HomeMy WebLinkAbout2022-04-05; Municipal Water District; Resolution 1670RESOLUTION NO. 1670
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CARLSBAD
MUNICIPAL WATER DISTRICT, AUTHORIZING EXECUTION OF AMENDMENT
NO. 4 TO THE PROFESSIONAL SERVICES AGREEMENT WITH NV5, INC., A
CALIFORNIA CORPORATION, TO EXTEND THE AGREEMENT TERM AND
REVISE THE LABOR RATE SCHEDULE FOR THE RECYCLED WATER PHASE Ill
RESERVOIR PROJECT
EXHIBIT 1
WHEREAS, on April 12, 2016, the Board adopted Resolution No. 1546, approving an Agreement
with NV5, Inc. a California corporation, or NV5, to provide engineering design services for the Recycled
Water Phase Ill Reservoir Project, Capital Improvement Program, or CIP, Project No. 5210, or Project,
for an amount not to exceed $287,154; and
WHEREAS, on March 28, 2018, the Executive Manager approved Amendment No. 1, which
extended the term of the Agreement for a period of two years ending on April 13, 2020; and
WHEREAS, the Project was delayed beyond the Agreement completion date to confirm that the
proposed storage tank capacity was consistent with the projected recycled water system demands of
the 2019 CMWD Recycled Water Master Plan, or RWMP; and
WHEREAS, on March 12, 2020, the Board approved Amendment No. 2, which extended the
Agreement term for a period of two years ending on April 13, 2022, and authorized additional design
phase services for the not-to-exceed amount of $26,800, resulting in a total not-to-exceed Agreement
amount of $313,954; and
WHEREAS, on Dec. 21, 2020, the Assistant Executive Manager approved Amendment No. 3,
which authorized landsca pe design services for the not-to-exceed amount of $22,462, resulting in a
total not-to-exceed Agreement amount of $336,416; and
WHEREAS, Project design revisions necessitated a new application for a Conditional Use Permit
and a Coastal Development Permit, further delaying the Project; and
WHEREAS, staff desire to extend the term for an additional two years and revise the labor rate
sc hedule; and
WHEREAS, the Project budget for CIP Project No. 5210 is sufficiently funded for the scope of
work and costs related to this Agreement amendment.
NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of Directors
of the City of Carlsbad, California, as follows:
1. That the above recitations are true and correct.
2. That the President of the Board is hereby authorized and directed to execute Amendment
No. 4 to the Agreement with NVS for the Project, which is attached hereto as Attachment A.
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the Carlsbad Municipal Water
District Board of Directors of the City of Carlsbad on the 5th day of April, 2022, by the following vote,
to wit:
AYES:
NAYS:
ABSENT:
Hall, Blackburn, Bhat-Patel, Acosta, Norby.
None.
None.
MATT HALL, President
fov FAVIOLA MEDINA, City Clerk Services Manager
(SEAL)
DocuSign Envelope ID: FC9C541 F-348C-4BDF-ADC8-4B013388A8FD
Attachment A
UTIL 1400
AMENDMENT NO. 4 TO EXTEND AND AMEND AGREEMENT FOR ENGINEERING DESIGN
SERVICES FOR RECYCLED WATER STORAGE RESERVOIR AT THE D TANK SITE
NV5, INC.
This Amendment No. 4 is entered into and effective as of the J ~ day of
ft~\/\ \ , 2022, extending and amending the professional services
agreement dated pril 14, 2016, (the "Agreement") by and between the Carlsbad Municipal Water
District, a Public Agency organized under the Municipal Water Act of 1911, and a Subsidiary
District of the City of Carlsbad, ("CMWD"), and NV5, Inc., a California corporation, ("Contractor")
(collectively, the "Parties") for design services for the recycled water storage reservoir at the D
tank site.
RECITALS
A. On March 28, 2018, the Parties executed Amendment No. 1 to the Agreement to
extend the term for a period of two (2) years; and
B. On March 12, 2020, the Parties executed Amendment No. 2 to change the scope
of work and extend the Agreement for a period of two (2) years; and
C. On December 21, 2020, the Parties executed Amendment No. 3 to the Agreement
to change the scope of work; and
D. The Parties desire to alter the Agreement's scope of work to change the
supplemental labor fee schedule and extend the Agreement for a period of two (2) years; and
E. The Parties have negotiated and agreed to a supplemental fee schedule, which is
attached and incorporated by this reference as Exhibit "A", Revised Fee Schedule.
