Loading...
HomeMy WebLinkAboutSDP 2019-0015; JEFFERSON STREET APARTMENTS; PRELIMINARY HYDROLOGY & HYDRAULICS STUDY; 2020-09-14--... - ... ... -.. -.. -- ... - .. ... ... -... -... -... -... ... ... --... Preliminary Hydrology & Hydraulics Study Jefferson Luxury Apartments at 3039 Jefferson Street Carlsbad, California APN: 203-351-22-00 Prepared For Dr. Bruce Baker PRIVATE PROPERTIES, LLC P.O. Box669 Poway, CA 9207 4 Phone: 858-717-2929 Prepared Bv Landmark Engineering Corporation Lawrence E. Cole, RCE 36292 3443 Camino Del Rio South #204 San Diego, California 92108 Phone 6 260-0~ ~ ~~ RCE36292 Exp. 6/30/'12 Project #2404 September 14, 2020 ----... .. -... - ... .. -.. ... ... ... .. .. .. ... ... ... -... ... ... -... - -... -... .. ... INTRODUCTION PROJECT DESCRIPTION METHODOLOGY TABLE OF CONTENTS Existing Condition Hydrology Post-Development Hydrology HYDROLOGY CALCULATIONS INTENSITY-DURATION DESIGN CHART (100-yr Tc= 5 min.) INTENSITY-DURATION DESIGN CHART (2-yr Tc= 5 min.) RAINFALL ISO PLUVIALS 100-YEAR 6-HOUR PRECIPITATION 100-YEAR 24-HOUR PRECIPITATION 2-YEAR 6-HOUR PRECIPITATION 2-YEAR 24-HOUR PRECIPITATION RUNOFF COEFFICIENTS FOR URBAN AREAS (Table 3-1) HYDRAULIC CALCULATIONS CONCLUSION CERTIFICATION REFERENCES ATTACHMENTS DRAINAGE MAPS DRAINAGE MAP (EXISTING) DRAINAGE MAP (PROPOSED) ... -.. -.. .. --.. -.. .. -.. .. ... .. ... ... ... ... ... ... -... -... -... - ""' .. ""' - - INTRODUCTION The proposed project site is located in the City of Carlsbad, County of San Diego. The project is located at on the west side of Jefferson Street between Carlsbad Village Drive and Oak A venue. It is bordered to the east by Jefferson Street, to the east by an unnamed alley, and to the north and south by existing developed properties. The Assessor's Parcel numbers for the project lot are 203- 351-12-00 and 203-351-13-00. The project proposes grading and improvements for eleven residential units. This drainage study calculates the peak stormwater discharge entering and leaving the project site (onsite and offsite drainage) in the existing condition and after development. PROJECT SITE DESCRIPTION The project proposes two commercial/retail floor plan one at 1,100 sf and the other at 1,085 sf. It also proposes 17 residential units comprised of a total floor area of 18,259 sf with a deck area of 3,624 sf. The building can be conveniently accessed through an elevator from each of the floors. The off-street parking in the 1st floor parking garage has direct access from the unnamed alley and located at the rear of the property. The proposed architectural design maintains a traditional pitch roof and a contemporary look while utilizing form, material, color changes and clearly defined offsets are utilized to break the building into smaller vertical units to be consistent with the village character of the community. All the parking is located on first floor with 19 spaces which includes two handicap spaces. The parking has direct access to the alley with on-street parking on Jefferson Street. -... .. ... ... ... ... ----... -... -.. -... ... .. ... ... -... --... ... ... ... -... -... METHODOLOGY Stormwater runoff was calculated using the Rational Method as outlined in the San Diego County Hydrology Manual, dated June 2003. Stormwater runoff was calculated for an existing and post- development condition resulting from the 100-year, 6-hour storm event for the project and its drainage area. Standard intensity-duration curve data was used for the San Diego region supplied in the Manual. The soil group used for the site and in the drainage area is soil hydrologic Group B from