HomeMy WebLinkAboutCDP 2017-0044; THOMPSON GEESBREGHT; FINAL SOILS REPORT; 2022-01-03@ COAST GEOTECHNICAL I CONSULTING ENGINEERING GEOLOGISTS
January 3, 2022
John and Priscilla Geesbreght
4056 Skyline Road
Carlsbad, California 92008
Subject: FINAL GEOTECHNICAL REPORT
Proposed Guest House and Garage
4056 Skyline Road
Carlsbad, California
References: Please see Page 5
Dear Mr. and Mrs. Geesbreght:
W.O. 674617
In response to your request, enclosed is our Final Geotechnical Report on the above referenced
property. This report presents a summary of our geotechnical observations during the grading and
construction phases.
PROPOSED DEVELOPMENT
Grading plans for site development were prepared by Civil Landworks. The project included the
construction of a guest house and a garage. The structures are supported on continuous wall and
column pad footings with slab-on-grade floors. Retaining walls ranging from 1.0 to 4.0 feet were
constructed between the guest house and garage and along the southwest portion of the development.
Grading on the site consisted of cuts up to 3.0 vertical feet and fills up to 2.0 feet.
Coast Geotechnical
GEOTECHNICAL CONDITIONS
January 3, 2022
w.o. 674617
Page 2 of 6
The subject property is located in the Coastal Plains Physiographic Province of San Diego. The
property is underlain at relatively shallow depths by Pleistocene Very Old Paralic Deposits. The
Very Old Paralic Deposits are covered by relatively thin fill and/or top soil. Unweathered dense
Very Old Paralic Deposits are considered dense and competent, which makes it suitable for the
support of foundation and fill deposits. The Very Old Paralic Deposits are composed of reddish-
brown fine to medium grained sand.
CONSTRUCTION PHASE
1) Rough grading for the development was performed by John Smith Earthworks from May 9
through June 11, 2019. The remedial grading was observed and or tested by this firm on May
15, 2019, June 4 through 7, 2019 and June 10 through 11, 2019.
2) Caisson excavations for the garage were observed by this firm on December 9, 2019. The
caisson excavations for the garage are founded into compacted fill deposits with an expansion
potential in the very low range.
3) The continuous wall and column pad footing excavations for the guest house and site retaining
wall for the support of the garage pad were observed by this firm on October 2, 2019.
4) The continuous wall and column pad footing excavations were founded into compacted fill
deposits. The footing excavations were approved by this firm provided all loose deposits were
removed from the base of the excavations prior to pouring concrete. The footing excavations
were not reviewed for compliance with structural plans and location.
Coast Geotechnical January 3, 2022
w.o. 674617
Page 3 of 6
5) Based on visual classification and previous laboratory testing, the mixture of soils utilized as
compacted fill reflect an expansion potential in the very low range.
6) The utility trench backfill consisted of on-site materials and was compacted with hand operated
compaction equipment (whacker). The utility trench backfill within the building perimeter of
the guest house was observed by this firm on October 2, 2019.
CONCLUSIONS
The geotechnical conditions encountered on the site were in substantial conformance with those
conditions anticipated in the Preliminary Geotechnical Investigation Report. In general, the
recommendations of the geotechnical reports were implemented during the grading and construction
phases.
Footings and slabs on grade should be protected from root and/or moisture migration. Undermining
and pressure from roots and/or saturated soil conditions from infiltration can adversely affect
foundations and slabs on grade. Irrigation should be limited to that amount necessary to sustain plant
life. Over zealous irrigation can result in slope instability and settlement of foundations and concrete
flatwork.
LIMITATIONS
This office assumes no responsibility for any alterations made without our knowledge and written
approval, subsequent to the issuance of this report. All areas of disturbance which require the
placement of compacted fill to restore them to the original condition will not be reviewed unless
such backfilling operations are performed under our observation and tested for required compaction.
It should be noted that density (compaction) testing is conducted on a very small volume of the fill.
The intent is to provide an opinion, based on selective testing and observation during fill placement.
Coast Geotechnical January 3, 2022
W.O. 674617
Page 4 of 6
Coast Geotechnical cannot be responsible for areas not reviewed for soil compliance during
construction. Such areas are the sole responsibility of the contractor.
Geotechnical analysis of storm water infiltration was limited in scope. The long term effects of
infiltration cannot be predicted with certainty and can only be evaluated through usage and time.
However, in no respect do we guarantee or warrant the future performance of infiltration systems.
This study has been provided solely for the benefit of the client and is in no way intended to benefit
or extend any right or interest to any third party. This study is not to be used on other projects or
extensions to this project except by agreement in writing with Coast Geotechnical.
