HomeMy WebLinkAboutCUP 260D; PALOMAR TRANSFER STATION; PROPOSED PALOMAR TRANSFER STATION PROJECT; 2019-11-14Converse Consultants
Geotechnical Engineering, Environmental & Groundwater Science, lnspectior1 & Test!r19 Services
November 14, 2019
Mr. OJ Dean
Principal Architect
KPG
3131 Elliott Avenue, Suite 400
Seattle, Washington 98121
RECORD CoPY 7
~i~ 1'¥1i' \/JI io . .. _ ., -, I)
Initial Date f(~(~'E. i ~! !~4 '-·•
Subject: Proposed Palomar Transfer Station Project
Orion Street and Faraday Avenue
Carlsbad, California
Converse Project No. 06-32-110-05
Dear Mr. Dean:
In accordance with your request and approval, Converse Consultants {Converse) has prepared
this percolation test review letter for the subject project. To prepare this letter, we have reviewed
the following:
• Converse Consultants, Geotechnical Investigation Report, Improvements to Palomar
Station, Orion Street and Faraday Avenue, Carlsbad, California, dated April 5, 2006,
Converse Project No. 06-32-110-01.
• The project grading, foundation and improvement plans for Proposed Palomar Transfer
Station Project.
• Percolation Testing Report, Palomar Transfer Station, 5960 El Camino real, Carlsbad,
California, prepared by Geologic Associates, dated November 2018.
Based on our review, the boring locations BH-1, BH-2 and BH-3 which were performed by
Converse are in the proposed biofiltration area. The borings BH: 1, BH-2 and BH~3 show very
dense materials up to five (5) feet below ground level and shallow bedrock materials from five (5)
feet below ground level. Dense and bedrock materials have low percolations rates and not
feasible to infiltration systems. Therefore, the proposed location is not feasible for infiltration
systems. Proposed biofiltration location with soil borings and boring logs are attached with this
letter.
The opportunity to be of service is highly appreciated. If you have any questions or require
additional information, please call the undersigned at (626) 930-1275.
Sincerely,
CONVERSE CONSULTANTS
~-'~~ c.:=-~~,' v-. ;i::;'---
siva K. ~an, PhD, PE, GE, OGE, QSD, F. ASCE
Senior Vice President/ Principal Engineer
Dist: 2/Addressee
Attachments
PA/SKS:jjl
717 South Myrtle Avenue, Monrovia, California 91016
Telephone: (626) 930-1200 + Facsimile: (626) 930-1212 ♦ www.converseconsultants.com
·, ·J -i i ·1 ·i I I L ........ -------... "i_ r-\ I j -,! ·-~-~--\ J NEW PAVING i j . , I. j , •• : .. : /. I I j-/,. : . ;·// f. / }I I ,!· • g § !/ p LE>s<LH II, I,: i 1, :/ : l,1 p ' caEJW..orr :1 • COMMERCt.ll ~/ J ti I CCIIWERCW;.·,o.r/ ,; ""ax~, ~1 I }ii , i NEW °"TES / / '!J ii t-f ··1 ri,, ~ : • i I \ a I , .. I i . \ ~:\\~ NEW '"BIJC \ \ \ •\\ •, \ ' '<i,~ .. _. CUEIJINC LJ,HC;', ~• I \ '.\\ ,v· ~\, '\.\\ . 'it,. \\ ~, -~ 'Ii). ·-~ .,._ "~ ~r '\, '110N ;✓ / / \l . -✓ / #✓/1~ .> ~\\\ V _.,-. -~ ,>~~/ ..... /"' · •.• ,,,, , 'o~J, J~~~ \ ;· ~ IIUC ~\..~~ MECIWIICS , ,' COST""'-"~\·~• ,o FNJ. Sli<lP AREA ' • -~~~!~'";,.~; .. ,.,,,~2:~-t'~(· -~L9l¢:cooH'. '•;'.-~;~/\ -"r;:> ,.i1¢,i\,.;-,\v~,__.· .,.110H '(::/ /) ,,,,. ... --:: .. ·'"\'... ..-.r / \ / •Ji; .. >•:_ V ·,:y_~/ /. ·: )v/. -~~;_✓~/ /'/ ,':(',' l, ·._,.· ,c;:> 11!111£R EXIT 1,,,,-, ,. ;1,_,,.···,.~ . ~✓/ \" ✓ , ✓ ,,. :· fflJOC . \ -\\\ .. · .,. .. .,. / w.sE LM· ·., ·.,, ,~ ~-\\ •, . v·, ~,, CCUUEJ!Ci.<1. EXIT -~ •:\'<.. ' ••~~\ <..:·~ '.'~ ,,;\ s:'t r I 'I ~--~ LEGEND BH-2 INDICATES NUMBER AND S APPROXIMATE LOCATION OF BORING " -~ ' . f ••. -4 ~ l ~SITE -.~i '\t \ ~ ... IO!"'_!Vl#' J -__,,7'\ 'J fl / ',,.i ., / 0--"i VICINITY MN' .. r ... 11 cT Base Plafl•Provided: by.Riha-Construction Co. SIT€' A-NllJ:lBORING: LOCATION, PLAN• r01•c~No. IMPROVEMENTS.:TO'T1-iEPALOMAR'TRANSFER'STATION, Clty,of'Cartsba¢..California, 06-32..110:.01 ~ Converse a;o:r.rsuJtants, Geotechlica-El\9n"'""l· and ~p1,; Sdenca. F1g1ir• No, 1'