Map Soil Hydrology Groups in County Hydrology Manual. EXISTING CONDITION HYDROLOGY The existing project site drainage area is approximately 0.436 acres. The site varies in elevation from a high of 47.95 through the property to a low of 46.44 at the southwest gutter of Jefferson Street and from a high of 47.95 through the property to a low of 45.17 at the southeast alley swale. The calculations for, the 0.436 acre drainage area that is graded or disturbed is divided into 5 separate basins (see Drainage Map (See Drainage Map (Existing)) each described as follows: Area El is a portion of Jefferson Street and an easterly portion of the property on the west side of Jefferson Street. The stormwater sheet flows to the westerly gutter in Jefferson Street and then southerly away from the site. The stormwater is concentrated to POC# 1 at a point in the westerly gutter of Jefferson Street. The runoff flows southerly to the northwesterly gutter of Oak A venue the surface flow southwesterly along Oak A venue through a series of cross gutters toward the Pacific Ocean . Determination of C for existing: Total Area = 2577.58 sf Impervious = 2029.56 sf %Imp. = 2029.56/2577.58 = 78.7% From Table 3-1: C = 0.78 By equation: C = 0.90 x (%imp)+ Cp x (1 -%imp)= 0.7828 use C = 0.78 Area E2 is a westerly portion of the property on the east side of an unnamed alley. The stormwater sheet flows westerly to the center swale in the unnamed alley and then southerly away from the site. The stormwater is concentrated to POC#2 at a point in the unnamed alley. The runoff flows southerly to the northwesterly gutter of Oak A venue the surface flow southwesterly along Oak A venue through a series of cross gutters toward the Pacific Ocean. Determination of C for existing: Total Area = 2577.58 sf Impervious = 2029.56 sf %Imp. = 2029.56/2577.58 = 78.7% From Table 3-1: C = 0. 78 By equation: C = 0.90 x (%imp) + Cp x (1 -%imp) = 0. 7828 use C = 0. 78 - - - ... .. --... .. .. .. .. -.. .. ... .. -----... --... .. ,. ... ... Area E3 is an onsite drainage area that sheet drains southerly over the south boundary into the adjacent developed property. There is no POC for this area. The runoff sheet flows westerly into the unnamed alley and for this report the Q is combined at POC#2 for design purposes only. Determination of C for existing: Total Area = 2577.58 sf Impervious = 2029.56 sf %Imp. = 2029.56/2577.58 = 78.7% From Table 3-1: C = 0.78 By equation: C = 0.90 x (%imp)+ Cp x (1 -%imp)= 0.7828 use C = 0.78 Area E4 is an onsite drainage area that sheet drains northerly over the north boundary into the adjacent developed property. There is no POC for this area. The runoff sheet flows easterly into the Jefferson Street and for this report the Q is combined at POC#l for design purposes only. Determination of C for existing: Total Area = 2577.58 sf Impervious = 2029.56 sf %Imp. = 2029.56/2577.58 = 78.7% From Table 3-1: C = 0. 78 By equation: C = 0.90 x (%imp)+ Cp x (1 -%imp)= 0.7828 use C = 0.78 Area E5 is a portion of the unnamed Alley in which the stormwater sheet flows to the centerline of the Alley then southeasterly to POC#2 at a point in the centerline of the unnamed Alley . The runoff then flows southerly to the northwesterly gutter of Oak A venue and then it flows southwesterly in the northwesterly gutter of Oak A venue through Madison Street, Roosevelt Street, and State Street, about 50' to an existing curb inlet which then carries the runoff in an underground drainage system which ultimately discharges into the Pacific Ocean. Determination of C for existing: Total Area = 2577.58 sf Impervious = 2029.56 sf %Imp. = 2029.56/2577.58 = 78.7% From Table 3-1: C = 0. 