July 18, 2021
TMS Highland Investments, LLC
Tony Sfreddo
29250 Paseo Sedano
San Juan Capistrano, California
tsfreddo@icloud.com
Reference:
Subject:
W.O. 284018
Final As-Built Compaction Report,
Multifamily Residential Development 341-
347 Oak Avenue, Carlsbad, California
STRATA-TECH, IN C., "Preliminary Geotechnical Engineering Investigation,
Proposed Multi Family Residential Development, 341-347 Oak A venue Drive,
Carls bad, California, W.O. 28401 8.1, 8 Dec 2020"
Mr. Sfreddo:
Submitted herewith is the Final As-Built Compaction Report for the subject site. The grading
construction was conducted between March 16, 2020 and June 24, 2021, utilizing the
recommendations of the referenced report. Observations of the grading were provided by
STRATA-TECH, Inc.
PLACEMENT OF STRUCTURAL FILL
Compacted fill was placed on the subject site to provide adequate support for the proposed
multifamily building. Once foundations were poured and as retaining walls built walls were
water proofed, subdrains installed and backfilled with on site native soils.
OBSERVATIONS DURING GRADING
Preparation for placement of compacted fill included excavation to semi-subterranean pad grade
and recompaction of two feet below 5-feet beyond the building foundation to provide a minimum
STRATA-TECH,INC.
GEOCONSULTANTS
TMS Highland Investments, LLC
Final As-Built Compaction Report 2 W.O. 284018
July 18, 2021
of 2 feet of compacted fill under the footings of the proposed building. Prior to placement of fill,
the bottom was made level, scarified, watered and compacted.
Subsequent fills were placed in 6 to 8 inch loose lifts and compacted to a minimum of 90
percent.
IMPROVMENTS
Utility services
Water service May 2020
Sewer main and water installed in June -May-June2020.
Fire water line in August 2020.
Gas service line installed in April 2021.
Street improvements in June 24, 2021
Interior utilities
Sewer and water were backfilled with birds eye/ pea gravel to avoid damage from mechanical
compaction.
Foundations
Foundations were excavated per plan and penetrate the bearing soils a min of 24". Building
foundations were observed before pouring of concrete with capillary break, 15mill visqueen,
sand and steel ready for pour. Foundations were installed May-June 2020.
TESTING
Maximum density optimum moisture relationship determinations were performed for each soil
type encountered during grading operations. Test results were as follows:
Laboratory Standard: (ASTM: D-1557)
4-inch dia. mold; 1/30 cu.ft.vol.;
5 layers-25 blows per layer;
10 lb. hammer dropped 18 inches
STRATA-TECH,INC.
GEOCONSULTANTS
TMS Highland Investments, LLC
Final As-Built Compaction Report 4
COMPACTION TEST RESULTS
Test
No. Location
1 Building Pad
2 Building Pad
3 Building Pad
4 Building Pad
5 Building Pad
6 Building Pad
7 See plan
8 "
9 "
10 "
11 "
12 "
13 "
14 "
15 "
16 "
17 "
18 "
19 "
20 "
21 "
22 "
23 "
24 "
25 "
R. G.: rough grade
FG: finish grade
G: gas
W: wa ter
F: fore line
S: sewer
D: drive
CG: curb gutters
SG : subgrade
Below
Proposed
Grade (ft)
1
1
2
2
R.G.
R.G.
2.5
6.0
3.5
2
6.5
4
2
6
4
2
1
SG
SG
SG
SG
SG
SG
SG
SG
Moisture Dry Unit Soil Content Weight Type % (Lbs/fr)
9.8 118.0 I
10.1 117.7 I
10.1 119.2 I
10.0 116.9 I
9.4 119.3 I
9.8 119.3 I
9.7 112.0 I
10.1 117.4 I
11 .0 116.9 I
9.8 119.4 I
10.8 118.7 I
8.9 121.9 I
11.5 123.4 I
11 .4 120.0 I
9.7 121.9 I
10.2 123.1 I
9.3 122.0 I
10.5 121.5 I
9.9 120.9 I
9.8 121.0 I
11 .1 121.5 I
11.2 120.8 I
10.7 121.9 I
10.3 121.0 I
10.6 122.0 I
%Relative
Compaction
91.5%
91.2%
92.4%
92.1%
92.5%
92.5%
90.3
92.4
92.1
94.0
93.6
96.0
97.2
94.4
96.1
96.9
96.0
95.6
95.2
95.3
95.6
95.1
96.
95.2
96.0
W.O. 284018
July 18, 2021
Date
3-25-20
"
3-26-20
"
6-20
9-15-20
~ STRATA-TECH, INC.
· GEOCONSULTANTS
310. 968. 2999
stratatech@yahoo.com
~ STRATA-TECH, INC.