NOW, THEREFORE, in consideration of these recitals and the mutual covenants
contained herein, CMWD and Contractor agree as follows:
1. That the Agreement, as may have been amended from time to time, is hereby
extended for a period of two (2) years, ending on April 13, 2024, on a time and materials basis
not-to-exceed three hundred thirty-six thousand four hundred sixteen dollars ($336,416).
2. All other provisions of the Agreement, as may have been amended from time to
time, will remain in full force and effect.
3. All requisite insurance policies to be maintained by the Contractor pursuant to the
Agreement, as may have been amended from time to time, will include coverage for this
Amendment.
/II
/II
/II
April 5, 2022
General Counsel Approved Version 1 /30/13
Item #5 Page 7 of 10
DocuSign Envelope ID: FC9C541F-348C-4BDF-ADC8-4BD13388A8FD
UTIL 1400
4. The individuals executing this Amendment and the instruments referenced in it on
behalf of Contractor each represent and warrant that they have the legal power, right and actual
authority to bind Contractor to the terms and conditions of this Amendment.
CONTRACTOR
NVS, INC., a California corporation
By:
By:
(sign here)
Carmen Kasner,
Regional Managing Director
(print name/title)
(sign here)
(print name/title)
CARLSBAD MUNICIPAL WATER
DISTRICT, a Public Agency organized
under the Municipal Water Act of 1911 ,
and a Subsidiary District of the City of
Carlsbad ~
By ~~
ATTEST:
f!+L_
for Faviola Medina,
City Clerk Services Manager
If required by CMWD, proper notarial acknowledgment of execution by contractor must be
attached. If a corporation, Agreement must be signed by one corporate officer from each of the
following two groups.
Group A
Chairman,
President, or
Vice-President
Group B
Secretary,
Assistant Secretary,
CFO or Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant
secretary under corporate seal empowering the officer(s) signing to bind the corporation.
APPROVED AS TO FORM:
CELIA A BREWER, General Counsel
By: ___ ~-'---..........____ __ _
Assistant General Counsel
General Counsel Approved Version 1/30/13
2
April 5, 2022 Item #5 Page 8 of 10
DocuSign Envelope ID: FC9C541F-348C-4BDF-ADC8-48D13388A8FD
UTIL 1400
EXHIBIT "A"
REVISED FEE SCHEDULE
2022 CHARGE RATE SCHEDULE
Office:
Technical Services
Engineering Aide/Planning Aide ............................................................................................................. $62.00/hour
Project Assistant .......................................................................................................................................... $79.00/hour
Project Administrator ............................................................................................................................... $102.00/hour
CADD Technician II ................................................................................................................................ $113.00/hour
CADD Technician III .............................................................................................................................. $124.00/hour
Senior CADD Technician/Designer ..................................................................................................... $147.00/hour
Professiona I
Junior Engineer/Planner/Surveyor ....................................................................................................... $113.00/hour
Assistant Engineer/Planner/Surveyor .................................................................................................. $125.00/bour
Principal Geologist .................................................................................................................................... $203.00/hour
Senior Geologist ........................................................................................................................................ $170.00/hour
Project Geologist ....................................................................................................................................... $158.00/hour
Senior Engineer/Planner/Surveyor ....................................................................................................... $180.00/hour
Project Manager ......................................................................................................................................... $220.00/hour
Principal ...................................................................................................................................................... $288.00/hour
Field
Surveying
1-Person Survey Crew (GPS) (Robotic) ................................................................................................ $209.00/hour
1-Person Survey Crew .............................................................................................................................. $166.00/hour
2-Person Survey Crew .............................................................................................................................. $285.00/hour
3-Person Survey Crew .............................................................................................................................. $378.00/hour
Survey Manager ......................................................................................................................................... $215.00/hour
Expenses
Plotting and In-House Reproduction .................................................................................................................... Cost
Other Expenses -Including Subconsultants & Purchased Services through Subcontracts ............. 1.10 x Cost
Mileage -Outside Local Area .................................................................................................. Per Accepted IRS Rate
Rate are effective through December 2023. If contract assignment extends beyond that date, a new rate
schedule will be added to the contract. Rates based on "Prevailing Wage" (PW) for Construction
Management and Surveying will be determined by Project and County per California law.
General Counsel Approved Version 1/30/13
3
April 5, 2022 Item #5 Page 9 of 10