78 By equation: C = 0.90 x (%imp)+ Cp x (1 -%imp)= 0.7828 use C = 0.78 ... ... -... .. .. ... -.. ... .. .. .. .. .. .. ... ... ... ,. .. ... ---... -... ... - ,.. ... .... METHODOLOGY (continued) POST-DEVELOPMENT HYDROLOGY The project site drainage area is approximately 0.437 acres . The calculations for, the 0.436 acre drainage area that is graded or disturbed is divided into six (6) separate basins to define peak flows and DMA determination (see Drainage Map (See Drainage Map (Proposed)) with each described as follows: Area Pl is a portion of Jefferson Street and a portion of the parkway on the northeast side of the property. The stormwater flows southeasterly to POC#l at a point in the westerly gutter of Jefferson Street. The runoff continues southeasterly to the northwesterly gutter of Oak A venue and then it flows southwesterly in the northwesterly gutter of Oak A venue through Madison Street to an existing curb inlet between Madison Street and Roosevelt Street which then carries the runoff in an underground drainage system and ultimately discharges into the Pacific Ocean . Area P2 is a portion of the project on the northeast side of the property consisting of commercial roof and landscaping which flows to the westerly gutter of Jefferson Street then southerly away from the site. The stormwater is concentrated to POC#l at a point in the westerly gutter of Jefferson Street. The runoff flows southerly to the northwesterly gutter of Oak A venue and then it flows southwesterly in the northwesterly gutter of Oak A venue through Madison Street to an existing curb inlet between Madison Street and Roosevelt Street which then carries the runoff in an underground drainage system and ultimately discharges into the Pacific Ocean. Area P3 is a portion of the project on the southeast side of the property consisting of commercial roof and landscaping which flows to the westerly gutter of Jefferson Street then southerly away from the site. The stormwater is concentrated to POC#l at a point in the westerly gutter of Jefferson Street. The runoff flows southerly to the northwesterly gutter of Oak Avenue and then it flows southwesterly in the northwesterly gutter of Oak Avenue through Madison Street to an existing curb inlet between Madison Street and Roosevelt Street which then carries the runoff in an underground drainage system and ultimately discharges into the Pacific Ocean. Area P4 is a portion of the project on the northwest side of the property consisting of residential roofs, decks and landscaping which flows to the westerly into the centerline of the unnamed Alley then southerly away from the site. The stormwater is concentrated to POC#2 at a point in the centerline of the unnamed Alley. The runoff flows southerly to the northwesterly gutter of Oak A venue and then it flows southwesterly in the northwesterly gutter of Oak A venue through Madison Street to an existing curb inlet between Madison Street and Roosevelt Street which then carries the runoff in an underground drainage system and ultimately discharges into the Pacific Ocean . ... -.. .. -.. .. -.. -.. -.. - .. .. .. -.. ----.... -.. -... ,.. ,.. ... METHODOLOGY (continued) POST-DEVELOPMENT HYDROLOGY (continued) Area PS is a portion of the project on the southwest side of the property consisting ofresidential roofs, decks and landscaping which flows to the westerly into the centerline of the unnamed Alley then southerly away from the site. The stormwater is concentrated to POC#2 at a point in the centerline of the unnamed Alley. The runoff flows