 at lic!IP-throttle. ll'hen the ..at.er level t,,.. reac:.l'led the height oP the agitator llhaPt:, good recolrwlatlon llhcoll k:>e eatak:>lll!lhed and at thle time the -d Qnd col'lemlec:1I additive llhcoll be added t=ertlll.zer el'lall then lc>e added Poll-.:1 i:,,t "°°d pulp mulel'I. The Nood pulp mulcol'I ehall only be added to the mixture aPter the tank I& at leaet one-third PIiied .. 11:1'1 ....ter. 1he engine throttle aliclll m opened to Pull apeed ll'lhen 1:1'1• tc:mk. "' l'IQIP-Pllled ,..;ti, ....ter. All the ~ pulp mulel'I el,cill m added k:>y the time l:l'le tank. 11!1 tl'IG-tnlrdl!I to tl'lree-Pourthl!I Pull. Spr'QYlng aliclll coommenee PIV• ~) mirllte11 aPter addition oP the coheml=I additive when the tank. le Pull. Applleatlon rate, P'iber 1,900 lk:>6. per .,..,.. Seed, ~o•ead ml>< 'A' IOlk:>e-/aere. 6re>..PONer l"'tue J,100 Iba. per-....re. <S-r-o-l"°"'er Controlled ~le..,.. (l.:z-e-e) .:ZOO lk:>a. per -.-e "Note, For aoll-pr-epped area•, apply 900 lk:>e . .sr.,_,._,. HI- Nltr<lg•n (14-4-"I) p•r =re In the alurr-y or,I~. NOTE: THE FOLLO-«; AIENDMENTS ARE FOR IIIDOIIG Plal'08ES ONLY. ACTUAL Al.l!WRTir QUANTITIES Alm .. XES SHALL BE DETERR ■ED IN ACCORDANCE WITH THE SOILS REPORT OBTAINED PER ITEM 5.02 AIIOVE. S. Appllcoatlon, The operator llhcoll apray the <>reQ l'llth '" unlPorm vlalble =at i:,,t 11111ng h ~-eolor oP the Nood pulp Ql!I a guide. 1he elurry aliclll m applied In a -aping motion, In an arcohed etra<Olm eo """ to Pall like rain, a110 .. 1ng the "'°od ,.,.,._ fflaterfQI to apread at the r9Clulred rQte per acore. I". J..Ai'IW5,V,S5 l"I.ANTIN6 I. Hycrc>•-d .__,,, lnatc:,llatlon a) After eoll preparation, -1:ak:>llehment oP Plncll 9'"adeo, and ,.._d control, the eurlaee t..o (.:z) I.....,_,. oP ...,11 llhcol I m looeened t,y h.:,irrc,,. or rototiller and floated level Qnd irrigated Jllllt prior to planting. I:>) 19repcrmlon, 1he &lur-ry preparation et,,.11 t..::iu plaee at the •lte oP l'lork <Olnd llhcoll 1:>eg1n i:,,t adding ..c:tter to the tank ""1en the engine le at lic!IP-throttle. i'lhen the ....ter level licla rec:,c.l'led th• height oP the agitator etiaPt:, good recolrwlatlon ei,c,11 l:>e -1:ak:>llllhed and at this time the .-d and cohemlec:1I additive shall be added l"ertillzer ..r,.,11 then l:>e '"dd•d Poll-.:1 i:,,t ~ pulp mulel'I. 1he ..ood pulp mulcoh shall c,r,ly be Qdded to the ml,cl:ure aPter the tank I• at 1 .... t one-third PIiied .,;t,t, ....ter. 1he engine throttle ehall m opened to Pull o,peed when the tank. "' lic!IP-Pilled "'"'" ....ter. All the ~ pulp mulcol'I ei,c,11 m added i:,,t the time the tank la t..o-thirdl!I to t:tr--Pourtha Pull. Spraying aliclll eommenee Plve ~) ml,..,tee aPter addition oP the col'lemlc:.al additive ,..1,en the tank 111 Pull. ""'Pf'lleatlon rQte, l"lk:>er 1,900 lk:>a. per acore Seed 49!5 lk:>e. per c:,c.re (I lb. per 100 e.P J <S-r-o-l"ONer Plue 1,100 lk:>6. per acore 6ro-Po,.._ Controlled ~leaee (l.:Z--6--6) .:ZOO lk:>6. per acore "Note, l"'or eoll-pr-epped are""6, app",j 900 lk:>a. Sr-o- l"'oNer HI-Nltr<>g•n (14 4 "I) per -· In 1:1'1• elurry only. co) Appllcoatlon, 11,e operator llhcoll &pr<llj the area Nll:l'I a unlPom, vi11ll:,le eoat i:,,t u.lng the ~•en eolor oP the l'IOOd pulp a5 a guide. 1he 5lurr-y eliclll m applied In Q -eplng m<>tlon, In an arc:hed atream ao Q6 to fal I like rain, allol'llng l:l'le "'""d Pn:o.r-.. materlQI to o,pre<:ld at th• r•"lulr-•d rate per acore. .:Z. ~TION, iarotecot all turf ar-• agaln5t dQmage, lneludlng .,._Ion .:1nd tr••paH. Provld• ,.1,atever fQcollltl•• .:,ind ..,Peguard• are necoeo11101"\j to acocoomplieh thle. Taic. o,pecolQI coare to prevent er09lon. All dQfflQgee 5hall l:>e the eontraetor'e reapon1tlk:>lllty during the IIP• oP 1:1'1• eontraet. 5. CSUAl'-ANT!!E AND lel"J..AeeMENT, I. 5hruk:>5 and ~oundeover, 6uarantee until end oP malntenancoe perle>d and aecoeptancoe. ~I=• any plante that die or lo-Pom, and alze a• or191ncilly apec.lf'led even though hy have tc:ikan root and are groNlng aPter the dleloocok or lou oP Porm or elze. 2. Tr_, 6u<:1rant-all tr.•• In writing to live In a h-ltny eondltion ,or one (I) year aPter ffl<Ollntencinco• period •,cplree and proJecot I• ae,:;epted k:>y O..ner. ~lac:.• dead or unhealthy tr••• Immediately. Cletem,lnatlon oP the .-d Por replacoement aliclll be per h O..ner'e repre,..,,tatlve. All replaeement., lncol"dlng planting, atak.lng. training, etco., el'lal I be Q5 originally apecor,1ed, l'llthout cooat to the O..ner. H.CJ..EANIJI"' I. After all planting op•rat1on11 are eomplete, remGVe all traah, e,ccoeu •oil, empty plant =nt<:llner•, and ruk:>k:>l•h Prom the property. ~air ,.,...,.,., rut., or other mc:rluo In th• ground coQueed i:,,t thl• ...,ri. .:,ind leave the ground In Q neat and orderly coonclltkm. .:Z. 1-eav• the o;lt• In klroom-colean coondltlon, and ,......, dGN'I all <:1reaa ,.,thin the pro jeeot 111te. J..aQve ..... ii... In co lean and •aPe coondltl<>n. 6.0 MAINTl!!NANCI!! A. The Contrac:.tor ehall cooni;lnuouely fflQlntaln lc:rld■<ap• and Irrigation In all area• Involved In thle Contracot during the pr-ogrH• oP the l'IOf'k. and dJrlng the malntencincoe period untll Pinal """""•pf:anco• o, the Nork i:,,t 1:1'1• I md•eap• Arel'llteco, and the C..ner. Improper malntenancoe or poulbl• po<>r "°""'ltlon oP <:lnY planting at the termination oP the •eheduled fflQlntenan<Oe period may ,:a1ee poatponement o, the Pinal coompletlon date oP the C<lnl:rCICOt. Malntenc,r,,:;e ■hall be =ntlnuec:I i:,,t h eontrac:.t:or until QII ""'rk 11!1 aee•P'ak:>le. In c>rdei to "'"""11 out the plc:lnt malntenancoe "'ork, the Cont:rac:.tor &hall Puml.n ..u,Pielent men and <:lde"luc:it• •CVJlp,nent to perPorm the ..ork during the ffl<lllnten<:lncoe period. MCllnter,or,C,• period llhcol I not •tart until al I element& "1' c:.onet:ruetlon, planting, and ll'T'lgc:ltl<ln ,or the entire pr<>jeeot are In c:,c.co<>rd<::incoe 1'111:h ClrQNing& Qnd SpeG1,1coatlona and aecoepted i:,,t th• 0-.r. The Gontraet aliclll reo;,-t an lnapeetlon to 1c>e91n the fflQlnte""1nCOe period aPter al I planting and related ..ork licl& ~ e<>mpleted. Prior to the d<::ite o, Pinal inepecotlon, the eontraetor llhcoll ~ulr• ,rom the J..c:indac:.ape Arcol'llt...t approved reproducolk:>te prlnte and Plncilly recoord ,r-om the Jot> r-=rd ut all c.t,c,ngea mQde during =na~tlon, 1...,,.1 ■aid pr-lr,te '~d 1:1ra .. 1nga," and deliver to the Land•cape Ar-c:.l'lltecot. 19r'lor to h date o,' Pinal lnapeetlon, the eontraetor &hall dellVer to the l-""""6c ape N'c:.hltecot the "J..andecoap• .:1nd lrrlgatlor, 6u<llrQntee" ae r9Clulrad. B. l"fwn the eo..tr....tor haa """'f'l•ted all the landl!leape Qnd lrrl~lon ....nc, he ehal I r•"lu"t Inapecotlon k:>y the O..ner Cllld Arel'lltecot. A 'puneh llet .. 