Log of BH-1
3/9/2006 Logged by: CKL Checked By: Dates Drilled
Equipment: 8" HOLLOW STEM AUGER
Ground Surface Elevation (flt__ . N~~
Driving Weight and Drop_: _!40 lbs/ 30 in
Depth to Water (ft): NOT ENCOUNTERED
n I -I ~
.c a.. QJ
0
u E C. ro O> ,_ 0
(9 ...J
-5 __ _J__
'
I
I j r 10
r
I
I
SUMMARY OF SUBSURFACE CONDITIONS
This log is part of the report prepared by Converse for this project
and should be read together with the report. This summary applies
only at the location of the boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change
at this location with the passage of time. The data presented is a
simplification of actual conditions encountered.
4" ASPHALT CONCRETE OVER 8" AGGREGATE
BASE
FILL:
SILTY SAND (SM): fine-to coarse-grained, olive gray.
BEDROCK FORMATION:
SANDSTONE: broken into silty sand, fine-to
coarse-grained; cemented clasts, olive gray.
-rocks and cobbles
End of boring at 10.5 feet due to refusal of bedrock.
Groundwater not encountered at the time of drilling.
Boring backfilled with bentonite chips and soil cuttings.
-SAMPLES I-~I ~ 0 0 UJ I-LL 0::: ---::i z Cl)
1 w , s I-::i ~ I :J I 0 S2 >-c I er: ::::, ...J 0 0::: (j
0 CJ:l CJ:l ~ o-e:
7-
I
50-4" I 11.s : 110
I
50-6" i 14.5 1 99
'\ /;
50-4" 110 5 i 106
·,/ I (50-2") . /·
KN
(I)
I-
(I)
UJ I-
co ~ ...J
ds, wa
I I .I __ -1.__________ ------I I I --~--'--1 ___ _j_ L -
~ Converse Consultants
Project Name Project No.
Improvements to Palomar Transfer Station 06-32110-01 Carlsbad, California
For: Riha Construction Co.
Drawing No.
A-2
l
I
I
Log of BH-2
Dates Dri lled: 3/9/2006 Logged by: .. _ CKL Checked By: KN
Equipment: 8" HOLLOW STEM AUGER
Ground Surface Elevation (ft):__ __NIA _ .
Dri ving Weight and Drop: 140 lbs/ 30 !~ _
Depth to Water (ft): __ NOT_ENCOUNTERED _
SUMMARY OF SUBSURFACE CONDITIONS
Th is log is part of the report prepared by Converse for this project
and should be read together with the report. This summary applies g u only at the location of the boring and at the time of drilling.
.c i: Subsurface conditions may differ at other locations and may change ci 0. Cll Ol at this location with the passage of time. The data presented is a Cl) .... 0 0 C) ...J simplification of actual conditions encountered.
T FILL:
I I SILTY SAND (SM): fine-to coarse-grai ned, some fine
gravel, brown.
'
j 5 _,
I BEDROCK FORMATION:
I SANDSTONE: broken into silty sand, fine- to
coarse-grained, some broken cobbles, cemented,
I elastic sedimentary rocks and cobbles, reddish brown.
_j ,. 10
I -gray, rocks and cobbles
r I
1-15 I -rocks and cobbles
I -20 7 -some fine gravel, olive gray I I
I -rocks and cobbles
L -
End of boring at 24.5 feet due to refusal of bedrock.
Groundwater not encountered at the time of drilling.
Boring backfilled with soil cuttings.
_j
@ converse Consultants
Project Name
Improvements to Palomar Transfer Station
Carlsbad, California
For: Riha Construction Co.