southerly to the northwesterly gutter of Oak A venue and then it flows southwesterly in the northwesterly gutter of Oak A venue through Madison Street to an existing curb inlet between Madison Street and Roosevelt Street which then carries the runoff in an underground drainage system and ultimately discharges into the Pacific Ocean . Area P6 is an unchanged portion of the unnamed Alley in which the storm water sheet flows to the centerline of the Alley then southeasterly to POC#2 at a point in the centerline of the unnamed Alley. The runoff then flows southerly to the northwesterly gutter of Oak A venue and then it flows southwesterly in the northwesterly gutter of Oak A venue through Madison Street to an existing curb inlet between Madison Street and Roosevelt Street which then carries the runoff in an underground drainage system and ultimately discharges into the Pacific Ocean. ---.. -----.. HYDROLOGY CALCULATIONS Area< 0.5 square miles. Use Rational Formula ~ =N33 ° 0 9, 38 II A=Wll7°20' 44" From Hydrology Manual Soils Map -Soils Group B Developed Site (Existing) 89.5% impervious Residential (Proposed) 89.2% impervious From INTENSITY-DURATION DESIGN CHART Q100 = CIA C = 0.83 C = 0.83 Loo= 6.59 in/hr. Tc= 5min I2 = 2.90 in/hr . 11111 From Existing Drainage Map -... .. --... .. -... -... -... -... .. ... ... .. .. Area El: Area E2: Area E3: Area E4: Area E5: Area El: Area E2: Area E3: Area E4: Area E5: Area El= 0.167 acres Area E2= 0.235 acres Area E3 = 0.045 acres Area E4= 0.016 acres Area E5 = 0.023 acres 0.486 acres Q100= CIA= (0.83)(6.59)(0.167) = 0.91 cfs Q100 =CIA= (0.83)(6.59)(0.235) = 1.29 cfs Q100 =CIA= (0.83)(6.59)(0.045) = 0.25 cfs Q100 =CIA= (0.83)(6.59)(0.016) = 0.09 cfs Q100= CIA= (0.83)(6.59)(0.023) = 0.13 cfs 2.67 cfs Q2 =CIA= (0.83)(2.90)(0.167) = 0.40 cfs Q2 =CIA= (0.83)(2.90)(0.235) = 0.57 cfs Q2 =CIA= (0.83)(2.90)(0.045) = 0.11 cfs Q2 =CIA= (0.83)(2.90)(0.016) = 0.04 cfs Q2 = CIA= (0.83)(2.90)(0.023) = 0.06 cfs 1.18 cfs ... -- ... -... .. .. .. ... -... .. .. .. .. ... ... ... .. .... --.. .... ' ... - .. ... ... ... HYDROLOGY CALCULATIONS (CONTINUED) From Proposed Drainage Map Graded Areas Area Pl: Area P2: Area P3: Area P4: Area PS: Area P6: Area Pl: Area P2: Area P3: Area P4: Area PS: Area P6: Area Pl= 0.092 acres Area P2 = 0 .110 acres Area P3 = 0.114 acres Area P4 = 0.062 acres Area PS= 0.061 acres Area P6 = 0.046 acres 0.485 acres Q100 =CIA= (0.83)(6.59)(0.092) = 0.50 cfs Q100 =CIA= (0.83)(6.59)(0.110) = 0.60 cfs Q100 =CIA= (0.83)(6.59)(0.114) = 0.62 cfs Q100 =CIA= (0.83)(6.59)(0.062) = 0.34 cfs Q100 =CIA= (0.83)(6.59)(0.061) = 0.33 cfs Q100 =CIA= (0.83)(6.59)(0.046) = 0.25 cfs 2.64 cfs Q2 =CIA= (0.83)(2.90)(0.092) = 0.22 cfs Q2 =CIA= (0.83)(2.90)(0.110) = 0.26 cfs Q2 =CIA= (0.83)(2.90)(0.114) = 0.27 cfs Q2 =CIA= (0.83)(2,90)(0.062) = 0.15 cfs Q2 =CIA= (0.83)(2.90)(0.061) = 0.15 cfs Q2 =CIA= (0.83)(2.90)(0.046) = 0.11 cfs 1.16 cfs I :5 I 0 .c ~ .c g1 . 0 ~o. 9 ·~o. 8 ~o 7 0. 6 0. 5 I 0. 4 0. 3 0.2 5 6 7 8 9 10 15 11 I I I l --! •. I !I Li I 111 Ii ! ! I I I I I I + t. : 1+ j_µ'~; (hi, I !; ! I I 20 30 40 50 Minutes Duration EQUATION = ?.44 P6 D-0.645 ' I l'!'-,.1 I 1, r-..r---; I ...._ I I I. ! II I i 'I I ! I I II II\ ! i 3 4 Hours I I Ii 1-, .1-1 i I 5 6 Ol :i: 0 !:; Intensity-Duration Design Chart -Template Directions for Application: (1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are included in the County Hydrology Manual (10, 50, and 100 yr maps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart. (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed. Application Form: (a) Selected frequency _.!..Q!L_ year p (b) P6 = ~ in .. P24 = _!.Q_ .