Loading...
HomeMy WebLinkAbout2021-12-30; Clean Energy Alliance JPA; ; Consider Adoption of Resolution No. 2021-017, Amending Resolution No. 2021-007, Setting Rates for Clean Energy Alliance~ CLEAN ENERGY ALLIANCE DATE: TO: FROM: ITEM4: Staff Report December 30, 2021 Clean Energy Alliance Board of Directors Barbara Boswell, Chief Executive Officer Consider Adoption of Resolution No. 2021-017, Amending Resolution No. 2021-007, Setting Rates for Clean Energy Alliance RECOMMENDATION Adopt Resolution No. 2021-017, amending Resolution No. 2021-007, setting rates for Clean Energy Alliance and authorize staff to adjust the rate schedule as appropriate to ensure all rates are treated equitably regarding achieving savings compared to the San Diego Gas & Electric 2022 rate schedules. BACKGROUND AND DISCUSSION At its March 4, 2021 meeting, the Clean Energy Alliance (CEA) Board set initial rates that are charged to customers for energy consumed through adoption of Resolution No. 2021-007. CEA's rates are set to achieve the following goals: • Generate revenue sufficient to cover costs • Provide funds to meet financial reserve policy of minimum 5% contribution per year • Meet credit facility covenants • Maintain competitiveness with San Diego Gas & Electric (SDG&E) o Target 2% customer savings on generation related costs as calculated on CEA's Clean Impact power supply product • Provide rate stability-minimize rate changes For ease in customer understanding and comparison to SDG&E, CEA mirrors SDG&E rate schedules including time-of-use periods. In developing rates, CEA begins with SDG&E's rate schedules, deducts exit fees that SDG&E charges CEA customers, and then applies a 2% discount. CEA analyzes the resulting revenue generated by these rates to determine revenue sufficiency. If rates are not sufficient to cover operating costs, the discount is adjusted until revenue sufficiency is achieved. SDG&E's rates are approved by the California Public Utilities Commission (CPUC) through its Energy Resource Recovery Account (ERRA) application. The application for 2022 rates was initially submitted to the CPUC in May 2021, was amended in November 2021 to update assumptions used in determining SDG&E's revenue requirements and resulting rate adjustment and finally approved through the CPUC final decision on December 16, 2021. Through this lengthy process, SDG&E actual rate schedules are not December 30, 2021 Rate Adjustment Page 2 of3 made available until after final CPUC approval, however, CEA used t he system average changes as reflected in SDG&E's ERRA filings to prepare t he recommended CEA rate schedules. The result ing CEA rate schedule, based on using SG&E's system average rate adjustment, meets CEA's rate setting goals including maintaining t he 2% discount on the