111 be developed Prom thll!I lnapecotlon. Malntenancoe period ("10 d<llj&) .. 111 not k:>egln unl:11 all puneh l"'t Item& are """'f'l•te and c:,c.o::epted i:,,t 0-.r and Ar-cohlt...t. Irrigation ma1rite,..,.,.,• la incoluded In the above. I. Str-t gutter. and coun,a <:1re to be lncolua.d In the deb-"'/elltatlon removQI prc:,gr-c,rn. .:Z. r-blnt:ain ~uate proteetlon Por people QM pr-ope, ty and l:>e Plrl<:rlcolall~ ~•ap<>I •Ible Par dQffl=>9•• and lnJUrle&. ~air clcr-=-g•• at ""' addltlonc:II cooat to the o..ner. C. l"J..ANTIN6 A~, I. l'lleed and coultlvQte all -•-at Inter-vale oP nGt more than ten (lo) do,11!1. :Z. l"'erPorm ..at.ring, fertilizing. 6pr-<lljlng, and pHt eontrol ""6 deemed necoe6....-Y i:,,t apeelf'le alte c:.ondltiona . ~-~,NL~= I. Begin malntenclncoe lmmedl<:ltely aPter e<:ICOl'I portion o, turP 11!1 planted. eont;,..,. Por at ,_t "10 day& aPter =mpletlon 0, all turl "'ork and ae mucoh longer, prior to eompletlon oP proJecot, <:Ind """""•pf:ancoe i:,,t the O,,,.,er Q6 n-.......-y to -tablle,t, CICO,:;eptak:>le turf. :Z. Mc!lnt:ain I'""'"• to ..c:ttering, Perl:111z1n9, -.:ting, m<>,.lng, trimming, and other operatle>"6 sud, ae r<>lllng, regr'Qdlng, and repl.:1nting Ql!I req,lred to -tal:>li&h a smooth, ~I• I'""'" Pr-oP eroded or k:>are areaa. C<>mplete Plret c:.utt1n9 ae dlrecoted i:,,t ~ Arcol'lltecot. S. lnap•cot la"'n or-k:>et..een the 15th and .:zoth d<lljl!I o, "''"Int•"""""'• period and reapply I'""'" materlal(matel'I lnlt:Jal ""F'f'll=t:lon) to all k:>are --larger l:l'lan 6" >< 6". I!!. l"IIIIJNIN6, I. Under no c.lr"um•tancoea .. 11 I •tripping oP lo-....__ on ~o..,g -.a i:,. permitted. J..oNer l:orancohe6 &hall lc>e retained In a "tlpped-i,aek" or plncohed coondltlon "'Ith ""6 mucoh Polic,ge aa poaall:>le to pr-omot. =liper trunk. gro"'th (tape~ed trunk..) J..oNer k,r-Qn,:.h" ma~ be cout Plueh .. Ith the trunk only dter the ~ 16 <:lk:>le to •tand erecot: ,.,ttiout atc:ik.lng or other .upport. .:Z. l!vergreen tr ... 11hall be thinned and ~h=p•d ..hen necoe""""1:I to prevent "Ind and ato,,., d.....,ge. 1he prlm<:11"\j pruning oP decolduoue ~• •half be done during the dormant eeaaon. C'Qffl 051•d tr-or thoae that =natltute health or &Qf'ety hazard& elicll I m pruned at Cll"!j time oP the ~ -r9Clulrad. P'. 5TAt<IN6 ANCI SU'T'IN6, etakeil and 9¥ ei,c,11 be lnapecoted to prevent 91rdllng oP l:runka or~ and to pr-event r. lol:1,.g that cooue ... ""'11-k. .......,.._ 6. I > ~. tc:eep toe.Ina and _,.. b.t..een pkiirltl!I Pree oP "'••da. 1/ee rec.ornmended and legal",j app, oved he, k:>leld-. Avoid Prec:v,ent aoll coultlvatlon that deatrc:,ye llhcollc,., ......ta. U.. mulcohe6 to help prevent ,..ed wd germl..atlon. All herl:>lcoldee ..r,.,11 only k:>e ""F'f'lled t,y a lieenaed "'F'f'IIGatar. H. l~T ANCI ClliSLA!5C eoNi"'-OL, Maintain a r....,,,.,.,le control Nith approved mater I ala and ""F'f'lled i:,,t llcoenaed Qf)p 11....tc,,... I. P'l!!"-TIJ..IZATION, I. P'ertlllze all planting are""6 l'llth the Pollol'ling• At 90-c:lc:ly Interval•, apply 6 lm/1,00C a.P. 16-6-& eommerelal Pertlllzer or Qe, r9Clulred i:,,t the •oil• repoi t. J. ltEl"'LAeEMENT OF Tl'-El:S,'l!il lfllWES. ~lac.. decad, dying, and mlelng tr-• "'Ith llk<o alze, =ndltlon, <:1r,d variety =eptc:,k:>I• to 1:1'1• ONner at th• Conl:raetor'• •xp•n11• . t<. ~l!!Ml!!NT Cl" !....AJl'IN, ~laee d<::imaged or decad I'""'" areas l'llth eod. J... 1-IISATION &'r'!oTl!!M, I. eyatem lnapecot,Jc,r,, eontracotor llhall diec:.k. all awatem• ,or proper operation. J...:iteral 11.,.. ehc::111 be Pluahed out aPter remC>Vlr,g !:he mt aprlnkler head or tl'IG at eaeh end oP the l<:lteral. All head& are to m adJwted ""6 ne,:;e.......-y Por unimpeded coover-ag• and to prevent ..v..-.pr<llj onto k:>ulldlnga, Nlndo-, and pavement&. :z. ContrGllel"l!I, !:let and pr<>gram Qutomatlco coontroller& Por ••""""'"' Nater r9Clulremeni;e. &Ive O..ner'• repreeentatlve a key to coontr<lllera, and lrwtrucotlon& on ho"' to tum oPP eyatem In =-e oP emergeney. 9. ~pair&, ~air all dQfflag•• to Irrigation •yetem Qt C<lntrac:.tor'e e,cpense. ~all"l!I eliclll l:>e m<:1de l'lltnln one (I) ....terlng p-lod. M. 5011-l"lel"~TION AND AMl!!NCIME!NT NOTE, THE l"OJ..J..Oi'II~ AMENCIMENTS ARE l"OIII. BICICIINIS PURPOSES ONJ..'T'. Aei\JAJ.. AMENCIMENT Clll/ANTITIE$ ANCI Mixes SHAJ..J.. ee CIETERMINEC> IN ACCORCIANC:.e i'IITH THE !0011.$ REPORT OBTAIIIECI f"eR ITEM 5.0.:Z ABOV!!. I. Baek.PIii 5011 should be 1005 natlVe .11te ""'" that hae been elearod c,f all dek:>rlo, and roek. and br-oken up and made frlak:>le. The ,0110,.lng Qddltlv.,.. be blended thc,rouq,ly Into bclc,kPIII •oil Qt the 1:lm<> 0, planting and all plcinte ehould be thorouq,ly 1o1at..,.od In lmmedlat..ly upon c:.ompletlon of lretallatle>n &<>-F'e>-r produets aro suppllod In 50 p01A'ld bags, nGt k:>ulk. The lnatalllng Ge>ntraetor c.an be rec,,lrod to sul:>mlt empty k:>ags upon c:.ompletlon of ,...,,.k to coonflrm applleatlon. The &e> Po....,. 5-3-1 Ponnulatlon rnciterlal coan be used 1o1lth or 1o11thc,ut the soil ponotrQni: Qnd tho &o p.,,....,. 1:2-6-& formulation materfQI 1oh<luld be "sod In 4 to 6 d.,..lrod, plea•• ee>ntacot us Por ""F'F'roprlate reeommendat:le>ne P<>r "u of sane. The 9:f'"""' Qnd llme =n be applied In their Plnoly ground fc,m,s. 100% of the 9"0Und mc:itorlcil sl'l<luld pass through a I0-meeh sa .. n and at least 50!I. c,f tho mat..,.lals 11hould """" ttrc:>U<:11, a loo mesh ,,..,...,,_ C:ONTAl1Eit.6RO-f'Ot.U..k~OJ"'=R SIZE 5-S-I 1:2-&-& .S'l'PSUM 1-IME I-Iner 1.0 t:"'5p .:25 twp 1.0 t:12op ~ gc:,I .5 c.up :2.0 tl:>sp o.:25 c.up 4.0 t1:>sp gc,I 1.0 coup 3.0 tbap o 5 eup 1.0 eup 15 ~I 1.5 coupe .:25 eup 1.0 coup 1.5 eupe :24 box :,.o c.upo, .5 eup 2.0 eupe 2.0 "'"P" 30"1:>ox S.5 coups .15 eup 2.:25 eupe :2.5 c.upe 36''box 4.0 coups 1.0 eup 2.5 eupe S.O coupe 4:2 "box 4.5 cups 1.5 coup ::1.0 coupe S.5 c.upe 4e''box 5.0 eupe 2.0 coups S.5 eupe 4.0 coupe S4''bc,x 6.0 eup• 2.5 coups 4.0 coupe 4.5 c.upe 60''1oox 6.5 coupe S.0 coupe 4.5 c:.upe 5.0 coupe T.2''box <!.O eupe 4.0 ""f'9 6.0 coupe 5.5 eupe IP bClc:.kflll 5011 Jo, mae.1 blondod, same mal:erlcils c:.cin be added Cit tho fc,ll01o11ng rat..e per-COl.ble yard o, .1<>11. CSRO-POl"ER ISRO-POI-Ek .S'l'PSUM LIME ME I HOC> 5~1 12-.!'>-& Maee Blend 10 u,., :2 llos :2 lk:>a llk:>9 For general l:oroad<;aet oP mater1Ql6 on tho o,urlaee o, •olle,, tho ,....,, .. mal:orfQle coan be ""F'f'llod t<> tho &olle at tho fol le>"'l"9 ratoo, po,r lpoo squaro foot c,f plQntecl area and thor-ougt,ly ....tared In sucol'I that soil• aro Not to a minimum dopths c,f &"prior-to ~lanl; iretallCltl<>n. 6k.O-POl'>IER 6RO-l"Oil"ER METHOD 5-3-1 1:2-b--6 .S'l'PSUM 1-IME Br-OQdeast !55 lk:>9 :2 lk:>9 20 lk:>e-10 lk:>e- lf mal:erlc:116 coan be erose ripped Into to a soil to a mlnlrrMn dopth c,f 6", tlio ...,.,,., mc:itorfQl9 ean be Clf'F'llod at tho Poll°"'l"9 rate• per-lpoo squ<:1ro f .. t c,f plantod are,c, and .....tor-od In thoroughly euel'I that oils are "'et to ci m1n1rrun dopth a, 1:2• at le,c,et oncoo prior to ~I~ ' IEfll '5kO-POl'ER METrlOC> 5-5-1 1:2-&-t> .s'l'PSUM Lll'E c;ro,.. kip 150 lk:>9 30 lk:>9 200 Im 50 Ilea IP matorlal11 aro Clf'F'llod ttrc,ugt, l'lydr090odlng proc:.