~ = _iU_ %(2) 24 (c) Adjusted P6(2l = ---22_ in . (d) Ix = _5 __ min. (e) I = ~ in./hr. Calculated by formula Note: This chart replaces the Intensity-Duration-Frequency curves used since 1965. PG 1 1.5 2 2.5 3 3.5 ' 4 4.5 5 5.5 6 Duration I I I I I I I I I I I 5 2.63 3 95 5.27 6.59 7.90 9-22 10.54 , 1 !.86 13. 17 14.49 '15.81 7 2.12 , :u8 4.24 5.30 6.36 7.42; 8.48 9.54 10.60 1 t .66 12.72 10 1.68 2.53 3.37 4.21 5.05 5.901 6.74 7.58 8.42 9.27 10.11 15 t.30 1,95' 2.59 3.24 3.89-4.54'5. 19 . 5.84 6.49 7.13 7.78 20 1,08 1 62 2.15 2.69 3.2'J 3.77: 4.31 _ 4.85 : 5.39 5.93 6.46 25 0,93 1 40 1.87 2.33 2.80 3.27 3.73 4.20 4.67 5.13 5.60 30 0.83 1.24 t.66 2.07 2.49 2.90 3.32 3.73 4.15 4.55 4.98 40 0.69 1 03 1.38 1 72 2.07 2.41 2.76 3.10 3.45 3.79 4.13 50 0.60 0 90 1 19 1 49 l 79 2.09 2.39 2.69 2.98 3.28 3.58 60 0.53 0 80 1 06 1.33 1 59 186' 2.12 2.39 2.65 2 92 3.18 90 0.41 0.61 082 1.02 1.23 1.43 1.63 1.84 2.04 2.25 2.45 120 0.34 0.51 O.SB 0.85 1.02 1.19 1.36 1.53 1.70 1.87 2.04 150 0.29 0.44 0.59 0.73 0.88 1.03 1.18 1.32 1.47 t.62 1,76 180 0.26 0,39' 0.52 0.65 0, 78 0.91 1.04 1.18 1.31 1.44 1,57 240 0.22 . 0.33. 0.43 0.54 0.65 0.76 0.87 0.98 1.08 1.19 1.30 300 0.19 0 28 0.38 0.47 0.56 0.66 0.75 0.85 0.94 1.03 1.13 360 0.17 0.25 0.33 0.42 0.50 0.58 0.67 0.75 0.84 0.92 1.00 FIGURE ~ 10. O r~NI .::-1'--ioc-,r-. i:.:-,..._-;.•-"J~; 't -:-1 'i +-n'"T"'rl....-r! TTlrr ii nil ml 1ml ml !ti--r-'.I ir.-l h-rr:+m-tmlml ;-nil l,:-rr!lri-;-ll -+-,-1 ""Tl -,-,--r+.-1 "i 1-r+ 1 -;rl I'" I, i hT:-rnt-, ! 9·0 ""''1-..d-, ~I-..! 1-,..;~~p,,,...._:--t.._~l'~l-..:N.H1i-+++++I +H, +w.11++! .wl 1~1 LJ+H+I 1-+-rli+I f+++.!~:Wll4+1H+' l 114 ld!-l-ll --+-,f---Li H-++I +++I-HI 1...;..µ.i4-Jii-41 -m+lll-i ~:~N 1-..'r-..'r-J'i--.N--",.. illl lllillllll ii I Ill Ill ~ Ii-. ~N-J ·~~,. !.~~~~, Ill I EQUATION y.44 P6 0-0.645 J I :i 0 ~ a, .c g1 0 ~o. 9 ·~o. 8 ~O. 7 0. 6 0. 5 0. 4 0. 3 I I I I I I ' ! I I I I I ! . .I I i -·H--H+H+H1+H 1--,-1 H-1---1---1-1--._,1-; -+-·i-' -H-1+++·H .. H+H+H·1!+l' 0,1 I I I j i I 5 6 7 8 9 10 15 20 30 Minutes Intensity (in/hr) 6-Hour Precipitation (in) Duration (min) ' I, ! I I ;I,, I 1 H+H~-!+Hti+11#il*!_~-I-H·-H11-H+~-~11Ki~I~~ ~; I I 11 ... i ! 1 j I! i ! I! ' I ! 40 50 Duration Ii ' i \ 2 3 Hours 4 5 6 Intensity-Duration Design Chart -Template Directions for Application: (1) From precipitation maps determine 6 hr and 24 hr amounts for the selected frequency. These maps are included in the County Hydrology Manual (10, 50, and 100 yr maps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of the chart. (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed. Application Form: (a) Selected frequency _2 __ year (c) Adjusted p6(2) = _l_. I_ in . (d) tx = _5 __ min. (e) I = ...1.1Q_ in./hr. Calculated by formula Note: This chart replaces the Intensity-Duration-Frequency curves used since 1965. PS 1 .5 2 2.5 3 3.5 4 Duration I I I I I 5 2.63 3.95_s.2z; 6.5917.~19.22: 10.54 7 _?_.12 _ 3.18 __ 4.24_._§.3D_Ji.36. 7.421 8.48 10 1.68 2.53 3.37 4.21 '5.05 . 5.90 6.74 ~ ·1.30 1.9s~2.s(TEJ~_;]s-1 1 s.19 20 1,08 1.62 2.15 . 2.69 .;J.23_3.]7,_4.31 25 0.93 1 40 1.87 2.33. 2.80 3.27 3.73 30 0.83 1.24 1.66' 2.07 2.49 2.90 . 3.32 40 o.69 · .of 1.38 1.?2 2.0-r 2.41 2 76 SQ 0.60 o.9o 1.19 . i.49: 1.19 2.09: 2.39 60 0.53 0 80 1.06 1.33 l 59 1 86 2.12 96 0.41 0.61 0.02· 1.02 1.23 1.43· 1.63 120 0.34 0.51 0.68 -, 0.85: 1.02 1.19 1 36 1SO 0.29 0.44 0.59 0.73 0.88 1.03 1.18 18_~. 0.26 0,39' 0.52, 0.6( 0.7( 0.91 1.04 240 0.22 0.33 0.43 0.54 0.65 0.76 0.87 300 0. 19 028 0,38. 0.47 0.56 0.66 0. 75 360 -0.17 025 0.33. 