· GEOCONSULTANTS
310. 968. 2999
stratatech@yahoo.com
July 18, 2021
TMS Highland Investments, LLC
Tony Sfreddo
29250 Paseo Sedano
San Juan Capistrano, California
tsfreddo@icloud.com
Reference:
Subject:
W.O. 284018
Final As-Built Compaction Report,
Multifamily Residential Development 341-
347 Oak Avenue, Carlsbad, California
STRATA-TECH, IN C., "Preliminary Geotechnical Engineering Investigation,
Proposed Multi Family Residential Development, 341-347 Oak A venue Drive,
Carls bad, California, W.O. 28401 8.1, 8 Dec 2020"
Mr. Sfreddo:
Submitted herewith is the Final As-Built Compaction Report for the subject site. The grading
construction was conducted between March 16, 2020 and June 24, 2021, utilizing the
recommendations of the referenced report. Observations of the grading were provided by
STRATA-TECH, Inc.
PLACEMENT OF STRUCTURAL FILL
Compacted fill was placed on the subject site to provide adequate support for the proposed
multifamily building. Once foundations were poured and as retaining walls built walls were
water proofed, subdrains installed and backfilled with on site native soils.
OBSERVATIONS DURING GRADING
Preparation for placement of compacted fill included excavation to semi-subterranean pad grade
and recompaction of two feet below 5-feet beyond the building foundation to provide a minimum
STRATA-TECH,INC.
GEOCONSULTANTS
TMS Highland Investments, LLC
Final As-Built Compaction Report 2 W.O. 284018
July 18, 2021
of 2 feet of compacted fill under the footings of the proposed building. Prior to placement of fill,
the bottom was made level, scarified, watered and compacted.
Subsequent fills were placed in 6 to 8 inch loose lifts and compacted to a minimum of 90
percent.
IMPROVMENTS
Utility services
Water service May 2020
Sewer main and water installed in June -May-June2020.
Fire water line in August 2020.
Gas service line installed in April 2021.
Street improvements in June 24, 2021
Interior utilities
Sewer and water were backfilled with birds eye/ pea gravel to avoid damage from mechanical
compaction.
Foundations
Foundations were excavated per plan and penetrate the bearing soils a min of 24". Building
foundations were observed before pouring of concrete with capillary break, 15mill visqueen,
sand and steel ready for pour. Foundations were installed May-June 2020.
TESTING
Maximum density optimum moisture relationship determinations were performed for each soil
type encountered during grading operations. Test results were as follows:
Laboratory Standard: (ASTM: D-1557)
4-inch dia. mold; 1/30 cu.ft.vol.;
5 layers-25 blows per layer;
10 lb. hammer dropped 18 inches
STRATA-TECH,INC.
GEOCONSULTANTS
TMS Highland Investments, LLC
Final As-Built Compaction Report 4
COMPACTION TEST RESULTS
Test
No. Location
1 Building Pad
2 Building Pad
3 Building Pad
4 Building Pad
5 Building Pad
6 Building Pad
7 See plan
8 "
9 "
10 "
11 "
12 "
13 "
14 "
15 "
16 "
17 "
18 "
19 "
20 "
21 "
22 "
23 "
24 "
25 "
R. G.: rough grade
FG: finish grade
G: gas
W: wa ter
F: fore line
S: sewer
D: drive
CG: curb gutters
SG : subgrade
Below
Proposed
Grade (ft)
1
1
2
2
R.G.
R.G.
2.5
6.0
3.5
2
6.5
4
2
6
4
2
1
SG
SG
SG
SG
SG
SG
SG
SG
Moisture Dry Unit Soil Content Weight Type % (Lbs/fr)
9.8 118.0 I
10.1 117.7 I
10.1 119.2 I
10.0 116.9 I
9.4 119.3 I
9.8 119.3 I
9.7 112.0 I
10.1 117.4 I
11 .0 116.9 I
9.8 119.4 I
10.8 118.7 I
8.9 121.9 I
11.5 123.4 I
11 .4 120.0 I
9.7 121.9 I
10.2 123.1 I
9.3 122.0 I
10.5 121.5 I
9.9 120.9 I
9.8 121.0 I
11 .1 121.5 I
11.2 120.8 I
10.7 121.9 I
10.3 121.0 I
10.6 122.0 I
%Relative
Compaction
91.5%
91.2%
92.4%
92.1%
92.5%
92.5%
90.3
92.4
92.1
94.0
93.6
96.0
97.2
94.4
96.1
96.9
96.0
95.6
95.2
95.3
95.6
95.1
96.
95.2
96.0
W.O. 284018
July 18, 2021
Date
3-25-20
"
3-26-20
"
6-20
9-15-20