HomeMy WebLinkAbout2582 DAVIS AVE; ; CBRA2020-0197; PermitBuilding Permit Finaled
(City of
Carlsbad
Residential Associated Permit
Print Date: 10/13/2021
Job Address: 2582 DAVIS AVE, CARLSBAD, CA 92008-1451
Permit Type: BLDG-Associated Permit Residential Work Class:
Parcel#: 1552520600 Track#:
Valuation: $81,360.00 Lot#:
Occupancy Group:
#of Dwelling Units: 1
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Project Title:
Project#:
Plan#:
Construction Type:
Orig. Plan Check#:
Plan Check#:
Description: LUEBBERT: 480 SF ATTACHED ADU
Applicant:
JAMES CHINN
2120 JIMMY DURANTE BLVD, # 114
DEL MAR, CA 92014-2215
(858) 755-5863
FEE
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
Property Owner:
D L FAMILY TRUST
2580 DAVIS AVE
CARLSBAD, CA 92008
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
561473 GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1 -Medium BLDG
SWPPP PLAN REVIEW FEE TIER 1-MEDIUM
Second Dwelling Unit
Total Fees: $1,213.34 Total Payments To Date: $1,213.34
Building Division
Permit No: CBRA2020-0197
Status:
Applied:
Issued:
Fina led Close Out:
Inspector:
Final Inspection:
Balance Due:
Closed -Finaled
10/05/2020
12/07/2020
PB urn
10/13/2021
AMOUNT
$547.76
$0.00
$43.00
$175.00
$52.00
$80.00
$4.00
$10.58
$246.00
$55.00
$0.00
Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
' : /: PERNIJ:.INSPECTION HISTORY for {CBltA2020•0197)
Application Date: 10/05/2020 Owner: TRUST D L FAMILY TRUST Permit Type: BLDG-Associated Permit Residenti,
Werk Class: Second Dwelling Unit Issue Date: 12/07/2020 Subdivision: SUNNY SLOPE TRACT POR OF
Status:
Scheduled
Date
08/13/2021
10113/2021
Closed -Finaled Expiration Date: 02/09/2022 Address: 2582 DAVIS AVE
IVR Number: 29136 CARLSBAD, CA 92008-1451
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
Status
Checklist Item COMMENTS
BLDG-Building Deficiency
08113/2021 BLDG-17 Interior
Lath/Drywall
164135-2021 Passed Tony Alvarado
Checklist Item
BLDG-Building Deficiency
COMMENTS
August 13, 2021: (virtual inspection).
1. No drywall Building Deficiencies.
2. Drywall/gypsum board; type, size, and
method of attachment-approved.
10/13/2021 BLDG-Final Inspection
Checklist Item
168378-2021
COMMENTS
Passed Chris Renfro
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
Passed
Yes
Passed
Yes
Passed
Yes
Yes
Yes
Yes
Yes
Complete
Complete
Wednesday, October 13, 2021 Page 2 of 2
Building Permit Inspection History Finaled
(city of
Carlsbad
A)fi' ', 'f}{t;,,:;,,i;'."fbj", ~ ,',' , "~ 0 \0/ ',
· ,;tffli: ,MIT INl~ECTION ~I TORM.for Gf.:tM202Q-0197) ,
Permit Type: BLDG-Associated Permit Residenti, Application Date: 10/05/2020 Owner: TRUST D L FAMILY TRUST
Work Class: Second Dwelling Unit Issue Date: 12/07/2020 Subdivision: SUNNY SLOPE TRACT POR OF
Status: Closed -Finaled Expiration Date: 02/09/2022 Address: 2582 DAVIS AVE
IVR Number: 29136 CARLSBAD, CA 92008-1451
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
11/17/2020 11/17/2020 BLDG-SW-Pro-Con 143876-2020 Passed Paul Burnette Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
12/08/2020 12/08/2020 BLDG-11 145661-2020 Partial Pass Chris Renfro Reinspection Incomplete
F ou n datlo n/Ftg/Plers
(Robar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Partial pass on first pour of ADU and No
addition foundation. Second pour is
pending. Need hold downs and anchor
bolts in place.