0.42 0.50 0.58 0.57 4.5 5 5.5 6 I I I 11.86 13.17114.49.15.81 9.54 • 10.60111.66; 12.72 7.58 8.42 9.27 10.1 1 s.84 . BM ;1.!}_ 1.18 4.85 5.39 5.93 6.46 4.20 .. 4.67 r 5, 13 · 5.60 3.73 4.15 . 4.55 4.98 3. 10 3.45 + 3.79 4.13 2.69 2.98 ' 3.28 . 3.58 2.39 2.65 . 2.92 . 3.18 1.84 2.04 2.25 2.45 1.53 1.70 . 1.87 2.04 1.32 1.47 1.62 1.76 1.18 1.JI 1.44 1,57 0.98 1.08 1.19 . 1.30 0.85 0.94 ' 1.03 1. 13 0.75 0.84 0.92 1.00 FIGU R E @] t '- 38°1 Stl 1 I 1 I l r I l l l - .,. I i • I / 0 1 /: ;A ~ -r' I . .... .... ~~ • .. r_ -- -~ r---, ., >!-1:;r,~~ OCCEANSIDE I 1 -_J -' I __ J __ ·~ I: i•, ~ : c--J(i :-:w1 .. ~ ~---r-7!"-. . l-~ -l '(~~ SIT IL! -~,;i,,..-"' ,_;· ~ I '"\ --j ! .. ) . ,, CARL~BA --~-·-) ·. ·• ---j. . r \_ ---· I \ . ...:. r·J'" _r I I -~_,_., :..>t i J '-1 -' \ .. , __ ' 1 I .., .. _ .J/ I ' ' ~ ~ -I h : I I ' I ' .J ~ -rw~~~ . ~ EN1CINITA , .. _ .... -r-' t ~ OLAtr,JA BEA J 100yr-6hr 33°1 B' I I r L -+ ~ T I- t- -t f .....------.. t---+ - ~ -' ----, -r r I ~ ' I I l r l j r 1 ' I • I ~=tt,~ I O~EANSID 7':::+~iv\° ("' ' ·- , _J ~~~~~r~:;.~ , • ~ ~ ' ! .... --· 1 ' I I -i -r-----· I"" -~ f NCINIT1- i I r·j I , -----~..../ i i --i- T __ l I .. I ;-T I ~ I -1 -I 1 l \ I C O~EANp1D ·t7_. i 1 ~ ()) ci t J--•I L-~ _,,,,.. ' . I -\ \ ENClt'fJIT~S r I I ·J -~ ' .... ---+~-,11 .. .. ~~ . ~ ~ " • . 2yr-6hr -· -~ I ----. -1- · 3B 0 n5' I --l I !---• ,. ! ·t 1 ..J......--- ~- I I ~,-: ~ -t- I . t --- I +-I I -~--I ___, ----- l ..__ __ I 77- ' ~-- -+ -' I --;--i--i !h lo .... ·, ,, ' . ~-"-.. ·t -:· . .. ,. ~ I I I . I t '. D /-. -· I ' ... I j , -11111111 -- I I i ... I • -· V 2yr-24hr r 1 f 1 I 1 I I I I I I I I I I I 1 I I I 1 I I I I I 1 I I I 1 I I I 1 I 1 San Diego County Hydrology Manual Date: June 2003 Table 3-1 Section: Page: RUNOFF COEFFICIENTS FOR URBAN AREAS Land Use I Runoff Coefficient "C" Soil Type NRCS Elements Count Elements % IMPER. A 8 Undisturbed Natural Terrain (Natural) Permanent Open Space O* 0.20 0.25 Low Density Residential (LDR) Residential. 1.0 DU/A or less 10 0.27 0.32 Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 Low Density Residential (LOR) Residential, 2.9 DU/A or less 25 0.38 0.41 Medium Density Residential (MOR) Residential. 4.3 DU/A or less 30 0.41 0.45 Medium Density Residential (MOR) Residential, 7.3 DU/A or less 40 0.48 0.51 Medium Density Residential (MOR) Residential, 10.9 DU/A or less 45 0.52 0.54 Medium Density Residential (MOR) Residential. 14.5 DU/A or less 50 0.55 0.58 High Density Residential (HOR) Residential. 24.0 DU/A or less 65 0.66 0.67 High Density Residential (HOR) Residential. 43.0 DU/A or less 80 0.76 0.77 Commercial/Industrial (N. Com) Neighborhood Commercial 80 0.76 0.77 Commercial/Industrial (G. Com) General Commercial 85~ 0.80 0.80~ Commercial/Industrial (O.P. Com) Office Professional/Commercial 90 9.5 0.83 0.84 0.83 Commercial/Industrial (Limited 1.) Limited Industrial 90 0.83 0.84 Commercial/Industrial _{General 1.) General Industrial 95 0.87 0.87 C 0.30 0.36 0.42 0.45 0.48 0.54 0.57 0.60 0.69 0.78 0.78 0.81 0.84 0.84 0.87 3 6 of 26 D 0.35 0.41 0.46 0.49 0.52 0.57 • 0.60 0.63 0.71 0.79 0.79 0.82 0.85 0.85 0.87 *The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff coefficient, Cp, for the soil type}, or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area is located in Cleveland National Forest). DU/A= dwelling units per acre NRCS = National Resources Conservation Service Cp=0.90x(%imper)+0imper( !-%imper) Exist Cp=0.90x(.895)+.25(.105)=0.83 Proposed Cp=0.90x(.892)+.25(. 108)=0.83 3-6 ,. -.. ... .. .. .. ... .. -.. -.... .. .. ... -.. ... ... ... ... -.. ---... -.. .. .. .. .. ... .. HYDRAULIC CALCULATIONS Modified 3" x 12" D-25 Curb Outlet@ 2.0% Area P2 (Q100 = 0.38 cfs) n = .012 S = 0.02 A=0 .. 