<>66, tho ...,.,,., materfQls ean be ac:lded dlr-.,..tly Into tho hydr090od slurry and "!'Plied at the follol'll"9 ratoe p..,. Ipoo squar-o , .. t to non-prepared aoll. (Noto, If l'lydrc:>seed 16 appllod to 50lle that have already lceen prep,:rod "'Ith the ClddltlVee nGted undor Br-oGldGClst or C::..-oes Rip met:hGds, Eir'o-P.....,. 14 4 q coan be added to hydr'oeeed elur-r-y at the ral:o oP i pound& ~r lpoo squa,... , .. t oF p,-ep<:1rod soil !IUl'f'cic.e and the Pollo,.,.lng ¥r°°"•od material s.,pplieatlone "'°"Id not apply In addition to the 14 4 1) 6kO-f'Ol,,ER ISIIW-f'C>CK METHOD 5-5-1 I2-&-t> .S'T'f'SI..M 1-IME I iydl oo eed 55 lk:>a 2 lk:>9 20 Hos 5 lk:>a Again. It le Important that al klroCldcoast or eroes ripped soil additives be tnoroug,1y '"""""',...d Into 50119 after Clf'F'IIC.Cll:lon and prior to planting. HJpros.....:I ffl<lltorfQls should be applied to thoroughly moll!ltened &olle. 1 .. tcill.:itle>n eoll malntenanc:.e should be lmpl........nl:ed '"" fc,ll°"'s. In all ar-e""', 45 days aft..r coommencoement o, 1nstallat1Gn malntenanc:..:,, Eir'o..Power 5-5-1 =n be g....,..,..,, broCldcoast ..ver all plmtlng area& cit the rate of :25 lk:>5/lpoo •"luare feet. All ffl<Olteriale ehould be thoroughly ll'T'lgal:od Into soile immediately after appll=tlon. If lnatallatlon malnte,...,... period le ilo day• In duration, Eir'o-Po..,.,. Slo Release 1:2-&-& In the 4 to 6 month roleaee formulQtlon ean k:>e klroadeaat ..ver all plant:lng <:lrl.lQl!I at the rate <>f 15 lk:>a/1,000 square Peet 9':lf'6Uffl cit the rate c,f 20 lk:>9/lpoo •..,.., • r .... t i:>et:Hoon day &O c,nd day &5. ,,,,,. appllcoatlon "'ould be In addlt:lon to tho d<::iy 45 appllc.atlon. All ffl<llterlals ehould be Irrigated thoroughly Into 5<>11• lmmodlately aPt:er Clf'F'lleatron. ENCi OF SECTION CITY OF CARJ..SeAD EROSION CONTROL. NOre5 SL.OFf:S 6,1 Ok 51ELJ2Ek kEG!UlklNIS EROSION CONTROL. MEAeURE5 A5 Sf'EGIFIED HEREIN SHAJ..J.. eE TREAlcD WITH ONE Ok MORE OF THE FOU.OWIN6 PJ.ANTIN6 STANDARC)S. 5TANDAKD, •1 -COVER CFIOP~INFORCED Sl'RAJ,I MATTIN6, COVER CROP SHAU. eE A SEED MIX T'T'PICAJ..J.. 'T' MADE UP OF GUICK 6ERMINATIN6 AND t=A5T COVERINIS c5RAS6ES, CJ..OVEkS, AND/Ok WILD FL.OJ/IIERS. SUBMIT THE SPEGIFIC SEED MIX FOR CITY APPROVAL. PRIOR TO APPL.ICATION. THE COVER CFIOP SHAU. eE APPLIED AT A RATE AND MANNER SIJFFICIENT TO PROVIDE <10!5 COVERA6E WITHIN THIRTY (!:!OJ DAY5. REINFORCED Sl'RAJ,I MATTINIS SHAU. BE REGlUIKEC> J/llHEN Pl..ANTIN6 OCCUk5 BETJ,EEN AU5UST 15 AND APRIL. 15. TYPE OF REINFORCED Sl'RAJ,I MATTINIS SHAU. BE A5 APPROVED BY THE CITY AND f.TAKB? TO THE SLOf'E A5 kECOMMENDE1? BY THE MANJFACTUKER ""2 -6ROIJND COVER, ONE HJNCIRED (IOOSIS) PERGENT OF THE AREA SHALI.. BE PL.ANTIN6 l'IITH A ~ KNOr+I TO HAVE EXCELI...ENT 5011. BINDINIS c;HAKACTERISTICS (PL.ANTED FROM A MINIMUM 5IZE OF FJ..ATTED MATEKIAJ..) AND SPACED TO PROVIDE FUU. GOVE!V6E J/IIITHIN ONE YEAR) . .., -J..OW 5HfUJB5 L.OW SPREADINIS i"IOOD'I" 5HfUJB5 (PL.ANTec, FROM A MINIMUM OF :2-5/4 INCH J..INERS) SHAU. COVER A MINIMJM OF SEVENTY HO%) PERGENT OF THE SLOf'E FACE (AT MAi\JRI: !>IZE). "'4 -TREES AND/Ok I..ARo5E SI n;~ac iREE5 AND/OR J..ARISE 5HfUJB5 SHAJ..J.. eE (PJ..ANlcD FROM A MINIMUM OF I .SAI.J..ON CONTAINERS) AT A MINIMJM ,V.TE OF ONE (I) PEl't Tf/llO HJNDRED (200) 5G!UARE FEET. SLOPES -6:1 OR SILLI LR ANi:>1 A. S' Ok l.L55 IN VERTICAL. HEIISHT AND ARE ADJACENT TO PUel..lC J/IIAJ..KS OR 5TfllEETS REGIUIRE AT MINIMUM STANDARD #I. B. S' TO &' IN VERTIGAJ.. HEIISHT RLGUIKE STANDARC)S •1, "':2, AND 413. C. IN EXCE!6 OF&' IN VERTICAL. HEIISHT RLGUIRE STANDARDS •1, 112, E AND-◄-. AREAS 6kADB? FJ..AT!l:R THAN 6d REGIUIRE STANDARD Ill (COVER CFIOP) l'IIHEN THE'T' HAVE ONE Ok MORE OF THEFOJ..J..OJ/ll!Ne CONDITIONS, A. -!>I CE, 6kADB? PADS NOT ecHEDULECI FOR IMPROVEMENTS WITHIN 6 MONTHS OF.,COMPLETl'f')T., ON OF ROUISH ISRADIN6. e. -A PolEr<TIAJ.. E~ION PROeJ..EM A5 DEIEkM,NECI BY THE CITY. C. -IDENTIFIED BY-THE CITY AS HIISHL 'I' VISIBLE AREAS TO THE FUBJ..IC Ok HAVE SPECIAL. CONCIITIONS THAT WARRANT IMMEDIATE TI'EATMENT. CITY OF CARLSBAD B. 1he minimum aecoeptak:>le elze ,or Qf I atruk:>a, me...,ured m,ore pruning Nlth the 1:>ranehe6 In nGrmal poaltl<>n, 11hall c:.onPom, to l:l'le m.....uremente utlllzed i:,,t Hin .. Nur••'11· l"'lant& l.:1rger In &lze l:l'IQn epecolPled may lc>e used Nll:l'I the approval oP 1:1'1• J..andl!leape Arehltec:.t, k:>ut th• uee oP larger plant& ,.,11 ,:,:1111• ""' ehang• In coontraet prlcoe. Al I tr-11lze11 ehall coonf'orm to the mlnlrrMn &IZ4N lndlec:tted per o,pec.lPled coontalner alze ae eontainad In the Va119!j<Oreat Tr•• Company eatalog. www.gmplandarch.com DRAWN JR .--------.,,.. A_S __ B_U-IL-r-.,--------,----,--.,...-------------~--..-----.--~----1 ~ PLANNING DEPARTMENT AREA 3,4/3.5 -PLANTING SPECIFICA TI□NS 61ESTBIJILOER VILLA6ES OF LA COSTA TIE OAKS -5.415.5 ·' APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PREC.ISE LOCATION OF PLANTING AREAS. ... <> -... ... l)SC od .. I CJ.\.\~ 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 LANDSCAPE ARCHITECTURE & PLANNING APPROVED .... 1ST strmMITTAL 02-09-07 DATE 2ND SUBKITTAL 3-13-07 3BD SUBMITTAL 4-90-07 TITLE: 4TH SUBMI'M"AL 7-02-07 RECEIVED BY: MYLAR SUBKITI"AL 7-10-07 JOB NO. 05-038 DATE 04-90-07 SCALE AS SHOWN INSPECTOR DATE t----+--+-----------+--+---+--+--~ IAPP~~-/ ¢1:::-~(~ft _PLANNING DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DA TE INITIAL DA TE INITIAL OTHER APPROVAL CITY APPROVAL DWN BY: CHKD BY: ___ , RVWD BY: PROJECT NO. C..T 05-lb LP-Oi DRAWING NO. 44b-6L 6ENERAJ.. 5f'!::Cll'ICATIONS 1.0 SCOFE 1.01 0El'INITION6 A. ONMr-, MORROI'\ PeVl!LOl"MENT CARI.SBAD CA e. Cont:rac.tor-, An lnc:llvldual ,,,-c.ompany c.ontr-ac.tlng ,.itt, tlie c,,.n•r-to pr-ovlde mater-lalt1, perfONII "°rk, and aer-vic.ea ,,,,-h pr-o Jec.t. c. !aub-Gontr-ac.w, ,A,n lnc:llvtdYal ,,,-c.omp'""".j c.ontr-a<:tlng ,.,tt, the Contr-ac.w to pr-ovlc:iol material• or per,om, .. orl<., ,,,.. bott,, Por-a epec.1,1c. por-tlon .,, the pr-ojec.t. c::>. ~• Arc.hltec.t, The landtlc.ap• arc.1,Jtec.tural Plr-m o, RJM c::>-tgn 5roup, Inc.. e. c:ontr-ac.t c::>oGIIITl8rlttl, The agr-eement, term. c.ondll:lont1, ,.,-,tten tm;truc.tlont1, dr-a,.lng.. and t1pec.1P1c.attona, .t,op dr-cll'llng• and c.t,ang• or-de.