Clean Impact power supply product. Since the rate adjustment is only in effect for part of FY 2022, and would be reflected in the lower winter rates, the revenue does not fully recover costs for FY 2022. Staff will be presenting a credit solution that provides the necessary f unds at a future agenda item. Impact of Rate Change -Average Residential Customer The tables below summarize the impact of proposed rate change for an average residential customer for the two Power Charge Indifference Adjustment (PCIA) vintages (2020 for the Carlsbad and Del Mar customers and 2017 for Solana Beach). The comparison is based on comparing CEA's Clean Impact, 50% minimum renewable power supply to SDG&E's 31.3% base power supply product (Per SDG&E's 2019 Power Content label, the most current information available). 2020 PCIA Vintage -Carlsbad & Del Mar Customers Rate: Residential DR CUn-..tRatas PrapmedRatas Eff 3/J./21 Eff1/1/22 "a. .. CEA SDG&E CEA SDG&E CEA SDG&E Generation $ 30.13 $ 45.80 $ 37.75 $ 49.64 SDG&E PCA & FF $ 14.64 $ 10.90 Total Generation Related Costs $ 44.n $ 45.80 $ 48.65 $ 49.64 8.67" 8.38% SDG&E Delivery • $ 71..26 $ 71..26 $ 71.26 $ 71..26 TOTAL AVERAGE MONTHLY BILL $ 116.(B $117.06 $ 119.91 $ 120.90 3.34" 3.28" GENERATION a>ST SAVINGS -2.25" -1..99% TOTAL BILL SAVINGS -0.88% -0.82" * Delivery charges are kept constant to isolate the impact of the generation cost changes. For Carlsbad & Del Mar residential customers in the 2020 PCIA vintage, the average customer will have an approximately 3.3% increase in their total bill, or an average $3.88 per month. The generation cost savings is maintained at the target 2% savings. 2017 PCIA Vintage -Solana Beach Customers Rate: Residential DR OlnntRata Eff3/l/D CEA SDG&E Generation $ 30.13 $ 45.80 SDG&E POA & FF $ 16.78 Total Generation Related Casts $ 46.91 $ 45.80 SDG&E Delivery • $ 71.26 $ 71.26 TOTAL AVERAGE MONTHLY Bill $ 118.17 $117.06 GENERATION a>ST SAVINGS 2.42" TOTAL BILL SAVINGS 0.95" PrapmedRata Eff1/1/22 CEA SDG&E $ 37.75 $ 49.64 $ 8.75 $ 46.50 $ 49.64 $ 71.26 $ 71.26 $ 117.76 $ 120.90 -6.33% -2.60% December 30, 2021 Rate Adjustment Page 3 of3 "a. .. CEA SDG&E -0.87" 8.38% -035% 3.28" Solana Beach customers in the 2017 PCIA vintage will see an average bill decrease of .35% or $.41. Generation related costs in 2021 were at an average 2.42% premium to SDG&E and will be at a 6.33% discount for 2022. All customers, regardless of PCIA vintage, pay the same generation costs to CEA, the difference in bill is due to the differences in the PCIA that SDG&E charges CEA customers. CEA staff will review SDG&E's actual rate schedules once available and compare to assumptions used in developing the rate schedules proposed to the CEA Board for adoption. Staff recommends CEA Board direct staff to make any