25 Wetted perimeter (full) = 1. 5' R=0.1 Calculated capacity= 1.33 cfs > 0.38 cfs (P2) OK! Modified 3" x 12" D-25 Curb Outlet@2.0% Area P3 (Q100 = 0.41 cfs) n = .012 S = 0.02 A= 0 . .25 Wetted perimeter (full) = 1. 5' R= 0.1 Calculated capacity= 1.33 cfs > 0.41 cfs (P3) OK! .. .. .. ,. .. .. ... ... -.. .. .. .. .. -.. .. .. ... .. -.. -.. ... .. -.. ... pa CONCLUSION 1. The proposed project does not substantially alter the existing drainage pattern of the site or area. No flooding will occur due to development. 2. With no reduction in Time of Concentration, the peak Qs post-construction remain virtually equal to or less than pre-construction. Minor discrepancies of 0.01 cfs are the result of mathematical round off only. Added Time of Concentration from using planters will further reduce Intensity (not calculated) will further reduce the post construction peak flows . 3. As shown above, the proposed project does not create or contribute any runoff water which would exceed the current capacity of existing storm water drainage systems. 4. The concrete ramp, Area P6, requires a separate sump pump for minimal runoff, Q!Oo= 0.31 cfs. The runoff which is collected in a trench drain and carried to a catch basin on the upper parking level where it is pumped up to a Biofiltration Basin for Treatment and Detention . 5. Hydrology Report Summary: EXPECTED RUNOFF DISCHARGES (a), 5 minutes Outlet Tributary Area Ql00 Peak Q2 Peak Discharge (Acres) Discharge ( cfs) (cfs) Pre Post Pre Post Pre Post Jefferson Ave POC#l 0.183 0.317 1.00 1.72 0.44 0.75 Unnamed Alley POC#2 0.303 0.169 1.67 0.92 0.74 0.41 Total 0.486 0.486 2.67 2.64 1.18 1.16 Outlets shown are based on changes per development of the project site . Storm water runoff was calculated using the Rational Method as outlined in the San Diego County Hydrology Manual, dated June 2003. Stormwater runoff was calculated for an existing and post-development condition resulting from the 100-year, 6-hour storm event for the project and its drainage area. Standard intensity-duration curve data was used for the San Diego region supplied in the Manual. .. .. ... .. .. .. .. .. ... .. ,.. ... .. .. ... .. .. .. .. .. .. .. ... -.. ... ... -.. -.. ,... Ill! ... CERTIFICATION Report Preparation I certify that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is true, accurate, and complete . CIVIL ENGINEER September 14, 2020 Date RCE 36292 Exp. 6/30/22 - .. .. .. .. .. .. .. - ... .. .. 1111 .. ... ... ... -... -.. - ... .. .. REFERENCES 1. County of San Diego Department of Public Works Flood Control Section, San Diego County Hydrology Manual dated June 2003 . 2. County of San Diego Stormwater Standards Manual . EX. CDNC. EX, BLDG ~ I __J PARCEL 1 PH 3339 ; I 'I. ii ,_._ EX, BLDG ------ 9 7 -T ' i i 6 I I ' u z D u x u I I~ ~, x w FS45.50 \'G-I \-<0, ' .. _ u z D u x w \ / \/ \ \ 4 ' ';J] 21 I L_ I ___j fX BLTIG I L_ ~~ '_i - ------------------------------ EASEMENTS, AN EASEMENT FOR THE PURPOSE SHOWN BELOW AND RIGHTS INCIDENTAL THERETO AS SET FORTH IN A DOCUMENT. GRANTED TO: SAN DIEGO GAS AND ELECTRIC COMPANY PURPOSE: UNDERGROUNDING FACILITIES AND ABOVE GROUND STRUCTURES TOGETHER WITH THE RIGHT OF INGRESS AND EGRESS THEREFROM RECORDED: NOVEMBER 9, 1976 AS FILE NO. 76-374117 OF OFFICIAL RECORDS THE EXACT LOCATION AND EXTENT OF SAID EASEMENT IS NOT DISCLOSED OF RECORD. I \ I 1 <1--lc4)'..,~ lfl~ i (/) 11~ I , ' I ! I' 40' --r-----' / I~ 16'+ , ,)Y l~====--~=~---4v ~ ' " __J "' BENCH MARK CLSB-130 ~ w x "' +I I I S[T 2,5' DISK IN SOUTH[AST CORN[R OF DR AI NAG[ BOX INL[T AT TH[ [ND OF CURB R[TURN IN TH[ NORTH[AST CORN[R OF GRAND AV[NU[ AND w'ASHINGTON ST. NGVD29 [L[V,: 40,91 No. Q loo= 1.72 CFS P9C111 IP1, P2, P~ " 24'± No. 5097 Exp. 06/30/21 REVISIONS Description I I I I 1--w w a::: 1-- (/) ~z D (/) a::: w LL l.L 5w 7 24'± Approved 40' Date : I , I \ \ 16'± .. --- l~,o, ', I, 5'± J, ~ \ / r ., X \ \ \ \ \ \ \ w 8 ~ "' ? LEGAL DESCRIPTION: ! 