-& approved b!j tli• ONner-and la-.:! b!j the L.andec.ap• Arc.httec.t. 1.02 SG01"I: OI" ~' ihe ,.orl<. to be done under-tlie c.ontr-ac.t c.onetattl of Pumlt1htng all mater-lale, all •&:fllpment and p•rior-mtng tlie l'IClr-k. req,ulr-ed b!j tl"leee t1pec.!Plc.atlon11 and tlie dr-.,.,.lnge nec.et1...,r-y ,.,,. the pr-oper c.ompletlon 0, the NOrl<.. I.OS l"'LANS ANc::> ~ll"ICATIONe, ihetle epec.1'1c.atlont1 ar-• Intended to ,:.over-all labor, mater-lal, and &tandar-de oP land&c.ap• arc.hltec.tur-al anc:I mec.tianlc.al ~Ip to be empl~ In the l'IOrl< et,o..., on h pl..,. or-c.alled ,,,,.. tn h•• epec.lflc.atlone or ,-......,,,..t,ly implied b!j term• .,, ....,,._ The plana anc:I epeo:.IPlc.atl«la ar-• Intended to c.cmpl-,,t one another-and any par-t oP tlie l'IClr-k. ht may I» mentioned In .,,.,. and not pr-eaented In h other-, 8"0I1 be done the..,.,,. aa If It Mid a minor-natur-• Nhlc.l, may not I» apec.lftc.ally mentioned, but Nh!o:.h may be r-eaeonably CIHlmled c:1t1 nec.e11ar-y f,,,-h c.cnatr-uc.tl<>n ,,,-c.ompl•tlon of thle l'lorl< .tiall be performed b!j the Contr-ac.tor-the -a& IP et,o,.n on th• draNlr,ga ,,,.. d•""r-11::ied In the apec.!Plc.at1""t1. In general, •xc.ept that th• l.anc:lec ..,. Arc.hlteo:.t'e int.r-pr•tatlon et,all al .. ay• tau pr-ec.•d•""'" ov•r-the dr--lng.. and large d•taile over-...... 11 eo:.al• dr-.,.,.lng... F'lgliree • ..hen given • .tiall i.. folloNeit In pre,...-.nc• to ec.ale m•me 1 .,,.. its. 1.04 IN.Cd I .Ef.>.TION OI' l"'LANS ANc::> Sf'l!Cll'ICATIONS, "TM I o-d■cape Arc.t,ttec.t ,.ill inter-pr-et the ,,,...,;ng of any part oP the pl..,. and epec.!Plc.atlone al:>ollt ,t,tc.1, any mleunder-&tanding.. may arl-, anc:I hit1 dec.lelon ehc:111 io. final. Should t,t,.,.e appear to io. any .,.,-,,,-,,,-dl•o:.repanc.y In ,,,-io.t .... n the plana and epec.1t1c.at1on■, h Contr-ac.t,,,-.tiall ,..,.,. the matter-to h Land&c.ape Arc.hltec.t f,,,-adJuetment io.Por-• pr-oc••dlng ,.11:h h ...,,.k. Should the Contrac.w proc.eed ,.,th the .....-1< ,.1tt,o11t -r-eferr-lng the matter, he doee.., on hie.,..., r-■pon.lbllll:y and any ...,,.k ht 1"8<\uf.-.. r-emoval and/or-r-eplac.ement 8"011 be pr-ovlded b!j the Contr-ac.t,,,-at no ad.:111:lonal o:.<>&t. 1.09 LANc::>6CAl"e ARC+-IITecT'6 l"UNCTION, ihe Landec .... Arc.hll:ec.t ehc:11I pr-ovide per-lodlo:., llmll:ed on-elte ol:leer-vatlon oP th• Nor-k In progr-eee per the o..,wr'e r•q,u-■t to revi. .. , In ger,er-al, the exeo:.lltlon of c:lol•lgn Intent and ll"lter-pr-•t the land&c.ape doo:.umena. He ,,. Agent of the °""1er to the •><tent pr-ovldec::I In the epec.lflc.atlone and '""•n In epec.ial lm;tanc.-■ he le auth,,,-Jzed b!j the o..ner-ta aet ae lnter-pr-eter-of the o:.ondltlone oP the o:.ontrac.t and ae _Judge .,, Ia perfOMnC111C<t, he llhall elde neither ,.itt, c,...,.,. n,,,-.. 1th the contr-ao:.tor blit u.e hie auhr-lty under-the c.ontr-ac.t to en,,,,-,:.e ta fatthtu I periormanc.e. He ,-th• r-tghl: to etop Nor-I<. ehould thte l:>ecom• ,wo:.-■eary to em;ure the pr-aper exec.utlon oP the o:.ontr-ao:.t. l.o6 Oll'IN!!R'6 l't!Sl90N5115I1.ITY, ey enter-Ing Into agr-eement, ON,er 9""rantee• eontr-ac.t,,,-f'llnc:15 are avallable and llhall make tlmely progr-et1t1 payment.. to the Contrac.tor-during the"~ of the .. or-1<.. The o..ner .tiall fur-nlel! all aur-veye and eetalolltlh all pr-~ llnee anc:I r-eetr-lo:.tlone. All other-llnee, gr-adee, and dlmenlllont1 ■hall I» Ntablltlhed b!j th• contr-ac.t,,,-. Un 1-ott,er,,,ltle ep-!Pi.d, the o-.-tlha II make available to the eontr-ac.w all lltllltletl r-equlr-ed to perior-m the -.-1< at no c.oet ta the Contrac.t,,,-. 1.0"! CONTRAG.T~'S l'U5f"ON&l151LIT!ES, The contr-ac.t,,,-f>h<:111 gtv• efflc.tent euper-vlelon to the ......-k, uelng hi• io...t ek.111 and attention. W,.,, ab••nt Pr-om the Job, he ehc:11 I appoint an Englleh-epeaktng auper-vleor c apabl• of dl.....,.elng matter-. .. 1th the ~ Arc.hltec.t on h elte and to IIICIU dec.lelone on the eontr-ac.t,,,-'e io.hali'. He ehall c.aref'lllly •tudy and c.ompare all ~Inge, epec.lflc.at"'"", and other lnetr-uc.tlontl t,,,-the ,...,-k_ An_j ..,,,..i. lndlc.ated In a manner ,t,1c.t, ,.ould make It dlfflc.ult to produc.e c:r"""lngtl and epec.!Plc.at.Jone, or-io.t..een ■pec.lfleatlon• and lac.al or-dtnan<:•e or .--tr-lc.tlone, ehall io. referred to the Lao .dee.ape Ar-c.hll:ec.t Por Jnterpr•tatlon or c.,,,..,-ee,tlon io.for-e pr-oo:.eedlng ,.1th .. or-1<.. l.o& l!XAMINATION OI"' SIT!! ANc::> ~, A. 1'1,• Goo.ti a,:.t,,,-.tiall examine the projec.t elte, phyetc.al c.onc:lltlone, and ..,,.,.oundlng of the pr-opoeed Nor-I<. and _;,ctge ,,,,.. himeelf the natur-e oP the l'IOrl< to t,e done prlOI" to ...t,mltttng a bid. e. The plane p,,,-the ......-k ..,.,,. c.cndltlontl aa they are 11Yppo••d or belleved by h ~ Aro:.hll:ec.t to extet. It le Contr-ac.w'• r-et1ponelblllty to lnfor-m l.arldec.<lp• Arc.t,11:ec.t oP any var-latlon io.t..een plant1 anc:I ac.tual elte c.ondltlone pr-1,,,-to etar-tlng any ,.,,,-k. Should contr-ac.tor-begin ..,,,..i. .. 1thollt ver-ltylng If plane mc,d:c.l, elte c.cndltlone, Contr-ao:.tor-CINUll'letl all .--ponelblltty p,,,-any loeeee he might lnc.ur-. I.O"I .. Ale: 1' .;oc:,es .ANc::> !ITZL"_,t,,TIONS, T!i• Contrac.w ehall Parnlllar-lze htmNlf .. 11:h anc:I NIii c.omply Nlth all tec:iolr-al, etate, and loo:.al 1.,...., or-dtnan,e, r-ul-, and r-egulatlone ino:.ludlng Cal1'omia-oe.HA e.at.ty order-& pertaining to the performanc.e of the ,.orl<.. 1.10 CONST!IIJCTIO!ll S-"'l"eTY, The c:ioletgn, adeq_uac.y, anc:I eaPety of erec.t1"", exc.avatlon, brao:.lng, tlhor-lng, temporary auppor-te, etc:.. le the eol• r-eeponelbllll:!4 oP the eontr-ac.w. ,,.,. eontrac.w le r-eaponall::ol• Por the etablllty oP th• t1t:l"uctur-•• and exe-avatlom; and .tiall pr-ovlcle the n•e-•ary brae.Ing to pr-ovlde etablllty during the entlr-e c.onetr-uc.tlon pr-ogr--•· Obller-vatton viela to the elte b!j the Landeo:.ap• Arc.hltec.t· ,,,-hie c.oneultante ehall not 1nc.lude ln•p•c.tton oP the above It.me. I.II l"Elll"~NCI!: ANc::> PA'l"MENT BONc::>S, IP r•q,ulr-ed, the Contr-ac.tor- shall deltver tao,.,,.,. tNo eurety bonde Nlth gaod and euf'1c.tent eur-etl-. The bonde &hall io. malrol:ai,wd b!j the Convac.tor In Pull Por-c.e and •"•o:.ted until c.ompletlon and ac.c.eptanc.• oP the ,...rl<.. A. Material anc:I lal:>or bonc:I in the ,oum of 50$ of the c.ontr-ac.t pr-lo:.e. e. l"'eriormano:.e l:>ond In the eum .,, S05IS of the c.ontr-ac.t prlc.e o:.ondll:iOIWd to c.over all guarantee■ of the <.ontrac.t. 1.1:2 INSURANC!!, The eontr-ac.tor ehall c:iolllver-to c,,.,.,.,. ...r-tlflc.at-■ .,, lnaYr-anc• .,. •vldenc.e of c.overage .. 1th O..ner-anc:t Landtlcap11 Arc.hlte<:t lleted a• additional ln■ured. A. l'\<>rker-e' Compeneatlon lneur-ano:.e and employer's Llabillty IMIJl""Clr,e.e; 1.15 LANc::>e.CA!"'e A~l~T'S LIABILITY, ihe c,,.,.,.,-and Contr-ac.to.