appropriat e adjustment to the adopted rate schedule to ensure equit y among the various rates regard ing comparability to SDG&E (e.g., each rate has the same discount compared to SDG&E). FISCAL IMPACT The proposed rates generate sufficient revenue to cover costs in the future fiscal years when rates are effective a full year. For FY 2021/22, a credit solution will be needed to ensure sufficient funds are available for expenses through fiscal year end which will be presented to the Board at a future agenda item. ATTACHMENTS Resolution No. 2021-017, Amending Resolution No. 2021-007, Setting Rates for Clean Energy Alliance 2022 Proposed Rate Schedule DocuSign Envelope ID: 93838166-FAFE-46CB-AF56-BC06000CCB3A CLEAN ENERGY ALLIANCE RESOLUTION NO. 2021-017 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CLEAN ENERGY ALLIANCE AMENDING RESOLUTION NO. 2021-007, SETTING RATES FOR CLEAN ENERGY ALLIANCE WHEREAS, the Clean Energy Alliance (CEA) is a joint powers agency formed on November 4, 2019, under the Joint Exercise of Power Act, California Government Code section 6500 et seq., among the Cities of Carlsbad, Solana Beach and Del Mar created by the cities of Carlsbad, Del Mar, and Solana Beach; and WHEREAS, Section 4.6 of the Joint Powers Authority (JPA) Agreement establishes the specific responsibility of the CEA Board of Directors to adopt retail rates for power; and WHEREAS, Section 6.5 of the JPA Agreement states CEA's power supply base product will be greater than or equal to 50% qualified renewable resources and the Board shall establish other product offerings; and WHEREAS, CEA established initial rates through adoption of Resolution 2021-007; and WHEREAS, the CEA Board desires to amend Resolution No. 2021-007 and set rates to ensure revenues sufficient to cover costs and comparability with San Diego Gas & Electric rates. NOW, THEREFORE, BE IT RESOLVED, by the Board of Directors of the Clean Energy Alliance, as follows: Section 1. The Board of Directors of the Clean Energy Alliance hereby approves CEA Rates as detailed in Exhibit A. 1 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A The foregoing Resolution was approved and adopted this 30th day of December 2021, by the following vote: AYES: Druker, Inscoe, Musgrove, Bhat-Patel, Becker NOES: None ABSENT: None APPROVED : Kri sti Becker, Chair ATTEST: ~ DocuSlgned by: ~£.-~ 087CF7B87878476 ... Sheila Cobian, Interim Board Secretary 2 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A CLEAN ENERGY ALLIANCE PROPOSED RATES EFFECTIVE JANUARY 1, 2022 Exhibit A The rates below reflect Clean Energy Alliance's (CEA) generation rate, and do not include San Diego Gas & Electric (SDG&E) delivery charge, General Municipal Surcharge (GMS), or the Power Charge Indifference Adjustment (Exit Fees) on SDG&E's