1 VICINITY MAP ND SCALE LEGEND• ITEM PROPERTY LINE EX. EXISTING CONTOUR EXISTING SPOT ELEVATION EX. ASPHALT EX. CONCRETE EX. WATER METER EX. FIRE HYCRANT EX. PO\,/ER POLE PROPOSED DECK PROPOSED UPPER DECK PROPOSED SLOPED ROOF FLOW DIRECTION PROPOSED CONCRETE· PROPOSED CURB PROPOSED CURB & GUTTER DRIVE\,/AY TOP OF CURB FLOW LINE PAVEMENT FINISH FLOOR SYMBOL EXISTING --(34)-- ~ ASPH CDNC. \,I).\ Ci FHIX)'.J pp ~ EB [[]Il[[]Il]] . . " . D\,/Y TC FL p FF LOTS 23, 24, 25, 26 IN BLOCK 48 OR TOWN OF CARLSBAD, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 535, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, MAY 2, 1888. ASSESSOR"S PARCEL NUMBER: 203-351-22-00 DRAINAGE MAP (PROPOSED) FOR: JEFFERSON LUXURY APARTMENTS Carlsbad, CA PREPARED FOR: PRIVATE PROPERTIES, LLC OR. BRUCE BAKER P.O. BOX 669 POWAY, CA 92074 (858) 717-2929 Sht 1 of 1 Date:9/04/20 Dwn. MC L E C LANDMARK ENGINEERING CORPORATION 3443 Camino Del Rio South Suite 204 San Diego, CA 92108 (619) 260-0420 Apr. LEC Dwg. No. 2404-PGP-1 EX, C□NC. ' I I EX, BLDG __ __j v· ~ 'J½ 0 EX, BLDG r-- _J n1 ' __J 9 I I I I s I u s x w >-w _J I <[ 10' u z D u x w ' ' I i \ +-- 10' a, (\J 0 1---"<I"" (Y) z x w I? I \ \ I I I I x w ' -7 I \ / \ / \/ I \ \ \ ~ i 1 EX. B!,.~G rr ar ·,t:. ?7 28 - I u z 8 d I r-- 1 I I I I I- EX. BLDG E2 10241.072 SF 0,235 AC 1 0 EX, 3ACi(Fl_OY/ - '' [,, 16'+ 7 5'+ --<11> i::;.:. crn,,:c, ..___ .....____ D?l·JE\./AY I EX, BLDG *- i JI ,, ~ '":'-- L _J I __J EX. BL~·G I I i I L_ --, ------': EASEMENTS: AN EASEMENT FOR THE PURPOSE SHOWN BELOW AND RIGHTS INCIDENTAL THERETO AS SET FORTH IN A DOCUMENT. GRANTED TO: SAN DIEGO DAS AND ELECTRIC COMPANY I ' PURPOSE: UNDERGROUNDING FACILITIES AND ABOVE GROUND STRUCTURES TOGETHER WITH THE RIGHT OF INGRESS AND EGRESS THEREFROM RECORDED: NOVEMBER 9, 1976 AS FILE NO. 76-374117 OF OFFICIAL RECORDS THE EXACT LOCATION AND EXTENT OF SAID EASEMENT IS NOT DISCLOSED OF RECORD. --._ / / /--1~ I ·1-===-=--jL9: ~ 4 :Jc w BENCH MARK CLSB-130 6 w x 'W i I I I I ' S[T 2.5' DISK IN SOUTH[AST CORN[R OF DRAINAG[ BOX INL[T AT TH[ [ND OF CURB R[TURN IN TH[ NORTH[AST CORN[R OF GRAND AV[NU[ AND WASHINGTON ST, NGVD29 [L[V,1 40.91 i i II : l I I, \ I I I I I ! 40' I Oe-H-+- ! j~ I i ,' i' I / i I I j I Na. 5097 Exp. 06/30/21 1--w w 0:::: 1- (/) z D (/) 0:::: w LL LL w 7 24'+ Ii II I .1 !I !I 1: I I' Ii • I i \VJ I I ·~ ! I ' I I I ' I , I I I I/ I I __J_l , i I I ' I V) I ' X CJ REVISIONS I I I I I I I ' I ' I I 'I 'I I ii I r ), II 11 Ii I --7 24'± r 'i \ \ 40' D ' :;::::: \ -< \ 16'± \ C, ?< V, D C, : ,;:::: ~ " \ ', I ' LEGAL DESCRIPTION: LDT AREA 13977,8256 SF IMPERVIOUS AREA 12507.4084 SF 89.5% IMPERVIOUS LOTS· 23, 24, 25, 26 IN BLOCK 48 OR TOWN OF CARLSBAD, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 535, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, MAY 2, 1888. ASSESSOR'S PARCEL NUMBER: 203-351-22-00 DRAINAGE MAP (EXISTING) FOR: JEFFERSON LUXURY APARTMENTS Carlsbad, CA PREPARED FOR: LANDMARK ENGINEERING CORPORATION No. Description Approved Date PRIVATE PROPERTIES, LLC DR. BRUCE BAKER L E C 3443 Camino Del Rio South Suite 204 P.O. BOX 669 POWAY, CA 92074 (858) 717-2929 Sht 1 of 1 Date:8/05/15 Dwn. MC San Diego, CA 92108 (619) 260-0420 Apr. LEC Dwg. No. 24D3-TOP0-1