-., r-eo:.ognlzlng the trtier-ent rltlke c.onnec.ted Nlth o:.onetr-uo:.tlon, agr-.. to llmlt any and all llabillty, o:.lalm Por damage .. , c.oet oP d•P•n••• ,,,-expeneee to be levied agalnet the Lanc:l""ape Arc.httec.t on ao:.o:.ount oP any cleelgn c:lefec.t, •rr-or, omlt1t1lon, or pr-oPeeelonal negllgenc.• to a eum not to axo:.eed th• amount oP the Landtlo:.ape Ar-c.l,Jtec.t'tl , ... 1.01 1.02 51Jl"!!l'lVl5ION, The Cont:rac.w .tiall euper-vl•• and dlr-ec.t th• •Pflc.leno periormanc.e of the ,.orl<. In ao:.o:.ordanc.e .. 1th hie beet &k.1I1, attention, and Judgment. He ehall io. eol•ly r--■ponelPI• ,.,,. the meane, methode, t•o:.fintq,uae, eequenc-e■, and proo:.edur-•• of o:.onetruo:.tlon and t1hal I be r--■ponelble to ... tl1'1t the Plnlehed NOr-k c.omplte• ,uIIy Nlth the Contr-ao:.t c::>oc.umentll. Ha ehall have a r-epr-e..,.tatlve In o:.har-ge Nho et,al I io. a c.ompetent aYper-tntendent and dlr-eo:.t the pr-ogr--■• oP the ,.or-k and ,.ho ehall be auhr-lzed to r-ec.elve Jnatr-uc.tlone and ta ac.t ,,,,.. the Contrac.t,,,-on al I matter-ti r-elatlng to the ,.orl<.. I.oe CIIIJALITY OI"' ~ ANc::> ~MAN5HII"', A. At all time after-c.ommeno:..,,,.nt oP the ,.orl<., Contr-ao:.tor ehal I pr-ovlde an adeq,uate ,.,,,..k for-c.e of c.ompetent, aultably &:flc:IIIP!ed and trained per.an,,., to ■ur-v•y anc:I lay ollt the NOrl<. and c.onetr-u<:t the pr-o Jec.t and el!al I c.CIUN euc.l, .. or-k Por-e• to exec.Ute the NOr-k In c.cnformanc.e Nlth the baet tr-ade pr-ac.tlc.e■, fr-ee fr-om ,auIa and c:1o1,-a In ac.c.or-ctanc.e NJit, the r-•q,uiremente oP the eontrac.t ~nte. 1.10 loAl"eTY ANc::> ~TION, Contr-ac.tor shall eomply ll'tith all appllc.al::ole la'"•• ,,,-dtroc:u,c.ee, r-ulee, r-egulatlone, and order-& oP all govemm•ntal ag•no:.I•• and auth,,,-ttles having Jurlt1dlc.tlon for the tlClfety of pe.....,,.. or- pr-op•rty Prom damc:,ge, loee, or lnJUr-y and ehal I io. reeponelbl• ,.,,. Initiating, """lntGllnlng and eupervlelng al I •af•ty precautlone and progr-amt1 In c.om•c.tlon Nlth tne ,...rl<.. contr-ac.tor ■hall take all pr-ec.alltlone nec.at1......y p,,,-the eafety of and .tial I provide all pr-otec.tlon nec.at1....,.y to pr-event damc:,ge, loe•, or ln.Jur-y to, A. All ,.,,,..lcrn•n and otl"ler-pereone on ,,,-abollt th• site and all other per-eone .. ho may io. aPf-t•d b!j the .....-1<; e. ih• Nark la.IP and all mater-tale and eq,ulpment lnc.orpor-ated or to io. lnc.orporated therein, ,t,ether In etorage on or-off the elte; C. All other pr-operty at, adjac.ent to and abollt the •Ite, 1nc.ludlng, "lthollt limltatlon, tr--•, tlhl"lbtl, la..ne, Nalke, pav.,,,.nt&, road .. aye, etruc.tur-ee, anc:I lltllltletl Nhfc.l, ar-e not detlipted ,.,,. removal, r-eloc.atlon, ,,,-r-eplac.-,,t a& par-t of the ,.,,,-k. I.II !!XIE,TIN6 UTILIT'I" LINES, !!xc.ept c:1t1 lnc:llo:.ated by the c1r--1nge or epec.ltlc.atlont1, the eontrac.w NIii not io. liable ,,,,.. the r-e-routtng of exlt1ting ac.t1ve under-gr-ound lln-■ Nhlc.l, may be dltlc.over-ed during the pr-o~• o, .. ,,,..k_ Contr-ac.tor-ehall ver-!Py loc.atlon of exftlttng lltllltl-Nlth appr-opr-tate utllll:y c.cmpanl-■ pr-lor-to etar-tlng .... rl<.. Contrac.w """'' I io. llal::ol• ,.,,. damage done to ex1etIng utmt,-. eontraet,,,-•hall c.cntac.t I-&oo c::>I6 ALEltT and have all exl11tlng lltllltl-■ loc.ated pr-lor to c.omm•nc.•ment oP ,:.on9tr-uc.tlon. e. Any eubc:ont:rac.tor-or-labor-er employed upon the ...,,-k ,.1,0, In th• 1.01 opinion of the Landec.ape Arc.l,lte<:t t:J//'id/or-c,,.,,.,-, le non-1.02 REPAIRIN6 INJDPt' l"I01'll< o:.ooper-attve, ,,,-Nho shall prove c.ar-elee ,,,-ln,.a .. op•tent, ehc:,II io. A. All portlon11 of the ,.,,,-k ht may io. broken ,,,-Injured by ac.c.ld•nt ,,,- lmmedic:ltely removed Pr-om the ,.Qrl<. b!j the eontrac.w, .. hen In the c.our-•• of ..,. on Cle.Gaunt oP blilldlng operatlone or b!j rea&on of notlfi.d to do ea, and .tiall not ba r-e employed on thl■ pr-oJ•o:.t. any other-caooee ,.hat;eoever-during the progr--oP the Nork, el,all 1.04 CIIIJALITY OP' MAT9l!ALS .ANc::> l!GIUll"M!!lll'r, All mater-lale anc:I ba c.aref'lllly and !Watly r-epalr-ed or reo:.onetr-uc.ted and the Nhole left equipment ln,:.,,,-porated Into the NOrl<. shall io. neN unl•H oth • .-..... In Plr-et c.lca■ c.onc:lltlon and tur-,wd over-to the c,,.,.,.,. r-eady Por--- epec.!Plc.al ly pr-ovldec::I In the Contr-ac.t c::>oc.ur,wonttl. Mcd:erJal• and eq,utpment e. 5houlc:I any par-t of the ,..,rl<. of thle c.ontr-aGt i.. GIit Into ,,,-damaged not otne.-.., ... ••ignc:,ted I::,,i detailed epec.lflc.atlon& sl1'111 io. of the io...t ~ other-c.ontrac.tor-■, the Orin«-anc:I party <:CIU5lng r,uc.h damage ~c.ial q_Yallt'.j and shafio. eultable Por the pur-poN tntenc:iold. If ehall IIICIU ad_JUtltmente io.t..een th.,....lv .. r-•latlve ta r-eq_ulr-ed b!j o-r-, contr-ac.t,,,-.tiall ,umleh evlc:iolnc.e tlatftlPac.tor-y to .--t:r-uctlon, repair-a and P"'Y"-t. o..,,.,. ae to the kind and q_Yal11:y oP materials and equipment. All mater-tali; 1.09 M.mJAL ~I15ILITY OI"' ~TR"'C-T~, !!ac.h and •q,ulpment i;hall be lnetalled per th• mc:nif'ac.tur-er-'& IIUbc.ontr-ac.w et.all perform the ..,,,..i. of the c.ontr-ac.t eo that It .. 111 pr-operly ....,u11 .. -dat1ont1. c.oor-dlnate Nlth and flt the ~ per-for-med b!j other •uL..e .. tr-oc.tor-■. He 1.05 5UEl&Tl'IVTION6, etoall gtve eac.h other-eubc.ontr-ac.t,,,-ever-y r-eaeonal::ole oppor-tunlty to A. Submit t1ube'1tul,lone of mater-tale or method& pr-opotled to o:.lty lnepe,:.t,,,-and per-for-m their-...,,-t., et,,,-e mater-Jal&, and plac.e •q,uipment t,t,.,..,.,,., and flt 1-,.,......ape Arc.1,11:ec.t In ,.,-1ttng for appr-oval ,,,-denial one ,...k pr-lor-their-Norl<. to the l'IClr-k. of otl"ler-eubeontr-ao:.tor-5. to liiA:>ml""'I of bid. Subtlt11:utlone ""' le» app oved only If mat..-iale 1.04 COOl"el'lATION l'\ITH OT.-CI G. ,,,-methode ar-e dernonetr-ably .uperl,,,-In q,uallty. ManJPac.tur-er-'e A. ~ aubeontrac.t,,,-.tiall c.ooperate .. 1th other-& In the •xec.utlon of llt..-atur• alo,w may not io. eufftc.i.nt evtdenc.• oP pr-ooP oP al ...,,.k and ehc:111 not Inter-Pe.-. N11:h rnater-ial, appllanc.ae, ,,,- euper-J,,,-Jty. A r-ec:v•••t f,,,-a aubetltutlon c.onetltute& a r-epretlentatlon ,.orlcmen oP other tlUl::oeontrclctor-5. that NCll"'ker-e and c.onlrac.tor-5 .. a1ve all c.laime p..,. additional lal::>or or-e. All •ulxontrac.tor-5 engagad In ~ at the t1lte ehall have, tneofar-a& mater-Jal o:.<>&a Nhlc.h may io.o:.om. etbe•C\uently apparent b!j the pr-ac.tlc.able, •q,ual UN of the pr-•m-and Pac.lllttee. In ...... ot uee oP 51/eh eubet11:uted material• ,,,-procluc.t■. It le the Contr-ac.tor'• dleagr-eement r-egar-dlng ~" UN, the mc:il:ter ehall be ,..,.,.,.e,:1 to r-eeponelblllty to pr-ove that the r--,,eeted eul::oetltlltlon le In ,ao:.t the °""1er, '""o dec.l•lon r-•latlv• to ""'Id UN .tiall gover-n. ..... .,.,.I." 1.05 Ol"folel'l'S !ltlcs-HT TO c::>O l"IOIIIK, o..n.r-may, at tte -1• option, perform, e. It rnor-• than one m,:niPao:.tur-er-le epec.ifled In th•N epeo:.!Pleatlon&, It .,,. eontr-ac.t dlr-ec.tly Nlth other o:.ontr-ac.tor-& Por-th• per-formano:.e .,, other- le the eontrac.w'• option to eelec.