01/07/2021 01/07/2021 BLDG-Gas Meter 147720-2021 Cancelled Chris Renfro Reinspection Incomplete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
01/20/2021 01/20/2021 BLDG-22 Sewer/Water 148605-2021 Passed Paul Burnette Complete
Service
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
02/08/2021 02/08/2021 BLDG-11 149978-2021 Passed Chris Renfro Complete
F oundatlon/Ftg/Piers
(Robar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
08/03/2021 08/03/2021 BLDG-84 Rough 163412-2021 Failed Paul Burnette Reinspection Incomplete
Combo(14,24,34,44)
Checklist 1tem COMMENTS Passed
BLDG-Building Deficiency No
BLDG-14 No
Frame-Steel-Botting-Welding
(Decks)
BLDG-24 Rough-Topout No
BLDG-34 Rough Electrical No
BLDG-44 No
Rough-Ducts-Dampers
08/09/2021 08/09/2021 BLDG-16 Insulation 163787-2021 Passed Chris Renfro Complete
Wednesday, October 13, 2021 Page 1 of 2
·-GEOTECHNICAL EXPLORATION, INC.
City O 4no11•1v SOIL & FOUNDATION ENGINEERING
~ Ree GROUNDWATER • ENGINEERING GEOLOGY
FEB o s to11 nr,r. C 1
FIELD REPORT ON OBSERVATION oFYoJW,o 0P¥TE: 'r1 AtJ C.. I
BUILDING DIVISION
/ TIME: I l : 3 c>
CLIENT: /J .. "'L Uc..~Lc.,.../-JOBN0.-Zu•f3oz..s
PROJECT NAME: l.,t. Lt(./+ ~((i.: tl,...y_ .AblA LA J.J. . .J ··""
_-z._-s-.=....-,,c_i o=-----~~ .... _.._, _____:_A____._11 __ L.'-----_1 ____.c:c=---, ,_4> '-=---•...;c__,.A~, CA:-PROJECT ADDRESS:
□
□
The footing excavations listed below were bottomed ~aterial for which the bearing values
recommended in the foundation report are applicable. X"
The cast-in-place drilled friction piles listed below penetrated material for w hich the
al lowable supporting capacities recommended in the foundation report are applicable. The
piles were excavated to diameters at least as large as specified and the excavations extended
at least to the depths indicated on the Foundation Plans.
The excavations for the cast-in-place belled piers listed below were bottomed on material for
which the bearing values recommended in the foundation report are applicabl e. The
excavations were at least as large as specified on the Foundation Plans.
The driven piles listed below were observed to be driven to the specified lengths and/or D driving resistances to obtain the supporting capacities recommended in the foundation
report. /· I { £, s,-l '\. {} •
ALSt.t""A:-~ Based upon observations, it is our opinion that the foundation recommendations presented-i-n,tbe
v ~repoft .. ~e..f.o:U-fl0'!tti~r.i.v.~~' Job No."lll .,, o '--1>, dated 7. oz.,h 9ee}/(are
~,;"'') 1 • not) appli~abli to the conditions observed. Foundation Plans by ~""-~'-•e." ~ ,
"' -1, .. ~'"""' dated ql2 1 _,-.. were used as a reference for our observations .
... tM~ l .
t V< ' '4. -l-,. ._ I<-.:,.,.,...>· 1'( v=;:;j_:~'s'. o~sw.<A. -,At:,v._/ AJJ..·ct.-..,,
MQQr,~nn11?AM 1/00
M;J,U,-f~t,'Dr: (r:"•Ai:-'~ g...,-\ -k1t~4\ /.,o,4:,..~ a,:l((.,\"-l:~
o..,.. <A. Wc.d, , .._. :l.L.kM A 5 f .. I. ,. J. !j LI) ( "-.. ~ , -z. " )
#,c,.,,Jt.A O)'\. 5v.+ .. Lfc.. dot.\.f!".••,+".,,( 'f,;·1/ s,~ls
~OT\~b,~t~~~ repo~~ • .to,.t~•f ~; Zo~stitu: :~ appr~}. ~ :f fo~ :d:t:Jl~at~! :; : sf.
footing size or depth, reinforcement, or foundation design. v I d
Loose, soft, or disturbed soils must be removed prior to placement of reinforcement or < t"" (
concrete. ,,,I,~
The opinions and recommendations presented in this repo~w?re based upon our observa-I/
2.
tions and are presented in accordance w ith g neraiiy)'a·ccepted professional engineering
practice. We make no other warranty, either expres i'nl lid.
3.