CCA-CRS rate tariff. Information for these charges can be found at www.sdge.com. SDG&E to SDG&E Rate Mapping The table below maps SDG&E rates to CEA rates SDG&E RATE CEA RATE RESIDENTIAL Schedule DR-LI and Medical Baseline Customers DR-LI-MB DR-TOU, DR-TOU-CARE, DR-TOU-MB DR-TOU DR-SES, DR-SES-CARE, DR-SES-MB DR-SES EV-TOU EV-TOU EV-TOU-2, EV-TOU-2-CARE, EV-TOU-2-MB EV-TOU-2 EV-TOU-5, EV-TOU-5-CARE, EV-TOU-5-MB EV-TOU-5 TOU-DR-1, TOU-DR-1-CARE, TOU-DR-1-MB TOU-DR-1 TOU-DR-2, TOU-DR-CARE, TOU -DR-2-MB TOU-DR-2 TOU-DR, TOU-DR-CARE, TOU-DR-MB TOU-DR DR-SES (Grandfathered) G-DR-SES EV-TOU (Grandfathered) G-EV-TOU EV-TOU-2, EV-TOU-2-CARE, EV-TOU-2-MB (Grandfathered) G-EV-TOU-2 TOU-DR, TOU-DR-CARE, TOU-DR-MB (Grandfathered) G-TOU-DR COMMERCIAL/INDUSTRIAL TOU-A TOU-A-S TOU-A TOU-A-P TOU-A-LI, TOU-A-2-LI, TOU-M -LI E-LI-TOU AL-TOU-LI, DG-R-LI E-LI-NR TOU-A-2 -Secondary TOU-A-2-S TOU-A-2 -Primary TOU-A-2-P TOU-A-3 -Secondary TOU-A-3-S TOU-A-3 -Primary TOU-A-3-P TOU-M TOU-M A-TC A-TC OL-TOU OL-TOU AL-TOU -Secondary AL-TOU-S AL-TOU -Primary AL-TOU-P AL-TOU -Transmission AL-TOU-T AL-TOU-2 -Secondary AL-TOU-2-S AL-TOU-2 -Primary AL-TOU-2-P DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A SDG&E RATE AL-TOU-2 -Transmission DG-R -Secondary DG-R -Primary DG-T -Transmission A6-TOU -Primary A6-TOU -Transmission TOU-M (Grandfathered) OL-TOU (Grandfathered) TOU-A (Grandfathered) -Secondary TOU-A (Grandfathered) -Primary AL-TOU (Grandfathered) -Secondary AL-TOU (Grandfathered) -Primary AL-TOU (Grandfathered) -Transmission DG-R (Grandfathered) -Secondary -DG-R (Grandfathered) -Primary DG-R (Grandfathered) -Transmission A6-TOU (Grandfathered) -Primary A6-TOU (Grandfathered) -Transmission PUMPING/AGRICULTURE TOU-PA<20kW -Secondary TOU-PA<20kW -Primary TOU-PA-2>=20kW-Secondary TOU-PA-2>=20kW-Primary TOU-PA-3<20kW -Secondary TOU-PA-3<20kW -Primary TOU-PA-3>=20kW -Secondary TOU-PA-3>=20kW-Primary PA-T-1 -Secondary PA-T-1 -Primary PA-T-1 -Transmission PA-T-1 (Grandfathered) -Secondary PA-T-1 (Grandfathered) -Primary PA-T-1 (Grandfathered) -Transmission TOU-PA<20kW (Grandfathered) -Secondary TOU-PA<20kW (Grandfathered) -Primary TOU-PA>=20kW (Grandfathered) -Secondary TOU-PA>=20kW (Grandfathered) -Primary LIGHTING LS-1, LS-2, LS-3, OL-1, DWL and LS-2 DS Ol-2 LS-2 AD CEA Proposed Rate Schedule Effective January 1, 2022 CEA RATE AL-TOU-2-T DG-R-S DG-R-P DG-R-T A6-TOU-P A6-TOU-T G-TOU-M G-OL-TOU G-TOU-A-S G-TOU-A-P G-AL-TOU-S G-AL-TOU-P G-Al-TOU-T G-DG-R-S G-DG-R-P G-DG-R-T G-A6-TOU-P G-A6-TOU-T TOU-PA-S TOU-PA-P TOU-PA-2-S TOU-PA-2-P TOU-PA-3-S<20kW TOU-PA-3-P<20kW TOU-PA-3-S>=20kW TOU-PA-3-P>=20kW PA-T-1-S PA-T-1-P PA-T-1-T G-PA-T-1-S G-PA-T-1-P G-PA-T-1-T G-TOU-PA-S G-TOU-PA-P G-TOU-PA-2-S G-TOU-PA-2-P LS OL-2 LS-2-AD 2 DocuSign Envelope ID: 93838166-FAFE-46CB-AF56-BC06000CCB3A