• the one ,t,10:.h he may deelr-e to ,.,,,-k r-elated to the pr-o;ec.t on euc.t, termt1 and o:.ondll:lone ae O..ner ehall, u••· If mor-e than .,,.,. Ptnieh ,,,-etyl• I• avallabl• In th• Item In la eol• dlec.r-etlon, c.ho<>&e. epeo:.IP!ecl, the c:.ontr-ac.tor-le ol::ollgated to alto,. the o..ner-to make 1.06 l"IIOVl610Ne l"01'l exT"l'lA5, No ,.,.,. Norl<. o, '""".j kind el!all io. the -1-t1on. c.ont1Jder-ed an extr-a uni..,. a ••par-ate .. timate la $11Ven ,.,,. ...,,c:1 .....-1< 1.06 Ll5T OI" 5Ul!k;CNTR"'C-TOl't6 ANc::> 5U6U!TTINS i"IORl<, l:>efor-e It le c.ommeno:.ed and until ""'m• le appr-oved by the o..r.er-exc.ept A. No par-t ot the c.onetr-uc.tlon l'IClr-k. .tiall be don• aa pl•o:.eNor-k nor-p,,,-extr-a l'lorl< or-der-ed b!j the o .. ner ac.,:.,,,-dtng to unit pr-lc.e■ ,.hlc.h have shall It be left to a ~ontr-ac.tor-after-the exec.lltlon o, the ,,,-Jglnal _,, bid. Any extr-a -.-1< periom,ed, not authorlZec:I aa provldec::I above, c.ontr-ac.t exc.ept ae author-ized In .... 1t1ng. In c.at1e part of the NOrk her-II shall not io. paid ,or-~ the 0-.r. .tiould be l!!Ubl.t, ~ general c.ondltlone ..... II govern eaeh tr-ode 1.01 TESTS AND INSl"'ECTIONS, lneol'ar .,.. 1:1,ey may appfy to the ...,rl<. oP ht tr-ac:iol. A. ih• o,.,.,.,-el,all have the r-lghl: to test, lnepec.t, and appr-ov• ,,,- 1!1. No ,.ubcontr-a<:t may io. .,..,gnec:1 ,,,-tr-anePerr-ed exc.ept ae req,ulr-e the t-■tlng, inepec.tlon, and appr-oval oP all materials and aut,t,,,,-lzed In ...-n.tng b!j the Contrac.w. • ....... ,. equpnent f'llmlllhed and all ..,,,..i. per roe .. ed under the Contr-ac.t C. The Contr-ac.t,,,-tlhall, at all tlmee, be r-eepon111bl• f,,,-the <IHlgned or-c::>oc.umena. In addition, IP the Contr-ac.t c::>oc.umente ,,,-h 1.,...., tr-aneferr-ed l'IClr-k. to the ....,,,. extent ae IP the aHigne<I ,,,-or-dlnanc.-■, r-ulee, regulatlone, ..,. any other-of the publle author-Ity traneterr-ed .....-k. to the ..,._ extent aa If he "•r• doing, or had having _Jur-ltldlc.tton 1"8<\Ulr-e the Nor-I<. ,,,-any ~Ion ther-eot to io. d<>IW, h ..,,,..i._ epec.1'1c.ally lnt1pected, the c:o, .t, ""'t,,,-.tiall arr-ange, pay Por-, and c::>. ihe G,or,trac.tor el!all IIUl::omlt to h o,.,.,.,-a llet oP the c:iolllver c.enlflc.ate• of lnepec.tton, t-■ttng, and appr-oval to °""'8r. tlubc:ontr-ac.tor-■ "Ith detail• oP the pol"t1""• oP the ....,,-k. to io. e. The Contr-ac.w .iiall not c.over-up any ,...rl<. req,ulr-lng 1""pec.tlon performed b!j eac.h. eubcontr-ac.tor-■ .tiall ba l!IUbjec.t to the appr-oval until the ....,,.. hca to... +F'• _,.,e,:1 b!j the appr-opnate author-11:y. If oP the ONler-and Lande cape .vc.1'111:ec.t. Nor-k ehould ba c.ov..--1 up Nfor-e being lnepec.ted, the Contr-ac.tor 1.0"1 l"'Ail!lolT!,, In the event that any patented ar-tlc.le, mater-Jal, ,,,.. pr-oo:.eu le to .. 111 be requlr-ed to r-emov• auc.1, pol"tlone of the l'IClr-k. ae may be io. tnetalled ,,,-ueed In the perf.,,.,,,.,,,... of the ,...rl<. ae &hol'ffl on the plana .............-y to dtec.loee the par-t In a.u•etlan . ,,,-pc:lr-tic.ular-epec.!Ptc.atlon■ th..-efor, the Coo 11:i ac.t,,,-.tiall pay the r-oyalty 1.c,e, 51 IOI"' c::>l'lAil'IINl56, Contr-ac.t,,,-.tiall provide c.omplete ehop dr--lng.. p,,,- c.t,c:rgeable and ehall ....v•, keep, and t,ear-the Orin«-and b.aroctecape all lteme epec.lfled f,,,-ehop c:ra'"tng ...t,mfttal. Shop crG!Nlnge t1hall Arc.l,11:ec.t harrnl...,. fr-om all ctc,ma3e, -_....t:e, and •><pen•-■ b!j ,._ of the lndlGGlte all mater-lat methode oP attac.hrTa,t and ,,nleh. Shop c1r-.,.,.1nge I.II Al"l"'LICATION l"OI' ~ l"'A'l"MeNTe., Ae of the end oP eac.h o:.alendar-month during eonetr-uc.tlon, blit In no event rnor-e o,ten than onc.e monthly, Contr-ac.w atlc:ll I eubmit to ONner Por-r-evl.,. and appr-oval a c.ompletely tllled out and elg,wd Appllc.atlon ,,,,.. l"ayment c.overlng the NOr-k o:.ompl•ted a• oP the date oP IIYC.h applleatton. !!aeh eueh Appllo:.atton ,.,,. l"ayment shall ba ac.c.ompanled b!j fully-exeo:.llted unc.ondltlonal r-elea&e,. and Nalvere ll'ther-eb!j all pereom; and par-ti-.. ho per-form•d labor, eul::oc.ontr-ac.t l'IClr-k. or other eer-vlo:.e• upon the pr-o_Jeo:.t, or-,.ho eold, l•Cltled, f'llmlehed, ,,,-other-Nie• eupplled ta ,,,-Por the u .. oP ,,,-to io. o:.oneumed in the pr-oJ-t •'l"lpment, matel"lalt1, appllanc.ee, ,,,-other-goocle, releaN and ..alve, to anc:I lnc.ludlng the date o, euo:.h appllo:.Cltion, all me,:.1,ar,tc.'• ll•n, •top nottc.e, equtl:able llen and k:lbor and rnaterlal bonc:I rlgha on the pr-o J•o:.t. 1.12 Ol"IN!!l'l'S l'lldM-IT TO 5Ueol"'eNc::> OJll CANC!!L ~' A. The c.ontr-ac.t enter-eel Into unc:iolr-th-• epeo:.l'1<:atlone may be terminated b!j the ONner ,.1t1,out llal::olllty for-darnagee, ,.he,wver the O..ner le pr-evented b!j operation oP la.., an Ac.t oP &ad, or b!j the oPPlc.lal a<.tlon oP the publte, federal, •tat., or munlelpal author-ltlee ,.-om c.ompletlng the ,...r-k c.ontemplated her-eunder-. e. In the event oP euc.h eanc.ellatlon, the eontr-ac.t,,,-ehall io. paid ,,,,. the ...,rl<. ac.tYally done io.,ore notlc.e oP ~anc•llatlon le given to the eontr-ac.t,,,-. IP the c.cntr-ac.t pr-ovtde& for paym•nt• to the contr-ac.w on the batll• of unit pr-lo:.ee Nt f,,,-th therein, the amount due the c:.ontr-ac.w upon c.anc.•llatlon •hall io. c.ompllted on the batll,o of euc.h unit pr-lo:.-. It the c.ontr-ac.t pr-ovldee for-the payment oP a '1xed aurn f,,,-the entlr• ,...rk, ..,. any dePlnlte por-tlon thereat other-than a unit, of meaeur-ement, the Contra,:....,. ehall io. paid the """'• propor-t1on ot 5uc.l, eum upon o:.anc.el latlon that the ...,,.k done l:>eare to the total ......-k, or c:iolflnlt• por"tlon ther-eof, to io. perf,,,.._d under the c.cntr-ac.t. c. Notlo:.e oP .uc.h c...,,...llatton ehall io. given In ,.,-1t1ng anc:I .iiall be depot111:ed 11"1 the lk!!ted Sate■ """" In a ...,.led envelope ,.,th pOtltc:lge pr-epald and dlr-ec.ted to the Contr-ac.tor at hie ~ ae Piled l'litt, the ONner-. 1.01 ex-re,istON OI" TIM!!, In the event It le c:iolemecl neo:.eeec:ry b!j the o .. n.,. to e>denc:I the time of c.ompletlon of the .....-k to io. done under ~ epec.lflc.atlom;, 51/eh extentllon .tiall, In no """Y• r-eleaN any guaranty gtven b!j the eontr-ao:.t,,,-pur-euant to the pr-ovltltone oP theee epeo:.!Plo:.atlone, ,,,-the c.ontr-ac.t let her-eunc::ler, or-to r-eti.ve, ,,,-.-.1-the eur-etl-of the l::oonde exec.ut.d pur-euant to the ""'Id pr-ovlt1lone. 1.02 CL!!AN-IA", At all tlmee during the o:.our-ee oP the ...,rk, h Contr-ac.t,,,-ehall keep the elte Pr--from ac.c.urn,latlone oP ..... te materlale, nA::oblel!, and other-delor-ltl .