1.0 Introductory As-Graded Information
1.1 Report Outline
The purpose of this report is to document our geotechnical observation and testing performed
during grading for the proposed new two-story residence with new detached two-story structure
consisting of a garage on the lower level and an apartment above at the subject property located
at 148 Tamarack Avenue Carlsbad CA, 92008 from March 41\ 2020 to March 16th,2020.
Geotechnical recommendations for this project was previously presented in the report entitled:
Updated Geo technical Investigation for the Subject Property Located at 148 Tamarack
Ave, Carlsbad, CA 92008 dated June 3,2019 by Applied Consultants.
Our scope of work is limited to the observation and testing, and consulting services during
grading at the subject property.
The following services were performed by us during our grading inspections.
• Compaction of the engineered fill was tested in accordance with the Sand Cone Method
(ASTM D-1556).
• Laboratory testing was performed to check soil conditions and strength parameters for
design purposes. Tests included maximum dry density, in-place moisture and density.
• As-Built Analyses -Geologic conditions observed during construction did not vary from
those identified during our preliminary investigation.
• As-Built Report -The following report has been prepared which outline the results of our
observations, testing, and analyses.
1.2 Project Description and Identification
The grading operations have been performed at 148 Tamarack A venue Carlsbad CA, 92008 The
intended purpose of the grading was to prepare the lot of the subject property for the construction
of the new two story residence with new detached two story structure.
The submitted plans for this project are referenced by:
Project#: GR2019-0015
Grading Plans by:
BHAinc.
5115 A venida Encinas
Suite "L" Carlsbad
CA, 92008-4387
148 Tamarack Ave -Final As Graded report
JL VG/BJ L 2/18/2022 Page 3 of 7
Grading contractor:
Pacific Coast Grading
2726 Morning Glory Ln
Carlsbad, CA 92008
Owner:
Paisan Pinpokintr
148 Tamarack Ave,
Carlsbad, CA 92008
1.3 Construction Summary
The grading of the subject property lot was completed under the supervision of the general
contractor. The grading operations were performed in two stages for the garage building pad and
the main residence building pad respectively.
• Stage I -Garage pad re-compaction
The grading operations for the building pad were to: excavate from grade to a minimum of 36
inches below grade scarify the exposed surface and compact the local soils to the required grade.
Prior to the backfill operations, a staff engineer from our firm inspected and approved the bottom
key of excavation. Maximum depth of fill for the garage pad was 48 inches below finish grade
towards the northwestern portion of the property.
• Stage II -Main residence pad re-compaction
The grading operations for the building pad were to: excavate from grade to a minimum of 36
inches below grade scarify the exposed surface and compact the local soils to the required grade.
Prior to the backfill operations, a staff engineer from our firm inspected and approved the bottom
key of excavation. Import soils were used as fill for the upper two feet of the main residence pad
re-compaction feet. Maximum depth of fill for the main residence pad was 48 inches below
finish grade towards the northeastern portion of the property.
The grading of the building pads began on March 3rd, 2020 and was completed by March 16th,
2020.
The local fill soils were mechanically excavated with a CAT938F Front loader and then
compacted with the wheels of the CAT938F Front loader. The excavation and compaction of the
local and import fill soils were extended generally to five feet outside of the proposed building
footprints.
148 Tamarack Ave -Final As Graded report
JL VG/BJL 2/18/2022 Page 4 of 7
• Stage III-Retaining walls
The site retaining walls were constructed without our supervision, we did not observe the footing
trenches and we did not monitor the backfill of the site retaining walls during construction.
Compaction testing was performed for the retaining walls located at the south of the property
with a maximum height of four feet. We were provided with testing windows, and we tested the
fill soils at two feet below top of wall and at finish grade. Compaction results were greater than
90% of the maximum dry density in conformance with our recommendations.
1.4 Scope of Services
We provided geotechnical engineering inspection services for the grading of the building pads.
The geotechnical engineering characteristics of the local and import fill soils were determined
according to:
Optimum Moisture Content and Maximum Density-ASTM D1557
In-Place Density Test (Sand Cone Method) ASTM-1556
Geotechnical engineering inspections were conducted by a representative from our
firm.