TIME-OF-USE PERIODS Weekdays Summer June 1-October 31 On-Peak 4pm-9pm Off-Peak 6am-4pm; 9pm -midnight Super Off-Peak Midnight-6am Weekends Summer June 1 -October 31 On-Peak 4pm-9pm Off-Peak 2pm -4pm; 9pm -midnight Super Off-Peak Midnight-2pm GRANDFATHERED TIME-OF-USE PERIODS On-Peak Semi-Peak Off-Peak CEA Proposed Rate Schedule Effective January 1, 2022 Summer June 1-October 31 llam-6pm Monday through Friday, excluding Holidays 6am-llam and 6pm- 10pm Monday through Friday, excluding Holidays 10pm-6am weekdays, and all hours weekends and Holidays Winter November 1 -May 31 4pm-9pm 6am -4pm Excluding 10am-2pm in March & April; 9pm -midnight Midnight-6am 10am -2pm in March & April Winter November 1 -May 31 4pm-9pm 2pm-4pm 9pm -midnight Midnight-2pm Winter November 1 -May 31 N/A 6am-6pm weekdays, and all hours on weekends and Holidays 6pm-6am weekdays, and all hours on weekends and Holidays 3 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A CLEAN ENERGY ALLIANCE RATES CEA RATE TIME-OF-USE PERIOD RESIDENTIAL DR All DR-LI-MB All E-LI-TOU All E-LI-NR All DR-SES On-Peak DR-SES Off-Peak DR-SES Super Off-Peak G-DR-SES (Grandfathered) On-Peak G-DR-SES (Grandfathered) Semi-Peak G-DR-SES (Grandfathered) Off-Peak EV-TOU On-Peak EV-TOU Off-Peak EV-TOU Super Off-Peak G-EV-TOU (Grandfathered) ' On-Peak G-EV-TOU (Grandfathered) Off-Peak G-EV-TOU (Grandfathered) I Super Off-Peak EV-TOU-2 On-Peak -EV-TOU-2 Off-Peak EV-TOU-2 Super Off-Peak G-EV-TOU-2 1 On-Peak (Grandfathered) I G-EV-TOU-2 Off-Peak (Grandfathered) G-EV-TOU-2 Super Off-Peak (Grandfathered) EV-TOU-5 On-Peak EV-TOU-5 Off-Peak EV-TOU-5 Super Off-Pea k TOU-DR-1 On-Peak TOU-DR-1 Off-Peak TOU-DR-1 Super Off-Peak TOU-DR-2 On-Peak TOU-DR-2 I Off-Peak TOU-DR On-Peak TOU-DR Off-Peak TOU-DR Super Off-Peak G-TOU-DR I On-Peak (Grandfathered) CEA Proposed Rate Schedule Effective January 1, 2022 SUMMER RATE WINTER June 1 -October 31 November 1-May 31 Per kWh Per kWh $.15057 $.06334 $.15057 $.06334 $.06169 $.04128 $.07444 $.05044 $.38676 $.06258 $.10523 $.05244 $.04025 $.04122 $.38344 $.38342 $.10447 $.10839 $.09277 $.38676 $.06258 $.10523 $.05244 $.04025 $.04122 $.33252 $.08824 $.31188 $.07982 $.06908 $.06781 $.38676 $.06258 $.10523 $.05244 $.04025 $.04122 $.32796 $.08404 $.28762 $.08305 $.06908 I $.06781 $.38676 $.06258 $.10523 $.05244 $.04025 $.04122 $.35487 $.07591 $.09513 $.06428 $.03510 $.05138 $.35487 $.07591 $.07238 $.05859 $.22978 $.06194 $.16515 $.05188 $.10116 $.04072 $.27379 $.07114 4 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A (Grandfathered) G-TOU-DR Off-Peak (Grandfathered) COMMERCIAL/INDUSTRIAL TOU-A-S On-Peak TOU-A-S Off-Peak G-TOU-A-S On-Peak (Grandfathered) G-TOU-A-S Semi-Peak (Grandfathered) G-TOU-A-S I Off-Peak (Grandfathered) TOU-A-P On-Peak TOU-A-P Off-Peak G-TOU-A-P On-Peak (Grandfathered) G-TOU-A-P Semi-Peak (Grandfathered) G-TOU-A-P Off-Peak (Grandfathered) TOU-A-2-S On-Peak TOU-A-2-S Off-Peak TOU-A-2-S Super Off-Peak TOU-A-2-P On-Peak TOU-A-2-P Off-Peak TOU-A-2-P Super Off-Peak TOU-A-3-S On-Peak TOU-A-3-S Off-Peak TOU-A-3-S Super Off-Peak TOU-A-3-P On-Peak TOU-A-3-P Off-Peak TOU-A-3-P Super Off-Peak A-TC All TOU-M On-Peak TOU-M Off-Peak TOU-M Super Off-Peak G-TOU-M (Grandfathered) , On-Peak G-TOU-M (Grandfathered) Semi-Peak G-TOU-M (Grandfathered) Off-Peak OL-TOU On-Peak OL-TOU Off-Peak OL-TOU Super Off-Peak CEA Proposed Rate Schedule Effective January 1, 2022 $.2316 l $.04728 $.23526 $.07037 $.11725 $.05365 $.24815 $.07349 $.13522 $.05896 $.04828 $.04976 $.23397 $.06993 $.11655 $.05336 $.24672 $.07302 $.13439 $.05859 $.04791 $.04952 $.31111 $.06836 $.10460 $.05796 $.04627 $.04630 $.30949 $.06794 $.10398 $.05762 $.00000 $.04608 $.23897 $.06837 $.13756 $.05797 $.04589 $.04631 $.23771 $.06795 $.13678 $.05763 $.04556 $.04609 $.05799 $.05799 $.31458 $.06857 $.10539 I $.05814 $.04739 $.04647 $20156 $.07815 $.19549 $.06291 $.05705 $.05329 $.40751 $.08527 $.13429 $.07280 $.05778 $.05897 5 DocuSign Envelope ID: 93838166-FAFE-46CB-AF56-BC06000CCB3A CEA RATE TIME-OF-USE PERIOD G-OL-TOU On-Peak (Grandfathered) G-OL-TOU Semi-Peak ( Grandfathered) G-OL-TOU Off-Peak ( Grandfathered) AL-TOU-S DEMAND On-Peak AL-TOU-S On-Peak AL-TOU-S Off-Peak AL-TOU-S Super Off-Peak G-AL-TOU-S DEMAND On-Peak ( Grandfathered) G-AL-TOU-S On-Peak (Grandfathered) G-AL-TOU-S Semi-Peak (Grandfathered) G-AL-TOU-S Off-Peak (Grandfathered) AL-TOU-P DEMAND On-Peak AL-TOU-P On-Peak AL-TOU-P Off-Peak AL-TOU-P Super Off-Peak G-AL-TOU-P DEMAND On-Peak ( Grandfathered) G-AL-TOU-P On-Peak (Grandfathered) G-AL-TOU-P Semi-Peak ( Grandfathered) G-AL-TOU-P Off-Peak ( Grandfathered) AL-TOU-T DEMAND On-Peak AL-TOU-T On-Peak AL-TOU-T Off-Peak AL-TOU-T Super Off-Peak G-AL-TOU-T DEMAND On-Peak ( Grandfathered I 1--'- G-AL-TOU-T , On-Peak I (Grandfathered) G-AL-TOU-T Semi-Peak ( Grandfathered) G-AL-TOU-T Off-Peak (Grandfathered) I AL-TOU-2-S DEMAND On-Peak CEA Proposed Rate Schedule Effect ive January 1, 2022 SUMMER RATE WINTER June 1-October 31 November 1 -May 31 Per kWh Per kWh $.26036 $.09291 $.24216 $.07508 $.07489 I $.06422 I $13.25 $0 I $.13677 $.11279 $.11000 $.09720 $.07845 $.07991 $7.55 $0 $.12995 I $.12572 $.12212 $.10294 $.09183 I $.08907 I $13.19 $0 $.13599 I $.11214 $.10937 $.09670 $.07809 $.07957 $7.50 $0 s .12913 I $.12500 $.12142 $.10237 $.09140 $.08868 $12.62 $0 $.12904 $.10634 $.10362 $.09166 $.07390 $.07533 $7.17 $0 s.12221 I $.11853 $.11517 $.09704 $.08665 $.08406 I $23.17 $0 6 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A CEA RATE TIME-OF-USE PERIOD AL-TOU-2-S On-Peak AL-TOU-2-S Off-Peak AL-TOU-2-S Super Off-Peak AL-TOU-2-P DEMAND On-Peak AL-TOU-2-P