--ultlng the .. orl<. ar,d .tial I take otuc.h ac.tlon ""' le nec.-y to prevent and c.cntr-ol duet. At the o:.ompletlon of the ......-k, contr-ac.t,,,-ehall r-.mov• all temp,,,-ary etr-uc.tur-ea, toole, c.ont1tr-uc.tlon eq,utpment, and mac.hl,wr-y, aur-plue materlale, ...,..te mater-tale, nA::obltlh, anc:I c:iolt>rl& fr-om and abollt the 1111:e and .tiall leave h 1111:e c.lean and r-eady for uee b!j the o..n.r-. 1.09 COMl"'L.!!TION, A. Completion le defined ae i..1ng ..hen all c.ondltlone of h c.ontr-ac.t hav• io.en ac.c.omplltlhed inc.ludlng the epec.lfled matnte....,ce period. 6pec.1'1c.ally ..hen all It.me a.-. tnetalled, the -· c.l•aned and the malntenanc.e period eatiel'ac.t,,,-lly c.ompleted, and ..hen all epec.lal tool• anc:I equipment, lnet:l"uctlon&, ..,.,tten gua, ao:t•••• ae- 1::oullt plaro,o, ll•n .-.1 ........ anc:I any 1tem11 r-eq,utr-ed b!j the Contr-aet,,,- t>oc.ument& have io..n properly e,cec.llted and c:iolllvered to the o .. ner-. e. The J..andec.ap• Arc.1,itec.t shall have full allth,,,-1ty to accept ,,,-r•Jec.t the c.ontrac.t Item• and .. 111 pr-omptly notify the o,.,.,.,-of c.ompletlon. 1.04 .SUARANTI!!!, In CIGlc:l!tlon to ep•c.lflea guarantee• pr-ovlc:iolc:I Por-In th• ~arate ..... t1ont1 .,, the epec.IPl<:atlon■, the Contr-ao:.t,,,-shall Cl!U«"Gnte. In ..,.11:lng al I ,.orkmantlhlp and mat..-lale to ba fr-ee fr-om c:iolP•c.t for a per-lad oP .,,.,. year Pr-om the date oP ac.c.eptanc.e o, the l'IClr-k. b!j the O..ner-.. 1thout addltlonal O:.<>&t to the c,....,.r. fallur• to pay the royalty o:.hcrgeabl• f,,,-the uee ther-eoP; and any loH to etlc:III io. appr-oved pr-1,,,-to ,a1::or-1c.atton. the 0,,,,.,.,-In the •vent ht the c:,,,,n.,. ltl enJol!Wd Prom uelng 51/eh I.O"I 5AMl'"l.!!5, contr-ac.t,,,-ehall pr-ovk:le aarrpl•• ,..,. all mater-lalt1 epec.lfled to patented Cir-tic.le ,,,-material• and the lnc.ldental damage cwd b!j the I<>&& ino:.luda ""''"Pl-. All aarrpl-.tiall be appr-oved b!j c:,,,,n.,.'tl oP u.e and damage ta 0-..-'tl pr-oper-ty In removing ..,._, the c.oet oP ~-entative In ,.,-It1ng prior-to c:iolltv•ry to the pr-oJec.t t1lte. r-eplac.lng th• Cir-tic.le .,,. mater-Jal& the uee ot ,t,lc.h 15 en.Joined. l'"rovldec::I 1.10 ~ PAC.ILITl!!S flrih•r-, the bond p,,,-Paltt,f'III performanc.e ehc:111 I» d<Nmed to expr-••ly A. er-eo:.t and properly """ll"ltaln at all tlmae ae r-equlr-ed b!j c.Dnc:iltlon■ appl~ t:'IQ.~le pr-ovtelon of the epec.lP!Gatlon■. and P.-"9'" ... .,, the ,.,,,-1<, all neo:.eeec:ry anc:I 1"8<\Ulr-ed pr-otec.tlv• 1.0& IT5, LIC!!N5ES, ANc::> IN61"1!!C:TIONS, l:>arr-lc.adee, inc.ludtng a 6' height o:.hain link, temp,,,-ar-y eonet:l"uctlon A. The eontr-ac.w .tiall obtain and pay ,,,,.. all permlttl tagether-.. 1th all fenc.• ,.,th ac:c••• gate, Penc.ee, and other-tlafeguarde f,,,-the ll"ltlpec.tlone r-equlr-ed In c.onneo:.tlon N11:h the ,.,,,-k ta be done under-protec.tl<>n of ..,,,..1.,., ■ anc:I the publlo:.. Verity llmlb oP ar-ea ,.itt, the c.ontr-ac.t, uni..,. ~IN 1opec.lfled io.I0... o .. ner-prior to ln&tallatlon . ...,.,.. th••• 1::oa,.,-1c.ade• anc:I tenc.ee ar• B. The Contr-ac.tor-.. 111 pr-ovlde anc:I pay for any epec.lal or-c.ontJnuoue vlelbl• to the publle, paint, ,,,-other-NIN ,1n1eh them In a """', ,e~ lnapec.tlon of the ,.Qrl<. dOIW unc:iolr-the .oontr-aet, Nherl epe<:lal ,,,-ao:.c.eptabt• to the ~ape Arc.1,Jtec.t. c.cntlnlDUe lnepec.tlon te noted belo,.. e. At all tlmee dur-lng c.onetr-uc.tton or-er-ec.tlon of pr-oJec.t or la I.O"I LAI'&, Olll:>INANCES, 111,iLES, ANc::> l'le6ULA TIONe., Th• Contr-ac.t,,,-o:.omponent part., prior-to c.ompletlon oP the etr-uc.tural fr-ame or shall give all notJc.e,o 1"8<\ulr-ed boj anc:I .tiall othe.-..ltle tully c.omply ,.,th all placement and ~ c.onnec.tlon oP c.ompOIWnt member-a to 1a .. e, ,,,-dlnanc.ee, r-ulee, and r-egulatlom; appllo:.able to the o:.ommenc.ement, the etr-uc.tural frame, pr-ovlde, ln•tall, and maintain pr-oper-ly proe•<:lltlone, anc:I c.ompletlon of the ,..,rl<.. In the ev•nt Contr-ac.tor c:ioleigne<I anc:I c.ont1t:l"uctec:I temp,,,-ary brae.Ing of adequate etrength obeerv•• or dlec.over,. that the Contrac.t c::>oc.umente ,,,-any p,,,-tlon ther-eof to prevent dltlloc.atJon, dl•tor-tlon, o:.rac.k.ing, falling-off, ,,,-any other- are In any Nay at var-lanc.e .. 1th any euc.1, 1.,.,. .. , ,,,-dinanc.-, r-ul-, ,,,.. d""""98 to the l'IClr-k. ,,,.. any oP la c.omponent part■ due to regulatlone, Contr-ac.t,,,-■l,all promptly give J..andtlc.ap• Arc.hltec.t ...-Jtten Por••-able nor-mc:il exo:...,.lve ,.,r,c:1,. and earthq,uake ,,,,.. .... ,., notlo:.e ther-eof. Should Contrac.t,,,-perfor-m any ....,,-k. t.no..lng that It lt1 ,.11:hollt adc:ln.to.,.,I c.oet to O,.,.,.r. l'epalr or r-eplao:.• at no adc:iold c.ontr-ary to any .uc.h l.,...e, ordlnanc.-■, r-ul•• or r-egulatlom,, anc:I ,.,thollt o:.ot1t, damage por"tlone oP NOrl<. oP ,:omponent parts. euc.h notlo:.e to Land&c.ap• Ar-c.1,1tec.t, Contr-ac.tor ehal I baar all c.o&te ond C. l"r-ovlde 6' ht. c.haln link bc:rr-lc.ade ar-ound dr-ipllne oP exleolng 1:r-ee• expeneee arlt1tng therePr-om and aet1oc.lated there,.,th and Indemnify and to io. pr-otec.ted. Maintain 1:>arr-10:.ad•, and prevent any mater-lale hold harml••• ONner anc:I anyo,w dlr-ec.tly or lndlr-ec.tly employed b!j o .. ner-at,,,-age ,,,-vehl<:ular ac.o:.e•• .. 1th1n pr-otec.ted area. lnc.ludtng the Land■c.ape Arc.hltec.t ,.-om and agalnet al I o:.lalme, liablllty, clamag•, ,.,,.,..,. and exp•n•••• ln,:ludlng, ,.,thollt llmltatlon, attor-n.-ye' P••• arising In c.orv,ec.tlon ther-.,.lth. l"l!Ql ~TIONPR06RAM POLIClll:6 AND !l!!OIUl!l!!M!!NTS I" .S l'll!!<illlll"!!M!!NT5 c::>et11gn, fm,tal latlon and mod1P1c.at1on oP exlettng vegetation •11'111 be in c.onP,,,-mc:onc.e ,.11:h one of the Po llo,.,ng "c.cndltlone" or ae r-eq,utr-ed or modified b!j the Cll:y. It ehall l:>e the ret1pOnt11blllty oP the appllo:.ant to develop a plan Nhlo:.h m .. a the Plr-• ptotec.tlon r-eq,u1r-•ment11. env1r-onmental """'tralnttl ,,,-other reetr-tc.tlon plac.ed upon the c:iolvelopment el!all noo be c.onelc:iolred Jue•!Plc.atlon for modr,10:.atton ,,,-eut>Dr-dlnatIon of tlr-e pr-oteo:.tton etandar-de. ihe elt• planning of the development el,all eat1a,y toott, the fire pr-otec.tlon etandar-de and envlr-onmental c.on11tr-alnt&. I" .S-1 CONc::>ITION A -MANJl"ACTIJl'l!!c::> SLOl"'e l"ll'll: ~CTION (See Appendix I" .2) l"'er-talne to man mad• elop•• abutting high r-l•k ,1.-e areaa ae d•t1o:.r-lbed under- Sec.tlon II C.I e.!!CTION A-I -mec:111Ur-ed hor-lzontally 20' out..ard ,.-om the outlying edge of etr-uc.tur-e(t1). I. !"!anted .. 1th ground c.over-or lo,. gro,.lng ehnib ,.pee.I•,. (lee,. than !!' In height) kno..n to have fire r-etar-dant &:flalltlet1. 