If you have any questions regarding this report, please contact our office. Reference to our Job No.
674617 will help expedite a response to your inquiry.
Respectfully submitted,
COAST GEOTECHNICAL
Mark Burwell, C.E.G.
Engineering Geologist
Enclosures: Compaction Test Results
Grading Plan
✓~~~~
Vithaya Singhanet, P.
Geotechnical Engineer
Coast Geotechnical
REFERENCES
1. PRELIMINARY GEOTECHNICAL INVESTIGATION
Proposed Guest House and Garage
4056 Skyline Road
Carlsbad, California
Prepared by Coast Geotechnical
Dated July 26, 2017
2. SUPPLEMENTAL REPORT FOR PROPOSED GRADING
Proposed Guest House
4056 Skyline Road
Carlsbad, California
Prepared by Coast Geotechnical
Dated January 8, 2018
3. FOUNDATION PLAN REVIEW
Proposed Guest House
4056 Skyline Road
Carlsbad, California
Prepared by Coast Geotechnical
Dated January 28, 2018
4. RESPONSE TO CITY OF CARLSBAD
SDRSD C-01 Retaining Wall
Proposed Guest House
4056 Skyline Road
Carlsbad, California
Prepared by Coast Geotechnical
Dated July 2, 2018
5. GRADING PLAN REVIEW
Proposed Guest House
4056 Skyline Road
Carlsbad, California
Prepared by Coast Geotechnical
Dated December 12, 2108
January 3, 2022
w.o. 674617
Page 5 of 6
Coast Geotechnical
6. ROUGH GRADING REPORT
Proposed Guest House
4056 Skyline Road
Carlsbad, California
Prepared by Coast Geotechnical
Dated June 26, 2019
7. NOTICE OF FOOTING EXCAVATION OBSERVATION
Proposed Residential Structure and Site Retaining Wall
4056 Skyline Road
Carlsbad, California
Prepared by Coast Geotechnical
Dated October 3, 2019
8. NOTICE OF CAISSON EXCAVATION OBSERVATION
Proposed Guesthouse and Garage
4056 Skyline Road
Carlsbad, California
Prepared by Coast Geotechnical
Dated December 9, 2019
January 3, 2022
w.o. 674617
Page 6 of 6
ENCLOSURES
COMPACTION TEST RESULTS
PROJECT NO: 674617 PROJECT NAME: Greesbreght
PROJECT LOCATION: 4056 Skyline Road, Carlsbad, CA
FIELD COMPACTION TEST RESULTS (ASTM D1556):
Approximate Field Max.
Date Test Soil Approximate Test Field Moisture Dry Dry Relative Comments
No. Type Test Elevation (MSL) (%) Density Density Compaction
Location (ft) (pct) (pct) (%)
5/15/2019 I I Bldg Over-Ex 284 6.5 109.5 116.5 94
5/15/2019 2 I Bldg Over-Ex 289 9.3 107.7 116.5 92
6/4/2019 3 I Bldg Over-Ex 286 8 115.8 116.5 99
6/4/2019 4 I Bldg Over-Ex 289 8.2 109 116.5 94
6/4/2019 5 I Bldg Over-Ex 287.5 6.5 108.5 116.5 93
6/5/2019 6 I Bldg Over-Ex 288.5 6.7 115.2 116.5 99
6/5/2019 7 I Bldg Over-Ex 290 8.9 114.4 116.5 98
6/5/2019 8 I Bldg Over-Ex 290 9.1 114.8 116.5 99
6/6/20 I 9 9 I Bldg Over-Ex 290 8.6 113.7 116.5 98
6/6/2019 10 I Bldg Over-Ex 292 9.2 114 116.5 98
6/6/2019 II I Bldg Over-Ex 294 6.8 114.5 116.5 98
6/7/2019 12 I Bldg Over-Ex 296 7.9 113.7 116.5 98
6/7/2019 13 I Bldg Over-Ex 296 8.8 115.1 116.5 99
6/7/2019 14 I Bldg Over-Ex 297 6.2 113.2 116.5 97
6/10/2019 15 I Bldg Over-Ex 298 8.4 114.7 116.5 98
6/10/2019 16 I Bldg Over-Ex 296 6.9 115.8 I 16.5 99
6/10/2019 17 I Bldg Over-Ex FSG 7.3 114.3 I 16.5 98
6/11/2019 18 I Bldg Over-Ex FSG 6.6 113.9 I 16.5 97
6/11/20 I 9 19 I Bldg Over-Ex FSG 8.9 115 I 16.5 99
6/11/2019 20 I Bldg Over-Ex FSG 8.5 114.8 I 16.5 99
6/11/2019 21 I Bldg Over-Ex FSG 6.7 114.8 116.5 99