On-Peak AL-TOU-2-P Off-Peak AL-TOU-2-P Super Off-Peak AL-TOU-2-T DEMAND On-Peak AL-TOU-2-T On-Peak AL-TOU-2-T Off-Peak AL-TOU-2-T Super Off-Peak DG-R-S On-Peak DG-R-S Off-Peak DG-R-S Super Off-Peak G-DG-R-S (Grandfathered) , On-Peak G-DG-R-S (Grandfathered) Semi-Peak G-DG-R-S (Grandfathered) Off-Peak DG-R-P On-Peak DG-R-P Off-Peak DG-R-P Super Off-Peak G-DG-R-P (Grandfathered) On-Peak G-DG-R-P (Grandfathered) Semi-Peak G-DG-R-P (Grandfathered) ' Off-Peak DG-R-T On-Peak DG-R-T Off-Peak ,__ DG-R-T Super Off-Peak G-DG-R-T (Grandfathered) 1 On-Peak G-DG-R-T (Grandfathered) Semi-Peak G-DG-R-T (Grandfathered) Off-Peak AG-TOU-P DEMAND On-Peak A6-TOU-P On-Peak AG-TOU-P Off-Peak AG-TOU-P Super Off-Peak G-AG-TOU-P DEMAND All (Grandfathered) G-A6-TOU-P On-Peak (Grandfathered) G-AG-TOU-P Semi-Peak (Grandfathered) G-A6-TOU-P Off-Peak (Grandfathered) I AG-TOU-T DEMAND On-Peak A6-TOU-T I On-Peak CEA Proposed Rate Schedule Effective January 1, 2022 S!JMMER RATE WINTER June 1-October 31 November 1-May 31 Per kWh Per kWh $.12251 $.09990 $.09816 $.08577 $.06876 $.07009 ---$23.06 $0 $.12179 $.09932 $.09758 $.08530 $.06844 $.06977 $22.07 $0 $.11546 $.09406 $.09233 $.08074 $.06463 $.06592 $.40619 $.08533 $.19946 $.07284 $.12199 $.05898 $.26901 $.09783 $.25370 $.06144 $.11735 $.06792 $.40555 $.08482 $.19873 I $.07243 $.12171 $.05870 $26833 $.09723 $.25303 $.07878 I $.11697 $.06759 $.39991 $.08016 $.19210 $.06839 $.11836 $.05530 $.26264 $.09196 $.24739 $.07443 $.11273 $.06383 $13.19 $0 $.13599 $.11214 $.10937 $.09670 $.07809 $.07957 $7.50 $0 $.12913 $.12500 $.12142 $.10237 $.09140 I $.08868 $12.62 $0 $.12904 $.10634 7 DocuSign Envelope ID: 93838166-FAFE-46C8-AF56-8C06000CCB3A CEA RATE TIME-OF-USE PERIOD A6-TOU-T Super Off-Peak G-A6-TOU-T DEMAND All (Grandfathered) G-A6-TOU-T On-Peak (Grandfathered) G-A6-TOU-T Semi-Peak (Grandfathered) G-A6-TOU-T Off-Peak (Grandfathered) PUMPING & AGRICULTURE TOU-PA-S 1 On-Peak TOU-PA-S Off-Peak G-TOU-PA-S On-Peak (Grandfathered) G-TOU-PA-S Semi-Peak (Grandfathered) G-TOU-PA-S Off-Peak (Grandfathered) TOU-PA-P On-Peak TOU-PA-P Off-Peak G-TOU-PA-P On-Peak (Grandfathered) G-TOU-PA-P Semi-Peak (Grandfathered) G-TOU-PA-P Off-Peak (Grandfathered) TOU-PA-2-S DEMAND On-Peak TOU-PA-2-S On-Peak TOU-PA-2-S Off-Peak TOU-PA-2-S Super Off-Peak G-TOU-PA-2-S 1 On-Peak DEMAND (Grandfathered! G-TOU-PA-2-S On-Peak (Grandfathered) G-TOU-PA-2-S Semi-Peak (Grandfathered) G-TOU-PA-2-S Off-Peak (Grandfathered) TOU-PA-2-P DEMAND On-Peak TOU-PA-2-P On-Peak TOU-PA-2-P , Off-Peak TOU-PA-2-P Super Off-Peak G-TOU-PA-2-P On-Peak DEMAND (Grandfathered) CEA Proposed Rate Schedule Effective January 1, 2022 SUMMER RATE WINTER June 1-October 31 November 1-May 31 Per kWh Per kWh $,07390 I $.07533 $7.17 $0 $.12227 I $.11853 $.11517 $.09704 $.08665 $.08406 -- $.18316 I $.05676 $.09261 $.04238 $.23006 $.05934 $.09791 $.04752 $.04508 $.04033 $.18215 $.05641 $,09205 I $.04215 $.22875 $.05896 $.09729 I $.04723 $.04474 $.04013 $9.51 $0 $.07965 $.06916 $.06283 $.05922 $.04727 $.04821 $1.06 $0 j $.18038 $.07927 $.09868 $.06446 $.03689 $.05544 $9.47 $0 $.07919 $.06876 $.06244 $.05890 $.04695 $.04799 $1.05 $0 8 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A (Grandfathered) G-TOU-PA-2-P Semi-Peak Grandfathered) G-TOU-PA-2-P Off-Peak (Grandfathered) TOU-PA-3-S<20kW On-Peak TOU-PA-3-S<20kW Off-Peak TOU-PA-3-S<20kW Super Off-Peak TOU-PA-3-P<20kW On-Peak TOU-PA-3-P<20kW Off-Peak TOU-PA-3-P<20kW Super Off-Peak TOU-PA-3-S>=20kW On-Peak DEMAND TOU-PA-3-S>=20kW On-Peak TOU-PA-3-S>=20kW Off-Peak TOU-PA-3-S>=20kW Super Off-Peak TOU-PA-3-P>=20kW I On-Peak DEMAND TOU-PA-3-P>=20kW On-Peak TOU-PA-3-P>=20kW Off-Peak TOU-PA-3-P>=20kW Super Off-Peak PA-T-1-S DEMAND On-Peak PA-T-1-S On-Peak PA-T-1-S Off-Peak PA-T-1-S Super Off-Peak G-PA-T-1-S DEMAND On-Peak (Grandfathered) PA-T-1-S (Grandfathered) On-Peak PA-T-1-S (Grandfathered) Semi-Peak PA-T-1-S (Grandfathered) Off-Peak PA-T-1-P DEMAND On-Peak PA-T-1-P On-Peak PA-T-1-P Off-Peak PA-T-1-P Super Off-Peak G-PA-T-1-P DEMAND On-Peak (Grandfathered) PA-T-1-P (Grandfathered) On-Peak PA-T-1-P (Grandfathered) Semi-Peak PA-T-1-P (Grandfathered) Off-Peak PA-T-1-T DEMAND On-Peak PA-T-1-T On-Peak PA-T-1-T Off-Peak PA-T-1-T Super Off-Peak CEA Proposed Rate Schedule Effective January 1, 2022 $.09806 1 $.06408 $.03659 $.05519 $.21362 $.05536 $.10095 $.04697 $.04084 $.03768 $.21250 $.05501 $.10037 $.04670 $.04055 $.03749 $2.25 $0 $.13779 $.06973 $.10706 $.05974 $.03172 $.04864 $2.24 $0 $.13705 $.06932 $.10645 $.05940 $.03148 $.04842 $5.29 $0 $.09057 $.07941 $.07202 $.06831 $.05497 $.05602 $2.57 $0 $.08463 $.08854 $.07965 $.07233 $.06442 $.06247 $5.27 $0 $.09005 $.07896 $.07160 $.06796 $.05472 $.05578 $2.56 $0 $.08408 $.08801 $.07919 $.07193 $.06412 $.06218 $5.04 $0 $.08537 $.07482 $.06774 $.06438 $.05174 $.05275 9 DocuSign Envelope ID: 93B3B166-FAFE-46CB-AF56-BC06000CCB3A CEA RATE TIME-OF-USE PERIOD G-PA-T-1-T DEMAND On-Peak (Grandfathered) PA-T-1-T (Grandfathered) On-Peak PA-T-1-T (Grandfathered) Semi-Peak PA-T-1-T (Grandfathered) Off-Peak LIGHTING LS All OL-2 All LS-2-AD On-Peak LS-2-AD Off-Peak LS-2-AD Super Off-Peak PREMIUM POWER SUPPLY PRODUCTS Clean Impact Plus Premium -75% Carbon Free Green Impact Premium -100% Renewable ------NET ENERGY METERING Personal Impact -Net Surplus Compensation CEA Proposed Rate Schedule Effective January 1, 2022 SUMMER RATE WINTER June 1-October 31 November 1-May 31 Per kWh Per kWh $2.45 I $0 s.07951 I $.08341 $.07501 $.06814 $.06074 I $.05891 s .06747 I $.05338 $.07911 $.06420 s.24009 I $.07247 $.14046 $.06225 s.o5o39 I $.05080 s.00100 I $.00100 $.00750 I $.00750 $.06 $.06 10