2. No tr .. 11 or-ehrul::oe al lo,.ed. 5. Irrigated. &ec,TIOlil A-2 -m-ur-ed hor-1zorotally 20' out..ar-d Prom the olltlytng edge .,, S.<:tlon A-1. I. l"'la:t:.o.l ,.Ith lo,. ..ate.-UN naturalizing plant epec.l•• 1cno .. n to have lo,. fuel c.l,arac.t..-l11tlc.11. 2. No treet1 allo-ct. 5. lrr-lgated. e.ecTION A-!! -m-ur-ed out..ar-d ,rom the outlying edge of A-2 to lnc.lude the remainder .,, the ar-ea be""9en S.o:.tlon A-2 t:J//'id high rltlk ,1.-e areae ae de5c.r-lbed unc:iolr Sec.tlon 11 C. Horizontal dlstanc.e from the etr-uc.ture(r.) to untr-eated high rlek ar-eaa ehall not be ,.,.,. than 60'. I. l"'lanted ,.,th 1.,.. ,.ate,-uee naturalizing plant apec.1-1cno .. n to have ,.,,. ,uel c.harac.terftltlc.e. 2. Tr--ar-• allo,.•d but .tiall not io. planted o:.lo-.-than 20' apar-t. a. lrr-lgated. l".5-2 CONc::>ITION i, -NATI~ SLOl"!!S -l'\11.t>b.ANc::> 1"111'!! ~ION (!!lee Appendix ,. .2) l"'..-tatna to .,.,_ ...,.,.. removal ot envtr-omoental ly Nnelttve native vegetation le .--tr-lc.ted l'litt,Jn the Plr-• ..... t1one. 51!CTION !!II -meaaur-ed 20' hor-lzontally fr-om the olltlytng edge oP the etruc.tur-■) to..ard the envirormerotally r-eetr-ic.ted area a■ dePined ~ the City. I. Rarnoval of high f'll•I and moderate hazar-d epec.ie■" ae lieted In Appendix l".I. 2. l"'lantlng ,.,th ground c.over-or-,.,,. groNlng ehr-ub ape,:.,_ (I-than S' In height) kno..n to have Plr-e retar-dano q,ualltl•• ,,,-ae othe.-..1 ... req,utred b!j the City. 5. No tr--or-etrul::>e al lo,.ed. 4. lrr-lgatecl. e.ecTtON B:2 -meaaur-ed hor-1.zontally 20' out..ar-d Prom the outlying edge oP Bl. I. l'llarnoval of 'high f'llel epec.lat1" c,a lleted In Appendix l".I. 2. ~al b!j .. Iec.ttve pr-unlng oP up to 6°"' of the volumo, oP the "moder-ate fuel epec.lee" ae llt1ted In Appendix l".I. 5. ~!anting '"Ith natur-CIIIZlng lo'" fuel r.pec.i.e. 4. Tr-... anc:I lar-ge tr-.. fom, ehr-ube (e.g. Oc:lke, eumac., Toyon) Nhlc.h a.-. being r•tatned .iiall be pruned to provide c.lear-ano:.e eq,ual to th.--tlmee the height ot the eurr-oundlng under-etor-y plant mater-lal or-6', '""'"hever-1e higher-. c::>ead and exo:...,.lvely t..1ggy gro,.th ehall aleo ba r-emov•d. 5. lrr-tgated. &e:c;TION ea -mea■ur-ed horizontally 20' out..ar-d fr-om the outlying •.:lg• of Sec.tlon !32. The outer-•age of ea ehall extend har-tzontallly to a point at leaet 60' Prom etr-uc.tu.-.11. I. !lemoval of "high f'llel epec.1-• ae lit1ted In Appendix l'.I. :2. ,._,,,oval b!j ... Iec.tlv• pruning of up to 405I/, of the volume of th• 'moder-ate ,_, spec.ietl' CII llt1ted In ,•,ppenc:llx P.1. !!. Tr---■ and large tr--form alruba (e.g. °"""9, $uma<:, Toyon) ,<hie.I, a.-. batng retained ehall be pruned to pr-ovlde c.learano:.e eq~al to thr-ee t-the height of the ..,..rounding und.,..tor-y plant mater-Jal ,,,-6', Nh1c.l,ever-le higher-. c::>ead and exc.eet1lvely t..tggy gro,.th .tiall aleo be .-.moved. 4. Non-lrr-lgated. I" .S-4 Malntena...... ao:.o:.eN .tiall io. pr-ovldec::I to th• flr-e pr-otec.tlon ar-eae. I" .S-S c::>et,rt. and tr-trm,lngtl produc eel b!j thinning ehc:111 io. .-.moved fr-om the erte or ehall be ~er-tec:f to m11lo:.h b!j a c.t,tpptng mac.1,tne and evenly dleper-&ed ov•r the area to a maxm,m depth of 4". 00' oP the native undletur-bed area. I" .S-"T ihe l"lr-• t>epc:ar-trnent may r-eq,lr-• doo:.umentar-y ~apha oP t1lopn at the time oP tr-ec:atment. l"hotogtaplo.. ... 111 remain In poee•eelon oP the c;.11:y ae a r-eferenc.e Por Putur-e ..... ,ntenano:.e lnepec.tlone b!j the Cll:y. NATl\/!!5 Ac:lenoetoma Pa...tc.ulal:um Chamlee Artemlela c.allPornlc.a Cal!Pomia 6c:lgel::orueh l!!rtogonum ,a...1c.utaturn ~ Salvia epec.1-■ Sage Other-epec.1-■ ae epec.lPi.d by the City c::>otwESTICS Ac.ac.la epec.le■ Ac.Cle.la c.dr-ue apec.i.e Cedar- cupr-eMUt1 epeel-c:.yp.-... c::>oc:lonaea vltlc.ctla Hopeeecl !!lveh eiic.atyptue epec.i.e euc:.c:ityptue jw,Jper-ue ep-ietl jwilper- l"ennleatum l"ountaln 6rae11 l"'lr-ua apec.lee 1"'1,w other-epec.le& ae epe<:lfled b!j the City ~ ff! 1-!AZ.Al'lC) Sl"'!!c;l!!S Heter-omel-■ ar-butlPolla Tayan Maloema laur-lna Laurel eurnac. $/ero:.ue dumo""' 6c.rub Oak ~ integr!Polla Lemanade eerry Ayloc.oc.uc.u& bl-c.olor Minion Manzanita e. Compr-ehenelve L!ablllty lnauranc.• .. 1th limit■ oP not I-■e than tl500poo per any one per-eon anc:I e1poopoo per-any .,,.,. oc.c.urr•nc.• ae to bodily lnJur-Y or oeath and e:z,o,c,c,o per- oc.c.urr-..,,.,. a• to pr-operty damage. ~ CITY OF CARLSBAD ------------~ _________ .---------=------=::----------.-----.---.-----------------,-----,--~--~--I ~ PLAIINING DEPARTt.ENT • AS-BUil T" AREA 3.4/3,5 -PLANTING SPECIFICATI□NS ~ 2 APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING FREC.15E LOC.ATION OF PLANTING AREAS. u -.J * -I www.gmplandarch.com 9404 Genesee Avenue Suite 140 La Jolla California 92037-1353 Tel 858 558 8977 Fax 858 558 9188 LANDSCAPE ARCHITECTURE & PLANNING DRAWN JB APPROVED Ml( 1ST SUBMITTAL 02-09-07 2ND SUBKITl'AL S-13-07 3RD SUBMITTAL 4--30-07 4.TH SUBMITTAL 7-02-07 IIYUR SUBMITl'AL 7-10-07 JOB NO. 05-038 DATE 04-30-07 SCALE A.S SHOll'N DATE 1111..E: RECEIVED BY: INSPECTOR DATE 61JEST BJILOER VIL I AGES OF LA COSTA 11E OAKS -5.415.5 l-----l---+-------------1-----l--.L----l.---l I APPR~~-{ lT-E::>1--c:ft: PLANNING DA TE INlllAL ENGINEER OF WORK REVISION DESCRIPTION DATE INlllAL DATE INlllAL OlHER I\PPRDVAL CHY APPROVAL OWN BY: I PROJECT NO. I CHKD BY: C,T 05-16 RVWD BY: P-0 1-\~ ... , DATE DRAWING NO. ~tiae> -~ ~ I ~ I' APPROVED FOR PLANTING AND IRRIGATION ONLY, INCLUDING PRECISE LOCATION OF PLANTING AREAS. ~ECYCLED ~ATE~ USE tv1AF (NO RECYCLED HATER IRRIGATION IS PROPOSED IN THESE PLANS) IIF- --,,..,, IIO. ,...,_ -JI,., AREAS TO BE IRRIGATED BY RECYCLED HATER AREAS TO BE IRRIGATED BY POT ABLE HATER CITY OF CARLSBAD -.gmplandarch.com DRAWN .JR ~ ,---------::-. A~S::--:B:-:-U~IL-:T:::-.. ---------r---,----,---------------r----,---,---,----1 PLA/IIIIINC DEPARTMENT REC.Ye.LED KATER USE MAP 9404 Genesee Avenue APPROVED MM Suite 140 la Jolla 1ST SUBlOTTA.L 02-09-07 California 92037-1353 2ND SUBMITTAL S-13-07 Tel 858 558 8977 3RD SUBMITl'AL 4-30-07 Fax 858 558 9188 <&TH SUBMITTAL 7-02-07 LANDSCAPE MYLAR SUBIIITl'A.L 7-10-07 RCHITECTURE JOB NO. 05-038 DATE 04-30-07 PLANNING SCALE AS SHOWN TITLE: RECEIVED BY: INSPECTOR DATE 6'£'ST Bl/lLDER Vli.Utt5ES OF LA COSTA TIE OAKS -S.4 S.5 l..1-t-01 t------t--+------------+--+--+---t----i l-AP_PR~Pru"'--+-4::=.L....C. ___ f.A=l ... ~,Jt ......... ___ ?-l', .... 71 _ PLANNING DA TE _ t--:c-:-:--r::-=-:-:--t---------------+---+---+--+---1 DWN BY: __ PROJECT NO. DATE INITIAL ,....._DA_TE~_IN_lll_AL-+-_OA_TE~_IN_lll_AL_, CHKD BY: __ -~~~-ENGINEER OF 'MlRK REVISION DESCRIPTION OTHER APPROVAL OTY APPROVAL RVWD BY: DATE GT 05-lb I DRAWING NO. _ 44b-6L