2.0 As-Graded Conditions
2.1 Geologic Conditions
The geologic condition that was encountered at the site was as anticipated in our geotechnical
inspection report for the subject property. We encountered a fine to coarse graded, orangish
brown silty sand (SM)
The import fill material used as fill for the upper two feet of the main residence pad was a fine to
medium grained, yellowish dark brown well-graded sand with silt (SW-SM).
No water was encountered at this site during grading operations.
2.2 Geotechnical Conditions
The grading at the subject property did not require stabilization fill, buttress fill, or subsurface
drainage.
3.0 Fill Placement and Compaction Testing
During our observations we conducted in-place soil density tests and conducted geotechnical
inspections throughout the duration of the project.
148 Tamarack Ave-Final As Graded report
JL VG/BJL 2/I 8!2022 Page 5 of 7
The grading of the project began with excavation from grade to a minimum depth of 36 inches,
the exposed surface was scarified and the local and import fill soils compacted to the required
grade. Maximum depth of fill for the building pad was 48 inches below finish grade towards the
northwestern portion and northeastern portion of the property.
The local fill soils were mechanically excavated with a CAT938F Front loader and then
compacted with the wheels of the CAT938F Front loader. The excavation and compaction of the
local and import fill soils were extended generally to five feet outside of the proposed building
footprints.
Our tests for compaction of the fill materials were in accordance with ASTM guidelines. The
compacted soils underwent the scrutiny of:
-Optimum Moisture Content and Maximum Density -ASTM D1557
-In-Place Density Test (Sand Cone Method) ASTM-1556
The following is a summary of our density tests:
Test# Elevation
( ft )/Location
4' below finish
grade / Garage Pad
T-1 2' below finish
grade/ Garage pad
T-2 1.5' below finish
grade/ Garage pad
4' below finish
grade / Garage Pad
T-3 2' below FG /
Main residence pad
T-4 2' below FG /
Main residence pad
T-5 FGI
Main residence pad
T-6 FG I
Main residence pad
148 Tamarack Ave -Final As Graded report
JLVG/BJL 2/18/2022
Date
March
3rd 2020 '
March
3rd 2020 '
March
3rd 2020 '
March
4th 2020 '
March
4th 2020 '
March
4th,2020
March
16th 2020 '
March
16th,2020
Page 6 of 7
Relative
Compaction
Approved key
>90%
>90%
Approved key
>90%
>90%
>90%
>90%
Notes
Approved garage
building pad
excavation.
Pass
Pass
Approved of main
residence building
pad excavation.
Pass
Pass
Pass
Pass
T-7 FG I Garage pad March >90% Pass
16th 2020 '
2' below finish
T-8 grade / South February >90% Pass
Retaining walls 14th 2022 ,
T-9 Finish grade / South February >90% Pass Retaining walls 14th 2022 '
4.0 Conclusions
It is our geotechnical engineering opinion that the soils for the building pads of the
proposed new two-story residence with new detached two-story structure have been compacted
in accordance with our recommendations and are suitable for its intended use.
We certify that all remedial earthwork and grading to bring the site to grade for the proposed
building pads were done in conformance with our recommendations.
148 Tamarack Ave -Final As Graded report
JLVG/BJL 2/18/2022 Page 7 of 7
T-7
T-8 T-2 £XIST. 6' PUBUC URUTY fASfMENT P£R ---...i..-1!----l BOOK 961, PAGE J, R£C. 07-10-T92J PROPOSED 6' HIGH IIOOO FENC£ PORRON OF £X15T. WALL TO R£MA.IN 53.80 TG 52.20 I[ COR[ HO/.£ 1HROUGH [XIST. WALL FOR 4• ouiur-1 ll -APPLIED CONSULTANTS ...,.._..,,_,...~~ 15' MANUFAC1UR£S AS APPROV£D BY O1\NfR c:, T-5 T-4 P£Rl.i£ABLE ARCHIT£CT': RY N ll 9.JJ' ,--,..-----=-=-=----~ AS-GRADED MAP (BUILDING PAD): TEST LOCATIONS 148 TAMARACK AVE, CARLSBAD, CALIFORNIA 92008 ~ ~ a ~ ~ i3 ':., ..., ~ ) PROPOSED BU/WING Date : 3/16/20 Drawn by: JLVG Lu <>: V ~ " !il ;:. ~ ~ ,. ~ v· :!. ':..,. ..., a -) ·--'·;