7420 Trade St. San Diego, Ca . 92121 • (858) 549-7222 • FAX: (858) 549-1604
{_ tb '/ 8/z.•
Job Name -~~--'-1-f~-~..........._u~·-c,\e_4_ua.., ____ Job # 20 -'3oi..s Date ___.___.__., '------'---'------II
0.1\. rr C
ol . -t: ' tA Q4".o u
~ ~. <-1-.-Glr .. ,...l
,J u
( ro1,,
wl
' u
0 ,J
Recommendation: _l:....:cl:.....:.l_-=-=::....:..:::..::..=-• ::...::· ~.i.:..-,,..,:....:.,.-_..;:.../.=.,0::...:~..:...:""'c=..-=-t -~//c--=-0 -----'' "°'....:..::~..:_-<::...c......... _____ ---1
J " J u
V
11 Oo, l:,,.,r.c..r ~ u
f -..&. q,<,,,.,I • co u ~
By:
r/1~. j
--;-~-,;;;;;;:--c=~~;:_-----Received by: ------------~ I
7420 Trade St. San Diego, CA 92121 • (858) 549-7222 • FAX: (858) 549-1604 • E-mail: geotech@gei-sd.com
GEOTECHNICAL EXPLORATION, INC.
SOIL & FOUNDATION ENGINEERING
GROUNDWATER • ENGINEERING GEOLOGY
It./ t 4
DATE: 17..,/ '::!/-..,, If
TIME: ~ />~
p~t,iof4~sbad
DEC O 9 2020
CLIENT: ~..,c ( v~ llt.a'tiLDING DIVISION JOB NO. Zo -("30-z.g
PROJECT NAME: _l_..,_~ _t_L_t.. .,_~ _ ___._R__.:_;'-::........,'L..__A______,,_~_L-\..-1-/_A_:_J...._vl____::_:__~ ~..:.._:___.::._"""-~-
' PROJECT ADDRESS: ~~-" Av<
□
□
□
The footing excavations listed below were bottomed on material for which the bearing values
recommended in the foundation report are applicable. *
The cast-in-place drilled friction piles l isted below penetrated material for which the
allowable supporting capacities recommended in the foundation report are applicable. The
piles were excavated to diameters at least as large as specified and the excavations extended
at least to the depths indicated on the Foundation Plans.
The excavations for the cast-in-place belled piers listed below were bottomed on material for
which the bearing values recommended in the foundation report are appl icable. The
excavations were at least as large as specified on the Foundation Plans.
The driven piles listed below were observed to be driven to the specified lengths and/or
driving resistances to obtain the supporting capacities recommended in the foundation
report. ~~ ... .{ .,..; ;,~,~
Based upon observations, it is our opinion that the foundation recommendations fli:e5-enl'.e€1-iLthe
/ 1 r..ep.9c~~-uu~-fe,~gatio□ jn\lestigatioo, Job No.'?..o -r,0 '2 8 , dated t..o L-u (a re)/(are ~~~,v .... -t,·...._~ not) applicab to the conditions observed. Foundation Plans by T,...,~, (J.,,',.,,. ~ t,.,
1 •~ dated 'f 'Lt .) were used as a reference for our observations.
o-_\,,.~ Jc..,.,..._
Cw,.'> ,., l., ... ' .
«,..J... "..,r J-~.tA."' -:k_ ~1.'"' ., ~ o ~ ~ t.. r "'Lcl E 5;,t ... ,....., 'jc_ ~ <:. ; ~ 11'-V', 0
rc.,c.~ At),(A./AclcA.,+;""".. t~, + J No rtk °'-"-":\ Sov"'"t~
? e_ r: & ._+ Y::: & .J. 0,,' .J,1/>,::c,<pl (-..(_ • \.,, ' &O,d oh.ti_
... ,v.,: I\ : .. • ,,, i r z ,J .-o -/. s., . :f.-. LI,. /or.,,,,.:1.,_ ...,_/__ s: o: <>
NOTE:
1 The observations reported above do not constitute an approval of foundation location,
footing size or depth, reinforcement, or foundation design.
2 Loose, soft, or disturbed soils must be removed prior to placement of reinforcement m
concrete.
3 The opinions and recommendations presented in this reoOJCI..-\Ne.re based upon our observaa
tions and are presented in accordance with gene y accepted professional engineering
practice. We make no other warranty, either express r impli
7 420 Trade St. San Diego, Ca. 9212 1 • (858) 549--7222 • FAX: (858) 549-1604
ro 1-11\. l
GEOTECHNICAL EXPLORATION, INC.
SOIL & FOUNDATION ENGINEERING e
GROUNDWATER e ENGINEERING GEOLOGY
.._ rr. or
7420 Trade St. San Diego, CA 92121 • (858) 549-7222 • FAX: (858) 549-1604 • E-mail: geotech@gei-sd.com