I I-~ ~ SAMPLES,
g:-1 0 e....
0 lJJ (/)
LL a:: t: I----(/) ~ ::J z lJJ ! I-::J I-(/) ~ ...J 0 0 >-c 0) ' a:: ::J ...J I 0:: U I :5 0 co co ~ 0 -9:: ! --·7 --,
I max,ma
50-6" 19.~ I 11 8
~ 50-6"
~I
~-j
•, /I' I
f
I
1--,' ~-1
I
I
I
l--j >( p
I I
I::: /1 , . . I ,/',,,
50-4"
(50-4")
(50-2")
1 (96-11")1
I
(50-6") I I
Project No.
06-32110-01
16 109.5
10 I d" ISt. I
--__j____ ______ l
Drawing No.
A-3
i
I I
I
I
l,.og of BH-3
Dates Drilled: 3/9/2006 Logged by: CKL Checked By
Equipment: 8" HOLLOW STEM AUGER
Ground Surface Elevation (ft)~_ NIA
Driving Weight and Drop~_14_~ lbs! 30 in
Depth to Water (ft):_~9I .§_N.C<?_l!!')T~f3~Q_
g
.c -Cl. a,
0
g
.c Cl. CO Ol ,._ 0 (9 .J
SUMMARY OF SUBSURFACE CONDITIONS
This log is part of the report prepared by Converse for this project
and should be read together with the report. This summary applies
only at the location of the boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change
at this location with the passage of time. The data presented is a
si)11plification of actual conditions encountered.
FILL:
SAMPLES I t .~ I w 1· 1-, a::: -
:) I z
I-::i
5£2 >-c-o 0::: u I ~ 0 .e:
I SILTY SAND (SM): fine-to coarse-grained, some fine
gravel, brown.
5 J-'_l~---
BEDROCK FORMATION:
50-4" 12.5 1 108
50-6" 8
I 10
15
SANDSTONE: broken into silty sand, some fine gravel,
cemented, elastic sedimentary rocks and cobbles,
brown.
-gray
,~ ~ ~ ~ r CLAYSTONE: broken into clay, cemented, gray brown. I
... ;v: X >:
X Y X A
X X X :,,·
I .-C X >< ;x
-,.. ',, -,, )'
X ;o.. ,o X
l X Y >" >
I
I. I
~ ----------------' '
End of boring at 22.0 feet due to refusal of bedrock.
Groundwater not encountered at the time of drilling.
Boring backfilled with soil cuttings. I
(50-6"),
I I
11 s.5 I
I
i 50-4" 10 107
50-6" 25 , 92 ,
50-6" 18.5 103
I
l _L_ --~------·
KN
~ Converse Consultants
Project Name Project No.
06-3211 0-01
Drawing No.
Improvements to Palomar Transfer Station Carlsbad, California
For: Riha Construction Co.
A-4
. . Log of BH-4
Dates Drilled: 3/9/2006 Logged by: . _ _ __ . CKL Checked By:
Equipment: 8" HOLLOW STEM AUGER
Ground Surface Elevation (ft): __ N/A
Driving Weight and Drop: 140 lbs/ 30 in
Depth to Water (ft):_ NOT ENCOUNTERED
€
..c: ...., a..
(lJ
0
(.) :.c a.. CO Ol L. 0 (9 ...J
SUMMARY OF SUBSURFACE CONDITIONS
This log is part of the report prepared by Converse for this project
and should be read together with the report. This summary applies
only at the location of the boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change
at this location with the passage of time. The data presented is a
simplification of actual conditions encountered.
I
ISAM~LES _ §
a::: :J ...J 0 co co
·~lL':5 1 I
...___4_"_A_S_P_H_A_L_T_C_O_N_C_R_E_T_E_O_V_E_R_8_"_A_G_G_R_E_G_A_T_E _____ I_ I -
I I
r 5 --
'
I
J __ _J ___ j .
\ BASE
FILL:
SIL TY SA ND (SM): fine-to medium-grained, some fine
gravel, light brown.
-rocks /
/ ----------------------
End of boring at 6.5 feet.
Groundwater not encountered at the time of drilling.
Boring backfilled with soil cuttings.
I
!
I I
I I
I '
50-2" 16.5 I dist.
(50-6") I
______ J___i __ ·------' --~
KN
~Converse Consultants
Project Name
Improvements to Palomar Transfer Station
Carlsbad, California
Project No. Drawing No.
06-32110-01 A-5
For: Riha Construction Co.